Loading...
HomeMy WebLinkAboutcoa.lu.sr.Bell Mountain.1979 I"'" -., MEMORANDUM TO: Aspen City Council FROM: Jack Johnson, Planning Office RE: Bell Mountain Sports Building Revision - Special APPROVED AS TO FORM: DATE: May 11, 1981 Location: Background: CC - Commercial Core (HP Overlay) Bell Mountain Sports Building was granted a 1979 com- mercial and office allotment for 2,000 sq. ft. All six (6) applications that year were granted allotments. Bell Mountain Sports Building changed ownership since receivi!ng the allotment and the new owner is interested in altering 'the internal spaci ng 1 ayout and the exteri or facade of the building. No increase in the square footage allotment is proposed. On March 10, 1981, the new owners representatives received final approval from the Historical Preservation Commission for the alterations to the facade. This approval was subject to the condition that building material samples (brick, bronze and glass) be presented and the working drawings be signed. Zoning: Applicant's Request: Approval of modifications to Bell Mountain Sports Building and reaffirmation of the 1979 Commercial GMP ,allotment. Engi neeri ng Department Comments: The application would appear to be somewhat confusing regarding the actual square footage involved. The written portion, on the one hand, compares the gross area of the original design (4,871 square feet) with the net area of the revised design (4,379.87 square feet not including the employee apartment.) --- Rather than delve into the further confusion between the written application and the drawings, suffice it to say the areas summarize and compare as follows: Using the figures in the application, Deduct: GROSS AREA Uti 1 i ty Rooms Basement Employee Apartment Light Well NET AREA ORIGINAL 4871 S.F. 68 S.F. a 413 a 4300 S.F. REVISED 5597 S.F. 46 S.F. 513 414 245 4379 S.F. It should be noted that the site is in the C.C. zone re- quiring a trash facility adjacent to the alley. Provision .-.., .-.. Memo: Bell Mountain Sports Building Revision - Special Review May 11, 1981 Page Two of this requirement would probably eliminate one of the parking spaces. Parking is not required in the zone. Planning Office 'Coll1llents: The modifications proposed in the Bell Mountain Sports Building, 1979 GMP allotment, are improvements in the judgement of the Planning Office. The HPC has also recommended approval of these modifications. Any con- cerns regarding the scoring received by the original GMP application, and any affect these revisions would have on those scores, should be resolved in the fact that the Bell Mountain Sports addition ranked 3rd of six (6) applications and, all six were approved. The basic revisions include: 1) Facade changes to the buildings front exterior; 2) The integration of an open light well with sky- lite as an amenity and energy. feature for both floors; 3) Relocation of the Hyman Avenue entrance stairway to the 2nd level floor from the east side of the building to the west side and the corresponding relocation of the 2nd floor pedestrian corridor (The entrance to the 2nd level is now proposed to be a mutual entryway utilizing the Crystal Palace stairway. An easement, mutual usage agreement or other instrument is necessary before these two buildings should use a common entry); 4) Relocation of the 2nd level employee apartment unit to be "stilted" above the two rear-entry parking spaces. These revisions do result in slight shifting of the square footages between the first and second floors, however, the total square footage is still under the total permitted. The applicant is aware that September 1, 1981 is the ex- piration date for 1979 Commercial GMP allotments which have not submitted valid building plans on or prior to that date. Planning Office Recommendations: Approval of modifications to Bell Mountain Sports Building and the reaffirmation of the 1979 COll1llercial GMP allotment subject to the following conditions: 1} Buildi ng materi a 1 samples be submitted to and approved by the Historic Preservation Commission prior to issuance of a building permit. 2) An easement,conmon use agreement or other instrument be acquired for the purposes of accessing the 2nd floor via the Crystal Palace stairway prior to issuance of a building permit. 