HomeMy WebLinkAboutagenda.apz.19901120
AGENDA
Ja",-,
,. {:(,'J
i.,,? /.1
'("-'t,_~
" rf
,<
---------------------------------------------------------------
-----------------------------------------------------.-----------
ASPEN PLANNING AND ZONING COMMISSION
REGULAR MEETING
November 20, 1990, Tuesday
4:30 P.M.
2nd F100r Meeting Room
City Hall
I. COMMENTS
commissioners
Planning Staff
Public
II.
MINUTES
III.
PUBLIC HEARINGS
.
A. Schiff Conditional Use for Accessory Dwelling
unit
IV. NEW BUSINESS
A. Aspen Meadows Conceptual SPA
VI. AWOURN
. a.cov
----
MEMORANDUM.
TO: Planning and Zoning Commission
FROM: Kim Johnson, Planner
RE: Schiff Accessory Dwelling Unit - Conditional Use
DATE: November 9, 1990
SUMMARY: The applicant seeks a Conditional Use approval in order
to include an accessory dwelling unit of approximately 372 square
feet within an existing 4,158 square foot duplex. Planning Staff
recommends approval of this Conditional Use with conditions.
APPLICANT: Theresa Schiff, represented by Roger Kerr
LOCATION: 211/215 Midland Ave. Lot.38 West Aspen Subdivision ##2
ZONING: R-6
APPLICANT'S REQUEST: Conditional Use approval for an accessory
dwelling unit.
PROPOSAL: The duplex contains 3 bedrooms on each side, with a
total area of 4,158 sq.ft. The applicant wishes to include a
studio type accessory dwelling unit of approximately 372 sq. ft..
in the lower level of one of the residences (Attachment "A") Ms.
Schiff requests that the approval for one unit be granted for
placement in either unit. Both sides of the duplex are for sale.
The location of the Accessory Dwelling Unit will depend on the
preference of the first buyer.
REFERRAL COMMENTS: ( see attachment "B" )
Chuck Roth from Engineering reviewed the proposal and forwards
the following comments:
1) The condominium plat needs to be updated to match the existing
structure, which appears to be completely new.
2) Various construction features appear to be in the public
right-of-way. The current driveway configuration needs an
encroachment license through the Engineering Department. Other
encroachments may exist. Drawings must be provided to the
Engineering Department for review and remedial actions may be
required.
The Housing Authority forwards the following comments:
The accessory dwelling unit shall contain not less than 300
square feet of net livable.area and be located within or attached
to a principal residence. It shall meet the housing designee's
guidelines for such units, is required to be deed restricted by
Owner, is to meet the definition of a Resident occupied Unit and
be rented for period of six months or longer. The Owner of'the
principal residence ' shall have the right to place a qualified
employee or employees of his or her choosing in the accessory
dwelling unit. Recommended conditions are:
1. The net livable square footage of the proposed studio
accessory dwelling unit shall be verified by the Housing
Authority prior to final approval.
2. The accessory dwelling unit shall meet definition of
"dwelling unit" as to a separately enterable, self-sufficient
room or combination of rooms which contain a kitchen and bath
facilities and which are designed for or used as a residence by a
single family, independent of other families or guests.
3. Prior to issuance of any building permits for the accessory
dwelling unit, Owner shall file an appropriate deed restriction
with the Aspen/Pitkin County Housing Authority for approval.
Upon approval by the Authority the Owner shall record the deed
restriction with the P-itkin County Clerk and Recorder's office.
The deed restriction shall reflect that the shall meet the
housing desIgnee's guide -lines for such units, meets the
definition of Resident Occupied Unit,, and be rented for periods
of six (6) months or longer. The lease agreement for the units
shall be approved, by the Housing Authority to ascertain the six
month provision is met and shall be executed by owner prior to
occupancy by any tenants.
STAFF COMMENTS: An accessory dwelling unit is a conditional use
in the R-15 zoning district. The Commission has the authority to
review and approve development applications for conditional uses
pursuant to the standards of Section 7-304:
A. The conditional use is consistent with the purposes, goals,
objectives and standards of the Aspen Area Comprehensive
Plan, and with the intent of the Zone District in which it
is proposed to be located.
