HomeMy WebLinkAboutminutes.apz.19831122
RECORD OF PROCEEDINGS
100 Leaves
F ORM'~ C. F. HOECK E L B. 9. II L. CO.
Regular Meeting
Planning and Zoning Commission
November 22, 1983
Chairman Perry Harvey called the meeting to order with members Jasmine Tygre,
Pat Fallin, Welton Anderson, Lee Pardee, David White, Roger Hunt and Paul
Sheldon present.
Commissioners
Comments
Roger Hunt said the Commission should speak to the
department about their parking south of City Hall.
said he would be willing to talk to them.
police
Hunt
Paul Sheldon said there is a new transit agency, and they are
effecting the transportation in Aspen. Sheldon asked if the
agency would come to P & Z or Council for comments. Sheldon
pointed out the route on Hyman Avenue was removed with no
consultation from the city. Sunny Vann said this can be
addressed in the transportation planning. The transit agency
is trying to get going with no major change in existing
service.
Harvey asked the Commission how they would like to handle the
scoring of the projects. Pardee said he would like the
planning office, applicant, public hearing, and the planning
office can be totalling the scores while the Board hears the
next presentation. Sunny Vann told the P & Z that in
addition to the scoring, one of the projects is requesting a
multi-year allocation. Vann said after both projects have
been scored, the Board will hear a presentation to the
appropriateness of a multi-year allocation. Harvey said he
would like the scores handed in and tabulated by staff.
Harvey said he is employed as a consultant for the Hotel
Jerome, and that could be construed as a conflict of interest
in judging these applications. Harvey read a letter from
the owner of the Hotel Jerome into the record. In the letter
Gilmore stated he feels there is no conflict as he is support-
ive of new lodge development if of quality, sensitive in
scale, etc. Harvey read a letter from himself into the
record disclosing his position as a consultant working with
Gilmore on the upgrading of the Hotel Jerome. Harvey stated
his dedication to the Jerome project derives from the con-
viction that Aspen needs to upgrade its lodging inventory.
Harvey said new lodging is in keeping with the work on the
Jerome and his belief about Aspen's lodges. Harvey said he
feels no conflict on his work on the Jerome and his position
on P & z.
Wright Hugus, attorney for Lyle Reeder, said he had no
objection to Harvey hearing these applications. Art Daily,
attorney for Commerce Savings Association, said he sees no
conflict. Assistant City Attorney Gary Esary said the proced-
ure outlined in the letter is consistent with conflict of
interest questions. Anderson stated he is one of the credit-
ors in the bankruptcy. Anderson said he does not feel biased
in this. Hunt said he is in the same position and feels the
same as Anderson. Hugus asked if either members had any
specific creditor problems with this real estate. Hunt and
Anderson answered no. Hugus said then he felt there was no
conflict of interest in this application. Daily stated the
Aspen Mountain Lodge does not feel these members have a
conflict.
Sheldon, the alternate member, said he is the manager of the
St. Moritz lodge. Sheldon said the potential conflict is
that additional lodge rooms in a limited market could effect
him. On the other hand, eleimination of the Copper Horse
Regular Meeting
1984 L-l/L-2
Lodge GMP
Competition
...-.., ".......---...-,.....
Planning and Zoning Commission
November 22, 1983
and Alpina Haus from short term accommodations is significant
to the St. Moritz as they could benefit from the elimination
of dorm rooms. Sheldon said he participates in the P & Z
as an individual but would listen to objections. Sheldon
said this would only become relevant if he were to vote.
Pardee said he feels this situation may be a problem.
Pardee said if the vote is close, it is wiser to have someone
step down. A manager of a competing hotel has a conflict to
some degree.
Esary read from Ordinance #50, 1979 (1) (h) the definition of
substantial interest; "substantial means and includes a
situation where, considering all of the circumstances, a
reasonably prudent person would expect a marked tendency to
make a decision other than an objective decision". Harvey
said he would not be at the next meeting, and Sheldon will
be in a voting position. Daily said he feels Sheldon does
not have a conflict. Hugus said they have no problem.
Hunt moved to not remove Sheldon from the Commission for the
reason that the applicants and other Commission members have
no objections; seconded by Fallin. All in favor, with the
exception of Pardee. Motion carried.
Sunny Vann, planning director, stated there are two projects
before P & Z for consideration for a 1984 GMP lodge alloca-
tion; The Lodge at Aspen, submitted by Lyle Reeder, and the
Aspen Mountain Lodge, submitted by American Century Corpora-
tion, Commerce Savings Association and Alan Novak. The
process for this meeting will be an overview of each of the
projects. Vann told P & Z that Reeder submitted and success-
fully competed for a GMP allocation two years ago for a
similar project on the same site. Alan Richman will give
information on the implications of that prior GMP application.
Vann said these projects are reviewed by individuals in the
planning office. The recommendations are then reviewed by
the entire planning office staff. The composite recommenda-
tion is forwarded to P & Z as planning office scores under
the various procedures. The P & Z does not have to concur
with the planning office recommendation. Vann reiterated the
staff will go through their recommendation, will then allow
each application to make a presentation, P & Z can then ask
questions, the public hearing will be opened, the P & Z will
then score the project. Vann said the Aspen Mountain Lodge
is requesting a multi-year allocation, and the planning office
does have a presentation on the pros and cons, if the project
is successful.
Harvey said this is a competition for 1984, and asked how many
units are available for allocation. Vann said this is a
competition in 1983 for construction in 1984 and there are
35 units available. Harvey asked what the holdover of units
is. Vann said approximately 50 units. Harvey asked if the
Aspen Mountain Lodge were successful, and they convert units
in the Copper Horse and Alpina Haus from lodge to residential,
will that affect the multi-year allocation. Vann said the
Copper Horse will be a change in use and will have a separate
review as it is going from L-3 lodge to residential. The
Alpina Haus is R/MF and will go to deed restricted employee
housing and no change in use will be required. Vann said the
quota will be affected and there will be an adjustment. The
Copper Horse units will be credited to L-3 quota, and the
residential quota will be debited.
... ,
FORM 10 C. F. ~OECK(L B. B. 8t L.. C~.
, '
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
The Lodge at
Aspen
Planning and Zoning Commission
-3-
November 22, 1983
Alan Richman said the P & Z scored this project a few years
ago, in a similar but somewhat different configuration.
This is a proposal to build an entirely new facility on the
corner of ute and Original next to the Aspen Alps. The
proposal is for 46 tourist rooms and six employee units.
The units are about 216 square feet each. The lot size is
slightly of 15,000 square feet; it is a small, constrained
site. Richman said previously, the applicant won an alloca-
tion to build 31 tourist units and four employee housing
units. Richman said the planning office feels this project
has a net effect on the quota of 15 units. The applicant
would relinquish the previously awarded 31 units, if he is
awarded the 46 units requested in this submission.
Richman said there are some desirable and some undesirable
features in the project. Richman said important aspects are
underground parking, 1 per bedroom; the lodge is quite close
to the ski area. Richman said the applicant has proposed
some on-site amenities for guests, dining and health facilitiel
although the staff has some problems with some of the quality
of those. The applicant is proposing to house about 80 per
cent of the lodge employees. Richman said the proposed rooms
of 216 square feet are extremely small. The previous rooms
were 320 square feet. There is a question if these are the
type of units that are desirable in the Aspen lodging market.
Richman told P & Z there is a substantial degree of paving on
the site. Richman said there is a landscaping plan. There is
no outdoor recreational or open space amenities of any
magnitude on this site. Richman said in the water system,
there was a commitment by the applicant to sharing the cost
of a looped water system. Richman said the applicant is
willing to provide the cost for the loop involving this
particular project; therefore, the applicant is improving the
level of service for this project only. Richman said it is
unlikely the quality of service to the area would be improved
by this proposal and the city does not have any funds to
share in this project. The planning office scored this area
a one (1).
Richman said in storm drainage and fire protection there are
substantial upgrades. There is a proposal to extend the
storm sewer up Aspen mountain road, which would improve a
neighborhood drainage situation; therefore this got the
maximum rating of two (2). In fire protection, the applicant
proposes the installation of a hydrant, which would improve
fire protection services.
Richman said the road proposal is simply a proposal to black~
Aspen mountain road, which is only cosmetic, not service ~
related. Harvey noted the applicant proposed the fire
hydrant in the northwest corner and the fire department
prefers it at the northeast corner. Richman said the P & Z
may find that the hydrant located in the northwest corner
would primarily benefit the site and not the general area.
Richman said the staff scaled the height of the building and
found the peak of the roof too high allowed in the L-l zone
district; therefore, there is a major flaw in design. Richman
said the applicant may be able to technically clarify the
position regarding the height. The information provided to
Regular Meeting
,,<""'_"~"n_'''"',__'
Planning and Zoning Commission
November 22, 1983
staff indicated a design flaw. Richman said this would not be
considered a design flaw it the roof were brought within the
heighth limitations. Richman said within the conceptual
nature of an applicant's presentation for growth management
approval, the staff would not typically reject an application
exceeding the code by a few feet. The applicant would have
an opportunity to clarify the situation.
Richman pointed out in site design there are three curb cuts
proposed; two on Ute avenue and one on Aspen mountain road.
The engineering department does not feel three curb cuts on
a site of this size was necessary and not a desirable site
design. Richman said the staff feels this is a major design
flaw in terms of site design.
Richman said the proposal has an ambitious parking scheme with
two levels of underground parking. The engineering department
is questioning the turning radius, it may not be adequate.
Richman said there was no information provided on the trash
facility,it's location and the extent of it.
Richman told P & Z for the guest amenities, these are rated
with the size of the lodge, size of the facilities and
quality of facilities. The planning office finds the common
meeting facilities somewhat inadequate; there are only
meeting areas in the lounge and lobby. The lounge area will
also be a dining area as well as a sitting area. There is no
area for conference facility. There are lodges in Aspen of
this scale with common meeting'~The planning office finds
this to be a design flaw with not even a small area of the
lodge dedicated to meeting areas.
Richman told P & Z the lodge does provide restaurant facilitief
for guests, which is fairly standard. The problem with the
recreational facilities - the saunas and exercise room - is
their location, in the parking area below grade. Richman
said the staff does not feel the quality of those facilities
meets the standard of Aspen. Harvey said in amenities a score
of one (1) indicates services which are deficient in terms of
quantity or spaciousness. Harvey asked if the planning office
had standards of square footage per person for amenities.
Vann said the staff does not have a quantitative measure.
The staff looks at the number of rooms provided and address
whether the applicant has included the space for the sole
purpose of gaining points or whether they have tried to come
up with an area, through design, which tries to provide an
amenity for the guest. Richman pointed out the L-l, L-2
district requires 25 per cent of the lodge to be non-unit
space, not rentable, not employee housing. This facility has
27 per cent, which meets the requirement.
Esary said there is a standard, total non-unit space should be
25 per cent. This project has 27 per cent. The P & Z can
look at this application and come up with a ratio which can
be determined of rooms to square footage. Richman said
another comparison the planning office used was evaluation of
similarly sized facilities in the community and the amenity
package provided. Richman said he had visited many of the
lodges in the 40 to 50 room size and moast of them have
meeting rooms and outdoor recreational facilities.
Richman said the application indicates it will house all 15
employees of the project on and off site. The on-site
proposal is for 12 employees in 6 rooms. The off-site housing
proposal contained no information as to specifics of location.
Richman said no progress has been made in firming up a
specific proposal. Pardee said the P & Z cannot expect an
applicant to go buy 3 condominium unit in the expectation he
will get an allocation.
'J
, I
FOllM" C.F.HOECKtl8.9.IlL.CJ.
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
Planning and Zoning Commission
-5-
November 22, 1983
Vann noted the housing office must review the specifics of a
proposal to determine if it complies with the guidelines.
Harvey said there are two applications before the P & Z. One
application estimates its employee requirement for one for
every two rooms; the other, one for every three rooms. Harvey
asked if this estimate for this project of 15 employees is
the staff's estimate, or the applicant's. Richman said this
is the applicant's figure, which was reviewed by the housing
office. Harvey asked if it were fair for P & Z to consider
two applications with different requirements for employees.
Richman said the housing office has standards it uses for
number of employees per hundred beds. The standard the
housing office feels comfortable with is for every 100 beds,
between 13 and 23 employees will be generated based on the
level of service the lodge is trying to provide to its guests.
Richman said the difference in the two applications is probabl)
level of service. Richman said the P & Z would not want to
have all lodges with the same level of service as there is
a variation of market.
Harvey asked if the number of employees takes into considera-
tion the widely varying occupancy rates during the year.
Richman answered this is dealing with peak, fulltime equiva-
lency. Richman pointed out the P & Z had difficulty with this
application in 1981 with the number of employees proposed.
The applicant said he would house 100 per cent of his employeef
but it did not appear he had identified 100 per cent of his
employees. The new lodge quota system was written to reflect
the concerns of P & Z, with detail listing of employees
required to serve the lodge. Richman said the housing office
finds 15 employees to be adequate. Vann said it is suggested
the applicant contact the housing office to discuss reason-
ableness of employees needed and discuss any problems. Usuall)
the staff and applicant wind up with a mutually agreed upon
number.
Lyle Reeder presented a model of the project and passed out
comments in written form. Reeder said he would like to
comment, generally, about the P & Z competition, and to
address the specific deficiencies that planning did in scoring
this project. Reeder said the Lodge at Aspen is a 52 room
project, 46 lodge rooms and 6 employee rooms. This project
will cater to ski clubs and budget-minded skiers. Reeder
said he feels that the proposed demolitition of the Continenta
and Aspen inn, to be replaced with a first class world hotel
will create a deficiency in the low and medium price range.
The Lodge at Aspen with smaller rooms can offer more reason-
able price accommodation than a hotel offering large rooms,
energy consuming swimming pools and elaborate health facilities
which some guests may never use. Reeder said he has some
objections to the Aspen Mountain Lodge project. The first
regards Ordinance #35, 1983. Harvey said this is not
pertinent to the review of the Lodge at Aspen. Harvey said
he would like Reeder to clarify any points.
Reeder presented a summary of the planning office scoring,
showing where rated below the maximum, the multiplier and the
total number of points he has not received. Reeder, in his
memorandum, then addresses each category of review. Reeder
said the city's water department director has indicated a
neighborhood deficiency, and the Lodge as Aspen's proposal
to share the cost of the looped water main would bring about
Regular Meeting
.......~'''_._.''''.._....',_.-
Planning and Zoning Commission
November 22, 1983
correction of the neighborhood water system inadequacies.
Reeder stated the water consumed by this project will be
metered and paid for resulting in increased revenues to the
city. Reeder stated he feels a two (2) rating would be
appropriate.
Reeder said the applicant will pay sewer tap fees and the
sewer assessments. Harvey asked the applicant if he was
sticking to the commitment to share the cost of the water
improvement. Harvey pointed out of Markalunas says there
are no city funds available to construct any portion of the
water system, there is a problem. Reeder told P & Z this
comes from two years ago when Markalunas indicated the city
was willing to pay a share. Reeder said he feels sharing
the cost is adequate and other people will benefit from the
loop, and the city should share the cost of providing for the
loop.
Harvey asked if Reeder was going to do anything to improve
the service beyond the scope of his project, or just take
care of his specific needs. Reeder said the water line is
in the street; he could run to the water line and not even
contribute to the loop. Harvey said it appears to him that
the Lodge would be adequately serviced by providing the loop
but not just be adding into the water line. Richman read
from the referrals, "If the applicant is willing to provide
the referenced improvements (the loop) at its own expense
without any concrete assurances the city would participate,
we would certainly endorse the application as an improvement
to the water distribution system".
Reeder said the costs would be paid for all sewer construction
and the sewer facilities seem to be adequate and a two (2)
rating is appropriate. Reeder said he feels the Aspen
mountain road is more important than indicated in the planning
office report. It is access to the Ajax condominiums and a
house, and continues over Aspen mountain and is used in the
summertime. Reeder said he feels a score of two (2) would
be more appropriate.
Reeder said the proposed lodge will be built within the legal
constraints of the 33 foot height limitation. Reeder pointed
out PUD procedures are not available to the Lodge at Aspen,
restrictions are imposed which limit architectural design
potention. Reeder said compatibility with existing neighbor-
hood developments is to be considered in evaluating archi-
tectural design. Also size of rooms is not a factor. Reeder
said he believes the design fits in well and should have a
higher rating than that given by the planning office.
Reeder said the site design was prepared observing the setback
requirements of the city. Reeder said he is willing to reduce
the curb cuts from three to two. Reeder said it appears that
concentration of tourist rooms at the base of the mountain
will have desired results such as reducing automobile use by
lodge guests. Harvey asked which curb cut the engineering
department wanted removed. Richman said one on ute most
adjacent to the Alps. Sheldon asked where the entrance would
be. Reeder said on Ute avenue. Pardee said a technical
clarification is acceptable, but to change from 3 to 2 curb
cuts is in response to rating. People come in with a presen-
tation not knowing what the competition is and are rated
accordingly. Pardee said the P & Z cannot accept the fact
the curb cuts will go from three to two. Richman agreed
changing the site design does put this process into some
question.
Reeder said the trash removal was not gotten into the original
presentation because normally it is no big deal. The trash
'-
, ,
FORM" C. F. HOECKH B. B. 8t l. C~.
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
November 22, 1983
Planning and Zoning commission
-7-
facility will be located near the southeast corner of the
property. Hunt pointed out that area is grated down for the
parking. Reeder said there would be a retaining wall.
Hunt asked how it would be accessed. Reeder said by Aspen
mountain road. Hunt asked how the people from the building
would get to the facility. Reeder pointed out the sidewalk
area.
Reeder said for snow control, the lodge will have engineered
snow stops installed to retain snow on the roof; heat tape
system installed on the edge of the roof to control ice
build up; heat systems will be installed in the sidewalks and
driveyway and on site dry wells will handle any runoffs.
A snow plow will be kept on site for clearing snow, and
contract snow removal will be used for emergencies in heavy
snow fall.
Reeder said parking for the project is provided of one space
per lodge and employee bedroom, which is a requirement of the
L-l and L-2 area and bulk requirements. Reeder said the
turning radius for cars in the parking area was laid out
according to the city's parking standard. Harvey said in the
application an auto elevator into the parking garage was
mentioned and asked if that was because the site constraints
are such that a ramp cannot be constructed. Reeder said in
doing engineering work, if a ramp is not adequate, they will
go to an elevator. Hunt asked about the snow and ice control
on the ramp. Reeder said there will be heat in the concrete
with drains at the bottom.
Reeder said the height of the building will be reduced slightl
to stay within the area and bulk requirement. Reeder said
the Lodge at Aspen sits back off Ute avenue in order to
enhance the visual appearance from the street.
Reeder said in the amenities section, the commission shall
consider each application with respect to the quality and
spaciousness of its proposed services for guests as compared
to the size of the proposed lodging project. Reeder said it
appears that a smaller lodge will be limited in its ability
to provide amenities. Reeder said he feels that a common area
of 1120 square feet of lounge and lobby is sufficient for a
46 room lodge. Reeder pointed out the restrictive nature of
the area and bulk requirements, conference facilities in a
small lodge are unrealistic.
Reeder said in the L-l zone, restaurant for public use is
prohibited except as a conditional use. This lodge is
located within walking distance of the commercial core.
Harvey asked if the applicant intends to serve food to the
guests. Reeder said there is a kitchen, they will serve
breakfast, after ski snacks, etc. Reeder said being located
so close to town, he does not want to be in competition with
restaurants in town. This is more of a convenience item.
Harvey noted that the applicant seems to have changed the
marketing from the original application where it is going to
be a small, elegant lodge catering to an affluent market.
Reeder agreed after considering the original application, in
the sense they have small rooms, they will change the
approach.
Regular Meeting
Planning and Zoning Commission
November 22, 1983
Reeder said as far as the recreational facilities, this is a
small lodge site. There are two athletic clubs within walking
distance. The indoor hot tub at the garden level will look
out at a landscaped area, and will be much more energy
efficient. Vann pointed out in upgrading the L-l, L-2 scoring
the issue of providing amenities was debated at length, and
P & Z felt they should be provided in size and relationship
to the specific project.
Sheldon asked if Reeder proposed to be a moderately priced
lodge. Reeder said yes. Reeder said the Lodge at Aspen
proposes to house 100 per cent of its employees. Three
employees will be housed off site. The Lodge at Aspen will
either enter into long term leases or purchase three condo-
miniums. Reeder feels this will provide a better lifestyle
for employees, particularly if they have families. Harvey
asked if this project passes threshold, is the applicant
prepared to enter into an agreement with the city regarding
this housing. Reeder said he is, and will have the units
stay within the housing guidelines. Reeder told P & Z the
employee unit at garden level will be built to meet building
code requirements for habitation. A door to the outside of
the building will be provided, and minimum window requirements
will be designed into the unit. Reeder said he feels this
project qualifies for 15 points for employee housing.
Reeder said this applicant represents the first attempt since
GMP adoption to construct an entirely new lodge. The
submission addresses the upgrading of a key corner location
with proximity to the base of Aspen mountain and the proposed
Little Annie ski area. Reeder said the design of this lodge
represents an attempt to develop an intimate scale lodge, in
keeping with a mega structure approach. Reeder said the
project can be built within any deficiencies in water, sewer,
storm drainag,e fire protection, sidewalks, etc. The
location is within walking distance to the commercial core
and public transportation. Reeder said the design of the
proposed lodge will not interfere with the pedestrian traffic
sight line of Aspen mountain. These address bonus points
considerations.
Harvey opened the public hearing.
Jerry Hewey, manager of Aspen Alps, presented a letter to the
Commission. Hewey presented pictures of Ute avenue and the
general area and said it is quite difficult to park in the
area during the ski season. Hewey said the roads in the area
are very narrow and is concerned about safety. Hewey said
this is a nice, small lodge. He has been in the lodge business
39 years and the economics of running a small lodge are very
difficult, particularly a new development. Hewey said if the
lodge is going to have three limosines running 16 hours a
day, it will take 7 employees just to run the limosines.
Hewey said he did not three limosines were needed anyway.
Alan Shaffer, realtor, said he does not think that a fairness
doctrine with respect to hotels is in this scoring. Shaffer
said there could be a lodge without any amenities to guests
and still be a nice place. Shaffer said he feels amenities
is an improper and subjective scoring area.
Wright Hugus, attorney for the applicant, presented a letter
for the record containing technical and legal comments and
objections to the entire GMP procedure in general and the
Mountain Lodge in particular. Hugus said some of his legal
objections are directed toward scoring and the point system;
therefore, he would like his letter considered prior to the
\",
" ;
FORM '.G C. F. HOECKEL B. B. 8: L. ~O.
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
November 22, 1983
Planning and Zoning Commission
-9-
Lodge at Aspen. Hugus said he would be guided by the P & Z
pleasure. Harvey said this a not a comparative process where
the projects are analyzed together; they are rated by the
criteria in the scoring categories. Hugus said his objections
are to irregularities and basic procedure in connection with
the lodge GMP proceedings.
Hugus first objection is that the Aspen Mountain Lodge is
being considered as both a PUD and a lodge competition and
has certain advantages. The second objection is that amenities
scored 9 in Reeder's application and 21 in the Mountain Lodge.
Hugus said it is difficult to equate the amenities for 480
rooms versus 46. The third objection is eliminating 269 rooms
means the Mountain Lodge only needs 211 units from the GMP.
Hugus said it seems to him that the Commission should only
consider 211 units.
Hugus said a project the size of the Mountain Lodge is diffi-
cult to conceive in this small town. It seems to be a compari-
son between projects. The fifth objection requires that an
applicant for a GMP lodge competition has certain standing,
either owner, contract purchaser, option to buy, etc. Hugus
said the applicant for the Mountain Lodge is an assignment for
the rights of the owner to file an application. Hugus said
he did not feel this is proper.
The sixth point is the request that the Mountain Lodge receive
units for the next five years, which would insure using up
the future. It is difficult to predict what Aspen will need.
Point seven, in September 1983, the City Council received a
proposal to change the law pertaining to city owned property
in applications. Hugus said the law at that point required an
applicant who was including city owned property to have the
consent in the application of the city, and required the
scoring process to be done with the city owned property and
without the city owned property. Hugus said this was tabled
until an October meeting, and passed changing the law so that
if an applicant had city owned property included, the city
did not have to approve in the application. Hugus said the
Mountain Lodge has city owned property within it, and the
application had to be in the planning office October 3. At
the time the application was received, the city had not
approved it.
Esary said it is clear in the GMP process that scoring in front
of P & Z is not a reliance event. Esary pointed out that an
award of an allotment in front of Council is not a reliance
event. Esary recommended that scoring proceed. The P & Z
has accepted Hugus's letter.
Harvey closed the public hearing regarding the Lodge at Aspen.
Hunt questioned the energy conservation and asked how many
hours of sunlight in the winter the project receives to use
solar collectors. Sheldon estimated 4 to 5 hours. Harvey
said in the pre-application, back up on number of employees,
back up on solar research should be gotten so the P & Z can
evaluate these. Richman agreed; however, the planning office
did not do a pre-application because this project had been
presented before.
--
Regular Meeting
Aspen
Mountain Lodge
-.
Planning and Zoning Commission
November 22, 1983
Vann said the P & Z will hear the planning office recommenda-
tion on a multi-year quota, if appropriate, this evening.
The P & Z is scheduled to hear the additional review require-
ments on the Aspen Mountain Lodge next week. The recommenda-
tion.that will go forward to Council is the scoring on the
GMP application, recommendation on multi-year quota, and a
recommendation on PUD conceptual and associated review
requirements.
Sunny Vann told P & Z this consists of 11\ acre site on land
located between Galena street and Monarch street south of
Durant avenue, with a piece of land located on Mill street at
the base of Aspen mountain. Vann said the PUD is a multi-
phased project. The applicant is competing at this time for
a lodge portion of the project. There is a separate residen-
tial at the top of Mill, there is a residential at the old
700 South Galena site, adjacent to the hotel site. Some of
these will require a GMP allocation, which will not be
submitted until December. The Board is considering only the
appropriateness of the lodge GMP application and consistency
with GMP scoring criteria.
Vann said the site is currently zoned L-l, CL, R-15/PUD-L,
and conservation. The actual hotel is located on L-l and C-L
which allow construction of a lodge. The application is
requesting several rezonings to take advantage of area and
bulk requirements permitted in those zone districts. These
will be considered at the conceptual PUD review. The request
for rezoning is not germaine to the GMP scoring categories.
Vann told P & Z the lodge portion consists of 480 unit resort
hotel; this involves reconstruction of 269 existing units
located at Continental Inn, Aspen Inn and Blue Spruce lodge.
The application is requestion exemption from GMP for the
reconstruction of those existing units. This request will be
heard at the next meeting.
The additional reviews are rezonings, exemption from GMP for
employee housing, request for reconstruction of existing units,
change in use exemption for conversion to deed restricted
employee housing, street vacations, a possible view plane
review. Recommendation to Council for any allocation will be
contigent upon Council's approval of additional reviews.
Vann said he would like to discuss architectural design and
visual impacts of this project. Vann said the site plan is
very well done; however, the planning office is concerned
about the bulk of this project on Durant street facade. The
lodge wings on Mill, Monarch and Galena are basically consis-
tent with the surrounding uses in the lodge district. The
height varies, and they have taken advantage of architectural
techniques to reduce the bulk.
The facades on Durant and Dean streets are substantial in
terms of height and bulk. In the PUD process, the applicant
will be requesting a variation from the FAR and from the
height restrictions of the underlying zone districts. The
intent of PUD regulations are to provide that flexibility.
As far as the GMP scoring categories, the architectural design
which considers impact on the adjacent neighborhood, in the
visual impact, there are a major design flaws. These issues
can be addressed as part of the conceptual PUD submission.
The applicant would have an opportunity to deal with site
specific architectural concerns.
'-
",I
FORM ~I C. F. H O~CKEL B. 8. 8t l. CO,
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
Planning and Zoning Commission
-11-
November 22, 1983
The planning office feels the variances from the height
regulations, which would be required for these facades, are
inconsistent with the surrounding development and would block
views of Aspen mountain.
Harvey said he is concerned and unclear about the number of
units requested, number of units to be reconstructed, the
Alpina Haus being lost to employee housing, calculation of
net employees. Vann said the applicant is requesting recon-
struction of the Aspen Inn, Blue Spruce, and Continental.
The Code requires the applicant submit for staff consideration
inventory of the units to be demolished for verification.
