Loading...
HomeMy WebLinkAboutcoa.lu.sp.Apsen Institute.A8195 c"'"",,\ ,- , , CASELOAD SUMMARY SHEET City of Aspen DATE RECEIVED: DATE COMPLETE: 6 ItJ ~5 j ~l, & 9S I P PARCEL ID AND CASE NO. 2735-121-29-008/009 A81-95 STAFF MEMBER: LL PROJECT NAME: ASPEN INSTITUTE INSUBSTANTIAL SPA AMEND/ORD AMEND Project Address: 100 N. THIRD STREET ASPEN. CO 81611 Legal Address: ASPEN MEADOWS SUBDIVISION, LOT 1-B APPLICANT: ASPEN INSTITUTE Applicant Address: P.O. BOX 222 OUEENSTOWN. MD 21658 REPRESENTATIVE: JACK PALAMINO/TED GUY ASSOC. Representative Address/Phone: BOX 1640 927-3167 BASALT CO 81621 -------------------------------------------------------------- -------------------------------------------------------------- FEES: PLANNING ENGINEER HOUSING ENV. HEALTH TOTAL $ 1!.D20 $~OO $ $ $ 1120 # APPS RECEIVED # PLATS RECEIVED 1 1 TYPE OF APPLICATION: STAFF APPROVAL: 1 STEP: XX 2 STEP: ~P&Z Meeting Dat,e , " PUBLIC ~.J!rho\;L-'~ 16~ 0i!..j 0 VESTED CC Meeting Dat~'I~C:~, "jh.f~~~~~~ DRC Meeting Date HEARING: RIGHTS: YES NO ~YES, 11)> (\{2 NO NO HEARING: RIGHTS: --------------------------------------------------------------- --------------------------------------------------------------- REFERRALS: City Attorney Parks Dept. School District city Engineer Bldg Inspector Rocky Mtn NatGas Housing Dir. Fire Marshal CDOT Aspen Water Holy Cross Clean Air Board City Electric Mtn. Bell Open Space Board Envir.Hlth. ACSD Other Zoning Energy Center Other DATE REFERRED: I, f 7,/6 INITIALS:~ DUE: ==============~============================================== FINAL ROUTING: DATE ROUTED: j~-I;(..qJ INITIAL:.l2tL _ city Atty _ Housing _ city Engineer _ Open Space _Zoning _Env. Health Other: FILE STATUS AND LOCATION: __l'. ,r-.. ~ MEMORANDUM FROM: Mayor and Council Amy Margerum, city Manager stan Clauson, Community Development Leslie Lamont, Deputy Director Director~ TO: THRU: THRU: DATE: July 10, 1995 RE: Aspen Institute Extension of Recordation Period for Amended Final SPA Development Plan - Resolution __, ----------------------------------------------------------------- ----------------------------------------------------------------- SUMMARY: The applicant, Aspen Institute, received a substantial amendment to the Final SPA Development Plan for the Aspen Meadows in May of 1994. The Aspen Institute had proposed-an approximately 2,410 square foot addition to the seminar facilities at the Paepcke Auditorium complex. The approval also required the applicant to record an amended SPA development plan reflecting the approved changes. The amended plan was to be recorded within 180 days of final approval, December 12, 1994. The architect in charge of the proposal left Institute delayed further work on the project. days have expired. the project and the As a result the 180 As part of this extension request, staff would also like to point out that the Institute is proposing minor changes to the 1994 approval and has been working with staff in review of the minor amendments to the 1994 approval. Those minor changes include 758 square feet of additional square footage that was not contemplated in the 1994 review. The additional square footage represents a 2.5% increase in floor area from the 1994 approval. These changes will be approved as a minor amendment by the Community Development Director if this extension is granted. Please see Ordinance 21, Series of 1994, which granted the SPA amendment for the Aspen Institute. Staff recommends approval of an extension of the date for filing the amended final SPA development plan to August 31, 1995 finding that the Land Use Code has not been amended that would require a reevaluation of the 1994 approval. RECOMMENDED MOTION: "I move to adopt Resolution _, Series of 1995, extending the date to file amendments to the Aspen Meadows Final SPA Development Plan to August 31, 1995." CITY MANAGER'S COMMENTS: Resolution _, Series of 1995 EXHIBIT: A. Ordinance 21, 1994 1 ,-, ..-, MEMORANDUM TO: stan Clauson, Director community Development FROM: Leslie Lamont, Deputy Director RE: '0 Aspen Institute Insubstantial SPA Amendment for Minor Amendments to the Approved Expansion for the seminar Building - Lot I-B of the Aspen Meadows SUbdivision DATE: July 20, 1995 ----------------------------------------------------------------- ----------------------------------------------------------------- SUMMARY: The applicants, the Aspen Institute, seek to amend the Aspen Meadows Final SPA Plan for Lot I-B to adjust a previously granted approval for the expansion of the Institute's Seminar building. ZONING: Academic with SPA overlay STAFF COMMENTS: The Aspen Meadows final SPA development plan was approved in 1991. The approved plan outlined specific development proposals and provided the ability for other entities of the Aspen Meadows to propose future expansions their facilities. In 1994, a substantial amendment to the final SPA plan was approved for the expansion of the Aspen Institute's Seminar building. For a variety of reasons the Institute has been unable to begin construction based upon the 1994 approval. The 1994 review granted an approval to add ,approximately 2,410 square feet. However, the existing gross square footage of the building was incorrectly stated as 5,120 square feet rather than the current calculations which indicate the building is 5,467 square feet. The purpose of this application is to correct the existing gross square footage and to request an additional amount of square footage than was previously approved. In addition to the 2,410 square feet, the applicant requests to add 758 more square feet to the proposed enlargement. The total square footage of the proposed enlargement ,is 3,168. The total gross square footage of the building will be 8,635. REVIEW: Pursuant to Section 24-7-804 E. an insubstantial amendment of an approved SPA plan may be authorized by the Planning Director provided that the amendment does not: a. change the use or character of the development; RESPONSE: The character of the Aspen Meadows SPA is tourist, guest and conference oriented. The use of the Seminar building will be enhanced by the expansion as circulation within the building will be improved, bathroom facilities will become accessible for the 1"""\ , .1"""\ disabled, and the building will be upgraded for aUdio/visual equipment. b. increase by greater than 3% the overall coverage of structures on the land; RESPONSE: The new request for additional square footage represents a 2.5 % increase in the overall coverage of structures on the land. c. substantially increase trip generation rates of the proposed development, or the demand for public facilities; RESPONSE: The proposed expansion seating capacity but to correct building. is not intended to functional elements increase of the d. reduce by greater than 3% the approved open space; RESPONSE: The reduction in approved open space is approximately .1%. e. reduce by greater than 1% the off-street parking and loading space; RESPONSE: Parking and loading space will not be affected. f. reduce in required pavement widths or rights-of-way for streets and easements; RESPONSE: N/A. g. increase greater than 2% the approved gross leasable floor area of commercial buildings; RESPONSE: N/A. i. create a change which is inconsistent with a condition or representation of the project's original approval or which requires granting of a further variation from the project's approved use or dimensional requirements; RESPONSE: The expansion potential of existing facilities at the Meadows was contemplated within the final SPA development plan. The Institute's request for an expansion is consistent with the original approval. RECOMMENDATION: Staff recommends approval of the correction of the gross square footage of the Aspen Institute's Seminar building and the additional 758 square feet to be included with the 1994 request to expand the Seminar building with the following conditions; 2 .~. ,~ 1. The applicant shall record an amended SPA plan that indicates the approved addition. The plat shall be recorded prior to the issuance of any building permits or within 180 days whichever is shorter. Failure to record the amended plat shall render this approval void. 2. The total gross square footage of the Aspen Institute Seminar building shall be 8,635 square feet. 3. All representations made in the application and in meetings with staff shall be adhered to unless amended. I hereby approve of the insubstantial amendment, for Lot I-B of the Aspen Meadows, to the final SPA development plan for the Aspen Mea SPA pursuant to section 24-7- ~ t icipal Code. ~.....~, 4, \ ~ . ~ \ Director Community Development st De 3 ,.......,. r->. ~~ ~/PITKIN PLANNING OFFICE 130 S. Galena Street Aspen, Colorado 81611 (970) 920-5090 FAX# (970) 920-5197 June 28, 1995 Jack Palomino Guy Associates Box 1640 Basalt, CO 81621 Re: Aspen Institute Insubstantial PUD Amendment and Extension Case A8l-95 Dear Jack, The Planning Office has completed its preliminary review of the captioned application. We have determined that this application is complete. We have scheduled this application for 1st Reading before the Aspen City Council on Monday, July 10, 1995 at a meeting to begin at 5:00 p.m. Second Reading and Public Hearing will be on July 24, 1995. Should these dates be inconvenient for you, please contact me within 3 working days of the date of this letter. After that the agenda dates will be considered final and changes to the schedule or tabling of the application will only be allowed for unavoidable technical problems. The Friday before the meeting dates, we will call to inform you that a copy of the memo pertaining to the application is available at the Planning Office. Please note that it is your responsibility to mail notice to property owners within 300' and to post the subject property with a sign at least ten (10) days prior to the public hearing. Please submit a photograph of the posted sign as proof of posting and an affidavit as proof of mailing prior to the public hearing. If you have any questions, please call Leslie Lamont, the planner assigned to your case, at 920- 5101. Sincerely, ~N-C / ' S ne L. Wolff Administrative Assistant ~,ph THEODORE K GUY Ar,CIATES PC ARCHITECTS AND STRUCTL... -A.L ENGINEERS ~ June 1, 1995 Ms. Leslie Lamont Aspen/Pitkin Community Development 1 30 South Galena Aspen, CO 81611 " 'Y"i . --t~/--' ~~ ..~ 0", i ,~,-{! j -.c..__/ ',", ~.l '~ .....""... ;::, RE: Aspen Institute Seminar Building Expansion LEGAL DESCRIPTION: Lot l-B of the Aspen Meadows Subdivision SUBJECT: City Council Ordinance Procedure Extension of Recordation Period / / Dear Leslie: The 180 day Recordation Period for the Amended Final SPA Development Plan commencing 6/1 3/94 has expired and the documents for the approval have not been recorded. We are hereby requesting that an extension for this Recordation Period be granted by the City Council through an Ordinance Procedure. We anticipate an October construction start date and would like to secure Planning Department approval as soon as possible so we can submit for Building Permit review at the earliest possible date. If possible we would like to be scheduled for the June 26th City Council meeting and the next available meeting for review and approval. The following documents are included for your review: - A letter of authorization from the Owner to act as his representative - A draft Plat with current amendment conditions and 1992 SPA approval conditions identified, consisting of Sheets A 1.1, A 1.2 and A 1. dated, 6/1/95. - A check payable to the City in the amount of $1,02 00 for processing fees. We trust that the enclosed information meets your information required, please contact this office. further Jack Palomino, AlA THEODORE K GUY ASSOCIATES PC I i <~ \_^', A '/, t: ',/" t< o. ;;"'l.- '-'" w,)) 'i,'J' ) ''':I'. -', .. GI h , <' {) l{,-L.. ~i:J .' .' /'() '--f.." ':'-""."" ~"ui'-""'f._ JP/jp 93166 L18 YO'il '~'9 i' . "-, Pl~h,; '. '-...'