RESPONSE: This proposed deed restricted unit will allow the
property to house a local employee in a residential area, which
complies with the,zoning and Aspen Comprehensive Plan. ADUIs are
encouraged by City Council. This unit is being voluntarily
provided.
B. The conditional use is consistent and compatible with the
character of the immediate vicinity of the parcel proposed
for development and surrounding land uses, or enhances the
mixture of complimentary uses and activities in the
immediate vicinity of the parcel proposed for development.
RESPONSE: This use is compatible with the other residential uses
in the surrounding neighborhood including a large amount of
affordable housing for the community. As it contained within the
principal residence, the unit is not visible as a separate
structure.
C. The location, size, design and operating characteristics of
the proposed conditional use minimizes adverse effects,
including visual impacts, impacts on pedestrian and
vehicular- circulation, parking,* trash, service delivery,
noise, vibrations and odor on surrounding properties.
RESPONSE: A studio or one bedroom accessory unit carries no
parking requirement. The application indicates that each unit
provides 4 spaces which is sufficient for the principal residence
and the accessory unit. No other impacts other than that of the
main residence should result.
D. There are adequate public facilities and services to serve
the conditional use including but not limited to roads,
potable water, sewer, solid waste, parks, police, fire
protection, emergency medical services, hospital and medical
services, drainage systems, and schools.
RESPONSE: All public facilities are all ready in place for the
existing neighborhood..
E. The applicant commits to supply affordable housing to meet
- the incremental need for increased employees generated by
the conditional use.
RESPONSE: As proposed, and in compliance with rental
stipulations.
F. The proposed conditional use complies with all additional
standards imposed on it by the Aspen Area Comprehensive Plan
and by all other applicable requirements of this chapter.
RESPONSE: This use complies with the Aspen Area comprehensive
Plan and any other applicable conditional use standards.
NOTE: No F.A.R. bonus is granted to'this parcel as the. accessory
dwelling unit is not 100% above grade.
STAFF RECOMMENDATION: Planning recommends approval of this
conditional use with the following condition:
1. The net livable square footage of the proposed .studio
accessory dwelling unit shall be verified by the Housing
Authority prior to final approval.
2. The accessory dwelling unit shall meet definition of
"dwelling unit" as to a separately enterable, self-sufficient
room or'combination of rooms which contain a kitchen and bath
facilities and which are designed for or used as a residence by a
single family, independent of other families or guests.
3. Prior to issuance of any building permits for the accessory
dwelling unit, owner shall file an appropriate deed restriction
with the Aspen/Pitkin County Housing Authority for approval.
Upon approval by the Authority the Owner shall record the deed
restriction with the Pitkin County Clerk and Recorder's Office.
The deed restriction shall reflect that the shall meet the
housing designee's guidelines for such units, meets the
definition of Resident occupied unit, and be rented for periods
of six (6) months or longer. The lease agreement for the units
shall be approved by the Housing Authority to ascertain the six
month provision is met and shall be executed by owner prior to
occupancy by any tenants.
Attachment "All - Floorplan and Elevation Sketches
IIBII - Referral Comments from Engineering and the
Housing Authority
j tkvj/schif f memo
w
ROGER N. KERR
ARCHITECT
406 PA61FIC 303/925.62H9
SUITE G ASPEN, COLORADO
Attachment "A"
UTE
CEN
ezpo Y v a.
Vlel �lc54c�0!5im,,L/
I
UNIT A UNIT B
interior 561 sq. ft. 585 sq. it .
garage 529 485
I
R
Z
O
a
w
.J
w
W-
LL
W
.I
IT
z
MEMORANDUM
TO: Planning and Zoning Commission
FROM: Amy Margerum, Planning Director
Kim Johnson, Planner
RE: Aspen Meadows Conceptual SPA (Specially Planned Area)
Development Plan
DATE: November 14, 1990
----------------------------------=----------------------------
---------------------------------------------------------------
SUMMARY: This hearing is the first of four steps to establish a
development plan for the Aspen Meadows, a multi -use, multi -owner
project which recently completed a Specially Planned Area (SPA)
Master Planning process with the Planning Commission and City
Council. The Planning Office has reviewed this Conceptual Plan
application in consideration of the Master Plan (Attachment "A")
and recommends approval with conditions.
APPLICANT: Owners: The Aspen Institute and Savanah
Ltd. Partnership
Leaseholders: Music Associates of Aspen and Aspen.
Center for Physics
Interested User: International Design Conference in
Aspen
Representative: Joe Wells
LOCATION: 86.1 acres bounded by Gillespie St. to the south,
Roaring Fork Road to the east, the Roaring Fork River to the
north, and to the west Meadows Road, the Red Butte Cemetery and
the Black Birch Subdivision. Please see application booklet
(Attachment "B") for site plan and verbal descriptions of the
project.
ZONING: Current zoning consists of 25 acres of C (Conservation)
along the river margin areas of Castle Creek -and the Roaring
Fork. The remainder of the property is zoned SPA with no
underlying zone designation. Rezonings are being requested as
part of this application and are discussed below.
APPLICANT'S REQUEST: The SPA process is a four -step approval.
The Applicant seeks approval of the Conceptual SPA Development
Plan at this level of review. Upon approval of the Conceptual
Plan, the applicant will submit a Final SPA Plan, Subdivision,
Condominiumization of the townhomes, GMP Residential Allotment,
GMQS Exemption for essential public services, Rezoning, and
Special Review(s). The HPC reviewed the proposal in order to
provide referral comments for this staff report.
1
Review Process: The following reviews,will constitute The Aspen
Meadows SPA 4 step process:
Step 1 - P&Z Conceptual SPA Plan, and review of, rezoning
(Nov. 20) and mitigation plan as threshold issues.
Step 2 - Council Conceptual SPA Plan (public hearing);
(Dec. 10) and review of rezonings and mitigation
plan as threshold issues.
Step 3 - P&Z Final SPA, Development Plan including proposed
(March 19) variations from requirements of the underlying
zone districts; rezonings; Subdivision (public
hearings); Special Review for parking in the
Academic Zone (pending rezoning outcome) one
stepatP&Z.
Step 4 - Council Rezonings; Final SPA; Subdivision (public
(April 22) hearings); 'Condominiumization; GMQS
Exemption for essential public facility; and
SPA/rezoning Ordinance, first reading.
Council Second reading of SPA and rezoning ordinances.
I
REFERRAL CONMENTS: Complete referral memos are included in
Attachment "C". Summarized comments are as follows:
Engineering: A Final Plat, in full compliance with requirements
of Sections 7-1004. D.1 and D.2, is required at Final SPA
submission. Engineering additionally requests as a condition of
approval that the Plat be submitted in digitized format
compatible with the City's Autocad system. The Final Plat must
indicate what portions of roadways will be dedicated public
rights -of -way. Right-of-way and pavement widths must reflect
street parking, snow plowing, drainage and sidewalks.
Parking lot design shall be done to Engineering's approval. A
loop circulation system should be considered entering the Meadows
on Seventh and leaving on Eighth. Less pavement would result and
traffic impacts would be dispersed. One access should be,
addressed in the traffic study. Should parking be provided for
public who wish to use the public trails on the site and on the
City -owned Conservation land? Any landscaping or other work
performed in the public ROW requires permitting from the City
Public Works Agency.
The adopted Pedestrian and Bikeway Plan elements shall be
implemented in this project. Fisherman's easements along the
river and creek should be platted if not guaranteed otherwise.
Trail grades and alignments must meet requirements. Has
M
discussion occurred. regarding pedestrian/ nordic conflicts in the
winter? Street and trail lighting must be presented.. Tree
plantings should be served by irrigation ditches whenever
possible.
All utilities should be- underground. The easement need of each
Utility must be addressed at Final submission and major Utilities
should sign -off on final proposals.
Subdivision and Condominiumization requirements call for a storm
water runoff plan. Compliance with the Clean Water Act may be
required. Existing and proposed irrigation ditch alignments. must
be on the plat. Drainage cannot enter Hallam Lake. Four ditches
and one sedimentation pond require easements as per the "Urban
Runoff Management Plan" map.
