HomeMy WebLinkAboutcoa.lu.sp.Water Treatment Plant.A39-95CASELOAD SUMMARY SHEET City of Aspen DATE RECEIVED: 3 /29/95 DATE COMPLETE: PROJECT NAME: Project Address: Legal Address:_ PARCEL ID AND CASE NO. 2735 - 132 -00 -858 A39 -95 STAFF MEMBER: KJ APPLICANT: Citv of Aspen, Enaineerina Department 920 -5080 Applicant Address: 130 South Galena St., Aspen REPRESENTATIVE: Tom Stevens 925 -6717 Representative Address /Phone: 312 E AABC, Aspen, Co Aspen, CO 81611 ---------------------------------------- FEES: PLANNING $ # APPS RECEIVED 24 ENGINEER $ # PLATS RECEIVED U HOUSING $ ENV. HEALTH $ TOTAL $ 0 TYPE OF APPLICATION: STAFF APPROVAL:_ 1 STEP: _ 2 STEP: X Z P &Z Meeting Date + PUBLIC HEARING: YES NO VESTED RIGHTS: NO CC Meeting Date PUBLIC HEARING: YES NO VESTED RIGHTS: YES NO DRC Meeting Date �3 27°00 --------------------- - - - - -� ---------- - - - - -- ------ - - - - -- - - - -- REFERRALS: ` / City Attorneyy F 1t Parks Dept/ School District r*City Engin2 Bldg Inspec r Rocky Mtn NatGas ousing Dir. ' Fire Mars CDOT Aspen Water Holy Cross Clean Air Board j City Electric F ^� Mtn. Bell Open Space Boa •Envir.Hlth. ACSD • Other Zoning I Energy Center Other �I� on ATE REFERRED: 1 - { FINAL ROUTING: l v01` INITIALS: D w DUE: DATE ROUTED/ A INITIAL: City Atty City LrigineElA\N_oriiag` Env. Health Housing _ Open Space other: FILE STATUS AND LOCATION: maAA I., .s CITY OF A.SPEN')WATYMDEPARTlNMNT I3C-SOi." GALENA STREET tMAILING) 5007 DOW OY'l.E ORNE (SHIPPIN01 ASPEN, CO 816!1 F>x: 070-020-51 17 ,PHONE: 970-920-61 1 0 TO: JTJLIE ANNE WOODS FAX M: 5439 FROM: MARK O'MSARA r V DA` F,-' JUNE 13, 1997 PAGE'S INCLUbNI G COVER SHEET: 3 SUBJECT' ADMINISTRATION BUILDING ON TOP OR THE SEDIMENTATION BASIN C011'LMl.ENTS: IF YOU NEED A CONYUMATION OR VfY OF TIE PAGES M - SRN1T, PLEASE CALL On OFFICE AT 970 -935 -5110 1jU .i T'd 1d3G 831W N3dSU WdEI;EO L6, ES Mrf 6 S E'd 1d3Q M-LW W3dSU WdbT:60 2-6. ET Wit :T wnf Stan Clauson, PM Re: Elevation Plans X- Sender: stanc @comdev.aspen.co.us Date: Fri, 13 Jun 1997 12:08:49 -0600 To: "Mark O'Meara" <marko @aspen.co.us >, juliew @aspen.co.us From: Stan Clauson <stanc @comdev.aspen.co.us> Subject: Re: Elevation Plans Cc: juliew @aspen.co.us, chrisb @aspen.co.us, amym @aspen.co.us, nicka @aspen.co.us, philo @aspen.co.us Since you are moving the location of the structure, we need to establish for the record that the visual impacts are minimal in order to process this change as an insubstantial amendment. In order to do that, we had asked for a site section and a site plan showing topography. The point is to establish that the impacts of a new location for the office building are not significant, so whatever you can bring to bear on that issue will be helpful. I recognize that you are under time constraints, but there are PUD approval criteria which need to be met because of the change you are requesting. Please provide a site section and site topography and we will give the materials very prompt review. However, if it is clear that the new proposed location will have significant visual impacts, then it will need to go back to P &Z for review as an amendment to the PUD. Thanks, Stan At 11:40 AM 06.13.1997 -0600, Mark O'Meara wrote: >I talked to the architect about the issues pertaining to the topographic >features on the new administration building over the sedimentation basin for >the site plan. He can incorporate the features from the elevation 8120 east >of the structure (this is down the bank toward Castle Creek Rd.) to the west >side of the round >architects office. >I have also talked the clarifiers on the old plant. This plan is is the to Heather about the GIS map of the area and she has >features up here also topographically. This is not availabe to the >architect until it is printed and sent to him . I need some direction on >which way to go in order to satisfy Com. Dev.1s needs and get this project >under way. > Please reply. > >Mark rin a or u ie n oo s <-Ju-13-6W@aspdfi.co.us> ion O'Meara, ans X- Sender: marko @commons.aspen.co.us Date: Fri, 13 Jun 1997 11:40:06 -0600 To: juliew @aspen.co.us From: "Mark O'Meara" <marko @aspen.co.us> Subject: Elevation Plans Cc: stanc @aspen.co.us, nicka @aspen.co.us, philo @aspen.co.us I talked to the architect about the issues pertaining to the topographic features on the new administration building over the sedimentation basin for the site plan. He can incorporate the features from the elevation 8120 east of the structure (this is down the bank toward Castle Creek Rd.) to the west side of the round clarifiers on the,old plant. This plan is is the architects office. I have also talked to Heather about the GIS map of the area and she has the features up here also topographically. This is not availabe to the architect until it is printed and sent to him . I need some direction on which way to go in order to satisfy Com. Dev.'s needs and get this project under way. Please reply. Mark rin a or u ie n oo a <7u ie aspen.co.us> - Nick Adeh, , Re: Scr heads up X- Sender: nicka @comdev.aspen.co.us Date: Thu, 12 Jun 1997 09:32:03 -0600 To: Stan Clauson <stanc @comdev.aspen.co.us> From: Nick Adeh <nicka @comdev.aspen.co.us> Subject: Re: Scrubber bld. heads up Cc: marko @aspen.co.us, juliew @aspen.co.us, philo @aspen.co.us, nicka @aspen.co.us Stan: The SPA plat was submitted to show the existing Chlorine Storage Building to be extended similarly in width and height to house a scrubber unit, meaning it would have had the built -in inside maintenance access space. We reduced the building extension to an unoccupied facility primarily to avoid installation of fire sprinkler system (a design option developed after the SPA approval for simplicity purposes and expediency in implementation). Therefore, the enlarged building foot print if needed, would closely match the original SPA, and secondly, this building is a stand alone facility and is not attached to the future office building. As it stands now, it will not impact the progress of the office building expansion plan. I hope this will provide more clarification for your concern regarding the water treatment plant improvements project. I will be glad to provide additional info. if you have any questions. Nick Adeh At 09:01 AM 6/12/97 -0600, you wrote: >Does this mean we will be looking for an amendment to the SPA to accommodate >a larger structure? Does this impact the office facility, which is now >being reviewed as an amendment to the SPA? >Thanks, > >Stan > >At 07:37 AM 06.12.1997 -0600, you wrote: >>Mark : >>I am not aware of portable Chlorine Scrubber units, but I wished to receive >>the benefit of doubt for such system assuming the technological advances >>might have suggested new changes. If we were to go through a process of >>elimination to make sure such type of equipment is not in the market yet, I >>would recommend that you ask Bill S. to search for other vendors to see if >>other manufacturers have made skid mounted scrubbers. Otherwise, it seems >>that we are left with no choice but to enlarge the building foot print to >>provide for inside maintenance access. rinted tor Julie Ann Woods <!uiiew@aspen.co.us> -Nick Adeh, , Re: Scrubber bld. heads up >>Nick Adeh >>At 03:35 PM 6/11/97 -0600, you wrote: >>>I just received a call from Bill Schroeder about the Chlorine Scrubber >>> Building. He talked to Tom Maretto about the 'enclosure' building we were >>>trying to accommodate the unit in and the manufacturer said that it won't >>>work on the concept we had. The unit wieghs 30,000 pounds and is NOT >>>intended to be moved about on a skid system. I understand that the scrubber >>>is not to be moved once it is set. Therefore, we will need to increase the >>>size of the building(now) to allow for maneuvering inside for maintenance. >>>Bill will be calling to discuss this with you on Monday (I will be off). JPrinted tor Julie Ann Woods <juliew@aspen.co.us> A -24-1997 3:13PM FROM RUDD CONST. INC. 970 927 4027 WATERPLACE HOUSING CITY OF ASPEN ASPEN, COLORADO THE 1 DESIGN / BUILD TEAM OF RUDD CONSTRUCTION, INC. AND BAKER / FALLIN ASSOCIATES, ARCHITECTS A PRESENTATION OF THE PURPOSE, GOALS, METHODS, AND G'R WRAL SCOPE OF THE WORK AS DEVELOPED BY THE DESIGN /BUILD TEAM IN AN EFFORT TO CREATE AN ENVIRONMENTALLY FRIENDLY AND ENERGY EFFICIENT HOUSING PROJECT FOR EMPLOYEES OF THE CITY OF ASPEN I. �2 ) 1, i f 1 1 A-24-1997 3:13PM 1.1 Purpose FROM RUDD CONST_ INC. 970 927 4027 1.0 General The purpose of this Basis of Design Report is to establish the scope of the work, establish a not to exceed price for fees and construction, and establish a schedule for the construction of the Waterplace Housing Project. This report will establish and identify the products and methods to be employed in the construction of the Waterplace Housing Project. The proposed products and methods are a result of the research and value engineering of the Design/Build Team during the term of the Part One agreement, Preliminary Design and Development. In our research we have found environmentally friendly or "green" construction is a very common sense approach to the environmental concerns of today. New products are emerging every day and it has been our job to focus on the cost and desirability of these products in the Waterplace Housing Project_ The individual products and methods will be grouped by CSI Specifications divisions as they will appear in the final Construction Documents. 1.2 Background The Design / Build Team of Rudd Construction, Inc. and Baker / Fallin Architects was retained by the City of Aspen to complete the Part One of the Design/Build contract for the Waterplace Housing Project in February of 1997. Using the approved Land Use Planning documents as prepared by Gibson /Reno Architects and Schmeuser Gordon Myer, Engineers in 1996, the Design /Build Team has further developed preliminary documents for construction under the approved outline. The given location for Waterplace Housing is, itself, a sensitive area and proper consideration has been given to the maintaining of the beauty of the site under the requirements of the City of Aspen_ Consideration of climate and conditions of the area has been a criteria for the selection of the building products, building methods, and scheduling of the Project. 1.3 References Detailed analysis of products to become a part of the construction are listed in a volume produced by 'What's Working' a group dedicated to environmentally friendly construction and employed by the Design /Build Team as consultants. Other data available for reference include the Land Planning maps used in the original submission for Land Use Approval, and geotechnical reports prepared at that time. 2= P-3 d -24-1997 3:14PM FROM RUDE) CONST..INC. 970 927 4027 2.0 Methodology of the Design/Build Effort 2.1 General The scope of the Part Two Agreement includes design and construction of the Waterplace Housing Project. The design and construction of the project will continue with the same personel that have been key in the Part One agreement. 2.2 Detailed Design The design effort will include preparation of drawings and specifications in sufficient detail to obtain building permits and to carry out the construction. During the term of the Part One agreement certain modifications have been made to the attached units to better utilize space and to accomodate access to basements which were added to fourteen of the seventeen units. It should be noted here that in an effort to accelerate the schedule the Design /Build Team has met with the Aspen/Pitkin Community Development Department and an agreement has been reached whereby foundation design will be submitted at the earliest possible date. Considering the scope of the project and the length of the building season this is of great advantage to the project as a whole. Based upon the preliminary design used in the land Use Application, selection of subcontractors has been in process during the term of the ;Part One agreement_ The selected subcontractors will be open to the review of the City. The project, as a whole, will be 'open book' and review of costs by the City will be welcomed. All cost accounting will be performed by Rudd Construction and each Payment Request will be accompanied by a Billing Worksheet itemizing each invoice. 2.3 Construction 11w, Once construction begins, the Design/Build team will provide full -time on -site supervision of the work. A fully equipped site office will be established. VVdh commencement of above ground construction a second supervisor will be assigned to the job. The design /build team's approach to the project is to divide the single family residences from the attached residences. The attached residences will be the first priority for construction. The areas adjacent to the attached units will provide for adequate parking for construction personei and staging area for construction of all units. During construction of the Waterplace Housing units we realize that other 1 construction projects involving water plant improvements will be in progress and that it *11 be necessary to establish procedures that will allow for all work to progress smoothly. / 1 4 -24 -1997 3:14PM FROM RUDD CONST. INC. 970 927 4027 SCOPE OF THE WORK General The scope of this project is to include the following items as depicted on the drawings prepared by Gibson -Reno Architects along with modifications made during the term of the Preliminary Design Development by Baker /Fallin Architects. DIVISION 1 100- .General Expense The scope of work for this division includes maintaining a temporary office at the site of the work manned by a field superintendent and equipped with computer, fax machine, and telephone; temporary power and sanitary facilities; weather protection of new construction and snow removal; trash removal, general clean -up and final clean -up; General Expense also includes costs of payment and performance bonding; 2 -year maintenance bonding, Professional Builders Liability Insurance and the use of on -site general construction equipment. DIVISION 2 200 - Excavation / Backfill / Utilities - Installation of infrastructure in the single family area -Clear and grub and remove from site all waste materials - Excavation for each building. 17 multi- family units, and 5 single family units. Basement depth excavation for all multi - family units except for the 'H' units. Includes footer and stab prep for Van pick up, mail station, and two recycle bins. - Installation of underdrain system at perimeters of each building. - Backfill and compaction of backfill material at all foundations -Water service from curb stops at lot lines provided by others to inside foundation -Sewer service from stubs at lot lines provided by others. - Trenching, padding and backfilling for shallow utilities; electric, phone, and cable in same ditch from main service locations as provided by others. - Trenching, padding, and backfilling for gas service. Service lines by KN Energy_ a P. 5 4 -24-1997 3:15PM FROM RUDD CONST. INC. 970'927 x027 P.6 210 - Site Concrete 1 Paving I Drives/ Sidewalk -Clear and grub and remove from site all waste material -Prep 16' wide promenade for installation of concrete walkway -Prep all indicated parking areas for asphalt -Prep all driveways to single family homes for asphalt -Prep all sidewalks to individual units in multi - family area -Dig and backfill for pads and tubes at covered storage units -Dig and backfill for various accessory buildings as shown on Plan view Install curb and gutter and gutter pan as shown on site plan Apply and compact 3" hot bituminous pavement on roads, parking area, promenade and walkways to individual units 220 - Landscaping - Provide rough grade only with on site materials as per Schmeuser Gordon Meyer Grading and Drainage plan - Actual landscaping, irrigation, and retaining structures will be by others, or, will be an additional cost to the contract price proposed by the Design /Build Team. DIVISION 3 300 - Structural Concrete Note: As a result of preliminary soil tests performed by H -P Geotech certain assumptions for spread footing and foundation wall pricing have been made. - All building footings to be 10" D. x 1'-8 W. and of continuous pour, - All foundation walls are to be constructed of EPS Reward Wall system. This loam form' concrete forming system offers an R -Value of 33. 310 - Flat concrete - All interior slabs to be minimum N' thick w/ #4 reinforcing bars at 18" o.c. DIVISION 4 N/A DIVISION 500 - Miscellaneous steel beams 5 • 4 -24 -1997 3 =15PM FROM RUDD CDNST. INC. 970 927 4027 DIVISION 6 — Wood and plastic 600 - Rough Framing The scope of this section of the work will include all rough carpentry framing.. Wherever possible we have incorporated materials that are considered to be more environmentally sensitive. . - Floor joists will be wood I beams, better known as TJI's, rather than solid wood - Floor sheeting will be 'oriented strand board' as made by Louisiana Pacific Company. OSB sheeting is made from farm grown trees and as manufactured by LP is bonded with adhesives containing no forrnaldehydes - Exterior walls will be of 6 -1/2" R- Control panels offering an insulation factor of R -24 and a reduced on -site labor time. 610 - Carpentry Siding The scope of this section includes all exterior finishes such as fascia boards, soffit, siding, trim boards, and deck and rail products. Exterior finishes will follow as closely as possible the elevations shown on the Gibson -Reno drawings. Cementitious siding will be used for the board and batten siding, the horizontal board siding and the soffit and fascia detailing. The advantages of this type of material is that it does not bum and it holds paint or stain incredibly well resufting in very low maintenance. Other exterior finish products are corrugated, galvanized metal, cedar shingles, and where required solid wood beams and posts will be used. It is interesting to note that shingles are available in 'certified second growth' bundles. These shingles are made from farm grown trees rather than virgin timber. 620 - Finish Carpentry DIVISION 7 - Thermal and Moisture Protection 700 - Insulation - Wails - The structural building panels that will be used as the exterior wall construction are made of expanded polystyrene (EPS) insulation welded between stranded lumber facings. The tested R -value at 40 degrees Farenheit is R -24.33 and the integrity of the system allows for no R -value drift. Neither the EPS insulation nor the strand board contain any CFCs or formaldehyde. - Ceilings - Cellulose insulation, containing no formaldehyde bonding agents, will P. 7 !i be used in the ceiling area to obtain an R -38 insulation value. Roof trusses have been designed to accomodate full thickness of the insulation all the way to the outside of the building wallls. t �,_- 4 -24 -1997 3:16PM FROM RUDD CCNST. INC. 970 927 4027 710 - Roofing system The scope of this section of the work includes the installation of 30 year architectural fiberglass shingles over a dry-in that includes lee and Water Shield at building perimeters and valleys as required. 720 - Foundation waterproofing The scope of this section of the work includes the application of Rub -R -Wail waterproofing. This product has been formulated for application over foam concrete forming systems. Rub -R =Wall is non -to)ac and non - carcinogenic, it serves as an effective radon barrier, and is asphaltt free so as not to contaminate ground water. DIVISION 8 - Doors and Windows 800 - Doors - Exterior doors will be Therma -Tru metal insulated doors with thermopane }} glazing 1 - Interior doors will be'Colonist six -panel pressed wood door with a simulated wood grain as manufactured by Masonits. P. 8 810 - Windows - Windows will be Visions 2000' as manufactured by Weather Shield, Inc. An all vinyl window with Low -E glazing the majority will be of the double -hung style. t1 DIVISION 9 - Finishes - The scope of this section of the work will include all paints and stains used throughout the project. Care will be exercised in the selection of these products as they are the most likely to have an adverse effect on occupants of the buildings. - Exterior - The cementitious siding products and trim products as well as the real wood products will arrive on the job with an Olympic1PPG factory applied coating. This high tech coating system allows Olympic(PPG to offer fifteen year warranty on the finish. For ease and expediency in handling the pre -finish factory has offered to package each building separately, minimizing site handling and increasing efficiency. f Interior - All interior finishes will be of a low /no VOC paint products and clear finishes will be of water -based urethane. These products are safer for the eventual occupants of the buildings as well as for the mechanics in the field applying them. DIVISION 10 - Mirrors and Accessories - The scope of this section of the work includes mirrors at all bathroom vanities, medicine cabinets, and typical accessories such as towel bars, tissue holders, etc. A-24-1997 3:16PM FROM RUDD CONST. INC. 970 927 4027 P.G. DIVISION 11 - Appliances - The scope of this section of the work includes the supply and installation of kitchen appliances; i.e. refrigerator, dishwasher, range, and disposer. Clothes washers and dryers have not been included. DIVISION 12.- Cabinets and Countertops - The scope of this section of the work includes the supply and installation of all cabinetry and tops. The majority of factory made cabinets are constructed using partite board a product using a high amount of formaldehyde. With this in mind we have included in this section the use of cabinets made of solid wood. The countertops however will be manufactured with a particle board substrate. We have been advised that sealing of the underside of the countertops will eliminate any off - Basing of the formaldehydes and this will be accomplished on site just prior to installation. DIVISION 13 - Special Construction - The scope of this section of the work includes the building of the carport/storage buildings for use by attached home residents as well as the construction of the Van pick up, the Mail station, and two recycle bins. DIVISION 14 - Conveying Systems - N/A DIVISION 15 - Plumbing, Heating, and Ventilating 1500 - Plumbing - The scope of work of this section includes all rough and finish plumbing within the buildings and the supply of all plumbing fbdures. 1510 - Heating and Ventilation - The scope of work of this section includes a forced air heating system combined with a heat recovery ventilation (HRV) system. The HRV system will provide adequate inside/outside air changes to assure a more healthy inside environment as well as utilizing air that has already been heated in a more efliclent circulating system to maintain a desired temperature at a lower cost. The HRV system will also provide ventilation in the warmer months to maintain a fresher atmosphere inside. 1520 - Fire Sprinkler System - Each unit will be equipped with a fully engineered Fire Supression System including and alarm system and outside indicator. 4 -24 -1997 3:17PM FROM RUDD CONST. INC. 970 927 4027 P.10 DIVISION 16 - Electrical 1600 - Security, Phone, Communications - The scope of work in this section will service wire to the units and pre -wire for phone system and cable T.V. It will not include any provision for security systems other than that involved with the fire sprinkler system. 161 o - Electrical rough in and fixtures - The scope of work in this section will include electrical service wire installed in conduit from each unit to the transformer provided by others. it will also include all rough in wiring and finish wiring at each unit with fixtures to be supplied. All fixtures and lamps supplied will be energy saving devices. 1620 - Site lighting - No exterior site lighting is included under this contract. i t mm 1 MEMORANDUM Nf W TO: Mayor and Council THRU: Amy Margerum, City Manager THRU: Steve Barwick, Assistant City Manager FROM: David Hauter, Asset Mana A DATE: April 23, 1997 RE: Approval of the Contract for the construction of Twenty Two Affordable Housing Units SUMMARY: The City Council has approved the Affordable Housing Project situated on Lot 2 and 4 of the City owned Thomas Property. At this time we are requesting you to authorize Part Two of the Design/Build Contract. The City of Aspen's Design Build Agreement contains two separate, sequential agreements. The Part One Agreement, previously approved by City Council, covered services for completion of the design, finalizing the project scope and total project costs. Staff has reviewed and approved the completed work under the Part One Agreement. The Design/Build Team and staff are presenting the final design, not -to- exceed construction cost, and the construction schedule for twenty two affordable housing units. The Design Build Team and staff are also requesting approval of the Part Two Agreement which covers the services for producing final design documents, obtaining the building permits and beginning construction. Construction of the approved Project is scheduled to begin in June and substantially complete by February 28, 1998. PREVIOUS COUNCIL ACTION: Council approved an Ordinance granting final approval for SPA Plan which consisted of Water Treatment Plant Improvements and a 23 unit Affordable Housing Project. Council approval was subject to thirty two (32) conditions that need to be addressed during the final design and construction of the Project. Council approved the Part One Agreement on February 10, 1997 between the City of Aspen and The Design Build Team of Baker Fallin Associates, Inc./ Rudd Construction Inc. for the Part One Scope of Services to design and build the Housing Project. It was the intent that the parties first enter into the Part One Agreement, and pending Council approval, enter into the Part Two Agreement. BACKGROUND: In 1994 the City granted conceptual approval to the project on an approximately 4.4 acre bench above Castle Creek and below the City of Aspen Water Plant. A mission statement was developed: "Provide a family orientated affordable housing project which will help to benefit individual owners as well as the Community of Aspen ". The project was redesigned and went through a four step review process before final SPA approval was granted on July 22, 1996. The SPA Plan combines Doolittle Drive Improvements and Water Treatment Plant Improvements with the Housing Project. This Project has been reviewed and approved by the Aspen employees, the Aspen/Pitkin County Housing Authority, the Planning and Zoning Commission, the Design Review Appeals Board, and the Asset Planning Committee and City Council. The intent is that this Project serve as an example of good design practices, quality construction and low maintenance costs to the buyers and the environment. DISCUSSION: Since the last presentation to Council the floor plans and elevations for all units have undergone a final analysis to solve remaining design and construction issues and to address the aesthetic concerns raised by council. In the attached units bedrooms were enlarged slightly and lower floors added. The single family residences have undergone major changes in size and character. The prospective buyers of each unit were contacted and the proposed designs were discussed to assure the these homes meet the needs of families. The finished living area of the overall project has increased from approximately 22,200 square feet to approximately 25, 500 square feet. Unfinished lower floor area has increased from approximately 5,067 square feet to approximately 10,173 square feet. Garage space has increased from 5,825 square feet to approximately 6685 square feet. The additional square footage is required for functionality. The aesthetic and design character issues were reviewed with staff and by the Design Appeals Review Board for compliance with the Aspen character guidelines. The specific site constraints of the single family were reviewed with the board and various site plans and architectural solutions discussed. The Board recognized the topographic and other constraints as the determining factor and waived certain criteria that do not apply to this site. The revised single family design effectively addresses the design standards and constraints and the single family home designs were approved. The Design Build Team and staff have addressed all the conditions of the final SPA approval including involving residents in the proposed park planning & design, landscaping and tree mitigation, and revising the plans and elevations of the single family homes. Since final SPA approval an insubstantial amendment to the Final Plat was granted allowing for lower floors at each unit. The DBT and staff believe that the Project is now ready for the final construction phase. (Please see attached) FINANCIAL IMPLICATIONS: The City revised estimate for the entire Affordable Housing Project Cost is approximately 4.5 million dollars. This estimate includes the Housing Projects contribution to the Doolittle Drive improvements, architectural and professional engineering fees, new infrastructure cost, construction costs and the indirect developmental, long range planning and financing costs to support the development. The Design/Build Team of Baker Fallin Associates, Inc./ Rudd Construction, Inc. propose to complete the Scope of Services covered under the Part Two Agreement for the not -to- exceed price of Three Million Five Hundred Sixty Three Thousand and Thirty Three Dollars, ($3,563,033). Staff recommends the award of the Part Two Agreement to the Design/Build Team of Baker Fallin Associates, Inc./ Rudd Construction Inc. for a not -to- exceed total of Three Million Five Hundred Sixty Three Thousand and Thirty Three Dollars. ($3,563,033). The cost of the Housing Construction is being funded by the sale of units to City of Aspen employees. This includes the sale of the Cemetery Lane Units. Staff is requesting Council to appropriate One Hundred Sixty Thousand Dollars ($160.000) for the land planning and conceptual design costs from the General Fund excess cash over reserves. The current excess cash over reserve balance is $1,931,000. These costs include the expenditures for preparation of the bid documents for the City infrastructure improvements and long term planning for the entire 54 acres of City owned property. Council had previously agreed to fund upfront planning cost for this development. Cost increases were incurred when the Project was required to go through the lengthy and more costly four step review process. The Project was redesigned after workshop sessions in the fall of 1995 with the P &Z, neighbors and council resulted in a revised housing design program and new site planning requirements. Any cost savings accrued to the Housing Project during the Construction Phase will be returned to the General Fund Balance. The Part Two Agreement covers the construction costs to build twenty two (22) affordable housing units. The following summarizes the entire Project including the associated indirect costs for the Doolittle Drive improvements, professional fees, new Infrastructure cost, and the indirect developmental and financing costs to support the development: Includes professional fees for SPA planning, the revised design, the four step review and approval process, engineering, surveying, hazardous waste testing and final plat filing. Doolittle Drive Improvements: Road improvements and major infrastructure under the Gould Contract Part One Design Build Contract $325,000 $52,000 Part Two Design Build Contract 1 $3,563 „033 Other Associated Developmental Costs: Housing Project Fund - Landscaping & Tree Mitigation Housing Project - Survey, Amended Plat, & Misc. Parks & Open Space (Project costs to be determined and to be funded via the Parks and Open Space Fund) General Fund ($100,000 included 1997 AMP) Financing - Housing Fund Sewer Tap Fees - Housing Fund TOTAL $150,000 $30,000 Trail & Park Construction Doolittle/ Castle Creek Bus Stop $100,000 $73,382 $4,453,415 The Design Build Part Two Contract is a fixed fee contract with a not -to- exceed guarantee for the cost of construction. What this.means is that all the services to be performed during the Construction Phase: final construction documents, engineering services, project management, construction management, bonding, insurance, and all general expenses by the contractor to provide general labor, equipment, tools, temporary utilities and all incidental costs to perform the scope of work under this Contract are a fixed fee. The remaining portion and the largest portion of the work involving the labor and materials provided by subcontractors is under contract for a guaranteed- not -to- exceed price. All this work has been bid and responsible subcontractors selected and budgeted. During construction this work will be paid for at the actual cost of the work. It is an open book approach with the City reviewing all pay applications to determining and paying for only the actual costs at the time of construction. An incentive is provided for the Contractor to save on the expense budgeted in the contract. The incentive offered is to spilt 50 -50 all savings in the actual costs of labor & materials. RECOMMENDATION: Staff is recommending Council approval of the Part Two Design Build Agreement and an appropriation of $160,000 for the land planning & conceptual design costs from the General Fund Balance. PROPOSED MOTION: I move to approve the appropriation of $160,000 for the land planning & Conceptual Design Costs and the Contract between the City of Aspen and The Design/Build Team of Baker Fallin Associates, Inc./ Rudd Construction Inc. for the Part Two Scope of Services to design and build the Housing Project for the not -to- exceed contract amount of Three Million Five Hundred Sixty Three Thousand and Thirty Three Dollars ($3.563.033). El CITY MANAGER COMMENTS: Attachments: A - Basis of Design Report B - Contract Form D- Resolution #97 -31 5 ..9 67 to N in O c� a.+ W �1 1 0 6 c a m N � U N w c C . p CL U1 J. am 0 C 4>5 C 00 > Q I' N ti Q. .Y L .9 O E C ca N a R N U O 7 C m >. U- � (i 0) L U O N �. f6 N 0 U)U)ninl°'� p 0 ,Lu a� V Op a�'i ai 0 0 0 0 a3i V a3i m o to O Z Z Z Z Z Z Z � Z Z Z Q1 C1 r • • • • • • • • r' • • • • Lvol 00 N N C N Q Q v- O a IA a a a a a w mill, Jr4 cu U Q E m = N > Y O C o a C o E c oa m `m 0 .0 o_ v R N R LL Q Q t`6 t`6 U a' _ � Q H C. 0 U °o a3i (D m 0 m N 0 to Q z Z Z Z Z z z CD CD zo w 00 N N c m CL Q O A i m a) _ O Q CO O ca N Y a' N 0 ay•° CD v O � a o r U A 0 V U U) � 2) W z ai z a m z zo w 00 N N c m CL Q O A i �. M O V tL O bA .T, O "NO rm rd O V � PC 00 N CV c (D CL 0 0 T U >• U LO 7 (D w E p) •�• E a) a) �; r- m p O A 0 03 U E cm: = °� �E 0 0 0 ° m U o t a O v- U a) N L o C N a) ¢ N C y w a) a ° X a) t O' 0 3 w o c o U L >, o s p -a -o w m_. U) O a) .m y v '� OO Cc r cc 0. Q o� tM o a) E a) () 'yC..0 m N CC) p 'L6 U `) d0 CL .0 d U n. ¢¢ a ¢� • • • • • • • PC 00 N CV c (D CL 0 0 T U .i V) G� 4d > -E.