HomeMy WebLinkAboutresolution.council.005-18 RESOLUTION #005
(Series of 2018)
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN,
COLORADO, APPROVING CHANGE ORDERS #52 AND #58 BETWEEN .
THE CITY OF ASPEN AND CHARLES CUNNIFFE ARCHITECTS
AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE
ORDERS ON BEHALF OF THE CITY OF ASPEN, COLORADO.
WHEREAS, there has been submitted to the City Council change orders for
the Civic Space Relocation Project—Police Department, between the City of
Aspen and Charles Cunniffe Architects, a true and accurate copy of which is
attached hereto as Exhibit "III and IV";
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ASPEN, COLORADO,
That the City Council of the City of Aspen hereby approves those change
orders for the Civic Space Relocation Project— Police Department between the
City of Aspen and Charles Cunniffe Architects, a copy of which is annexed hereto
and incorporated herein, and does hereby authorize the City Manager to execute
said change orders on behalf of the City of Aspen.
INTRODUCED, READ AND ADOPTED-by the C' Council of th City of
Aspen on the 8th day of January, 2018. 41
Steven Skadror , Mayor
I, Linda Manning, duly appointed and acting City Clerk do certify that the
foregoing is a true and accurate copy of that resolution adopted by the City
Council of the City of Aspen, Colorado, at a meeting held January 8, 2018.
C
inda Mannmg, City Cle k
CHARLES CUNNIFFE
ARCHITECTS
CHANGE ORDER #52
PROJECT: City of Aspen Building Replacement Project - Aspen Police Department
Aspen, Colorado
DATE: September 22, 2017
TO: City of Aspen, Jack Wheeler, Capital Asset Manager
JOB NO.: 1506
Per the Owner/Architect Agreement AIA BI01-2007 doled March 16, 2015, the following services
requested by the Owner are beyond the scope of work defined by the aforementioned
Agreement and the following is a request for approval to supplement the Agreement:
DESCRIPTION OF ADDITIONAL ARCHITECTURAL CONSULTANT SERVICES:
Per the OAC on 8/15/17, the design team is to update the construction documents to provide K4
vehicle impact rated barricades at the south facade of the Police Department. CCA will meet
with CoA,APD and Amy Simon as needed. CCA will coordinate and resubmit drawings to the
Building Department.See KL&A and Design Workshop proposals attached for additional scope
descriptions.
CCA:$1,200
KL&A: $1,600
Design Workshop: $6,500 1
Total Change Order N52-Services fee: $9,300
Reimbursable expenses associated with these services are in addition to the Change Order
services fee and will b urged ac rding to"Exhibit A-Schedule of Hourly Billing Rates" per
the Owner/Archil Agre ment AI 101-2007 dated March 16, 2015.
AUTHORIZED
ck he(eler, City'of Aspen Date
AUTHORIZED BY: 1
Charles L. Cunniffe, AIA, Principal Date !
Charles Cunniffe Architects
I
610 East Hyman Avenue • Aspen.Coluodo 81611 • 970.925.5590 Fox 970.920.4557 • www cu _fp com
KL&M, Inc.
Structural Engineers and Builders
Request for Additional Services
KL&A, 111C., ("Structural Engineer")
215 N. 12"Street, Unit E
Carbondale, CO 81623
Telephone:(970)927-5174
Date:
September 18, 2017
Submitted to:
Charles Cunniffe Architects
610 East Hyman Avenue
Aspen, CO 81611
Attention: David Rosenfeld
Project:
Aspen Police Department-Housing
Date of Agreement: November 15, 2016-
Description of Additional Services:
Structural design steel K4 rated bollards,and concrete K4 rated bollards.
Fee=$1600
Terms and Conditions:
The Terms and Conditions of this agreement are set forth in Agreement dated: November 15,
2016.
Agreement:
Services will proceed upon receipt of authorization and a signed copy of this form.
Structural Engineer: Acceptance by Client:
KL&A, Inc. Charles Cunniffe Architects
by: by:
Dan Doherty, P.E. date:
Principal Engineer title:
Page 1 of 1
9/22/2017
Charles Cunniffe
610 East Hyman Avenue
Aspen, Colorado 81611
970-925-5590
Additional Services for: Aspen Police Station
To David Rosenfeld:
This letter is a request for payment to complete Additional Services associated with the Police Station.
Requests for drawing changes have occurred after the final 100% Construction Document and
Specifications for the landscape drawings were submitted to CCA on September 28"i, 2016. Based on
the direction from the Architect and Client, we understand that the following services will be required.
