Loading...
HomeMy WebLinkAboutagenda.apz.19910702A G E N D A ASPEN PLANNING AND ZONING COMMISSION REGULAR MEETING July 21 1991, Tuesday 4:30 P.M. 2nd Floor Meeting Room City Hall I. COMMENTS Commissioners Planning Staff Public II. MINUTES III. PUBLIC HEARINGS A. Bellina Conditional Use Review for an Accessory Dwelling Unit B. 645 North Mill Street Conditional Use Review for a Satellite Dish (tabled to July 16) IV. PLANNING ITEM A. Red Brick School Site V. ADJOURN a.cov UAKTU032A --Nk I NO yT TO: Aspen Planning and Zoning Commission FROM: Cindy Christensen, Planning Office RE: Upcoming Meetings DATE: June 27, 1991 This is a list of your scheduled upcoming meetings. Regular Meeting, July 16th Aspen Villas PUD Amendment for Trash Enclosure (KJ) (PH) Early Learning Center Conditional Use (DM) (PH) Taylor Change in Use (KJ) Regular Meeting, August 6th 100 Park Avenue Subdivision/PUD GMQS Exemption and Condomiunization (KJ) (PH) Wolftone Corporation Presentation (ES) a. nex MEMORANDUM TO: Aspen Planning and Zoning Commission FROM: Leslie Lamont, Planning RE: Bellina Conditional Use Review for a Voluntary Attached Accessory Dwelling Unit DATE: July 21 1991 SUMMARY: The applicant proposes to remodel a single family home and provide a voluntary attached accessory dwelling unit. Staff recommends approval of conditional use for an accessory dwelling unit. BACKGROUND/PROCESS: The renovation of this Historically Designated structure was granted final development approval from the Historic Preservation Committee at their June 26, 1991 meeting. The HPC granted a variance for combined side yard setback and a variance for the combined rear and front yard setback. An accessory dwelling unit is a one-step conditional use review by the Planning and Zoning Commission at a public hearing. The Commission shall consider whether the standards outlined in Section 7-304 of the Land Use Code are met when considering this - applications for a conditional use. APPLICANT: Joseph and Delia Bellina as represented by Charles Cunniffe and Associates LOCATION: 716 West Francis Street, Original Aspen Townsite ZONING: R-6 APPLICANT'S REQUEST: To provide a 360 square foot accessory dwelling unit 100% above grade. REFERRAL COMMENTS: Having reviewed the application and having made a site inspection, the Engineering Department has the following comments: 1. It is preferable that no runoff from the buildings, driveways or parking areas go onto any public right-of-way. Per Section 24.7.1004.C.4.f of the municipal code, all but historical drainage must be maintained on site. 2. The applicant shall consult City Engineering for design considerations of development within public rights-of-way,and shall obtain permits for any work or development within public rights - of -way from City Streets Department. A five foot wide pedestrian usable space must remain unobstructed between the property line and the edge of pavement. 3. The applicant shall agree to join any future improvement districts which may be formed for the purpose of constructing improvements in the public right-of-way. 4. With reference to the adopted pedestrian walkway and bikeway system, curb and gutter is required for all new construction by City Code, Section 19-98. Rolled curb is to be used at the edge of street paving in the West End. 5. The site plan should indicate a site for dumpsters or trash containers which is located on the applicant's property and not in the alley right-of-way. 6. There are existing lilac bushes which may be in the alley right-of-way. The applicant may want to consider removing the lilacs for improving the alley function. STAFF COMMENTS: Proposal - The applicant proposes to remodel an existing 4 bedroom, approximately 2878 square foot home. The remodel will decrease the number of bedrooms from four to two, add a two car garage, and provide a 360 square foot attached accessory dwelling unit. * Conditional Use Review - Pursuant to Section 7-304 the criteria for a conditional use review are as follows: A. The conditional use is consistent with the purposes, goals, objectives and standards of the Aspen Area Comprehensive Plan, and with the intent of the Zone District in which it is in; and RESPONSE: The proposed attached accessory dwelling unit will be approximately 360 square feet. Although the dwelling unit is 1000 above grade it is unnecessary for the applicant to request a floor area bonus. The unit will comply with the provisions of the