Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Land Use Case.501 Rio Grande Pl.0029.2005.ASLU
505 Rio Grande Place Stream Margin Rvw- Use 0029.2005.ASLU . €Okk) A)121> D 61 1 6 J q -11 City of Aspen Community Development Dept. CASE NUMBER 0029.2005.ASLU PARCEL ID NUMBER 2737-07-3-06-851 PROJECT ADDRESS 505 RIO GRANDE PL PLANNER SARAH OATES CASE DESCRIPTION STREAM MARGIN REVIEW REPRESENTATIVE THEATRE ASPEN 925-9313 DATE OF FINAL ACTION 5/10/2005 CLOSED BY Denise Driscoll 1 'lljgm,ift MEMORANDUM OF POLICY Building Codes FROM: Russell A. Grance, C.B.O. DATE: January 19, 2000 APPROVED: Stephen Kanipe, C.B.O. DATE: April 12,2003 SUBJECT: Change Order Criteria Change orders will not be accepted prior to issuance of the #1 permit. When changes to approved plans are submitted that reflect relocation of interior walls, change of room use, addition of plumbing facilities, change in window size or location, and similar minor modifications but no increase to existing square footage, then a change order application can be processed. Change orders will only be processed on active building permits. Any change submitted after final inspection will require a new and separate permit. When changes to approved plans are submitted that reflect an increase in the square footage, increase in height, expansion of the existing footprint, then a new and separate permit will be required. When changes to approved plans are submitted that reflect a decrease in total square footage and have substantial changes in design i.e. exterior wall location, building height, elevation changes and similar major changes, then a new and separate permit will be required. When changes to approved plans are submitted that reflect a decrease in total square footage and minor or no change to the remaining square footage, a change order application can be processed. Page: 4 mH,m0#H~•~ [ile Edit Becord Navigate FQrm Reports Format Iab Help . , Module Help v~ lee#*E:.]]Gue,~di.|10&-3.GQO.I]N 4 , Makidiumpt :4 9 & 44 Cj aer 1* 9 Routing History | Conditions | Sub Permits I Valuation I Public Comment 1 Attachments | Main | RoVting Status | Arch/Eng | Parcels ~ Custom Fields | Feel ~ Fee SummarM | 8ctions ~ Permit Type |91~ -~34en Land Use 2004"1~ Permit # | 0029.2005.ASLU 3~I Address |505 RIO GRANDE PL 3 Apt/Suite I City ~ASPEN State|CO j Zip |81611 ~ Permit Information Master Permit 1 2 Routing Queue |aslu Applied |04/05/2005 ~ Prolect ~ .~ Status ~pending Approved | ~| Description ~STREAM MARGIN REVIEW Issued 1 Final I ~QI Submitted |THEATRE ASPEN 925-9313 Clock |Running Days E-6- Expites |03/31/2006 12| r Visible on the web? Permit ID: ~ 33619 Owner Last Name |THEATRE ASPEN £~ First Name ~ 110 E HALLAM STE 103 Phone |(970) 925- 9313 ASPEN CO 81611 9 Owner Is Applicant? '61 t 221'. 721~~15_*1 -- Irt?2'32~5'20 .c~JU -4. I 1 - 1 .1 trter the permit type code Record: 1 of 1 About The Department 0% WORKING WITH THE COMMUNITY TO ASSURE IMPLEMENTATION OF PUBLIC POLICY AND TO CREATE A SAFE AND WELL-PLANNED PLACE TO LIVE, WORK AND PLAY. The Pitkin County Community Development Department includes the Build- ing, Planning and Zoning offices. We are responsible for reviewing all land use applications, enforcing zoning regulations and issuing permits (building, earth- moving, access, signs, etc.). Building Planning Zoning *Reviews building *Facilitates and imple- *Reviews building per- permit