RECORD OF PROCEEDINGS
PLANNING & ZONING COMMISSION
APRIL 11. 1989
Chairman Welton Anderson called meeting to order at 4:30 pm.
Answering roll
Herron, Roger
Peyton and Jim
call were Graeme
Hunt, Jasmine Tygre
Colombo were absent.
Means, Bruce Kerr, Michael
and Welton Anderson. Mari
COMMISSIONER'S COMMENTS
Jasmine: This is regarding the garbage problem from Cookie
Munchers. When that building went in and there was this problem
about the trash and trash access. I reported some months ago
that trash from that cookie place is allover. And it has
continud. That is an enforcement problem. But it is not just
people who go in there and buy a cookie or ice cream and throw
stuff around. It is cartons and bigger packing things that are
obviously used by the business to store things.
They say they have tried to compact and then thrown into other
people's dumpsters or trash barrels or not as the case may be.
Li ttle Annie's and 0 I Leary's are already mad at Eastern Winds
thinking that it was our trash until we went through and looked
at it and found out that it was definitely Cookie trash.
So now everybody is mad at them. We were concerned about it even
when we granted approval for the building because of the problem
of trash. I don't know what they can do about it but maybe we
should just not approve uses like this in buildings like that
where there isn I t any trash use because all the neighboring
businesses have to keep picking up this crap all the time and the
neighboring businesses are not happy.
until people come in at 11:00 to start clearing up and setting up
for lunch at Eastern Winds there is garbage allover the street
on cooper Street. It is not a desireable situation.
Alan: I will bring it to Chuck Roth's attention.
Bruce: Does the city of Aspen have a pooper/scooper ordinance of
some kind?
Welton: Yes. I think so.
Bruce: Maybe I will bring it to Council. I am really concerned
now that we are entering the summer season about people and their
dog in Wagner Park and the kids playing where the dogs do their
thing. It really is a health problem.
Roger: Just expanding on Jasmine I s comment--we do have in the
Commercial Core for restaurants requirement for direct access to
PZM4.11.89
the alley in the code. That was waived on that application at
special review because they were there in that project to start
with. Had they not been there to start with I certainly wouldn't
have been tempted to waive that in this case. So as far as
future is concerned I think everything is in place.
STAFF COMMENTS
Alan: We need to talk to you about site visit for the meadows
and how best to handle that. This is such a complex application
that a site visit is very important.
After discussion it was decided to meet at the parking lot at the
restaurant Monday April l7, 1989 at 4:30 for the site visit.
ASPEN GREENS REZONING AND CONCEPTUAL PUD SUBMISSION
Tom Baker: I will start. this out by
Adamski, Tom Stevens and Dwight
architect and Pat Doby, Engineer.
introducing everybody. Jim
Shirt, Peter Dobolvrony,
About 2 and l/2 years ago we were discussing whether or not the
Red Roof Inn was going to go unoccupied for the winter Season.
At that time there were all sorts of reasons why we couldn't use
it for housing. It was too near the golf course, the noise from
the Music School children would distract golfers, etc. But the
P&Z felt it was very important that that facility be used for
housing at least on a temporary basis.
The Council was not inclined to do that on a permanent basis and
they directed staff to write a resolution that was submitted to
the Council. As a result of that resolution the facility was
used for affordable housing by the ski company for the winter and
the MA has used it ever since.
The proposal you are interviewing tonight is the result of P&Z's
input and a lot of other input. The applicants will describe the
extensive public process they have gone through to get to this
point in the design.
Staff has found that the results of this process
and exciting design which achieves a balance
community's land use concerns and providing for
community's housing needs.
is a creative
between the
some of the
What we are looking for tonight is conceptual approval and sort
of agreement on a couple of threshold issues such as rezoning and
conditional use. We have gotten the May meeting with City
2
PZM4.11.89
council and that will be a public hearing provided that we can
get through the process with P&Z in time to do that.
This is going to be a full blown 4-step PUD process although P&Z
requested that council consider a compressed 2-step review for
this project to keep it moving, council decided that it was going
to be important to have the full blown 4-step process to insure
adequate public input.