The application states that the City will limit truck traffic
size on Third, Seventh and Eighth Streets, at the same time
exempting MAA and Institute deliveries. It is not know at this
time if a process allowing exemptions exists. At any rate, it
seems like a difficult concept to enforce.
Housing: The applicant proposes housing mitigation for 23.69
employees as offered in the mitigation portion of the Master
Plan, based on the 14 unit free market component of The Meadows
proposal.. 23.69 persons -represents 35% of the threshold (low
income) of minimum mitigation required in the GMP section of the
Land Use Code.
The mitigation plan calls for four deed restricted one bedroom
units (1.75 persons each, 7 total), one unit in each single
family residence. These must be deed restricted as low income
affordable housing units meeting size, type, asset, income, and
occupancy standards of the Housing guidelines. They cannot be
viewed as "accessory dwelling units" which do not require
occupancy and income requirements, and price limits.
Cash -in -lieu payment forthe:remaining 16.69 low income employees
shall be indexed to guidelines in effect at the time 'building
permits are issued for the free market residences (townhomes and
single family.) Today's guidelines require 'a figure of
$584,150.00. If the applicant chooses to mitigate completely via
cash -in -lieu, the figure today would be $829,150.000.'
Yvonne Blocker has calculated the housing fees waived resulting
from the Master Plan negotiations. The 50 lodge rooms would
require mitigation for 56.87 low income employees, a cash
equivalent of $1,990,450.
Water: Plant and systems capabilities are available to serve
potable water to the proposed development. System extension
details and impacts must be reviewed prior to making specific
3
requirements. Water service is contingent upon approval of all
plans, engineering standards, placements and payments of
connection fees.
Fire Marshall: No reference was made in the application regarding
fire protection. The Final Plan must show details for approval.
Legal: The contract to sell the conservation *land to the City
does not contain an adequate description of the property at this
time.
HPC: . Prior to submission for Final Review,, the project must
receive conceptual and final HPC approval. An HPC subcommittee
will be working closely with the applicant's architects on design
issues.
Environmental Health: A fugitive dust control plan must be
approved by this office and the Colorado Air Pollution Control
Division prior to beginning construction. Limits to fireplace
installations exist. Paved parking reduces windblown dust, but
encourages automobile use. Limited parking is suggested.
Underground parking must be designed by a ventilation engineer.
The applicant should commit to use of non -diesel buses and a
shuttle system. Lighting should be high -efficiency compact
florescent throughout. Low flow plumbing fixtures should be
used. Modifications to the food service facilities must comply
with state codes on this subject. State rules also, apply to
swimming pools. The applicant shall contact this office if mine
waste or dumps are encountered.
Sanitation District: 1) Sufficient District capacity can serve
this project.The existing disposal system (including on -site
septic systems) at the Meadows must be abandoned and replaced
with an approved system prior to connection to the District's
system. 2) Food service installations require grease
interception devices. 3) An 'on -site drainage plan excluding all
clear water connections is needed. 4) At the Applicant's expense,
significant infiltration problems existing off -site in the
District's trunk line must be corrected.
PROPOSAL: Please see the application booklet describing the
specific expansion concepts. In summary, the applicant is
proposing the following:'
- 10 new townhomes, 3 bedrooms, 2,500 s.f. each (condominiumized)
- Expansion (6,,000 s.f.), and Condominiumization of eight existing
Trustee houses
- 4 new single family lots including 1 bedroom deed restricted
affordable apartment each, 4,540 s.f. maximum each home
- Lodge expansion of 50 rooms,, 42,,410 s.f. total
- Music Tent expansion of 2,000 s.f. (backstage area)
- New Rehearsal Hall, 11,000 s.f./500 seats
4
Expanded Health Club
swimming pool
- Access from Seventh
Eighth Street
STAFF COMMENTS:
SPA Process:
facility (1,800) s.f. and relocated
Street, with an intersection connecting
The areas not included within the current Conservation zone
carries an SPA (Specially Planned Area) overlay. This requires
any proposal to comply with the review process and standards
contained in Division 8 of Section 7 of the Land Use Code. A
Conceptual Plan is first approved by the Planning Commission and
the City Council. The applicant then prepares and submits a
Final Development Plan reflecting any conditions arising from the
Conceptual Plan approval. The Final Plan. is presented to both
bodies for approval. An approved Final Development Plan
(including site plan, landscape plan, utility plan, and building
elevations) must then be filed in the County Clerk's Office.
