Resolution No. 12
(SERIES OF 2006)
RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
APPROVING A STREAM MARGIN REVIEW, SPECIAL REVIEW TO
DETERMINE THE RIVER'S TOP OF SLOPE, AND VARIANCES FROM THE
BUILDING ORIENTATION AND WINDOW HEIGHT RESIDENTIAL DESIGN
STANDARDS TO CONSTRUCT A NEW SINGLE-FAMILY RESIDENCE AT 17
SHADY LANE, CITY OF ASPEN, PITKIN COUNTY, COLORADO.
Parcel No. 2737-073-00-010
WHEREAS, the Community Development Department received an application
from Callwinnie LLC, requesting Stream Margin Review, Special Review to determine
the river's top of slope, and variances from the building orientation, fence height, garage
entry width, and window height residential design standards to construct a new single-
family residence at 17 Shady Lane; and,
WHEREAS, the Applicant revised the design of the garage to setback one of the
stalls to satisfy the garage entry width design standard, eliminating the need for the
garage entry width variance; and,
WHEREAS, the Applicant's property is a 93,653 square foot lot located in the R-
30 Zone District and in an Environmentally Sensitive Area as defined by the Land Use
Code; and,
WHEREAS, the Community Development Department Staff reviewed the
application for compliance with the stream margin review standards, special review
standards, and the residential design standard variance review standards; and
WHEREAS, upon review of the application, site visits, and the applicable Land
Use Code standards, the Community Development Director recommended approval of
the steam margin review, special review to determine the river's top of slope, and
building orientation residential design standards variance finding that the review
standards have been met; and,
WHEREAS, upon review of the application, site visits, and the applicable Land
Use Code standards, the Community Development Director recommended that the
Planning and Zoning Commission deny the fence height and window height residential
design standard variances finding that the review standards are not met; and,
WHEREAS, the Aspen Planning and Zoning Commission has reviewed and
considered the development proposal under the applicable provisions of the Municipal Code
as identified herein, has reviewed and considered the recommendation of the Community
Development Director, and has taken and considered public comment at a duly noticed
public hearing; and,
WHEREAS, the City of Aspen Planning and Zoning Commission fmds that the
development proposal meets or exceeds all applicable development standards and that the
approval of the development proposal is consistent with the goals and objectives of the
Aspen Area Community Plan; and,
WHEREAS, the Planning and Zoning Commission approved Resolution No. 12,
Series of 2006, by a seven to zero (7-0) vote, approving with conditions, stream margin
review, special review to determine the river's top of slope, and variances from the
building orientation and window height residential design standards to construct a new
single-family residence at 17 Shady Lane, and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that this
Resolution furthers and is necessary for the promotion of public health, safety, and welfare.
NOW, THEREFORE BE IT RESOLVED by the Commission:
Section 1
Pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal
Code, the Planning and Zoning Commission hereby approves a stream margin review,
special review to determine the river's top of slope, and variances from the building
orientation and window height residential design standards to construct a new single-
family residence at 17 Shady Lane, Subject to the conditions contained herein.
Section 2: Buildinl!: Permit
The Applicant shall submit and receive approval of a building permit application prior to
commencing construction activities. The building permit application shall contain the
following:
a. A copy ofthe final P&Z Resolution.
b. The conditions of approval printed on the cover page of the
building permit set.
c. A completed tap permit for service with the Aspen Consolidated
Sanitation District.
d. A tree removal permit as required by the City Parks Department
and any approval from the Parks Department Director for
mitigation of removed trees, if applicable.
e. The building plans shall demonstrate an adequate fire suppression
system approved by the Aspen Fire Marshal will be installed. A
fire alarm system meeting the requirements of the Fire Marshal
shall be installed.
f. A construction management plan that details the proposed method
and means by which the site will be accessed with excavation and
grading equipment during construction. This plan shall also detail
the proposed construction parking, which shall demonstrate that
except for essential trade trucks, no other personal trucks are to be
:551
o 0.00
parked in the area around the site. The City encourages that site
workers be shuttled in from the airport parking area.
g. A Geotechnical Report and study performed by a Colorado
licensed Civil Engineer. This study shall include a detailed
description of the slope stabilization and erosion control techniques
to be used during construction.
h. A drainage and erosion control plan, prepared by a Colorado
licensed Civil Engineer, which maintains sediment and debris on-
site during and after construction. If a ground recharge system is
required, a soil percolation report will be required to correctly size
the facility. Silt fencing shall be incorporated into the erosion
control plan as is described in Section 3 below. A 5-year storm
frequency should be used in designing any drainage improvements.