/' 74- ' Oy ,,' .-,-'1 I ~ '..(~ ,~""" Cl )' 23280 STATE HIGHWAY 82 P,O, sox 1640 BASALT, COLORADO 81821 (303) 827-3167 THEODORE K GUY ~CIATEB PC ARCHITECTS AND STRUC',. .(AL END'NEERS ,-. June 23, 1995 Mr. Stan Clauson, Director Aspen/Pitkin Community Development 130 South Galena Avenue Aspen, CO 81611 RE: Aspen Institute Seminar Building Expansion LEGAL DESCRIPTION: Lot 1-B of the Aspen Meadows Subdivision SUBJECT: Development Application Insubstantial Amendment to SPA Plan Overall Coverage of Structures Dear Stan: The following text was included in a letter to Bill Drueding dated 6/1/95. Per your request I am readdressing this letter in your name. The amendment to the Aspen Meadows Final SPA Development Plan was granted for this project on June 13, 1994 as Ordinance No. 21 (Series of 1994). A copy of this Ordinance is attached for your reference. Prior to our submittal for an Insubstantial Amendment to the SPA Plan, Kim Johnson suggested we review our assumptions for calculating the lot coverage increase with you (Bill Drueding). The area to be added to the existing building was quoted as approximately 2,410 square feet. The existing gross area of the building was incorrectly quoted as 5,120 square feet. The correct existing gross area of the building is 5,467 square feet and is identified in our drawing sheet A2.0, Demolition Floor Plan, dated 6/1/95. This corrected figure is significant because our proposed addition to the building has increased to 3,168 square feet and we are submitting this information as a part of our Developme~t Application for an Insubstantial Amendment to the approved SPA Plan. According to the Review Standards, an Insubstantial Amendment may be authorized by the Planning Director if an increase is less than three (3%) percent in the overall coverage of structures on the land. Kim Johnson suggested we consider the approved square footage of the Seminar Building as existing and use only the difference between the approved and proposed areas in calculating the overall increase coverage of structures on the land. Our calculations for this increased coverage are as follows: SEMINAR BUILDING AREA PROPOSED (5,467 SF + 3,168 SF) . EXISTING (5,467 SF + 2,410 SF) NET AREA INCREASE 8,635 SF 7,877 SF 758 SF :23280 STATE HIGHWAY 82 P.O. BOX 1640 BASALT, COLORADO 81621 {970J 927.3167 ^ ,,-., Aspen Institute Seminar Building Expansion June 23. 1995 Page Two EXISTING LOT COVERAGE SEMINAR BUILDING BOECHTER BUILDING PAEPKE AUDITORIUM BUILDING 7,877 SF 8,183 SF 13,722 SF TOTAL LOT COVERAGE AREA 29,782 SF BUILDING COVERAGE PERCENTAGE INCREASE NET AREA INCREASE TOTAL LOT COVERAGE = 758 SF 29.782 SF = .025 (2 1/2%) The proposecl net area increase represents a 2 112 percent increase to the overall coverage of structures on the land and is below the maximum 3 percent increase allowed by the Review Standards. Copies of the existing building footprints and their area calculations are included for your review. If you find no exception to our request for a correction to the area of the existing Seminar Building and our calculations for the building coverage percentage increase, please return a signed copy to me as soon as possible. This letter will be included as a part of our Development Application for an Insubstantial Amendment to the SPA Plan. Reviewed and Approved by: Stan aauson Date JP Ijp 93166 L19 Encl. cc: Leslie Lamont, John Keleher, Gideon Kaufman , 5) ATTACHMENl' :L ~ USE APPLICl\TICN FORM /-, 1) 'Project NaIre -==t1P, ~.Ths:htt1t-e.../ &mlV/4V ~ild4'Y71 2) Project IDcation-iio/:;" MffJ.<<rJJJS ~. Ape-n. COl)f(!J1J W, a#-o..cAorL ~/. tasCh't?mm ' (inlicat:f.l street >rl'l,I?"'<;, lot & bld;k'I1IlIliJer, legal description where apprq:>ri.: ::e) Present Zonirq A (~pA) 4) rot size J3.ltP AcY'e,~ (Lot1-e.) Applicant's NaIre, AcXJress & Hlone I j1.t ~ j;rz5:htvtk- 100 rY .1hJ~d Sf: ~1(O?Jlbll (?lJ?,)~2"5.