Tom then made presentation as attached in record.
After discussion between P&Z Commission and the representatives
for the project:
CONDITIONS FOR CONCEPTUAL PUD APPROVAL
Tom Baker: First condition talks about providing the P&Z with a
map showing the existing boundaries of the golf course support
zone and identifying what portion of that zone will be rezoned to
Public.
They have provided us with a presentation map. All I would
request is that for city council we have a map by May 11 that can
be included in the packet so that they can see what is going on
at the site.
We are aSking for an 8 and 1/2 X 11 for the council packet for
conceptual review.
#2 to provide the Planning Office with a
Bill Efting, proving the long term lease
the existing golf course parking lot
project.
written commitment from
of 20 parking spaces in
for winter use by this
Tom stevens: That is in the works and we will have it for you by
Council meeting.
Tom: #3 is to develop a drainage plan which is acceptable to
both Engineering and the Golf Course superintendent.
That revolves around trapping the oil and grease before the water
gets to the golf course or the irrigation ditch. They have
committed to provide drawings by Council time.
Tom: Yes.
Michael: #2. I am concerned about a long term lease. I think
that parking lot has got a lot of potential as to whether it is
going to end up being an. intercept lot some day or other things.
And I hate to see that that would stand in the way of something
,.....-
3
PZM4.11.89
else that would be of more beneficial use if there is a 20 space
lease over there for people to park cars.
Tom B:
level.
ability
I guess the term lease was put in there for our comfort
If we don't need the term "lease" in there--just the
to utilize as necessary up to 20 spaces.
Michael: What I am concerned about is not what you call it but
what the commitment is.
Tom B: The flip side to that is if the project requires 15
additional spaces to work, what kind of priority are we g01ng to
need to overturn that. Are we going to displace people or how do
we deal with that? I will strike the "long term lease".
Tom S.?: So that it would say Planning Office with written
commitment from Bill Efting, Leisure Services Director, approving
up to 20 parking spaces for winter use by this project.
Tom B: #3 was the drainage plan.
#4. Provide the Planning Office with a memorandum from the Golf
Course Superintendent stating that the berm along the 9th fairway
is acceptable.
Tom S: In fact that is why we are staking the berm.
Tom B: So that is going to happen between now and the end of the
month so that will be available for the Council packet as well.
#5. Apparently Tom already has a letter committing the MAA to as
many units as possible for an indefinite period of time.
I think then we
and just make
parking.
could strike this provision or this condition #5
sure everything works at final then with the
Bruce: Jim mentioned a while ago that MA is talking about 3
months. Are they willing to pay rent for 3 months?
? Yea.
only need it
months.
In fact that is what they are doing. They really
for 2 and 1/2. But they are willing to pay for 3
Tom B. So we strike #5.
#6. strike 6 as well then.
#7. Tom has identified how that access continues through that
donut area--the turn-around.
~.....
4
PZM4 .11. 89
Tom S.: If that is what they want to do, that is easy enough to
do. I think the main thing is that turn-around is not going to
be curved prohibiting traffic. Whatever they want to pave
outside of that is fine.
Tom B. So #7 is struck as well.
#8. The Applicant shall be required to demonstrate that the
proposed structures do not extend above the height of the
existing structure, as viewed from Hwy. 82.
Welton: They have already done that.
Tom S.: The other thing that we are going to do is on the 17th
we are going to have another meeting with the steering committee.
We are going to stake the buildings and also send a balloon up to
roof height. Then we are going brave standing in the oncoming
lane of 82 and see----(much hilarity)
Welton: You could just provide us with some photographs.
Tom B: These are conditions we want them to work on.
1. For application for final development plan staff is
requesting that there be geotechnical study to determine the
impact of existing fill material on the proposed development.
And at their meeting today Tom agreed that they would be doing
that.
2. To work with the Colorado Department of Highways and the
Engineering Department to develop a detailed traffic study to
determine the traffic impacts that this proposal will have on Hwy
82. Both Engineering and CDOH have indicated that a left turn
lane may be required.