The staff reviewed the request for reconstruction of 277 units
and physical survey and documentation, the number was reduced
to 269 units. The discrepancy involves the legality of some
of the units the applicant was claiming for reconstruction.
Vann said the Code, in addressing employee housing, it require
the applicants provision of the net increase in the number of
employees, those units that are being added. The employees
for the units being reconstructed is not discussed. Harvey
asked if the applicant puts employee housing on the Benedict
land, what does that do to Little Annie ski area. Vann said
the employee housing for this project is provided off-site,
and the applicant proposes to house 60 per cent of the net
increase of employees. Some units will be provided by
conversion of existing structures. Fifty units will be
provided on the Benedict site, these units were considered
as part of the Little Annie proposal and are located on the
same portion of the site. Should Little Annie ever build,
they would be looking for other employee housing.
John Doremus, representing the applicant, presented drawings
and photographs and told P & Z they have been presenting these
to the public for three weeks to acquaint them with what is
being proposed. Doremus pointed out the employee housing in
three locations. Doremus pointed out the hotel site and the
buildings overlaid on it. The hotel site is over 5 acres.
Doremus pointed out all the land the applicant has acquired,
showed where the residential projects are proposed.
Doremus said large projects do have impacts but they can also
provide "goodies" that small projects cannot. There are
trade offs. This project is able to provide considerable
amount of open space, trails, underground parking. Doremus
said the applicant would like to see the implementation of
the lodge improvement district. The applicant is upgrading
the utilities and underground the utilities.
Joe Wells addressed the relationship of this proposal to the
scale of the neighborhood. Many buildings are 35 to 40 feet
and two are over 60 feet. Wells showed a drawing of elevation
perspective. Wells said architecturally, they had tried to
minimize the bulk of the building, as it is a large building.
The facade is varied in height, ranging from two to four
stories. The building has been set back from Durant street
for the entrance and to prevent excessive shading of Durant.
Doremus said he would like to review the GMP scoring points
as they feel they deserve some bonus points. They are
adding a 12 inch water main, which will upgrade the distribu-
Regular Meeting
-......-,
Planning and Zoning Commission
November 22, 1983
tion network in the area. This will also increase fire
flows in the area. This provides a third 12 inch V for the
city. The project will add 3 or 4 fire hydrants. The
applicant requests bonus points in water. The applicant
requested upgrading from 1 to 2 in sewer points as they are
going to put in a new line and eliminate two on Durant that
have caused maintenance problems. This will improve the
capacity of the main and allow more treatment.
Joe Wells said in storm drainage, the applicant deserves not
only an upgrade to 2 but bonus points. Wells said in additior
to handling the 100 year run off and the 5 year historical
run off, which is an upgrading because the run off is
presently being dumped into the street, the city needs to
retain 2.5 acre feet of water. The applicant is offering
to construct that facility in the upper portion of the PUD.
The control of it will reduce the flow to no more than 13
cfs at a given time. Wells said he feels they are helping
the city solve a significant problem.
Pardee asked why the planning office scored this area 1 point.
Vann said the representation was that it was not construed
this upgraded the city's collection and discharge system.
Vann said he will look at the drainage study. Wells said in
fire protection, they are offering additional hydrants to
service this and adjacent projects. The building will be
fully sprinklered; there will be a computer smoke alarm
system, with stand by power and back up. This will be state
of the art in fire protection. The applicant requests bonus
points in this category.
Larry Stricker, architect, addressed quality of design and
visual impact. Stricker pointed out they will excavate and
submerse the buildings to mitigate the heighth of the build-
ing. Stricker said this is an innovative design, it is not
standard on grade building. Stricker showed visual lines
from Durant. stricker pointed out the building is set back
50 feet from the curb at Durant. Stricker showed the view
from the Mill street mall, how the building fits in and
other surrounding buildings.
Harvey asked the height at the main entrance. Stricker said
the mean height is 42 feet and peak height is 47 feet.
The applicant is still in the process of mitigating wherever
possible, diminishing the height. Harvey asked for a
discussion of square footage, floor area ratio and that
below grade area. Wells said the rooms below grade as a
result of excavation are counted in the floor area ratio.
The rest of the space below grade which is non-habitable is
exempt.
Vann said the handling of the wings, stepping them back and
fitting them in with surrounding buildings works quite well.
However standing to the east, the building creates a canyon
effect and blocks the view of the upper mountain. There
will be a 50 foot wall where there is a vacant parking lot
now. The planning office raises the problem of the facade
along Durant street. Vann said he feels through further
design refinement, the design flaw can be fixed and lessen
the impacts.
Harvey recommended the Commission take a site visit before
the next meeting. The applicant told P & Z they are prepar-
ing an elaborate model that should be ready for the next
meeting. Vann said the assistant city engineer, Jay Hammond
has looked at the drainage study in this application.
Vann said the improvements in the application for storm
drainage would be eligible for scoring.
'"',
, ,
FOIlM'. C_F,HOECKEla.B.&L.CO.