Additionally an SPA Agreement which declares any conditions
placed on the project at Final approval must be filed with the
Final Development Plan.
The SPA designation has special suitability to a multi -use,
multi -structure project like the Aspen Meadows. Not only does
the SPA approval process require detailed -levels -of review by the
Commission and Council, the SPA process allows great flexibility
to vary certain requirements of the underlying zoning districts.
Items such as setbacks, heights, -lot area, parking, and use may
be allowed to be different than would be required by the
underlying zone district. Any variations allowed must be
specified on the SPA agreement and shown on the Final Development
Plan. The Meadows will be utilizing this SPA variance process
to:
- Reduce the size of the R-15.single family•lots (12,000 s.f
instead of the required 15,000 s.f.);
- To allow uses not permitted in the Residential Multi -family
.(R/MF) zone (short term accommodations); and
- To allow uses in the Academic zone (lodge, health club
facility, and restaurant.) The applicant seeks to amend the
Academic.zone district to allow these uses, but staff feels the
SPA variation process is. preferable. Please refer to
discussions in the Zoning section of the staff comments.
Any changes to the structural or functional aspects of an
approved SPA must be reviewed and approved according to the
provisions of Section 7-804 E. of the Code.
9
Conceptual Submission
The Conceptual proposal must be consistent with the overall plan
recently adopted as the Aspen Meadows Master Plan as well as
address the requirements for Conceptual submission required by
Sec. 7-804 (C) of the Land ;Use Code. The Conceptual Plan relies
on the agreements developed between the City Council, Planning
Commission -and the Meadows Consortium.
The Aspen Meadows Conceptual Plan satisfies the requirements for
submission except for the following information:
1. General time schedule for construction of the proposed
development:
The applicant has been informed that a general time schedule
for development is required as part of the Conceptual
review. Perry Harvey indicated that a schedule will be
provided prior to Conceptual review by Council.
2. A statement outlining in conceptual terms how the proposed
development will be served with appropriate public facilities and
how assurances will be made _that those public facilities are
available to serve the proposed development.
General infrastructure aspects have been discussed with
appropriate utility agencies. The major omission regarding
public facilities is the transportation issue. Expanded use
of MAA facilities and lodge uses combined with limited
availability of parking will require development of an
innovative, easy to use transportation system. Perry Harvey
has organized a committee of citizens, planners, Consortium
representatives, and transportation people to discuss
transportation issues. The outcome of these meetings will
lead to the creation of a transportation plan to be
submitted with the Final * SPA Plan early next year. Please
see Perry's 10/19/90 letter, Attachment I'D". On the date of
this memorandum, Perry forwarded to the Planning Office a
report from the Meadows' traffic consultant Felsburg,,Holt &
Ullevig, Attachment "Ell. Staff has not had a chance to
review it at this time. Comments relating to this
correspondence will be made at the Commission meeting.
The Conceptual Development Program table on pages 16 and 17 of
the application describes existing and expanded elements of the
Meadows proposal. Mostaspects of the proposal mirror the Master
Plan, however, the following items in this Program are
inconsistent with the Master Plan and require discussion by the
Planning Commission. Please note that the Master Plan did allow
for insubstantial changes to be made to the Master Plan
consistent with the provisions in the PUD section of the Land Use
Code for insubstantial amendments. The Master Plan states :
1.1
"Insubstantial amendments to the Aspen.
authorized by the Planning Director
entity's facilities (with similar
outlined in Section 7-908 of the Aspen
Meadows Master Plan may be
if amendments for each
uses) meet the criteria
Land Use Code."
Health Club facility expansion
The 1,800 s.f. expansion of the health facility was not
identified in the Master Plan except for "replacement or
updating" ofthe Health Center. A new swimming pool site
was not included in the Master Plan. The Commission and
Council should consider directing the Planning Director to
amend the Master Plan to' allow these elements if they see
fit to include them in the Final Plan. Conceptual site plan
and elevation sketches should be presented to the Planning
Commission or deferred for Council's consideration at the
Conceptual Plan review.
