Loading...
HomeMy WebLinkAboutresolution.council.013-18 RESOLUTION # 13 (Series of 2018) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT BETWEEN THE CITY OF ASPEN AND LORIS & ASSOCIATES INC. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a contract for Hallam Street and Castle Creek Bridge Improvements between the City of Aspen and Loris & Associates Inc., a true and accurate copy of which is attached hereto as Exhibit "D"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract for Hallam Street and Castle Creek Bridge Improvements between the City of Aspen and Loris & Associates Inc, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Council of the City of Aspen on the 22nd day of January, 2018. Steven' kad on, Mayor 1, Linda Manning, duly appointed and acting City lerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, January 22, 2018. " 1 6 Linda Manning, City Cl rk Loris ii► A DIVISION OF OTAK Mr. Pete Rice, P.E. City of Aspen 130 S. Galena Street Aspen, CO 81611 Reference: Hallam/Castle Creek Corridor LORIS' Additional Services Request #11 Construction Engineering Pete: LORIS is submitting the following Additional Services Request: 1. Construction Engineering The following services will be performed during construction: ✓ LORIS —Overall project management, prepare addenda, review RFI's, review shop drawings and submittals, perform 3 site visits during construction. $21,600.00 ✓ PR Studio — Public information and outreach, pre-construction and construction phases. $36,400.00 ✓ Connect One— Prepare addenda, review RFI's, review landscape submittals, perform 3 site visits during construction. $4,500.00 ✓ Z Architecture— Prepare addenda, review RFI's, review bus shelter shop drawings and submittals (including structural engineering), perform 2 site visits during construction. $8,850.00 ✓ RMH — Prepare addenda, review RFI's, review electrical submittals. $3,800.00 ✓ Hines Irrigation — Prepare addenda, review RFI's, review irrigation submittals. $1,500.00 Total CE Additional Services: $76,650.00 TOTAL FOR CHANGE ORDER #11: $76,650.00 Please call or email if you have questions regarding this Additional Services Request. 100 Superior Plaza Way, Suite 220, Superior, CO 80027 • Phone(303)444-2073 otak.com Loris moi► A DIVISION OF OTAK Page 2 of 2 Sincerely, The Office of Loris and Associates, Inc. A Division of Otak, Inc. Cody Christianson, PE, ENV SP Senior Project Engineer/Project Manager 100 Superior Plaza Way, Suite 220, Superior, CO 80027 • Phone(303)444-2073 otak.com F" � \ & . $ ■ / � � ■ \ . . . ° ■ , a . . | f ■ . � § � $ i ! � R 2 R • p � � #k 22 MEW |■ �}kk I f4 | �� - - ( � \ ! \/� \;� Im\\ I CITY OF ASPEN CHANGE ORDER FORM, CHANGE ORDER NUMBER: 11: Construction En ink eerina Services PROJECT NAME: Hallam Street Castle Creek Bridge Connectivity Study ACCOUNT NUMBERS: 000.327.81200.52199.50464. 100.327.81200.52199 50281 TO: Loris and Associates,Inc. 100 Superior Plaza Way, Suite 220, Superior, CO 80027 Contract Date: March 10, 2014 Project: 2014-019 Upon approval of this form by the City Manager or designee, you are directed to make the following changes in this contract: The Hallam Street and Castle Creek Bridge Improvements consulting services is utilizing the same design team that provided the information and construction drawings for the project. In the best interest of the City,staff recommends approval for$76,650.00 for construction consulting services to maintain the expertise of the project during construction. The original Contract Sum was .....................................................$ 54,130.00 Net change by previous Change Orders............................................$ 319,591.00 The Contract Sum prior to this Change was .......................................$ 373,721.00 The Contract Sum will be increased By this Change Order .........................................................$ 76,650.00 The new Contract Sum,including this Change Order, Willbe ............................:...........................................$ 450,371.00 SUBMITTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: Pete Rice,PE Cody Christianson,PE Don Taylor Steve Barwick ENGINEERING LORIS AND FINANCE CITY MANAGER CITY OF ASPEN ASSOCIATES,INC. CITY OF ASPEN CITY OF ASPEN ADDRESS ADDRESS ADDRESS ADDRESS 130 S.Galena St. 100 Superior Plaza Way 130 S.Galena St. 130 S.Galena St. Aspen Suite 220 Aspen Aspen CO 81611 Superior,CO 80027 CO 81611 CO 81611 7 BY: Q BY: BY: BY: DATE: Z ZZIO DATE: 1/-11//S DATE: DATE: 2-)-i0