Loading...
HomeMy WebLinkAboutagenda.hpc.20180328 AGENDA ASPEN HISTORIC PRESERVATION COMMISSION REGULAR MEETING March 28, 2018 4:30 PM City Council Meeting Room 130 S Galena Street, Aspen I. SITE VISITS A. Please visit the sites on your own II. 4:30 INTRODUCTION A. Roll call B. Draft minutes for February 14th & February 28th C. Public Comments D. Commissioner member comments E. Disclosure of conflict of interest (actual and apparent) F. Project Monitoring G. Staff comments H. Certificate of No Negative Effect issued I. Submit public notice for agenda items J. Call-up reports K. HPC typical proceedings III. OLD BUSINESS A. None IV. 4:40 NEW BUSINESS A. 4:40 135 E. Cooper Avenue- Substantial Amendment, PUBLIC HEARING B. 5:50 500 W. Main Street- