HomeMy WebLinkAboutagenda.apz.19880802
AGENDA
ASPEN PLANNING AND ZONING COMMISSION
August 2, 1988 - Tuesday
4:30 P.M.
Old City Council Chambers
2nd Floor
City Hall
REGULAR MEETING
--------------------------------------------------------------
--------------------------------------------------------------
I. COMMENTS
commissioners
Planning Staff
II. MINUTES
III. CONSENT AGENDA ITEM
A. Interpretation of a Use in the C-l Zone District
IV. PUBLIC HEARING
A. Brand Building - Conditional Use
V. PLANNING ITEM
A. Discussion with P&Z on Planning Office Work Priorities
VI. ADJOURN MEETING
MEMORANDUM
TO: Aspen Planning and Zoning Commission
FROM: Cindy Houben, Planning Office
RE: Request for an Interpretation of a Use in the C-1 Zone
District/Consent Agenda Item
DATE: August 2, 1988
REQUEST: Dr. Jack Crandall has requested an interpretation
concerning a use in the C-1 zone district.
DESCRIPTION OF THE PROPOSAL: Dr. Crandall has requested that an
electronics repair and limited sales establishment be allowed in
the.Patio Building in the C-1 zone district.
RECOMMENDATION: Staff is recommending that this be approved as
a consent agenda item. Attached is a memorandum to Alan Richman
explaining the staff position on the request.
ch.pcc
MEMORANDUM
TO: Alan Richman, Planning Director
FROM: Cindy Houben, Planner
RE: Patio Building Uses
DATE: July 21, 1988
Attached is a copy of a letter from Jack Crandall requesting that
a small space (250 sq. ft.) in the Patio Building, located in the
C-1 Zone District be allowed to be occupied for an electronics
repair company, with limited sales of electronics goods.
Appliance repair stores are not listed in the use chart for the
C-1 zone district, however, service commercial establishments are
allowed to a limited extent. Furthermore, an appliance store is
an allowed retail use in the C-1 zone.
SECTION 5-210 B
Service Commercial establishment limited to the following
and similar uses: catering service, financial institution,
office supply store, shop -craft industry parking garage, and
personal service shops including barber shop and beauty
shop.
You have asked me to review this to see if we could make a
finding that the use could be interpreted as an approved use.
The purpose of the C-1 Zone District reads as follows:
SECTION 5-210 A
The purpose of the Commercial (C-1) Zone District is to
provide for the establishment of commercial uses which are
not primarily oriented towards serving the tourist
population.
Indeed, the proposed use is not a tourist oriented service. It
appears that this proposed type of use would be appropriate in
the C-1 zone district and is similar in nature to the above
listed uses. I recommend that this use be approved, subject to
its acceptance by P&Z on the consent agenda on August 2.
ch.crandall
MEMORANDUM
TO:
Aspen Planning and Zoning Commission
FROM: Cindy Houben, Planning Office
RE: Brand Building/Conditional Use for Historic Structure
Allowing Existing Residential Unit to Delete the 6
Month minimum Lease Restriction
DATE: August 2, 1988
REQUEST: Conditional Use Approval for residential dwelling units
which are located above street level commercial uses in a
historic landmark and which are not restricted to 6 month
minimum leases.
APPLICANT: Harley Baldwin.
LOCATION: The Brand Building, located at 205 South Galena St.,
lots G, H, and I of Block 88.
ZONING: Commercial Core (CC).
HISTORY: The Planning Commission reviewed an application for a
change in use from commercial to residential use by the current
applicant. in October of 1986. This application was approved,
thereby allowing (4) new residential units to be created with the
condition that these be deed -restricted to a minimum 6 month
occupancy requirement. Three other previously existing units
were allowed.to be short -termed at that time for a total of seven
units on the property.
DESCRIPTION OF THE PROPOSAL: The application is requesting
approval of a conditional use allowed in the CC zone district for
historic structures. The specific request is to allow the
applicant to lift the 6 month minimum lease deed restriction
placed on 4 of the 7 units at the time the application was
reviewed in 1986.