Housing Guidelines. The unit will be deed restricted as a resident occupied unit for residents of Pitkin County. B. The conditional use is consistent and compatible with the character of the immediate vicinity of the parcel proposed for development and surrounding land uses, or enhances the mixture of complimentary uses and activities in the immediate vicinity of the parcel proposed for development; and RESPONSE: The proposed renovation and addition to the original residence is done in a traditional historic style reinforcing the original architectural character of the area. C. The location, size, design and operating characteristics of 2 the proposed conditional use minimizes adverse effects, including visual impacts, impacts on pedestrian and vehicular circulation, parking, trash, service delivery, noise, vibrations and odor on surrounding properties; and RESPONSE: The adu is attached to the main house by a mud room. The adu is designed to reflect the historic charm of the main house as well as creating a natural boundary for the south facing Victorian garden. The above grade adu should not have a negative impact upon the church located to the west of the parcel. The rear yard setback was increased due to neighborhood concern. D. There are adequate. public facilities and services to serve the conditional use including but not limited to roads, potable water, sewer, solid waste, parks, police, fire protec- tion, emergency medical services, hospital and medical services, drainage systems, and schools; and RESPONSE: There are adequate facilities for this proposal. E. The applicant commits to"supply affordable housing to meet the incremental need for increased employees generated by the conditional use; and RESPONSE: ' ,. �.:� un The proposal includes an affordable it for employees~ of Pitkin County'. An increase in employees is not expected by the provision of an accessory dwelling unit. F. The proposed conditional use complies with all additional standards imposed on it by the Aspen Area Comprehensive Plan and by all other applicable requirements of this chapter. RESPONSE: The conditional use meets the requirements of the Aspen Area Comprehensive Plan and other requirements of this chapter. The proposal is well within floor area requirements and does not seek a floor area bonus. The applicant requested and was granted, by the HPC, a side yard setback variance and combined front and rear yard setback variance. RECOMMENDATION: Staff recommends approval of the conditional use for the attached accessory dwelling unit with the following conditions that prior to the issuance of any building permits: a. a deed restriction shall be reviewed and approved by the Housing Authority, the applicant shall record the deed restriction with the Pitkin County Clerk, Recorders Office and Planning Department. The restriction shall state that the accessory unit meets the housing guidelines for such units, meets the definition of Resident Occupied Unit, and if rented, shall be rented for periods of six months or longer. b. all representations that are made in the application and those 3 reviewed and approved by the Historic Preservation Committee and Planning and Zoning Commission shall be complied with. c. the applicant shall demonstrate to the Engineering Department that the historic drainage patterns shall be maintained on -site. d. the applicant shall consult City Engineering for design considerations of development within public rights -of -way and shall obtain permits for any work or development within public rights - of -way from City Streets Department. e. a five foot wide pedestrian usable space must remain unobstructed between the property line and the edge of pavement. e. the applicant shall agree to join any future improvement districts which may be formed for the purpose of constructing improvements in the public right-of-way. f. rolled curb shall be installed at the edge of street paving. g. the site plan shall indicate a place for dumpsters or trash containers which is located on the applicant's property and not in the alley right-of-way. ?".w AAA. A--: 1011111il"11,144--_ In -Town School Sites Advisory Committee THRU: Amy Margerum, Planning Director FROM: Diane Moore, Deputy Director of City Planni RE: In -Town School Sites Planning Process DATE: June 17, 1991 At the April 23, 1991 Committee meeting, the Committee agreed'to review six alternatives for the use of the Red Brick School site. Staff