Design and Rendering of bench to comply with security strategies. Designs to be integrated into the
overall design of the plaza including Flag pole, monument,time capsule and site furnishings. This
request was discussed between Design Workshop, Charles Cunniffe, Capital Asset,NV5 and Shaw
Construction Representatives at the August 15'x' OAC meeting. OAC meeting minutes captured this
conversation as "CCA to review design options for front entrance vehicle barricade."This request
includes construction documentation and specification changes for benches, bollards (not including
structural design)and 'paving layout modifications which may occur as a result of the selected design
and security direction.
• Requested by Jack Wheeler on 8/15/2017
• Estimated Fee: $6,500
By signing this letter, you are authorizing Design Workshop to commence services immediately. This
fee does not include reimbursable expenses. The contract conditions of existing Agreement dated
October 15`h, 2015 shall be binding on these additional services unless modified herein.
Please call me at 970-925-8354 if you have any questions regarding this request for additional services.
Sincerely,
Richard W. Shaw, Principal
DESIGN WORKSHOP, INC.
APPROVED BY CLIENT:
By: Date: t / Lt t $
Title: GAL6C W dGKS D( et37WL�
C� t!`'t rT pt'ty
CHARLES CUNNIFFE
ARCHITECTS
CHANGE ORDER #58
PROJECT: City of Aspen Building Replacement Project-Aspen Police Department
Aspen. Colorado
DATE: December 41h; 2017
TO: City of Aspen, Jack Wheeler, Capital Asset Manager
JOB NO.: 1506
Per the Owner/Architect Agreement AIA 8101-2007 dated Morch,16. 2015, the following services
requested by the Owner are beyond the scope of work defined by the aforementioned
Agreement and the following is a request for approval to supplement the Agreement:
DESCRIPTION OF ADDITIONAL ARCHITECTURAL CONSULTANT SERVICES:
Per the OAC on 8/15/17, the design team is to update the construction documents to provide K4
vehicle impact rated barricades at the south facade of the Police Department. Per the revised
Landscape Design issued by Design Workshop on 11/17/17, this will require revisions to Civil grading
and design as outlined in the attached proposal.
SGM:$2.250
Total Change Order#58-Services Fee:$2,250
Reimbursable expenses associated with these services are in addition to the Change Order
services fee and will be charged according to "Exhibit A-Schedule of Hourly Billing Rates" per
the Owner/Architect Agreement AIA BI01-2007 dated March 16.2015.
AUTHORIZED BY:
r, City of Aspen _ Datet
d
G g►t4N✓r5
AUTHORIZED BY: 12•K•13�
Charles L. Cunnitfe,AIA, Principal Date
Charles Cunnitfe Architects
610 East Hyman Avenue Aspen.Colorado 81611 • 970.925.5590 • Pax 910.920.4557 ww &vWif fe&M
SGMI
MEMORANDUM
TO: Jack Wheeler
FROM: Jay Hammond
DATE: October 16,2017
SUBJ: Additional Services for New South Side Landscape Plan
Please consider the following request for additional services for the Aspen Police
Department. On October 6`t', 2017 we were informed by Charles Cunniffe Architects that
the City of Aspen would like to add bollards to the landscaping on the south side of the
site. The new landscaping plan removes and adds benches, changes the extents of the
hardscaped areas, adds trees and makes other minor revisions.
These changes will require us to make edits to the site plan and grading and drainage plan
for the proposed Aspen Police Department. Based on the landscape plan received by
SGM from Charles Cunniffe Architects on October 6'n, 2017, we estimate the total cost
of these additional services to be$2,250. This estimate does not include any revisions to
the drainage report, structural design or major variances from the landscape plan
mentioned above. No revisions to the drainage report are being made because the changes
to the impervious areas will not affect drainage patterns, peak runoffs or water quality.
The new trees will require approximately 20' of storm pipe to be rerouted and may
require one inlet to be relocated.
Please let me know if you have any questions or if I can provide any additional
information.
Sincerely,
Jay Ham dd, P
SGM, IN ..
118 W. 6°St, Suite 200, Glenwood Springs, CO 81601 I
■� g z mramue _133N1S NIWI1SV30K_ � O
`JNISnOH 31SVON033V Y °D
ERE F ! S1031WOLIV 3ddINNnO S3121VH0 - 4NV NOIIVIS 3�IlOd 045
h
w
0
� y iii i89 4 � yYr'�9 r
YY iff§559l9 E i Y i � SS1(� i i i�i i i�i 1%3� i i � 3 - i
IYj,gf Y
p=� I � t YYI
111HM =� i ii %J i ; ! i � � , � � i�� i ; � i"� } I � ; � � � fii ► � isl �E
'6 d 1
rlt• � m
€ 9 _ � ,^• i