(P~li · , Representative's NaIre, 1\ddress & fhone ,crcM~ A!lontfno MIr ~eooo.tk-G;/A.1~SOC. pc. rf.O.f~"db40 ~.f({tt(iJ PJ/02/ -&;5 q273Jh7 Type of Application (please check all that ar;ply) : " 0/t/q~ 3) 6) 7) Corditional Use _ Con:::eptual SPA _ Special Review Final SPA 8040 Greenline _ Corx::eptual fUD _ Conc.ept:ual. Historic [hv. Final Historic [hv. Minor Historic D:..-'V'. " _ stream Mngin Final RID Historic Delrolition M::xmtain view Plane . Sub:livision _ Historic Designation Condominiumization _ TextjMap l\merrlment _ QQS Allotment: ~ IDt SplitjIDt Line _ QQS Exemption Mjust:l!ent ' X .::/J1~-b""ii(;l.1 f1me-ndh'V\T-k 8) Description of Exi.stin:J Uses (n.mi:>er and ~ ~f'A~ structures; ar;praxilDate sq. ft.; llI.llIber of bb.h.~; any previous ar;provals granted to the property) . &.t~hYt' ~if1etY'~i!din9 ~jfh tme{ayjLaMcL ~O lrtMa{(t7-V' ~M1iJ1CO" ~ W' . I in It" :e . Y'C#1tfttL in ri vtal SPA ~ t p~ t?J O1)ilin M f.t Z I 9) "ie:S. 1~1!(<f) rI/)Jtf.el 0. 13jQ4. , 1ptioE. ~f 6"v~op:nent Afplication Btq),\l\f avv' 3h&fAk0~-h~J AJrtpMdMwMt -Jv -JW SPfLplM1 flY' (WI JhGY(l~~ "n ~ ~W(l." COVfIVwp- bf srruduyts 0)1 +k la<<rJ.. ,pt., 10) Ie ycu attached the follwing? eS Response to Attactnnent 2, Min:in:um Sum;"'",ion COntents ' Response to Attactnnent J, Specific Slim; "''''ion COntents ~5 Response to l\ttactnnent 4, Review st:an::lards for Your Application :tA-1 < " THEODORE K GUY A~CIATES PC ARCHITECTS AND STRUCT',L. ENGINEERS r--, .. August 17, 1995 Mr. Bill Drueding Zoning Enforcement Officer Aspen/Pitkin Community Development 130 South Galena Avenue Aspen, CO 81611 RE: Aspen Institute Seminar Building Expansion LEGAL DESCRIPTION: Lot 1-B of the Aspen Meadows SUbdivision SUBJECT: Floor Area Ratio (FAR) Calculations Dear Bill: In lieu of FAR guidelines contained within the Aspen Land Use Regulations for the Academic (A) zoning designation or the "Aspen Meadows" Specially Planned Area (SPA) Development Subdivision Agreement, adopted January 24, 1992, I am herewith submitting square footage information for for the above mentioned project for your review and approval. The square footage and lot coverage for the proposed project i$ as follows: Existing Seminar Building Proposed Addition 5,467 SF 3,168 SF 8,183 SF Existing Boechter Building Existing Paepke Auditorium Building 13,722 SF I' ~. Total Building Area 30,540 SF Lot Area (13.1 6 Acres) 573,246.6 SF Proposed Lot Coverage Buildino Area = Lot Area 30.540 SF = 573,246.6 SF 5.33% In addition to these figures, I am including a copy of a memorandum from Leslie Lamont to Stan Clauson dated, July 20, 1995, which approves our request for an Insubstantial Amendment to increase the square footage of the existing Seminar Building to a maximum of 8,635 square feet. 23280 STATE HIGI.../WAY 82 P,D. sox 1840 BASALT, COLOF=lADO 81621 (303) 927_31 67 , '. ~, ,-., " August 17, 1995 Aspen Institute Seminar Building Expansion Should you have any questions or comments regarding our request for approval of this project with respect to the FAR, please call me. JP!jp 93166L20 Enc!. cc: Leslie Lamont, Stephen Kanipe I' ~! THEODORE K GUY A~CIATE5 PC ARCHITECTS AND STRUC1- \... ENGINEERS ,,-., June 1, 1 994 THE ASPEN INSTITUTE SEMINAR BUILDING DEVELOPMENT APPLICATION INSUBSTANTIAL AMENDMENT TO SPA PLAN The amendment to the Aspen Meadows Final SPA Development plan was granted for this project on June 13, 1994 as Ordinance No. 21 (Series of 1994). The area to be added to the existing building was quoted as approximately 2,410 square feet. The existing gross area of the building was incorrectly quoted as 5,1 20 square feet. The purpose of this Development Application is to correct the the existing gross area of the building as 5,467 square feet; to increase the area to be added as 3,168 square feet and to request an Insubstantial Amendment to the SPA Plan by the Planning Director. The proposed net area addition represents a 2 1/2 percent increase to the existing coverage of structures on the land and is below the maximum 3 percent increase allowed by the