applications ments master plans that mits and development *Conducts building provide direction for the fu- applications for compli- inspections ture growth of the County ance with the Pitkin *Administers contractor *Analyzes development County Land Use Code licensing program and land use applications and any land use approv- *Provides on-call staff with input from referral als to answer questions re_ agencies and makes *Enforces land-use/ recommendations to lated to building, plumb- zoning regulations decision-making bodies ing, electrical and me- based on the Pitkin County the public regarding *Provides information to chanical codes Land Use Code *Provides educational zoning regulations *Provides information to materials including hand- the public regarding land outs and code books use regulations and gen- * Assigns addresses to eral planning properties ~ Important Days and Times -~ 4. Office Hours: Planning and Zoning Monday-Friday: 8arn-4:30pm Commission: . -i --. D. I - I. Building Plan Submittal: 1 st and 3rd Tuesdays: 5:30pm, Com- 130 South Goleno Street Mon: 1:30pm-3:30pm missioner's Meeting Room, 530 E. Tues, Wed, Thurs: 8:30am- Main St., Aspen Third Floor 11:30am, 1:30pm-3:30pm Board of Adjustment: Fri: 10:00am-11:30am, 1 st Tuesday: 5:30pm, location varies Aspen, Colorado 81611 1:30pm-3:30pm Board of County Commissioners: Planning & Zoning Walk In 2nd and 4th Wednesdays, 3pm, Hours: 530 E. Main St., Aspen, *2pm as of Phone: 970-920-5526 Monday: 1:30pm-3:30pm November 5,2003* Tues, Thurs: 8:30am-11:30pm, Public Hearing Officer: 3rd Tuesday, FAX: 970-920-5439 1:30pm-3:30pm 3pm, Commissioners' Meeting Fri: 10am-11:30am, 1:30pm- Room, Pitkin County Courthouse, www.ospenpitkin.com 3:30pm Closed Wed 506 E. Main St., Aspen September 16,2003 Pitkin Cou Community Development MEMORANDUM TO: Chris Bendon. Community Development Director FROM: Sarah Oates, Zoning Officer CO RE: Theatre Aspen, 505 Rio Grande Place-Stream Margin Exemption and Insubstantial Specially Planned Area (SPA) Amendment DATE: April 21,2005 SUMMARY: Theatre Aspen (aka Aspen Theater in the Park) has applied for an exemption from the Stream Margin Review and an insubstantial amendment to a Specially Planned Area (SPA) to install an additional tented area at the entrance of the theater, a shed for concessions and a portable trailer for dressing rooms. The installation is temporary and will be removed at the end of the summer. The applicant has sketches of the proposed improvements (see Exhibit "B'). Parks Department staff has meet with David McClendon. Artistic Director of 1 heatre Aspen. on-site to discuss the installation of the exterior improvements and staff s comments are reflected in the conditions of approval. APPLICANT: Tlieatre Aspen. LOCATION: 505 Rio Grande Place. ZONING: PLJB SPA. Public with a Specially Planned Area overlay. REVIEW PROCEDURE: Development that meets the criteria in Exhibit "A" may be approved by the Community Development Director. STAFF COMMENTS: Review criteria and Staff Findings have been included as Exhibit "A." The application has been included as Exhibit "B." 1 RECOMMENDATION: Staff recommends the Community Development Director approve this Stream Margin Exemption and SPA Amendment with the following conditions: 1. The applicant has flood and liability insurance. 