has provided the committee with a list of the six alternatives along with the pros and cons of each of the alternatives. In addition, staff has proposed a "seventh" alternative that it would like the Committee to consider. Staff has also prepared conceptual site layouts for each of the proposed alternatives and they will be discussed at the meeting. RED BRICK SITE - PRELIMINARY ALTERNATIVES Alternative 1. Community Facilities Uses in portion of existing building and Park Use. PROS - Provides for community uses - Maintains historic building - Addresses needs of non-profit organizations - Less traffic CONS - Renovation costs for building may be high - May not address financial need of school district - Does not address issue of affordable housing Alternative 2. Free Market Housing Development and Park Use ss ingle family lots) PROS - Less traffic than current use - Neighborhood compatibility - Park use for neighbors and community - Financial benefit to School District CONS - No affordable housing - Loss of historic building - Must compete under GMQS Alternative 3. 100% Affordable Housing and Park Use. -(single family lot - UL) PROS - Provides affordable housing - Lower density than 100% housing - Park use for neighborhood and community - Less traffic than current use - Exempt from GMQS CONS - Less affordable housing - Loss of historic building - Less financial benefit to Sphool District Alternative 4. Mix of Free Market, Affordable Housing, and Park Use. (single family lots) PROS - Less traffic than current use - Financial benefit to School District - Exempt from GMQS - Lower density overall - Park use for neighborhood CONS - Less affordable housing - Loss of historic building Alternative 5. Colorado Mountain College utilizing-- the existing building. PROS - Maintains historic building - In town location for CMC - Community use of building CONS - No affordable housing - Parking problems - Renovation costs for building may be high - Traffic concerns - Less park use Alternative 6. 100% Affordable Housing with Community Uses in Portion of Existing Building ---(single family lots). PROS - Provides for community uses - Provides affordable housing - Less traffic - Maintains historic building CONS - No park use. - May not address financial need of School District Staff would recommend another alternative: Alternative 7. Mix of Affordable Housing, Free Market, Community Facilities and Park Use (single family lots) PROS - Provides for community uses - Provides affordable housing and limited free market - Maintains historic building - Some park use - Exempt from GMQS CONS - May not address financial need of School District - Less affordable housing - Renovation cost for building may be high - Limited park use EXISTING CONDITIONS RED BRICK SCHOOL SITE The Red Brick building was originally built as an elementary school in 1945.'y1Over time, additions to the building converted the use to gh school, middle school and administrative offices. The school is currently used as an elementary school, however, the gym is used by the community and the Music Associates of Aspen. Some Administrative offices remain. The Red Brick school is situated on 90,691 square feet of land. The building itself is approximately 34,800 gross square feet, which is distributed as follows: Original Building = 14,000 square feet Classroom Addition = 11,300 square feet Gym/Stage/Basement = 9,500 square feet Surrounding land uses are primarily residential, although commercial development exists to the north and east of the site. A public trail is located on the northeast boundary of the property. The property quickly drops off toward Hallam Lake. The site is zoned for medium density residential uses (R-6) which permits single family homes and duplexes. Conditional uses include: open use recreation, public or private academic school, day care center, museum, church, and group home. There are three hazardous materials on site which may need to be contained should the building- be renovated. Asbestos, the potential for underground storage tanks and radon levels were identified in a recent inspection of the property. OTHER ISSUES There are numerous issues that should be explored in conjunction with the various alternatives and they include: - Financial need of School District - Financial feasibility and cost associated with each alternative which includes the funding or revenue source for the acquisition of the site, maintenance, capital improvements and cash flow analysis. - Affordable housing needs - Need for park use - Need for community facility - Use by non -profits - Retention of historic building - Colorado Mountain College need for classes in Aspen ATTACHMENTS Advisory committee Goals Art Groups Questionnaire Inventory of Aspen Area Parks Inventory of Aspen Area Public/Private Open Space Inventory of Aspen Area Special Open Space/Recreation Facilities Summary of Aspen Area Recreational Facilities by Jurisdiction Major Public/Private Facilities and Institional Uses Map - Community Facilities in the City of Aspen Map - Community Facilities in Pitkin County/Aspen Area The Advisory Committee set the following goals for the planning process: GOAL #1: 'The Plan should be mutually beneficial to the School District, the City of Aspen and Pitkin County. GOAL #2: The Plan should be compatible with the surrounding neighborhood and impacts mitigated to the maximum extent feasible. GOAL 13: The Plan should provide some level of affordable housing for the School District and the community. GOAL #4: The Plan should take into consideration the needs of the School District and the community for early 1 childhood education and day-care needs. GOAL 15: The Plan should contribute to the financial needs of the School District. 3 IN -TOWN SCHOOL SITES PLANNING PROCESS ARTS GROUPS QUESTIONNAIRE - SUMMARY: The attached questionnaire was sent to all 22 members of the Aspen/Snowmass Council for the Arts. 11 surveys were returned. i Ten groups indicated an interest in leasing space at one of the downtown school locations. A summary of the questionnaires is shown below; GROUP Sq ft $/Sqft Total $ Comments Aspen Ballet Co. 2,.000 $5 $10,000 Aspen Theatre Co 250+ $5 $ 1,250 Perfor. Space Aspen writers 400? $ .38 $ 150 2wks conference Aspen Filmiest 3-400 $1.18 $ 472 Screening Space DanceAspen ? Rehearsal Space Arts Council 600 ? Meeting Space ACIC 200? $ .50 $ 100 Grassroots. 10,000 $13.25 $13,250 121 Ceilings Wheeler 6,,000 Gymnasium • Aspen Comm. Theatre 200? 100? Storage The actual surveys are attached for your information. N L1R4VaUCIRY OF ASPEN AM RJBUC/PRrv7�= OPEN SPA] Date of Name of Propyt Owner sition East Aspen Townsite Parcel City 1961 Water Plant (ad] . property) City 1966 Sunny Park Subdiv. Parcels City 1967 Koch City 1985 Garrish Park City 1969 Rubey Park City 1970 Ute Cemetery City 1971 Sunny Park Subd.iv. Parcel City 1972 Jenny Adair Park City 1971 This Property City 1971 Bayer Property County 1974 Red Butte City Hospital County 1974 Midland Right -of -Way City 1975 High School S.D. Red Butte Cemetery Private Little Nell County 1976 Little Cloud Park City 1977 Rubey Subdivision (Lot 6) County 1977 Randall Park County 1977 Aspen Grove Cemetery Private Patsy Newbury Park City 1978 Aspen Art Museum Park City 1978 Meadvwood Private North Star Nature Preserve County 1978 ASPan One City 1978 Marolt Property City 1983 Shapery Property City 1983 Molly Gibson Property County 1983 Maroon Creek Park City 1971 Plumtree Ballfield City 1971 Bugsy Barnard Park City Freddie Fisher Park Park Trust Rldg. Henry Stein (Fisherman's) Park Trust Hdlg. Extension ion of Herron Park City Clapper park City Ute 1010 (Ajax Park) City 1989 City/County Dung City 1967 Inns of Court County 1975 Aspen One County 1976 Aspen Village County 1977' Airport Ranch County 1989 Rio Grande Right -of -Tay .City/ 1968 County S.D. = School District Area acres Location 0.1 9.18' of Lot 4, Block 25, Gibson and Fisherman's Access 3.2 Adjacent to Water Plant 0.1 Near Garrish Park 1.5 Base of Aspen Mountain 0.5 King Street 0.9 Wagner Park/Durant 1.2 Adjacent to Children's Park 0.1 Bureaun Addition 1.1 Puppy Smith /Rio Grande Trailhead 47.0 Between Castle Bridge and Turnoff 10.4 Smuggler Mountain 100.0 Northwest Aspen 9.0 SW of Aspep/Castle Creek Road 6.25 Thomas/Marolt Properties 5.0 Maroon Creek Road 20.0 Cemetery Lane 11.5 Mining Claim 2.2 Third & Hopkins N of Aspen near Hunter Creek 12.5 Smuggler Mountain 12.0 East Aspen 1.9 Adjacent Rio Grande Property 2.0 Mill & Gibson 25.0 Meadowood Subdivision 175.0 South on State Highway 82 2.2 Rio Grande 35.0 Between 82 & Castle Creek Road, 1.2 Adjacent to Jenny Adair Park 9.0 Centennial Site 6.0 Unde..rneath/N of Maroon Crk Bridge 2.5 Highway 82/Maroon Bridge 2.0 SH82/Cemetery Ln Improvmnts List 0.1 Riverside/Cooper 1.4 Cemetery/Slaughterhouse 0.8 Adjacent Herron Park .2 Btwn Firehouse -Thrift Shop on Hopkins 2.0 Base of Aspen Mountain 9 miles NW of Aspen on Highway 82 3.69 5.99 On State Highway 82 300.0 Adjacent to Airport 87.0 Along Roaring Fork River from Post Office to Woody Creek "Lem Date of Acqui- Area Name of Property owner sition acres Location Park TNIDe Pitkin County Courthouse County 1890 .2 Adjacent Courthouse Mini Iselin Park & Moore Pool City 1892,070, 21.4 Maroon Creek -Road Community '77 Wagner Park County 1907 2.5 Central Aspen Neighborhood Glory Hole Parkl City 1952 1.5 •Original & Ute Mini Paepcke Park City 1954,166 2.0 Btwn Main & Hopkins Neighborhood bounded by Garmisch and Aspen Ute Children's Parkl City 1958,171, 3.0 Ute Avenue East; Neighborhood 171,172 East of Aspen Herron Park City 1964 3.0 Neale Avenue Neighborhood Conner Memorial Park City 1965 .2 Adj. to City Hall Mini Hillyard Park (leased) City 1969 .3 W Bleeker / 4th&5th Mini - Rio Grande Park City 1973 11.5* E of Mill, S of Neighborhood Roaring Fork River Tot Lot Park City 1976 2.0 W Aspen Sub/Alta Neighborhood Vista & Bonita Dr. Shaw Triangle Parkl City 1977 1.7 Corner Smuggler, Neighborhood 2nd and Lake Plumtree Ballfield City 1971 2.5 SH82/Maroon Bridge Neighborhood Bass Park (leased) City .4 Hopkins/Monarch mini Willoughby Park City N/A .8 Aspen St/S of Durant Mini Clapper Park City .2 Btwn Firehouse & Mini 'Drift Shop/Hopkins Koch Lumber Park City 1985 1.5 Base of Aspen Mtn. Neighborhood Ajax Park City 1989 2.0 Base of Aspen Mtn. Mini Patsy Newbury Park City 1978 1.9 Behind Eagles Club 1Purcha_se initiated by, or park designed by Pitkin County Parks Association. *Only three acres of this property is used for park purposes. 194 ' TAME A i INVEN= OF ASPEN AREA I SPECIAL Q PEN SPACFVR8CFo=ag FACIA C Date of Name of Erpperty Owner Acqui- sition Area acres Lixation Iselin Park and Moore Pool City 1892,170 21.4 Maroon Creek goad '77 City Golf Cam City 1971 120.0 State Highway 82/Camtery ram North Star NablM Preserve County 1978 175.0 South on State Highway 82 Hallam Za}ce ACC 22.0 Near Past office Aspen Pedestrian Mall City Mi11/Cooper/Hymap/Galena Aspen Ice Garden City West Hyman it 4, 4 195 A T-A—ME A-10 SC144ARY OF ASPEN AFM FAMMMIES BY JURISDICIICK School Facility Ci District RE-1 Private* Softball / Baseball Fields 5 Multi -Purpose Fields 4 — -qk tball courts 1 7 Camunity, Courts 1 — Golf Course 1 — Gym-osiums — 4 Picnic Area 13 — Playgrounds 5 3 Swimming Pools 1 — 7 Tennis Courts 4 43 Tracks — 1 Soccer Field — 1 Ski Areas 3 Nordic Ski Areasl 1 1 Indoor Ice Skating Facility 1 Volleyball Courts 4 — 1See attached trails inventory. *Includes cmme=ial, non -lodge facilities. 196 I TABLE 10 MAJOR PUBLIC/PRIVATE FACILITIES AND INSTITUTIONAL, USES City of Aspen 1. City Hall 2. Wheeler Opera House 3. Aspen Ice Garden 4. Fire Barn 5. Water Plant/Water Tanks/Pumping Station 6. City Shops 7. City Power Plant 8. Electric Department 9. Parking Garage Pitkin Count 10. County Courthouse 11. County Jail 12. Aspen/Pitkin County Airport 13. Pitkin County Library 14. Community Center 15. Pitkin County Maintenance Facility 16. Proposed Health & Human Services Building Special District Facilities 17. Assisted Living Facility 18. RFTA Bus Maintenance Facility 19. Rubey Park Transit Center 20. Holy Cross Electric Power Plant 21. Rocky Mountain Natural Gas Company 22. ACSD Water Treatment Plant- AABC 23. ACSD Water Plant Offices 24. Aspen High School 25. Aspen Middle School 26. Aspen Elementary School- 110 E. Hallam 27. Aspen Elementary School- 215 N. Garmisch 28. New Elementary School Site 29. Aspen Valley Hospital Private Schools 30.. Aspen Country Day School 31. Wildwood School 32. Montessori School Federal/State 33. U. S. Forest Service Offi--=- 34. U. S. Post Office 35. State Highway Department Maintenance.Facility Cultural Facilities 36. Aspen Historical Society 37. Aspen Center for Environ- mental Studies 38. The Aspen Institute 39. Music Associates of Aspen 40. Given Institute of Pathobiology 41. Aspen Youth Center Note: Facility locations are keyed by number on Maps 7A and 7B. Source: Aspen/Pitkin Planning Office; January, 1991 133 • • W N 0 . o V i33: 539 1 F 3<ri3c� o�u [ 3« »«< u<r< P .rn►re►�ww�: ��=«.erHwwwww�sr V47 c a L LL V _ o u' H r w t � � J % b n / w i i u s r ZA La In -Town School Sites Advisory Committee THRU: Amy Margerum, Planning Director FROM: Diane Moore, Deputy Director of City Planni RE: In -Town School Sites Planning Process DATE: June 17, 1991 At the April 23, 1991 Committee meeting, the Committee agreed