Loading...
HomeMy WebLinkAboutagenda.apz.19920616 IV ...- . ... AGE N D A I ------------------------------------------------------------------ ------------------------------------------------------------------ ASPEN PLANNING AND ZONING COMMISSION REGULAR MEETING June 16, 1992, Tuesday 4:30 P.M. 2nd Floor Meeting Room city Hall ----------------------------------------------------------------- ----------------------------------------------------------------- I. COMMENTS commissioners Planning Staff PUblic\, II. MINUTES III. NEW BUSINESS A. Zaluba 8040 Greenline Approval Non-Compliance, Leslie Lamont IV. ADJOURN , MEMORANDUM TO: Aspen Planning and Zoning Commission FROM: Leslie Lamont, Planning DATE: June 16, 1992 RE: Zaluba 8040 Greenline Approval Noncompliance SUMMARY: In January of 1990 the Planning and -Zoning Commission approved a 8040 Greenline approval for the construction of a single family residence on Lot 3 of the Hoag subdivision. The previous excavation permit for the new access road along with several other permits were issued but have expired. A result of the previous roadway excavation has been the existence of unstable soil conditions and this has impacted the surrounding properties. In addition, there are several conditions of approval that have not been observed with regard to the excavation of the access road. It is the City Attorney's recommendation that the Planning and Zoning Commission schedule a hearing with Mr. Zaluba to review his 1990 8040 Greenline approval, with the potential action of revocation of his 8040 Greenline approval. Staff will provide a full review of violations prior to the meeting with Mr. Zaluba. RECOMMENDATION: Staff recommends that the Planning and Zoning Commission schedule a hearing to re -review 8040 Greenline approval for Hoag Lot 3 with Mr. Zaluba for the July 7, 1992 Commission meeting. BEFORE THE ASPEN PLANNING AND ZONING COMMISSION IN RE THE MATTER OF LOT 3, HOAG SUBDIVISION, A/K/A 1125 UTE AVENUE, JOSEPH S. ZALUBA, APPLICANT NOTICE TO SHOW CAUSE TO: Joseph S. Zaluba 8899 William Cody Drive Evergreen, Colorado 80439 PLEASE TAKE NOTICE AND BE ADVISED that on June 16, 1992, the Aspen Planning and Zoning Commission voted to issue a Notice to Show Cause why the following land use development approval as previously granted on January 2, 1990, should not be revoked and/or modified: 8040 Greenline Approval for a Single -Family House on Lot 3, Hoag Subdivision, City of Aspen, Colorado. Based upon information made available to the Planning and Zoning Commission, reasonable grounds exist to believe that the Applicant, Joseph S. Zaluba, has violated and/or failed to comply with"the'.•fo_ llowin4 terms 'and/or conditions of the 8040 breenline .. Approval: Condition 3. A vertical tie-in wall and boulder wall shall be constructed by the applicant and the plans shall be reviewed and approved by the Planning and Engineering Department$. Condition 4. The applicant shall adhere to the recommenda- tions of Chen -Northern regarding slope stability during the excavation of the road and site and those plans and recommenda- tions shall be reviewed by the Engineering Department. Condition 8 No .spoils or f ill shall' be placed -over the.,-. side of the road cut. All excavated materials shall be remove from the site if not used in the construction -of the residence. Condition 10. The applicant shall revegetate the upper road cut, beginning at the hairpin turn. WHEREFORE, you are directed to appear before the Aspen Planning and Zoning Commission on July 21, 1992, at 4:30 o'clock p.m., at the Second Floor Meeting Room, City Hall, 130 South Galena Street, Aspen, Colorado, and show cause why the land use. development approval as set forth above should not be revoked or 3 modified. The hearing before the Planning and Zoning Commission will be conducted in accordance with the procedures established €' in Section 24-6-205B of the Municipal Code. E Dated thisdayof June, 1992. ASPEN PLANNING AND ZONING COMMISSION Ei j By • l City glerk cc: Marty Pickett 2