2. Access: delivery of the trailer will require proper trail signage and safety. The trail shall be signed to inform users of the activity additionally any vehicle using the trail shall be flanked be flaggers in front and behind the vehicle alerting users of the coming vehicle. 3. Irrigation and Turf: due to the nature of the site and limited space along the trail and entry of the park turf and irrigation damage may occur. All damage shall be repaired by Theatre Aspen to a condition acceptable by Parks. 4. The installation ofthe concession stand will require minimal earth work. Any areas disturbed by earth work shall be restored with the Parks approved native seed mix. Additionally. after the berm area has been cleared o f trash and unused theater materials all disturbed areas along the berm shall be restored with the same mix and seeding standard. Seeding standard is 6" of top soil, hand spread seed mix. cover with weed free straw and irrigate. 5. Theatre Aspen requested the ability to add additional solar path lights out along the Rio Grande Trail. As discussed the lights shall be placed a minimum of two feet from the trail. Theatre Aspen shall contact the Parks department prior to installing the lights. a staff member will assist with install by locating any irrigation electrical lines and water lines. 6. Site improvements: improvements to the gravel entry and trailer location are permitted only within existing gravel areas. Material storage and vehicular parking shall all take place in Theatre Aspen parking area. Access to the site for improvements shall be covered under comment #1. 7. Tlie Parks Department is not responsible for communicating with or informing park neighbors of proposed changes. APPROVAL 1 hereby approve this Stream Margin Exemption and SPA Amendment to install an additional rented area. shed for concessions and portable trailer for dressing rooms at the Theatre Aspen, 505 Rio Grande Place as represente¢ in the application. APPROVED 6© 4, dawt.tfi.05 Chris Bendon, Community Development Director APR 2 5 2005 COMMUNITY DEVELoPUBN I utritut uh CITY OFASPEN 2 ACCEPTANCE: I. as a person being or representing the applicant. do hereby understand and agree to the conditions ofthis approval and certify the information provided in this application is correct to the bes*Pm·* knowledge. 400#40£"- date l~ 2-6/66' David Med·Endon, Artistic Director. Theatre Aspen. ATTA(71]XlENTS: Exhibit A-Staff Comments Exhibit B-Application W EXHIBIT A THEATRE AsPEN KTAFF COMMENTS: STREAM MARGIN: Section 26.435.040(B) Exemption. The expansion, remodeling, or reconstruction of an existing development shall be exempt from stream margin review ifthe following standards are met: 1. Construction ofpedestrian or automobile bridges, public trails, or structures ful· irrigation, drainage, flood control or water diversion, bank stabilization, provided plans und specifications are submitted to the City Engineer demonstrating that the structure is engineered to prevent blockage of drain age channels during peak flows and the Community Development Director determines the proposed structure complies, to the extent practical, with the Stream Margin Review Standards. Staff Finding: This standard is not applicable. 2. Construction of improvements essential tor public health and salbly which cannot be reasonably accommodated outside ofthe "no development area" prescribed by this Section including, but not limited to, potable water systems, sanitary sewer, illilities, and.fire suppression .9'stems provided the Community Development Director determines the development complies, to the extent practical, with the Stream Margin Review Standards. Staff Finding: This standard is not applicable. 3. The expansion, remodeling, or reconstruction of an existing development provided the fullowing standards are met: u. The clevelopment does not add more than ten (10) percent to the floor area of the existing structure or increase the a molint of bitilding area exempt pom floor area calculations by mai·e than twenty-five (25) percent. All streani margin exemptions are cit,]11{lative. Once a development reaches these totals, a Stream Margin Review br the Planning and Zoning Commission is required: and, Staff Finding: This proposal is for temporary improvements to an already approved temporary structure therefore, this standard is not applicable. b. The clevelopment dOC,4 not require the removal Of any tree for which a pernlit wou Icl be required pursuam to Chapter 13.20 of this Code. Staff Finding: The applicant is not proposing to remove any trees. c. The development is located such that no portion oftl>ie expansion, remodeling or reconstruction \\~ill be any closer to the high water line than is the existing development; Staff Finding: This is no remodeling or reconstruction related to this proposal. (i) The development does not #ill outside ofan approved building envelope if one has been designated through a prior review; and Staff Finding: There is no approved building envelope. (ii) The expansion, remodeling or reconstruction will cause no increase to the amount 01 ground coverage of structures within the 100-year flood plain. Staff Finding: There is no expansion, remodeling or reconstruction nor is there an increase to the amount of ground coverage of structures within the 100-year flood plain. INSUBSTANTIAL AMENDMENT TO A SPECIALLY PLANNED AREA Section 26.440.090(A) Insubstantial Amendment to a Development Order: An insubstantial amendment to an approved development order for a final development plan may be authorized by the Community Development Director. The following shall not be considered an insubstantial amendment: 1. il change in the use or character ofthe development. Staff Findinu: There is not change in use or character ofthe development. 2. An increase by gj·eater than three (3) percent in the overall coverage ofstructures on the land. Staff Finding: There will not be an increase greater than 3% iii the overall coverage of structures on the land. 3. Any amendment that substantiallv increases trip generation rates of the proposed development, or the denialld.tbr public facilities. Staff Finding: This amendment will not substantially increase trip generation or demand for public facilities. 4. A reduction by greater than three (3) percent ofthe approved open space. Staff Finding: There will not be a reduction by greater than 3% of the approved open space. 5. A reduction by greater ti·ian one (1) percent of the off-street parking and loading space. Staff Findinu: There will not be a reduction of off-street parking spaces with this proposal. 6. A reduction in required pavement widths or rights-ofrway 12„· streets and easements. Staff Finding: There will be no reduction in pavement widths or rights-of-way for street easements. l. An inci-case (,1 gl·cater than two (2) percent in the approved gross leasable floor area of commercial buildings. Staff Finding: There will be no increase in approved gross leasable floor area. 8. An increase by greater than one ( 1) percent in the approved residential dem'itv ofthe developnient. Staff Finding: There is no proposed increase in residential density. 9. Any change which is inconsistent with a condition or representation of the project's original approval or which requires granting of a kirther variation from the project's approved use or dimensional requirements. Staff Finding: This proposal is not inconsistent with the projects original approval, approved use or dimensional requirements. E>c. 2 ATTACHMENT 2-LAND USE APPLICATION - APPLICANT: Name: Ih© rrt-2 e - ~<1*~-e~r~~_~ Location: 6-05 -Pon G,LA Plget- N.€.49/tin,1-%4* (Indicate street address, lot & block number, legal description where Appropn j Parcel ID # (REQUIRED) 3-3 31 03- 30 lo F 4 / REPRESENTATIVE: Name: 3-Dai),4 f->9 c_-0-Jq»4.7 n flri-c-'yu-&O 43# rec-.tor Address: 1/0 6, . P-An .C lorn W. «fle, 70-9~ ftp.n Phone #: 9 -10 14 2,£6 -- CI)>:f> i -33> 1 PROJECT: -1- Name: -7 /3€44/GE- fkppen f6-9,0 r,-n, C-3 «t-·-_tu~npkboefl\~L Address: Phone #: TYPE OF APPLICATION: (please check all that apply): Conditional Use U Conceptual PUD E Conceptual Historic Devt. Special Review U Final PUD (& PUD Amendment) D Final Historic Development Design Review Appeal El Conceptual SPA U Minor Historic Devt. GMQS Allotment ~ Final SPA (& SPA Amendment) U Historic Demolition GMQS Exemption ~ Subdivision U Historic Designation ® ESA- 8040 Greenline, Stream U Subdivision Exemption (includes U Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane U Lot Split U Temporary Use ~ Other: ~ Lot Line Adjustment j Text/Map Amendment EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) Sumino %£!Cre, -t-edr- wil-h f«rn a RAX#de,k,trt-; 1 ;-1~jske,4. ..btf' rn"- e.,u e.; 3 ~-Q<.rrna»a.0 -5,»n led-63-unt-- A uy,3-k PROPOSAL: (description ofproposed buildings, uses, modifications, etc.) €34-ov- ; su- Inlf r--e·ue,Ad# -\-a> i n A , ide .: al A :1-: e·via.Q +ekki are« SheA -For- 2*ne-es<, mis ;Tn<Hable.-Emil«--5*- 4/-e,ssit.7 100"< Have you attached the following? FEES DUE: $ ~1 Pre-Application Conference Summary ~1 Attachment #1, Signed Fee Agreement El Response to Attachment #3, Dimensional Requirements Form El Response to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards All plans that are larger than 8.5" x 11" must be folded and a floppy disk with an electronic copy of all written text (Microsoft Word Format) must be submitted as part of the application. - m 0 0 El El THEATRE . ~ ~~~~©1.f ~~~ * '1« 4, 1 e341 . 60 4...., 44 t OF, . L'.L B E I 1 - 14 b . .... ''': 9/ -1- I. 't . 7 f . . I : I h , 32'14 . b¢3,4 ty ' 3 - 6 , L, H I . -. .. 4 . 2 / · . r ,- V . 0 7 , . . L. 11'1¥ / ..." F, 5 1* : 3 +2 • £ h 'llc. -1.] 4 .....4- % D, Ti ly .• 1 \F r- 16 ... 121 ~ 1* -/ 9 4~ | - , p <'fs*yo~ © j. /t . :4 Y .i Id .1. '21'bc, ir> ..,214: 4, 4 .* 1 k. 3t 2 1.1 .1 , .: f / fi ?L -49.. ·32«¥r ' 7<-'. ..t:#,/1 1 I ~ Theatre Aspen ~ ~ (showing potential exits offstage) Preliminary Groundplan 1/8" = 1'-0" iII - ----------- 1 11 i possible back wall location (adjustable) T , 8, 1 11 11 2 0 1 '~fh 1 4> 4--.------------ -= 22'-3" L-- --1------------1.- 1 r - ~M ~M--*Il 20' 4/0 1 V - :4 + 7~ 6 &1 2.1. -j-J ...\A><flili il \<\ 4 14> 1 1 1 7 1/11 y 1 1 ~11 1 111 ~ 1 0/ el A , 1 .A j FROM :William Scotsman - Gran ' - t FAX NO. :970-241-7273 Jan. 21 2005 10:45AM P2 We'1160 To Any Length To Meet Your Every Mobile Office Need. 2.0 04 20'-0" 1 I - h· ®ill* W /i-- I'LAN Wlt. ~ |~ j ) 61 VAOP· --9 1- WAY VAAl ~ ./Al" 1 1 b 16 5 2-, .... 1 1 11 k | 14" 055'10/ W/2 -| - K: 1 41.- 14 $20%0 2.1 1/...., t,RAWER 41 F r*gillrY / 1 n Mobile Office 24' X 8' '--2 Mobile Office 32' X 8' (Box size 20' X 83 (Box size 28' X 81 8=' 0 41' : e·-4· 1 F. -4 1.' --...... ...1 1. DIAN.!.I , ~.-Ed?11&f &46, MY'# 1 ,0, .,,.,op •n -- 1 · il ----::. : 1 1-- 922 5*Ynte . --. „. I#.,. : n b 10-/ 2- 4-9 DI,AWeR FILE G*DINE, | -7 Moblle Office 36' X 10' Mobile Office 46' X 10' (Box size 32' X 10') (Box size 42' X 10') M· ·U" •Z'·:11. .-01· 1 "'-„1· 11'.1,3- - 01 4.----1 1 1 9 -I 1-B Ef-11 -83 L{ Sh~D 7 -* .j -4 Rk--:. - f - 4- r=i-- -7 -6- < {6 ti Mobile Office With ttestroom 46' X 10' ~ ~ ~~~~~ ' d¢ Mobile Office With Restroom 60' X 12' (Box size 42' X 10') Self corok vud f 1 44. (Box size 56' X 12') 1 1° upv Vuul !(207 C \ 0\ . 4* 2 'B -I- ..401„ 1 1- 12.-21- 1 -- ...=-1 , 1 --1 IR 6 i.,9/ 1. 1.- in JEOCALD R.> .0 2 '13) / RAO' --1 E- '3 -39 i 1 ~ - -1 I . -C--1 Mobile Office 60' X 12' Storage Van 32' X 8' (Box xize .56' X 12') W ILL I AM S (Box size 28' X 8') SCOTSMAN db Mobile Offices · Storage Products And Mot·c Sizes, options, and floor pl ans can vary between regions, 1-800-782-1500 Tell us about your requirements. '3 1 6 92'-0 ' [21042] - T]Iting c•nopy off-horizontal wiN Increase wind lift & drag forces I ·'Chi , 1 exponentially, effectively lowering U. Design Wlnd. Canopy ohall be level In regions of high wind. - 1 centre Nagn[tudoofvectors vads: with 1~ -/ 1 M ultiply magnltudes by 0.45 for 40 +1 - wind. Vocton *hown for 70 mph. 1 . ----4 - mph / 1.8 for 80 mph. I . 2/ 1/ . .9 / 11 \1. % 3000 Ibf l·1 j '· i. . 1 11 3000 'bf 00'·A, / 4 ~ ISOMETRIC VIEW ' ~ (Showing fabric seams) bo 1600 Ibf jJ ; ' ,\,1500 Ibl -4 ' Typical Door y . ._ O 0 ~ #Pd@.92/71 2 lt; i (113) ' 4 1 117 \ 1 1 Doom shell ba ctoeed in high wind. PLAN VIEW (Area = 5,236 s f = 486 sm) (114 . ,, 1 , /, 1 1 h\ Contours 0, e hiehes obove dotum @ 0 wind I .i a r- indicating typical anchor reactions at design wind to f \ , 89%141 194" 1212933 - to 7 Ct":.1.17... Un 1 hi I ·· 1, 1. 111 i i;"ri.11'li,- 15*1: dil , 1 END VIEW 4\ NOTE: , f 24'-2 3,4" 1 ' 01 *S For anchor & cable locatlons, refor to tho following: 20'·4 1/4" f · / i 173CY; 50.32.003- 85000 Complete Sufvoy l 62061 0, 1 , 14.4 - '/ Truss & Guy 50.32.004- 85000 Concert Survey. '' 'H # 7 ~. I_ ~~~~~ ~ ~ 1 11, 111.,i: Connection Detail 50.32.005-85000 Open Survey. '' c:',;t . 2 Installer shall verify View from below , / -- 7 Ita•· | ' suitability of this or 0.} 1 ' ·' i. 1 2-M.E. G. ~. t otheranchoragato / 117 . h.m·. 11.„ m): 0,40,1,1.-11.,1. 11,-i:„i i,-ud...„.n ''; 11,:i,:1. 1, .:1.iii. 11,4 '-- · ,' Il.Irib'l, --,i· 3 ' 1 soil Conditions. i AE :i,f|06-- t il,, ci,3,1!tl.,1, inid (,ji,te.,. a,1..:ih 7 .11. .1. 41,1. :,p.,1 Iii·.1 |14. i„ 14 ' il l 17.41 |1.,1 ...1,11 it up 1 ..1 1 "i: 11 " ELEVATION ITEM# PART# QTY. DESCRPTIOIJ WEIGHT (Showing fabric seams) Anchor Kit L' , 1 40.32 004 1 85000 TOP 868 2 40.32 003 2 65000 END LIGHTING: Hardware will vary 1.265 with customer order / 3 30.16 100 4 GUYCABLEASSYSADDLESPAN-RED 33 Allowable live load due to equipment such as lighting f &,1- 1 rit·€*A and /orsile / 4 30.16.101 4 GUYCABLE ASSY SADDLESPAN·BLUE 21 I .? P 5 30.16.102 4 GUYCABLEASSYSADDLESPAN-GREEN 10 -=250 1bs ea x 4 locations symetrical about cL & axels, \. '421/ requirements. / F 6 30.18208 12 TENSIONER ASSY 14504-WITHDELTARNGS 63 Attachment shall be by web belt or clamps to pipe In- 4/-44 7 30.60.106 12 TRUSS 55000 ALUMNUNI 1.197 < Il~ 11 2022006 48 BOLT HEXHO0TSX45NCPLGR• 2' tentnology CO. 8 30.60.105 2 APEX S®00 GALV 80 serted Into truss between plckets. Do not clamp to truss, 9 30.60,100 2 8ASE ASSY SSCOO CA'Y HNGES & AXLE GALV 349 10 20.23.035 12 NUT EYE 0 625 CROSBY (500 # 5 - 3/4 THREAD 12 40' 12 20.23,006 36 NUTHEXO.75 GR2 NCPL 4 No, S»in 30.25 201 4 DOOR POLE · AD JUSTER ASSY S5000 67 15427 68th Avenue Su,rey H.C, Canada V36 2A1 5Jf NCI Shown 70.63.016 1 MANUAL. S5000 NSTALLATION & VIDEO 2 Tolit lbs 50,32.[ 03 SADDLESPAN SYSTEM S5000 COMPLETE 4,001 Tal; (604) 597-8308 Fax: (604) 697-8749 e.mall: tent@lantnology,com 05101620 Dentgned to meetorexceed the following requlnements: De:Ign Wind ANSI- 70 MPH Fastast Mile - NBC 4.1.8, FIn - ULC 3109, Calif. FIre Marshall, & MI User Nate Tent Intogrtty l" direct ~ SADDLESPAN S5000 COMPLETE function of Initallatlon quality. Follow Installatlon instructions, adding •taka, as conditions require. Do not excead design parnmetem or 10/1 01,1lnancoa for publlo ass•,nbly. Reaction forces 14: General Arrangement %:r Z ~::671,4,1Ff.'PV~i':f",0,7&22&9&:irtliTTAE,EZi~ZJZ"I'lin~,1„9,X~11'linain:~h:ig~, ~C~:'in: c:';:~='A:,=:,Uf27'i~:tatad on 0,18 drowIng SCALE IN FEET projecl: Saddlespan sea NTS | Sheet No.: 1 of 1 For Plan & Elivailons D.9 By: OW/1- Date: 11 Feb 01 .1, m.*Ir,Unkedapre/*WWm mm. .#*Jul ..2003·11,12 Ck·,1 Ey. BANS 40 P'd· 'f * - 50.32,003 . 4,1 # 4 .1.111 1 1. 1 - :i :'~'r :. r 9 4 3411 -11% 3-* ,!SV.11 ", 11'PL !11 2 , *: 'F 1.- /..ANFO/ 1 1114 + 1. 11 lilli 11 01111 . 9 ' t .,.ils,CH,·~·-4.-ti:14 ..rl .19, '' ig ,IMD'·~~ , 1: 1", f 1, r 9 14 ?,ro' +Mi : i i: 4 6 1 l.11<14 Ii' '9 A ' 2 6%, 1 1 1- ./.'~• ¥ V L '' ' 1,4..I.. ... 2,11.63 .//21 f '1 ' /41- 1. X biA » I \ I . '1,...1, t 4 r>: 41 \ 1 04 ~.;4,4 '.. ': i.,T v t.~* 41 1141 71 '-14 k .1 . 1 14 .7 V# 4 ~1 k. I I· ir 1 --,1 4,6:_ 4 r 1 2 ,y -ziL £*Mill/1.~9 j#D·j..,~- ~, Ut·; #r-- 1..: A ' :AB € a 4 I O- " t I -1 N . - I 1 5. 34 : -11 h a,10 /2. R b I' M ./ .49" L 1 + . .p , i l . --- V ./ (41·,0 ~ ", , . A te.k, .a *u· 4. th 11 . 7*'.7· ~•Un··'1;t..'·-.~4:0·©:~3049=twif4 - ,:4089·§·;9*.>t·'-e;4.<1*>~At,0/ -?04-1~6>~:.'2.5#,5 1 . .'*-,A. * -9 6441 x - . -- "22 . .... 1.....1.11 1 ;0'A :. 49.- 192'311--ie-·3151*37£*te 6%~91 -2-:.....»4-. 92-3ff\-~ 3/r:ff- f trtet, :-- €4 4,711 ./, 7¥ 1:4*'4 ''M ; - " lu) * -2 % ~ 4 , - -, /41€ , , 4* 04 - 1 . 44 17· i 4 . 4 / ~~..r~ 3 p.. K.._* ?*f-~.f 9244 ¥%*wae'./u'.D ....&.i - ·-%· 4, T · 4-7 y.€~·k' -- N 1 ·-42'.bft*34: 4 /3-t :'4 - e·,<25£,2- .#043 .- I k 4 L .1 X ms 01.-# ., , 1 3'k- Ue.·•4~7·CU~...1(~fot=j.,Fi -, lt.0. y, 7 1 Ir t 04'91\1 : .-Le=-0. 4,4 /44*F , - -er . Ii' 5 ..2 € C . t.., -.- ·g 10 . 1 ':h /1 : 4 - - 1 1 1¥6-i'-1. '. - 1- 14'L -1 1 ' ~ ¥ 1 4. U h. 272 ert=-21- v .. ser-ge 7- 2 %&/S,LI,$'. 114,- . 4 - ' ' ' J '7' 71 1 11 1 1 1,1,1~1 1 11 11 1*..11!41%0?<11~i'ib'·~'J.'t I.L.6~ P'. "i j.,1 ' ~,1'·i '~~?,·'i·~~61611"k.ti ..14*·, 4· 1 N. * - 21~ , 1,li 1 . C w i/8? 1, r,Le" 16 I frel ¢ 49 11*14 !1 5 1 t i. 1 1 2 --2, 4 21% h