Review Standards. Review Standards a. There is no change in use or character of the development. b. The increase to the overall coverage of structures on the land is less than three (3%) percent. Overall coverage will be increased by two and one half (2 1/2%) percent. c. Existing public facilities, utilities and roads exist to service the existing building with no increased impacts as a result of this amendment. d. The reduction to the approved open space is not greater than three (3%) percent. The reduction is one tenth (.1%) of one percent. e. There is no reduction to the number of off-street parking spaces or loading spaces. f. There is no reduction to the required pavement widths or the rights-of-way for streets and easements. , g. There is no increase to the approved gross leasable floor area of commercial buildinQs. h. There is no increase to the approved residential density of the proposed development. i. The change is consistent with the conditions and representations of the project's original approval. The change does not require granting of a further variance from the project's approved use or dimensional requirements. 93166 Insubstantial Amendment 23280 STATE HIGHWAY 82 P. O. sox 1 840 BASALT, COLORADO 81821 (308) 827_31 87 :tA-& ,! THEODORE K GUY A'ii"""?CIATES PC ARCHITECTS AND STRUCl'" :L ENGINEERS "-.,, June 1,1995 Mr. Bill Dreuding Aspen/Pitkin Community Development 130 South Galena Avenue Aspen, CO 81611 RE: Aspen Institute Seminar Building Expansion LEGAL DESCRIPTION: Lot 1-B of the Aspen Meadows Subdivision SUBJECT: Development Application Insubstantial Amendment to SPA Plan Overall Coverage of Structures Dear Bill: The amendment to the Aspen Meadows final SPA Development Plan was granted for this project on June 13, 1994 as Ordinance No. 21 (Series of 1994). A copy of this Ordinance is attached for your reference. Prior to our submittal for an Insubstantial Amendment to the SPA Plan, Kim Johnson suggested we review our assumptions for calculating the lot coverage increase with you. The area to be added to the existing building was quoted as approximately 2,410 square feet. The existing gross area of the building was incorrectly quoted as 5,120 square feet. The correct existing gross area of the building is 5,467 square feet and is identified in our drawing sheet A2.0, Demolition floor Plan, dated 6/1/95. This corrected figure is significant because our proposed addition to the building has increased to 3,168 square feet and we are submitting this information as a part of our Development Application for an Insubstantial Amendment to the approved SPA Plan. According to the Review Standards, an Insubstantial Amendment may be authorized by the Planning Director if an increase is less than three (3%) percent in the overall coverage of structures on the land. Kim Johnson suggested we consider the approved square footage of the Seminar Building as existing and use only the difference between the approved and proposed areas in calculating the overall increase coverage of structures on the land. Our calculations for this increased coverage are as follows: SEMINAR BUILDING AREA PROPOSED (5,467 Sf + 3,168 Sf) EXISTING (5,467 Sf + 2,410 Sf) 8,635 Sf 7,877 Sf NET AREA INCREASE 758 Sf EXISTING LOT COVERAGE SEMINAR BUILDING BECHTER BUILDING PAEPKE AUDITORIUM BUILDING 7,877 Sf 8,1 83 Sf 13,722 Sf TOTAL LOT COVERAGE AREA 29,782 SF 2,3280 STATE HIGHWAY 82 P,O, BOX 1640 8ASAL T, COt_ORADO 81 821 (308) 927.8167 ! ,-..", ~, Aspen Institute Seminar Building Expansion June 1. 1995 Page Two BUILDING COVERAGE PERCENTAGE INCREASE NET AREA INCREASE TOTAL LOT COVERAGE = 758 SF 29,782 SF = .025 (2 1/2%) The proposed net area increase represents a 2 1 /2 percent increase to the overall coverage of structures on the land and is below the maximum 3 percent increase allowed by the Review Standards. Copies of the existing building footprints and their area calculations are included for your review. If you find no exception to our request for a correction to the area of the existing Seminar Building and our calculations for the building coverage percentage increase, please return a signed copy to me as soon as possible. This letter will be included as a part of our Development Application for an Insubstantial Amendment to the SPA Plan. Reviewed and Approved by: ------------------------------------------- 8i11 Dreuding Date JP/jp 93166 L15 cc: Kim Johnson, Leslie Lamont, John Keleher Encl. 1"""'\ ~ The A,p!.titute 45 YEARS 1950-1995 David T. McLaughlin Chairman of the Board June 7,1995 Ms. Leslie Lamont Aspen/Pitkin Community Development 130 South Galena Avenue Aspen, CO 81611 RE: The Aspen Institute Seminar Building Expansion Legal Description: Lot I-B of the Aspen Meadows Subdivision Subject: City Council Ordinance Procedure Extension for Recordation Period Dear Leslie: We hereby authorize Theodore K. Guy Associates, P.O. Box 1640, Basalt, CO, (970) 927-3167, to act on our behalf regarding the Ordinance Procedure forthe above mentioned project. 1000 North Third Street, Aspen. CO 81611 . (303) 544-7900. Fax (303) 925-4188 Administrative Center: 2010 Carmichael Road, P.O. Box 222, Queenstown, MD 21658. (410) 820-5426. Fax (410) 827-9182 Headquarters: 1333 New Hampshire Avenue, NW, Suite 1070, Washington, DC 20036. (202) 736-5840. Fax (202) 467-0790 t"""\ ~ The ASp!.ti'U,e 45 YEARS 1950-1995 David T. McLaughlin Chairman of the Board June 7,1995 Ms. Leslie Lamont ASPen/Pitkin Community Development 130 South Galena Avenue Aspen, CO 81611 RE: The Aspen Institute Seminar Building Expansion Legal Description: Lot 1-B of the Aspen Meadows Subdivision Subject: Development Application Insubstantial Amendment to SPA Plan Dear Leslie: We hereby authorize Theodore K. Guy Associates, P.O. Box 1640, Basalt, CO, (970) 927-3167, to act on our behalf regarding the Development Application for the above mentioned project. 1000 North Third Street. Aspen, co 81611 . (303) 544-7900 . Fax (303) 925-4188 Administrative Center: 2010 Carmichael Road, P.O. Box 222, Queenstown, MD 21658. (410) 820-5426. Fax (410) 827-9182 Headquarters: 1333 New Hampshire Avenue, NW, Suite 1070, Washington, DC 20036. (202) 736-5840. Fax (202) 467-0790 r-. .~ ASPEN INSTITUTE - SEMINAR BUILDING LEGAL DESCRIPTION LOT 1 B OF A SUBDIVISION LOCATED IN THE NORTH 1/2 OF SECTION 1 2 AND THE SOUTH 1/2 OF SECTION 1, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6TH P.M., PITKIN COUNlY, STATE OF COLORADO. 93166 Legal Description .tA-2 ,-, ~ A/z. J Icrtf.. A (3/GC, (~~~S~er No. A94:QI0 ADJACENT OWN"SHlP CERTIFlCATE'tr~~~~~ ~1 tH~1't K GIJY ASSOOJAffS, P. , ASPEN TITLE CORPORATION, a corporation organized and existing under and by virtue of t~e laws of the State of Colorado, HEREBY CERTIFIES That is has made a careful and diligent search of the records in the office of the Clerk and Recorder for Pitkin County, Colorado, and has determined that those persons, firms or entities set forth on the Exhibit "A" attached hereto and by this reference incorporated herein and made a part hereof, reflect the apparent owners of lots, tracts, parcels and condominium units lying within 300 feet of the following described real property situate, lying and being in the County of Pitkin State of Colorado, to-wit: Lot I-B, ASPEN MEADOWS SUBDIVISION This Certificate has been prepared for the use and benefit of the above named applicant and the City or Town of Aspen in the County of Pitkin, State of Colorado. THE LIABILITY OF THE COMPANY HEREUNDER IS EXPRESSLY LIMITED TO THE AMOUNT OF THE FEE PAID FOR THIS CERTIFICATE PLUS $250.00 DATE: 4/19/94 ASPEN TITLE CORPORATION, a Colorado corporation BY:~~~ Lynn M. Dy u, ~Ice President :tA-4- I'"'- Board of County Commissioners 'itkin County J5 East Main Street Aspen CO 81611 Music Associates of Aspen, Inc. P.O. Box AA ,Aspen CO 81612 Aspen Center For Physics 700 West Gillespie Aspen CO 81611 Aspen Institute, Inc. 1000 North 3rd Street Aspen CO 81611 Kenneth R. Whiting Two