Loading...
HomeMy WebLinkAboutcoa.pi.1540 Silver King Dr.-Knowlton 2001 rC'o 1 -:>'-"'-"1 1n'C:-.-..(',M f""'TTV (',r (',CDt""~d NO. 900 P.3 . 11111111111111111111111111111I1111111111111111111111111 452720 03/26/2001 02:42P AGREE"EN DAVIS SILVI 1 0' 2 R 10.00 D 0.00 N 0.00 PITKIN COUNTY CO SIDEWALK, CURB Al.~ GlJ IIER. IMPR.OVEMENT AGREEMENT BETWEEN THE CITY OF ASPEN AND ~V/0 ~CFvJL TtJ "\. ) (hereinafter "Owner") WHEREAS Owner(s) is (are) the owner(s) of the real property located at (street address and legal description of property) ~+o SI4IfIl- Kwr.. 1)1t-. (\.1>,- ~'"') W~T ~ Aspen, Colorado, and . SU~ '), WHEREAS, Owner has recently completed new coIl$\:IU.Ction and desires to obtain a certificate of occupancy; and WHEREAS, Owner's property is within a zone district or other area as designated on the City of Aspen adopted sidewalk, curb and gutter plan requiring construction of curb, gutter and sidewalk prior to issuance of a certificllte of occupancy or, in lieu .thereot:, an agreement for future construction pursuant to Section 21.16.050 of the Municipal Code; and WHEREAS, the City Engineer does not recommend the constrUCtion of curb, gutter and sidewalk on public right-of-way adjacent to Owner's property at this time due to existing improvements or conditions. NOW, THEREFORE, the parties agree as follows: 1. Owner agrees to consttuct curb, gutter and sidewalk, meeting City specifications, along the frontage of Owner's property (approximately 10" feet), together with associated street asphalt pavement work, at such time as the City of Aspen deems construction necessary and feasible. It is acknowledged by all parties that the present requirement is for two (2) foot gutter. six (6) inch vertical curb, and five (5) foot wide concrete sidewalk with five foot snow storage between sidewalk and curb, or as otherwise specified in the City of Aspen Sidewalk, Curb and Gutter Specifications in effect at the time of construction. As provided for in Section 21.16.060, Owner agrees to pave driveway from curb to property line. 2. In the altemative, at the City's option, the City may construct the above improvements and Owner shall reimburse the City for all costs of such conmuc:tion. Reimbursement shall be made to the City within ninety (90) days after receipt of invoiee. In the event of failure to pay, the cost shall be placed as a lien against the property to run with the land. 1 FEB. 1.2001 10:50AM CITY OF ASPEN s NO. 900 P.4 3. In the event that the City determines that sidewalk shall be consttucted on one side of the street only, and if that side is Owner's side of street, Owner agrees to pay to constrUCt the sidewalk: with reimbursement of half the coSt at a later date it'the property across the street from Owner is developed. If the City determines that the sidewalk shall be constructed across the street from the Owner, Owner shall participate in the cost of the sidewalk in the amOUllt ofhalf of the cost 4. This agreement shall be binding md shall insure to the benefit of the heirs, assigns, and successors in title of the parties hereto. day of N\~~ , t.2.o91 t..- - State of Colorado ) ) County of Pitkin ) The foregoing instrument was acknowledged before me this l ~ , by f~W1 Y' ~. l~ tvOv.) \-\0", day of 1{~AI2O\; ;,~?,."". " ial seal. My commission expires: P-lO-7ft91 Notary Public i",)'ID Sf lwv lilIJ4 ~7{)-iV\1 (0 (?((t'(\ CITY OF ASPEN. COLORADO, A Municipal Corporation Approved as to form: . ~ ,,~ 99KM137 .z 1/1111I1111I1111111111I111111111I11111111I1111111111111 452720 03/26/2001 02:42P AGREE"EN DAVIS SILVI 2 0' 2 R 10.00 D 0.00 N 0.00 PITKIN COUNTY CO