+ PLO o � O P 0 (U h+i 5 W. t C31 w PI rn co N N c a) 0- U) Q 0 0 T .r+ A V � c6• c Q m n O � O CL E � 06 4 CU �« Q zT r m cm cc Q UJ z C Q Q cu a- cu -2 cc � � U. LA N m U ate+ U fA a) 3 z N :3 _ S r• 06 U Q (n N E O (D (n c CL W .L (U tQ N O O Z Z Q Z U PI rn co N N c a) 0- U) Q 0 0 T .r+ A TO: ro"�'. MEMORANDUM Phil Overeynder CC: Amy Margerum Bill Earley Steve Barwick Nick Adeh Scott Smith FROM: David Haute RE: 1996 Affordable Housing & Water Plant Improvements Project DATE: February 13, 1996 At the project review meeting for the Affordable Housing & Water Plant Improvements Project held last Monday (2/5/96) and in follow -up meetings last week with Nick Adeh, City Engineer, you brought forth several issues. Some of the issues could cause major design changes and have a major impact to the schedule. As the project leader responsible for delivery of the project, I acknowledge the concerns and offer the following suggestions in order to move the Project forward. Please initial where we have agreement or provide specific suggestions for action: 1. Existing Water Line - The single family units are too close to the existing transmission water line and Doolittle Drive, and if the water line is relocated it would free -up the site. The existing raw water line on the western perimeter of the site hems in the single family homes. We propose to move this raw water line to the Doolittle ROW and from Doolittle ROW extend to the West under a cul de sac connecting into the existing raw water line on down the line. The design and construction documents for this new line could be included into the project, but the actual construction costs would need to be funded from the Water Department AMP. The single family homes would be placed behind a landscaped berm, separating the homes from the traffic on Doolittle Drive. The opportunity to move the homes away from the street will make it safer for children and add additional area between residences. The overall effect will be a less crowded and much safer neighborhood. Page 1 The number of home sites will determined by the balancing of topographic, solar access and density considerations. No home site created will require a retaining wall greater than three feet above the finished floor or so unique that extra ordinary costs would be incurred during construction. (please see attached sketch) �. Backwash Sediment Drying Bed - The Water Plant operations include the removal of sludge from the back wash pond. I was informed last week that the area currently being used for discharge is the western perimeter of the site above ground adjacent to the raw water line. The handling of this discharge at the existing location may be in conflict with the intention of the housing design program; to provide private views and yards to the outside extending into the natural vegetation for all the residences. However, Nick has mentioned that there may be a creative way to deal with this and incorporate the discharge it into the proposed water feature. The prospect of integrating the water feature to divert this discharge is very intriguing, and I look forward to learning more about this possibility from you and Nick. The idea of the water feature accomplishing this function along with picking up surface water and providing irrigation is certainly fulfilling an objectives of the green design approach, that is to have design solutions solve more than one problem. 3. Transformer Storage - There appear to be several acceptable options for the storage of the electrical transformers. The accessibility, protection and site work requirements need to be clarified. The final location dependent on other site planning issues may be determined later. The options for transformer storage need to be identified that will allow for the planning process to continue. (Recommendation from the City Engineer is requested) 4. Brick Storage - There are several acceptable options for the storage of the mall bricks. The accessibility, protection of the bricks and site work requirements need to be clarified. The final location is dependent on other site planning issues and may be determined later. The options for a site should be identified which will allow for the planning process to continue. (Recommendation from the City Engineer is requested) Page 2 \N^5. Spoiled Material Storage - The proposed Water Plant site plan includes an open area for the storage of spoiled parts and miscellaneous material. The specific needs for Water Department and the Electrical Department are not quantified. The square foot area needed, accessibility, protection and other site work requirements need to be clarified. (Recommendation from the City Engineer is requested) V 6. Office Space - The demolition of the existing building at the proposed housing site will require the water meter operations to relocate. If you do not intend to include any space for personnel in the new storage buildings, then the relocation will require an internal reorganization under existing roofs, or maybe the use of a temporary trailer until new office space is built. It is my understanding that you would like to continue along the lines of the master plan we discussed last fall, i.e.; the construction of new office space above the west plant building. This is not in current scope of work, and could turn a long term goal into a short term objective. I feel that the specific space planning needs for water plant operation are not sufficiently communicated or quantified. It is my understanding that you feel that there may be a need for the equivalent of nine (9) new offices. I recommend that you and your staff prepare and overall layout and master plan of your operations that includes the proposed new storage buildings, the housing project and an eventual reservoir expansion. This is a task that should be done over a longer time than is available under the current scenario for construction of the "1996 Affordable Housing & Water Plant Improvements Project ". I recommend that Housing Project construction be phased to allow for the planning of new office space and a relocation of the water meter shop and offices. The addition of new second floor office space' and the relocation of the Water Meter Group could be the Phase Two development of \ a sequenced construction plan that is part of the master plan. 7. New Storage Buildings - The proposed location of the new storage buildings as shown on the current drawings was determined after many hours of comparative site studies and several meetings with you and your staff. The location and site analysis were completed with the reservoir expansion in mind and other site - related requirements and limitations. The proposed location works well with all the site constraints including topography, Page 3 ., accessibility and traffic circulation. This site plan once had your approval. (please see attached drawing) The next step was going to be to review with you the building plans and prepare the final construction drawings this Spring. The coordinated construction of these buildings along with the road improvements could happen early summer. Revisiting the site selection phase will disrupt the project flow and impact the construction schedule. I recommend that you approve the proposed site plan. However, prior to approving this plan you and Nick need to review it to make sure it meets your needs. An expedient review and approval would keep us on track. 8. Reservoir Expansion - As mentioned above the proposed location and design of the new storage buildings takes into account the proposed reservoir expansion. It is my understanding that a detailed site analysis has not been completed regarding the proposed reservoir expansion, and the information available is relatively sketchy. The potential for a larger reservoir is a fact that was strategic to the placement of the buildings in their current proposed location. The level of information needed to establish the precise requirements for the reservoir expansion are beyond the current level of understanding and need to be part of the master plan. Please advise if there is other critical information that we need to know prior to finalizing the construction plans for Water Plant improvements. 9. Sequence of Construction Operation - It is understood that the uninterrupted operations of the Water Plant are essential to the community. Any proposed project effecting day to day operations of the plant must be planned and coordinated. It is my intent to work hard to insure that the construction and administration of this project minimizes disruption as much as possible to the normal operations. This will be a basic requirement of bidding and negotiations with the Contractor(s), This project will undoubtedly involve several prime contracts that will need coordination. To have a successful project and a well - executed project we first need accurate information and time to produce clear, complete construction documents. The importance of timely information and timely review and approvals in order, to produce the best construction documentation cannot be overstated. Page 4 W W The Bid Documents will require the contractor to produce a detailed sequence of all construction operations. The construction schedule and sequencing shall be prepared in advance, and will require your review and approval. Furthermore, the selection of the Contractor(s) will be based on lowest qualified bidder not just cost. In conclusion, this is a project that links the community need for housing to the Water Plant. There is probably no other site owned by the City that offers a perfect infill site; semi -rural with sewer, water, transportation and an opportunity for our work force to live, work and play within the city. It is also a project that will not be possible until integrated into the operations of the Water Plant and the surrounding neighborhood. I will be out of the office until next Wednesday morning. In the meantime the Design Team has been instructed to hold off on the design process and the P &Z application has been placed on hold. I would like to meet with you next Thursday or at soon thereafter to review progress on the above. I will be checking for messages and returning calls; please call me if you have a question. I believe that by all of us working together we will be able to quickly reach resolution of all of the above issues. Page 5 f. MEMORANDUM TO: Cris Caruso, City Engineer FROM: Stan Clauson, City C.D. Directdr DATE: 23 January 1995 RE: Doolittle Drive Housing Development This memo is to confirm that staff will review the application for the Doolittle Drive Housing Development as a two -step process. In making this determination, the department is relying on the representation of project consultants that extra community meetings will be held to ensure consensus at the critical junctures in the formal review process. It also appears that familiarity with the project on a city staff and Council level will support an efficient two -step process. ^., Attached is a memo from staff detailing issues with respect to a two -step process. It would be helpful to share these concerns with our consultants. Kim Johnson will be responsible for liaison with the consultants to develop the land use application and will be ready to schedule the application as soon as it is prepared. Please let me know how I can help further. Attachment cc: Amy Margerum, City. Manager Kim Johnson, Planner v^, City of Aspen Pre- Application Conference Summary Project 7- Applicant's Representative eom I alt e1 , Owner's Natne of Application iption gf the pr S 1 q5 Planner I Date The applicant has been requested to respond to the following items and provide the following reports: Land Use Code Section 7`�ALL #"-r Referral Agencies 8. 9. 10. ('nmmpnlc �i The review is: (P &Z only) (CC on1�Y) (P &'L and CC) ups Public Hearing: (O dl) ' Deposit for the Application Review: 2 d Referral agency flat fps: 452 ff5gjS6 F--A, ICre TOTALDGPOSIT �(t,o�F (Additional hours are biffed at a rate of 163 / it ) allowing Informatian: P. lent. . address and telephone number in a letter signed by the applicant the name, address and telephone number of the representative. review of the application gja q ie cemplete application packet and maps. plaining the request (existing conditions and proposed uses), including legal description of the property. . „ .,� „y „ vicinity map locating the parcel within the City of Aspen. Site plan shall include property boundaries, lot size, proposed access, and physical These items need to be submitted if circled: List of adjacent property owners within MO feet of the subj b. Site photos. C. Proof of legal access to the parcel d. Historic Preservation Commission review /approval ��jRc� dttc —� PPK(� 110'y MEMORANDUM TO: Stan Clauson FROM: Kim Johnso DATE: January 12, 995 RE: Water Plant Review Process I understand Cris Caruso's desire to process the project as a two step versus four step review. As we have discussed, the scope of the project is fairly extensive with its industrial and residential components. The fee deposits associated with either process are related to the anticipated amount of staff time needed to complete the review. If we decide to undertake this as a two step review, it is very likely that Planning staff will be involved in additional meetings (informal and formal public hearings), research and memos not accounted for within the two step fee deposit for 12 hours of staff time. My concern is that P &Z and Council (and concerned neighbors) will need more than one public meeting each to understand the project well enough to grant their approvals. Since the application fee deposit is subject to additional hourly billings as it accumulates, it is important that the applicant understand that ultimately the cost of review might ultimately be the same whether two step or four step is pursued. Another consideration is that a two step review requires the application to be submitted at a "Final" level of detail, requiring much up front work from the architects and planning consultants. If the P &Z and Council have objections to basic concepts (density or layout), a certain amount of work would have to be replicated by the design team. Project City of Aspen Pre - Application Conference Summary Owner's Name K- 7 4 C-) Planner Date The applicant has been requested to respond to the following items and provide the following reports: Land Use Code Section Connnents Referral Agencies The review is: (P &Z only) (CC only) &Z and CC) Public Hearing: (yes) (no) Deposit for the Application Review: Referral agency flat fees: TOTAL DEPOSIT (Additional hours are billed at a rate or 16 / r.) To Apply Submit file Following Information: 1. Proof of ownership. 2. Signed fee agreement, 3. Applicant's name, address and telephone number in a letter signed by the applicant Which also states the nano, address and telephone number of the representative. A. 'total deposit for review of the application $ 5. copies of the complete application packet anal maps. 6. Summary letter explaining the request (existing conditions and proposed uses), including ,,. street address and legal description of the property. 7. An 8 1/2" by II" vicinity trap locating the parcel within the City of Aspen. 8. Site plan shall include property boundaries, lot size, proposed access, and physical features (drainageways, streams, rivers, etc.) 9. 10. ( S 'these items need to be submitted if circled: e^^ 2. List of adjacent property owners within. 300 feel of the subject property with addresses. b. Site photos. C. Proof of legal access to the parcel. 4. Historic Preservation Commission reviewlapproval. 1 - l�b� kA�/�4, F November 10, 1995 WAT PLAC HOUSING OUSSING "GREEN ARCHITECTURE" CONCEPTS TO INCLUDE IN DESIGN: 1. Increase density to save infrastructure (16 units 25 units + / -) 2. Smaller units (1375 SF 1000SF + / -) 3. More attached units (50% 75 %) 4. Van pool to downtown. 5. Re -Use existing structure (building) 6. Provide recycle center for solid wastes. 7. Provide place for home gardens and composting. 8. Cluster autos to reduce asphalt. 9. Preserve Scrub Oak Groves. 10. Retain storm drainage to replenish ground water. 11. Utilize excess raw water from Waterplant for site irrigation. 12. Landscape with native plants and drought tolerant grasses. 13. Solar orientation within 15 due South, with solar mass. 14. Place living spaces on south side. 15. Use "superwindows" on north side. 16. Super insulation of roofs. 17. Natural daylighting and ventilation. 18. Gas -fired radiant floors for space heating. 19. Use heat - recovery ventilation systems. 20. Energy - saving compact fluorescent fixtures. 21. Water - saving plumbing fixtures. 22. Energy miser appliances. 23. Non -toxic paints, sealants and compounds for construction 2 PCB. UH iT , HAS kbt &T waterpl.doc •SF erl R-OF �Lpor�-� Gam. 7FS,4a_,�4f -,? AY3o u-t-v d'PPti °HTIo� ,"0 'AIL SITE DESIGN BUILDING ENVELOPE SYSTEMS 1. --4 z,S Z. -$2-7 3. --$ 30 MESSAGE DISPLAY TO Steve Barwick CC David Michaelson CC Phil Overeynder CC Ross Soderstrom CC Bill Efting Rejected by Post office David Michaelson (CEO_POA) Unknown addressee. From: DAVID HAUTER Postmark: Oct 11,95 4:05 PM Subject: 'Water Place Housing Message: There is going to be a meeting this Friday @ 1:30pm in RM 106 @ Red Brick Schoolhouse. The purpose of this meeting is to discuss the Design Program with the design team and work with them on the integration of issues such as site and building design, energy and resource - effecient construction and a cost effective "Green Design" approach to this project. I have invited representatives from the Rocky Mountain Institute to attend, they are looking forward to it and will be there. Please plan on coming ... and or ask someone else to go ... maybe potential buyers would be interested in participating? W , W WATER PLACE AFFORDABLE HOUSING PROJECT City of Aspen Aspen, Colorado The site comprises approximately 2 /34 acres located on a bench above Castle Creek, below the City of Aspen Water Plant. This location is at the end of Doolittle Drive above the Twin Ridge and Castle Ridge neighborhood. Doolittle Drive extends up the hill and separates the site into two areas, on the west is approximately 3/4 an acre of gentle hillside bordered by Aspen trees. The east side of the site is clear and flat and defined on the edges by steep slopes, oak brush and the sloping hillside of the Water Plant property to the north. In 1994 the City gave conceptual approval for this project. A mission statement was developed: "Provide a family orientated affordable housing project which will help to benefit individual owners as well as the Community of Aspen ". Meetings, discussions and work sessions with _the Planning and Zoning Commission and City Council have established that this project must satisfy the following requirements: it must be affordable housing and energy efficient. In order to accomplish this objective the design team will be guided by the principles of "sustainable building ". Therefore, a successful project will meet the needs for the present without compromising the ability of future generations to meet their needs. The concept for affordable housing at this site has been reviewed and approved by the Aspen Employees, the Aspen/Pitkin County Housing Authority, City Council and the Planning and Zoning commission. The following further outlines the design objectives of the project: The specific design solutions of the Water Place Project must adhere to the principles and philosophy of "Green Building Design "; that is, to blend energy efficiency and green technologies into: •- site development • energy saving architectural features • an energy saving architectural shell • energy- efficient systems and appliances • all design solutions rp L�� Page 1 Version 1015195 SITE DEVELOPMENT The Water Place Project site is adjacent to Aspen's water plant which provides clean water to the community from free flowing pure mountain creeks. The identification with this renewable natural resource and the importance of clean water as an essential element of sustainability emphasizes the connection of this project to the green design approach. It is not often that you have an ideal site with clean water and air and with public transportation, work, schools, and all the community services nearby. The site development will also utilizes existing roads and has the potential for a compact infrastructure to be built without causing undue environmental harm. The water plant has enough excess water and the site has the potential to generate enough hydro -power to power the entire project! The steep hillside to the east is ideal for locating a turbine, generator and other equipment at the bottom to produce about $36,000 worth of power each year, at 4 cents per kwh. If we can't do hydro, it has been suggested that the City should be looking into bringing clean wind power to the project by enrolling in CORE's wind power "green pricing" program. Randy Udall, Director of CORE has developed a plan for both potentials, he would like the City and the design process to be committed to further investigating the possibility of powering the project with either hydropower or wind power. HOUSING TYPES TYPES: BDRMS / UNIT BDRMS BTHS / UNIT TOTAL UNITS SF/ UNIT TOTAL SF S.F. HOUSING 3 6 2 2 1100 2200 S.F. HOUSING 4 8 2 2 1400 2800 S.F. HOUSING 4 8 2 2 1550 310 DUPLEX 3 9 2 3 1100 3300 DUPLEX 2 6 2 3 950 2850 S: Ma 2 BD RM 2 8 2 4 900 3600 1 BD RM 1 4 1 4 750 3000 STUDIO 1 3 1 3 600 1800 TOTALS 52 23 22650 OJ a f5� �o�aQ rJok Note: One of the concerns raised during the work sessions in the need to include some one bed room and studio units. The table above includes these changes and in general indicates five more units, but all units approximately 10% smaller than were previously listed. r_. n Page 2 Version 10/5/95 The site plan should be designed to encourage the use of public transportation and pedestrian/ bicycle pathways. It should be recognized that this development does not require the resident to own his own car. The City has also expressed its willingness to provide a van to transport residents to and from work. Covered stops for these vans to pick -up residents should be included in the street plan. Furthermore, the streets should be as narrow as possible, yet providing adequate width for service trucks and emergency vehicles. Adequate off street parking will be integrated into the landscaping design. t 1 1 The buildings shall be located to maximize the use of the sun. The buildings orientation to the views and for privacy shall be in harmony with placement for solar access. All natural attributes of the site including; existing trees, topography, vegetation, wildlife, prevailing winds and weather patterns will be considered in the overall site planning process. If the excess water from the reservoir is not placed in a conduit and used at used for hydro power production , then there is an option to direct this water from the water plant through the site as a stream. The pathway of this potential water feature will be evaluated and included as an alternative land plan layout. Open space will be provided for walking, sitting, eating, exercising and playing and a community garden. The buildings themselves should designed not as the primary focus, but to eventually blend into to the overall land use plan, albeit one the requires time to mature. The building placement and land plan will provide a variety of outdoor spaces, some located for privacy and others more suited for community activities. Narrow streets that curve with the topography and the streetscape including such items as benches, shelters, street lighting and all elements will be integrated into the site plan. The location of fences serving individual homes will be designed and part of the overall site plan. BUILDING DESIGN Passive solar design principles and the attributes of site will establish the building design. The residences will be compact with adequate storage and privacy. There is no need for a double car garage at every single family residence or unit. The location of garages and or covered parking and storage will be established as an outcome of the design process. Page 3 Version 10(5(95 The building shell will be designed to optimize thermal performance and will: • Meet the standards of the Colorado Green Program. • Conform to the "Neighborhood Character Guidelines" as adopted by the City. • Meet or exceed the minimum standards of the proposed new energy code of the City. • Provide protected airlock entries. • Added solar mass • Use "superwindows" • Use a window plan, with differing specifications and requirements for South, East, West and North orientations. • Meet or exceed federal standards for heating and hot water equipment. • Use natural combined gas boiler/hot water heater. • Use engineered wood products instead of large dimensional lumber. • Use a membrane roofing system. • Use compact fluorescent lamps and other energy saving lighting products. The design process will include an investigation into appropriate building materials other than 2 x 6 framed walls for the building envelop. This investigation will not be exhaustive, however there are options that need to be considered and evaluated in terms their advantages and disadvantages, cost effectiveness, and in general the acceptance and appropriateness for this project. A final commitment needs to be as soon as possible in order to maximize the inherent advantages of the selected system and insure the other aspects of the design are not compromised. RECYCLING The trash collection plan will include recycling containers and other provisions to insure that recycling is convenient and will become an established pattern for all the residents. The location of the trash collection areas and any fences or structures will be integrated into the landscape plan and part of the overall site plan. The above is a first whack at a design recipe for a successfull project. Please discuss this with anyone that is concerned with this project, and let me know your comments and suggestions. I would appreciate recieving all the review comments no later than October 12th. Thanks, David r, Page 4 Version 1015195 StF' G'I "J-S 10 :1BAM GI13SON & RENO � P 1 PROJECT: Waterplace Housing Project MEETING DATE:9 -26-95 START TIME: 1:45 STOP TIME: 2:30 ATTENDEES: David Hauter, David Gibson, and Scott Smith N 07 E S NOTES: The best way to proceed with the project was discussed in light of the changes from the original program and input received from P &Z and Council. The Design Team has now completeo.1he original Schematic Phase in terms of work completed and;"fdes. It was decided that now was a good time to re- evaluate the program and site planning in order to arrive at the best possible solution(s). Emphasis will be placed on creating a strong sense of "Neighborhood" within the project as well as concentrating on "Energy Efficiency" as an important concept. PLAN OF ACTION DECIDED ON: 1, PROGRAM: David Hauter will define & coordinate with Gibson & Reno Architects (number, size, type of units) by Wednesday, October 4th. Mission Statement to be revised also to include any new ideas, 2. TEAM MEETING: David Hauter, Gibson & Reno Architects, Tom Stevens, and Jay Hammond; Wednesday, October 11, 1995. a. Review program b. Collaborate/brainstorm site design concepts; arrive at couple viable options. C. Define new scope of Design Services and Fees. 3. COMBINED WORK SESSION WITH P &Z AND COUNCIL TO REVIEW SITE PLAN(S). 4. 4-STEP APPROVAL PROCESS: a Conceptual P&Z Approval b. Conceptual Council Approval C. Final P &Z Approval d. Final Council Approval Copies to: Tom Sjbvens, Jay Hammond III 21 D E. HYMAN No 202 ASPEN COLORADO 81611 303.925.S968 FACSIMIIIE 303,925.5993 p ' Fax Note 7871 DeftT,2- 7 IAW7— F comep1. c0. Phone A Phone p Fax! -- JC F8x . iO3.728.6607 FACSIMQIE 303.728.66S8 W MEMORANDUM TO: Mayor and City Council FROM: Dave Michaelson, Planner DATE: September 25,1995 N RE: Water Place Affordable Housing Project - Work Session SUMMARY: The proposed Water Place Affordable Housing Development would house essential city employees, including emergency response personnel, adjacent to the city's water facilities. The applicant (City of Aspen) held a work session with the Planning Commission on September 19, 1995. Follow input from the work sessions, the applicant will pursue a four -step review process. In contrast to the March, 1995 submittal, the applicant has stepped back to the conceptual design stage. Significant revisions from the March 1995 submittal include the following: • the elimination of a fourplex previously proposed for the lower portion of the property adjacent to Castle Ridge, and replacing with two triplexes on the west side of Dolittle Drive, opposite the single - family and duplexes. The former site of the fourplex is no longer proposed for development, and the applicant intends on dedicating the area as open space; the units proposed near the bluff above (south) of Castle Ridge have been set back an additional 25 to 50 feet to lessen the visual impacts from existing units and State Highway 82; and, based on a user survey of City employees, the proposal includes additional townhome units, increasing total dwelling units to 18 in 11 individual structures. PROCESS Following work sessions with the Planning Commission and City Council, the applicant will follow a four -step process, beginning with a conceptual SPA submission. PLANNING COMMISSION WORK SESSION Following a site visit, the Planning Commission indicated that they conceptually supported the appropriateness of the site for affordable housing, put that a number of issues must be resolved, which are summarized below: VISUAL IMPACT Building Envelopes. The proposed building'e�uvelopes may be quite visible from both adjacent development (Castle Ridge and Twin Ridge) as well as from the State Highway 82 corridor. The applicant has set back the building envelopes approximately 25 to 50 feet from the edge of the bluff overlooking Castle Ridge. Story poles were in place at the time of site visit; and considerable 3 yvi�nj b tg flexibility is available to pursue alternative building envelope locations to rumm ze impact. The deletion of the lower fourplex and the proposed open space dedication was supported by the Commission. Road Improvements. Dolittle Road is substandard for existing uses, and the applicant proposes to improve the road with a pavement width of 24 feet, and install curb and gutter on the downhill side., The existing road width varies from 14 to 16 feet, with existing grades at or exceeding 10 percent with north- facing decent. Widening the template to 24 feet will require significant disturbance of existing vegetation on both the up and downhill slopes. The proposed uphill and downhill slope reach 2:1, which may make topsoil retention and revegetation difficult. The Commission requested that additional analysis be conducted to determine the impact of widening the road, particularly through the lower section, which has the steepest grade and tends to hold the most snow. Trail Alignment. The applicant is proposing an improved trail connection from upper Dolittle Drive to the Twin Ridge intersection. The relocation of dwelling units from this area may mimmize impacts on existing vegetation when compared to previous trail alignments. Staff has requested that the alignment also be shown on an aerial photograph, and be field - located to minimize disturbance of the mature oak stands. Parking. A proposed parking area of approximately 5000 square feet is conceptually shown in the front of the proposed triplexes. The Commission suggested that alternative parking designs should be investigated to avoid the visual prominence of parking mass this size. Alternative Design Options. The Planning Commission noted that the site offers considerable flexibility in terms of housing mix and alternative internal circulation patterns. The notion of "creating a neighborhood" was noted by staff and several commissioners. The applicant has agreed to develop alternative designs to address housing mix (single vs. multi - family) and visual impacts of the project. CHLORINE STORAGE The water plant stores approximately 4600 lbs. of liquid chlorine for disinfection at any time, which presents issues regarding evacuation requirements. Chlorine is 2.5 times heavier than air, and tends to "plume" downhill. Accidental releases can be deadly at concentrations of 500 PPM. A "large" spill would require the evacuation of existing units in Castle Ridge, Twin Ridge, and several residents west of the water plant. All units proposed in the Water Place project would fall within the 1500 foot radius depicted in the Water Department memo. The Commission requested that the applicant refine an Emergency Response Plan to ensure that access improvements take into account the traffic pattems in and out of the site in the event of an evacuation event. TRAFFIC SAFETY Dolittle Road currently carries a traffic mix that includes both residential trips as well as heavy equipment associated with the City's operations. Additional residential development, in addition to the expansion of the water plant facilities, will increase conflicts associated these types of vehicles. The Planning Commission requested that the applicant include an analysis that addresses the number of trips associated with the proposed water plant improvements, and possible mitigation (i.e. shifting trips out of AM/PM peak). eo"n %^t Parking. .A proposed parking area of approximately 5000 square feet is conceptually shown in the front of the proposed triplexes. Staff would suggest that the parking should be relocated or broken up to avoid the visual prominence of parking mass this size. TRAFFIC SAFETY The proposed road design does not meet standards regarding curve radius or cul-de -sac design. In addition, Dolittle Drive has a traffic mix that includes heavy equipment associated with the water plant and other City Departments. Staff notes that the proposed expansion of the water plant facility will also increase the number of heavy equipment using this portion of Dolittle Road. Staff has requested that the Engineering Department assess the number and time distribution of existing city vehicles to determine if trips could be shifted out of the AM/PM peak period to m;n;m;ze impacts. Additional residential development, in addition to the expansion of the water plant facilities, will also increase conflicts associated with the these types of vehicles. Traffic impacts, as well as the proportional share for necessary road improvements, have been premised on a trip generation number used by the Housing Authority based on other affordable housing projects that have access to transit service, estimated at 4 vehicle trips /per day. Staff notes that this factor is considerably less than expected generation used by the Institute of Traffic Engineers for mutt - family (approximately 6.5 to 8.5), as well as single- family units (9.0 - 10.6). CHLORINE STORAGE The water plant stores approximately 4600 lbs. of liquid chlorine for disinfection at any time, which presents issues regarding evacuation requirements. Chlorine is 2.5 times heavier than air, and tends to "plume" downhill. Accidental releases can be deadly at concentrations of 500 PPM. The applicant has submitted a summary of risks associated with exposure to. chlorine gas (see September 7, 1995 memo from Mark O'Meara, attached). A "large" spill would require the evacuation of existing units in Castle Ridge, Twin Ridge; and several residents West of the water plant (see evacuation radius map). All units proposed in the Water Place project would fall within the 1500 foot radius depicted in the Water Department memo. Staff notes that an Emergency Response Plan has not been finalized. Staff recognizes that precisely estimating the statistical probability of an event triggering evacuation is difficult. However, an evacuation plan would assume that Dolittle Drive could handle both response personnel arriving at the site (although some will be on- site), as well as the evacuation of residents in the area. The road template, proposed roadway grade, and traffic volumes entering and exiting the area during any necessary evacuation event should be conceptually analyzed. PROCEDURE: The applicant intends on holding work sessions with both the Planning Commission and City Council prior to submitting a conceptual SPA. Consistent with comments from the March 1995 submittal, the application will go through a four -step review. Attachment: Exhibit A (Applicant's Submittals) September 8, 1995 Mr. David Michaelson Aspen/Pitkin Community Development Department 130 South Galena Aspen, Colorado 81611 RE: WATER PLACE AFFORDABLE HOUSING DEVELOPMENT Dear David: Attached hereto is the additional information requesteq for the above referenced project. Pursuant to the directive of the Planning and Zoning Commission, the attached information shall pertain to the Conceptual Submission only as the project will now go through a five step process. Please note that conditions of Conceptual approval pertaining to future review phases such as Final Submission have not been addressed at this time but will be addressed at the appropriate stage of the process. While specific information has been provided for the technical issues such as development program, infrastructure etc., the design of the development has been reverted back to a conceptual level. Our reasoning is that we hope to be able to have constructive work sessions with the Planning and Zoning Commission and Council, and be able to incorporate input from these meetings into the project design. By providing a specific design now, prior to the work sessions, we subject the project to being reviewed on the basis of that specific design rather than generating new ideas. The plans incorporating the work session input will be finalized and forwarded to the Planning Office for review prior to the public meeting with Planning and Zoning. Revisions and Additional Information I. The most significant revision involves the relocation of the units previously sited on the lower portion of the site next to Castle Ridge. This portion of the site is no longer being considered for residential development. Instead this site will be left undeveloped and identified as open space with a provision for a future park. In turn, all development will be confined to the upper portion of the site adjacent to the water plant facility. Additionally, the limits of the development have been pushed back from the edge of slope by 25 to 50 feet. This will significantly reduce the visual impact of the units from the adjacent properties as well as the Highway 82 corridor. 