Use of Lodge for outside individuals or groups
The Master Plan states that "The Institute will renovate or
construct a lodging base of 110 units in the most economic
manner, consistent, with the character of the Meadows, .the
needs of the Institute and their attractiveness for year
round use." Use of the lodge in a "free market" short term
fashion on a year-round basis should be fully understood by
the Planning Commission and City Council as employee
mitigation is anticipated to be waived for this use. The
intent of the Master Plan is that operation of the Lodge
will support thel Aspen Institute's programs, thus the
rationale for wai.ving.empl.oyee mitigation. Planning assumes
that 100% yearr-round occupancy is a goal of the Lodge.
Condominiumization of Trustee and Tennis Townhouses
During the Master Plan review and approval process, the
expansion of the Trustee Houses was determined not to
require mitigation for employee housing under our existing
Land Use Code. We did not address mitigation associated
with Condominiumization, in the Master Plan, however, this
should be a requirement!of SPA approval.
Parking for 96 spaces under tennis courts
The Planning Office j has concern about the 96 parking -spaces
proposed to be located under the tennis courts. These were
not presented as Part of the Master Plan. It- is proposed
that the Consortium seriously explore reducing this parking
substantially (perhaps by half) and applying the saved funds
directly to the implementation of a top notch, clean fuel
bus system. A small 'but regularly scheduled shuttle route
between the Institutional users and major points in town
would be a substartial*ibenefit to the entire community in
terms of accessibility of the Meadows and reduction of
private automobile traffic.
7
The application does not address how this will be physically
accomplished. There are no conceptual drawings included in
the application. This will be required to be' presented to
the Planning Commission or deferred to City Council's
Conceptual discussion. Great visual impact may result.
Planning staff notes that the cost factor associated with
this proposal should be weighed in light of applying some or
all of these funds to the development of a clean, efficient,
regular mass transit system to serve the Meadows property.
It may then be easier to promote this parking for long-term
vehicle storage, and dissuade short trips into town.
2,000 s.f. expansion of the Music Tent backstage area
The Master Plan discusses expansion by approximately 1,500
s.f. The Conceptual Plan.exceeds this by 500 s.f. Staff
cannot recommend approval of 2,000 s.f. because of the
inconsistency with the Master Plan without adequate
,justification by the applicant. An insubstantial amendment
to the Master Plan will be required to accommodate this
increase.
Rezonings as Threshold Issues
Although the rezoning elements,of the Aspen Meadows will be acted
upon during the Final Development Plan hearings., the Planning
Office requests that the Commission discuss these *rezonings
during the Conceptual phase as, "threshold" issues. The Meadows'
existing zoning consists of 25 acres of C-Conservation along the
river and Castle Creek, and SPA overlay (with no underlying
zoning) on the remainder of the parcel..
The application proposes underlying zoning of R/MF with (L) Lodge
overlay for the two townhome parcels and R-15 for the four single
family lots. Additionally, the proposal calls for zoning the
remaining SPA land occupied by the non-profit institutions as A -
Academic. The request also includes amendment of the A -Academic
zone (Attachment I'D") to include the uses currently on site but
not listed as permitted uses. These would be uses such as lodge,
restaurant, 'and health facility. The Planning Office supports
the A Academic designation, but does not want to see the Academic
zone permitted use list expanded. An expanded list of uses
exceeds the intended purposes of the A district. Even though
there are no existing Academic districts, future A zones would
then be allowed these uses by right.
As an alternative, the'Planhing Office recommends utilizing the
SPA use variation process, to accomplish the objective of
legitimizing these uses. As changes to the Final SPA Plan must
be reviewed by established Code processes anyway, the burden to
the project does not increase.
W
In the same light, the Planning Office supports R/MF designation
for the townhomes, but not the (L)Lodge overlay. The applicant
states that the reason for requesting (L) is to allow short-term
rental of the units which are condominiumized but are not sold.
Condominiumization requires 6 month minimum leases for
residential uses. Again, Planning recommends utilizing SPA use
variation to remove the 6 month minimum lease requirements if
approved by the Planning Commission and City Council.
Access
The Conceptual Plan shows Seventh Street as the major access into
the Meadows. Technical considerations which support this choice
are:
1) Once the Hwy.82 re -alignment occurs, most traffic will
naturally flow onto Seventh Street.
2) There are fewer residential uses along Seventh Street.
3) Seventh Street was identified as the Meadows access in the
1987 Transportatiori-Elemeht of the Comprehensive Plan.
4) Ingress and egress would be dispersed along both Seventh and
Eighth Streets rather than,concentrated on Eighth.
The Planning Office is aware that other considerations exist
regarding access: neighborhood character, traditional traffic
patterns, and intrusion .into the racetrack caused by roadway
width. The Planning Office finds that any of the access options
adequately address the impact of traffic. In order to address as
many issues as possible, the Planning Office recommends the one-
way pairs (Seventh St. into the Meadows and Eighth St. out of the
Meadows.) This option Mill disperse traffic impacts, preserve as
much of the open space as possible because of reduced roadway
width, and generally meet the technical points outlined above.
The Engineering Department has recommended this option.
Employee Generation Impacts of Townhouses as Residential or Short
Term Accommodations
Staff was initially concerned, about.the potential increase in
employee generation created by short term occupancy of the
Townhouses. Staff finds that the "residential" mitigation of
23.69 employees.for the new residential construction adequately
addresses the likely lodge generation of employees given our
assumptions about the general service levels associated with the
lodge.
Provision for Open Space
The Master Plan calls !for the City to purchase the 25 acres
currently zoned Conservation' and additionally deed restrict that
land to be used only. for trails and benches. This protects the
Meadows from potential future use of .this parcel for limited
9
single family use, active parks, stables, etc. as allowed in the
C * zone.. The Planning, Office has discussed this issue and
proposes creation of new-izone district called "Open Space". This
new zone would have a !very limited list of permitted uses -
trails,, benches, picnici tables, and open pasture. This zoning
designation could be readily applied to other open spaces that
exist in the City, ie. the Marolt parcel. In exchange for this
improved protection for the Meadows, the Planning Office
recommends this new Open Space zone be also be applied to the
open areas shown on the Master Plan: the Race Trackopenspace,
Anderson Park open space,, 'Sage Meadow open space, and the Tent
Meadow -open space. Maintaining the integrity of these areas was
listed as a goal of the Master Plan. If the Commission and
Council agree with the concept of this new zone district, Staff
will prepare a Code text amendment for consideration at or before
Final SPA Review of the Meadows.
Location of the Rehearsal Hall:
The Planning Office recommends the eastern site for the Rehearsal
Hall. This would help limit visual intrusion and maintain access
into the open spaces to. the west of the main tent. The site
feels less cramped, is further: away from Institute uses, and has
better access for service vehicles and patron and equipment
loading/drop-off. The eastern site is closer to parking. A
roadway separates the residential area further east, and Planning
recommends the Landscape Plan include a vegetative buffer along
the Meadows boundary to the east of the hall.
Bus Drop -Off Area Z Interface with Pedestrian Access
Although it is part of the Master Plan, the Planning Office feels
the location of the transit area needs some additional discussion
and review. As proposed,, the buses will line up for passengers
and create a hostile barricade for pedestrians and bikers
travelling between the Seventh/Sixth Street corridors and the
Music Tent. The applicant should explore relocating the drop-off
area(s) along the east side of ' the property and in front of the
Boetcher Hall or design pedestrian routes through the parking
area to enhance the "walking and biking experience."
Neighborhood concerns
West End residents are concerned with two issues: transportation,
including the access via Seventh or Eighth St. and the Rehearsal
Hall programming (seating capacity, number of performances,
seasons of use, and "outside" use by other organizations).
11,000 square feet is proposed in the application. - The Master
Plan sets the upper limit of seating at 500. Planning recommends
that the applicant address these programming issues at Final
Review.
