Loading...
HomeMy WebLinkAboutresolution.council.012-18 RESOLUTION # 12 (Series of 2018) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CONTRACT BETWEEN THE CITY OF ASPEN AND PHIL VAUGHAN CONSTRUCTION SERVICES INC. AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a contract for Hallam Street and Castle Creek Bridge Improvements between the City of Aspen and Phil Vaughan Construction Services Inc., a true and accurate copy of which is attached hereto as Exhibit "C"; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves that Contract for Hallam Street and Castle Creek Bridge Improvements between the City of Aspen and Phil Vaughan Construction Services Inc, a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. INTRODUCED, READ AND ADOPTED by the City Counc' of the City of Aspen on the 22nd day of January, 2018. StevSkadr , Mayor ti I, Linda Manning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, January 22, 2018. Linda Manning, Cityjerk Phil Vaughan Construction Management, Inc. 1038 County Road 323 Rifle, CO 81650 Phone: (970) 625-5350 Fax: (970) 625-4522 Email: phil(dpvcmi.com Website : www.pvcmi.com November 2, 2017 Mr. Pete Rice, PE, LEED AP Senior Project Manager Engineering Department City of Aspen,Colorado Sent via email: yete.ricencityofaspen.com Dear Pete, As per our conversation,please find below a proposal for Construction Management as Advisor services for the City of Aspen Hallam Street and Castle Creek Bridge Improvements project. City of Aspen Project Number 2017-50464. As discussed, PVCMI has an executed professional services contract with the City of Aspen for Construction Management as Advisor services on an as-needed basis via Resolution#54- Series of 2017. As per our October 16, 2017 phone call, please find below the services discussed, with estimated hours noted for each item. 1. Review of the contract document for conformance with the design documents, bidding documents and addenda. Estimated hours: 12 2. Review of project submittals. As per our phone call, you would like for me to review approximately 1/2 of the submittals below and the Contractor's schedule. The bid documents indicate the following approximate number of submittals: (1) indicates the number of main subsections of the described submittal. A. Section 440.03- Permeable Interlocking Concrete Pavement(6) B. Section 519-Thin Bonded Overlay(Polyester Concrete) (7) C. Section 03 30 00- 1.5 and Sheet 713- Cast-in-Place Concrete (7) D. Section 03 33 10- 1.5-Cast-in-Place Architectural Concrete (3) E. Section 05 12 00- Structural Steel (5) F. Section 051250-Architecturally Exposed Structural Steel (5) G. Section 05 50 00 and Sheet 714- Metal Fabrications(3) H. Section 06 10 00 and Sheet 714- Rough Carpentry(3) Page 1 of 4 I. Section 06 16 00- Sheathing (2) J. Section 06 40 13- Exterior Architectural Woodwork (4) K. Section 07 20 80-Water Resistive Barriers(11) L. Section 07 04 20- Exterior Solid Phenolic Cladding Panel System(7) M. Section 07 54 23- Thermoplastic Polyolefin(TPO) Roof(7) N. Section 07 62 00- Sheet Metal Flashing and Trim(5) O. Section 07 92 00- Joint Sealants(8) P. Section 08 80 00- Glazing(5) Q. Section 09 97 26- Cementitious Coatings(5) R. Section 16050- Common Work Results for Electrical (4) S. Section 16145- Lighting Control Devices (5) T. Section 16442- Panelboards (7). U. Section 16521 and Sheet 800- Exterior Lighting (3) V. Sheet 712- General note regarding submittals W. Site Furnishings- Sheet 800 (4) X. Traffic Control Plan Y. Contractor's Schedule Details: 14 submittals @ 2 hours per submittal Estimated hours: 28 hours 3. Pre-Construction Meetings and preparation of meeting minutes. 2 total. Details: 10 hours travel. 8 hours meetings and preparation of meeting minutes. Estimated hours: 18 hours 4. Periodic Field Observation- Not requested. 5. Field Inspection on an as-needed basis as requested by Pete Rice. 6. Monthly pay application review and recommendation regarding certification. Details: 5 monthly applications. 8 hours each. Estimated hours: 40 hours 7. Attend weekly Owner/Architect/Contractor meetings from April 1, 2018 to July 31, 2018. Details: 17 weekly meetings. 4 hours travel per meeting. 4 hours per meeting. Estimated hours: 136 hours 8. Project closeout review and coordination Details: Review of documents to confirm conformance with closeout provisions of the contract. Estimated hours: 25 hours Total Estimated Hours: 259 hours @ $95/hr.=$24,605.00 Total Estimated Mileage: 19 trips at 154 miles each. 2,926 miles @ $0.65/mile= $1,901.90 Total Estimated Copies: $1,600.00 Estimated Total Services: $28,106.90 Page 2 of 4 Additional services: As per your 11/1/17 email, preparation and distribution of meeting minutes for each of the 17 meetings will take approximately 3 hours per meeting. Estimated hours: 51 hours @ $95/hr=$4,845.00 We propose to provide services on an hourly basis as per the attached PVCMI 2017/2018 Fee Schedule. Please sign below to approve our proposal. Please also provide invoicing information including purchase order number, name and contact information for the person who will be approving invoices and any other relevant information. Thank you for the opportunity to serve you. Please contact me if you have questions. Sincerely, Philip B. Vaughan O� President Phil Vaughan Construction Management, Inc. r Proposal Approved: Name Y%7' fe Signature Title Cevs,— Date Invoicing information i.e. Purchase Order Name for person approving invoicing Email: Mailing Address: Phone Number: Page 3 of 4 Phil Vaughan Construction Management, Inc. Fee Schedule City of Aspen- As-Needed Construction Manager as Advisor 2017/2018 Construction Services Plan Review $95.00/hour Design and Estimation $95.00/hour Meetings/Discussions $95.00/hour Construction Management/ Scheduling $95.00/hour Travel $95.00/hour + .65 mile Out-of-pocket expenses Cost of expense plus 15% Miscellaneous Charges Photocopies 8.5x11 $0.30/each Photocopies 8.5x11-color $0.75/each Photocopies 11 x17 $0.40/each Color 11x17 $1 .25/each Blackline/Blueline Prints $3.00/each 24"x36" Mylar Sepias $24.00/each Presentation Binding Cost of expense plus 151/6 Color Plots- D size $22.00/each D size scans $2.50/each 8.5x11 scans $0.35/each Flash Drives- 8GB $43.00/each Page 4 of 4