2. A user needs survey was conducted which has provided valuable information as to unit types and costs currently in demand by emergency response and City employees. Based on the results of this Survey the program has been modified to include more townhome units resulting in an overall increase in density to eighteen units from the previous sixteen A summary of the employee survey and the revised program has been attached hereto. 312 E. Aspen Airport Business Center, Aspen Colorado 81611 (303)925 -6717 - FAX: (303)925.6707 r September 8, 1995 Mr. David Michaelson Aspen/Pitkin Community Development Department 130 South Galena Aspen, Colorado 81611 RE: WATER PLACE AFFORDABLE HOUSING DEVELOPMENT Dear David: Attached hereto is the additional information requesteq for the above referenced project. Pursuant to the directive of the Planning and Zoning Commission, the attached information shall pertain to the Conceptual Submission only as the project will now go through a five step process. Please note that conditions of Conceptual approval pertaining to future review phases such as Final Submission have not been addressed at this time but will be addressed at the appropriate stage of the process. While specific information has been provided for the technical issues such as development program, infrastructure etc., the design of the development has been reverted back to a conceptual level. Our reasoning is that we hope to be able to have constructive work sessions with the Planning and Zoning Commission and Council, and be able to incorporate input from these meetings into the project design. By providing a specific design now, prior to the work sessions, we subject the project to being reviewed on the basis of that specific design rather than generating new ideas. The plans incorporating the work session input will be finalized and forwarded to the Planning Office for review prior to the public meeting with Planning and Zoning. Revisions and Additional Information I. The most significant revision involves the relocation of the units previously sited on the lower portion of the site next to Castle Ridge. This portion of the site is no longer being considered for residential development. Instead this site will be left undeveloped and identified as open space with a provision for a future park. In turn, all development will be confined to the upper portion of the site adjacent to the water plant facility. Additionally, the limits of the development have been pushed back from the edge of slope by 25 to 50 feet. This will significantly reduce the visual impact of the units from the adjacent properties as well as the Highway 82 corridor. 2. A user needs survey was conducted which has provided valuable information as to unit types and costs currently in demand by emergency response and City employees. Based on the results of this Survey the program has been modified to include more townhome units resulting in an overall increase in density to eighteen units from the previous sixteen A summary of the employee survey and the revised program has been attached hereto. 312 E. Aspen Airport Business Center, Aspen Colorado 81611 (303)925 -6717 - FAX: (303)925.6707 r% ,- 3. A preliminary financial plan has been attached hereto. This plan outlines the projected development costs and revenues. 4. As previously submitted, the Applicant has requested that a significant portion of the proposed development be categorized Resident Occupied. This will serve to provide additional flexibility for future buyers whether emergency response personnel or City employees. The sales price, however, will be set at initial sale, at the rates proposed in this application, and shall appreciate from that point at a rate of 3 %. Of this 3 %, only 1.3% will be retained by the owner and 1.7% will go towards a capital replacement fund. This appreciation, capon the initial sale price will ensure that the units, although categorized as R.O. will remain affordable through subsequent sales. The actual mix of R.O. and Category units is provided in the program summary attached hereto. 5. Within the proposed development program the vast majority of the units will be identified for emergency response personnel with the remaining units for City employees. In the event that an emergency response personnel buyer cannot be identified for a unit held for emergency response personnel, the unit will be sold to a City employee. In the event that no City employee can be identified for a unit, the unit will be sold by lottery to a qualified member of the public. 6. As it is anticipated that a substantial number of residents of the proposed development will be employed by the City, and therefore work in the same location during the same hours, van pool service will be provided. This will result in a decrease of vehicle trips per day generated by the proposed development. A chlorine evacuation plan has been attached hereto. 8. With the relocation of the fourplex from the lower portion of the property (next to Castle Ridge), the proposed pedestrian trail can be located in a manner so as to minimize disturbance to the existing vegetation. The revised location has been reflected on the attached plan. This location shown on the plan is conceptual as the final alignment will be field located in order to provide the greatest level of site sensitivity. 9. The lower portion of the site where the fourplex was previously, located will now be identified as open space with a provision for a future recreation area. 10. Attached hereto is a report outlining the proposed improvements to Doolittle Road to provide additional safety for vehicular traffic. As stated in the original application, an increase in maintenance will also occur providing yet another increase in safety. Also attached is a report revising the projected impacts of the proposed development on the surrounding road system and the proposed financial mitigation. 11; The Fire Marshall has made specific recommendations for the proposed development based on access provided by Doolittle Road. The Applicant will comply with all recommendations. The recommendations made by the Fire Marshall may change r^� due to improvements to Doolittle Road. In this case, the Applicant will continue to comply with the recommendations. 12. At this time, the road system within the water plant is being planned to incorporate improvements to the water plant as well as the proposed Water Place development. A plan of the road improvements has been attached hereto. If you have any questions or comments on the information provided, or should require additional information, please do not hesitate to contact me. Sincere) , Thomas G. Stevens Attachments DW nie/Addcneo.s 11�1 oovnoyna Nwov 1 � �onond oNIanCH ]Novae UJUVAK � 11, I oVg 1 j � �l I � r-• N�1 � �.�` } y� S I •� � m i II/ 1 f till /1 �.. z MEMORANDUM TO: Planning and Zoning Commission Community Development Department FROM: Steve Barwick DATE: September 7, 1995 SUBJECT: Water Place Housing The purpose of this memo is to respond to some of the concerns expressed by P &Z board members during their first review of the Water Place housing project. A summary of the building types, sizes, and projected costs for this proposal is shown in the following table. The City expects that the full cost of the project will be recovered through the sale of the units. The expected unit cost is based upon a preliminary budget which includes all aspects of project construction. There is no project subsidy built into the following unit cost figures. Type # Bdrm # of Units Unit S.F. Unit Cost —� Single Family Home 3 2 1,224 $179,236, Single Family Home 4, 2 1600 $234,296 Single Family Home 4 2 1,740 $254 796 Duplex 3 6 11188 $173,964 Townhome 2 6 1,090 $159,614 Total 18 / Zug a o0 2� `f zy A. One of the concerns raised by board members was that at the time of the first review the City was unable to verify the demand/affordability of these units as they relate to City employees. Response: The City has concluded a survey of the housing needs of the City's emergency response and management staff which indicates that we would be able to sell all of the Water Place housing units to such staff members. At this time it appears that all but 3 or 4 of the units could be occupied by emergency response employees. Should there be any units remaining, they could always be sold to other City employees. B. Another concern mentioned during the first review of this project was that one board member objected to the planned use of the units for City employees. 'Response: The Aspen/Pitkin County Housing Authority has already reviewed this project and unanimously approved the concept of sales to City employees only. Although it is unusual for projects to be restricted to the staff of one employer, the Housing Board felt that the fact that this project was 100% affordable housing and was not using any funds from the Housing/Daycare Fund was an important overriding factor. In fact, one board member stated that "Aspen wouldn't have a housing problem if more employers did this type of project." The Aspen City Council has also addressed this project on several occasions-and continue to support the concept. C. Several questions were raised concerning the Housing Authority categories bf these units and the possibility of unit price appreciation. Response: The City's application to the Aspen/Pitkin County Housing Authority included 9 Resident Occupied (R.O.) units with the remainder being category 4. This mix of units was approved in order to give the City flexibility in the use of these units. The prices shown above fall mostly within category 4 limits, with only the largest units priced into the R.O. category: City staff is assuming that most or all of the $493,600 which will be produced through the sale of the Cemetery Lane units will be used to help pay for the infrastructure costs of the Water Place housing project.- City staff feels that it is important to keep unit prices affordable in order to create some units for our lower paid staff. By utilizing these funds for infrastructure we can include some Category 2 and 3 units in the mix available to employees. The Aspen City Council has expressed support for this concept on several occasions. The maximum annual unit appreciation will be 1:3 percent for all of these units..- The appreciation will be based upon the original sale price and will not be affected by the Housing Authority category. Therefore, the sale price of many, of these units will continue to be less than the maximum allowed for their category. In this way the City will maintain flexibility in matching employees with specific units, but the overall mix of unit affordability cannot be changed. (303) 925 -6727 FAX (303) 925 -4157 September 7, 1995 Mr, Tom Stevens THE STEVENS GROUP 312 Aspen Airport Business Center Aspen, CO. 81611 ENGINEERS SURVEYORS GM SCNMUESER GORDON MEYER RE: City of Aspen. Water Place Housinc Proiect. Revised Road Improvement Contribution Dear Tom: P.O. Box 2155 Aspen, CO 81612 I am writing in follow -up to our meeting yesterday regarding changes to the Water Place Housing project unit program as it impacts the proposed contribution to improvements along the lower Castle Creek Road in Pitkin County. One item that I had mentioned in our meeting was the fact that Pitkin County has issued a new document titled Pitkin County Road Management and Maintenance Plan, as adopted by the Pitkin County Board of County Commissioners Resolution # 95 -97, which includes new traffic generation requirements for residential development. In reviewing my report to you dated March 24, 1995, however, I was reminded that we had used traffic generation figures based on Aspen /Pitkin County Housing Authority trip generation figures for comparable affordable residential units with an available transit option rather than the trip generation figures in the previous Pitkin County Road Specifications and Standards in effect at the time. My inclination is that the figures generated by the Aspen /Pitkin Housing Authority from actual studies of comparable projects remains the more appropriate traffic generation figure for the Water Place project. The only significant change to our calculation of traffic impacts due to the Water Place Housing project, therefore, relates to the increase in the unit count from 16 to 18 units. Using the trip generation figure of 4 vehicle trips per day per unit as determined by the Housing Authority, the traffic impact of the Water Place Housing project would now be 72 vehicles per day (vpd). The second relevant comment involves the annual average daily traffic (AADT) figure for the lower Castle Creek Road that I had used in my previous report to calculate the pro -rata contribution by the Water Place project. At the time, based on traffic count information most recently acquired in the Fall of 1993, 1 calculated an AADT figure of 5,226 vpd. More recent counts from the Winter of 1994 -1995 indicate a somewhat lower AADT of 4,123 vpd (Calculating the AADT from limited, often one -day, traffic volume information is certainly tricky. I do feel that the additional data is useful in that it indicates that the true AADT on the lower Castle Creek Road may not yet exceed 5,000 vpd.) By averaging the more recent data, it would suggest that the current AADT on the lower Castle Creek Road is probably closer to 4,675 vpd than the 5,226 indicated in my March, 1995 report. Adding the calculated 435 vpd associated with future build -out in the upper valley, the base figure for build -out traffic becomes 5,110 vpd and the total including Water Place becomes 5,182 vpd. While : this figure still _ exceeds the 5,000 vpd threshold, our recommendations regarding the appropriate level of improvements to the lower Castle Creek Road remain unchanged though 1 would increase the estimated cost of the work slightly at this time to $300,000.00: 1001 Grand Ave., Suite 2E • Glenwood Springs, Colorado • (303) 945.1004 r September 7, 1995 Mr. Torn Stevens Page 2 The contribution of the Water Place project to the traffic volumes at build -out on the Castle Creek Road therefore represent 1.39% of the total volume and the pro -rata share of the lower road improvements is now $4,168.27. Current discussions would still indicate that the Highlands and Moore projects will be paying for improvements to the Castle /Maroon /82 intersection. I hope these comments are helpful, call me if you have questions or require further detail. Very truly yours, SCHMUESER GORDON MEYER INC. ay . Hammond, P.E. Principal, Aspen Office JH4h 85030751 cc: Scott Smith, Gibson -Reno David Hauter, City of Aspen GORDON MEYER, MEMORANDUM To: P &Z Commission Members From: David Hamer, Project Mana� Date: September 7, 1995 ,1, Subject: Water Place Housing Project: An overview of a conceptual masterplan and road improvements planned for Water Treatment Plant. The Water Treatment Plant is scheduled for two new storage buildings and comprehensive roadway improvements in 1996. The existing roadway within the Water Treatment Plant is contiguous with Doolittle Drive. The existing Water Plant roadway is inadequate for the occasional semi -truck delivery and needs to be expanded to serve the two proposed new storage buildings. The attached Site Plan indicates the sites selected for the new storage buildings and shows the proposed internal roadway. Generally the roadway improvements for both the Water Plant and Water Place Housing can be reviewed and designed as one project. The new upper road within the Water Treatment Plant as proposed will terminate at a turn -a -round as shown. All the major road improvements within the Water Treatment Plant will be designed as a two -way road wide enough to accommodate semi - trucks. The attached site plan is conceptual and is being submitted along with the Water Place Housing Project for your initial review and comments. The existing emergency access /egress road to the east of the Water Plant above the Water Place Housing development will be maintained for emergency use only to the Water Plant. M EXIST. RE5EVOIR PROPOSED SEMI -TRUGK TURN -A -ROUND ,080 I� I I w I Q I W I z I z I 0 I N I z I l�l ROP05ED (15) UNIT5 WATER PLACE HOUSING LOGATED NORTH OF WATER TREATMENT PLANT GONNEGTED TWO -WAY MAIN AGE55 /EGRE5S ROAD. REGRADE TO 5% MAX. AND RE5URFAGE.� 6AGK pvNp WASH N F N III I I UPEN FI Fr,TRIr,AI nFPT SPACE STnRA(', RI ifll FUTURE I pARKiN� cNl GUAR WE L EAS �'L-ANT J 84? yn W Q EXPANDED I I SLD0RINE "rSIN' "'I 4XI RESEVOIR I N I FUTURE EXIST ROOMS NFW I I STORAGE ET_ BLDG. r-) Tn I 1 I I NOTES: I. A 50' DIAM. GLEARANGL 5HkLL BE MAINTAINED AROUND THE CHLORINE BUILDING, 2. TWENTY (20) ON -51TE Pp,RKIING 5PAGE5 SHALL BE PROVIDED. 5. THE MAIN TWO -WAY ROADW/HY SHALL BE DESIGNBD TO AGGOMODATE A SEMI -TRUGK TURNING RADIUS. . II I ANT;� F ®F®5EI;� ®AL;� MFR ®Y EMENTS lllW NORTH CITY OF ASPEN - WATER TREATMENT PLANT prepared by: dlh SCALE: I" = 100' -O" city of aspen Sept. 5, IR,:15 I I EXIST. I I LARIFIE I I I I zF4 IT� I LARIFIE N F N III I I UPEN FI Fr,TRIr,AI nFPT SPACE STnRA(', RI ifll FUTURE I pARKiN� cNl GUAR WE L EAS �'L-ANT J 84? yn W Q EXPANDED I I SLD0RINE "rSIN' "'I 4XI RESEVOIR I N I FUTURE EXIST ROOMS NFW I I STORAGE ET_ BLDG. r-) Tn I 1 I I NOTES: I. A 50' DIAM. GLEARANGL 5HkLL BE MAINTAINED AROUND THE CHLORINE BUILDING, 2. TWENTY (20) ON -51TE Pp,RKIING 5PAGE5 SHALL BE PROVIDED. 5. THE MAIN TWO -WAY ROADW/HY SHALL BE DESIGNBD TO AGGOMODATE A SEMI -TRUGK TURNING RADIUS. . II I ANT;� F ®F®5EI;� ®AL;� MFR ®Y EMENTS lllW NORTH CITY OF ASPEN - WATER TREATMENT PLANT prepared by: dlh SCALE: I" = 100' -O" city of aspen Sept. 5, IR,:15 W MEMORANDUM {PRIVATE} TO: P & Z COMMISSION MEMBERS THRU: DAVID HAUTER, PROJECT MANAGE FROM: MARK O'MEARA, WATER DEPARTMENT, CHIEF PLANT OPERATOR DATE: SEPTEMBER 7,1995 SUBJECT: WATER PLACE HOUSING PROJECT: OVERVIEW OF CHLORINE STORAGE HAZARD AT THE WATER TREATMENT PLANT The chlorine stored at the Water Treatment plant is used for disinfecting of the City of Aspen's potable water supply. At any given time, the amount of liquid chlorine on site may be up to 4600 lbs. Under most circumstances, storage consists of 2 one ton containers, one full, and one 50 -75 % full. The remainder of the chlorine stored is in four 150 pound cylinders for back up in case of failure with the primary feed system. The Water Department staff has considered the risks involved with the storage and use of chlorine as a disinfectant. All of the storage and use facilities on the Water Department site are continuously monitored with an on line gas detector which is connected to the dispatch system for early warning purposes. This piece of equipment serves as an early warning device for the three rooms which have chlorine use and distribution. This equipment will alarm to the Communications Department for dispatching an alarm condition to plant personnel and a response team immediately. GENERAL INFORMATION ABOUT CHLORINE COLOR: Greenish yellow both as a liquid and as a gas ODOR: Very pungent detectable at less than l part per million (chlorine bleach) WEIGHT: 12.6 pounds per gallon, 1 volume of liquid = 456.7 volumes of gas 1 ton of liquid chlorine will expand to approximately 20,000 cubic feet of chlorine gas. HAZARDS: Oxidizer, promotes combustion in other materials. Corrosive, causes visible destruction or irreversible alteration of living tissue, and causes metals to rust. Toxic, can cause damage or disturbance to bodily functions when it enters the body.. Irritant, can cause reversible inflammation at the site of contact. r"'"`, a _ V lu 0.2 - 3.5 ppm Odor detection 1.0 - 3.0 ppm Mild Mucous membrane irritation tolerable for up to 1 hour 5.0 - 15 ppm Moderate irritation of upper respiratory tract 25 ppm Immediately dangerous to life and health 30 ppm Immediate chest pain, vomiting, cough, dyspnea 40 - 60 ppm Toxic pneumonitis and pulmonary edema 430 ppm Lethal over 30 minutes 1000 ppm Fatal within a few minutes Primary concerns will be those originating from unscheduled releases of chlorine liquid or gas. The "Guidebook For First Response to Hazardous Material Incidents" U.S. Department of Transportation outlines the following for small and large chlorine spills: SmalllV First isolate in all directions 900 feet. Then, protect those persons in the down wind direction 3 miles. Larne spill First isolate in all directions 1500 feet. Then protect those persons in the downwind direction 5 miles. A reportable spill is one that is equal to or greater than 10 pounds. Due to the topography and weather conditions, the behavior of the spill is unpredictable. Chlorine is 2.5 times heavier than air and will tend to drift downhill. Wind velocities, precipitation, and temperature will all have an influence on how isolation of the area will be performed. The Water Department staff has been developing an Emergency Response Plan specifically for chlorine releases which incorporates other hazards and many safety issues. This plan will involve many agencies and organizations from within the community and the State of Colorado. i �1 Q 0 @. � y IFA \ V , W � w r ry o Y 07 C 1 e. p r' �n1..r.xam,o `WRb ~PW ,...•� 'may f0 OWO ' • sxp�xa s�.+wuasu Jf mtiMZ� � O NC�Oi ' d •C 0 � VittGC3W Q 0 @. � y IFA \ V , %/.7',, ld3Q N3iUM 143cJSH Ol N3dSU JIO AiIJ,WdSE:EO S6. LO d3S %I W � w r ry o Y 07 C %/.7',, ld3Q N3iUM 143cJSH Ol N3dSU JIO AiIJ,WdSE:EO S6. LO d3S %I (303)925 -6727 FAX (303) 925 -4157 ENGINEERS SURVEYORS GM SORMUESER - GORDON MEYER MEMORANDUM TO: Scott Smith, Gibson Reno Architects FROM: Jay Hammond, SGM, Inc. —Nt-k— DATE: August 28, 1995 RE: Water Place Housing, Doolittle Drive Meeting Notes P.O. Box 2155 Aspen, CO 81612 Just a quick recap of my meeting on July 25th with Chuck Roth and David Hauter regarding the status of Doolittle Drive as it accesses the Water Place Housing project site. Generally, we reviewed the Roadway Plan and Profile drawing dated April 24, 1995 with regard to proposed improvements to the common access along Doolittle Drive to the site. We noted the typical section for Doolittle Drive with a pavement width of 24 feet and curb and gutter on the downhill side. Chuck requested that some additional gravel shoulder of 2 feet in width be shown on the uphill side of the roadway. We reviewed the curve radius in the vicinity of the previously proposed fourplex structure and the grades of the overall roadway. The curve radius is currently in the range of 65 feet and our plan would improve it to about 85 feet. The code requirement would be 100 feet. The overall grade is just under 10 %, which meets code requirements. We discussed at some length the feasibility of improving the curve radius and grade conditions for Doolittle Drive. I noted the constraints caused by the presence of the two large diameter water supply lines in the vicinity of the top of the road. We determined that, even with relocation of the waterlines (at potentially significant expense and disruption) and lowering the road in the vicinity of the project entry by 7 feet, we would only improve the overall grade conditions by about 1 %. We also discussed 'lengthening" the road by moving out onto the downhill slope near the top of the road and by cutting into the hillside near the curve. Again, impacts were significant and benefits were limited. Following our discussion, Chuck and David indicated an increased comfort level with the access road improvements as proposed. They did ask me to pursue some additional speed limit considerations based on AASHTO standards as well as advisory speed signing for the vicinity of the curve. I will pursue these issues prior to the P & Z worksession in September. JH4h 85030SS2 cc: dhuck Roth, P.E. David Hauter 1001 Grand Ave., Suite 2E • Glenwood Springs, Colorado • (303) 945.1004 MEMORANDUM TO: Planning and Zoning Commission FROM: Kim Johnson, Planner DATE: May 9, 1995 Re: Water Place Affordable Housing Subdivision - Final SPA Development Plan and Amendment of the Aspen Water Plant SPA, Growth Management Exemption for Affordable Housing and Essential Public Facilities, Subdivision, 8040 Greenline Review, Conditional Use, and Special Review for Parking, Open Space, and Dimensional Requirements in the Public Zone District: Public Hearing Continued from May 2, 1995 This item was introduced at a public hearing on May 2. At that meeting, the Commission voted to require this project to be processed as a four step SPA review rather than the requested two step consolidated review. The result of this action means that the application will be reviewed as a Conceptual SPA Plan. Presentations were made by staff, the applicant and several citizens. Issues discussed regarded roadway design and safety, open space and park site, visual impacts of new homes, density of the project, chlorine storage, and deed restrictions of the units. Staff has no new information to present to the Commission. The Commission shall forward their recommendation to the City Council. Currently, the Council review date is set for May 22, 1995. Threshold issues and concerns will be stated as conditions of Conceptual review. The applicant will then submit a Final SPA application which responds to the Conceptual conditions. The Commission and Council will hold additional public hearings for Final SPA review. ** Please be sure to bring your staff memo and application materials distributed prior to the last meeting. If you lack any of this information, contact me at 920 -5100 on or before Monday, May 8. A message may be left on the voice mail system. 1 WATER PLACE CONDITIONS OF CONCEPTUAL APPROVAL (revised for May 9, 1995) As this is a Conceptual Review, and some elements of the project may change, it is recommended that the Commission not grant any one -step reviews at this time, ie. conditional use or special review. It is anticipated that if the Applicant addresses many of the conditions listed below, those one -step reviews will be more easily processed during Final SPA review. Subdivision: 1. The curve on Doolittle Drive does not meet the requirements of the Subdivision, Section 7 -1004. Specific variations must be presented at Final review and identified in the SPA Agreement. 2. A final storm run -off plan must be submitted for Final review. 3. The applicant shall sign Doolittle Drive as 20 MPH (two signs) . 4. The cul -de -sac design shall meet the Fire Marshal approval. 5. The final plat must provide signature blocks for utilities. 6. Any new surface utility needs for pedestals or similar equipment must be installed on an easement on the property, not in the public right -of -way. 7. Homeowners covenants must provide for snow removal on any sidewalks and trails approved through this development review. 8. Downstream constraints in the Highlands Trunk sewer line require a proportionate impact fee from this development. Fees for Sanitation District reviews and construction observation must be submitted well in advance of building permit issuance to insure adequate review time and observation scheduling. 9. A line extension request and collection system agreement are required per Sanitation District regulations. 10. A new street name shall be chosen which meets the approval of staff overseeing addressing of new subdivisions. 11. The driveway for the fourplex shall be located opposite of the entry drive to Twin Ridge Subdivision. 12. Financial guarantees for landscaping, revegetation, and public facilities improvements required by Section 24 -7 -1005 must be rr reviewed and approved by the City Engineer and City/ Attorney 4A' �f prior to the issuance of any development permits for the project. SPAN 13. The final SPA Plan must show, dimension, and number all parking on the development. 14. Specific street light fixtures and locations must be shown on the Final SPA Plan. 15. It shall be demonstrated how the native vegetation shall be protected to the maximum extent practical, including the establishment of building envelopes outside of the scrub oak. Construction fencing must be erected at the dripline around all protected vegetation adjacent to structures, trails or roads prior to the issuance of any excavation, grading, or building permits. Any exposed roots must be protected during construction per Parks staff direction. 16. Trash /recycle areas must be shown on private property on the Final SPA Plan. 17. The amended SPA Development Plan shall be recorded in the office of the Pitkin County Clerk and Recorder. Failure on the part of the applicant to record the amended SPA Development Plan within a period of one hundred and eighty (180) days following approval by the City Council shall render the PUD Plan approval invalid and reconsideration and approval of both by the Commission and City Council will be required before their acceptance and recording, unless an extension or waiver is granted by it Council for a showing of goo cause. Condi tonal Us e/ z 18. Screen fencing shall be designed and installed between the Water Department shop building and residence number 11, and between the water plant road and duplex number 1/2. Growth Management Exemption for Affordable Housing: 19. The single family home size variance is allowed for net livable area less than 1,400 s.f., provided that the units would be larger than the minimums for 2 and 3 bedroom townhomes, and the smaller size would permit a lower sales price. 20. The deed restrictions shall be 9 Resident Occupied units and 7 Category Four units. The Housing Board does not have the jurisdiction to waive the minimum residency requirements for the R.O. units. 2 f f10"N !~l 21. The deed restriction shall provide enough time for the sale of a unit when an employee leaves the City. If terminated by the City, the employee shall have 180 days in which to sell his /her home to a qualified buyer. If the employee resigns, this period shall be 90 days. Special Review for Open Space: 22. Residents from adjacent residential areas should be included in planning the park area. An easement or encroachment onto the Castle Ridge property for park development shall be pursued to get a larger park space. 23. The park shall be adequately fenced from the road and driveways to keep children from straying. 24. A park development impact fee waiver may be granted in exchange for the applicant's commitment to accomplish certain park development activities (grading, drainage, top soil, and seeding) while these same activities are taking place for the adjacent fourplex. 8040 Greenline: 25. The structures located on upper Doolittle Drive shall be sprinklered for fire suppression. 