I guess based upon Peter's comments and if the P&Z is inclined, I
would like to add to that they come up with an adequate
resolution to the traffic problem of that intersection if we
strike the 3rd condition.
So P&Z wants me to work to add to #2 and strike #3?
Jasmine: Yes.
Welton: But to include investigation of these options but not
restrict you to using anyone solution.
Roger: I think in that might be to try to come up with an
adequate interim solution before Hwy. 82 is set.
5
PZM4.11.89
Tom B: #4. Develop a detailed Transit Plan in cooperation with
MA and RFTA.
And I will also beef that up with the information that we got on
the pedestrian crossing of Hwy. 82 and the free transit concerns.
#5. Comply with the ACSD standards for connecting to the
District system and providing for the ACSD to take over ownership
and maintenance of the sewer line at the project.
They have committed to do that. They are on record.
Provide a fire hydrant at the turn-around as request by the Fire
Marshal and to sprinkle with a residential system and equip with
an automatic fire alarm system capable of notifying all residents
of pending problem to the satisfaction of the Fire Marshal.
I think both of those are a result of the recently adopted 1988
Fire Safety Code. Wayne Vandemark can guide you on the specifics
of that.
......".,.
This last condition that Roger touched on with his concerns.
Peter was making changes already. But the code definition of
dormitory calls it a dormitory unit can be shared by up to 8
people. Technically this kind of design may have a problem doing
that. I think that the code is so unstructured in terms of
dormitory that we should remain as flexible as possible and just
keep in mind that that general technical definition of dormitory
and work within that. If you can't, maybe we need to amend that
definition.
Peter: I think one of the ways of solving that is
units in here so that we have a mix of 2-bedroom
one of the buildings which reduces the number
bedroom sharing.
by how we mix
uni ts in each
of dormitory
Roger: In other words you mix a 2-bedroom plan with a dormitory
plan.
Peter: Yes.
Tom B: And then what I am going to do is have the information
that Jasmine and Roger brought up about the free transit and the
safe crossing of Hwy. 82 to conditions that are already in here.
I will add a condition about the winter use of the bike path and
the recreational use for basketball and tennis court.
.
The traffic light alternative will be incorporated into that
second condition under final.
6
PZM4.11.89
Mickey, I have got notes here about the MA providing a bicycle
fleet. Is that a condition that you would like to have the MA
investigate the possibility of providing summer residents with a
bicycle?
Michael: I don't know that I intend that it goes so far as to be
a condition. But take a look at it.
Tom B: We can put it in as encouragement rather than an absolute
condition.
Roger: One thing that seemed to get missed is covered bicycle
racks in the project.
Tom B: I will add that with the bike path condition.
Michael: I can't imagine that you are going to get a very large
percent of these people who live there and work there to ride a
bike. I don't care what you do--unless you give them a heated,
covered facility. Most people in the winter don't ride bicycles.
It is dangerous. It is cold. You go out in the morning and your
bike is frozen. Basically, other than the guys who are looking
to ride in Alaska are not into things like that.
Tom B: I think the biggest problem with winter bike riding is if
you don't get off work when it is light or you are not going to
work when it is light it is really tricky.
Welton: I would entertain a motion for Tom to draft a resolution
approving the conceptual PUD for the former Red Roof Property
employee housing expansion with the additional conditions and
modifications to conditions as proposed in Planning Department's
memo of April 3, 1989 and to be elaborated on by Tom Baker.
(attached in record) And also to come up with an acceptable name
for the proj ect--something that does not say Aspen and is not
confusing to other similar names in Aspen.
Roger: I so move.
Michael
seconded the motion with all in favor.
AFFORDABLE HOUSING ZONE DISTRICT
PUBLIC HEARING
item is affordable Housing Zone District. I
hearing and continue the hearing to June 6,
Welton: The last
reopen the public
1989.
Meeting was adjourned.
Time was 6:50.
y Clerk
7