1"'"\ 1"'"\ MEMORANDUM TO: Jack Johnson, Planning Office Jay Hammond, Engineering Department * FROM: DATE: May 1, 1981 RE: Bell Mountain Sports Building Amendment to 8.M.P. Having reviewed the above apPlication and made a site inspection, the Engin- eering Department has the following comments: 1. The application would appear to be somewhat confusing regarding the actual square footage involved. The written portion, on the one hand, compares the gross area of the original design (4,871 square feet) with the net area of the revised design (4379.87 square feet not including the employee apartment.) Rather than delve into the further confusion between the written application and the drawings, suffice it to say the areas summarize and compare as follows: Using the figures in the application, GROSS AREA ORIGINAL 4781 S.F. REVISED 5597 S.F. Deduct: Utili ty Rooms Basement Employee Apartment Light well 68 S.F. o 413 o 46 S.F. 513 414 245 NET AREA 4,300 S.L 4,379 S.F. 2. It should be noted that the site is in the C.C. zone requlrlng a trash facility adjacent to the alley. Provision of this requirement would probably eliminate one of the parking spaces. Parking is not required in the zone. /"""', ~ J,'Ie... ~~~ MEMORANDUM TO: City Engineer FROM: Jack Johnson, Planning Office RE: Bell Mountain Sports Building - Amendment to GMP DATE: April 20, 1981 Attached please find an application submitted by Mead Metcalf to change the approved design for the Bell Mountain Sports Building (~979 commercial GMP allocation). The application proposes to change the second floor office space design, revise the front facade, enlarge the employee apartment, build a sky- light to enable the use of natural light and install a solar hot water system. This item is scheduled to appear before the City Council on May 11, 1981; please review and return any comments by Thursday, April 30, 1981. Thank you. I"". 1"'"\, SUiTE: Z05 t. ~ f' ~~ L.AW OFFICES AUSTIN MCGRATH & ,JORDAN 600 EAST HOPKINS AVENUE RONALD O. AUSTI N ..J. NICHOLAS MCGRATH. .JR. WILLIAM R. ,JORDAN m ASF=>EN, COLORADO 81611 April 1, 1981 AREA CODE 303 TELEPHONE 92S-ZS01 B. LEE SCHUMACHER Nr. Sunny Vann Planning Office City of Aspen 130 S. Galena Aspen, CO 81611 Re: Metcalf -- Bell Mountain Building V\Wfi7~ ~"""Z ~ r ,I ~R 11981 !I: 'I . . ,ill.....lj ,.ASPEN I PITKIN CO. , PtANNWtG OffiCE ~. ~'<"":'''''''';i''''' ~ Jo.. ^:.."..,....... ;. '" .;.. ~ '''''"'''':' Dear Sunny: Jack Walls and I would like to meet with you concerning changes in the Bell Mountain Building from the GMP approval. I enclose a draft application letter. Thanks. Sincerely, AUSTIN, McGRATH & JORDAN By-.!vlJ,.. M'G..d J. Nicholas McGrath, Jr. JNl'ljr/dw Enclosure cc: Mr. Jack Walls ~ ,-" LAW OFFICES AUSTIN MCGRATH & JORDAN 600 EAST HOPKINS AVENUE SUITE 205 RONALD D. AUSTIN J. NICHOLAS MCGRATH, ,JR. WILL.IAM R. JORDAN m ASPEN, COLORADO 8]611 April 13, 1981 AREA CODE 303 TELEPHONE 925.2601 B. LEE SCHUMACHER city Council Ci ty of Aspen 130 South Galena Street Aspen, CO 81611 Re: Bell Mountain sports Building Dear Councilmembers: In 1979 the Bell Mountain Building (adjacent to the Crystal Palace) was granted a commercial GMP allocation of 2,000 sq. ft. so that a second floor could be added to an existing one story building. The proposed total build- ing square footage, as outlined in the GMP application, is as follows: Existing commercial space 2 , 464 sq. ft . Second floor area (except employee area) 2,000 sq. ft. Proposed employee apartment space 407 sq. ft. Total Building Area 4,871 sq. ft. After the GMP application was approved by the city, the build- ing was sold to a new owner, Mead Metcalf, whom we represent. Mr. Metcalf wishes to change the approved design on the building. The revised design encompasses a complete structural update, a new and attractive front facade design, and a more imaginative second floor office space. We should state at the outset that all commercial GMP applications filed at the time of the Bell Mountain applica- tion were granted. Thus, there is no injury to any competitor occasioned by this change request. The approved design has been changed and improved in the following ways: /"'-' ~ AUSTIN MCGRATH & JORDAN City Council Ci ty of Aspen April 13, 1981 Page Two 1. The original front stairway has been eliminated, and the Hyman street stairway for the Crystal Palace will be used. 2. The original front facade design has been reworked and improved. The first floor has been set back 6 feet from the front property line, thus decreasing the gross first floor area, and making for a roomier area along Hyman Street. The revised front facade design has been presented to the Aspen Historical Preser- vation Commission and has been approved. 3. The original employee apartment has been enlarged and has been moved back over the parking area. 4. A large light well with skylight was created that will offer natural light to the second floor offices and to the commercial area on the first floor. 5. Passive solar and natural lighting will be used in the new design. Also, an active solar domestic hot water system is to be installed. The new proposed design building area is as follows: First floor commercial 2,301.92 sq. ft. Second floor area (except 2,077.95 sq. ft. employee uni tJ Employee apartment 413.62 sq. ft. Total building area 4,379.87 sq. ft. r~ ...-, AUSTIN MCGRATH & -.JORDAN City Council City of Aspen April 13, 1981 Page Three While the building appears from the above figures to have been reduced significantly in size, you should be aware that (1) the reduction in part is a function of decreases under the Building Code for lightwells, etc.; (2) it would be accurate to view the second floor as being increased by 77.95 square feet over the prior approval, with the first floor correspondingly reduced by 162.08 square feet. Mr. Metcalf believes the design changes have greatly improved the building, and while the changes are important to him, he feels they are relatively minor from the standpoint of the City's concerns. For your convenience we have attached the prior GMP application and the City Council resolution approving the prior GMP allocation. Thank you for your consideration. Sincerely, AUSTIN, 111cGRATH & JORDAN By \J~ M'~ J. Nicholas McGrath, Jr. JNMjrjdw Enclosure ~ ,.-.,. ~ LAW OFFICES DRAfT AUSTIN MCGRATH & JORDAN 600 EAST HOPKINS AVENUE SUITE: 205 RONALD D. AUSTIN .J. NICHOLAS MCGRAT""l. .JR. WILLIAM R. .JORDAN m 'ASPEN, COLORADO 81611 March 31, 1981 AREA CODE ,303 TELEPHONE 9Z$-2601 6. LEE SCHUMACHER City Council City of Aspen 130 South Galena Street Aspen, CO 81611 Re: Bell Mountain Sports Building Lady and Gentlemen: In 1979 the Bell Mountain Building (adjacent to the Crystal Palace) was granted a commercial GMP allocation of 2,000 sq. ft. so that a second floor could be added to an existing one story building. The proposed total build- ing square footage, as outlined in the GMP application, is as follows: Existing commercial space 2,464 sq. ft. Second floor area (except employee area) 2,000 sq. ft. Proposed employee apartment space 407 sq. ft. Total Building Area 4,871 sq. ft. After the GMP application was approved by the City, the build- ing was sold to anew owner, Mead Metcalf, whom we represent. Mr. Metcalf wishes to change the approved design on the building. The revised design encompasses a complete structural update, a new and attractive front facade design, and a more imaginative second floor office space. We should state at the outset that all commercial GMP applications filed at the time of the_~ell Mountain appli- cation were granted. Thus, there is no injury to any competitor occasioned by this change request. The approved design has been changed and improved in the following ways: 1. The original front stairway has been eliminated, and the Hyman Street stairway for the Crystal Palace will be used. _ _n__"'______'_.___.__,_.'-"...~~.__...,_'"__.'""'~__,<",.,",'._""'______.........~".,.._._"".......~........,...~~..,______ I""" ,-. AUSTIN MCGRATH & .JORDAN City Council March 31, 1981 Page Two 2. The original front facade design has been reworked and improved. The first floor has been set back 8 feet from the front property line, thus decreasing the gross first floor area, and making for a roomier area along Hyman street. J,it 3. The original employee apartment has been enlarged and has been moved back over the parking area. 4. In order to keep the building area from exceeding the building area that was approved, a large light well ,with skylight was created that will offer natural light to the second floor offices and to the commercial area on the first floor. 5. Passive solar and natural lighting will be used in the new design. Also, an active solar domestic hot water system is to be installed. The new proposed design building area is as follows: First floor commercial 2,287.5 sq. ft. Second floor area (except 2,018.53 sq. ft. employee unit) Employee apartment 413.62 sq. ft. Total building area 4,719.65 sq. ft. The revised front facade design has been presented to the Aspen Historical Preservation Commission and has been approved. .""...." ""...." AUSTIN MCGRATH & JORDAN City Council March 31, 1981 Page Three While the changes are important to him, Mr. Metcalf believes they are relatively minor from the standpoint of the City's concerns. Thank you for.your consideration. Sincerely, AUSTIN, McGRATH & JORDAN w By J. Nicholas McGrath, Jr. JNMJrhs ,-., -. Aspen Historic Preservation Committee March 10, 1981 RECORD OF PROCEEDINGS 100 Leaves 'OflM ~ C, F'...OECI(El8. D. It l, co. The Historic Preservation Committee held a regular meeting on T~esday, March 10, 1981 in the Aspen City Council Chambers; Members present were: Jon Siegle, Terry End, Mona Frost, and Florence Glidden. Sunny Vann and Colette Penne, Planning Staff representatives, were also present. APPROVAL OF MINUTES ---------- Mona, Frost moved for approval of minutes of the February 10, 1981 minutes, as written, Florence Glidden seconded the motion. All in favor, motion carried. . OLD BUSINESS -----~. ///"- Jack Walls, Architect, represented Bell Mountain Sports. Jack Walls showed the working drawings and blueprints and the building details were explained and discussed. Mention was made that the Bell Mountain Sports building is in trust to the Crystal Palace and the HPC would like to see the brick and the paint on the back of the Crystal Palace match. Sunny Vann indicated that he did not like the window treatments because they were too tall. Jack Walls indicated that the 'windows appear too tall in the dra~ings due to the perspective. .sunny Vann raised the question regarding the party wall between Bell Mountain Sports and the Mother Lode. The Mother Lode is due to be torn down. Sunny would like to know what will be done to the wall to safeguard against the future tear down. Jack Walls indicated the block wall will remain and around the corner it will be changed to brick, so a building may still be built next ,to the Bell Mountain Sports building. Public Hearing! Final Approval - Bell Mountain Sports Bldg. Jon Siegle opened the public hearing for comments on final approval for Bell Mountain Sports. Ther'e were no public comments and the public hearing was closed. Jon asked for committee comments. The committee questioned signing, exterior lighting and display area. Jack Walls indicated that signing will follow the City codes regarding signage. The directory for office space will be in the Crystal'Palace lobby. Exterior lighting will be used for accent only. Display windOWS will depend upon the tenant. Sunny Vann mentioned that he liked the improvements over the original application with the building set back off the sidewalk and the vertical columns to create a sun shade. Jon asked for further comments, none were made. Jon, then asked for a motion for approval. , ; . r I r ,I"""->, Aspen Historic Prese~vation Committee 'OA"'~ C. ',HOECICEI.8. e. & L. co. .- ) March 10, 1981 Page 2 RECORD OF PROCEEDINGS ---- ./-- / 100 Leaves . Design Changes/ Tom Thumb Bldg. f Terry End made a motion that the Committee grant final approval of the building on the condition that building material samples (brick, bronze and glass) be presented and the working drawings be' signed. Mona Frost seconded the motion. All in favor - motion carried. Don Ball presented the design changes on the Tom Thumb building. Sunny Vann indicated that these changes were minor and the committee could decide if they warranted a public hearing. Tom Thumb has a new owner. Sunny Vann mentioned that building must commence this spring or the allocation will run out. It has been two years since application, but a six month extension was granted. The new owner requested the demolition of the 2 existing buildings instead of remodeling. Two new buildings will be built, according to the plans approved by this committee as a remodel. ' Jon raised a question regarding the solid brick facade. This facade is to serve as -- a support for the staircase to the second floor. The architect would like to put a 6 foot round stained glass window in the solid wall, which would open onto the stair- case. The committee felt that the stained glass window would. look out of place with the classic window treatments;. The stairs will be lit internally. Sunny Vann felt the window would spoil the plane of the building. The committee is open to any other suggestions for a window that the architect-may wish to submit for approval. The loading dock will be revised so it does not block the alleyway during delivery. TIUs will be acccmplished by putting in a dock leveler so the truck can back in and load it. . The solar panels have been deleted. These changes do not, need to go to a public hearing because they are minor. The brick has been approved but the architect must return with colors of the awnings and the signage for approval. At that time the brick color sample will be brought in to compare with the awnings and signage. r", ^ Aspen" Historic Preservation Committee March 10, 1981 Page 3 RECORD OF PROCEEDINGS 100 Leaves 'OlI~!I$ e.', HCECI([L I. 9. lit I.. co. . ;: ADDITIONAL DISCUSSTOU /./ ./ Sunny Vann asked for a motion to approve the changes without a public hearing because the changes are minor. Terry End moved to approve the changes without a public hearing. Mona frest seconded the motion. All in favor - motion carried. Mona~A~t commented on the Victorian House on M~rch and Cooper which is being moved by the owner to build employee housing. Sunny Vann said that tr.e area is zoned multi- farr~ly. The owner wants' to move the victorian to the other side of town for his personal residence. The house is not designated historical by this committee. The planning office has just finished an inventory of all buildings in Aspen and their historical background and significance. The office is also looking at designating certain 'buildings historical so that. this committee will have jurisdiction over their demolition or relocation.. . ..-. Following a brief discussion, _/'/- moved to adj ourn the, meeting. Glidden seconded the motion. Mona Frost Florence Meeting adjourned at 1:~5. p.m. . ~:-~g~~:uty City Clerk I. i ....... 'OllM!G e.,. HO[C~[~ S. t. & t. co. ,1""'\ ,,-., RECORD OF PROCEEDINGS 100 Leaves 214 lake Avenue Shaw Sub- divIsion - Historic Designation . Bell Mountain Sports Preliminary Application " Sunny told the committee that the properties in the sUbdivision: i, , were resubdivided a number of years back and a condition that was attached by Council was that the existing structures had historic designation. Welton Anderson presented his plans for the residence with new lot lines he had platted. Sunny said there were two things involved here. First, the HPC has no jurisdiction over the property until such time as it is designated, so, the committee needs to recommend to City COuncil that the property be designated and following designation, the committee needs to review the plans of the proposed expansion of the structure. The committee reconmended that Sunny draft a resolution to present to Council. sUnny said this was a GMP allocation for a COIIlIIler'Cial structure that was approved two years ago. The property has subsequently changed hands and the new owner has proposed some mxlifications to the front of the building. Sunny said he had no problems with the new plans, as he had seen them already. Vann told HPC this is making some minor exterior changes. The Commission cannot. make a determination whether it affected the scoring, as not everyone was 'on the Commission then. Vann said all projects were approved with room to spare, and a rodification on the exterior would not affect the ability to rr,eet the minimum points. Jack Walls presented plans for the building; the front stairway will be eliminated and they will share with the Crystal Palace building. Vann told the Commission this is a historically designated building, and he felt this is a cleaner building with better material choice. Florence Glidden roved for preliminary approval of the Bell Mountain Sports, conditioned upon seeing samples of the brick and bronze and glass; set a public hearing; seconded by Georgeann Waggaman. All . in favor, rotion carried. Meeting adjourned at 2:35 p.m. )'.-1 'N, Conditional Use h:.blic Hearing ;:. " Commercial \pplications for \9 7 9, Public "<iring Ijax Mountain ~sociates Building ,.", ":.,> 'iii {., ..:ff. 'i 1,' ':' ~, t~; .,.'" h ." f-' ti ):i }~f: t, l r; Mountain Sports r:ure '~ 1" 'i,: ii. k ;k "" "" square roel:. ,?r "n", r ........."'=>r.. "<;>:J.J.Q:Lng for broadcastinq studios prov:J.ded that, concern:J.ng the ~ntenna sy~t 1) initial height, size and design are as repres;n~md b the applicant's letter of September 20, 1979, and t~c Hr.C assisted. by' thed Engineerling. ahnd. Building Departments, Shol have rev~ew an 'approva aut or~ty 50 as to minimize the visual impacts on Main Street and minimize the visual imp for the neighboring residence as much as is practical an; 2) any increase in height or any' increase in visual a;ea greater than 10% of the originally approved design shall require HFC approval. Otherwise, the application is in cc formance ~ith the principles of the Main Street uses unde: the existing zoning code and has no ~orseeable impact on land use or public good, McDonnell seconded. All in favor motion approved. . Anderson resumed his position ~n the commission Vann introduced the application, A-l TV wishes to ~ocate j the Trueman NeighborhOOd Cqmmercial Center. Theyrequest approximately 1000 square feet in the basement. level. The SPA plan allows this useas'a conditional use. Th~Plannin Office recommends approval'.;l' 'I Hunt !elt it would only be ,appropriate if sales and' repair occur. . .( "' Hedstrom opened the public hearing. H~dstrom closed the public nearing. Hunt moved to approve the conditional use of a TV Eales and service facility in spacE! 3'of the. Trueman Neighborhood Commercial Center as such use is consistent with the ap- . proved NC and S/C/I plan, Pardee seconded. All in favor, . '. mo.tion approved.' .it . 'I. . There were no ~omments. Hedstrom explained the procedure for the benefit or' the new P&Z members. Reents. explained- the criteria for evaluation. The ao~ssion heard the applicant's presentations of their projects. . ',..( t Kshley Anderson, representihq the applicant, introduced 1 Jack Lawlor, architect for the project. The site is across ~ frotll Little Nell on Durant. He felt this is a very impor- L tant portion of the commercial core. The Aspen A's will be I torn down which he felt was'an improvement to the City scape He asked that they disregard the liPe results. ' :, Hunt ~oted some open sp~ce-between the two buildings and asked if' they owned the property. Anderson said th~y do own. ,the property. Hunt as.ked if they intend to develop the property in the future, Anderson said yes. Anderson noted they could build up to 18,000 square feet and they 'are building 13,500. The open' space is above the required.' He noted they wil1qive the existing tenants priority for space in the new builqing. '. Bob Sterling, architect, gave the presentation. Tl:iey are mOdifYing the facade of the building and adding a second . story. He felt they were Cleaning up .the lines of the . building and noted it would serve as an example for the nr building to be b~ilt between Bell Mountain Sports and the' Crystal Palace in a few years. . .' Jerry McCarthy made the presentation. He stated t~e buildin' was designed to'allow the existing Epicure to dominate the block. He felt the open space courtyard was an important lr. part of the building. There is employee housing on the second floor. 11e noted the landscape plan for the open space. He noted they are considering a pedestrian access t' "1 ( ) ..."c.... .,',>- --- , /< -JP'o(: .;: (A..I;t//S ,..... r"\ <ftl y~d 'P-----:" y"'- BELL NOU:\'1\/;IN SPORTS BU:r.LDI~'~C; ;'~D;;I':'ICN ....; GnO:'lTH Hl!lN]:"GEI"lEN'I' ;')1- r::(:\, :\T c,:;;.~\~TC;(..:T(I;~,' -'-. .~.,-':-.:,.::::':'-:'::'=:":::'="~~ COH...\1ERCI~:r"L liND OI?FICB SI;CTIO~~ APPROVAL REQUEST. This Appli(;:?~tit.:.:1 is made fc:r- a Grc'i;t.h ~;lanage'- ment Plan (GMP) a.llotment r Comn'leJ:C l.alz~nd Office Section 1 for the 'diff-erence bet'd8en 'I.:.he exist':r.ng .sq:uare foct.age 2na the proposed total square fcoc.age. Proposed Office Total Ccn~ercial~ and Housing Space 4/871 square . '- o " . IIJII ..l.eel:llp'- ~ Existing Commercial Space 2,464 square feet. , " Proposed Additio:1al Office 2,000 SCfuare fee.t .. Proposed ErnFloyee Housing Space 407 square feet This Application, then, is for 2,407 total sross scuare feet cf office and apartme~t spacer as defined in Section 24-10.5 of the Aspen Mu~icipal Code. SUBMITTED TO. City of Aspen Planning Depaz:tffiE'-!n't, 130 South GaAena Street, Aspen, Colorado. \ p.PP!..IC]J.t~T.. 11.............-.. S1-.-~. ..../_ "'_"1, _.~..":l ... .,.-. . -!Cl...!....l..j' .l!C~'fV # ...... V .!.:V..L.l.c:.l"U ~ n,~.l..~! ..134 r...;;:.S"[_ C~:)~er Streett Aspen, Colorado 81611. ARCHITECT. Sterling .P-.ssociates, P. 0.. Bo;'~ 97 I ~'loc>(~'v C:reek, Colorado 81656. INTRODUCTION. 1.' Project Name: Bell ,Mo'untain' Sports B~.].ila.ir:; Ad6it..:.on. 2. Location: 312 East Hyman Avenue 3. Parcel Size: 3,000 square feet 4. Current Zoning: Co,,"-nercial Core (ee) Zoning Under 1'Jhich ?::tplication Is Filec: Ccrr,,;T,ercial Core (Ce) Maximlli'1l. Build-out Under Cux'rent Zoning: ';,500 sq ~ feet ~Bonus (E~ployee Housing) Provision: 1,500 sq.. feet 6 J' OeD sg. ff..~et 5. Total BUild-out ProDGsed: 2,464 squdrG feet E^is~.:ng Corr.rr;ercial 2,00C SC;l1.ar.:: f<z,et ?ro?os~~~ Of::ic2 ~.~..:J.i-t.'i()r.t. 407 sc.:~:are feet 'V...-,............-,C'.::-,...:; .....l. ~b"-',;;;t:.:u E~?lcye2 Housing :-: i ,;~ c'c- 4,271 ::.,: ," ...., ~ .... '-, '- - ,- ; ':.: J ~~ t. 'I' (;'l'l-, 7~ .",,,;! j'-i:~i,,+>,,1 if ,~ r-, . t- 6. Sp~cial Procedu.res Required: A variance will be obtain- ed (Applied for on August 14, 1979) with respect to the 25% open space requirement. The existing Bell Mountain Sports Building precludes compliance with the open space requirement without a variance. View Planes: None Stream Margin Review: None Special Review: None Historic District Review: Completed and Approved Subdivision (Condomiriiumizatioh): Not applicable PUD: Not applicable 7. Program Narrative: Surrounding zoning and land uses: Map No. 1 locates the proposed addition (within .1..nc.:. '-...- Commercial Core (CC) Zoning District and the Historic Preservation District). Surrounding uses are a mix of co~~ercial (restaurant and office) with some undeveloped land.. The site is 10c~t.ed bet~.~2Gn the Crystal Palace and the Mother Lode Restaurants. 8. Drawings and Maps Submitted for Revie"l: Site Location Map and Preliminary Architectural Drawings. PROJECT NARRATIVE: Public Services. '(aa) Water System. Water to the existing Bell l-lountain Sports Building is presently supplied from an existing 12 inch pUblic main, the pressure of which is between 95 and 120 psi. The location of this ,nearest main is Hyman Street, approximately 20 feet in front of the existing Bell Mountain Sports Building. An existing water line l~ inches in dia- meter presently serves the building and will be utilized to service the second floor addition. The estimated water demand is 200 gallons per day. (bb) Sewer System. The existing Bell Mountain. Sports Build- ing is present:ly served by a. 12 inch line directly'aajacen::: ;/ -1 /, . . ., i , I . i' i i I' , . .~.. -,\':t.,..:.;-:>',.~ -:;;:~:';"..;:,~" ;.,'0.-';:~;' ~ . ~.~'~ .c_<"""'~'_':'_~'-''l:,...,~:#"_....~",,...'' ',': . . ,,,,,,:~-_.,,.,_.,, ,-,-",:', -fl~';>.', - 2 - . . ,-" ,-" to the property in the alley. between Hyman and Hopkins Streets. The estimated sewer demand will be about 3.00 gallons' per day of \.;hich 100 gallons ]?er day represents the existing demand. No new connection is anticipated for 'the existing sanitary'sewer connection will very easily acco~~odate this small additional demand. (cc) Storm Drainage. The drainage con.tro1 system for this . . addition will consist of roof and area drains which will feed the existing 48 inch storm sewer situated on the corner of Monarch and Hyman street. The existing run-off from the site is at present feeding this storm se\ver line via gravity roof drains to existing curbed gutters, etc. Consequently, no additional drainage or surface run-off will result., (dd) Development Outline. The total new development area amounts to 2,407 sqUare feet (second floor). The lot cove~age total 2,628 square feet including a trash storage area at the rear on the alley. No areas are presently devoted to open space or landscaping for the existing structure upon which the addition will be constructed pre- eludes it. (ee) Transportation and Parking. The estimated traffic count increase on the adjacent street (Hyman Avenue) re- suIting from the proposed development 3 to 5 cars per day times 1 to 2 trips per day. The estimated number of vehicles expected to use or be stationed adjacent to the proposed addition to the building is 3 to 5. The hours of principal ,daily usage is 8:00 a.m. to 5:00 p.m. Offstreet parking supplied - 2 spaces. Onstreet parking - 2 to 3 cars. The location of alternate transit systems is as follm.;s: . 1. Silverking Shuttle - immediately in front of Bell Mountain Sports Building on Hyman Avenue; arid 2. Snowbunny Shuttle - l~ blocks to the west. - 3 - , .' . .": :;':>c.,<-~~Z~~~ .1"'"\ 1"'"\ (ff) Use. The existing first floor use is a retail ski shop including office and storage area. The propos~d second floor addition will be professional office space and an employee apartment unit. (gg) Adjacent Uses. The project will not add any neiv uses to the im~ediate vicinity. It will be closely matched to adjacent structures for scale of development. Note that the second floor of the Crystal Palace Building is pre- sently offices. (hh,) Construction Schedule. Construction ,and remodelling is schedules to start in April or May, 1980, and should be substantially completed during August, 1980, Due to the central location of the project and the needs of the public and nearby businesses, a careful schedule of maintaining access will be considered with thealley being utilized to the greatest, extent possible. Storage of building materials will be on Applicant's adjacent real property to further minimize public inconvenience. , EVALUATION CRITERIA: Quality of Design. (aa) Architectural Design. While certain scale qualities' c of the existing buildings are compatible with neighboring developments, the existing architecture creates a discord- ant note, appearing thin, temporary, and generaliy inconsistent with the Aspen tradition of well-constructed structures built for long useful lives. The approach taken in the addition/remodelling is to create a better relation- ship between old and new while allowing for the inclusion of office space and addition of employee housing. It is anticipated that future construction will ~esult in the removal of the existing Mother Lode Building and re- placement ~ith new development. The Bell Mountain addition is meant to establish a scale somewhat smaller than the buildings at each end of the block - the Opera House and - 4 - , ....,'::;,<~N~~ c "","" 1"'"\ the Crystal Palace. As a result, these two important .,'. historic landmarks will still dominate the block aestheti- cally. Building materials compatible to the area will be used throughout, including brick masonry walls, dark metal window trim and muted trim colors similar to the adjacent buildings. (bb) Site Design. All u:tJ1ity, and, dra5_nage pipes ~;ill be completely undergrounded. Service vehicles will be com- pletelyseparated from other vehicular and pedestrian circulation by the use of a service area in the alley to the north. No unusual service requirements are anticipated. The submittal relocates and enclosed the trash area. (cc) Energy., Within the use of the existing building and the heights of adjacent structures to the east and \{CS'C, all project construction will be designed to utilize solar insulation and minimize heat 10S8, thus reducing' the de~and placed on fossil fuels for space heating. The following techniques will be incorporated into this project. Insulation. Based on the current standards of City Ordinace 45 (series 1976) for thermal insulation, th~ project will improve upon required standards signifi- cantly, as follows: THE&V~L CODE (MIN) PROJECT ST~~DARDS Walls Roof Glass R-20.0 25.0 1. 43 R-25.0 38.0 1. 82 Design. The architectural design will orient spaces with highest use levels to the south to maximize solar heat gain while roof overhands and awnings will be 'used to limit summer heat gain. The north wall will have well insulated glass area and will capture the view toward Red Mountain from the Employee Unit yet the flass will reduce heat loss, and all windows will be designed to minimize cold air infilatration. The roof - 5 - .,. .'~.;;i::,.,:,,'2."::';'~:I-~~ft~~~.al~ -.},; . '.> r--.. .. ,," ~ I~ -. will be flat with excellent insulation to ta,:e advantage of the insulative qualities of accTh"ulated snow. Conservation Devices. Heat recovery devices will be used on .all flues to reduce space and water hea-ting requirements. Automatic-reset thermostats will be used in all spaces to reduce night~time heating requirements. Forced-air heating will not be used, as it requires the highest: thermostat setting for a given level.of comfort.. If a fireplace is used for the apartment (none are presently shown) it will use complete outside air ducting and heat recirculation devices. (dd) Amenities. Understanding the limitations of a one lot building site containing an existing structure, the project will have to obtain a variance from the requirement for open space. There is a bicycle rack immediately adjacent to the site. {eel Visual Impact. There are two important scenic corri- dors adjacent to this project; the view of the l\'heeler Opera House from the Hyman Avenue mall and the view of Aspen 110untain up Nill Street. Neither of these vie\vs will be affected by the proposed development. EVALUATJ;ON CRITERIA: Historic Features. (aa) Nassing. The project will remodel an existing build- ing and construct a second floor producing a building more I similar in height and massing to adjacent buildings on Hyman Street. The remodeled building and addition will be' more compatible with the other two adjacent buildings. The project is significantly be 101-' the allowed height and, of I I course, the height and massing of the Wheeler Opera House. The roof will be flat with parapets, consistent with the majority of buildings in the commercial core. (bb) Exterior Building Haterials. The l?roject 'dill be con- structed using brick masonry on all walls, including the - 6 - ". '- ' _.;i;'{;:T:~f?!~~__ ,....., 1"""\, alley elevation. FE;:ne~tration '"[ill be clear glass \-;ith dark neutral frames. No unfinished walls or exposed roofs will be visible. All upper floor windm-1s, includina the . . . ~ apartn\ent, will be provided with neutral color 1" venetian blinds (e.g" Levelor) which will bE; required to be the, only visible sun control device. Signage will be oriented to thE; pedestrian exclusively and will be controlled by the developer in terms of size, location and graphic style. (cc) Architectural Detail. Based upon suggestions by the Historic Preservation COlTh-nission the fenestration is in contrast to adjacent buildings thereby avoiding a "copying" effect. (dd) Color. The goal of the material colors in the project is to extend a harmony by utilizing the colors used in the vicinity of the project. The masonry \vill be a relatively monochromatic medium brown color and will be used with several complementary trim colors. (ee) Architecture. Starting from a bsis of necessary re- modelling of the existing building, the design integrates the structure into a visually cohesive project with the adjacent buildings while utilizing a contemporary form. -7 -