to review six alternatives for the use of the Red Brick School site. Staff has provided the committee with a list of the six alternatives along with the pros and cons of each of the alternatives. In addition, staff has proposed a "seventh" alternative that it would like the Committee to consider. Staff has also prepared conceptual site layouts for each of the proposed alternatives and they will be discussed at the meeting. RED BRICK SITE - PRELIMINARY ALTERNATIVES Alternative 1. Community Facilities Uses in portion of existing building and Park Use. PROS - Provides for community uses - Maintains historic building - Addresses needs of non-profit organizations - Less traffic CONS - Renovation costs for building may be high - May not address financial need of school district - Does not address issue of affordable housing Alternative 2. Free Market Housing Development and Park Use (-single family lots, PROS - Less traffic than current use - Neighborhood compatibility - Park use for neighbors and community - Financial benefit to School District CONS - No affordable housing - Loss of historic building - Must compete under GMQS Alternative 3. 100% Affordable Housing and Park Use. -(single family lots) PROS - Provides affordable housing - Lower density than 100% housing - Park use for neighborhood and community - Less traffic than current use - Exempt from GMQS CONS - Less affordable housing - Loss of historic building - Less financial benefit to School District Alternative 4. Mix of Free Market Affordable Housing, and Park Use. (single family lots) PROS - Less traffic than current use - Financial benefit to School District - Exempt from GMQS - Lower density overall - Park use for neighborhood CONS - Less affordable housing - Loss of historic building Alternative 5. Colorado Mountain College utilizing the existing building. PROS - Maintains historic building In town location for CMC Community use of building CONS - No affordable housing - Parking problems - Renovation costs for building may be high - Traffic concerns - Less park use Alternative 6. 100% Affordable Housing with Community Uses in Portion of Existing Building (single family lots PROS - Provides for community uses - Provides affordable housing - Less traffic - Maintains historic building CONS - No park use. - May not address financial need of School District Staff would recommend another alternative: Alternative 7. Mix of Affordable Housing, Free Market, Community Facilities and Park Use (single family lots) PROS - Provides for community uses - Provides affordable housing and limited free market - Maintains historic building - Some park use - Exempt from GMQS CONS - May not address financial need of School District - Less affordable housing - Renovation cost for building may be high - Limited park use EXISTING CONDITIONS RED BRICK SCHOOL SITE The Red Brick building was originally built as an elementary school in 1945.�y Over time, additions to the building converted the use to gh school, middle school and administrative offices. The school is currently used as an elementary school, however, the gym is used by the community and the Music Associates of Aspen. Some Administrative offices remain. The Red Brick school is situated on 90,691 square feet of land. The building itself is approximately 34,800 gross square feet, which is distributed as follows: Original Building = 14,000 square feet Classroom Addition = 11,300 square feet Gym/Stage/Basement = 9,500 square feet Surrounding land uses are primarily residential, although commercial development exists to the north and east of the site. A public trail is located on the northeast boundary of the property. The property quickly drops off toward Hallam Lake. The site is zoned for medium density residential uses (R-6) which permits single family homes and duplexes. Conditional uses include: open use recreation, public or private academic school, day care center, museum, church, and group home. There are three hazardous materials on site which may need to be contained should the building be renovated. Asbestos, the potential for underground storage tanks and radon levels were identified in a recent inspection of the property. OTHER ISSUES There are numerous issues that should be explored in conjunction with the various alternatives and they include: - Financial need of School District - Financial feasibility and cost associated with each alternative which includes the funding or revenue