The new Land Use Code, adopted April 25, 1988, specifically
allows the Planning Commission to review the applicant's request
as a conditional use in the CC zone district. Section 5-209 C.
of the Land Use Code states as following:
The following use is permitted in the CC zone district
subject to the standards and procedures established in
Article 7, Division 3.
Residential dwelling units which are located above
street level commercial uses in Historic landmarks and
-' which are not restricted to 6 month minimum leases.
According To Roxanne Eflin, the City Historic Preservation
Specialist, the Brand Building is listed on the National Register
of Historical Places and is also an Individually Designated
Historic Landmark by the City, thereby qualifying the structure
for this Conditional Use review by the Planning Commission.
REFERRAL COMMENTS:
Engineering Department: The following requests were made in
the attached memorandum submitted by Chuck Roth of the
Engineering Department:
All existing encroachments in the alleyway be
corrected.
2) A problem created on the alley from drainage off the
roof of the Brand Building should be corrected.
CONDITIONAL USE REVIEW:
The following are the criteria for a Conditional Use review as
outlined in Section 7-301 of the Land Use Code. The applicant
and staff response are included below. (Please see the attached
application for a more detailed response to the criteria).
A. Criteria: The conditional use is consistent with the
purposes, goals, objectives and standards of the Aspen Area
Comprehensive Plan, and with the intent of the Zone District
in which it is proposed to be located.
Response: The 1973 Aspen Land Use Plan includes the site of
the Brand Building, within the "Central Area" designation.
The following is taken directly froin the Plan:
Central Area - To allow the primary use of land for
tourist commercial activity that is essential to the
community's economic vitality in an area that relates
well to the proposed public transportation system, the
ski area and existing tourist oriented businesses.
Ordered yet diversified land uses, such as resident
related commercial, residential and professional office
uses, should be located on the fringe of the central
area. Urban design consideration is an essential
element of future development or redevelopment of the
central area and is necessary to take advantage of the
unusual opportunities presented by its historic
heritage and the relationship of the central area and
Aspen Mountain. This design element includes as
primary concerns the preservation of historic sites,
structures and mountain views/ implementation of tree
planting programs, as well as expansion of the
I
pedestrian oriented mall area.
Short term accommodations appear to be consistent with the
description above. Short term rentals are primarily tourist
oriented and offer a diversified downtown core. Such uses
.are also seen as an incentive to historic preservation,
which is consistent with the Plan.
The applicant also adds that the new Land Use Code took into
account the problems regarding second level commercial
operations in the Downtown core and thereby offers
residential uses as a possible option via the Conditional
Use review process.
B. -Criteria: The conditional use is consistent and compatible
with the character of the immediate vicinity of the parcel
proposed for development and surrounding land uses, or
enhances the mixture of complimentary uses and activities in
the immediate vicinity of the parcel proposed for
development.
Response: The application contends that the proposal is
compatible with the immediate area. It notes that 3 of the 7
units are already permitted to be leased without minimum
term restrictions. The application notes that residential
uses above first floor uses are common in the area. Such
uses have been generally viewed by the Commission as
desirable, although your support has tended more toward
resident -oriented housing.
C. Criteria: The location size, design and operating
characteristics of the proposed conditional use minimizes
adverse effects, including visual impacts, impacts on
pedestrian and vehicular circulation, parking, trash,
service delivery, noise, vibrations and odor on surrounding
properties.
Response: The application states that the proposal will not
cause adverse impacts in regard to visual, pedestrian or
vehicular concerns. It also notes that there will not be
any additional impact regarding noise, parking, trash, or
service deliveries. The -staff tends to believe that there
will be increased impacts caused by more frequent service to
the units by maids, service delivery trucks, and trash
service companies. Undoubtedly the units will be marketed
in a way which allows short-term occupancy by tourists to
the community. The staff generally supports the Brand
Building location for small scale tourist accommodations but
feels that the service impacts must be more closely analyzed
by the applicant. Listed below are conditions with respect
to trash service and alley encroachments in response to this
criteria.
3
With regard to parking, the application is correct in
stating that no parking spaces are required for residential
uses in historic structures in the CC zone district. It is
the opinion of the staff that the Brand Building occupants
will not need a car while staying in the Aspen Area and will
quickly realize that they are within walking distance or
that they have convenient access to the bus system allowing
them to easily get around the area. The Planning staff
encourages the Brand Building units to be advertized as
units which do not require that individuals have a car.
D. Criteria: There are adequate public facilities and services
to serve the conditional use including but not limited to
roads, potable water, sewer, solid waste, parks, police,
fire protection, emergency medical services, hospital and
medical services, drainage systems, and schools.
Response: Adequate public facilities exist at the Brand
Building, however, solid waste disposal has been identified
as an alley problem by the Engineer Department.
E. Criteria: The proposed conditional use complies with all
additional standards imposed on it by the Aspen Area
Comprehensive Plan and by all other applicable requirements
of this chapter.
Response: The only additional requirements that the Planning
Staff is concerned about are mentioned in the response to
criteria C.
Section 7-307 of the Land Use Code allows the Planning Director
to recommend conditions of approval which serve the purpose of
the Land Use Code and the Aspen Area Comprehensive Plan. The
Planning Office recommendation is to require that the applicant
upgrade their trash service capacity in order to alleviate the
need for additional trash pick up to occur. In addition, the
basic alley encroachments should be cleaned up pursuant to the
Engineer Department comments.
RECOMMENDATION: The Planning Office recommends approval of the
Conditional Use request to allow residential dwellings on the
second floor level above street level in the Historic Brand
Building with no minimum lease restriction with the following
conditions of approval:
1. The applicants shall install a trash compactor on their
property.
2. All isting t dash receptacles shall be located on ,t� Brand
Buil'd�ng property outside of the alle wa .
� y 4 The,, app scants
may e plore ot�zer�,ztrash storage -'options � which mist be
acceptable to t e EngineeringDepartment
(i.e., a below
�� ! 4
Ura ma`s_storage area which ac esses tie %aley with a
system)
3. o encroachments shall be _ ermitte
- in the alley and all
e iti�r g' e�rQ.a-Ehmen utility. boxes, etc:shall be take
ut of the alleyway. n
l✓ he roof drainage problem in the alleyway shall be corrected
by the applicant to the satisfaction of the Engineering
department .
The above conditions shall be met by the applicant within
six months of the date of P&Z approval of the conditional
use, or the conditional use permit shall be revoked.
CH.HARLEY
5
MEMORANDUM
To: Cindy Houben, Planning Office
From: Chuck Roth, Assistant City Engineer (iqe-
Date: July 24, 1988
Re: Brand Building - Conditional Use
Having reviewed the above referenced application, and having made
a site inspection, the Engineering Department has the following
comments:
1. Insofar as the granting of the conditional use represents an
improvement of property values and revenue potentials to the
applicant, and insofar as the city is able to make requests or
requirements associated with property zoning benefits, the
Engineering Department suggests two requests or requirements.
In the alley there are a number of encroachments of uses perti-
nent to the Brand Building. A plat was not received with this
application, but there appear to be at least four dumpsters in
the alley right-of-way and other utility installations - gas,
water, electric - which appear to be encroaching into the alley.
It is desireable both from a public safety standpoint (the code
requires 20 foot wide emergency access) and from the standpoint
of general ability to make the best use of alleys, to have these
encroachments removed from the alley. It does not appear that
these encroachments are licensed. It may not be appropriate to
be granting conditional use approvals to a structure which has
unlicensed encroachments in the public right-of-way.
There has been a problem with roof drainage at the Brand Building
which is merely drained onto the surface of the alley where it
freezes during winter months, thereby creating an ice hazard.
For new construction, a developer would typically install a
drywell to drain the roof into. (This was done at the Indepen-
dence Lodge Building, also known as the Crossroads Drugs build-
ing.) The Engineering Department would like to see this roof
drain removed from the alley. The other technique besides a dry
well to deal with the water would be to pipe it to the storm
sewer in Mill Street.
cc: Jay Hammond,, City Engineer/Director of Public Services
CR/cr/memo-88.62