Loading...
HomeMy WebLinkAboutcoa.lu.sp.Trail Easement City-Park.0039.2006,F,? ww ., Trail EawwMM sement —"273707304851 City Parks Case 0039.2006.ASLU I 41 City of Aspen Community Development Dept. CASE NUMBER 0039.2006.ASLU PARCEL ID NUMBER 2737-07-3-04-851 PROJECT ADDRESS 0 ZERO PLANNER JAMES LINDT CASE DESCRIPTION RELOCATION OF TRAIL EASEMENT TO ACCOMMODATE ADDI- REPRESENTATIVE CITY PARKS DEPT DATE OF FINAL ACTION 7/18/2006 12:( CLOSED BY Denise Driscoll E�►r°,,fir CE" 'O JUL l 1 zoos Cert Acct: 314-880-6 31 PITKIN COUNTY COMMUNITY A6rr-ir DEVELOPMENT DEPARTMENT BUILDING DEPARTMENT 130 S GALENA ASPEN CO 81611 He Edit Record Navigate Form Reports Format Tab Help Masi Ro4M Status Fee Summery Feel j1Cu9=6alds :!Parcels Actions SubQamts Attachments Rou6rg tjistory Perrrut Type Permi # M.2006,ASLU y Address ZERO Apt/SuAe City IASPEN State Fc—o--�, I zip 1611 j Permit lnformation p I Master Permit Routing Queue Applied 7/17/2W6 a ProvedrW Status pa+t9 Approved Description 'R TIO N TRAIL EtSEME � ACCOM- btQOV— flDvTtONAI PARKING Issued r_� ,� P �/trPi((Q� �X—ir�6f, FmkSubmitted(CITYPARKSDEPT clock 0 Expires 07/12/2007 Owner _ Last Name CITY OF ASPEN I Fist Name 1PARKS DEPARTMENT 585 CEMETERY LN SPEN CO 81611 Plrorre (970) 9205150 Owner IsAppbcant? _.__._.._._......._.._....._..._..__....—..._..._..._...._.___.-......_.__...._.____._._...__...--_--__.__.____..._ ...._ Applicant _ _ _ _ Last Name IaTY OF ASPEN I Fist Name JPAAKS DEPARTME 1585 CEMETERY LN Phone i920 s md Cust # 123881. A IASPEN CO 81611 Lender Last Name — Fist Name Phone j Record. 38097 / $ # >1 $ \ � a 0c< c/z E<ID z c 6 \ �m \1 q R 04 \/ k » k » ® k E \ E »% a_ e E < tm \ � CD 0 0 a a g 0 R \ \ \ § w i \ \ 6/ eo w = uz ƒ\ � o �E \ \ z\ E 0 g \\ \ \� \ƒ CD (\ Cl £ / § 3 2 ƒ \ ° � \2>£o >o n�2 = $ _ 04 V) c e U) c .\ Cl 2 y a 2 2 £ _ o \ ƒ @ P Austin Weiss Trails Coordinator City of Aspen, Parks Department Chris Bendon City of Aspen, Community Development 130 S. Galena St. Aspen, CO 81611 Re. Trueman Subdivision SPA Amendment Chris, The Parks Department is in the planning phase of a trail project located between the Aspen Center for Environmental Studies and the U. S. Postal Service property down at the Trueman Subdivision. See Exhibit A. In order to facilitate a compromise with the U.S. Postal Service, the Parks Department has agreed to abandon a section of City of Aspen owned trail easement and to relocate the trail on to adjacent City owned property to the west. See Exhibit B. The'relocation of the trail out of the existing public right-of- way will allow the Postal Service to build additional parking spaces in order to mitigate the loss of parking spaces caused by the new trail construction. The existing trail easement is also shared as a utility easement. This existing utility easement will not be abandoned and will stay as is. Austin Weiss, Trails Coordinator i Chris Bendon, Community Development ATTACHMENT 2 —LAND USE APPLICATION APPLICANT: Name: City of Aspen Parks Department Location: Trail West of Post Office Parking- Lot 1 Trueman Subdivision (Indicate street address, lot & block number, legal description where appropriate) Parcel ID # (REQUIRED) 2737-073-04-851 REPRESENTATIVE: Name: Austin Weiss- City Parks Department Address: Phone #: PROJECT: Name: Post Office Trail Easement Abandonment Address: Switch Station Parcel Phone # TYPE OF APPLICATION: (please check all that apply): ❑ Conditional Use ❑ Conceptual PUD ❑ Conceptual Historic Devt. ❑ Special Review ❑ Final PUD (& PUD Amendment) ❑ Final Historic Development ❑ Design Review Appeal ❑ Conceptual SPA ❑ Minor Historic Devt. ❑ GMQS Allotment X Final SPA (& SPA Amendment) ❑ Historic Demolition ❑ GMQS Exemption ❑ Subdivision ❑ Historic Designation ❑ ESA — 8040 Greenline, Stream ❑ Subdivision Exemption (includes ❑ Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane ❑ Lot Split ❑ Temporary Use ❑ Other: ❑ Lot Line Adjustment ❑ Text/Map Amendment EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) PROPOSAL: (description of proposed buildings, uses, modifications, etc.) Relocation of Trail and Trail Easement to accommodate additional parking. Have you attached the following? FEES DUE: $ N/A ❑ Pre -Application Conference Summary ❑ Attachment #1, Signed Fee Agreement ❑ Response to Attachment #3, Dimensional Requirements Form RETAIN FOR PE.RA,'. i RECORD ❑ Response to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards All plans that are larger than 8.5" x I I" must be folded and a floppy disk with an electronic copy of all written text (Microsoft Word Format) must be submitted as part of the application. A PARCEL OF LA1.__ -ITUATED IN THE WEST 1/2 OF SECTION 7 TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH P.M. CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO. / LOCATEDST OF ASPEN POST OF CE / PROPOSED 2,405 SF. .I / ASPHALT PAWMCa a1#4 (12 SPACES) PROPOSED 215 LF.. j CONCRETE CURB GUTTER t y PROPOSED 8'-0' ASPHALT TRAIL 36' E p lNV - 78<7 95' _ R R -SEMEN MANegff — 788QQD' \ . INV. IN- 7870. JO' PROPOSED SEEDED RESTORATION AREAS (4,925 SA TOTAL) \ Ronne 0117.71" a la 20 <. SCALE 1'=w0 C ITY OFASPEN PARKS AND RECREATION DEPARTMENT — SOMni CN XNA SfRW "S .COLO wRi61I rmO 9A.920312U iA.\ 9W V20.51U Z 0 J_ V Q M H cl) W Z V 0 LIL V U. N `o `0 ''UJ V r,^ I V Q V♦CL C m N a as wx�il.r"gu.s°s.eu,�u Pflw�tl9]0 ]W OJ1� 1 OATE OFSCPoPIIW 68Q5 �1ia1I.I� foarnrtu n l/6P5 9?7A5 b U5 4ti�PR01 NO POST—IM TRNL ORAWTI Sut PLOT CnTE 411m5 PHASE 2 TRAIL LAYOUT L-1 �oATlory or- rAoq yC tAsExtew �WIVM ,tp Sy c I ry or— A~. ASPEN ELECTR I C U u9 P _i P y c� / u9 w LOT ©© = 12 S77NG TREES TO REMAIN — 10 P / / r \ • SWITCH 7 STATION 5 / T EX -MANHOLE RIM= 7855.88' DIRT FILLED TOP DIRT 7848.8" 0 011PIA4 Al eAM47