source for the acquisition of the site, maintenance, capital improvements and cash flow analysis. - Affordable housing needs - Need for park use - Need for community facility - Use by non -profits - Retention of historic building - Colorado Mountain College need for classes in Aspen ATTACHMENTS Advisory Committee Goals Art Groups Questionnaire Inventory of Aspen Area Parks Inventory of Aspen Area Public/Private Open Space Inventory of Aspen Area Special Open Space/Recreation Facilities Summary of Aspen Area Recreational Facilities by Jurisdiction Major Public/Private Facilities and Institional Uses Map - Community Facilities in the City of Aspen Map - Community Facilities in Pitkin County/Aspen Area GOALS The Advisory Committee set the following goals for the planning process: GOAL #l: The Plan should be mutually beneficial to the School District, the City of Aspen and Pitkin County. GOAL #2: The Plan should be compatible with the surrounding neighborhood and impacts mitigated to the maximum extent feasible. GOAL #3:. The Plan should provide some level of affordable housing for the School District and the community. GOAL #4: The Plan should take into consideration the needs of the School District and the community for early childhood education and day-care needs. GOAL #5: The Plan should contribute to the financial needs of the School District. 01 IN -TOWN SCHOOL SITES PLANNING PROCESS ARTS GROUPS QUESTIONNAIRE - SUMMARY: The attached questionnaire was sent to all 22 members of the Aspen/Snowmass Council for the Arts. 11 surveys were returned. Ten groups indicated an interest in leasing space at one* of the downtown school locations. A summary of the questionnaires is shown below: GROUP Sq ft $/Sgft Total $ Comments Aspen -Ballet Co. 2,.000 $5. $101000 Aspen Theatre Co 250+ $5 $ 1,250 Perfor. Space Aspen Writers 400? $ .38 - $ 150 2wks conference Aspen Filmfest 3-400 $1.18 $ 472 Screening Space DanceAspen ? Rehearsal Space Arts Council 600 ? Meeting Space ACIC 200? $ .50 $ 100 Grassroots. 1,000 $13.25 $13,250 12' Ceilings Wheeler 6,000 ? Gymnasium • Aspen Comm. Theatre 200? ? $ 100? Storage The actual surveys are attached for your information. = L19VENTCORY OF • a APEA PUBrXC/PRIVA= OPEN S• • •r • 'i • :1 A0•UISITIOUS Date of Acqui- Name of Property Owner sition East Aspen Townsite Parcel City 1961 Water Plant (adj property) City 1966 Sunny Park Subdiv. Parcels City 1967 Koch City 1985 Garrish Park City 1969 Rubey Park City 1970 Ute Cemetery City 1971 Sunny Park Subdiv. Parcel City 1972 Jenny Adair Park City 1971 Thomas Property City 1971 Bayer Property County 1974 Red Butte City Hospital County 1974 Midland Riot -of -Way City 1975 Hick School S.D. Red Butte Cemetery Private Little Nell County 1976 Little Cloud Park City 1977 RLlhey Subdivision (Lot 6) County 1977 Randall Park County 1977 Aspen Grove Cemetery Private Patsy Newbury Park City 1978 Aspen Art Museum Park City 1978 Meadowood Private North Star Nature Preserve County 1978 Aspen One City 1978 Marolt Property City 1983 Shapery Property City 1983 Molly Gibson Property County 1983 Maroon Creek Park City 1971 Plumtree Ballfield City 1971 Bugsy Barnard Park City Freddie Fisher Park Park Trust Hldg. Henry Stein (Fisherman's) Park TnLst Hdlg. Extension of Herron Park City Clapper Park City Ute 1010 (Ajax Park) City 1989 City/County DLnTp City 1967 Inns of Court County 1975 Aspen One County 1976 Aspen Village County 1977 Airport Ranch County 1989 Rio Grande Right -of -Way ,City/ 1968 County S.D. = School District Area acres IDcation 0.1 9.18' of Lot 4, Block 25, Gibson and Fisherman's Access 3.2 Adjacent to Water Plant 0.1 Near Garrish Park 1.5 Base of Aspen Mountain 0.5 King Street 0.9 Wagner Park/Durant 1.2 Adjacent to Children's Park 0.1 Bureaun Addition 1.1 Puppy Smith /Rio Grande Trailhead 47.0 Between Castle Bridge and Turnoff 10.4 Smuggler Mountain 100.0 Northwest Aspen 9.0 SW of Aspen/Castle Creek Road 6.25 Thomas/Marolt Properties 5.0 Maroon Creek Road 20.0 Cemetery Lane 11.5 Mining Claim 2.2 Third & Hopkins N of Aspen near Hunter Creek 12.5 Smuggler Mountain 12.0 East Aspen 1.9 Adjacent Rio Grande Property 2.0 Mill & Gibson 25.0 Meadowood Subdivision 175.0 South on State Highway 82 2.2 Rio Grande 35.0 Between 82 & Castle Creek Road. 1.2 Adjacent to Jenny Adair Park 9.0 Centennial Site 6.0 Underneath/N of Maroon Crk Bridge 2.5 Highway 82/Maroon Bridge 2.0 SH82/Cemetery In Ir►provmnts List 0.1 Riverside/Cooper 1.4 