, ,
RECORD OF PROCEEDINGS
100 Leaves
Regular Meeting
Planning and zoning Commission
-13-
November 22, 1983
Wells said the applicant feels they should be considered for
bonus points under site design. Wells said all surface
parking has been eliminated. utilities will be undergrounded
The trees on Durant will be preserved or relocated. The
applicant will construct a major trail link in the trails
master plan; provide ski access. The proposal includes a
major open space commitment.
Hunt asked what happens to the nine parking spaces at this
site for the woodstone lodge. Vann said the problem is
whether Cantrup had the right to deed restrict parking spaces
to the city, what the effects those agreements have as a
result of the bankruptcy proceedings. Wells said if it is
found to be the legal responsibility of the applicant, they
will fulfill it.
Pardee asked if the applicant has addressed the question of
management. Alan Novak said they have been looking carefully
at hotel operators, with the criteria for the best reputation
Novak said Aspen is such an attractive place, there has not
been a shortage of hotel managers who have expressed an
interest in running this hotel.
Wells brought up energy conservation, the planning office
scored the maximum points. The room orientation was chosen
to take advantage of passive solar gain. There are limita-
tions to active systems in the area. Insulation exceeds the
minimum requirements. The subgrade space will minimize the
energy requirements. The HVAC system will be computerized
so when rooms are vacated, there will be an adjustment in
the system. They would like bonus points.
Doremus said if any project should get full bonus points for
amenities for guests, it should be this project. The three
areas, dining, conference, and recreation facilities deserve
bonus points.
Harvey opened the public hearing.
Spencer Schiffer said in years past, it was the intention
of the P & z (of which he was chairman) to encourage the
development and reconstruction for lodges in this precise
location. Schiffer said he feels this applicant is
deserving of the P & Z's approval and allocation. Schiffer
said a facility like this is needed in town.
Carolyn Doty, committee to preserve open space, said the
committee recognizes the need for a quality hotel. They
congratulate them on good design, landscaping, trail propos-
al, much needed conference facility, undergrounding utilities
and the courtyards. However, they are concerned over some
issues; the commercial plan inside the hotel, as Aspen is
presently over built. The project will double the density
in the neighborhood, which will have negative impacts.
The building will cause visual impact in the view plane of
Aspen mountain, cut out sunshine for surrounding buildings,
and take away open space. The open space figure of 32 per
cent is misleading because some of this is above the 8040
greenline and is not intended to be built upon. The project
is too high for the area. 480 units is over building for the
present need of Aspen. They oppose the employee units being
,""'-~III'
Regular Meeting
Planning and Zoning Commission
November 22, 1983
for this project when Silverking phase IV is being built at
the same time. They oppose the bridge and restaurant over
Mill street as it will further block the view of Aspen
mountain. Ms. Doty read some recommendations to P & Z.
One is that a comprehensive plan be submitted for all
parcels owned by this group. The committee recommends that
the applicant be allowed to replace the existing rooms and
36 units allocated to the Aspen Inn under existing zoning
and a normal GMP process. Aspen has maintained its quality
because of quaintness, beauty and open space. They feel
a 480 room hotel at the base of the mountain and blocking
views is not preserving the quality of Aspen.
Fred Pierce asked for the planning office recommendations
on employee housing, especially in the Little Annie area.
Vann said the area at Little Annie will require an exemption
from growth management; the conversion of the Copper Horse
will require a change is use. These will be considered on
November 29. Vann said the review is not complete at this
time and will be available for the next meeting. Vann said
a lot of these concerns will be addressed through the PUD
process.
Mike Otte said
them perfect.
points and few
he has seen a lot of applications,
However, this application has more
negative points.
none of
positive
Lyle Reeder said the Aspen Mountain Lodge height exceeds the
height of the North of Nell building by 16 feet. Reeder
asked if a person could come all the way down the ski trail
to the Durant bus stop. Wells said the ski trail ends at
Mill street.
Harvey continued the public hearing.
Esary advised the Commission that if anything said in the
public hearing would have changed the scores on the first
application, they should change the scores before the scores
are announced.
P & Z scored the application. Richman announced the Aspen
Mountain Lodge received 59.6, and the Lodge at Aspen received
49.5. The Lodge at Aspen did not make the 51 point thresh-
hold and is not eligible for an allocation. Vann said
tomorrow copies of the score sheets will be available. The
recommendation will be forwarded to Council. The Lodge at
Aspen did not meet the threshold but has an opportunity to
appeal. P & Z will meet next week to discuss the rest of
the requirements for Aspen Mountain Lodge.
Anderson moved to forward the results of the scores to
Council with the caveat the Commission is now forwarding
any recommendations pending further review; seconded by Ms.
Tygre. All in favor, motion carried.
Anderson moved to adjourn at 8:45 p.m.; seconded by Ms. Fallir.
All in favor, motion carried.
,~xI ~~
Kathryn Koch, City Clerk
'-'
, ,