10
STAFF RECOMMENDATION: Planning Office recommends approval of the
Conceptual SPA plan with.the condition that the Final Development
Plan address the following issues and questions:
Prior to Conceptual Review by City Council the following two
items shall be submitted to the Planning Office:
1. Site plans, elevation drawings, and program elements for the
health facility (including 1,800 s.f. expansion and swimming
pool) .
2. Details of the proposed tennis parking area including plan and
elevation sketches and specific use descriptions.
3. A Construction Schedule.
Prior to submission for Final Development Review:
The list items in the Master Plan must receive Conceptual and
Final approval by the Historic Preservation Committee (HPC).
A Subdivision Plat in full compliance with Section 7-1004 D.1
\and D.2 shall be submitted which describes the specific parcels
to be held in separate ownership, including the Conservation Area
to be purchased by the City.
Trail easements on the Meadows property must be dedicated on
the Subdivision Plat.
'�. All utilities shall beunderground. Easement needs of each
utility shall be addressed at Final submission. Major utilities
must sign off on final submission.
�- Compliance with the "Urban Runoff Management Plan" is required
as per Engineering Department requirements. Ditch and pond
easements are required.
The applicant shall;amend the application to reflect the use
f Seventh and Eighth Streets 'as a one-way pair into and out of
the Meadows.
1 Costs associated with the Seventh Street expansions or
alterations shall be borne by the applicant.
P. Trails and bikeways; shall be implemented in compliance with
the adopted Pedestrian and Bikeway Plan. The pedestrian trail
along the old Meadows road alignment shall be reconfigured to
conform to design standards set forth.in this plan.
A fugitive dust control plan must be approved by state and
ken
County agencies prior to issuance of any excavation or building
permits.
Undergro parking must be designed by a ventilation
engineer�i
lc� 12. Food service facilities shall comply with all State and local
environmental health codes.
.-� 13. High eff cl Compact florescent lighting and low flow
g
plumbing sha e used throughout new and remodeled buildings.
f Housing mitigation for the 23.69 low income employees shall be
provided through cash -in -lieu for 16.69 employees as well as on -
site housing for seven employees, deed restricted to low income.
i5'. The affordable housing units must' be deed restricted meeting
the Housing Authority's requirements for size, type, asset,
income, and occupancy standards.
Condominiumization fees shall be paid for the eight existing 3
bedroom townhomes totaling $64,240, payable before plats are
filed.
New residential units must receive GMQS allotments.
`l The following areas shall be rezoned to a new zone district
�J called OS -Open Space: the 25 acre parcel currently zoned C-
Conservation, the Racetrack, Sage Meadow, Anderson Park, and the
Tent Meadow, as designated in the Master Plan.
19. The Rehearsal Hall will be located to the east of the Music
Tent and shall be screened along the eastern MAA property
boundary with a vegetative buffer.
20. A detailed description of�the use program for the Rehearsal
Hall shall be provided. This must address seasonal use, daily
use, use by outside entities, public performances, etc.
21. The backstage expansion at the Music Tent shall be limited to
1,500 s.f. unless the Master Plan is amended to allow additional
area.
22. A fire suppression/protection plan must be developed in
concert with the Fire Marshall's Office and included in the Final
submission.
23. The applicant shall commit to making necessary corrections to
the Sanitation District trunk line as mentioned in the referral
letter.
24. A detailed transportation plan shall be submitted with the
12
i
Final Plan application. The bus loading area and its interface
with pedestrian access ways must -be addressed. The
transportation plan shall also provide specific details on items
mentioned in the Master Plan: vehicle size* regulations, small
non -diesel buses, Rio Grande shuttle, paid parking, residential
parking permits, lodge limousine, and paved MAA parking. In
addition the transportation plan shall evaluate the effectiveness
of less underground parking and a better transit system
throughout the property..
25. A digitized copy of the Subdivision plat is requested by the
Engineering Department prior to recordation.
Attachments: "A" - Master Plan
"B" - Conceptual SPA Application
"C" - Referral Comments from various agencies
"D" - Section 5-219 of the Land Use Code: " A -
Academic" zone
"E" - 10/19/90 letter from Perry Harvey regarding
forthcoming transportation plan
"F" - 11/13/90 Report from Fe-lsburg, Holt &
Ullevig
j tkvj /meadows. memo
13