Cemetery/Slaughterhouse 0.8 Adjacent Herron Park .2 BtwnZ Firehouse-lbrift Shop on Hopkins 2.0 Base of Aspen Mountain 9 miles NW of Aspen on Highway 82 3.69 5.99 On State Highway 82 300.0 Adjacent to Airport 87.0 Along Roaring Fork River from Post Office to Woody Creek 193 Date of Name of Property Owner AccjLi- sition Area acres Location Park 'I`ype Pitkin County Courthouse County 1890 .2 Adjacent Courthouse Mini Iselin Park & Moore Pool City 1892,'70, 21.4 Maroon Creek -Road Co cunity '77 Wagner Park County 1907 2.5 Central Aspen Neighborhood Glory Hole Parkl City 1952 1.5 Original & Ute Mini Paepcke Park City 1954,166 2.0 Btwn Main & Hopkins Neighborhood bounded by Garmisch and Aspen Ute Children's Parkl City 1958,171, 3.0 Ute Avenue East; Neighborhood '71,172 East of Aspen Herron Park City 1964 3.0 Neale Avenue Neighborhood Conner Memorial Park City 1965 .2 Adj. to City Hall Mini Hillyard Park (leased) City 1969 .3 W Bleeker / 4th&5th Mini Rio Grande Park City 1973 11.5* E of Mill, S of Neighborhood Roaring Fork River Tot Lot Park City 1976 2.0 W Aspen Sub/Alta Neighborhood Vista & Bonita Dr. Shaw Triangle Parkl City 1977 1.7 Corner Smuggler, Neighborhood 2nd and Lake Pltmitree Ballfield City 1971 2.5 SH82/Maroon Bridge Neighborhood Bass Park (leased) City .4 Hopkins/Monarch mini Willoughby Park City N/A .8 Aspen St/S of Durant Mini Clapper Park City .2 Btwn Firehouse & Mini Thrift Shop/Hopkins Koch Lumber Park City 1985 1.5 Base of Aspen Mtn. Neighborhood Ajax Park City 1989 2.0 Base of Aspen Mtn. Mini Patsy Newbury Park City 1978 1.9 Behind Eagles Club la=chase initiated by, or park designed by Pitkin County Parks Association. *Only three acres of this property is used for park purposes. 194 b @ ' TABLE A-9 I INVENTORY OF ASPEN AFTA SPEY AL CEM SFPAZFVRMM=C1ff I . Date of i Name of Owner Acqui- sition Area acres Location . Iselin Park and Moore Fool City 18920,170 21.4 Maroon Creek Road '77 t i City Golf Course City 1971 120.0 State Highway 82/Cmmtery lane I North Star Nature Pave County 1978 175.0 South on State Highway 82 Hallam rake ACES 22.0 Near Post Office Aspen Pedestrian Mall City Mill/Cooper/HynaWGalena Aspen Ice Garden City West Hyman It 1.r 4 4, !1 195 A 92—ME A-10 SUMMARY OF ASPEN AREA �ICN F'�►c''rT.7*r*nE� BY JUPtI.SDICTICN School Facility Ci District RE-1 Private* Softball / Baseball Fields 5 -- -- M l.ti-Purpose Fields 4 -- -- Bas}cetball Courts 1 7 — Community Courts 1 — — Golf Course 1 -- — Gy masitmzs -- 4 -- Picnic Area 13 -- -- Playgrounds 5 3 -- Swimuing Pools 1 -- 7 Tennis Courts 4 — 43 Tracks — 1 — Soccer Field — -- 1 Ski Areas — -- 3 Nordic Ski Areasl 1 — 1 Indoor Ice Skating Facility 1 -- -- Volleyball Courts 4 — — 1See attached trails inventory. . *Includes commercial, ncn-lodge facilities. 196 TABLE 10 MAJOR PUBLIC/PRIVATE FACILITIES AND INSTITUTIONAL USES City of Aspen 1. City Hall 2. Wheeler Opera House 3. Aspen Ice Garden 4. Fire Barn 5. Water Plant/Water Tanks/Pumping Station 6. City Shops 7. City Power Plant 8. Electric Department 9. Parking Garage Pitkin County 10. County Courthouse 11. County Jail 12. Aspen/Pitkin County Airport 13. Pitkin County Library 14. Community Center 15. Pitkin County Maintenance Facility 16. Proposed Health & Human Services Building Special District Facilities 17. Assisted Living Facility 18. RFTA Bus Maintenance Facility 19. Rubey Park Transit Center 20. Holy Cross Electric Power Plant 21. Rocky Mountain Natural Gas Company 22. ACSD Water Treatment Plant- AABC 23. ACSD Water.Plant Offices 24. Aspen High School 25. Aspen Middle School 26. Aspen Elementary School- 110 E. Hallam 27. Aspen Elementary School- 215 N. Garmisch 28. New Elementary School Site 29. Aspen Valley Hospital Private Schools 30. Aspen Country Day School 31. Wildwood School 32. Montessori School Federal/State 33. U. S. Forest Service Officee 34. U. S. Post Office 35. State Highway Department Maintenance_Facility Cultural_. Facilities 36. Aspen Historical Society 37. Aspen Center for Environ- mental Studies 38. The Aspen Institute 39. Music Associates of Aspen 40. Given Institute of Pathobiology 41. Aspen Youth Center Note: Facility locations are keyed by number on Maps 7A and 7B. Source: Aspen/Pitkin Planning Office; January, 1991 133 r o � t _ O o 0 La V C s ~O� Ftt C� •itt. ec g gqgggqqqqFq V _ A O�e1Y•1H»hNe9Y �DN»O Net �� J .•Ne7YIOOf�»�►•-•-s-.-^NN NMrfAAAr►Y Y' YY C _ .. cl n � � Q E a o a =" m o O O N .w— w. J N n r !' ! mw aw ! mp mm mv. !' v' ow ! mw