United Bank Center, Suite 2300 1700 Broadway Denver CO 80290 Elaine C. Hodges 2800 S. University Blvd, Suite 169 Denver CO 80210 Cathy O'Shana <5 Gillespie Street "spen CO 81611 Leslie Peer 635 West Gillespie Street Aspen CO 81611 James J. Markalunas and Ramona I. Markalunas 624 West North Street Aspen CO 81611 Sara Jane Tallman Kane 760 9th Street Boulder CO 80302 Elyse A. Elliott 610 North Street Aspen CO 81611 John A. Luetkemeyer, Jr. and Suzanne F. Luetkemeyer and Eugene H. Schreiber and Stanford D. Schreiber P.O. Box 10147 ~altimore MD 21285 EXHIBIT A ~ John Albert Odom, Jr. and Lorrie Furman Odom 11690 West 38th Avenue Wheatridge CO 80033 Naomi Uhlfelder Box 1165 Aspen CO 81612 Charles Collins and Janice S. Collins Box HH Aspen CO 81612 George W. Stark and Margaret S. Stark as Trustees of Stark Trust Box 8015 Aspen CO 81612 Jean Pierre Odier P.O. Box 714 Aspen CO 81612 James Salter 500 West North Street Aspen CO 81611 Neil H. Beck and Pamela L. Beck 515 West Gillespie Street Aspen CO 81611 Christ Episcopal Church Bishop and Diocese of Colorado 536 North Street Aspen CO 81611 Wood Duck Realty Corp. c/o Darryl Dworman 65 West 55th Street, Suite 4A New York , NY 10019 Robert F. Starodoj and Paula A. Starodoj Box 1121 Aspen CO 81612 Selim K. Zilkha 750 Lausanne Road Los Angeles CA 90077 Leonard A. Lauder and Evelyn H. Lauder 2 East 67th Street New York NY 10021 tA-r? Gary Lauder and "'illiam Lauder 67 5th Avenue, 37th Floor New York NY 10153 ~. EXHIBIT A CONTINUED /--. :!;l-w 1"""'\ (~ e CITY OF ASPEN VICINITY MAP N.T.S. TIll! ASPEN MEADOWS FlNAL S.P.A. DEYEI.OPMENT PLAN AND FlNAl.. SUllDIVISION PlAT c ,'''..,... , 'lo../ :tA-l ".,1; THEODORE K GUY A~IATES PC ARCHITeCTS AND STRUCTL. ..L ENGINEERS -. MEETING NOTES John Keleher, Owner's Representative Aspen Institute Jack Palomino AlA, Theodore K Guy Associates PC June 22, 1995 Seminar Building Aspen Institute Subject: Planning Approvals To From: Date Re Those Present: Stan Clauson, Director Aspen/Pitkin Community Development; Bill Drueding, Zoning Officer Aspen/Pitkin Community Development; Gideon Kaufman, Attomey; Jack Palomino AlA, Theodore K. Guy Associates PC The following are items discussed and decisions made: ITEM 1: ITEM 2: ITEM 3: ITEM 4: ITEM 5: The Planning approvals required to proceed with the project are: A. Granting of an extension and waiver by the City Council for showing of good cause to allow the applicant to record an Amended Final SPA Development Plan. B. Planning Director approval of an Insubstantial Amendment to the SPA Plan for the 2 1/2 percent increase in the overall coverage of structures on the land. The applicant shall secure the City Council approval of an extension and waiver, then proceed with securing the Planning Director's approval for the Insubstantial Amendment. Stan has scheduled Gty Council reviews of the extension and waiver request as follows: July 10, 1995 Consent Agenda July 24, 1995 Public Hearing Due to the fact that their is less than a 30 day period between the two scheduled reviews, pre-notice posting is required. The Architect has contacted Suzanne Wolff of Community Development to notify Catherine Koch of the City Clerks Office regarding our request for pre,notice posting. Upon detailed review and discussion of the previously approved project and the proposed square footage increase, Stan determined that granting approval for the Insubstantial Amendment request would be forthcoming once City Council has granted an extension and waiver. Stan requested the Architect readdress the letter to Bill Drueding regarding the Insubstantial Amendment and overall coverage of structures, dated 6/1/95, directly to him. The above represents our report of events noted and items discussed, and will be relied upon as true and correct by all parties unless notified within 5 working days of receipt. JP/jp 93166 MN21 cc: Those Present, Gndy Buniski, Leslie Lamont 23280 STATE HIGHWAY 82 P.O. BOX 1640 BASALT, COLORADO 81621 (970} 927-3167