The drainage plan shall demonstrate that there will be no increase
in the site's historic runoff as a result of the new residence. The
Study shall also demonstrate that there will be no increase in the
base flood elevation as a result of the development. No clear water
connections (roof, foundation, perimeter, patio drains) are allowed
to be connected to the sanitary sewer system.
1. A letter from the primary contractor to the Community Development
Director stating that the conditions of approval have been read and
understood.
Section 3: Erosion Control
The Applicant shall place vegetation protection fencing and silt fencing directly adjacent
to the top of slope that meets the approval of the City of Aspen Parks Department. The
Applicant shall provide a detailed tree protection fencing plan at the time of building
permit submittal and have the City of Aspen Parks Department inspect and approve of the
erected silt and tree protection fencing prior to commencing construction.
Section 4: Tree Protection
There shall be no excavation, storage of materials, storage of construction backfill,
storage of equipment, foot or vehicle traffic allowed within the drip line of any tree on
the site. An excavation under the drip line permit shall accompany the tree removal
permit required in Section 2 above. No over digging shall be allowed in the immediate
areas adj acent to the large spruce tree located just north of the proposed residence and the
large spruce tree located directly south of the proposed residence.
Section 5: Riparian Restoration
The Applicant shall submit a revised landscaping plan to the City of Aspen Parks
Department for review and approval prior to building permit submittal. The revised
landscaping plan shall not include the following types of vegetation that were proposed in
the original application:
11111111111111111111 II ~;~~~~~! ~1:551
JANICE K VOS CAUDILL PITKIN COUNTY CO R 26.00 0 0.00
Planting Zone 1- Shall not include Ticklegrass, Beckman's Sloughgrass, Fringed
Bromegrass, or New Mexican Checkermallow.
Planting Zone 2- Shall not include Colorado Male Fern, Mountain Nine Bark, Ribes
(Gooseberry), or Blue gama.
Planting Zones 4 and 5- Shall not include Coral Carpet Sedum, Golden Stonecrop, Blue
Spruce, Rosy Glow Sedums, Rubus, or Huckleberry.
Planting Zone 7- Shall not include Common Treesquare, Hardstem Bulrush, Water
Sedge, Beaked Sedge, Common Scouring Rush, or Streamside Alpine Bluebells.
Section 6: Outdoor Lil!:htinl!:
All outdoor lighting shall be downcast and meet the requirements of the City of Aspen
Lighting Code pursuant to Land Use Code Section 26.575.150, Outdoor Lighting.
Section 7: State and Federal Permits
The Applicant shall apply for and obtain all necessary state and federal permits for
vegetation restoration and plantings within the 100-year flood plain.
Section 8: Sanitary Sewer Requirements
The old sewer line connection next to the Rio Grande Trail shall be excavated and
abandoned at the main sanitary sewer line. Aspen Consolidated Sanitation District
(ACSD) personnel shall make a new tap and a new sanitary service line meeting the
ACSD's standards shall be installed at the Applicant's expense. The glycol heating and
snow melt system must be designed to prohibit discharge of glycol to any portion of the
public or private sanitary sewer system. Glycol storage areas shall be approved by the
ACSD prior to installation.
Section 9:
This resolution shall not affect any existing litigation and shall not operate as an abatement
of any action or proceeding now pending under or by virtue of the ordinances repealed or
amended as herein provided, and the same shall be conducted and concluded under such
prior ordinances.
Section 10:
If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any
reason held invalid or unconstitutional in a court of competent jurisdiction, such portion
shall be deemed a separate, distinct and independent provision and shall not affect the
validity of the remaining portions thereof.
\III~IIIUII~ :~~~:~~:,,~
JANICE K vaS CAUDILL PITKIN COUNTY co R 26.00
Section 11:
All material representations and commitments made by the Applicant pursuant to the
development proposal approvals as herein awarded, whether in public hearing or
documentation presented before the Planning and Zoning Commission, are hereby
incorporated in such plan development approvals and the same shall be complied with as if
fully set forth herein, unless amended by an authorized entity.
APPROVED by the Commission at its regular meeting on March 7, 2006.
APPROVED AS TO FORM:
PLANNING AND ZONING
COMMISSION:
~~
City ttorney
J J}
V
ATTEST: