Loading...
HomeMy WebLinkAboutcoa.lu.sr.Nichols.A4695Nichols Special Overlay Review 2737-181-00-036 A46-95 �? CaAZ,� � 6j-3 Aspen/Pitkin Community Development Department 130 South Galena Street Aspen, Colorado 81611 y� (303) 920-5090 City Land Use Application Fees: 00113-63850-041 Deposit -63855-042 Flat Fee -63 860-043 1 iPC -63875-046 'Zoning & Sign Pernut - MRO11 Use Tax County Land Use Application Fees: 00113-63800-033 Deposit -63805-034 Flat Fee -63820-037 Zoning -63825-038 Board of Adjustment Referral Fees: 00113-63810-035 County Engineer 00115-63340-163 City Engineer 00123-63340-190 Housing 00125-63340-205 Enviromental Health Sales: 00113-63830-039 County Code -69000-145 Copy Fees Other Total__ Name: (!>��/ ,L.�11L&S Date: Address: ✓ �C �[/ (o _ _ Project:j�U_'L�p Vi C'!:) [ ,q <x'�� Case No: _ Phone: I No. of Copies __— CASELOAD SUMMARY SHEET City of Aspen DATE RECEIVED: 04/11/95 PARCEL ID AND CASE NO. DATE COMPLETE: 2737-181-00-036 A46-95 STAFF MEMBER: KJ PROJECT NAME: Nichols Special Overlay Review Project Address: 125 Park Ave. Legal Address: APPLICANT: Gary & Lucinda Nichols 925-1043 Applicant Address: Box 8116, Aspen REPRESENTATIVE: John Backman, Studio B 920-9428 Representative Address/Phone: 555 N. Mill St. Aspen, CO 81611 -------------------------------------------------------------- -------------------------------------------------------------- FEES: PLANNING $ 425 # APPS RECEIVED 1 ENGINEER $ # PLATS RECEIVED 9 HOUSING $ ENV. HEALTH $ TOTAL $ 425 TYPE OF APPLICATION: STAFF APPROVAL: 1 STEP: X 2 STEP: */Meeting Date 26 PUBLIC HEARING: YES �NO VESTED RIGHTS: YES NO CC Meeting Date PUBLIC HEARING: YES NO VESTED RIGHTS: YES NO DRC Meeting Date --------------------------------------------------------------- --------------------------------------------------------------- REFERRALS: lieCity Attorney Parks Dept. 'I City Engineer Housing Dir. Bldg Fire Inspector Marshal Aspen Water City Electric Holy Mtn. Cross Bell Envir.Hlth. ACSD Zoning Energy Center DATE REFERRED: ---------------------------- FINAL ROUTING: INITIALS: School District Rocky Mtn NatGas CDOT Clean Air Board Open Space Board Other Other DUE: DATE ROUTED: Z INITIAL: City Atty City Engineer Housing Open Space FILE STATUS AND LOCATION: a. Zoning Env. Health Other: Nichols Overlay Committee Review Approved June 7, 1995 The Committee approved, 4-0, the re -submission of the Nichols' proposal located at 125 Park Avenue. The Committee approved the second submission with the following conditions: • the porches shall be larger and more useable • treat the towers as more individual The please find attached the submission as was approved. 0 - ---! L_ �) a MEMORANDUM TO: Overlay Zone District Sub -Committee FROM: Kim Johnson, Planner RE: 125 Park Avenue DATE: June 7, 1995 This project was originally presented to the Overlay Committee on May 3, 1995. It was tabled in order to give the architect a chance to work on some design elements which the Committee felt needed to be further developed. These items were: 1) Emphasize the entryways for both of the duplex units (color, overhangs, materials) 2) Develop a more detailed fenestration scheme 3) Create a model showing details of street elevations Attached is information submitted by the applicant on May 30, 1995. It notes that a model will be available at the March 7 meeting. In response to the Committee's concerns, the architects have added porch -like overhangs, altered window patterns on parts of the building, and redesigned the ADU stairway to eliminate the setback encroachment. Please refer to the letter and drawings, attached. cs t0e I I 8 a r c h i t e c t s LETTER OF TRANSMITTAL (Ha n d Del i v e r e d) To: Kin Johnson City of Aspen, Community Development Program 130 South Galena Street Aspen, Colorado 81611 From: John Backman - Studio B Architects Re.: F.A.R . Review - Second Submission Duplex at 125 Park Avenue Date: May 31, 1995. Dear Kim: We are enclosing our second submission for F.A.R Review for the duplex project at 125 Park Avenue. Unless we hear otherwise from you, we will be planning on presenting this project on June 7. We have built a model at 1/8th scale showing adjacent structures which we will bring with us on June 7. Please note that the drawings in this revised package are addressing the following issues which were of concern to the committee members: 1. Extended porch -like overhangs to accentuate entries. 2. Different fenestration patterns on gabled elements and pyramidal elements to enhance their reading as separate components and reduce the perceived scale of the overall structure. 3. Different fenestration styles for openings in walls with stucco finish an walls with wood siding reducing the perceived scale of the overall structure. 4. Stair descending to A.D.U. relocated to fit within property setbacks. We are enclosing four sets of drawings. Should you require additional sets of drawings or other support material, please give us a call. I will be out of town until June 7 but Scott Lindenau will be happy to help you. Regards, John Backman Project Architect cc.: Gary and Lucy Nichols, Owners 555 n. mill st. aspen co. 81611 303.920.9428 tax 303-920.7822 MEMORANDUM TO: Overlay Zone District Sub -Committee FROM: Kim Johnson, Planner RE: 125 Park Avenue I DATE: May 3, 1995 �P SUMMARY: This project is located in the Smuggler Mountain neighborhood, therefore both the general guidelines (Chapter 1 of the "Neighborhood Character Guidelines") and the specific guidelines for Smuggler Mountain (Chapter 4) will be applied. The applicants request approval for a new duplex to replace an existing duplex. The proposed FAR for this 7,688 sq. ft. R-6 lot is 3,721 sq. ft. The allowable FAR is 3,870 sq. ft. The new structure will be 96% of the maximum FAR. The special review process is mandatory as is compliance with the Committee's findings. APPLICANT: Gary and Lucinda Nichols, represented by John Backman, Studio B Architects LOCATION: 125 Park Avenue, southwest corner of Park Avenue at Dale Avenue) STAFF COMMENTS: Please refer to the application for the complete representation of the proposal. Planning staff finds that this project is substantially in compliance with the general and specific neighborhood guidelines. No conditions are recommended for approval. STAFF EVALUATION: The new duplex will cover substantially less site area than the existing duplex because it is a two story building. Each unit faces a different street frontage. The building will provide a one car garage and three exterior parking spaces on the Park Avenue frontage and a two car garage and one exterior space off of the alley. The height to the tallest ridge will be 26 feet. The designers have made great effort to break up the mass of the ' duplex with varying siding materials and accents and creativity with their use on the building. The wall and roof areas create multiple at -grade and above -grade spaces. The four mature trees /O along the Dale frontage will be augmented with additional landscape ,,,,,f MST„9 plantings on Park Avenue and the southern property line. • Mass and Scale Guideline #2. New buildings should appear milar in scale Tom- . 6►� bld � - � � -,,�,� ��?�%� �� • to those in the established neighborhood, or to the scale that is desired for the neighborhood. Response: The building envelope is atypically shaped because of the angled corner and street frontages. The applicant is thoroughly utilizing second floor square footage which is consistent with other building forms in the neighborhood. There is variety in the proposed rooflines which helps break up the mass of the building. RECOMMENDATION: Staff recommends that the Committee approve the request to exceed 85% of the allowed FAR at 125 Park Avenue with no conditions. Additional Comments: tA IMPORTANT Three sets of clear, fully labeled drawings must be submitted in a format no larger than 11 "x17", OR one dozen sets of blueprints may be submitted in lieu of the 11 "x1 T format. APPLICANT: Gary and Lucinda Nichols 125 Park Avenue Aspen, Colorado 81611 ADDRESS: ZONE DISTRICT: Medium -Density Residential (R-6) LOT SIZE (SQUARE FEET): 7688 sf EXISTING FAR: Interior: 2937 sf, Decks: 889 sf ALLOWABLE FAR: - 3870 sf PROPOSED FAR: 3721 sf EXISTING NET LEASABLE (commercial): n.a. PROPOSED NET LEASABLE (commerciai): n.a. EXISTING % SITE COVERAGE: 49.76% PROPOSED % OF SITE COVER,!�GE: 30.38% EXISTING % OPEN SPACE (Cct;.- al): n.a. PROPOSED % OF OPEN SPACE (Commer.): n-a- EXISTING MAXIMUM HEIGHT: Principal Bldg.: 16 ft /p,cce=BW: n.a. PROPOSED MAXIMUM HEIGHT: _Principal B1da.: 26 ft / Acce= E .: -- _ PROPOSED % OF DEMOLITION: 100% EXISTING NUMBER OF BEDROOMS: 6 Bedrooms PROPOSED NUMBER OF BEDROOMS: 7 Bedrooms EXISTING ON -SITE PARKING SPACES: 4 spaces ON -SITE PARKING SPACES REQUIRED: 7 Spaces SETBACKS: EXISTING: ALLOWABLE: PROPOSED: Front: 9'-0. Front: 10'-0" Front: 20'-0" Rear: 13'-9" Rear: 10'-0" Rear: 10'-0" Side: 38'-8" Side: 5'-0" Side: 12' & 1 V-6 Combined Front/Rear: 22'-9" Combined Frt/Rr: 30'-0" Combined Front/Rear. 30'-0" EXISTING NONCONFORMITIES/ ENCROACHMENTS: VARIATIONS REQUESTED (eligible for Landmarks Only: character compatibility must be made by HPC): FAR: -finding Minimum Distance Between Buildings: SETBACKS: Front: Parking Spaces: Rear: Open Space (Commercial): Side: Height (Cottage Infill Only): Combined FrtJRr-. Site Coverage (Cottage Infill Only): • • ASPEN/PITKIN COMMUNITY DEVELOPMENT DEPARTMENT 130 South Galena Street Aspen, Colorado 81611 Phone 920-5090 FAX 920-5439 MEMORANDUM TO: Zoning Officer FROM: Kim Johnson, Planner RE: Nichols Special Overlay Review Parcel ID No. 2737-181-00-036 DATE: April 18, 1995 Attached for your review and comments is an application submitted by Gary & Lucinda Nichols. Please return your comments to me no later than April 21. Thank you. ! i B a r c h i t e c t s LETTER OF TRANSMITTAL ( H a n d D e l i v e r e d) To: Kim Johnson City of Aspen, Community Development Program 130 South Galena Street Aspen, Colorado 81611 From: John Backman • Studio B Architects Re.: F.A.R . Review Submission Duplex at 125 Park Avenue Date: April 11, 1995. Dear Kim: We are enclosing our submission for the F.A.R Review for our proposed Duplex at 125 Park Avenue, Aspen. We hope to be on the agenda for Wednesday, May 3. In this submission, Please expect to find enclosed the following: 1. Application form (three copies). 2. Check for $ 425.00. 3. Drawings and Descriptions, including: a. Project Data and Vicinity Maps b. Parcel Survey. c. Written Description of neighborhood and proposed project. d. Site Plans, Floor plans and Elevations. Should you require any other documentation to complete this submission, please let me know. Regards, r�p'b John Backman Project Architect cc.: Gary Nichols, Owner 555 n. mill st. aspen co. 81611 303.920.9428 fax 303 920 7822 125 Park Avenue Duplex 1 25 Park Avenue Aspen, Colorado SUBMISSION FOR F.A.R. REVIEW • APRIL 11 1 995. SECOND SUBMI SSI ON: MAY 30, 1995. Owners: Gary and Lucinda Nichols • 125 Park Avenue • Aspen, Colorado 81611 • 303 925 1043 Architects: Studio B Architects • 555 North Mill Street • Aspen, Colorado 81611 • 303 920 9428 TABLE OF CONTENTS: 0.1 Project Data and Vicinity Map 0.2 Parcel Survey 0.3 Written Description of Property and Proposal 1 . Roof and Site Plan 2. Lower Level Floor Plan 3. Street Level Floor Plan 4. Upper Level Floor Plan 5. North (Dale Avenue) Elevation 6. West (Alley) Elevation 7. South (Side Yard) Elevation 8. East (Park Avenue) Elevation a r c h i t e c t s Project Data ' Project Location: 125 Park avenue, Aspen, Colorado Aspen Neighborhood: Smuggler Zone: Medium -Density Residential (R-6) Use: Duplex Lot Size: 7688 sf Allowable Proposed Building Gross Area: Lower Level 2360 sf (Excluding Decks) Street Level 2329 sf Upper Level 1852 sf n.a. Total 6541 sf Floor Area: Lower Level n.a. Street Level 1852 sf Upper Level 1869 sf 3870 sf Total 3721 sf (149 sf under) Above Grade Decks 580.5 sf 724.75 sf (15% of F.A.R.) (144.25 sf over) Lot Coverage 2719.5 sf 2351 (368.5 sf under) Deck and Canteliever 407.9 sf 295 sf extensions (15% of lot coverage) (112.9 sf under) Off Street Parking No spaces required for No spaces provided one bedroom ADU Unit 3 Spaces required for 3 Spaces provided West Unit 4 Spaces required for 4 Spaces provided East Unit i Vicinity Map N Not every street or road Is named on maps or listed in st reel guides. Construction \ streets and roads may be it progress in certain areas. N Q M K � Q0 0 c� a U � ,� N O 0 I' - 10' On 0 10 20 INDEPENDENCE SUB -DIVISION D,q4 e 14 N 7S'p6 0p •R, Se 17 FLAG l POLE a i UTH Ii2 A PAVED -- 'IVE AREA n s DECK .. O GRAVEL DRIVE O AND PARKING W V O I OJ < O V V l O m 3 0 PLANTER 2 UTILITIES w 13.0' z U FETAL ros�1 eeo / 231b i / / OVERHEAD UTILITIES TYPICAL NOTICE. Aa GADII TO COLORA00 LAW YW MJSI C. NCE Y LEWL ACTION BASED VP ON ANY DEFECT ON THIS PLAT WITHIN TM EEYEARS AF iER YOV FIN DISCOVER SIXH DEFECT, IN NO EVENT HA ACTION BASED WON ANY DEFECT IN THIS PLAT BE CO.MENCED PORE Y THAN TEN YEARS FRON THE DATE OF THE CERTIFICATION SNOMI HEREON. THE CERTIFICATION IS VOID IF NOT WET STAMPED WITH THE SEAL OF THE SUI VEVOR Ip l S rDR" OUpt Ek 0. BELLJ S 75.06 .00 -E DJ J7 s.0 ell OR N1ZONTAL CONTROL 0 r= LEGEND AND NOTES THE SURVEY PLAT OF BLOCK 6. RIVERSIDE ADDITION PREPARED FOR THE CITY OF ASPEN BY SURVEY ENGINEERS. INC.. JOB N0. 0180. DATED: AUGUST. 1970 WAS USED IN THE PREPARATION OF THIS I.L.C.. O FOUND SURVEY MONUMENT AS DESCRIBED 9 WOOD FENCE 0 UTILITY POLE TITLE INFORMATION FURNISHED BY: PITKIN COUNTY TITLE. INC CASE NO. PCT-6863 DATED: 08/05/92 POSTED ADDRESSES "301 AND 101. DALE AVENUE" IMPROVEMENT LOCATION CERTIFICATE I HEREBY CERTIFY THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS PREPARED FOR_ THAT IT IS NOT A LAND SURVEY PLAT OR IMPROVEMENT SURVEY PLAT. AND THAT IT IS NOT TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCES. BUILDINGS OR OTHER FUTURE IMPROVEMENT LINES. I FURTHER CERTIFY THAT THE IMPROVEMENTS ON THE ABOVE.DESCRIBED PARCEL ON TH15 DATE - I EXCEPT UTILITY CONNECTIONS. ARE ENTIRELY wI THIN THE BO D R ES OF THE PARCEL. EXCEPT AS SHOWN. THAT THERE ARE NO ENCROACHMENTS UPON THE DESCRIBED PREMISES BY IMPROVEMENTS ON ANY ADJOINING PREMISES. EXCEPT AS INDICATED. AND THAT THERE IS NO APPARENT EVIDENCE OR SIGN OF ANY EASEMENT CROSSING OR BURDENING ANY PART OF SAID PARCEL. EXCEPT AS NOTED. THIS CERTIFICATION VOID IF NOT WET STAMPED BY THE SURVEYOR BELOW. DATED: SIGNED:(\H WORTH PLS 25941 �c���jF>. lifi/:•-.;• . ;ON l 9•`.� 25947 - IMPROVEMENT LOCATION CERTIFICATE OF F LOTS IO AND II BLOCK 6_ RIVERSIDE ADDITION TO THE CITY AND TOWNSITE OF ASPEN, AND THE SOUTH ONE HALF OF DALE AVENUE. ADJACENT TO LOT 10. BLOCK 6. RIVE+t;IDE ADDITION. LYING BETWEEN RIVERSIDE AVENUE AND PARK AVENUE, COUNTY OF PITKIN. STATE OF COLORADO. AREA 7.688 50. FT •/- PREPARED BY ASPEN SURVEY ENGINEERS. INC 210 SOUTH GALENA STREET ASPEN. COLORADO 81611 PHONE/FAX (303) 925-3816 DATE JOB N' O ThePrudential Telluride Real Estate Corp. Plaza 117, Suite 206 117 Aspen Airport Business Center Aspen, CO 81611 Bus. (303) 925-1043 Fax (303) 925-1063 April 10, 1995 Historic Preservation Committee Planing and Zoning 130 So. Galena St. Aspen CO 81611-1975 Dear Members, The lower Smuggler neighborhood acquired much of its character with building developments that took place in the late 60's and early 70's when smaller, more modest homes were suited to the cost of the land. Small one and two story buildings with private gardens enclosed within fences contribute to the human scale, pedestrian friendly quality, and unique neighborhood feeling. The character of the neighborhood stems from its irregular layout. The base of Smuggler Mountain and the basin carved out by the Roaring Fork River have resulted in a very contoured topography. The road and buildings conform with the curving and non geometric layout. The diverse use of building materials has further contributed to this feeling of informality. The value or cost of property in Aspen has appreciated considerably since the first homes were built. The Smuggler neighborhood is struggling to preserve its character, as more and more of the smaller, aged structures are being replaced with larger more useful homes and upscale developments. We have lived in Aspen since 1988 and are part of a small, tenacious stronghold trying to live, work and raise a family here. We intend to continue residing at 125 Park Avenue for many years to come. Our hope is to participate in the evolution of our neighborhood, while preserving its unique character. We have worked carefully with our architect to design a project that is sensitive to the neighborhood in materials, massing, and human scale. We trust you will see the efforts that have gone into this place we hope to call "home". Regards, Gary �Nicho s Lucinda Nichols • a r c h i t e c t s April 11, 1995. City of Aspen Community Development Program/HPC 130 South Galena Street Aspen, Colorado 81611 Dear Members, .7 Our program calls for two free market units with an A.D.U. We have deliberately steered away from the symmetrical layout which usually characterizes duplex developments. Taking advantage of the corner lot condition, we have allowed for the eastern unit to face Park Avenue and the western unit to face Dale Avenue, enabling each to have a private entrance frontage and garden. The project when seen either from Dale or Park Avenue will be perceived as a single family dwelling rather than as a duplex. In an effort to keep the project consistent with the scale of the neighborhood, we have further attempted to break down our proposed structure into four distinct parts: two pavilion pieces with pyramidal roofs and two bar pieces with gabled roofs. These four components are connected with glazed, flat roofed links. Our project, when viewed from any angle will appear more as two small building than one large one. In a further effort to contribute to the human scale, we are proposing a combination of exterior cladding materials, all commonly seen throughout the neighborhood: stucco at the base, vertical wood siding at the upper level and shingles for the roof. Rather than having a clear break between siding materials, the wood occasionally meets the ground and the stucco likewise occasionally reaches for the sky, resulting in an interlocking composition of materials and further detracting from any monolithic perception of the building. John Backman, Project architect 2r-7 555 n. mill st. aspen co 8161 1 303 920 9428 lax 303 920 7822 An Independently Owned and Operated Member of The Prudential Real Estate e Dale Avenue Edge °J Pavement \ Exi tin � C lo oq . Pro e Lin, ff Exis Y� C� Blue ruce v E shn p a N s k Yard Seib rj Ex/St�n9 Shed (dej1pphshed) c o - - — - �9) 4. -- \ c, 8 - \ and Setback i' \ (- rky,____Frontf _gy-- -- - o'rV, W1 Xis ng- - if (den! t,s nnt - - - • i -- -._ . -.- sk --_ _ - _ .�-"' Via`,. •stir` Total -Stree Parking r West Unit: 3 pace's c -- �•� Toia,, Off-S1rt;� ,; •. v pr Asp ns Parkin r East t 'sue N Unit;-4 Spaces oPert 1�rne m 9g e m a Roof and Site Plan 1/16„=1,_0" a) Q. 0 CD � O Cu C .0 C' 0) O Q O U) M CU LC) O rao T • • Lower Level floor Plan 1/8„_1,_0" VI Master Bedroom Street Level Floor Plan 1/8'=1'-0" 4Ven4e Proms � dine — i vestibule j ? v i .'�— I Laundry lP IJyhtwell v (Below) m Mudroom v — I o a • ' One Car Garage Tools I ; —1 r— 1 I Propel tine m T x (1)^^ :� L o C a :3 o q) CU L.a'°> L p L. 0 i V M C4w J a� r Q V) • • • 0 0 • • • North (Dale Avenue) Elevation 118"=1'-0" 1 I i I I I I I I E] 101, I I -- L- �J Proposed Exterior Materials Max. Allowable Ridge Height Max. Allowable Building Height Top of Plate Upper Level F.F. Street Level F.F. Natural Grade Lower Level F.F. Exterior Wall Cladding: Stucco at lower portions 4" Vertical rough sawn cedar siding at upper portions Roofing Material: Cedar shingles Windows and Doors: Wood/clad Railings: Painted Steel • �71 0 • 1 ,. .. LAI 1 I:--- -j- rI I rt--- ----- -�---------- - -- -- ---- ---- -- - ---i —--------+ 1 ' I i West (alley) Elevation Max. Allowable Ridge Height Max. Allowable Building Height Top of Plate Upper Level F.F. 9 _ I Street Level F.F. Natural Grade �I �I Lower Level F.F. I' Top of Plate IMMMOMMEM Ell limit - Upper Level F.F. A4i� . Street Level F.F. I 1 I• I u I I, I it I Lower Level F.F. South (side yard) Elevation 1/8"=1' 0" 0 Qi > 0 W 0 C � � Q 0 L. V ca a CD /� �� T� Q A GZ C c t3 A I _ 2/4 -------------------------------�---J East (Park Avenue) Elevation I/a-'=1'-0" Max. Allowable Ridge Height Max. Allowable Building Height Top of Plate Upper Level F.F. Street Level F.F. Grade Lower Level F.F. d � 0 � W 0 0 Q—o°�c ^ d 3 = � U � Qi a rCN � a 1,r I— Q W