26. The trail alignment must avoid as much existing vegetation as possible. The trail shall be concrete, preferably eight feet wide. Snow removal on the trail will be the responsibility of the homeowner's association. 27. No fireplaces are approved for this development. 28. A fugitive dust plan shall be approved by Environmental Health prior to the issuance of any grading, excavation, utility, demolition, or building permits. 29. The Phase II Environmental Audit must be included in the Final SPA review. 30. In no case shall the new buildings be "washed" with light from the residential light fixtures. Other lighting needs for the trail and roadway must be specific to limit light pollution. This could include shielded fixtures and low level downcast fixtures. 31. The applicant must devise a detailed plan for retaining and revegetating the road cuts, disturbed areas or easements, and building envelopes. Such a plan shall include section details, plant species lists and construction and planting schedules. 3 32. Additional evergreen trees shall be specified on the SPA landscape plan along the north sides of the homes on lots 7,8,9,10,and 12 to provide screening of the homes from below. General: 33. The driveways which do not meet code requirements of Section 19 -101 must be presented to City Council and identified as variances in the SPA Agreement. 34. The applicant shall agree to join any future improvement districts which may be formed for construction of right -of- way improvements in adjacent and neighborhood public rights - of -way. 35. The applicant shall consult City Engineering for design considerations of development within public rights -of -way, Parks Department for vegetation species, and shall obtain permits for any work or development, including landscaping, within public rights -of -way from City Streets Department. 36. Mud shall not be tracked onto City strep/ts during construction. 37. he shal com w' �t11U h dl'n of h ri An Evacuation Plan must be approve by City Council and appropriate City departments prior to the issuance of any grading, excavation, utility, demolition, or building permits. 39. All material representations made by the applicant in the application and during public meetings with the Planning and Zoning Commission and City Council shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. �I` ` 1 i r. Ely 7.wGQ, `k'inQ �'� i vrb pyl , i !v�° .m Memorandum To: Kim Johnson, Planner CC: From: Ed Van Walraven, Fire Marshal Date: May 9, 1995 Subject: Water Place Dear Kim, As per our conversation re: life safety and property protection issues at the Water Place project. I feel at this time, due to the size of the project, location and limited access, the installation of residential sprinkler systems will be a mandatory requirement. We are knowingly facing a situation that could present a grave danger to life and property. With the access as it exists, should the road become impassable we would be forced to helplessly stand by. As we discussed, that in the event of a medical emergencyit may possible to move the victim to the ambulance, although not desirable in any scenario. A fire incident, as you know, is quite a different matter. As far as the cost factor is concerned I hesitate to quote actual dollar amounts because of all the variables involved contractor, water pressures etc. If you have any concerns please do not hesitate to contact me. E/ ASPEN /PITKIN ENVIRONMENTAL HEALTH DEPARTMENT TO: Kim Johnson, Planning Office FROM: Lee Cassin, Aspen /Pitkin Environmental Health Department DATE: May 2,1995 RE: Water Plant Housing, SIP Compliance I have reviewed the letter from Tom Stevens about Water Place Housing and traffic generation. The proposed Water Plant Housing project is in conformance with, and consistent with, the Aspen /Pitkin PM10 SIP. Further, it goes beyond complying with the SIP and actually is expected to improve local air quality. By bringing employees who now drive to Aspen from downvalley every day, to right near their place of work, daily vehicle miles of traffic will be reduced. Therefore, PMlo emissions will be reduced. With most residential development, these statements cannot be made, but in this case, all of the units represent employees who will now live at or close to their place of work, who previously commuted from farther away. We would not make these statements based on an applicant's telling us that they know locals will live in a particular house, because that typically changes depending on who buys the house. However, in this case, the project is being built solely for emergency workers and commuting employees, and their current daily trip distances (and PMio emissions) are thus being reduced. The proximity of RFTA service and bike paths are beneficial, but would not bring about a reduction in traffic from the before - project levels. However, in this case, traffic is already being reduced by the project, so it is not necessary to assume a certain amount of RFTA ridership or bike usage to achieve a traffic reduction. From an air quality point of view, this project would be a benefit to the community. ....:;�� MEMORANDUM TO: Planning and Zoning Commission FROM: Kim Johnson, Planner DATE: May 2, 1995 Re: Water Place Affordable Housing Subdivision - Final SPA Development Plan and Amendment of the Aspen Water Plant SPA, Growth Management Exemption for Affordable Housing and Essential Public Facilities, Subdivision, 8040 Greenline Review, Conditional Use, and Special Review for Parking, Open Space, and Dimensional Requirements in the Public Zone District This project is being processed as a consol dated Conceptual and Final SPA review. Therefore, the P mmI!ssion and City Council will each review it one time only. Applicant: City of Aspen Engineering Department, represented by The Stevens Group and Gibson Reno Architects Location / Zoning: Lot 4, City of Aspen Thomas Property. This is the City's water plant property located at the end of Doolittle Drive, south of Castle Ridge Housing complex. The entire parcel is 54 acres, with only 5 acres considered for this new development. Zoning is Public (PUB) with an SPA (Specially .Planned Area) overlay. The adjoining residential neighborhood to the north is zoned R -15 PUD SPA. Request: The applicant wishes to develop an affordable housing subdivision consisting of one four- lex, 8 single family lots, and 2 duplexes, for a total of 6 units. Also included in the application is the construction of two tora e complex. One will e. . approximately 2,160 square feet and the other approximately 3,290 square feet. These two garage -type structures will be used by the City's Wes, r and E1 r; Departments for heavy equipment and service veh1c a storage. Please refer to the original application booklet, drawings and amended drawings and text. Note that the original application and drawings refer to a roadway realignment to serve the proposed storage buildings. The new road has since been eliminated from the application because of the need to explore the alignment and its impacts in greater detail. This will likely be reviewed as an ko�A J)�I 1 PqI O4 CA, a (ryo.;* bIf� ow�Imp-j f1dU_ l"(;�,-fG W -bl &4; �P.Cao<aJ. Uh�,Q,'O�rrQ" $G6�ti� n.r� .-Era Nsn„ ' {5 • tJf'�W?' �P'{c Sro muwC�iAij / Ktvv uoec�ae►.Q - evL Z,t�aA, i2nudw �m ww> TArik" can a I Thom ha - V-3 to o e-*h �a W r administrative amendment prior to construction of the storage buildings. Process: The Planning Commission shall make a determination on the Special Reviews required for the Public zone, 8040 Greenline Review, and Conditional Use for affordable housing in the Public Zone. The Commission shall forward a recommendation to Council for the Final SPA Plan, Subdivision, and GMQS Exemptions for essential public facilities and affordable housing. Background: The Water Plant SPA (Lot 4, City Thomas Property) was originally created in 1984 and amended later that year for certain additions such as the East Treatment Plant and storage /shop building up by the plant. The City Water and Electric Departments have found it necessary to construct garage storage for several pieces of expensive and critical equipment. When these cranes and trucks stay outside all of the time they deteriorate quickly, causing additional expense for the City. The City has also come to realize that ability to staff essential personnel is becoming increasingly difflcu ;§, ,staff they miq be [as�cn gency response staff such as Water, Electric, or Police, or management level staff, affordable housing options in the upper valley are virtually non - existent. The City Manager has been working with Council in developing a philosophy which will be supportive of housing for critical City staff. Referral Comments: Extensive referral comments were submitted. Complete referral memos are attached as Exhibit "A ". Summaries are as follows: Engineering: The curve on Doolittle Drive does not meet the requirements of the Subdivision, Section 7 -1004. Specific variations must be identified and approved through the Final SPA process (Section 7- 804.D.) - A final storm run -off plan must be approved prior to the issuance of any development permits. - Curb and gutter is required by code. - The applicant shall sign Doolittle Drive as 20 MPH (two signs). - The private road areas will not be maintained or plowed by the City. - Many of the driveways do not meet code requirements of Section 19 -101. Variations must be specified and approved through the Final SPA process (Section 7- 804.D.) - The cul -de -sac does not meet the Fire Marshal and Subdivision requirement of 100' radius. The final plat must provide signature blocks for utilities. The applicant shall agree to join any future improvement districts which may be formed for construction of right -of- way improvements in adjacent and neighborhood public rights- 2 of -way. The final SPA Plan must show, dimension, and number all parking on the development. The applicant shall consult City Engineering for design considerations of development within public rights -of -way, Parks Department for vegetation species, and shall obtain permits for any work or development, including landscaping, within public rights -of -way from City Streets Department. Street light fixtures and locations must be approved by City Staff and shown on the Final SPA Plan. Native vegetation shall be protected to the maximum extent practical, including the establishment of building envelopes outside of the scrub oak. Construction fencing must be erected around all protected vegetation adjacent to structures, trails or roads prior to the issuance of any excavation, grading, or building permits. Any new surface utility needs for pedestals or similar equipment must be installed on an easement on the property, not in the public right -of -way. Fencing is recommended between the Water Department shop building and residence number 11, and between the water plant road and duplex number 1/2. Trash /recycle areas must be shown on private property on the final development plan. Mud shall not be tracked onto City streets during construction. Prior to the acceptance of financial assurances for the project, the cost estimates of improvements must be approved by appropriate City departments. Homeowners covenants must provide for snow removal on any sidewalks and trails approved through this development review. Sanitation District: There are downstream constraints in the Highlands Trunk line, requiring a proportionate impact fee from this development. A line extension request and collection system agreement are required per District regulations. Estimated connection charges are $42,000.00, not including downstream constraint charges, construction observation fees, televising costs and line extension costs. Street Addressing: The proposed name of "Water Place" is too similar to Waters Ave. and Waterview. This could cause potential confusion for emergency response personnel and should be avoided by choosing another name. Housing Authority: The Housing Board met on April 19 and approved the following aspects of this application: The single family home size variance for net livable area less than 1,400 s.f., provided that the units would be larger than the minimums for 2 and 3 bedroom townhomes, and the smaller 77-731. r � r r W go size would permit a lower sales price; and The proposed deed restriction of 9 Resident Occupied units and 7 Category Four units. The Housing Board does not have the jurisdiction to waive the minimum residency requirements for the R.O. units. The Housing Guidelines would have to be formally amended to allow such variance; and The provision of housing by an employer for use by employees, including the requirement to leave the unit if employment is severed. Two reasons for this support are: the City has in place a personnel policy and procedure to protect employees, and the City shall provide enough time for the sale of a unit when an employee leaves. If terminated, this period shall be 180 days. Parks: Scrub oak are valuable mature vegetation that must be protected during construction. The trail alignment discussed at the site visit and shown on subsequent plans must avoid as much existing vegetation as possible. The trail shall be concrete, preferably eight feet wide. Snow removal on the trail will be the responsibility of the homeowner's association. The proposed park area would be a neighborhood asset - residents from adjacent residential areas should be included in planning this park area. An easement or encroachment onto the Castle Ridge property for park development should be pursued to get a larger park space. The park shall be fenced from the road and driveways to keep children from straying. The issue of park dedication in lieu of fee payment has not been resolved. It is suggested at this point that a fee waiver could be considered if certain park development activities (grading, drainage, top soil, and seeding) would be accomplished by the applicant while these activities were taking place for the adjacent fourplex. (refer to Exhibit "Dn) Environmental Health: (Additional information regarding traffic generations and compliance with Aspen's SIP was submitted by the applicant on April 25, after referral comments were received from Environmental Health (Exhibit "B "). Additional referral comments will be presented when available). - A condition of approval will be ASCD's written confirmation of their intent to serve this project. - As no fireplaces are indicated in the application, this will be a condition of approval for the project. - A fugitive dust plan shall be approved by Environmental Health prior to the issuance of any grading, excavation, utility, demolition, or building permits. - The Phase II Environmental Audit must be received and approved by Environmental Health prior to final City Council approval of the project. - The project shall comply with OSHA standards for storage and 4 handling of chlorine. An Evacuation Plan must be approved by City Council and appropriate City departments prior to the issuance of any grading, excavation, utility, demolition, or building permits. (Please refer to Exhibit "C" for a map of the chlorine building location, and information provided by applicant regarding chlorine impacts.) Streets: The existing road widths and sight distances are inadequate for current use and should be upgraded. A sidewalk on the downhill side of the road would be "plowed over" and covered all winter without additional snow removal. Planning Staff Comments: This review is being conducted as a consolidated SPA review which allows a two step review rather than a four step review per section 7- 804.A. During the review, the Commission or Council may determine "that the application should be subject to both conceptual and final review, in which case consolidated review shall not occur." Staff has made every effort to provide all application information to the Commission. Please note that several plan revisions and addenda have been submitted and attached to this memo. There are multiple reviews occurring within this development review. Specific review standards and staff responses are as follows: SPECIALLY PLANNED AREA (SPA): The following review standards are set forth in Section 24 -7 -804 B. of the Aspen Municipal Code: 1. Whether the proposed development is compatible with or enhances the mix of development in the immediate vicinity of the parcel in terms of land use, density, height, bulk, architecture, landscaping and open space. Response: Staff believes that this project meets this criteria in terms of density, height, bulk, architecture, landscaping and open space. There is lingering concern about the chlorine storage hazard at the water plant and the lack of a definit miti ation and evacuation plans at this time. Evidently there are op ions being discussed by water plant personnel regarding the chlorine storage issue. These might include reducing the amount of chlorine stored on site (would require more frequent deliveries) , an advanced spill retrieval /containment system, an on- demand chlorine manufacturing unit (would eliminate trucking the chlorine into the plant), and certification of residents on the site for chlorine response training. Whatever is determined to be the most effective and safe for a residential development (including the workers during construction) must be in place prior to the commencement of 5 , 9 I . any construction activity on the site. /1'^ The proposed park is much needed in this neighborhood and hopefully will become a joint effort with the adjacent Castle Ridge development. 2. Whether sufficient public facilities and roads exist to service the proposed development. Response: Doolittle Drive is substandard for the current use as access to the water plant. The project engineers have submitted details for widening the road to 24 feet of pavement with drainage shoulders. The City Engineering staff recommend signing the road to 20 MPH because of the mix of industrial and residential uses. There are problems currently experienced with drivers accelerating to get up the 10% grade, especially in the winter. The project engineer suggests in the application that the project could participate in improvements to Castle Creek Road on a pro -rated basis. That dollar amount is stated as $3,891.00. At the time of this memo, the engineering could not be reached to clarify if this amount is appropriate for the entire subdivision or would be assessed to each dwelling unit. Winter maintenance and plowing would have to be upgraded because of the additional residential use of the site. This is a concern to the Fire Marshal because if vehicles become stuck on the roadway, delays in emergency response could be disastrous. For this reason, Ed Van Walraven is suggesting that all of the residences on the hill be sprinklered for fire suppression. The County has been sent a copy of the application for input on lower Doolittle Drive, Castle Creek Road, and Maroon Creek Road. County Engineer Bud Eylar will be submitting comments to Planning prior to the P &Z meeting. 3. Whether the parcel proposed for development is generally suitable for development, considering the slope, ground instability and the possibility of mud flow, rock falls, avalanche dangers and flood hazards. Response: Geologically speaking, the site is stable. Initial soil tests reveal that the portion of the site where electric transformers were stored does contain PCBs. This is the area of the proposed single family homes. We do not have written confirmation, but a call from the testing service indicates that the Phase II environmental study is not showing PCB contamination. When completed, this report will indicate the extent of the contamination and will provide further information on clean up needs. Also being studied is any potential leakage where some fuel tanks were kept. 4. Whether the proposed development creatively employs land planning techniques to preserve significant view planes, avoid adverse environmental impacts and provide open space, trails and similar amenities for the users of the project and the public at large. Response: The project calls for single family homes along the edge of the bluff overlooking the Castle Ridge apartments. This is a prominent location. It is essential to retain all of the existing scrub oak and perhaps require additional plantings of evergreen trees to provide a visual screen. The maximum height of these homes is described as 281, with the height in the rear of the envelopes limited to one story or 181. The project planner has since clarified that the height is to be 25' as defined in the code, not 281. Staff is seeking further clarification of the 18' limit as it is not totally clear from the text what this will produce on the sites. Two other units will be located in the area where there is one existing water plant employee unit. This area is also visible from distance (lower Castle Creek Road) and would benefit from additional evergreen plantings along the northern edge. The application states that lighting will be limited to architectural lights from the residences, being low level non - source light at the front and rear entries. Staff would like to add that in no case shall the buildings be "washed" with light from the chosen fixtures. other lighting needs for the trail and roadway must be specified to meet the requirement to limit light pollution. This could include shielded fixtures and low level downcast fixtures. S. Whether the proposed development is in compliance with the Aspen Area Community Plan. Response: The Aspen Area Community Plan Housing Action Plan policies section states: "Encourage special districts (Schools, Hospital, Sanitation, etc.) and non - profits to provide housing for their own employees." This project is an example of the City trying to provide housing specifically for its employees. It should be noted that the intent of this effort is to have individual owners pay for their home's construction if the owner's are chosen before the units are built. Otherwise, the city will pay for construction but be reimbursed when the units are ultimately purchased. 6. Whether the proposed development will require the expenditure of excessive public funds to provide public facilities for the parcel, or the surrounding neighborhood. Response: The costs of upgrading Doolittle Drive must be incorporated into the costs of the homes. However, as a direct beneficiary of the road improvements, the Water Department should 7 ;r pay a portion of these costs. This issue was touched upon at the development review committee meeting, but a resolution has not been reached. 7. Whether proposed development on slopes in excess of twenty percent (20 %) meet the slope reduction and density requirements of Sec. 7- 903(B)(2)(b). Response: According to the April 7 Addendum #1, page 2, no slopes exceeding 20% are proposed for development. a. - Whether there are sufficient GMQS allotments for the proposed development. Response: GMQS exemption is sought for these residences and storage buildings. The affordable housing component is being reviewed by the Joint City /County GMQS Commission on May 16, 1995. SUBDIVISION. SECTION 24 -1004: a. Land suitability. The proposed subdivision shall not be located on land unsuitable for development because of flooding, drainage, rock or soil creep, mudflow, rockslide, avalanche or snowslide, steep topography or any other natural hazard or other condition that will be harmful to the health, safety, or welfare of the residents in the proposed sub - division. Response: As mentioned earlier, the issues of chlorine hazard and toxic residue have not been completely answered. Conditions of approval require final resolution of these issues prior to final project approval by City Council. b. Spatial pattern efficient. The proposed subdivision shall not be designed to create spatial patterns that cause inefficiencies, duplication or premature extension of public facilities and unnecessary public costs. Response: This criterion has been met by the proposal. 6. Improvements. The code lists 16 required improvements for subdivisions, including items such as survey monuments, paved streets, curbs, gutters, and sidewalks, fire hydrants, street signs, etc. This application has been reviewed for these improvements and staff has made specific conditions of approval where needed. The applicant and staff are in substantial agreement regarding the specific designs of the roadway, trail, and internal access. Final details such as road and trail centerlines, and surveyed lot lines, etc. will be determined by time the mylars EA are prepared for recordation. Staff suggests that the driveway for the fourplex be located opposite of the entry drive to Twin Ridge subdivision for three reasons. It would provide a standard four -way intersection, would reduce the impact on the oak stand along the road, and would place the driveway many feet further from the curve of upper Doolittle Drive. As the slope will be altered uphill and downhill along Doolittle Drive, staff is concerned about complete retaining and revegetation of the area. The proposed slopes reach 2:1 which is very steep. Getting topsoil to remain until vegetation takes hold will be nearly impossible. Prior to recordation of the plat and subdivision agreement, the applicant must devise a detailed plan for retaining and revegetating the road cuts, disturbed areas or easements, and building envelopes. Such a plan shall be reviewed and approved by Engineering, Parks and Planning staff. Right -of -way width. Street and alley right -of -way widths, curves and grades shall meet the following standards. Minimum Street Center Line Right -of- Maximum Classifi- Curve Way width Per Cent cation Radius (ft.) (ft.) of Grade(o) Local 100 60 10 The Engineering Department states that as revised, Doolittle Drive does not meet the curve standards stated above. This must be clearly noted on the plats and SPA /Subdivision Agreement as a variation from subdivision standards. Cul -de -sacs. Cul -de -sacs shall not exceed four hundred (4001) feet in length and shall have a turnaround diameter of one hundred (100') feet. A Cul -de -sac of less than two hundred (2001) feet in length in .a single - family detached residential area does not require a turnaround if the City Engineer determines a "T ", "Y" or other design is adequate turnaround for the vehicles expected to use the Cul -de -sac. The Fire Marshal and the applicant are still considering alternative designs for a cul -de -sac or similar "T" or "Y" turnaround. This must be resolved before final Council approval. Street names and numbers. Streets which do not fit into an established street - naming pattern shall be named in a manner which will not duplicate or be confused with existing street names within the City or its environs. As mentioned in referral comments, the name Water Place needs to be changed to the satisfaction of the Building Department staff responsible for street names and addresses. W ._> Sidewalks. Staff and the applicant have discussed many options for pedestrian travel to and through the site. We have considered sidewalks on either side of the roadway. These options fail because of roadway snow plowing and potential pedestrian /vehicular conflicts. We have come to believe that the best option is to construct an easy to maintain, 8' wide concrete sidewalk down through the open space as shown on the plans stamped April 25. Maintenance and plowing of the sidewalk will be the responsibility of the homeowner's association. Subdivision Agreement. Prior to or concurrent with the recordation of a Plat for a subdivision, the applicant and City Council shall enter into a Subdivision Agreement binding the subdivision to any conditions placed on the development order. Landscape Guarantee. In order to ensure implementation and maintenance of the landscape plan, the City Council may require the applicant to provide a guarantee for no less than one hundred twenty -five percent (125 %) of the current estimated cost of the landscaping improvements in the approved landscape plan, as estimated by the City Engineer, to ensure the installation of all landscaping shown and the continued maintenance and replacement of the landscaping for a period of two (2) years after installation. This is a critical issue given the amount of revegetation and new screen plantings being required for this subdivision. Public Facilities Guarantee. In order to ensure installation of necessary public facilities planned to accommodate the subdivision, the City Council shall require the applicant to provide a guarantee for no less than one hundred percent (100 %) of the current estimated cost of such public improvements, as estimated by the City Engineer. 8040 GREENLINE REVIEW. SECTION 24 -7 -503: No development may occur on parcels within 150' below the 8040' elevation line unless approved by the Planning and Zoning Commission: 1. The parcel on which the proposed development is to be located is suitable for development considering its slope, ground stability characteristics, including mine subsidence and the possibility of mud flow, rock falls and avalanche dangers. If the parcel is found to contain hazardous or toxic soils, the applicant shall stabilize and revegetate the soils, or, where necessary, cause them to be removed from the site to a location acceptable to the City. Response: The complete Phase 2 environmental report will indicate if toxic soils must be removed from this site as earlier discussed. Otherwise, the site is free from geological concerns. 10 JR t ,^N The proposed development does not have a significant adverse affect on the natural watershed, runoff, drainage, soil erosion or have consequent effects on water pollution. Response: The final drainage plan must be reviewed by Engineering prior to recordation with the SPA documents. To this point, the submitted plan appears to accomplish the above protection measures. As suggested in Engineering's referral comment, staff has included a condition of approval which prohibits mud from being tracked off of the site during construction. 3. The proposed development does not have a significant adverse affect on the air quality in the City. Response: The Environmental Health Department is reviewing the information submitted on April 25 regarding compliance with Aspen's SIP for air quality control. since the housing will be deed restricted for City workers, many families will not have to commute on the highway every day. Also, the project will not have any fireplaces, per the application. 4. The design and location of any proposed development, road, or trail is compatible with the terrain on the parcel on which the proposed development is to be located. Response: The existing road cuts through the slope and will need to be widened several feet. This will require substantial revegetation and perhaps retaining walls to accommodate the new road platform. 5. Any grading will minimize, to the extent practicable, disturbance to the terrain, vegetation and natural land features. Response: Staff has included several conditions of approval regarding protection of existing vegetation and revegetation of the property after road, trail and residential construction. The placement and clustering of structures will minimize the need for roads, limit cutting and grading, maintain open space, and preserve the mountain as a scenic resource. Response: Staff has requested that the applicant provide aerial photos showing the layout of the roads and structures in relationship to the substantial scrub oak stands. It is critical to leave these small but well established trees as a visual screen for the new homes. Additional evergreen trees along the north sides of lots 7,8,9,10,and 12 are recommended as a condition of approval. Building height and bulk will be minimized and the structure will be designed to blend into the open character of the 11 e mountain. Response: The design of the homes maximizes heights at 25' as defined by the code. Staff believes that this is a poor effort to limit the visual impacts of the homes on the hill above Castle Ridge apartments. The Planning Office has received many complaints since the Castle Ridge apartments were built because of the destruction of the vegetation on the slope behind the buildings. Citizens are very sensitive to the visual impacts of development in this area. The statement in the application that in the rear portions of the building envelopes structures will be limited to an 18' height is vague. This limit accomplishes little if a row of 25' structures is butted up against the edge of the line of oak trees. The existing scrub oaks along this ridge are only 10 -15' tall, so natural screening is limited. The project architects have been directed by staff to accurately project the new subdivision and building footprints onto an aerial photograph which clearly shows existing vegetation. Staff believes that the layout of the cul -de -sac can be shifted to the south so that the buildings could be at least 15' further from the top of slope and tree line. We also strongly recommend that specific building envelopes be established on an individual lot by lot basis during individual 8040 Greenline reviews. Many times in the past, the P &Z and staff have been frustrated when 8040 reviews are brought before them for lots which have had building envelopes established through subdivision review with little regard for site specific conditions. Also, at this point the land use code is being amended to include a new definition of "building envelope ". This definition is very specific as to how an envelope should be defined regarding all aspects of development: excavation areas, overhangs, driveways, patios and landscaping areas, etc. The applicant is advised to review this new language before establishing envelopes on these lots. Staff believes that the home designs are premature to the overall discussion of the subdivision and SPA. As proposed, many features of these residences to not comply with the General Guidelines as stated in the Neighborhood Character Guidelines (NCG). The NCG have been in use since July of 1994. The City is currently studying FAR and bulk /massing issues with an interim overlay review process. If these buildings are to be approved at this time with the subdivision /SPA, they need to be presented to the Overlay Committee via a separate application. If applications are not submitted for Overlay review before May 9, the designs will be subject to any new regulations that the P &Z might enact on May 9. In summary, staff does not recommend approval of the home designs and building envelope layout because they fail to meet this 8040 Greenline criterion. 8. Sufficient water pressure and other utilities are available 12 to service the proposed development. response: The water system will be served off of two lines. The project engineer is working closely with Water Department staff and the Fire to insure the needs of the subdivision. The Sanitation District indicates that the project will need to financially contribute to improvements on the Highlands Trunk line. Adequate roads are available to serve the proposed development, and said roads can be properly maintained. response: The road issue has already been presented. 10. Adequate ingress and egress is available to the proposed development so as to ensure adequate access for fire protection and snow removal equipment. response: The road design is being monitored by the Fire Marshal and Streets Department. 11. Any trail on the parcel designated on the Aspen Area Comprehensive Plan: Parks /Recreation /Open space /Trails Plan map is dedicated for public use. response: There are no trails from this Plan identified on this parcel. FACILITIES: Pursuant to Section 8 -104 C.1(c) the Council shall exempt deed restricted housing that is provided in accordance with the housing guidelines. The Commission shall review and make a recommendation to Council regarding the housing package. According to the Code, the review of any request for exemption of housing pursuant to this section shall include a determination of the City's need for such housing, considering the proposed development's compliance with an adopted housing plan, the number of dwelling units proposed and their location, the type of dwelling units proposed, specifically regarding the number of bedrooms in each unit, the size of the dwelling unit, the rental /sale mix of the proposed development, and the proposed price categories to which the dwelling units are to be deed restricted. Response: The Housing Board reviewed this proposal and supports it, as explained in the referral comments above. CONDITIONAL USE FOR HOUSING IN THE PUBLIC ZONE, Section 24 -7 -304: A. The conditional use is consistent and compatible with the character of the immediate vicinity of the parcel proposed for development and surrounding land uses, or enhances the mixture of complimentary uses and activities in the immediate vicinity 13 I la of the parcel proposed for development. Response: The residential proposal is compatible with the surrounding multi - family and single family development. Staff still has reservations about the proximity of the proposed homes to the chlorine storage area 1,000 feet away in the water plant complex. B. The location, size, design and operating characteristics of the proposed conditional use minimizes adverse effects, including visual impacts, impacts on pedestrian and vehicular circulation, parking, trash, service delivery, noise, vibrations and odor on surrounding properties; and Response: Staff has presented much information regarding the visual impacts and roadway improvements necessary for this project. We are awaiting comments from Environmental Health and County Engineering on the traffic impacts as they will relate to air quality and volumes on Castle Creek Road. There are no anticipated impacts of odor, trash or noise. The Water Department will.be adding a service road to the southern portion of the plant in the near future. The layout of this road will be considered as a separate application for SPA amendment and 8040 Greenline review. C. There are adequate public facilities and services to serve the conditional use including but not limited to roads, potable water, sewer, solid waste, parks, police, fire protection, emergency medical services, hospital and medical services, drainage systems, and schools; and Response: These items have been discussed previously. D. The applicant commits to supply affordable housing to meet the incremental need for increased employees generated by the conditional use; and Response: This is the City's effort to provide housing for its essential personnel. F. The proposed conditional use complies with all additional standards imposed on it by the Aspen Area Community Plan and by all other applicable requirements of this chapter. Response: This project is being reviewed under all applicable section of the Aspen Municipal Code. REQUIREMENTS IN THE PUBLIC ZONE, SECTION 24 -7 -404: Parking in the Public zone shall be approved by special review, only if the following conditions are met: 14 In zone districts where the off street parking requirements are subject to establishment or reduction by special review, the applicant shall demonstrate that the parking needs of the residents, guests and employees of the project have been met, taking into account potential uses of the parcel, its proximity to mass transit routes and the downtown area, and any special services, such as vans, provided for residents, guests and employees. Response: The parking plan proposes a minimum of two spaces per unit plus guest parking, for a total of 58 spaces. This averages to 3.6 spaces per unit. This appears adequate to limit parking in the roadway. The site is approximately 1,000 feet from the RFTA stop at Doolittle Drive and Castle Creek Road. This distance might deter some residents from using the bus. Open Space and Dimensional Requirements in the Public zone shall be approved by special review, only if the following conditions are met: 1. The mass, height, density, configuration, amount of open space, landscaping and setbacks of the proposed development are designed in a manner which is compatible with or enhances the character of surrounding land uses and is consistent with the purposes of the underlying Zone District. Response: The project is adjacent to industrial and residential land uses. The proposal is compatible with either of these, as long as hazard mitigation for the water plant can be resolved. The internal open space and area to be dedicated as a park is successful for a development of this size. As earlier presented, staff is uncomfortable with the heights and locations of the structures which will be visible below the hill. 2. The applicant demonstrates that the proposed development will not have adverse impacts on surrounding uses or will mitigate those impacts, including but not limited to the effects of shading, excess traffic, availability of parking in the neighborhood or blocking of a designated viewplane. Response: Impacts to Castle Creek Road are discussed as a proportional cost participation in the application. This is being studied by County staff. Parking impacts outside of the subdivision will be negligible. The visual impacts have been discussed in detail in the 8040 Greenline portion of this memo. Project Issues: The major issues as seen by staff are recapped as follows: 15 14 W 5W 1) Marginal roadway access to a new housing development 2) Chlorine hazard mitigation PICLYN 3) Potential mitigation requirements for toxic substances 4) visual impacts along the top of the hillside a. heights of buildings b. proximity of buildings and envelopes to the top of the slope C. additional vegetative screening along the north sides of homes 5) Park development for this subdivision and surrounding neighborhood 6) Trail alignment, construction, and maintenance THREE COMMISSION OPTIONS: 1) The P &Z may forward this project as a final P&Z approval with the list of conditions as presented below by staff. 2) The Commission may choose to table this item to May 9 to continue the public hearing. This would allow additional time for the applicant to respond to any issues or concerns of P &Z before they forward the case to Council. 3) The Commission could vote to require four step review for this project. This would essentially establish this present review as a conceptual review. The project would proceed to Council and conditions of approval would direct the applicant in their formulation of a Final SPA Development application for submittal �V^ l this summer. Regardless of the Commission's determination on the above options, the Planning Office suggests the following conditions: 1. The curve on Doolittle Drive does not meet the requirements of the Subdivision, Section 7- 1004. Specific variations must be presented to City. Council and identified in the SPA .., Agreement. 2. A final storm run -off plan must be approved prior to the issuance of any development permits. 3. The applicant shall sign Doolittle Drive as 20 MPH (two signs) Avv j sm :1awr . -g;� 16 4. The driveways which do not meet code requirements of Section 19 -101 must be presented to City Council and identified as variances in the SPA Agreement. 5. The cul -de -sac design shall meet the Fire Marshal approval. 6. The final plat must provide signature blocks for utilities. 7. The applicant shall agree to join any future improvement districts which may be formed for construction of right-of- way improvements in adjacent and neighborhood public rights- of -way. 8. The final SPA Plan must show, dimension, and number all s parking on the development. 9. The applicant shall consult City Engineering for design considerations of development within public rights -of -way, Parks Department for vegetation species, and shall obtain permits for any work or development, including landscaping, within public rights -of -way from City Streets Department. 10. Street light fixtures and locations muss be approved by City rotaff and shown on the Final SPA Plan. oWnitGh +S- � ? 11. Native vegetation to be retained shall be protected to the maximum extent practical, including the establishment of building envelopes outside of the scrub oak. Construction fencing must be erected at the dripline around all protected vegetation adjacent to structures, trails or roads prior to the issuance of any excavation, grading, or building permits. Any exposed roots must be protected during construction per Parks staff direction. 12. Any new surface utility needs for pedestals or similar equipment must be installed on an easement on the property, not in the public right -of -way. 13. Screen fencing shall be designed and installed between the Water Department shop building and residence number 11, and between the water plant road and duplex number 1/2. 14. Trash /recycle areas must be shown on private property on the Final SPA Plan. 15. Mud shall not be tracked onto City streets during construction. 16. Prior to the acceptance of financial assurances for the project, the cost estimates of improvements must be approved by appropriate City departments. 17 �a�5a - (owe �in wwt,w� CK • (� g Z_ �3 _- . r 17. Homeowners covenants must provide for snow removal on any sidewalks and trails approved through this development review. 18. Downstream constraints in the Highlands Trunk sewer line require a proportionate impact fee from this development. Fees for Sanitation District reviews and construction observation must be submitted well in advance of building permit issuance to insure adequate review time and observation scheduling. 19. A line extension request and collection system agreement are required per Sanitation District regulations. 20. A new street name shall be chosen which meets the approval of staff overseeing addressing of new subdivisions. 21. The single family home size variance is allowed for net livable area less than 1,400 s.f., provided that the units would be larger than the minimums for 2 and 3 bedroom townhomes, and the smaller size would permit a lower sales price. 22. The deed restrictions shall be 9 Resident Occupied units and 7 Category Four units. The Housing Board does not have the jurisdiction to waive the minimum residency requirements for the R.O. units. 23. The deed restriction shall provide enough time for the sale of a unit when an employee leaves the City. If terminated by the City, the employee shall have 180 days in which to sell his /her home to a qualified buyer. If the employee resigns, this period shall be 90 days. 24. The trail alignment must avoid as much existing vegetation as possible. The trail shall be concrete, preferably eight feet wide. Snow removal on the trail will be the responsibility of the homeowner's association. 25. Residents from adjacent residential areas should be included in planning the park area. An easement or encroachment onto the Castle Ridge property for park development shall be pursued to get a larger park space. 26. The park shall be adequately fenced from the road and driveways to keep children from straying. 27. A park development impact fee waiver will be granted in exchange for the applicant's commitment to accomplish certain park development activities (grading, drainage, top soil, and seeding) while these same activities are taking place for the adjacent fourplex. 18 28. No fireplaces are approved for this development. 29. A fugitive dust plan shall be approved by Environmental Health prior to the issuance of any grading, excavation, utility, demolition, or building permits. 30. The Phase II Environmental Audit must be received and approved by appropriate City departments prior to final City Council approval of the project. 31. The project shall comply with OSHA standards for storage and handling of chlorine. An Evacuation Plan must be approved by City Council and appropriate City departments prior to the issuance of any grading, excavation, utility, demolition, or building permits. 32. In no case shall the new buildings be washed with light from the residential light fixtures. other lighting needs for the trail and roadway must be specific to limit light pollution. This could include shielded fixtures and low level downcast fixtures. 33. Additional plantings of evergreen trees shall be included on the SPA landscaping plan for better visual screen of the residences on the hill. 34. Prior to recordation of the plat and subdivision agreement, the applicant must devise a detailed plan for retaining and revegetating the road cuts, disturbed areas or easements, and building envelopes. Such a plan shall be reviewed and approved by Engineering, Parks and Planning,staff. 35. The driveway for the fourplex shall be located opposite of the entry drive to Twin Ridge Subdivision. 36. Prior to recordation of the plat and subdivision agreement, the applicant must devise a detailed plan for retaining and revegetating the road cuts, disturbed areas or easements, and building envelopes. The plan shall be reviewed and approved by Engineering, Parks and Planning staff. 9P � 37. The design of the cul -de -sac or alternative turnaround must be resolved before final Council approval. 38. Financial guarantees for landscaping, revegetation, and public facilities improvements required by Section 24 -7 -1005 must be reviewed and approved by the City Engineer and City Attorney prior to the issuance of any development permits for the project. 39. Additional evergreen trees shall be specified on the landscape plan along the north sides of the homes on lots 7,8,9,10,and 19 12 to provide screening of the homes from below. 40. Prior to the issuance of any building permits for the individual residential structures, an 8040 Greenline review must be approved for each by the Planning and Zoning Commission. Of 1?ra1VIG- Ae--tett(C4 too f lv&,f- 41. All material representations made by the applicant in the application and during ,public meetings with the Planning and Zoning Commission and City Council shall be adhered to and considered conditions of approval, unless otherwise amended by other conditions. 42. The amended SPA Development Plan shall be recorded in the office of the Pitkin County Clerk and Recorder. Failure on the part of the applicant to record the amended SPA Development Plan within a period of one hundred and eighty (180) days following approval by the City Council shall render the PUD Plan approval invalid and reconsideration and approval of both by the Commission and City Council will be required before their acceptance and recording, unless an extension or waiver is granted by City Council for a showing of good cause. Exhibits: Project Application Booklet and Blueprints "A" Complete Referral Comment Memos "B" April 18 Addenda, Traffic Generations /SIP "C" Chlorine Storage Information "D" Park Mitigation Fee In -Lieu Request 20 PUBLIC NOTICE RE: WATER PLACE AFFORDABLE HOUSING GROWTH MANAGEMENT QUOTA SYSTEM EXEMPTION NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 16, 1995 at a meeting to begin at 4:OO p.m. before the Aspen /Pitkin County Growth Management Commission, 2nd Floor Meeting Room, City Hall, 130 S. Galena St., Aspen, to consider an application submitted by the City of Aspen Engineering Department, requesting GMQS Exemption for affordable housing for a 16 unit, 100% affordable housing development for employees of the City of Aspen. The property is located at Lot 4, City Thomas Property. For further information, contact Kim Johnson at the Aspen /Pitkin Community Development Department, 130 S. Galena St., Aspen, CO 920 -5100 s /Bruce Kerr, Chairman Aspen /Pitkin County Growth Management Commission Published in the Aspen Times on April 29, 1995 City of Aspen Account TO Kim Johnson From: Chuck Roth Postmark: Apr 21,95 Status: Previously Subject: Water Place MESSAGE DISPLAY 2:11 PM read 1"`, CC Cris Caruso Message: Please accept this CEO as a minor amendment to the Engineering Department referral memo on the above referenced project. The curve of Doolittle Drive does not meet the requirements of the Land Use Code at Section 7 -1004. Thank you. To: Kim Johnson, Community Development Department From: Dave Tolen, Housing Office Re: Water Place Affordable Housing Date: 20 April, 1995 The Housing Board considered the Water Place application at its regular meeting of April 19, 1995. The Board discussed the following three issues related to the application: Units Sizes: Some of the single family units do not meet the minimum size requirements of 1,400 net livable square feet. The Housing Board approved these units, as provided in the guidelines, in that they were larger than the minimum for two and three bedroom townhomes, and in that the smaller size would permit the City to sell the units for lower prices. Proposed Category Mix: The City proposes 9 R.O. units and 7 Category Four units. The Housing Board agreed that this mix was consistent with the AH zone, in that it was a 100% restricted project. The Housing Board does not have the ability to waive the residency requirement for R.O. units, currently two years and proposed to be three years. That requirement is not subject to special review. If the City wishes to sell R.O units to employees who have worked in the community less than two years, we would need to amend the Housing Guidelines to provide for this. The Board suggested that this issue be included in the public hearings on the Affordable Housing Zone District and R.O. units. Sale of Units Tied to Employment: The Housing Board recognized the advantage to the community of having employers provide housing for their employees in the manner proposed by the City. The Board recommended approval of this with the following considerations: o The City has in place a personnel policy and procedures that protect employees. o The City provides a sufficient amount of time for an employee to sell a home back to the City in the event that the employee voluntarily leaves City employment. The Board recommends that, in the event an employee is terminated, that this time period be 180 days from such termination. '^ C2.ty Council Exhibit—AL Approved i 19 _ By ordinance IAA u � :: ►It lu To: Kim Johnson, Planning Office From: Chuck Roth, Engineering Department Date: April 19, 1995 Re: Water Place Affordable Housing SPA Amendment, Subdivision, GMQS Exemption, Conditional Use Review & Special Review (Lot 4, City Thomas Property Subdivision) Having reviewed the above referenced application, and having made a site inspection, the Engineering Department has the following comments: 1. Referral Agencies - It is recommended that the application also be referred to Pitkin County. The County refers county applications to the City when the proposed development may have impacts on the City. This application should be referred to the County for possible comments relating to traffic impacts on Castle Creek Road and the intersection of Maroon Creek and Highway 82. 2. Site Drainage - The storm runoff plan submitted in the application appears satisfactory. As discussed at the Design Review Committee (DRC) meeting, the lower 250' of road drainage must be intercepted with inlets and conveyed to the detention pond. If the project is approved, a final storm runoff plan must be prepared by a registered engineer prior to issuance of a building permit. The plan must provide for no more than historic flows to leave the site. The plan must include design as needed for storm runoff during construction to be maintained on site with no disturbance to existing slopes and native vegetation. 3. Sidewalks - The revised site plan showed sidewalk on one side of Doolittle Road in lieu of the trail shown in the original application. The sidewalk design did not meet "Pedestrian Walkway and Bikeway System Plan" by not providing a five foot buffer space between the curb and gutter and the sidewalk. As discussed at the DRC meeting, the sidewalk design also presented the problem of being on the side of the street to which the snow is plowed by the streets department. During the site visit, staff discussed installing the sidewalk on the uphill side of Doolittle Drive. It appears that more native vegetation would be lost with the pedestrian facility adjacent to the street than with the trail. 1 If the trial is approved in lieu of the sidewalk, there should be conditions of approval relating to maintaining a maximum grade similar to the street (10 %) and disturbing minimum amounts of vegetation. Construction fencing should be required to be placed to prevent disturbance of existing vegetation. The final proposed trail alignment should be staked for staff approval prior to construction. The trail would respond to pedestrian needs for the upper units. The lower units should include sidewalk along Doolittle Drive with a five foot buffer between the curb and the sidewalk. In the typical development case, the upper units should be served by public right -of -way with City streets, with sidewalk, curb and gutter. This is established in the Land Use Code in Section 7 -1004. A new code amendment allows for variations from the subdivision requirements by the process of special review. Therefore the design details of this project should be reviewed on that basis. If community and character guidelines supersede right -of -way width and sidewalk curb and gutter requirements in the Land Use Code, then that must be stated during the review process. As part of any discussions of variations to the Land Use Code, staff, P & Z, and Council should consider restricting the use of driveway for storage and overnight parking in order to preserve neighborhood character. The applicant has offered some "off- site" guest parking which might also be usable for the storage of vehicles and recreational equipment. Snow Removal - The improvements and declarations or covenants must provide for the homeowners association of Units 1 -12 to be responsible for snow removal on the sidewalk or trail to the lower units and for Units 13 -16 to be responsible for snow removal and maintenance on sidewalks downhill to their property boundary. 4. Curb and Gutter - The City Code requires construction of curb and gutter as well as sidewalk for new construction (Sec. 19 -98). Curb and gutter should be required unless the Community Character Guidelines dictate otherwise considering the location and neighborhood of the project. 5. Road Improvements - The 24' wide road section is acceptable. The applicant should be required to install two 20 MPH speed limits signs on Doolittle Drive. 6. Right_ v of -way - As in item 3 above, special review should address whether the access to Units 1- 10 is via public right -of -way or private road. If the access is a private road, the City will not be obligated to provide maintenance and snow removal, but then the community character of private little enclaves in the City is promoted. 7. Traffic - The applicant reported trip generation rates based on Pitkin County standards with an available transit option. We have requested the applicant to provide additional information concerning guidelines for qualifying as "available transit option." The development may be located too far from a bus stop to permit the trip generation rates that were used. 8. Driveways - A number of the driveways of Units 1 -10 do not meet the City Code requirements of Section 19 -101. Variations from the Code requirement may be permitted as discussed in item 3 above. 2 0 W 9. Emererncy Access - City Code requires a turn- around width of 100', which is greater than that shown in the application. The applicant must work with the Fire Marshall to meet emergency access requirements. 10. iUtilities - Any new surface utility needs for pedestals or other equipment must be installed on an easement provided by the applicant and not in the public right -of -way. The applicant must consult with the City Electric Superintendent prior to issuance of a building permit and provide electric load information in order to determine size and location of transformer easements. 11. mash & Utility rea - The final development plans must indicate the trash storage areas, which may not be in the public right -of -way. All trash storage areas should be indicated as trash and recycle areas. 12. Parking - The final development plan must show, label, number and dimension all parking spaces. 13. Site Design - a. The site contains extensive native vegetation which should be preserved where practical. All phases of construction should be required to install construction fencing at the limits of permitted construction in order to preserve native vegetation and to contain any excavation and construction debris. b. At the site visit we discussed installing fencing for visual reasons and to lessen the attractive nuisance aspects of the existing Water Department shop building. The fencing should be of material approved by City staff and installed alongside the road between Unit 1 and the shop and between Unit 11 and the shop. Landscaping may also be used as approved. c. If necessary to reduce building bulk or to increase space for a park, the applicant should be required to provide usable sub -grade spaces for the homes. d. I believe that much of the original landscaping at Castleridge was lost due to lack of maintenance. The improvements agreement and covenants should provide protection for maintenance, preservation and replacement of plant materials as need to preserve the approved landscape plan. 14. Street Lights - The application did not discuss street lights, however during the site visit, the applicant represented that street lights were included in cost estimates for utilities. The street and trail lights must be shown on the final development plan. The locations and light standard designs must be approved by City staff. 15. Other Conditions of Approval - 3 — _. _ .,. a. No tracking of mud onto City streets shall be permitted during construction. b. The applicant shall agree to join any improvement districts formed for the purpose of constructing improvements in adjacent and neighborhood public rights -of -way. c. The final plat must include certificates for approvals by the utilities. 16. Work in the Public Rie t -of- -way - Given the continuous problems of unapproved work and development in public rights -of -way adjacent to private property, we advise the applicant as follows: The applicant shall consult city engineering (920 -5088) for design considerations of development within public rights -of -way, parks department (920 -5120) for vegetation species, and shall obtain permits for any work or development, including landscaping, within public rights -of -way from city streets department (920 - 5130). 17. Improvements Cost Estimates - The estimates should be approved by the appropriate City departments prior to acceptance by the City for purposes of financial assurances. cc: Cris Caruso Scott Smith M95.93 IM L' �i r C2 -1tY Council Exhjbit /+ APProved BY Ordinance -- Z9 I N C O R P T R A T E D April 18, 1995 Tom Dunlop 'APR 2 5 1995 Aspen/Pitkin Environmental Health Department 130 South Galena Street C} a'ro rJ kTY Aspen, Colorado 81611 DEVELGPAIENT RE: WATER PLACE AFFORDABLE HOUSING DEVELOPMENT Dear Tom, Pursuant to our conversation at the Development Review Committee meeting I am providing the following information regarding traffic generations and compliance with the SIP. The Water Place Affordable Housing development will consist of the construction and subsequent sale of sixteen fully deed restricted units at the existing City owned Thomas property otherwise known as the Water Plant property. A portion of these units will be reserved for emergency response personnel currently residing downvalley and outside the boundary for adequate response time. The remaining units will be sold to City of Aspen employees. The development of this project will result in a net decrease in Vehicle Miles Traveled (VMT). This will be accomplished in the following manner: 1. By bringing emergency response personnel back up valley to live, the daily commute and emergency response commute will be eliminated or significantly decreased. 2. A certain number of personnel currently working at the Water Plant will reside in the proposed units eliminating even short commutes as they will live at the site of employment. 3. A strong transit system currently exists with RFTA service at the corner of Doolittle Drive and Castle Creek Road approximately 1,000 feet away. 4. Segregated pedestrian/bicycle access is proposed from the project site which links to the City trails system which bridges across Castle Creek. 5. Adequate parking will be provided for the proposed units. With the introduction of paid parking in the City of Aspen, the residential spaces provided will be the most convenient free parking spaces available. This combined with the strong transit service to the immediate area will force the use of mass transit. A traffic report prepared by Schmueser, Gordon and Meyer has been included in the application. This report establishes Vehicle Trips per Day (VPD) based on currently accepted formulas. What has not been taken into account in this report is the relocation of downvalley employees to this site, the location of Water Plant employees at this site and paid parking within the City of Aspen. If you have any questions or comments, or should require any additional information, please do not hesitate to contact me. Sincerely, Thom . Stevens, Pr sident The Stevens Group, Inc. 312 E, Aspen Airport Business Center, Aspen, Colorado 81611 (303) 925 -6717 FAX: (303) 925-6707 0 TO CRIS CARUSO CC MARTA STEINMETZ MESSAGE DISPLAY From: George Lilly Postmark: Apr 18,95 1:57 PM Subject: STREET NAME CC KIM JOHNSON CC GEORGE LILLY Message: The suggested name of "Water Place" for the street at the Water Plant housing project is too similar to Waters Ave and Waterview. HOW about water in a different language, like "aqua" or "aqua" or something. Or some other descriptive term derived from the landscape or historical reference. OR some adjective to describe water in front of it—like "muddy" or "cold ". OR the name of a Water Plant, like "hyacinth ". OR just some other dang name that suits your fancy. Why donft you come up with several and we can talk! �s ewl-1 C'ionsofidafed'&nilalion�isfricf ♦ 565 North Mill Street Aspen, Colorado 81611 Tele. (970) 925 -3601 FAX #(970)925 -2537 Sy Kelly • Chairman Michael Kelly Albert Bishop • Treas. Frank Loushin Louis Popish • Sccy. Bruce Matherly, Mgr. April 17. 1995 1/ ` P Kim 7ohnson 19 Planning Office 1995 130 S. Galena C.. Aspen, CO 81011 Re: Water Place Affordable HousingZoj.,., Dear Kim: The Aspen Consolidated Sanitation District currently has sufficient line and treatment capacity to serve this proposed project. There are downstream constraints in the Highlands Trunk line that will be corrected through a system of proportionate impact fees. Service is contingent upon compliance with the District's Rules and Regulations which are on file at the District office. The applicant will be required to request a line extension to the property and complete a collection system agreement. Each item will be reviewed by our Board of Directors at a regular meeting. The costs of the extension will become part of the developer's project costs. Easements will need to be granted according to standard District form. Prior to final approval of the project, we would request that the applicant be required to submit a District approved line extension request and collection system agreement. Funds will need to be placed in escrow with the District to cover the construction observation expenses and the cost of televising the system once it is completed. The alignment and plan and profile of the Line extension must be approved by the District's engineer. Based upon the plans submitted, I have estimated the connection charges for this development to be approximately $42,000. Add - itional costs will be in the form of downstream constraint charges, construction ob -servation fees, televising costs, and the cost of the line extension._ Sincerely, w M A )l. r Bruce MatherI� District Manager EPA Awards of Excellence 1976 • 1986 • 1990 ' Regional and National PUBLIC NOTICE RE: WATER PLACE AFFORDABLE HOUSING SUBDIVISION, SPA AMENDMENT, GMQS EXEMPTION, CONDITIONAL USE REVIEW & SPECIAL REVIEW NOTICE IS HEREBY GIVEN that a public hearing will be held on Tuesday, May 2, 1995 at a meeting to begin at 4:30 p.m. before the Aspen Planning and Zoning Commission, 2nd Floor Meeting Room, City Hall, 130 S. Galena St., Aspen, to consider an application submitted by the City of Aspen Engineering Department, requesting the following approvals: Conceptual Submission, Final Submission and Final Plat approval for a 16 unit, 100% affordable housing development for employees of the City of Aspen; amendment of the Lot 4 City Thomas Property SPA Amendment #1 (aka City of Aspen Water Plant); GMQS Exemption for affordable housing; Conditional Use Review for affordable housing in the Public zone district; 8040 Greenline Review; and Special Review for parking, open space and dimensional requirements. The property is located at Lot 4, City Thomas Property. For further information, contact Kim Johnson at the Aspen /Pitkin Community Development Department, 130 S. Galena St., Aspen, CO 920 -5100 s /Bruce Kerr, Chairman Aspen Planning and Zoning Commission Published in the Aspen Times on April 15, 1995 City of Aspen Account A, r STREETS DEPARTMENT To: Kim Johnson From: Jack Reid /11Tj/ Date: April 13, 1995 Subject: Water Place W EXHIBIT 6, PAGE 4: INTERNAL ROADS - The intended improvements discussed are all appropriate and need to be accomplished. The existing road widths and sight distances are inadequate for current use and should be upgraded. REFERENCE MR. STEVENS' LETTER TO YOU OF APRIL 7, 1995, BULLET 43. A sidewalk immediately adjacent to, and on the low side of Doolittle Dr., is not appropriate. Because of the hill on the uphill side, it is necessary to plow all the snow to the "off" side of the road. Without adequate room for snow storage (81), that new sidewalk will spent the entire winter covered with snow. The Parks Department would have to address additional costs in equipment and labor to keep it open. I suspect that cost would be substantial, since they do nothing in that area now. IR � TO: Kim Johnson, Planning Office THRU: George Robinson, Parks Department FROM: Rebecca Baker, Parks Department DATE: April 13, 1995 RE: Water Place Affordable Housing Project W We have reviewed the application for the Water Place Affordable Housing Project and have a few comments. As discussed in section H -D, the area of the townhomes should preserve as many scrub oak as possible. Many mature scrub oak do not meet code (ie. under 6" in diameter), but are often healthy, older trees (50 -60 years old) and should be maintained and protected during construction as feasible. Protection measures should include placing snow fencing or other such materials around vegetation that is not to be disturbed. Per our site visit on April 18, the trail should avoid as much vegetation as possible and be aligned per the discussions of that meeting. The trail should be concrete and eight feet wide. Snow removal for the trail should be included with the homeowner's association fees as a contracted service. If the City Parks Department is required to do the snow removal it may require additional staffing levels to meet this service, particularly due to the remoteness of the area compared to current snow removal responsibilities. The proposed park needs to be discussed with the Castle Ridge homeowners and residents to see if an encroachment onto their property for the purposes of a park and/or playground is agreeable. The park will need to be fenced (split rail) with a possible mesh netting attached to the lower rails to secure the park area for children from the surrounding roads. The issue of park dedication fees needs to be worked out further. It is suggested that as part of the mitigation of these fees that the area be graded and seeded (at a minimum) when the other excavating and landscaping for the adjacent townhomes is done. We will work with the applicant to further define the mitigation but feel the application does not need to be held up on this issue. The proposed landscape plan is acceptable. The areas such as the turn- around and entrance will need to be maintained which maybe included in homeowners association fees as well. W MESSAGE DISPLAY TO Cris Caruso CC Stan Clauson BC Kim Johnson From: Kim Johnson Postmark: Apr 12,95 11:55 AM Subject: chlorine report -- -- --- ----- -- -- -- - - ---- /10 ^ CC Phil Overeynder CC Bill Efting Message: Cris, I've looked over the document and realize that it does not address whatsoever the chlorine situation as it applies to residents in the immediate vicinity. The table of spills indicates isolation areas of 500 and 1,500 feet in all directions... how does this relate to the position of proposed units. What is the response plan for incidents other than trained reponse personnel? There are some big questions still in my mind. Please respond. Reminder... DRC is tomorrow at 2:00 in CC chambers (Thursday). W Memorandum To: Kim Johnson, Community Development Department From: Cris Caruso, City Engineer Date: 4/12/95 RE: Water Place Housing: Chlorine Impacts The attached documents, which you have seen, were provided by the Water Department as general information related to emergency response. It is evident that these documents do not provide all- encompassing information for the Water Department's policies and procedures with regards to chlorine. I contacted Mark O'Meara, Chief Water Plant Operator, this afternoon to gain further information on this matter. He noted that it has taken some time to develop an emergency response plan, and that the plan is not yet complete. The Water Department has been working closely with Colorado Chlorine Consultants, Inc. to gain information. Mark will ask for their input on the additional proposed housing, but believes that the final plan will maintain consistent emergency response procedures for Castle Ridge, Twin Ridge, and Water Place, as each housing development lies within 1500 feet and beyond 500 feet of the chlorine building. Among the policies and procedures being developed are measures for educating area residents on emergency response and evacuation procedures. Once the Water Department has fully developed the response plan, the residents of Castle Ridge, Twin Ridge, Water Place, and any others within 1500 feet of the chlorine building will be asked to attend periodic workshops to become educated on procedures in the event of an emergency. They will also receive emergency event instructions and updates to be posted in each home. This is the latest information that I have. Again, I am informed that the Water Department is working diligently to develop an emergency response plan related to chlorine, and that the Water Place Housing Project is being considered with their plan. Please contact me if you have any questions. Thank You 01j cc memo: City Manager Water Department Community Development chlresplmpl APR 11 '95 11 :02AM STEV GROU P 1 City Council Exhibit April 11, 1995 Approved , 19 By Ordinance Kim Johnson Aapeol tldn Community DmAcipinw Department 130 South Galena Aspen, 00 51611 VIA FAX: 920-8439 i Band an the per unit coals for Park Davdopment Imp d Fees you gave M this morning, I have determined tide Intel i V*dfe: fort icpgwed WaterPl aceaffordableRougingprojecttobe $47 ,174.00. This imbued an tie proposed develop oont ptugrem of 10 two bcdmom units at $2,6211uoit Sat a sub - total of 526,210, and 6 three bedeoam or Feder nails at $3,4% urdt for a s:dr -total cf $20,964.00. I discussed theprapasai for designating land to public use in lieu of s cash payment with Rebecca Baker of the Panel Department last wash. While sae wan not able to commit obviously without aecisg the application and discussing the waacr with Geoge Robinson, abo indicated that the Dopartment may be Aceptive to this proposal, If you have any questions or comments please do not hesitate In contact tyre. Sincerely, Thootas fG 312 E, Aspen Airport Business CenW, Aspen, Colorado 81611 (303) 925 -6717 FAX: {3031925 -6707 April 7, 1995 Kim Johnson Aspen/Pitkin Community Development Department 130 South Galena Street Aspen, Colorado 81611 RE: WATER PLACE AFFORDABLE HOUSING PROJECT ADDENDUM #1 TO LAND USE APPLICATION Dear Kim, In response to the outline for requested additional information provided to the development team on Thursday, March 30, I would like to offer the following; • The two road re- alignments proposed in the application located at the Water Plant have been eliminated from the application. Adequate information was not available from the Water Department. The project engineers have provided revised grading for the Doolittle Drive improvements which is attached herein. This grading also represents the side slope grading requirements. • The location of trash/recycle facilities has been added to the Development Plan. Two 4 yard dumpsters have been located at the upper site while one 4 yard has been located at the four - plex site. A sketch of the enclosure structures has been attached herein. Mail lock boxes have also been added to the Development Plan. • The pedestrian walk has been relocated to along side the road. This has been accomplished by adding a curb to the low side of Doolittle Drive as shown on the attached plan with a 6 foot wide walk immediately adjacent. This revision eliminates the path traversing the common area as shown in the application. • No specific variation is now requested. It was initially anticipated that the RO. Category would require the same minimum net livable square footage as Category IV. However after checking with the Housing Office, no minimum is specified for R.O.. For this reason, no variance is requested. • Information regarding the chlorine storage site has been provided by the Water Department and attached herein. • Wright Water Engineers has provided a soils analysis (a Phase One Environmental Audit) which is attached herein. • As this is a City project, and a 100% affordable housing project, City policy waives all application ad water tap fees. The Applicant will still be responsible for the Park Development Impact Fee. Based on the proposed development program, the park development impact fee is S . The Applicant would like to make a formal request that this fee be satisfied via designation of the 22,000 s.f common area for public use. This land will be held in reserve (no development) for future recreation area (children's play area) to be constructed by either the Applicant or the public. • The Applicant shall participate in future road improvements as specified in the Engineering Report, Exhibit 6. • The Applicant requests GMQS Exemption for all 16 units in 1995 including 9 resident occupied units. This will require borrowing an exemption for the 1996 Resident Occupied pool. There are 43 affordable housing allotments available which will accommodate the requested 7 units. 312 E, Aspen Airport Business Center, Aspen, Colorado 81611 (303) 925 -6717 FAX: (303) 925.6707 The review criteria for Section 7-804 B, Review Standards SPA, are as follows; I. The immediate vicinity is comprised of predominately affordable housing, the Aspen Valley Hospital and the Water Plant facility. The proposed affordable housing is compatible not only in land use but also in architecture, bull[, etc. This proposal represents a decrease in density from Castle Ridge and is similar to Twin Ridge. Provisions for open space are consistent with the surrounding projects with 29,723 st of common area 58,902 s.f of private open space available. 2. Evidence of sufficient public facilities is found in the Engineering report, see Exhibit 6. 3. The proposed site is free from geologic, avalanche and mud flow hazards. Slope for the upper site is nearly flat while the four plex site slopes at approximately 20 %. 4. The site plan depicts a design that maximizes the view and solar exposure of each unit. The density of the project tends itself to substantial usable open space around each unit. Pedestrian access to the property will be substantially improved by the addition of a walk at Doolittle Drive. Additionally, 22,000 st of common area will be dedicated to public use for outdoor recreation. 5. The proposal for 100% affordable housing meets the goals of the Comprehensive plan as well as the Aspen Area Community Plan which specifies a 650 unit deficiency in affordable housing units. 6. The project has been designed to be financially self sufficient. However, as the Applicant is the City of Aspen, public money will be used for the overall construction unit permanent mortgages have been secured by purchasers, 7. No slopes in excess of 20% are proposed for development. 8. Sufficient GMQS exempt allotments for affordable housing units including R.O. exist. This application requests 16 units for 1995. Section 7 -804, C as follows; La See Exhibit 1 Lb See Section III, Proposed Development Lc See Section III, Proposed Development and Exhibit 6, Engineering Report Ld See Existing Conditions Plan, Development Plan, SPA Plan • Section 7-804, D as follows; La See Exhibit 1 Lb See Section III, Proposed Development Lc See Section II, Existing Conditions i 0 Al-, l.d See Section III, Proposed Development, N. Construction Schedule Le See Section III, Proposed Development, I Public Facilities Lf NA. l.g See Map I, Final Plat The review criteria for Section 7 -1004 C are as follows; La See 7 -804, B, 5 above. Lb See 7 -804, B, 1 above. l.c This proposed development does not impact the future development potential of surrounding lands as it maintains the public facilities and land use patterns. l.d See below 2.a No geologic, avalanche, flood or other conditions exist to render this land unsuitable for development. 2.b This proposed development utilizes existing roadways and public facilities therefore no duplication or inefficiencies exist. 3.a 1. See final Plat 2. See Final Plat 3. See Amended Grading attached herein 4. NA 5. NA 6. None are proposed 7. Water Place shall receive a street sign at the intersection 8. See Landscape Plan 9. See Water Service Plan 10. See Sewer Service Plan 11. See Grading and Drainage Plan 12. NA 13. See Utilities Plan 14. See Utilities Plan 15. See Utilities Plan 16. See Utilities Plan 4.a 1. No extension of existing streets, only construction of one new road and one new parking area. 2. A 60 foot R.O.W. has been proposed over Doolittle Road for that portion which serves the proposed development. 3. 60' 4. NA w t 5. NA 6. The cul- de-sac has been sized at 100'. 7. NA 8. NA 9. NA 10. See Grading and Drainage Plan. 11. NA 12. Intersections have been designed at 90 degree angles. 13. Intersection Grades shall be less than 4 %. 14. Complies with return curve radii. 15. NA 16. The street name for the new road shall be Water Place. unit address numbers will be established upon approval by the Sheriffs office. 17. Curb, gutter and sidewalk will be added to Doolittle as shown on the Grading and Drainage Plan. 18. The walk shall be 6 feet in width as it is directly adjacent o the curb. 19. Complies. 20. Complies. 21. Complies. 22. Complies. 23. No street lights are proposed. 24. No street trees are proposed. b. All easements comply with the specified requirements. C. All lots and blocks comply with the specified requirements. d. All survey monuments shall comply with the specified requirements. e. See Engineering Report, Exhibit 6. f. See Engineering Report, Exhibit 6 and Grading and Drainage Plan. g. NA w • The review criteria for Section 7 -304 A & B can be found in Section N, D of the application. • The review criteria for 8040 Greenline have been attached herein. Should you require any additional information, please do not hesitate to contact me. Sincerely,_ Thomas G. Stevens ~ ..-, ! WATER PLACE 8040 GREENLINE REVIEW Due to the horizontal and vertical location of the Water Place property with relation to the city of Aspen, 8040 Greenline Review is required. The minimum submission requirements, while consistent with contents of other review sections, are contained within this application. The review standards are addressed below. This application requests 8040 Greenline Review approval for all deed restricted units. The project has been designed as a Specially Planned Area to take advantage of the site and minimize the impacts of development. All new roads and deed restricted units will be constructed by the Applicant. Information as to the design of these components has been included in the application. To further minimize the impact of development on this site, all units have been reduced in size to the minimum for a livable floor plan. No development shall be permitted at, above or 150 feet (150') below the 8040 greenline unless the Commission makes a determination that the proposed development complies with all requirements set forth below. 1. The parcel on which the proposed development is to be located is suitable for development considering its slope, ground stability characteristics, including mine subsidence and the possibility of mud flow, rock falls and avalanche dangers. If the parcel is found to contain hazardous or toxic soils, the applicant shall stabilize and reveqetate to soils, or, where necessary, cause them to be removed from the site to a location acceptable to the City. This application has demonstrated the development capabilities of the proposed site. All development has been proposed within the portions of the site considered suitable for development. 2. The proposed development does not have a significant adverse affect on the natural watershedi runoff, drainage, soil erosion or have consequent effects on water pollution. A grading and drainage plan and drainage report has been included in the Application to the city. Based on these plans, all on site and Off site drainage patterns will be preserved. Runoff generated by the proposed development will be contained and released at historic rates. . 1"'\ ,-. ~ 3. The proposed development does not have a significant adverse affect on the air quality in the city. The proposed use is strictly residential and will comply with all Clean Air Regulations in effect at the time of approval. It should also be noted that the proposed development is located near an existing RFTA transit route an is within close proximity to the Aspen downtown area minimizing the requirement for auto traffic. The result of this proposed development not being constructed is that those families which would purchase and live here, will be forced down valley and must commute. This will have a significant adverse affect on the air quality in the city. 4. The design and location of any development, road, or trail is compatible with the terrain on the parcel on which the proposed development is to be located. Substantial effort has been made to "fit" the roads, walks and structures to the site. As the Grading and Drainage Plan depicts, this has been accomplished as grading is minimal for the construction of the road. Structures have been individually designed to their respective sites, allowing for units to accommodate grade changes. As an example, the four-plex site contains approximately eight feet of grade change. The units accommodate this grade change by stepping into the slope rather than requiring a flat bench for siting of the unit. The result is significantly reduced impact to the site. s. Any grading will minimize, to the extent practical, disturbance to the terrain, vegetation, and natural land features. As stated above, the roads, walks and structures have been carefully designed to minimize grading. The applicant proposes to construct all deed restricted units. By doing this, the design and construction can be controlled to minimize site disturbance. The program alone lends itself to sensitive site placement, being predominately detached units rather that multi- family. The design of the specific units, as described above minimizes grading. There is little vegetation on the site in the area of proposed development. Therefore impacts to vegetation are minimal. Large vegetation such as the mature oak have been saved as a result of the location of the proposed structures. The natural land features will be preserved. Again, this is accomplished by means of sensitive architectural . ^ -, . design and placement of the structures as well as roads. 6. The placement and clustering of structures will minimize the need for roads. limit cutting and grading. maintain open space, and preserve the mountain as a scenic resource. While the deed restricted units have been clustered into relatively tight development areas. The clustered deed restricted units are adjacent to the Castle Ridge Condominiums meaning visual impact will be minimal. As explained above, the structures have been designed to utilize the grade rather than ignore it, resulting in a proposed development that will preserve the overall land forms of the subject property. 7. Building height and hulk will he minimized and the structure will he designed to hlend into the open character of the mountain. The proposed density decreases as the elevation up the site increases, providing more open space between structures. The structures are predominately single family detached, minimizing the bulk as compared to mUlti-family structures as with Castle Ridge. All structures will be a maximum of two stories. Maximum allowable building height has not been approached as the units all fall several feet short of the maximum. This has been accomplished by stepping the units into the slope and by shortening the second story wall top plates and extending the roof line. 8. SUfficient water pressure and other utilities are availahle to service the proposed development. As Section III, Proposed Development states, all utilities are available and have sufficient capacity to service the project. 9. Adequate roads are availahle to service the proposed development, and said roads can he properly maintained. As section III, Proposed Development states, the roads providing service to this development parcel have the capacity to service the proposed development.Schmueser Gordon Meyer has provided a traffic impact report contained in the application. 10. Adequate ingress and egress is availahle to the proposed development so as to ensure adequate access for fire protection and snow removal equipment. . f""', r' .~ All roads have been designed to Pitkin County standards for the quantity of units being served which will provide adequate service. 11. Any trail on the parcel designated on the Aspen Area comprehensive Plan: Parks/Recreation/Open Space/Trails Plan map is dedicated for public use. The walk along Doolittle Drive will be within a dedicated R.O.W. providing public use. This proposed development has also included additional Common Space as represented in the application. These have been dedicated to public use. ... , , (:2.)?J yp. f7VMPSTl5I1S ~"'a ~ <l , I ~ //I~/~\' ;t;+L.o" ~N O/"5.N 1't'\'lT5bl/PI..Y (M>\n;./it/NrTS . ;: , I, 'I ---F~T iiE;j".J5';YAT1~ 4T~~:.i$:..l:,..j:VATlaN .,..~"&t-I/~cYG~ e.aNC-.L..OSkl12.E._ Y6"=I'-c"--('1=' UNITIs ~N<::;~U~~IM, W/(I) 'S'/"l='. DJJMf;;;oI~) GIBSON & RENO , ARCHITECTS 21.....THYIWIAYENUe,.lU.2 :.. ASPEN. COLORADO .'fI11 SCALE: D....'...y~ "!? PROJECT: - . W,.tI;U::jQ.r'~Ct:=~lr-l6 OWNBY: DRAWING NO. PAo.IECTNO. Cl+>S . , I~L No.~u~~~~~~~~ MfJf v.:;'..J :;.~,J .1U.vV.I. I.V,," ~ _Waste .... Systems" lIIlOWNINO-FPIlIS INDUSTAIU ,..., .,-" Recycled _ 0 Western 8IOpe olColor.do ~!~~ ~~ ~~ 19~5- g~~ /k ~ ~ At ~ dl-137/ W~ ~~~~~.~ fn, ~ Wdt. /'~ ~ ~-~ ~~ ~. . )4dfJ<14-~ ~~ ~I' ~ ~ ;t; ~ /iN. J 9'rJ-(]OO_ ~I 8~ j}~ 3766 HIGHWAY 82 (81601) .. P,O. BOX 947 . GLENWOOD SPRINGS. COLORADO 81602 . (303) 945-1300 . FAX: (303) 945-1560 ~- APR~::'07'95(FRI) 14:44 WRIGHT WATER ,...,. TEL:303 480~~ _____ ,-. P. 003 DRAFI' PHASE I ENVIRONMENTAL SITE ASSESSMENr April 7, 1995 City of Aspen Property near Castle Creek Water Treatment Plant Aspen, Colorado Prepared for: Mr. Chris Caruso City Engineer City of Aspen 130 South Galena Aspen, CO 81611 Prepared by: Waste Engineering, Inc. 2430 Alcott Street Denver, Colorado 80211 (303) 433-2788 .-"'- ,.....,..,.".,.~._.~...._,..... . APR.- -07' 95 (PRI, 14:44 WRIGHT WATER ,-. TEL;303 480 5159 r-" P. 004 TABLE OF CONTENTS P~e Introduction, . . . . . . . . . . , . . . . . . . . . . . , . . . . , . . . . , , , . . . . . . . . , . . I Terms and Conditions ...............,..',...,.,..".......". 1 S. Descri ' lte ption.. .. . . . , . . . . . , . . . . . .. . .. .. . .. .. . . . . . . . . . . . .. 2 Physical Characteristics "........'..'.....'.,..,...,.,.... 2 Adjacent Properties ., . . . , " , . , . . .,. ......... ., ." , ., . . ...3 Historic Conditions . . . . . . . , . . , , . . , . , . , , , . , . . , , , . . . . , . . , . . 4 Review of Regulatory Agency Records and Environmental Databases ,.....,.'" 4 Conclusions and Recommendations ....,.......,.,................, 5 ATTACHMENTS Figure I - Location Map Figure 2 - Site Map Acronyms Photographic Log Environmental Disclosure Report -i- ."..'..~'.''''',,"".,,"'-'4'''''-'-:-- APR~ -.07' 9S (FRI) 14: 45 WRIOH1' WA'1'ER "....., TEL:303 480 5159 ,-. P. 005 INTRODUCTION This report has been written to comply with the American Society of Testing and Materials (ASTM) Phase I Site Assessment Requirements. This site assessment includes, in the following sections, a site description (which includes physical characteristics, adjacent properties, and historic site conditions) a review of regulatory agency records and environmental data bases, and conclusions and recommendations, Waste Engineering, Inc. (WEl) performed a limited site recoMaissance of accessible areas on the subject property in the field on March 29, 1995. Historic records and aerial photographs were examined in an attempt to construct the developmental history of the area, to identify historic land use and to identify potential historic environmental hazards or contaminant sources. Regional geologic and hydrologic maps were reviewed to determine depth to groundwater and direction of groundwater flow. TERMS AND CONDmONS This assessment is based on the infonnation available to WEI at the time of the investigation and provides an indication of the status of the site at that time. The opinions expressed concerning the environmental risks or migration of contaminants are speciflcally addressed in this report. The goal of the processes established by this practice is to identify recognized environmental conditions, The term "recognized environmental conditions' means the presence or likely presence of any hazardous substances or petroleum products on a property under conditions that indicate an existing release, a past release, or a material threat of a release of any hazardous substances or petroleum products into structures on the property or into the ground, groundwater, or surface water of the property. The term is not intended to include de minimis conditions that generally do not present a material risk of harm to public health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies. This process is designed such that completion of the process, as described in this report, should constitute all appropriate inquirY into the site and uses of the site to qualify for the iMocent landowner defense to Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) liability. A complete definition of the site conditions would require substantial testing and a more detailed investigation. Future conditions may change, and further investigation should be completed if contamination is suspected or if site conditions substantially change. Because of uncertainties related to subsurface conditions and the changing nature of site conditions, it is not possible for WE! to provide guarantees with this assessment. APR,J-07' 95(PRIJ 14:45 WRIGHT WATER t""'" TEL..:303 490 5159 ,-- P. 006 SITE DESCRIPTION The property investigated for this site assessment consists of a parcel of land located southwest of Aspen, Colorado (Figure 1). This tract of land is more accurately described as land situated in the NWl/4 of Section 13, Township 10 South, Range 85 West, of the 6th P.M. The site consists of several buildings associated with the water treatment plant (Figure 2), The maintenance shop is situated near the ,center of the property. The maintenance shop is used by the City of Aspen for storage of 1OO1s, machines, and vehicle maintenance. Numerous electrical transformers have been or are currently stored east of the maintenance shop (see photograph 3). According to Ron Ferguson with the City of Aspen Water Department, this site has been used for transformer storage for at least 20 years. WE! collected four surficial soil samples in the transformer storage area during our March 29 site visit. Using an in-house test kit, WE! found PCBs at concentrations greater than 50 ppb in two of four samples collected. Two above ground storaGe tanks (ASTs) were previously stored outside of the maintenance shop. According to Mr. Ferguson, these tanks were used for storage of diesel and regular Oeaded) gas from approximately 1985 to 1990. A sediment trap is situated near the east end of the transformer storage area, This area is used to collect sediment and sludge from city street - sweeping operations (see photograph 6). Physical Characteristics Aside from the buildings associated with the water treatment plant, the majority of the site remains undeveloped. Vegetation on the subject property consists primarily of scrub-oak and other native vegetation, The property has fairly steep relief throughout, which is typical of tributary canyons to the Roaring Fork River in this region, The topographic relief at the site and adjacent land is varied, with an overall slope toward Castle Creek. Surface water resulting from storm events or snow melt in the region generally flows toward Castle Creek, Groundwater at the subject site was not directly measured. USGS maps indicate that groundwater depths vary, with the shallowest groundwater nearest the Roaring Fork River. Inferred groundwater movement in the vicinity varies depending on specific topographic conditions but is inferred to be toward Castle creek, located approximately 0.5 mile east of the subject property, According to the preliminary "Geologic Map of the Aspen Quadrangle, Pitkin County, Colorado (B. Bryant, 1971), the site geology is comprised of surficial deposits which are described as "poorly sorted moraine deposits ranging from silt to boulders. In many places it has hummocky or ridge-and trough topography." -2- APR.-07'95(FRI) 14:46 WRIGHT WATER r-~ TEL;303 480 5159 r-c:- --, P. 007 According the U.S. Department of Agriculture (USDA) Soil Survey of AS!Jen-G,yosum Area. Colorado, the property is dominated by the Yeljack-Callings complex with 12 to 25 percent slopes. This unit is described as "deep and well drained, on ridgetops, benches, and mountainsides, It formed in alluvium and colluvium derived dominantly from sandstone and loss. If this unit is used for homestake development, the main limitations are a modified shrink- swell potential, low soil strength, the restricted permeability, and the depth to stones, sand and gravel. " The fiat, irrigated fields (including the grounds beneath the mobile home park) consist of the Kobar silty clay loam on 6 to 12 percent slopes. This is a deep, well drained soil on alluvial fans and terraces which formed in alluvium derived dominantly from Mancos shale. The drainages on the steeper slopes are also Kobar silty clay loams with 12 to 25 percent slopes. The steeper slopes not associated with drainages are domillated by the Dollard-Rock outcrop, shale complex, 25 to 65 percent slopes. The Dollard soil is moderately deep and well drained and formed in residuum derived dominantly from Mancos shale. The Rock outcrop consists of slightly weathered, consolidated exposures of Mancos shale. Much of the land along Highway 82 is dominated by the Uracca, moist-Mergel complex, 25 to 65 percent slopes. This unit is deep and well-drained. The Uracca soil formed in alluvium derived dominantly from mixed igneous and metamorphic material. The Mergel soil formed in glacial outwash. Adjacent Pro,perties Adjacent properties are primarily undeveloped and include the following. Castle Creek Road borders the subject property to the east. Further east, down a steep canyon, is Castle Creek which flows to the north. The land to the south of the subject property is essentially undeveloped, forested land. Similarly, most of the land to the west is undeveloped. To the northwest is the Aspen Valley Hospital facility. Immediately north of the subject property is the Castle Ridge Housing subdivision. Historic Conditions Regional and site-specific historic documentation for the subject property including USGS and Pitkin County maps, aerial photographs, historic documents from the U.S. Forest Service and Pitkin County Assessor's records were also reviewed in an effort to reconstruct the developmental history of the subject site and adjacent areas. Historic aerial photographs were reviewed at the U,S, Forest Service office in Aspen, Colorado. -3- APR:"-07' 95{PRf) 14:47 WR1GH1' WATER 1-- TEL:303 480 5159 p, 008 ,r'\ August 1990 aerial photographs showed the developments surrounding the subject property to the north and northwest were 80-90 percent completed as compared with current conditions. The water treatment plant site was similar to present conditions. July 1973 aerial photographs of the subject property and adjacent lands showed that the subject property appeared similar to present-day conditions, except that the maintenance building did not exist at this time. The current transformer storage area was cleared of vegetation, but no signs of significant equipment storage were evident from this photograph. October 1939 black and white aerial photographs of the subject property and adjacent lands showed that the subject property was basically undeveloped except for two round buildings near the current maintenance shop. There was only road on the subject property which led to the site from the south. REVIEW OF REGULATORY AGENCY RECORDS AND ENVIRONMENTAL DATABASES Our investigation included, but was not limited to, a review of the following lists prepared and maintained by environmental regulatory agencies for the area around the subject site. These lists were searched for sites up to a one-mile radius of the subject property: · Underground Storage Tank (UST) list, July, 1994 list from the Colorado Department of Labor and Employment, Oil Inspection Section, . Leaking Underground Storage Tank (LUST) list, October, 1994 list from the Colorado Department of Public Health and Environment (CDPHE), . Comprehensive Environmental Response Compensation and Liability Infonnation System (CERCLlS), October, 1994 list from the Environmental Protection Agency (EPA), · Emergency Response Notification System (ERNS) list, December, 1993 list from EPA, . Resources Conservation and Recovery Infonnation System (RCRIS) list, November, 1994, from EPA, . National Pollutant Discharge Elimination System (NPDES) April, 1994, from EPA, · National Priorities List sites, Colorado, August, 1994, from EPA, and -4- APR: ":'07' 95(FRI) 14,48 WRiGHT WATER ,~ TEL:303 480 5159 P,009 ^ · Solid Waste Sites and Facilities list, December, 1994, from CDPHE. This regulatory list review was performed by Environmental Data Resources, (EDR) Inc. The EDR report is included as an attachment. A review of the above records from the EDR Report and other sources of information revealed the following pertinent environmental records within a one-mile radius of the site, No RCRIS or CERCUS sites were identified on or near the subject property. No USTs or LUSTs were registered at or near the subject property, CONCLUSIONS AND RECOMMENDATIONS Due to the size of the property and the presence of several feet of snow during WEl's site visit, a complete site reconnaissance was not possible for this assessment. However, all "accessible" areas, including areas of development and human activities, were inspected. The primary areas of concern regarding potential contamination are; 1. The electrical transformer storage area. 2. The area near the historic AST, 3. The sediment trap and associated pond. WE! recommends that a Phase II assessment be performed to determine the extent of subsurface contamination on the subject property. WEl's recommended Phase n is described below, A combination of three methodologies described below is recommended for this Phase IT assessment, in order to fully ascertain the extent of soil contamination at the subject property. Time constraints may alter these recommendations and we would be glad to discuss these recommendations at your request. Because the firm BP-Geotech is scheduled to drill on the site on Tuesday, April 11, 1995, WE! recommends the drilling be coordinated with them on that day. Drilling a minimum of three boreholes to initially characterize subsurface contamination is suggested for Tuesday, April 11. A preliminary cost estimate for a drilling Phase IT investigation is outlined below: -5- p, 010 APR:-07' 9S(PRI) 14:48 WRIGHT WATER ",..." TEL,303 480 5159 'I""""', ----- Standard*' Travel and Expenses $1000 Preliminary Site Preparation $ 200 Drill Rig Time for 3 proposed boreholes $1500 WEI field time $3000 Laboratory Analyses $2250 (EPA methods for PCBs, BTEX, TVH and TEH) , Pbase n Dri1Iing Estimated Cost $7 ,950 Rush** $1000 $ 200 $1500 $3000 $4500 $10,200 Immediately following drilling (or on the same day if time is available), WEI would perform additional field tests to further characterize contamination on the site. This would be performed by performing a "Soil-Gas" analysis of subsurface soils. The soil-gas samplers must be buried in the ground for a minimum of seven days. The laboratory results from the Petrex samples would further define the areas of potential contamination and allow for more direct drilling of contaminated areas. Petrex samplers with analysis cost approximately $200 each. WEI recommends that a grid pattern with 15 Petrex samplers be used. The total cost for the standard Petrex analysis would accordingly be approximately $3,000, not including WEI field time. Additional field testing may be performed using the Din-house" PCB test kits described earlier. These tests cost approximately $50 each. WEI recommends that 20-25 samples be tested. Additionally, WEI would recommend sending a selected few of the "positive" soil samples to a laboratory for confirmatory analysis. Laboratory costs for PCB analysis are approximately $150 each. WEI recommends that three soil samples be sent to the laboratory for confirmatory analysis, totalling $450. ~-------------~----------~-----------------~-------------------------------------- * Standard time to complete equals 4 weeks. ** Rush time to complete equals 1.5 - 2 weeks, APR:-O" 951FRI) 14'49 WRIGHT WATER ~. TEL'303 480 5159 ,-.., P. 011 .----- - The total Phase II cost estimate is; Standard RYm Drilling and Soil Testing 7,950 10,200 6000 Petrex Analysis SOOO Field Screening for PCBs 1450 and lab analysis 1450 Interpretive Phase II report 3000 4000 TOTAL $17,400 $21,650 We would be glad to discuss these recommendations at your convenience. -7- . AP,R.~:"'07' 9S(FRI) 14:49 " WRIGHT WATER TE.L:303 480 5159 P.012 t"""'\ ,-. ACRONYMS . Above Ground Storage Tank (AST) . Benzene, Toluene, Ethylbenzene, and Xylene (BTEX) . Comprehensive Environmental Response Compensation and Liability Infonnation System (CERClJS) . Emergency Response Notification System (ERNS) . Environmental Protection Agency (EPA) . Leaking Underground Storage Tank (LUST) . National Pollutant Discharge Elimination System (NPDES) . National Priorities List (NPL) . Parts per Billion (PPb) . Polychlorinated Biphenyls (PCBs) . Resource Conservation Recovery Act (RCRA) . Total Extractable Hydrocarbons (TEH) . Total Volatile Hydrocarbons (TVH) . Underground Storage Tank (UST) . United States Geological Survey (USGS) . Waste Engineering, Inc, (WEI) ........".....:.,... .~..:,_..,~.';..-,.,...:.-."..:."".....~... . .~~'"'l;":''''...,., ',--:' ..--:----"..o.~-::.::.:~.'~.:..:,.'t.:..;,.,,;-":';r_~..-~7"...:_,'""""""""'''' .n '"',....,"'-<.\.'7':.;..'.. >'; ~_~.~. ,. '-.~'..'''' --e' ,. ~ AF:R."-07' 9S(FRI) 14:49 WRIGHT WATER TEL;303 480 5159 P. 013 .~ . WASTE ENGINEERING. INC. 2430 ALCOTT STREET DENVER. CO 80211 (303)433-2788 DRAWN CHECK DATE SCALE DSS PRA 4/95 1" = 2000. FIGURE 1 LOCATION MAP 952-034.000 A~R.~07' 95(PRf) 14:51 WRIGHT WATER . , o o TEL:303 480 5159 P. 014 ~ CASTLf RIDGE HOUSING (TRANSFORM'lTt'l ,STORAGE ARe:A/ \. --' ....----- SEOIMENT .0 PONO {;l I ,/ I HISTORIC AST LOCAll0N WEST PLANT '" 4~ NOR7H NOT TO SCALE BACKWASH PONO 2 MG. CLEARWEU. WASTE ENGINEERING, INC. 2430 ALCOTT STREET DENVER, CO 80211 (303)433-2788 ORAWN KAL CHECK PRA OATE 4/6/95 SCALE N.T.S. CITY COUNTY STATE JOB NO. I FIGURE 2 SITE MAP , CITY OF ASPEN PROPERTY ASPEN PITKIN COLORADO 952-034.000 ~;r:."':'~;. - . ". .~.:\'7;';;,"S'" "~''.:'''.',' _';, "".',..:~., C . .",,,.t- :.:-. ':i";~.:'",: ',' ".~.,.~. "C ,:~,-,,----.',".-~":"0,'C'.'''-''- '."-;-.''''C;:-:7:-.'"':':~~'''''''~''''''''':'''''''-''':'~~'-'-'~-~-'' .. " ~ . r'\ ,-. f'....\)\M~ ft" ~ " ._ ,. .l,o' MEMORANDUM TO: DISPATCH TO: WATER DEPARTMENT OMllO'JNITY D~ELO?N!ENT ~ .p ~ SPEN t'f'\~ FROM: MARK O'MEARA DATE: AUGUST 25, 1994 SUBJECT: ON-CALL COMMUNICATION PROCEDURES The purpose of this memorandum is to outline protocol for after-hours duty and emergency call- , out duty between the Communications Department (Dispatch) and the Water Department personnel. AFTER HOURS/WEEKEND ON-CALL PROCEDURE This procedure is to maintain a safe working condition after hours and on weekends for Water Department On-Call personnel. The establishment of radio contact with Dispatch shall be established upon arrival in Aspen, The accomplishment of this can be done by telephoning 920- 5310 or by radio communications on the City channel, During the Call-Out duty, Dispatch will be able to assist you through radio communications for further support if necessary. It is essential that we establish communications with Dispatch before arrival to the call-out location in case an emergency situation occurs. Upon completion of the Call-Out duty, the Call-Out personnel will again notify Dispatch to inform them of their departure, This will "close out" any support or monitoring that Dispatch is involved in. WEEKEND DUTY During the winter months, it is imperative to contact Dispatch on the City channel before going into the headgates and also when out on a trouble call. The Dispatcher on duty will check with the call-out personnel every ten minutes or as instructed by personnel as warranted by conditions" If communication with the call-out person cannot be established during "status checks", Dispatch will send a response person to that location, In case of a continued lack of communications, Dispatch will send a rescue team to that location, (See attached Headgate Map.) For your safety, please abide by these, ALARM PROCEDURES West Plant Alarm System -- This is the "old box" that remains functional from the West P?aiiCEiVEO - This alarm does reset after silencing (push button), This alarm is triggered by alarms occurriJl2. I . ' . At'!( 2 1995 :"JI~/Nt:''''R .-_. ~ .....1;: ....., ."'--~ -".~.' -". ....,--".,~~.^~...__..~_.".~._^"...-. -" - '-r~--- .~, - "+--. ---". - ,1"'\ ___. .. ,..f- in the West Plant and also from alarms occurring in the East Plant. With the initiation of this alarm the Communications Department personnel on duty will alert the ON-CALL WATER DEPARTMENT PERSON and appraise them of the alarm, East Plant Alarm System -- The Plant Line alarm is triggered when the communication line between the Water Plant and Dispatch has faulted. With the initiation of this alarm, it is the duty of Dispatch to alert the Water Department On-Call person and appraise them of the alarm, The Plant Alarm is triggered when there is an alarm condition at the East Treatment Plant. With the initiation of this alarm the Communications Department personnel on duty will alert the ON- CALL WATER DEPARTMENT PERSON and appraise them of the alarm, Chlorine Alarm -- The Chlorine Alarm goes off when the Chlorine Gas Detector senses chlorine gas in the Chlorine Building, the East Plant, or the West Plant. The detector has two alarm points--Iow and high. At Dispatch, this alarm will come with the plant alarm, The low level alarm is not to be considered an incident. The low alarm is indicated by the sounding of an audible horn at the Water Plant (an uninterrupted horn) and the adjacent red light above the horn on the west wall of the East Water Plant. The high level alarm is to be considered an incident, The high alarm is set at 10 ppm gas, The high alarm is indicated by the horn at the East Plant and by a flashing amber beacon and the sounding of a bell on the pole at the Pipeyard building, When a Chlorine alarm is initiated a police vehicle is to be dispatched to the Water Plant's lower gate to observe if the beacon is flashing and the bell is sounding on the pole at the Pipeyard building, Periodic checks 'of the beacon should be performed until the Water Department Call-Out person arrives, If a high alarm is initiated, the officer should leave the scene and report the incident to Dispatch for the initiating of a "Chlorine Incident." With the initiation of this alarm, it is the duty of Dispatch to alert the Water Department On-Call person and appraise them of the alarm. With the initiation of this alarm the Communications Department personnel on duty will alert the ON-CALL WATER DEPARTMENT PERSON and appraise them of the alarm. NOTES The alarm resets itself when the levels are below detectable limits. When the high alarm activates, it sets off the same annunciation as the low alarm AND it powers a bell and amber flashing beacon on the light pole at the Pipeyard Building. This is intended to alert any responding personnel that there is a high level of chlorine gas at the Treatment Plants, The current system is set up so that the East Plant Alarm System will go to the West Plant Alarm System. Therefore, the West Plant alarm will typically alarm after the East Plant has been in alarm state, WATER DEPARTMENT ON-CALL PERSONNEL The personnel from the Water Department who are On-Call generally rotate weekends between three people, The information pertaining to the person "On Call" will be forwarded to Dispatch on a weekly basis, usually on Monday through the CEO system. 2 " ,<:", -,",' i""'" ("""\ ...... JNhen a call for services or an emergency situation arises, it is the duty of Dispatch to call the On-Call person, and tell them there is a problem. In the event that the On-Call person cannot be reached by phone or radio communications, the pager system is to be used. It is advisable for Dispatch to continue to call the pager if there is no response within 5-10 minutes, As we all know, there are "dead spots" for radios throughout the Valley. The pagers have been successfully used to reach people as far as Denver since they are satellite activated. If there is still no response within 15 minutes, begin to call other personnel via phone and the pager system. Obviously, if it is a life threatening situation, don't wait at all to start calling other Water Department personnel. Water Department personnel will contact Dispatch by radio to notify them of their arrival in Aspen. This is to establish communications for safety reasons, They will also tell Dispatch when they are departing town, CONTACT ORDER FOR WATER DEPARTMENT PERSONNEL 1. Contact On-Call Person FIRST. See Weekly CEO to Dispatch containing name and numbers for this week's On-Call Person. 2. If no response within 15 minutes contact Water Department Personnel in the following order: NAME ~ Ballenger 'l.on Ferguson >1ark O'Meara 'hil Overeynder :harles Bailey erry Detlefsen :>hn McDermott kal Goldsborough )on Holbeck ee Ledesma obin Lamm ristin Everhart endra Baldwin HOME PHONE PAGER NUMBER DIVISION 920-1707 963- 3180 945-8199 920-7984 963-3485 963-3893 963-1895 625-0820 963-9646 963-0206 925-7546 925-8288 963-3981 928-3503 928-3578 928-3543 N/A 928-3549 928"3904 928-3503 N/A N/A N/A N/A N/A N/A Administration Treatment and Supply Treatment and Supply Treatment and Supply Distribution Distribution Distribution Distribution Administration Administration Customer Service Customer Service ater Department Cellular Phone -- 379-1527 ):ll atch.lis 3 I <3 ~-i~ :tII- Om~ O--i> fji~:tIC) -imc: ~>C/)_ ~r-o"O ~"zEB 2:!ICO >~mo ~m~~ -00 2"T1c: Q>:tI o _ m Z ..2 C) -i ,-.. -. iil .~ : . ..,'" '" 51 '" :II 1'1' '" 52.. I:I!!CD "'~CD -=aw 0", Ocn ~" o 2 CIt '" '"" '0 "'" ~.:,.. '. ........j ,~ l.-:=""J >!r.~ ~~~ ":.'0":' ;ill (l:: .~ :: ~ c CIl ftl n o Z o " :a - Z -t - Z '" 0' - a-c .;,;;.... a acc :E: !.~~. 0-' ~gta: rg ~~ ~~ "";! -. r c,8 '" s.~.>~ ~cg 5:B: r ~'t';:~;f o!l. Q ['6'~ ;! ~ ~~.;! 0;;;' 35.0> (D, z(j)Q~l!l~8' ,,0-< o. Co. ".'- 5,...!" ? 0..;;;' 30:.;;;. i2 !A~ a;;; ;:'8 Om-n""n ~'8:r '.a..::;lCll a !!.<D ~] ~ m =...oO'=~ ...~ ,:-:-8 ::::!2 "'< 0. ::;l o..-tg ~ =<1 "C III 3 0'" ;;:.~ ;:a" if' ~o... O~"2.=. _.:;Cll t5 ~. .3 is.g~e:. ... 0' 0-< ~'m_.~"C 5 8.ea' ~ S ::r... ::;.' :":1O"g -..t~S:"C ~.m :='0' Q 3... ... -,. "Sa 0;;$0..3 ~....,g...3;'::r::l. --' '2..~l\l c::;l ::llll_CC :) ~ 0 _.. ::;l tr"""'''' l!l1ll(tl'Q..3 ""000 :::!. . 0 0 Q..::;l 0 (tI is.:~ ,,- lt~'~o g:g::~. -<'n g, o 0 .., it 0 -" c 3 '" ~.8 eog--tSt3 5';;;'~ ~ E'~'5'= [!?,.,::c-Q ~ 3 ~ ,-, :T5= 0 . ~ t:;..,Z Cl c: 0 a /lice 3". gS<DCC ~~ is,...; 5i ~2 i' co 3> :.!l. ,.> 5'l! ~g.'<'~ ~ g-]: , , 0 a!~ c: . "C .....0 ." - @ s..co . -g ~~. ::loo.gftl...n::r.~ "-3-....0- ~m3 __::l;am ~ g g-g ~ . g !;.01 if;t -Cll"C_ ~ 3 ~ c8 ~ " -;;~ ";'-I~ ~ III ~, g ::r. ~~ eg- . . 0. 0 S -<". m _.0 -go, " i=o3 ~O~e...e.S'1Lo~- Q::;liD ; ~ if: ~a3 < :;:'" 50, ... :rl" Cl1 a = . 0 . -.....alm c . ....0 lD:l 0 ~ a: S' ". . '" c62 trc "0 0 = 0 .,:::1 a )>0 ;S::~ ~ S:a (i;' ~:r&-~ (i; ::!.~ s.g '" o a III - c: &. 3 . "". ... -.... " S oe)"O ,,- 0;:0 '" S 3 ,-~. -gg 3::: 0 -o!?: ':1"'-.000... c. a ~a.:a.Q =-.Q c: " 9t3 n lD C c_ u,5!.S'l%I 3'a Q..;-O ~ &......;:1"0 [2 -. . gii'a:. "" ~~~~ 2~ ... t a c 0 a-~ ~:t:r CD='=:CttO:ro'2.. "'-'" !l.g a~~ '" ~- ifi:l' >0 ~. :: 8'[ o' ::r- _::l.lll ... gm ,,",," ".".. Os.=Oc;::J"':::IO ;;; ~ 0 ~ Q..:i"~-& 8~8 Q C Q . Q =Cll 0.. 00> ~0'~.Q5'~'g ~~ "-'" "<aCllO~ .'" 0 c :r:t -l5o: N Ill-c _~ ~ '" !;-oM ::Ie 5~ 8..6':l' ::I Cll <'0 ':':3 r' g.~ s.tg.g g -< 0 ~~;~; -<~~ C _.;:Q.<D .? if ;;.R o _..,,0 ;!a. -0 '" ci:a~"8 >0 5 So =-. 01::1 ~ ;i"1ii 0> -< 3'" o ::l =f' 0 '" co. m _.Cll C '" g..;Ui ~; :raCll ~g CCI~ .0 -0....'0 ~ '" gH~ ::l' 0 " 8 .!f.'3 ~ :t m] OOlll~-:rI'D""m Z , c EI all: n~ ~~Q i'i ... 00 :F-3'"g.s - '" l!.~,1f' 0_0." . . ~ -< ;-i !!.O 0 0.;::1'" !!lQ~C;:lO 0 .a 8;;:> g'a a S'=:"'-n-. ;;."'''' 5 o"'2..! U Cll 0::1 "< e.. -" " ~ g 11 o Q I'D e.. _ ~Q ." ~.~ a.?Og. . '" 5 g o..~ a,:f- 0". g"g-::J III -l:r"cn'''O C!l -1::-"'" ..Ill it . .- ~ili c "'c~5'o~aa~ -< . ~8 e 3 ~ " ~ Ci: i.~- :foG ,,". q a3;;; :I: o.,,:""'~ ~ , ;ozS-.3. z .. ni . ' .:-"-cr",O 0_:1 in 0 !!!.rt '" ... ~~'a ~ a.o -:;:"-.c . -.! Q .....i~ ~a:5~~a =VI.....O 0_ a ;....~ =':::r"'O " I'D:! a..... 2:~ 5 c8 g:~ 0 '0> 0 '-' III ji;.....n: ~ -< 0.. . 0.'" ..Ggk . 0 , " OICQ 3 ::I 3 -, [fr~~ 0-8- z "OO'-'-go9- c 8..g. f~ '::!= = = . '" "OQ,'" ... 3 = S ~o "0 3 :::1-< -g ;"0' S ~"'8 > ~&.it! ~"E ~.:=i G a :::I ~(DQ~S'tD-c~lD 6 =r:;-":::I ~ ~cS -s:~a a..g',i ~ 11 3-g ~:!.. 0_0. ...,,< ""'-Ill 3 m ""to>. -< 03'"2.Q "if -~:I: S'&'"s'i ~a ~L~ 15 ~ g 8 ~ , '" . .s il 3 ~ ~ 0_'0 g' ~ g;._ !l. ~ '" .-: '8 - :::I III S'=-'(Q Q ~'E.Vi . - " . o -. cr .....=-.-. t~ 0 -".. ~ P . c. g: ~C:mQ<':::I~(II :::I.......I'D Q - -.., ;;:19...,,< .0- "";r a 11"'";;:1-< .. <:) \g aa M)(=-. ,:::I '"' Q.;Jlo.~O n Q..." .. '< ~"" .ll. s...:< "~;;. ;:: 8.g.g la.-4,Q . . a g (II _. -.... (II " 0.0 - c... S ~ > 0...._0' a. "O'tg . 0 :n S"'n::s. 11~Qg..80i:;; g.o:foO' " 0 ac8 VI I "00 '" (II ~ ~ c . ~'S:g.s .,- n "'t""-< o -.oil 011 = e,~ ~ g~ S a:~, ' . 0 :I: 0 3 ~~ Sg ~ 8.1< -. -::ldl c: (b'C11 , , CQ =n ~s~ ..., lll/'l :(;"5!. . 0 5'~ 8 g ". ~ 0.. -. ::!. rnQ.; '- '" l3' n 8~ . . 0 0.0 o Q =-. B ... ~ ;0::"'5 ~ ;oo5-:t- 00 .I'D :I..g co~ ~g:6'~ o.it- -< , - ~ i!~l 0..0 a Q:r 3:;-*g-~ <D._.~. I .s . . " cO (II 3.. -l ~= =.:;.~ ~. "3"" .. .0 ~, c -& ~. ..0-'_ m ::r,::l'" '-0 !!: _. ell .. .0 a 0 a Q 0, 0 '" 9...zs9-::lO 0 0 -. .. ,- 0 8..~ 5.. _n =:", ' = . 0, :!:.Q-::::I ~ ::I 0 -. CD ~ - c:g'-!!!' g ~,~ (Qa- .Q ....=-..... o~ ,,"no ;i5'05:~.fS.; -0. 0 0 ~ -,g.g &..;;;. a ::I Q s.g ~ ~-=-~ 0::1 (tl ... ... a g .. 0 5' (II o.crs'g-"':To 5 ~ -(0: -,0 5' 0..0..-3 , 5(Q J: S -'041 ::r~.-, (Il s'-o. - _.:::r, ~-c '0:- o 0 0 " ... 0 l\l Q if ~ :f> ::::: . -'::l a... 0 n'..oO~ !'l.3 3 ~::::I it ell n.;r'''< O"'Q"07 . :: 3" g , ~ ~g.00 5..;" :r (() 0Cl-t_ s..". o"l:l 00 3 00 "- rO""Ci-:J ~~ -. . . - '1-. <:'-0 . . ,-- . ,. . ' -""~~"-----'-'"--'.-".-'~ ... ... ... ... ... n ... n n g'2..i'2..3 ~ ii ii ii ii ii ii ii ii ii o..~"t1 R s'3 ~ .. .. .. 00: 00: .. .. .. ceoooc: s:5! i Q ~.g-i .. .. .. 000 .. .. oocO'_ ... 10 'l ~:~:. s:s:... s:s:s: .. Co> s: s: s: s: ~ s: s:s: s:s: s:- ij',p.. ~ ?- ..9....... a . . . . . a'S' 5'5' IA ... ... ... ... ... :::I a>S':J:_O N o' o' o' o' 0'5''0' o' o' C)' 0' o' o' 0 0 = = = 0 " :::I:::l:::l ::I 0 , 0 = , = 2 ~(Q 0 r~,Q 00 00 '"'" ............ ....,....,....,'" -..........-.......... 35.~~:r<:'Q. w 3: n lD ~:..." ;"':"'0 wi..J:"'.,.., ... :r..wi.,):""'Q o..o,:"'wt-.J:"'C' a"'Q..ltIC1lQ!!.Q.. c 4) n.... ~ S Q Q .. i 0 0 0 oo~. l?~."gf Q ~C>Z:!.1e ~ II. -"'I:J-' m < m m rn m" ... Q c: ~... ... :::: ::: , 0- = 0 .. , x Cl. "CD a Q 0 Q ID )( (1))( X)()(_ 3 ~.lr Q.::::l 0 " !. ~;;;'O (Q -.- ci:g3'a a ::: ... ::J 3 .. :f .:(''0'''0 '00 c:::l-'Sno_ Q. Q .. 0 _0= g ~~ 0" =3 a-.ffff~ ~(Q Eo: 03 c :r: 0 <' ~ o'g g 1Il 0" 36 a 0 ~.O 0 0 :::l _._._._.< Q ~ S~ ~::7'" ~ ? :- ID ~ ;:r s: ~ a 8 g..c: g: .,. ~;~~~~llt <' s:;; .. ~ir32: "0 NO 0 ? ID 11 0 5 0''' II iD :::I ... ... ... jIO .. ~a::7"'~...-n~ ." 0 a ID ~ 3 a a::J 3 l%l 3'a-~~~~ J> 0 g c: a = ~So~.. a 0 0 (Q Q a 0 Q...o..o ... g . .. 0 a g'"2. 0 Cl. :::r-<._ 0 E .:. 5 ~a g ~.;::~;::~ ... ... s -.... Q.. :JlJ 0 . ;- cotl.. " ~ 1'\ a: II> = o Q..... !loS, a 0 l:I 5 " :r 0 ~.fD is.: 0 c: n".. ~. otl :::1"0 Q CI :::I~Q..a 6'"0:;; -< 0 ~ 0 :I. ~ 0 9..:1. . ~ ~ =.!!- it 0'< , ;r'~~i"g3 0 w ~~ .. n .a =r~!?.~::J~3 '" a !!. . . !!. e. g'" ~ &It ::J -. 0 c z ~<'S :I. 0 o ' = ~o<i:r 0 ..2. ~ otlCl)_...::lac il. !!. 0 3 lit II> "a = 9;5'; M )( :r Q.. c: ... CD '" . '" 0 = Q. =: .. 0 Cl. g [S!. !..~.~~,~~ ::rOeD_.3a.... 2. :=.:r.n g :- l:' ii~ = a g ..~ Ir a5'~ "S'3 3 'S.O""n ci' "- ~6 II. " n -0'0 1!.~2.6,g: ~ = .9 0 6'3 aD 0 , = o ::l -:::I - I .. ;; ID :'.~-~:rg <<6..l%l ~::I:3;::. '" ~ <: -0 II =- a 0 ~3 a ~ . ;::I' a 0'" 0-' "Or)cr~s-oa.. .. it 0 ;- :2.8 .,. (Q~QQNg N oQ 05 0 ~ ~ c: n ,.,. -. M _0 00:-3-0-" '" ,,0 ;- ~ it :!. Q c: .. 0 5--<<6 - ;" a if "0 -n('f'0"'a.8 co . , 0' e... -.. ~ 3 Ctl;reo 11) Ctl _,- , :;::~ :I. ID ~ Ii' ~ ~e5l' S ~O","'~8. N ~ 0, !!. c: .. 0'" N ~~ .. ~ iD ~ ~aa.S a. =,,,,g.a"5 om so ;:i" .. 0 i ~<if,<c_;:: ~~ c: a ~... a. " 0 .,. E 8 m... cr'< :::r"m .? 9 .,. -,-~;:... .. c: '" n _.:::r 0'" 00 a c: it ~ ::r... 0 c...S''''< nO .. lIt:l::l~' 3'-' ~ " ::. .s;g.n,*"l-a ~ " ~ .,. '" ID iD "2,] ~ '< 0-< Q \' c6' c: ...)t~ a~ oQ a ~ ::l io g S::;o ~ 0 '" ; Q ... n...... 3. :To g Q..9-; :I. !%l-lCD~::ln.s. !!. ., fO~ ~ s S' .. n Xc 0"':::1 0 c~a..=a.- = ~ m ire Cl. Z 8c~ a*,= !:!.~ ~ is a r ~ -, ~1II => " 0 " c ~ c n "'" ~8&. ... ;:;::: 5" .Q.'o'- ::7::!:r. ~ 0.." 0..,.." CD _.c ... (C -. :" ::rg- ~g- > '<0 8-"" ~..: o 0 ~ -'" o " ~ . 1.13 . 8 ~~ ~s- 0_ ~g' =.0 g-< Q.,~ o 0 ~ a ~., o 0 :-,Q ~ ~ "-,,, c ," 0..", 00 " :J. 3 0 9..0- ~iD 3"00 Q.-l3 ill C o=c :To Q -'::! ::r::!',CD _... a~ CD:::I -. CD == Q _ CQ CD :::!'Q S.:ro=-c!:!.... ... ~. ~~ o~'" 0- a a.. 0 3 a. -::s no... _.:::1"" c ... _.!:!..~IO 3> ::3-<0a:;:ll:IC CD CO" -.0 .. aa.;~a~:r ~=:::I2.a.=.2 _nO-'_O"". o 0 - 0 ::r":::I .. _::J 'g'a <;;'>":< =,c-oacc 9.CD~:::IS.:r> CD 0 :::I Q.::ro ... o g:' c-Q.. ~ :::!. a; :::I !:!.'< ~ _=10'-< i" 0..:::1 10 -....... -.... ;r'&.3<5S'~a; 0.. _~ CD !L... 0.. CDoCQ3a.~o a3~~CD_::;:'_. - OCQ CD....:::I a r'l'< 0) < 0 G') !::~a; B.~a-5. o>"-oO)o_c- ='>0:"-0)0) o -l:::l S' Q ... :::I ~c-~CQ(Q ~ ~("J~;:.a~_ :r-=~'" (I) ~..Q =f" ~Oo~fo'og ;"0_':::1 O"'CQ -0' C:::I _lQ ... ::r- , n -. -._ :" .... c-< a So 0.. ~o..o -CD 0.. ~&.&..6g.g W_. N... 0:::1 Gl" ~ U5'c $-(OQ.:::IC- . i"O n 9. o' ("Jo5g &.~ ~8;9-:o~. ~~:::I 5.:q0) ~ ~ ~ 'il: g. m"'C c- :- ,,00 ~ ~ ~ (I) -'Q 3 - ~ 3 ~ 0 :0 B-."'2..D.::I ~ o03moQ. ::l 3 (Q .. o..CDtllCD::s ~ ::s... 0 .. o ittg"t) n ....0..::1 (I) :r.9'".Q e.g tll.... _.;:;1 O:r: g a cnUl......C ~~g So&. .-.... Q 2-0 Ctl ::J U. -......m"( CD CD m 3 IUI Q"3<C CD" .., (D s....,lD 3~s.cg3 o (D C)"::I_ ;a~a.Qn S'.., 'i35'.!!!, O'~ '<)5,:- 3"8 (')tll)- Q ::I """3.:::l _...;:ll:I, _ o' CD ..... -l (') :::l 0 -.o::rcn o 3o(D ;:;;. :::l Q.:...OO nE...p.,,)(I)::J cnoo:r:o . :::l :a>ca :r:5 :r: g G)_a _. ~ gn:l i g:;-- a.Q !D .B g '0 C"'" (1):;'<0 g: CD C' 0 >:t-~B- -CO(D_ ,,- 0 (D 0 On ::I::J"Oo ~n~3. ",o~ ~(') C- 5.2- o ~ 0 " ~ 0.. S !l...8 ClOtll c...'O o! a 5 3 5.?~ 6 ~ ~,5.f: o:::l"O..ca::JOo.."Oo -~3t:::>mQ5c..3= 0- G) -iii! ' -.(D.. CD "O::s ~-< 3!!..il:::l Q o..o;W S'~Q.::3 ~S5g;;;2.ooo_- o o..c:::::;-o CD 5..'" ;:.= ::l C i:C_0-C 0.. S' CD a Q iil O:::l ~ c-D..co = 3 ... O""o..Gi '" It) =i')( 0 S' n It) !2. _ g o..lll: it::l o 0 a; It) !!..:::l lll: _::J - it'~33.g!!..08;-l c..CDO-'::rO::l::J~2: o -.~ ; 0 ::s Q Q CD ... :I 2.o.._::l 0..3 n'" 3 0..['0 i~.8 s',;o 8 3 at:;03 c c 9.;.0-< :::l c c...CD 3'6'0) :r_'" =-, "'" ~ 0""3 D..:ro ;:. 0"'_5-CDCfl'OQ"OCD CD :I 0) Q "'" :::l ... N "'" .., a..."'Q"~-'t'~~CD -'O::s"_a...o a.... III 3 -03 0.. a 8..:;: g 0 :::l 0 o G) ..." It) C-< "'no"'O..,O"'''o &'0.., ,r=:r-'" 32.0' o :; 8..;- ~o -g 9. ~ ..... ....,l'" _." CD 3 ::; ~ =-.g- S'" :::l a ;"0 crcr!:!..N ooon;:ri-...o~ "O-Slt'On!'>'c...a... ... ~::l C s':rcn:J:~ 0 .gr.=tG;;lQCD:;,o=5 CD CD !!,.. " ~.no ~ 0 3 ... n - 0 n lIl:ro 3 o8.("J"tJ !:!..~< III - o ;:'ag~oClp:!:!..~. 5 s'a; coo 3 ~;:.!:!.. CD lQ 0 3 .., ::s It) nit)'" :" O_S'(')O;:'O:::~ :::lg"0:r::;:'0:::lll'0 a.._;-m~ ~Qg.3 co N c...3:~ _!l' " ~g!L;;;:SOo)>~ ;;'0)0 m:::l trR i'"o 3~2:(')ii~~Q:l ~3.cS-=!l;~-'I~i -::':'0 ':;:..a.. 0 s.. CD'S" s.. 9 :z: m III ... m ; III ~ 8.~ ,.. S'= ~ i 0-0 , 0 0.., ::;:0.. irs' a'" .0- ~ c "-' 2 ~. ~o.: 5'g: ~- "'tl :i" , < ~2.. ~:~. ..'" 50~ ;:Jib 07 2;8 i5'Q. ::I <' c . , n 0..,,- R ~ g 8' !l!.,pi" ~a ~.~ o 5' :;:'0" . c 5'~ !2.0 o..c . , , - <" a~.:t-a-iii is' a s.~"J:I --CD CD r"",. --<' a ., ~::.J:I ~ .......0..0-. CD"'JfI - ,'-0 S'-3"':a- ' = n ::I a On - ':e:e" =E 0 :e <0 mEr _ 3 .... ~~~fs.s.[s.~a~aa~.l~ "-'o"'tlOCDm"mx~c::lCD~3Jf1 o ., 0.." ., ... "'"tI . '" CTn '" CD s.~. 0 S'.!o 3.ij 3o<g .,m 2 n ~ :I ~ ~ ~fO,~ ~~~ S' 3=. g g.~a ~ "'!: -oaaa0""5'CT=~=an;LJfI ~ ~ ~ iir ~ CD <0 Gl' S' g S' g 0- O"! c - 0 3' CD _::I '" '" CO ",. c- _..... "tI =t"3 0" ::;::CD CD -". 0--.,,< _.... ~~...,~~.:s8.. g-~. g-:r~&; [~.ig :!.~'[L a i;i:'1\) '" . :;"'CD2..m_._ 2:;CD~<o~ :I 8 ~o :i"t5 ~ "So 3 .g S'~ iA 00.1\)::13-0 Ca"tlCcoa ., -, it.:<: -, 0 0 ., - -: -0""::1 ~gm~g,.,o Lg.8io~ ::I::e 0-::;:9. Z" 0.. 0 9...2::t)~0 0- ::o:"'tl n S' ;:'1)" ::.. '" CD ;; n ., CD;::rlDa<oCD_' m"c aL ~'::e 5.::Io.,:!. a1: c ~::Ic g.a~g-=~t5 575.f38 g ;-~a05'8a <00"'00.0 :T3 &..:g 6:0..3. S K!L::" ~ aa =lDoa =:r-88~'-' =-< CD ='-5' a::l "'I _.,~ - CT 0.._.. m -,-'-<,S.CD =t"m a:i"=-.., I=S<.=a m -<II)"'/CO_<C-.<'< "tI3 aO~i) '""ao_o ag ~~iil-c ~o..3f~] 0.. CD :;::=.l': "'I "< ~.-< '" CD" ~ 0" n <0 ~ n m g ~Gl :. ;;~. iii' Q ~ g!!!, 0 Q= ;; _n = _ "'=--I\)"tI -~ - mg_ox= ::r , r="tl- ~ ",mo~ ;; m a ~'a =~5' '< , ~ ~ ~""'iii'" ";"i/'( =~-~~~"'~-~=CD~=~~~~~O~:~ - -. ~ 00 = ["] iil .,....a 0...0 S. ~ 0 5' ....... ~ S. ;::r.,. ::r::l_ .Q r"lj'\ C:~",II) =<0 :rmCDlD CD !!'o~ ~ ~O O'a:"'iii.:!~n ~ Q1CD a::e "':, 00- '" iil ... "'3 0 ~c Q 2...0'0 it: ... ::rc :::I Ci~56-o~;;33~;;"a r-0330~n'a--~ :.:.- II) c 0 l'\ CD -.", - '" ..... "tI '"" ::rn, 00' l5:::J 0 0:1 "'_0.:[= no--ii)"Cl::e iii'CD;;:'. ~nc~o-..n030..:t;;:;S"tl.=0"<>"'7::;:l'\0~ =::r 3 nCD:s o.::ro'""o::l:.:r::r_ .:[=.m CD _:r 0 ---o"tl '"l"l--o::e e-:::!:: o g ~a f>2...g: 0'3 Zo g g-iii""-o.:D '<00 3 ~o3 __~:S:s ':'0...,3'""-3 0-<,"" ;;m_n.o- eCD~Q~ClO_CD~O. a:SS'~ag~ac3 ~,.:s;!l g s:6"'i&..,-a."'I:J3. ~a ~ Sa Q -;;.g.. ~grLCDg~3L~,",,2...o~~m~-&..a~F c C:+ ::l _.....0. ~.8 0 =0 0 ___.::t c 3 = -. '"" o' 0 c - 0 ib 0' - c ';' 0 :s co ~ 0 -rJ _. 3 ..a ~CD "'30~",""~-''''O-CDC30o,, OC 5'::r:tOCTo:::!::iS'_aCi)2..::e~c 3"''00-0.: ~~~0~3~iii""~=0~::;:::r~go~::I~~'" 0~0::J033a3~~a~~0'~Ci)~0-~~~ ~0-::I2=~0<0a.a-::;:"'GlOCl) ,ClS::e' Cl a~~"tI :rCT~~ CD'" ifcr8 9o:~E"tI~; =::n<g "'~.CI)oCl)ClCl)L~''''''''35..= ca::r~::rco= g~a~~~ECT}""'c~3g~Q~~~Qf~~ 0- 0 0 .... ii' - c "< a 0 , ::r~ S'c = 0 ......:s CD" !l ~ a &..a ~O'a CD _. 0-...... o-fO ~ 1: ;:,O-O'S'<,'" g>~.....o III 0 !?r~~ 0 g ~~ ~n 5. Cl :I ., C CD ::e 0.:" ....."tI E 3. III g 2'""; :I 0 2, 3 0 ~ ~;:.~ g.-cr~Cl 8..>~5.0 2.3 ~...... s'tS 3 ~ CD ~Cl 0 o.:n" ::rl<o.)trO'S O-&..S 3ce ":'~':s 3 0 2... :s Cl Q.. 0 c 3 ::r 0.,,< ... - '" - 0 2'"" CD 0 0 0- cr C;::I0...::I;0~' GlZ'o'~;~f~g~:sCD~O- _S.mg==CD>C~:S_...ao :lO-O-"-'CT -a] o..-~ '" S!a:::ra g..5."tIE"<"tI~:I ~.g,,< i:s::;l::lO......cOCD!!l;"O(jJCDC"oO a.. a:,o '" 3 0-_"'1 _['c 1<0.)_. ... '" ;;.a:o _0 5'1-0 n m '" ::r (")::r a:(Q ""ol:S ;:'m 0 Cl '" :;- CD ::J iir 0 ~"tI CD :s 0 m ..... a _.::r~ 0' Q :t"O r" 0 5' 0... = ~ a..:<: = Q :s "tl ~ Cl 0 :::;." Q ... ::J a "C S' i'"~, 'Q /!I '" S' ~ -3" :>3-< -.n3 0 -~>!Lc 0 2..::1 ~..,c a Q.g 2:i 0 n :. g.. 9.. ~ ~ 0 ~ a...:3 :s S S 3.8 0 :s :s m :::oc - 0 3 0 O' CD ~ -0-' Cil -."tI Q..::r 0 5(' c ~ n "< ., m ~ :: "tl -::I ., 0 = ... 0 0 _ _. :j' ::; CD - Cl (") -. 0 0 ~ ':""" :::!:: 2'"":::1 S'co 0 ..a .. _::I CD m 3 ~ ~_ e...!!!.:::: ~ 0 ~ 0 < "C g- c ::r '" ~ '" .... -. ..... r < -. -. am..... 0 0 n CD Cl 0 0'<0 ~ 0::1, Cl O""~ ,_ <__ 0 _..... ::r e~~Z;ioi'"g = S.~~5 g~~f iii' 0 m ... 0" - (D C 3. <0 '7' '" g-e.~..a'o ... CD >:= ... tt-<~5't:E o a CD 8..R a :s = 5?..0 CD ~ " :::;- 0'" < '" ~ e..~'8.g~ s2i g 3 g ~ n"C 0..0 n :r- ~.~ ;:. ~ g ~ ~ClCDn~cr n.~.~~ a: 2..;;.3~a :J 5 g 3 5' ij'I ; 30g.n::lo.. III .., i"'; 0- 0 a:, 0 < S 5-::1 Cl '" Q Cl:tC ~.~"& ;:'-ca :t)"'tl .;" Cl i"m as "'~'m~ -''''.Cl ., >: -. gU5'O'a~~ , ::J"':S 0 0 ~~ Q ~.:, g '" ::I Cl 0 ~ 5'~ =3 o CQ 2, 3 CD cr::e o'?-,::%:! ao= 0 -,-~ ::t3 :. ~ "tl 0 3 a '" ~ ~ 0 _."tl .!!!. Cl cr ::Iocr~iD 8..,,<-<..., 3 -gq~s. 9..2. '8s. ~ ::I :r-::!".CD o' S'~cij ~ iA -3 0 ~:s ~ Cl :s 0 0 --CD"< :s ~. ij~ 8.0 CD o..__.::t ~ '" 0 ::J CD i).!!!. 0 3 ~0'E. -5 ~.a-5 5~ 0" g- o ~ira ~ ; :; .!!!.< ;<:e:S"< -a < s.s ~.~~ a.~i" ~::="<sQ~Ci) 3 0 g-:e - a.. 0 '" n Q:s- ..."tI ~.::rSiDO'~:r~ c Cl ., < 0 CD _. r3?--0~~::r~ 0..0 a.i~~ 3 -..., '" . CD 0 0 .C'~g3_,.. Q.:L 0 -0 ::r......, 8.::rs"<~ago' ~ Cl g Cl CD... ii" 0", -m::;::n 3.0 ~~ i-<a.~s.; "< 8 ::e"tl -'.., m ;It"" :::-o..Q Cl ~ ~5'6 30 ..iDa.~ 0 ii"=E i:.::::"tI rg ;~:s - lit., 0 :s ~-5 cr~., ;;;--5 ~ '" == !.tD on -. 0 a.. :::;."o...:II:S- :II:S... Clc(Q::;ao:;o c... c = ... 0..._ '" .!!!.:i'''' (Q ~2i 8 0 c6(Q10'o:ll3'3 ;:..gO"~cgS_a 41"_' 3.002 oiifo-t_-o_ -'03:roo::o ~ 0-<; Cl:' '" 0 2- c 0 Ci) ::r" :II .., ~?~crCl~cg5' !<,,;3_::efO ;;:- Oo"So :S,;:;:O "," ... ::;: ~ ;:.:s-;:: 5; g 8 ;;. 0' CD ~O" o :'..-~:-~:'3 ; if l'\CD -of c:: 0 (Q 0.. .. 0 -< i"~ Q:. Cl 5' 0..; :T"< =-: -. C' <003003,.:;rQ. -=c-... 0::,;, :r-o '" ~ Cl (D" ::!". Cl -_0 _", CD m :e .., O'"_~"'O 3 ~'" ....0 8 Cl ~ m 0 _ :::;" - iD!l ,~a.3 ih" , 0 ' gJ5E iDg~~ a'~,,'" ~ - .. -. -l C :II 0 n 0 < ,,-, o C'" C CD <m",,,, 1Il CD '" ~ o..::;::"tICD. g K8.3 0..-'0 - < -~ "C ~CD 0' 0 !.;:.o ~ o CD 3 _ 3 ;.~", 0 lt2i ~~: :;.] 0 3 o ~Q:~' 30<0' _ a;. :r :s .., 0 CD ; e..cg 0 ... 3 ::J 3 ~$.~;;;- g 2,60 a ::e 0..0"" 0 ="'0- -3 a-2i a.s; 5."tJ g'-fQ ~ OCTO '" -ID<o Cl ~Gl :s m ~ 6 ~..~.g ;[g~' g cro..:::- ; ... :s 0 :s_CD3 - ,,-c _CD :::;--0 :r-",oO CD" ::,;,0 S'~ t!,iii'" n _.~O a:~ - mn is , _0 ,.. [: ~-6 g < UJ 8..g ~t ~.~~ a.O C~ So s,jID 5'o..o'~ n <.8 5:r-0 .g E.;:;-~ ! ~]g30jID non 0 ga~;,. _~ ::1_ ... 0 . 0 ~"tI ....._ ~. "C :r< C ... -, c !.g :.] Q :!.~ .., a..0 :r-... S.iD ~..!.. S g..-g 8 _me; a:l ., a.. 3 no.!! _ o !t 5.0 :s 0 03 g~::. 0 ;:'~i] g ~ c 0 S"g:; 0- ~'~a.;; Cl ;It"""'O 0 '" =.., 3 0.03 c o.."Co rt "C ~ cr ~ ~" i"' '" ;; a 0 -:11-" O::lB,t"l ;:'L,;::-2 CD' Cl 0 ~ :o..~. o 0'0 CD -g '.2:-= , ,.c a ~ 5. !l. !:- 9' '" =-.......=0 .l': La ::.z 3 _.c '" ... c:ll ='~::a g..g g Cl 0 g-~,:r~ P" -g &..:; ~ 5..s:fa '" 0-=-.3 2 5 tS 3 - - 0 :;:.ao= m lit ~o 3 !D ; &.. $.~~a 60 g.g: o..ib~ ~ o .., _.0 -3 lIt_ o 0 2":-<' :g"<il3 ifg"3g, a-.~o O';5~ " ir'" -. n ::0 ~'~.~ ~,~= ::;I ::r; g:~"~ g:;o 5' <5 iil_cg ~3 iOi' i g ~ -."< C .~ ao On<o s:o~ ~ :.:-"' o~ 3 . . Q5E~fl m--3::e ~ ~, !. :r ~ ;;:~e...}~ Q rn.:: '" _'" {):s-::r< ~ . 0 g g CD 8 a:s' ~ :s O'"!:!:o O'"Cl ~ ~ ~ ~:'g: g c...if~' - e 0..0 B.~8.:: ltg ij'i" -o:llQ as.o~ ca6S ~ ::r-:::!.m .. -o:to i~'e.8 CD Cl m = 3 ... ~ CD ;; 0 0 ., C::l- rgrt~;:' :s !D ; CD .Q " lit ~ .., g g a o Cl '" 0 is >: "E.~ o Q ="tI ~ 3 :,= 4l" :II :- iDJD~ tQ fa ~8 :r-"tl C c 00'" g ~~ ~ =niD_ ~ ~ ';' ;:. era-a: m _ n ... ~. i~8 , .- :!! la WI J> Z CI ... "CI ;::: ,.. n o ~ la o ,.. 8 ""'II C ;!' C st-O"lJ R~~~il$nc giHl[~H Ii 3 -'. $ ~~' 0 a 5'~ R $ a.;:' a.~ - ~ "5'''0 $ "0 0 ~ o ~ ~5 ~ 0 aa <' -~ cil 0 0 H: 0 $ h.g ~,a" ;:,g 3 ~ <., Q"'N l:D ::ro' o 3 5'~ ~ g a 5'::1 ;':::L.~4S(:lCD!lwN is,,< ",&a,O lr~g ,_Q 0: -;I,iD'~ CD CD -=3$"'~=0 ~ :rr;l'-a-~ ~ O~!, ~ ~R a 3 h.~,n~:ga , ~-"'ifo.Q$Q '!~-~83''' <' . 1t8 -$ a. s.~.rno ~ a-~J o 3''''~ $-- " s,"'aQ..:! i"& t ~ ~~Fg-~.;> 'ii .'.,... or5' ~ 3'1 a.::r-t~= = Gl .0 irQ3 ~'1l3' "0 ~:ia~ 8..a...~. a:r":;':S'"~~~&. ~"'O~=-'g,&.~ ~g.ni!a~~l ~ 0 ~-~ 1I'-g ~~5'~,~~h' ""~ ~ ~'", a.8 CD 0 No -. 'Q..:::s :;.....0!l:J :::s ::;'::'l , ~i 0' ~ a.Jl: ~ B 8 "," B a'5,a iD ::';'0..0 :Loa :J :r :::s N CD:1"<:3" CD s'It.l!:!;!.S' <: (Q ., 0 -. CD 0 ~ 3' <~'" ill ~~ 5! :;'S' -g 3-g~.a- :l ~,~ i-f2: 3.3 =-'$ 90 .8 ItF~ 3'-~ o 0 ~'.]~' ~'g-l!:& " '" 8..~ CD;,! iii' i5""" ?-!":t;o al!l""",,~iS ~" ~i'Q"''j" a.~ 3 a.ca Wi' -on _,.' h8ir~f R:::.Ra~ a~ifa-~ ',_,_0 ~3': H:g~'.il' "Q8Q"O 0'" ~,!l.,a _-0<8 g'- l'\,l'\:"a.}, ~~--'G) ~ ~ iB-Q g,.o'H, ::I ::1.2:0'::1 ...~(D a.. -Q"O f-' milO.S- n'ji,S~ =.sI-'" h!:[i """'Q ~o g..$R __'$ ora.. CD ~ 0 CD l!:l!:~"'8.. n'Cll ~ c... Q 3.:>.q '" _~g;->.o ~ 8.5 3'3 < -",.- ~o'~ Q g- ~a\O:a...... ~ 0 co c :r 2 ". ~~irota:<r-6 ~ ~." 3 QQ......~"m:r Cl g'"... --.<:f. _.CD n lD CD'" :r-~"D =:9..~'o3 )(Q'"Om(Dn('l~-- -g a.o 0 ~ 0 :: 02 ~a ... c: it 0 -- :r'" (C - ~"'!l~.!~5'-Q"a <D3<'cC:~(Q=.::Io~ Co <DQ'ii'::I 3'" a.. i-~~S.3 2.acg,!; :;t-':;"(Q~a..'<::::IC:=' ... ~..", n-(D~ ~-6'- o. 0 ::r:r~. 00 :I II' n ;;;-Ul ace ....~Cll m'C05lGi:S41 :;:In ::Lo ,,' &..~:;:J-_ :::':'::1 !ro D"". oO.ll"Q -. 0 0- m CQ - .. e _ ... CD = 00 :r ~Q ....~::l _.< c: _ cr...::Jon.,o::Jo:;':l '<'" Q -m :;;='=dlCG _c"'[X4l0Ctlt ;; ~<'ij:.~i f-g g 3c~<D<D=.noO.a. Q~-":i"-<Di" ~1'II ::l came - 0 .... ~ " "0 n... 0 ~... !4-- eo 0.3<:1 a c::5. !1-_ 00_....." ~ g. a ~-g":,,: ltg-a !t <' o' tit .. a !. D"" <- . <D::J 0 '"Oi a-:< !,.::I 5-' ~2. g..<D ~.g:" -Z$.Oo..", =':o<~=o-Q..Q cS 0 !..~'c8 e:i :;:.i' ii' ~ > en E."<'] a ; .. ..."0 C ::I" ::J c: 41 !=.a=!e.~g"tCo _.__" :r3 1I):r_ ..~.O$ ;::;"- Q _.~ _0 <D . 0:: a =0'0:'"' E. :r'" "tl ::I It) """'-,~ 0'.0;" ~ma..~::I~ :r.2.oo~c-...ce<D lD~::I~3,<,:<QO c .... Q..::I n"tl::l_ -..c: r- ":r ltl c.." o o1i'g i"s. 0 ' .. <:: c:. ... -. 0 =r~ 2..i3" ~ 0-' 3 . "'::l-:<!! 0'8 ~ lL.~ !:~'R "" o i'~~fCD ~ r6i~8'iJ O;:SlD ltl - 05 ! ,:"",ST It) iil jIlj' , . ~~ - Q Gl(l)...15" 0- ~,,-=<~ $ a.::l-- III ~ <5 ;reo a W.. :;-:;-~!; 3 -'CIa a 3 (D 0.m33-'3 a.8r$[~ ~ il ril. 0 &"~ t~roil !g.~ 0 ::I 0 S:Cll ~ a-t:! ."Om~o~o 8 "~~[!! ,8..g.,o 3 ""JO ~ & 3 'It'll a <: . ltl ::I":""'a Q.~.~ a..2.~ e ~ B..! 8..3'8..~ ~''''O' lT4I -c:i CD.. '" ~ ~$ 8'" '" :r:r~~ 35--0 . 8 -~ 3 ;1'3 ] j:8 _. ".!; ia.~ ~8..~~ o.".(;\lto. -is'O 0 if,il ~ ~ 0 5'&._ ~ i ' ! i,i enO" 13 ;tQ tri!B'~~ %'~ $sn: ~ ,'R 8'-8 a aU-~ . -" A ~~ rUll~, 8..g i~-g g ~r i e.. ~ ~ ~'Qo a,'a \,,0 ~'" 0']3 Q] e ,r~1i ~,~ !i~.il1n ~ ~t!2 ,g-g,~'g-~ ~~ lr 5&"g..;;'o~0~l!;~~iS It,,,-&.e..o '~ooO o~~.~::L~'="" 0.. ell. ::l!~.-ltlc8a;;r~~ 8..~ 3'~'U ~ ~,g8..'ll~' 8' 0 8..~,~Q 30rB ~ lffD CD CD <:: 5.:rQ..c::I:c::;J 3 a !l;:::g;l!!j"::!l.~ _"&,,"'0].' 08..~ '" Q ~"OW~" ~ O'~ g,'g a ~'>!n~ iD&. "dl fa b~~ i'~ ~3 ~::'~~.o 3l!:~fSl~ $ ~ "'!;!.<il i5'",~ 0 ~ &. ~ 2:0 ~'E"O 41::1 0 -in U cs ~::::I 'f"o Q a.!!.. ~~;~3~a. 108 ~~a~~n~~oE ~~oo~~~f~~ eQ::I~~~O::l~ ~F"'~'3l?8 ['::,.g ll"'.!< R"tg m '1'8 a& ~ ~Q_~.~ g.'ir !'l~ i &. ~~'! ~~~3 it a: za':;J B:~ ~rr-.5.~ e.g..,g,... ~8~ 5 E~a oi5"<,~Q ~ ~ . ~g:.;; , ~ . B 3 .-0' 6'0 a. ~-':r~lf.a8aH' .~'~~~l!::g~ dih,ru.i'lI-~l hn'~~8~:g a.a'l! ai;fa..~:rO-;ia~ ::I!," ~3 ;:;;:'-..-a a- a::l--g ".~.i!,It~ t.'.s" B:>~;;,~;r~.a- o' "'..~-''< 3B'0 "," .~~.;:: g,&~ ltif1>.;'8 &.-8 !;!.~B:~'H" if..:.. 5' crUS cr::s g ii'", f=-t~ g~ CQ.? ~a:!i3-= o . a 3 t.0 '" !l,3 0 0 ! .!l.o il..'1l1'1 a.8 ;.8-g..g ;rb _"0 "''' ~g-~o ~ ~ CD is! ?i' CD .ot;r~a 0 g, 0...... g-i5"-o o-l il!:ll"Q ~iS o. ~ 3 o' ~,'&.~.a ~~'ll g U~ s f. ~ H!?;:a ~ ~ 8 ~~1l ~ ag- ~Q-..~8holtH af33'~g,o~cg S!"'Q-<o'::J::I",AQ.../1. ca;;:!"'Ciiii.o....:r... !l.~8..a.ilg,8'Df3[0 oa~~e"1Sll~' h~~"'P r ao &.~~ ~~ U!l:ng-~ ~~oit:;"'ll!!,n.li. "'!;!.'ll~,f~~&" " Q..... _at Q..l!!.i '0-'" m iiI ltl 0 .. :::!.:::s Q..:::::!.~,~ Q..] 'i!'l'o"- ::L~' -Vi .. "":3 o~' ~~,t~~ 9.. 0 ~.a a i g.rt~~8 Q 5-.8.. a!~~~::::I ~~8 ~~cZra ~e"8go ~~ ~.~. ~ ~ i"8"~ g<B ~a",B'9:g-a ~ 'S.7ri e.a lS a :;:J r ~ f B..<E iji' ~ , 30 0.... ",0 ~ ~ ltl- .. o~ ~ Q 3 tD~:€ Cl)S'c" "'0 0 ~.-::;..13:r" 0 "...ce<<l:r;"c"_ Q~QO--<-Q- a~g-"iQ~a~ c"cnlll..=o...c< !'" ~ S' 2...8 0..: ... lD o :l -. c: J:"'C " " :i' - a..g ::;'ltl.:(o "\ 3~~"'Gle..~::s.~ ong"g;~=:g". a.~13o..:.>-iDS ~ 'Q''oQm...Q..o..QlD .::<IT....;-3ot''l "0 _". 0 -'-'0 CII 41 41 ..,,~ .. 2.::1 ::l _ ""...:l'O(Q"''''(O''' _ (')5--at~a:rQi'" ::~~.Q~.=-,8 ?:.~ a...~'?:oag~.:;, :I o ~~Gl 0 S'~ 0 Q 41 ... 0--0 -< 0 ~- ... 0"- 0 "0 ~ *,<':1 g"C"aas' at. _" ';t" CD _ .. c:"'O a. :l241Ulo@a......a. ltl:;."2'-0g..0<<l"'~ lD -'n o:;:J a ... lD ::Gia.a.::IS,,5iQ :r"nQ-6:€,,41,.. ltl~Qa.:I::,:g~!: 0.... ~__.:ro_:I "'c c:N:nwcQ'fG :t..cc 'lQ8..o....~)I >~ 0 n_.{')g~" ~'2..a ;G:,;a~::-a ir-6_:r."Si::.C '= 0 ::;;. ~ 41 08..:' a;.~ ::!.3,o oO:tlT:r.. <gg.~:.... ~::'< ~= g-~"'~>-' ~~- eno..g-:cc:o-8 ~ Q'~2.gS;tniii'Q :lCll:rO"Q_.:I:n..... g-E. ~,O'a.=.o ..Gl,t::, a.~E!:' 0 ~ a.~. '(Q-:rcn_CD-I ~CD"'n:r::l:r :i':!!:E g CD :::;.;;:;;" ccaco..s:o i g S'g n . . ~.iDO-5'"-< IT" S.:i':r==OlT.,....o 0-:::0 VI -eGln"'C4Io"'nno3"'ltl'" 0"-.. 0....1':"; a.:ltl Q < a.: a.: 3 ::;:c''tJ Gl Q 0 S,,;--., a -molT-'m41 4IOQQ,,--'::::IC l~=~_Fg-=:;:Jro..o..::L~i.r~n^ ... !" S ;:; 0 _'" ;;:- ;r ",,, ! 3 5' n UJ it 0 C -'-:-:s 0-0,0 ~5" 3 a v.41(Q so 0'.. =a ~ -10-3 a-g 3'~ S-SS::aioa.g -I~ ~t_ o:rm3_:i.,:;"-n ('I:;:Jo"'C::r"'cc _,lDfQ a O'O'lD S.::r'~ :'.c..-o ii'" ~.",::!! ~nc::l~~o..::I(Q"ocr-"nQ::::I::I,,\ ::a~ :::;'0..('1 3"Ota 5.0 :..a.g..2..o6..cc g 11 n<<lCD~13aa;o..~a-oS~oa,-~ g !~i5~; [~~~:I t3::"cn~'5~ gcg.. ~~~~f~~~'''Er~O~3o~r; "'-0" !418..?iTgs.S.-'CIR>c:.~a.~= ::I4I"g:r:r_' ....(Ca.... .....-5-:-=.0_0.. !l~~~~-L~:~~a~o-~~'~~ ~oOo..",~::I~~:r~O~O.:rlD~~~,,\ nm~41e -Ill Q.... Ui'clIiIOOO on 3 r!.-5 :r6.::J a..-!l.<;;~"O;..:r"," 3=-'0"'0 0... i'l lD Co 00.-'" a...-o=-'" lD 3 ~ :. g' 5..;' CDa 8..~ Ii a=;~ gt ~ ~ 0 ca :3 ::. CDnS_lD ~13lD::I _~=:to8< ~ 0' 3 0 ~ ,0 ... "< to ~ CI ~ 41 B-.::r'" ~ :l 11 ^ t~dl-oD~!....GlOUi'2~<~Lltl'" Q.-'Q..CD -c." ['~C:::I!l.c CD --a:Tn ~_'~~'~~""_'~o~~n~~-ltl~ 6 S.O~':lD~?l'i"-aQ..oC'lDo'~~ "2CD3"O-'~Q~ia...-%~n~::I",~ ....... -I' <<l (Q a...a..Cl -II) 5'~ 8 ~ 0 - !..6'!:;toe~'; ~! c..cB'~'9...0 i'a..-~i ~ :I 2 \;'~ t)..g",o ~::I :::3=-!--lt) ::I :-.:::-._ .~ ~..41 0 g (, 0..0 ... :r8..~> 0"" ~ ~ ~ Vt g ~c -g 5; ~ ~ i [a 0" ~ o..a:] ~ [0...:; c.. ~ 3 a..CD . ~ ce Cl 3'" ..... 2." ~. 0 41 .2. n soo=_.ozc:3~..~~.cf~"'~~ _.._O~"O",,~lD_O,..=.-CD~,cS' :r-=' _::I C ~ -'CD :.:rS.O".o "ltl ~tQ-I ;;'00 0-<" o~.... a a o..ig..3~ o..!!l-::I 2:' ce <::I =-. ....D""N<D~0-.(IlD""30... c:.~a~go~~o013~.~2'~'<Gl"'n ~~<~o..?~~S~~lD~3E:r~aa CD_lDC41 n__c:~n-cCDltln-41 o--'o::.\cJ:c:r-~...co03" o-<,(Q o G3 - 0 ::;s 0 41 C _ en" ...::t"o 0 o ... n 0 ~~ c.. - c: 3 -:::r'I 3 CD !!l-..- ~-< ~ _. 0 < CD. <1\... ,13 Gl 5' > CD ;:;::; 3 0 . ::f3.~~<tn"Tl4lit"UJ_ll)nlD"0032. -.....::f'4)()'"Oo",,,, , _0_ o 0 a: lD ..'" co () _ -. 0 ~ :!! - ::I 0 a. 0-!1. ;~~ _> <I\~io~~B~~~~ !::. ca 2:3 ~ ~:s;. 5' 0.. ::r ~ ... ~ () o' 0.. ~ 8.. 5' ," S' ::I 5: ~ ~ alto ~'o 8.._ o Q..li'::I .[!!,oil ~ B"~~ s' il~f. n~~ ; ~3.R.. '" -',il"O &~ a.2- CD"'t! 0 ~ =~ '< ,. ! g-~ ~' o !<.JHi ~.~=:o' Q'jIj" :::2 ~~!!, _"0 ~ B- ~ S'~~ 8 t.~... g.~~0' o a. ~ 3 - ;r 9.0 i!-,,' . g.-", h,h . ~~t d,... i8~ R'~ . a.. a. 9._-1- c !... , ,,3 o _, 8..U f"f o-g. [",~ . Q '" "'~. ~ a.; ;:;rltle o ' . -!:n ".'" - 0$0 g::i.. ", ~ :: a.3~ ~ 8.G . -,Q O a ~ --... . . 5'~ ~ --.0 . n "- . S:'jIf' 'Dc ~ ~ 0:;; '0 ~i "O~ a . ~.G') u.0 . ' _3 ~~ .or -' o ~ , ~ 0,,- " 0 a. _c ~~ -,0 o , ~ 3 a~ 3 ~ -, if or ".'< 0" , 0 ~1f s.. 'V iIlI o .. '" Q < '" n 6 .. % - Gl ogg "'~"- 2.:r-('I.Q'1 :;:r-41041 ~ 'ii"~-< _.~ (II :::r ~:.'3Q o :::r.... N ., ..' Q 3" ~ a ..)>n.. :-.:t.!l.g o a (; '" ~ -~ 00...... 3 ::J CD-O o..!:!.o it 3 a'~ ii' g;;~iii'" ::0:0 ~:r ~:::J _!:!. _:r-:1'"0.. :roGlGl 1JiI ~"O a :;"0 a-uo' c ~a.. Q'tJ 1"1 -. a'o 3 ;f ::Jit ~ al c: Q.-;:' :::J _D'"~ ::t:.~dl _dl",m :T'tJ !...~ (II c: eIl::r ~g;;.~ m!'Q..= o n::r =.00 Q ~ ~i~ ell -.c:.... 3 0 ::;::-0 o~~ < 3 -. It,c;!.9... . ~eIl'tJ n ~ ~ o ~ 0 ~:~ f ~'" 3 c ~ ~ ~ ~ 2, 0.,'-0' S' ell 9!!: WI )( iii 0 a:= "E.,WI:::J CI.. o tr'" 1ft ~. ell "a ;.< g g "" II~' . c:: 0 0 .... ;'r_ 4If'lC", 2..; ;:0 :F-a..'3 1JiI ':"ca" II 0..:& -. g,;o; ~ Q:re. ., f'I Q :& ::r":::f\ 0" ::rO 3 ii~ :I ce..c Q 3 a a:al c ~ 0" c O"a..;:;' i fII S,O "0 :t: ~ :. ., o a.. 0 ~. 3 g.; !lltO~ :t A.$._. ..n" 3 o:::r::r m..Cf'I 0..:10 -II'!!.:I 3"""<~"a ~....n fII 300'" CD" 5"g 3,~E;" "'Oo"a 3'3 = fI o .., :t:'~ ....l) c; ;.5~ c . ... .. ~ ~ "- - ,.-, :s"'Or;-< Q ft ~.".,,:; 0-;" oe-C:&o CoOO"" -:!.-.'" 11... ::r_:::J....:J.:. cO,....O l'I=..it:""(QY ... ~g-~ ft 1'1:1;;'0 f!l ii" !.~=c 0 0 Q <It. -0..'" 1'10 CD-a.:." 2.=:1 <:re c It !ll::J ~-'a. 0 e:::::: ~ -. <c -:I 11 C CD 41 ., <=::"'ccaO<_C"'"o....o e:rn3.0QQ.~(D. .. Q Q..1::I 3-''''''ftQ..0...-II .... 0 ~ Q ~ .. C Q 5' C"'":::S 1'10 f=:: 0 0""..00 c<c"< :f=' =....-;-II:&..lI'I. ceO 0...00"'''' 3 Q.O'fD -3 n " 5'" e- :I :I Q co. e -..2:!' ~ CD Ie", 3 :,!l..rg:~_;.S ~"2.~(D ~ o ~ ::::.:::;.'1Q.:I Q 0 =.2..;:, ., e,,< ." 0 .." 0 .... .... -. 0...1"1 ~ -<It. :s II "-< ::r"'O :;SQ-=~<O... 041 "'0 :::s ~ Q e ....... ~ g"::t...g oQ..!.~ c ~;.O =.:..- ~:;:.. ell6:::S1'l~;e.:Sl: "t) e <0 Gi ~ ~ft~ 30 a"<CDo!lOfD::r:. ...-. _Gl::r:s-...:a..aOo~.:J QI 3,;=;'(0 o:l"O:l:l:J =~. !l-'- :::J 0....... 0... -.a! =3 C::l. -" 0 CD o~. 3 ..:s.....o:::t.c ::'c& a ell~ o".9c:::.o...O'" :::J _ =Q.~ WI - ~o~[Q' :rl~~.&: _:=:- _oCD .."i"_. e CIl ::rl:T"__. <It. <It. ... < ~ 3.,ellGl .<'Iii:"g<C ""0 CO ....< a.::r:rf"'O g ~ 3 ~ ~,a g:. ~ ; $. ~ it ~GlQf=ell('t..oa.."'\ ::r~n=.O"tl.<;:;g~ 5.2.iDo::.g::rO!lQo.Q O CD 0"'0 ="'0 "" :;.... -. _!l ., :!'.CD -"( C ~.. :::I - -. - 0... ell 0 <C :f-' . o::r:::t. _.Q._ c>>' :::J ....:::J CIl ::r::J., ...::r !!:. :r.....C::;.;,41 ~.,,:I ell 3 0... Gl ~ .'''00 g-... co 0 9. Gl "'< o-::.....O....~alc Q 0... -:I 0 ... :rc ::2. ~ al;.~;ca fD'9..:; o ~ :1 ~ 3tngh~..1~ ~ 0 ., 0 o..~ ell i~a ell 0..3 "E..n Gl Q,< 0 1'10 o..CD' Gl'" !l-3" C Q::!':'''''3~ 0'0 0 CQ~g-Ot~?[.o::" e. CIl,,<, < _.:::r :J 1. ::s "'C .... CIl :::J CD CtlO CD 3 _'_::r_o...:J CD < dl" -oOo_Qcclij'cQ :r~ c:fo .o...5'~ g::J (ll ~ a:d1 a 9:-CD dl a'" :t. 1J"'":;s 0..-='.< -.3 -.-< 0 -. dI 0 0 Q 0 0 :la_=,o:Jn::J..::S< Q......o",g=.9..~Q_tO ;-~ CIl n :T7-::!".;ti;9- -. '"'." ell CD ID :::s Q ., - 5F'!:!.(ll....CD-ij'(Q. ell"tl . ~3iil~Q"t)::;;3~ ., -. n 1Il ., g _ c:" g i 3 ~ ~''''O ;-=. ;- itn..3.,\tIiD.,0"'- .. - ell ~..... :J cP dI (; Q'o :;:I 0 cD (ll iii'dl 3 .,S~3~~al5a ell ::s a..3 Q: tT'~ C _ :;:I (Q - CD::J "< C (Q :r g ~:fa. Q:...QfO:d: (Q(Q cD dl:To:J 'J_.Q Ts'-< Q..al a..=-.3 i Qell3-'0:T311l::l ~ a Q: :r .., 0 Gl OlD Q -....: _ dI ..... .,.0- "<""::s2:0ell~.,,o ...~o~ogQGl; o ::r - c .... n. 0' 0 _o...tr_.rrQ..c"'CJ _ T'uo.d1g..GlO2.iDo J C S O"'~ ~ o' 0' Q < ~ 3 0 Q "" ,::I ... ~. nOn 5' _.IT Q ==~~:-:-c: :GliD :J'!. 2. e:.:r:t. ., s'Vl!-mellaleO"'O :rc&"< ~ O-!l a"3 Q Q::::I.... :::s 0..< CD CD 1"1 <0...0 0 o_.='o...Gl <<lCD m:::t'~ !!"'CJ" . -<.....dl::s<..,--l o Q ., ., =:: 0 000 o-g 0 5'-i'(Q CD CD 3 o...:ft;' So ~ . ,-. S::;;-:!'.N c=r- ~2..gg::S0S .,o"'CD"'g311- 3 ,,",' , 0';' Q 0 ....::r" :-.:J ;!;!ID 1Il fD oo-._.!lo:z: '::l ...... <<I., &,,;;;' _~ Q..CIl Q o ........ to 0 tot ::J -,;;I TO 3 _'Q lri '6 41 is' ID ::'a. ~-.~~..,::r .. ., 0 <0 ID 00. ~::s e'<. )> 5' <' ~ _' ~ 0 "'" ... III ell 0 -< ., If " >" '" .., Cll a ~.g..o;:~gQ ~o., "'O-:s n :J 0 0..0 Q..II. 3 ::s 0 :l -. o go....::::::I a...al c -=--o~~!l" ~Q.,:;....-<,:s o'~ ~ =- ;--.,< -Gl ell ::s :""'!log~", --, --~ :r~!o..<,.. elloQ::'!lt,-< <C !l 0-2. -.. al -'=a-:J ell g 7111 CD ;:!, 1 ,'" 1"1 0 ~ ;;;. g"fa s=<o 3 a.......,:t.lDlD CD 3 2..CD~ ~ ., Q' 0 Q,.'<. ... ]~~oiilO (QO"CD...~ Gl =~:::S"'O Gl ~ 0 . ;:' 0 Cll :::~ ~a'" o' ~:rell CD ., Vllll ell 0 < 3 1II Q _." ~ OCDO"'CIl..... ., :f-!2..a IT CD 0 Q _ 0 a.. Gl." ~.-'o... III -tCll 0 g "< _0 0 ., ::J ... Q =g::9 . =:: ~ ~ 0 0...2.. "< "0 Q (Q'::T"11I 'a an.,~30., it o~ 0 ~ . a. &..? a..cg ~ ;a.gg~i. :;' g.. g-3 ., II '!L;:,.,oSl):l. o CO"'z:l ;;"'0 f\ S~~B.g~. .:rg Cll iii"'a..o ~......:,... ~ ~ ~ ~ ~~ a 0"":; ~Gl :::s ;; c: .... _'-10..._ =. !1. Q-::r ~-,;;I:' 2:;~ aJ ell ::rell" CD :".g lD 0 C ... i"',~'=~ -.r: :!.n':;{ :::s 0 ='0.._ :T-e...~~ ;;'Q..i:i5'Gl Q 00 aJ :J a; ~ [" Q 0- Q ~ 0'::J"'C .... :f:S 5'" 5a..Q !:!.; 5..~ a.1}< a..~ .."a CIl g-.... '6 :j':r Gl ~ ;t< CD < :ro. 2..:r- o n'-.< Gl g :r~ 3'e... S,S >(Q ~ ell c: !l a; Q a..C:::o'ii"a. g -o-::'! ~ .... o...lll OlD 0 -0 ;;;.....- ~:;:c~ ~ ~ i ~ 2... 0.." "" '< ~ 'a ., o .. It " .. <" It )0 " .. lr " .. -c o '" . <' 01"01"0 -')0 Q ~ CD g..~", 3 3 ,,""!Lo 0 ~-" < s..~ 0 ~. . lit ~ 0 1ft ".." " )0 CD_O,.. a 0 ::... c: c-c , \II <II 3 I '" -,'" 0 g..~:!' 0 _0 1It;j 0<"30 n CD 0 - "-o..,,""~ o . (I) Q ;OO';;? 11I05..5' 3:3 < 0- !t.aco ;- Q "C .., o Ul,O _ Q..1It~O o c:.. c: .., 3 CD 0... CD(I)<- l/'I _(1I!II \I> ::r::l"E. (Q Q _.- Q_......i"' III co ::I l:L ~ e 0 3 o (Jl TO .., lit 0 _ o ~ ~ ~ ~ a..s: "0 Q 0 . 3] s > 3 ~ 3 ~ o 0 0 -. -<"'io.. ".."'''' CD ,)" ;;;- ~ o 2.. ;;;- 0' .,., () )t.)g ~ en ~ ~~ ~ .;::.,...- ^' OQQ' ~ ~ ~'= '_.':- n ~5a:-:c ...._all"' , ~'s'~:l -0" nO~' :aI oS.al~", af~.g ~~ !l:i"ato f'l -5''0> c :r 1tI w-< ~~aQo Q 0 e...o::'C ~ ;.C Z Cl; ~ G) g ~- :c ~ [, -. -c: ~~ " ,- o c a:: -c".. o . '" ~ @: - 0- 0' II :I II .. lD II " " ii' .. o , ~ S'~. () < '-:1: 00 m S:-o 3: , '"' -; (C~:::oo a a::r: 9-:~.3 0, 0 () ~ 0':;- ~ ~'3 e. r- CD C :l 3 -" Q g Cl - 0 .0 C ::!.::::J""I 2..c..(il " -, , .- 0_ :T;:;;' ,- ii'O E...~ 00 " - ~.(D ~o 0, ~O- ... 00- , . :ra 0- , '"' g;&, ~[ -'0' ~ ' ii:o . c a:;:' " 0 ~. !. -, -0 0 'tl'tl C (3 2..~ a "' -"< lIt-n (]) crCD- 9-. ~so. c < '" ""-0 '" CD ::s"<.., !l.~ ;T,g Oz o CD Q CD a:-Q-~ -..., "'< en ='-'0 - cccEc:O.... g~, 8 ;: ''-is =- II Z CD d,O-<1I .... ~~ O"'~ ~ ';:;':!.~ =i'-< .... Q 0 0 . ~"3")> = "'C (II ~ ::s -..,"'C ="< o aa - CD :~=+3~ 01"0c:0 CD:!". lit ~ O'"'~ ::- lit ~ co ;-f~ "'""~" ~ c:: a. .., 0 ~. 3 _";;"'crCC Q :::gCP";i;'" ~ _3 Q..._ c:r' Q 0 -. CD mcc .., Q.CA,::s 0 Q) CD (D - -'n o-n(D ::::J c o g':~t'D ~= :T"3=-" 70~ctl.ctl :J 0 ~ ~ g o ~ 00 "'Ill ~... !l, )0 "'- ,~ z o "'% 0..", n,... !L." -. ~ 0)> ~o.. o < ~ -' ~ ~ U;'G -" o 0 " c: @ ~ ~01" ~ '" o 0 30- .Q.Q c: c: o E! ~;- -'... '" ~ 0-- 'tl 0 '" " ~2. o -. ".:;r " ~ !lo", ~ "" o " ~ 6-' m ... . . . . . . . E""~~~~~ZoO< n ::J .., =:1 -0' 0 n c:: 9...~.:!.n a" 39..., n <0 ~ Q _.lD III o'::l O::l ":1'" 0 ::l C :I Q) :I 0 Ql 0...... 3 ~1ll0":"'3glD :::'. ~::r",< 3 0 c...c g ~~ Q (t::J:I '" '7":'" ~ ::1.0 c... ~ S,..o en c: Q'=::.., 0 3 a.~lll= r:r c -'0 r:r III ., ~ ......0 ., ~~" ~ -,", < 0 - III cr~ 0--. 0", 3:r o , . , c 3 ". . '"' 3'tl ;To..lIt trial (Il 0 I'll ::I ::I,'(I)'i.n ;-+ 3 j :rC i:S. g,;ta .., 6-< I'll . :J 0 ... )>3 c: % -(0 t"\", o:a,ocn ~. :: n a ~o '" 00 ;;;.Z 3<0'" Ql al c- "g,,<' g o..:f~ co ~t1:I :T :ral c 0 _Ql..,c: o"C CD - ~"Cc~ o (Il c - o " '" <i~Q..5' c(OcCQ ::I. C ~._ a..~ ~ :r .., C .., CD al "< Ql -. 3......- 3 o .., :r3 < 0 CD CD Ql 3 Q ~ ~ ~ era c:m-<,,,, .., h 0 :T o (0 -.0 ~j"N ::J al CD Q al C: 0 0.. .0 :S1:l C c: a..(i"'.., "'6'To g , (Il:J.. 0- o :Eo~::I s'mt:En ~:r'" n 0 03 a..3 ii'":r% o . 3 0 a.. c: 0" 1Il '" -';:1 ::I c: m ~., T::I ~ ~ 0 0...(\ '" co 0 .. ttln"'" _O"'<lll..=-..... ll..c 1Il - :I...... .. ::;Q..()g ~o n 0) 1Il ~ :I lIl:I:Q..lIl""<::J "'''' <cam n 1Il (Ie: ~n ()=~:T:ra e 3"'0 I(l) -Illl (l)_~~. mc...;\'C"'3!llllll:;:l -.mar-' .,""'Iea ~a.05 g :i'-::r." --10." '" ..-_ (")5; c "".... .... _ ~:I: " m300~'om~ttl nC3c-"'O",~2.'" -g Z"~lll 6 Ci';tiO'"ift. ~ ::I-<Q a:~ mg 3 a.:.g a @ III ~..o::J c, III c...::I ::J :....". ir-'Ci ooa:i'3=i'(")iD= =::J n 3 =.::r:a..a. :r':' ;;r6lll" m" 2: III n _:I c...0 =::n CIl (l) :rc... _.:J -10" (j':J lll=2,.., ",,=0 =lIl~::l III ~ m:;:.: o a _.(Q 0 1Il nlll ::r- ~.;.:g 3=-~'''a ("'IlIl ~. ='CIllll _.- ::r-1Il <a0"'1Il~01ll1ll3 -'::100 -.lll3m ~n.......,oa<_.., Olll-~:lnii'8(Q '"'3 ~ i" '" :f.e... III -~ :r QID -o-ln OlD 3(Q ".......,"< g':ls.Qlga~g., :5 CD'~ Ill. c.S.0-c l!l _0 _;0 ..,'c...n 0-0, r~.e...;(l) S':r~ g _ 2:_. 0 <C 41 0 '" o.<~.,,-._3~.m o' .., -:rii'O ::l 2,.0:r11l 0 ::l < trl1l _ f ~iD ? ,-. :;:'0-0..;;" ...... a.Z; 5'''0 - Q) ~ e --c ;- 0 0 CD n O'.g '=' ~oC/lO' Cftrtt.o"'e"' :,: 3 0 ::;.Ul ;:: C or; 3 3 ~ Z a '" ~o C II = -3 0 ~ ... _ '" ~:::l -... .... = (D ~.Q-." -. C - a.. "'.....::1 0 =' g !1 " 5' II = ::l 0 0.." 0.. 0( . cC~a...";:Q)~()... -''''Ov .~o..o..,:c 0g.~3 a-c 0 D'" c: """m 2:c ca,,"'I..crl:J CD ~ 2. CD :rO .-a:<D 0: ~ 3 0" avg",:,,~)o oc=;o:Sa "CmCDN c: <tQ'CD CD .:a c <t8-J> ~ ::I..., 3 ~ ::S"'O cg 9.." JIIS a> C,,< C1l ",CD c:c_ ~ iiOo 3 0 a..< C"'C 0"""" '"C . -CD --lit o :; g"3....a..-<1l CD _ =>-~-'CD"'IO<DgD"'O ~~::J._ a.CD-CD" "'3"'''-0= -"'0 ;..09.:e.... ~oon o .., .., _ .. a'< c: ....::1 Q c::.CDCDT=-~D "~o.. -3 ~ '" II 0 "B..:ro ~ C- " C:J" c-aocg CD ;';'n CD_n '" m " -, = II _.m 301"0 8 E'; g-" "'I~~ ~ ,: ~ 3 .. 5'"" :r a II c: " @ 5' "-0.., 3 ac...~ C-:J (0 3 CD !:'< .,. .. 0 ~- CD .., o Cl.Q a:;-:r ....;0 C .., =-::"(Il o:s C :J'" tr" CDno~O"'..'" <1lCD o s.:J 0_ .. ::;'-::s"O n < F -c cO' 2...CL.D cD :rg fL~ -g.., "-< CD~.,. CD \II c: :r- o 3 0 - .. < :r~ So. 0-5' - c o.....:ra-...o -0-_ 1.0' en _.llf." _ -v. :!. :!'. 3 - - :r CD -. o 0 _. 3'" ".., (1l ~ - ::J -- -.-'- {tl. "<go =~ O'Q-....ca. ~ !-' T;JI:""c;-:rr-m ~ 5 a ii"~ ~ ~ (D~~"'OOOm -3'(6"'~ 5a..it~ 3 0..... ::f 0 0 C) (Q-lllC::frn ~~~:J'" a..z 0'2:-0 c: 3 an -m::r3 s,=-< (l).oC lJ""Ql_ ~ ::~ ~ S';-= ~ :r. 0 !.:-iD '" ... ---:r-"'a :'3 5=-~'ii'.g 0 o 2,11l -."'g'.:rZ o (tI :::":'''' ::f 0 -0 ~,~ 3<0. ~::: QI fL0 0" ., '" 0-:1 Q ::f ... '" 0 III ...." c: III g:J301P3,.. c...m <<l ;:: ITIII ~3<3c..3~"a o ;0 Q e -=% Q..cE'~ ;~;.O o g..~ =S'c...Z l!l 0 1Il :::'.!l..o III ~:J '" 3 C:::J Z o c"O 41 c..._ < n O.::.,CIl :rC 41 ::!'.~ . C Ql := :rg 0 -1:::1 S-lIII CIl:'~;~-c'rn (j) 03" I1l "E'." .a c-C-QI ., :J c:mlD"<C(O :;'--' o~"O ~~3::Jno ;II:"~St~-g :::::s... -:rm ., ~gg-o~~ m3 ::l ~S CD ~- :r:ICO 0 o:rc ift.g..~ ~;;.S-g cg ;f~ ~. a- ~ :J a:~ ~ n..~ g-~ l}g ~ S' 41 ~ ~, 0", 0",< 2..3 a ~,g ~ g :;- 0 Q ",c:m"oiir- ::::rCll-o 0 :;'::I.~ g g C<d 0 ~lD -m:J 0 0....'" '" c.. -:1"0 n ~ oOO-'m"OlD n :J .., N .., ., :J n c..o 9. '" 2-..1Il :z: ~ ;; ~o.g ~ 0 0 S'-g 9.:I..~;=- ~~3';Q~;' 0 QI ;;reo 0 : 0 @ n O'O'.ofi..o:I '" ...... =., g Q 0 o.:-g r ~. ;-=CL:I:T-:J .... n ~. 0 Cll c... .... ~'5l.g ~"'O ~ ... o ii' Q ~ g 5-ift. a.e...~,~9...~~ 41 :;'_:1 :::"",-0 ~O'gccglD0 ., (\-0 '" g!l 30~o"O((I!. C;; o. _ ij'G')l3 ~o ~.. ::I III c: _,0 ~ tr"~dl~Q~ m., '" --n~ 0 n "< E..Cl 0 Cl (Q 1ft O.;z-:I =~ :::s ~.. c...O 0 N' :r0'~ :J III :T~ .., ,~c...:T s.ep 00) 8 III Q < S" =1!: ~ g: -3 O'dl -.' (Jl n ., iP 0'$'-3!-_;::I fm~$if~ S' s: 2.. ~ 41 S'tr"ZO 3ccao;:a ~ om :::"Q '" 0-"-< ~ 41 c...c,,< ",. ~ :;:-o'oZ ,<00C:_ "'~ ((10_0 ",-::::r.., "O:;-0<C::! g 9.S.g 0 CD ~ O'N'Z 0..... 0--.; ." 3 ".,> o~ s.g Q ~., -'- . '" 0 0 "' o ::l co. Z :J'-( 41 n ig ~ -< -"O~ o '"' -; - 0 :r :r< _. 41 -.'" '" g..~ ~. == , >" ..Cll a.a 0'0'5' Cl a 3 ~3 2- < 0 -, 2.-< g ~'a 0 , " 5"'l. 41 I1l ::I. -. -," o 0 8 3'~ - . e-:< " . "', 0- -" o T 01")0 !lo." ""." Olllll :To ~)o ~n 3% :t:.n ")0 Oc c:... "-- "0 Oc ~lIt ~,... 01"0( So. "", o '" c: ~ Q a' Ci:;:. Q"m n c: 5'ca '!'''' 0' ~ c: ~ ,,- ..~. " o c: n o " " o - o Z I lit n '" Z '" lit )0 ." '" ~ -()() ~:r:2.. m- 3 :;:- s.-+ir o "" 0 ~.m3 9...n lD , -~ . ~'" o ' 0 ~"', 000 .;z 1?-< " ...~ ~ "'0 0.... o ' " o "'0 c "" _0. -'0 ell 0_ " - ..Ill 0 !!. .0 0." , 0 :r "-00 3 :J ~ ~o ::l '" . c 0" 3 ::t.o 0- g ~.!!1 "C 2:_ .., (Il;n' g 0';- o ~ "- "-0 0 ~ c...::J 0"-_ <II -.:r . g-.(tl , . Q~ -" -'" , -. 0" ~'" 3" o 0 ::!"."'O o . , ~ o.."z CD'" 0 t:9..... CDCDm c'n .. ",::!'.(It CD<CD ."CDCD "')> ~ 0,,- ...." m --. ,,0... ""0 <Co. CD_c .." )>.-::!'. ,,1212 ::.~:s OCD'" "..0 a;:.... -...... "O~ o"'W "...... ,,00 CD"ll" ....- .0 CD ;;:0 ~: "''' ;r :; ...-' o 3: 0.. '<2- -a ".. " -, ...0 CD" a)> "" CD... -UQ.>;! =;:: o.m :-(D(j:' <II , ,:r -<NO :ro" " , 0 _00 o-~ .., -'- ",.:r o . 0 ~ :r 0 o 0 ~ =i':i CD 0" 0 i":;':r ~ III :r-~ "0 -':t'" .., <II _. ~ ~g... ,,'" "c" -~~ '" co 0 :T' c;- o -<0 :r:='; Zt1l~ =H; 0 5>='a. ""--'0' . " Vio<t\ 00. ~o:r >-0 -dts.. -00 "- -0- Z_o N fo- 00,,- " 0 0 o " " Q (t,,:;, o .., :r coo " ~." ,,--~ - i"2. :r 0 o . 0 3 ::t. ~i'i. o~ :r_ o " (II :;,.' " -, _.0 =;- !!!.." mo o - " 0 "-fl.. ~ < o 0 ~ > ~~ '" 0 , o . ~ 0- "'- _:r ~ 0 o 0 3 x - -. :r" 0_ .'" =-: o. o c -. 0 " 0 -" :r, "0- "-" 0'" ~ :i" " " ~ 3' :i'co "-~ 0...:;..' :j' :r " - o :r :-. 0 o . , 0 . 0 0- . o ~,.,.:. :J:::J: :I: :I: ::I: :::I:::I: :r :I: :I: ~ :l~!:!J ()('H') 8 n ~ 5 ~~ff~~ E-<-< Q -<0-< f!:\-<'c -<-< g~Q ~ 0-< ~ -<-<-< :I: Z :J.O:l 0 Q Os-Oi '0 c -.:t::z:: l>l>l> l> 6 '" > coo :r::a:r:;a fgto "'''' 0 1-<-< ZZZ 5 0 . "'''' , ~8~8O FnFn ~ :;: "'80 -a.8~O ~o '" 888 Gl '" Z -<<DOmO "'N n aGl Z 3zz Z z ~l?;[g m &.m~ gmp ~lt.m~m-< g mg 2 il; ... em ,m mm mmm m 15 '" 0 zz ... z... 8 ~~ z,o z~ "'Z"'6 .z J 00 z,zz '" c::l> >> ~~ ~ '" n '" '" """" GlE ~ tn~o > -n cc ~ - ~QQa:Qn :I: - '" l;(l;( Z c ~~~ Z :;: ~~ c n 3'>~~> ~ n 0 il;~ 0 0 :!!::!! 0 ~ -.Z'" () 0 i!; ;: ;: ~ x '" ~QS ~ > ,~~ '" ~iilltiil6 '" ,iil i [ iil iil 030 i ... ,iil ,0 ,iil ..0 3' zllz 0 m .' , "" ~ _::IV! C );: >zr~. ..VI ~ ~ 0 '" _:;'_.<11 fa """ '" '" '" "'''' '" '" '" 0 "'''' "''''''' '" '" '" '" '" '" "'''' :~:;:Io:n 00 0 0 0 00 g 0 0 00 000 0 0 0 0 0 0 00 ",i1 00 0 0 0 00 0 0 0 00 000 0 0 0 0 0 0 00 !!t 6',9..):3- fi~ 0 - ,--I = m .-> t~i-g,f -~ 00 0 e 0 00 0 0 ~ ee EEE 0 0 0 0 e e ~:: n~ t.,)N :... ;., NP-J "' "' " " "' "' h:i il ;ll l'il~ """.""""~, 0 I!'" II .... :~r..., 6' q -! 0 00 "''''''' 0; '" '" ~ -n~':j'O"TI i1s: ~ 000 '" 0 0 . ~ ~-. gg 000 0 0 0 0 0 s .ft):,a 0 0 0 - -... i="" iii m t~ i-g ~ ~FG) 0 0 0 00 0 '" ..!=!=' 000 0 '" 0 0 0 0 00 Iilm ww "' "' "' ;,.,w - - "' '0 "'''' ""...... " .... " 00 '" '" l.JW .", =l~ --_~il() U~. '" "'...,'" ., .... '" .. '" '" .... ~z a-l o'~ z ?l ,0., .. '" ion;.,. ~i>>CIO '" .. 00 '" ;., ;., "'''' ';;~t' ~::;o -k NU;-5"" g 2... 5-: ~t.~ >" 0.0 -. - o '" ::: Q. N-' o Cl ::: '" + , , , , , , , I o o :!; ::: :!; 5' a.. o ;;;' 0' ::: @ \ \ \ \ \ \ \ o~ -,- . '" Co " 0 II :!; ::: :!; :;", a.. o~ Vi'i::3 Co ::: 0 II ~ " ~ 5' ,a.. ,II ",1 II " Ii "::,,~"':'''' ,~:"~,' .,," i I II I. " " 1- ~ 1:: 1 ~DR- S I'm t::':: C(, wfs .I , Ii .t~'WA'OA ~ de r-= . : ~OftVJ<j cr~ ~!o:&~ ~~+O ~ ~ ~~~~. j. ---------),.-~1h~~~.-:: _Jpt_",u~__~_____. __:,~~~J___,._,,~,_________ -------,-~~".L0~.ft~.:M-~.~.~j~[~ ~-~-~--. II __ SM. /)o.JIIM ~ ~ -h, k5:o~ , ',L I ~ . vOl) ;t d7r~1 ~f~~ ," cQo~ " La ~~_~ 'di1l-s.M~ , ~'~-vt.M(1~ r4A4j4(ftn-, ~~~- ~--:~=~r~---- , ;;J-~ ___~~~- ~~/f.rw& -: ~"~fn::::::tit~~''1~ . ~~ '''-'AO...P ~~~~ ~' " " .,.----..---------- : ~~~~----' -~ Iii , ill , I ,. -"' II! r ,I i , ^ ~ ~kf) ~/. & ~ti - tJk~~~ .~.J,,~ -iJ.,A.A\oA ~ ~ --- ~-' .. ~ \!i"';-\: _ \:w'::j ~I W-Q I ~uK, ! I ~~~~F~-~~ ~~~~~b ~, I ~ tJ~~ ~B~~~-~~ I' / ' " -pivM 1. aM4q~ (J~~ ' ' I ~~ ~_.J. :1 +_ ~ 1It, - '6. - o-H _ ~ <>-<' -- , -- ~~~~~~h,,~M&S:W - I. (fP-, ~OC ~ ~t2.~~~~ II . - , -, - - - ',- ',' ,'- -', 0- I!t-~ I' II . , ("'.. ~"I, /'-,:--1 -- ~.. s ,~', ~~t~~_ 'I ~ fI j. '.J. Ll~ (' - ", &I . ~ ~ 4- ~,~' /Alf! :-:b-JJR- , f' I' 'I,' '_' - _ , I, -',' - ': '_ ',' - - _ -, - " ,,- 'i r, ~.~ f~s-bcr;,() (7) 4~ G-:i ", 1'fi:tJ I~ ill' 61'\ /l\aure '-:~ ~~ ,', , ~ II t '~. fk- ~~ _J , .'j - '-'. '. -.'. '-^', "". .. '.. " " .'. .' "'-. . '. . . f ' , , '- - ,~, {. -,-i/!-, , -- -II~'~~~ ~~~~' '''-'',;' - :.,',". ,-,,' --:", - ' ',: " -," - " ,', ,,' , '" : ,', " .,' " .' :', - . .. ',,',' ',' " .' ',-,," :',' ." - '" - ,', - -" '- - " ,"" ,'" '--:- -': ' ' ----:, :'_.:,,' :-;, " -~- --'-~ 11 -' '" ",,"" ,", ' - --, iii, -----.--------, ------ --- ~' , "....... i""'., ,~~"-(1:MSt/l ~t~ ~ Io~Wq4-7 - / -y<- ", " ,-U(O-7~ M . '- -r- -" If .IZ. fz- ~ '<Uff ~__ _ , _ C77J-e1 H-e I ~ 'I I, - . 5JJ,~~~~ '~M1~6n'~ ,~,~~ -~, -;J~~ ~ ~ -"""i oYl fL~N~~at1S~) '," . ~ ~-2(ozJ1~ f~ti1~ l M ~~ ' - ~ ~'"( ~J-(fJ:)sc9J ~~~(I-Yi W.f~~~( ~~ - ~J \\<\".:. iM.-;JJ]~~~ ~: ~ I ii I , I I ----~,--~_._~---~-"--,--~-----:~--~ - --- --~ i I ,~OPOSED (IB) UNITS' 7" 'TER PLACE HOUSING~, LOCATED NORTH OF I^lATER TREATMENT PLANT C.ONNECTED c ,,,,,,,", ~~ t ( i "'DiN ( if ~TRI('"2L ~1iI f I~ ;::eN ' j1 DFPT / I I r~ "<:e U C,Tr?RAr.;F RI Dr.;, ~ FVTVRE J PA,~k:.1NG 0 ~ EXPAN~ED l I ~ (' ~!1,':i."'Ne ~:=:~VVI~__~~~c.."_,J I I 'J ~_=O'_. I I I I 10 HfrI 1/1 I^IATFfi! DI'fPT. c,TnRf(-,F, RI Dr=" I Tf^lO-I^lAY MAIN ACESS/E"'RESS ROAD, REGRADE TO 8% MAX. AND RESURFACE. . EXIST, RE5EVOIR N ------- -------- ~ /;' IJ Ji /f} u ~ " ~' ~ SEDI~ ; -~=~:J ! / ".. /., ----__J / --, FUTURF- -'.'-.- I nf,KFR ROOMS I I I ! NOTE5 I A 50' DIAM, CLEARANCE 5HALL BE MAINTAINED AROUND THE CHLORINE BUILDING. 2 n'lENTY (20) ON-5ITE Pf<RKlfNG 5PACE5 5HALL BE PROVIDED, 3 TH~ MAIN TI^lO-I^lAY ROfD"fY 5HALL BE DE51GNBD TO ACCOMODATE A 5EMI-TRUCK TURNING RADIU5, , I I . PRO'FOSED'MASTER PLAN AND PROPOSED ROAD IMPROVEtvlENT5 CB c. NORTH C; TY Of ASPEN - ~A TER TREA TIv1ENT PLANT SCAL-E: I" = 100'-0" ,prepared blj: d!h citlj of asper: sept_ 8, 1<4<45 ~ ~~ ,- ,-., ~\ VILLAGE HOMES A model solar community proves its worth In 1973 renegade architect/developer Michaet Corbett acquired a 70-acre site in Davis, California. His plan was to design a model community that would incor- porate aggressive energy conservation with solar en- ergy. Residential clusters of various types would be interspersed with commercial and agricultural uses, while commOn areas would enhance social interaction. Village Homes was completed in 1982, and the community has become one of the most desirable in California's Central Valley. Freelance writer Kim Hamilton spoke to Michael Corbett and other com- munity residents, and dmo on research conducted Iry Bill Browning of the Rocky Mountain Institute'in preparing this report. Village Homes has vindicated many of the experimental architectural and land-use ideas of architect/developer Michael Corbett. Over the strenuous objections of city planning and public works departments and the FHA, Michael pressed for and accomplished a visionary de- sign that has paid off in unex- pected bonuses both for the environment and for the resi- dents of Village Rornes. The narrow, tree-lined streets of Village Homes run east to west and feed o~t to an adjacent minor art.!'rial *_~t. Houses are oriented north- south along the streets to maxi- mize solar exposure, Carports or garages and small fenced and landscaped' courtyards face the street. Streets are much nar- rower than conventional subdi- vision streets to discourage traffic and allow trees to shade the road during :the Central Valley's intense summer heat. The concept of using nar- n::J5tration courtesy of ,\fich.:eI Cor!:ett by Kim Hamilton and Bill Bro\vuing rower streets is one example of Michael's holistic design approach, in which unexpected bEnefits arise from environmentally governed choices, "You know you're on the right track when you notice that your solution for one problem ac- cidentally solyed several other problems," Mi- chael says. "When you minimize the use of automobiles to conserve fossil fuels, for example, this also reduces noise, conserves land by mini- mizing streets and parking, beautifies the neigh- borhood, and makes it safer for children." An additional unanticipated bEnefit of the narrower streets is that the air temperature over the street is 10 to 1S degrees lower, than sur- rounding neighborhoods during the hot summer months. This is attributed both toa reduction in the heat-soaking asphalt mass and the mature trees, which shade more of the street area than would occur in a typical development. . Initial concerns on the part of city planning , \ ,'. f' f __ J"F .... . , ! -i No, 35 1\:-.0 CO~'-TEXr 33 \'11:.:.\< IfcHr:,.,~ .:....:-: ,~!,;,~:.::,-: ("il"icl<1Is rcgJrcin::.:. .c ,lblity cf emergency \,'ehi~ c!t..'s to ncgoti,HC the streets .....;cr~ met by m,1nd,1- tcr..' 30-foot eJ5t:rr.ent:; on botD sides of the street. . Despite officiJ.l concerns, the.crimc rate at \'il1.1Sc Homes is onl:- 10 Fercent of the al,'cr"se fer D.'\\'is, according to the Police Department. SOLAR G..\N CUTS ENERGY COSTS Although most homes are single-family de- t.lched, there are some duplexes and one co-op ~ .;? EOIGLE lANDSCAPING Hom~owners had the opportunity to pro- \'ide inrut on the landscaping of the common ar- C.1:; t'ct\q~en the clusters of houses. Grass, shrutterv, sandboxes, fire pits, and gardens \\'crc dmong the features chosen. All of the com- mons included some fruit-bearing trees and shruh, Residents grow vegetables, fruits, nowers, and herbs for home use and sale to markets and restaurants. Michael planted a .~~'; vineyard and 5e\:eralorchards, ~ which have matured, produc- '~ ing almonds, cherries, peaches, - pears, persimmons, and plums. Residents may freely harvest all crops with the exception of almonds, which are harvested mechanically and sold, contrib- uting about $3,000 annually to the maintenance fund. 'The aesthetics are re- markable now that the land- scaping has matured," Michael says. "1 think the pedestrian or- ientation and narrow streets give it a very picturesque, rather European feeling. In fact, Village Homes has be- come quite popular wi th non- residents who come often to stroll the grounds." 1-.::::':/,"1:.: ,..- '~:.~~iiffw~~ . ~.." -- _ -,.. . 0-','., ,-, . -'-:. ........:.:..~- .... !.r.: - .4" ._.-:-_-.......:.---. 5d;:.J' ga.:n provides 50 to 75 pacatt of tr..e r.eat needs. Ke....7ing cool .:S als~ a .rr'~fcr c;.~!!c:ge; this house r..a.s a srJUietreI!is :L.,:th grapes O~"eJ' sCHU:~fac:ng ~Clnac~c~. builc.ing. Styles vary from 0:ev,; ~.rexican and 0:'orthv....estem \....ood to California mode:n, \\-ith a fe\\t- earth-sheltered homes. Solar er.ergy contributes between SO per- cent and 75 percent of heat needs, All of the houses have 60 percent or more of their glazing on the south side. The most basic solar features are calculated overhangs on south facades, which shade the houses in the summer, but al- low sUr\.into the homes in the winter. They also have extra insulation in roofs, and concrete slab cons:'-uction for thermal mass. Almost all the homes have solar hot water systems with collec- tor panels on toe roof. Some homes have other ,,'stems which contribute to further solar gains.~ For example, long-time resident Paul Tarzi's home has a sun- r()c'fn/atrium ......ith skylights bet\,,'een the ent:y a!".":' the hOl.lse.Heatedair fror:\ theatriur.l is t-ic'.\'w thn)us:h tul:-es ur.c.er the house to th~ fa;-- t:-:e::t c.:Jf:;'2;s-cf t:.e hellS<? It tl-.e!'\ fitters :ack l'.? ::-:r~t:S::' d i'0CX aiiJ. tile r1ocr. This S\'5t~!n prC'~ \':...:~$ -;::-cu~10 ~;ce~t of the h0uscho'ld':; h~.l~. 14:,~, "4' ,~ ,. -., L'Co.....n\T ,_..:;.. ~ UL"R..\L DRAINAGE SYSTEMS Running through the common areas is a n~t'.\"erk cf drainage swales, a natural altema~ t:\'E~ to e:-::?enslve and wasteful storm drains. The svstem \';orks like this: . In t:.e typical subdivision, lots are graded to".ard the street. In Village Homes, lots are 2'!'aded a.....av from the street so that rainwater t.-ickHnQ; ofr"' roofs and la\vns finds its way into shallo"~ swales landscaped like seasonal stream- !:ees with rocks, bushes, and trees. Runoff from the streets goes directly into these larger chan- r.els. SI;1all check dams help slow the flow and prevent surges dO\'fflstream. In heavier r~ins, the system empties some water into the aty's storm drains. but not nearly as much as would r.,C1 off a t:Tical subdivision. The design saved approximately 5800 per hct:5chold in up-front costs which was applIed tc: ia"'c.::..::a~i1!.g enhancemen~s_ This syste~ con- ~~;-~~:; tC' fT0..ide sa\.ings; the landsca~tng re- '-: _u:';~ jc.:5-~ two-thirds the w.J.tenng of Pr.otos bj Bill Sro'Xning - ~.... ~ .-.- '~~:::. ~..,: . . ,-"., Kim Hami1:on I 'Vj[lQg~ Hom ~_,"er and meeting facility. Nearby is a small cOmmercial building where residents rent space for their businesses. . COMING OF AGE Village Homes has proven to be a great environ- ment for kids, according to Paul, who has raised two chil- dren there. 'There's a play area right outside our house and the kids made lots of good friends. The only difficulty was, as they grew up and left, they had to adjust to the idea that the world is not like Village Homes." . . Although turnover is very' low, the few families who have left Village Homes have realized dramatic appreciation on their homes. In 1991, houses at Village Homes were selling for a premium of 511 per square foot over other Davis developments, demon- strating that features once considered of ques- tional?le value,by some have become not only mainstream, but extremely desirable, More typi- cal ,than moving away is movement within Vil- lage Homes or additions made to original structures. ' "We're finding that because people feel they've benefitted from the communi tv and en- jOy: where they are, they are conunitted to giving something back," Paul says. "This is paid out in terms of people's willingness to serve on the board or get involved in ongoing community projects. "A community is more than a physical 10- cation. It's a feeling of kinship. Ii~ing at Village Homes has enhanced our lives in many ways. I guess I could say I'm looking forward to grow- ing old here." ... surrounding developments because of, the denser plantings and extra water pro~ided by the drainage system. , A SENSEoF COMMUNITY Village Homes was designed to facilitate neighborhood interaction within subgroups of eight homes. Each house in the grouping faces a shared green ,space linked to other green spaces by a network of pedestrian paths. Paul Tarzi, a resident of Village Homes since 1979, says the design works well. 'The open spaces and play areas are well used and provide casual meeting opportu':ities," he says. "You're just more accessible to your neighbors." Paul's neighborhood group has had weekly potlucks for years. "It's something that people look forward to:' he says. "Everyone has an orange flag they put out that day if they in- tend to come." The architect's efforts to enhance commu- nity cohesion have worked, both at the neighbor- hood and the communi tv-wide scale. VilIa..e . 0 Homes has community events both planned and spontaneous throughout the year, including ,an annual fall harvest party. Playing fields and numerous play- grounds dot the common areas. There is a well-used solar-heated com- munity center and swimming pooL The community center is used as a dJ.y-care ..... , ~. ", ..,~.. . .~ ..... - .".. .......s:. , -'~-...n~ , . ,;._ '.::::c. ~ ..,. . - r:lrU f Ea_~t, J..;..r..::- :-' ~.' ....- -- ,'..fi~~. .' fl:, ~" r-~~~- '!I.~" ~:t. , ; III ; , '''' : ~:1 : " J;~ ~r:... ~ , , " Sc;t:'on throu.gh.: commons_ Rlin :J.:a!a is c::ll::c..xl in sr.::llow S"'J.:aus, u.'ha~ it an slowly pa-a:L%u into trL sc No. 35/ IN CO~7EX1" 26.80,040 . -e. A statement specifying the public facilities that will be needed to accommodate the proposed devel- opment, and what specific assurances will be m.ade to ensure that public filciIities will be available to accommodate the proposed development. f. A statement of the reasonable conformance of the final development plan with the approval granted to the conceptual development plan and with "the original intent of the city council in designating the parcel specially planned area (SPA). g. A plat which depicts the awlicable information required by Section 26.88.040(D)(1)(a)(3) and (D)(2)(a). 2, Variations pennitted. The final development plan shall comply with the requirements of the underlying zone district; provided, however, that varialions from those requirements may be allowed based on the standards of Section 26,80.040(B). Varialions may be allowed for the following requirements: open space, minimum distance between buildings, maximum height, minimum front yard, minimum rear yan:l, minimum side yard, minimum lot width, minimum lot area., trash access area, internal floor area ratio, number of off-street parking spaces and uses, and design standards of Section 26.88.040(C)(4) for streets and related improvements. Any varialions allowed shall be specified in the SF A agreement and shown on the final development plan. 3, SPA agreement. Upon approval of a final development plan, the applicant and the city council shall enter into an agreement binding the real property to any conditions placed on the development order approving the final development plan, and providing landscape and public facilities guarantees as specified in Section 26,84.040(C) and (D). 4, Recordation. The final development pIan, which shall consist, as applicable, of:final drawings depicting the site plan, landscape plan, utility plan and building elevations, and Specially Planned Area (SPA) agreement shall be recorded in the office of the Pitkin County CIeri<: and Recorder, and shall be binding upon the property owners subject to the development order, their successors and assigns, and shall constitute the development reguIalions for the property. Development of the property shall be limited to the uses, density, configuration, and all other elements and conditions set forth on the final development plan and SPA agreement. Failure on the part of the applicant to record the final development plan and SPA agreement within a period of one hundred and eighty (I80) days following its approval by city council shall render the plan invalid. Reconsideration of the final development plan and SPA agreement by the commission and city council will be required before its acceptance and recording. E, Amendment to final development plan. 1. An insubstantial amendment to an approved development order for a final development plan may be authorized by the Community Development Director. The following shall not be considered an insubstantial amendment: a. A change in the use or character of the development. b. An increase by gre3ler than three (3) percent in the overall coverage of structUres on the land, c. Any amendment that SUbstantially increases trip generation rates of the proposed development, or the demand for public facilities. d. A reduction by gre3ler than three (3) percent of the approved open space. e, A reduction by gre3ler than one (I) percent of the off-street parking and loading space. f, A reduction in required pavement widths or rights-of-way for streets and easements. g, An increase of greater than two (2) percent in the approved gross leasable floor area of commercial buildings. h. An increase by greater than one (1) percent in the approved residential density of the development. (Aopen 10195) 620 26.80.040 , . i. Any change which is inconsistent with a condition or representation of the project's original approval or which requires granting of a further variation from the project's approved use or dimensional requirements. 2, All othermodificalions shall be approved pursuant to the tenns and procedures of the final development plan. provided that the proposed change is consistent with or an enhancement of the approved final development plan. If the proposed change is not consistent with the approved finaI development plan. the amendment shall be subject to both conceptual and final development plan review and approval, 3. During the review of the proposed amendment, the commission and city council may require such conditions of approval as are necessary to insure that the development will be compatible with cuzrent comm1lIlity conditions. This shall include, but not be limited to, applying to the portions of the development which have not obtained building permits or are proposed to be amended any new community policies or regulations which have been implemented since the original approval, or1ak:ing into consideration changing comm1lIlity circumstances as they affect the project's original representations and committnents. The applicant may withdraw the proposed amendment at any time during the review process. (Ord. No, 7-1989, ~ 2; Ord, No, 13-1991, ~ 3; Oni No. 24-1993, ~ 2; Ord, No. 22-1995, ~ 13; Code 1971, ~ 7-804) 621 ("'P<<> 10195)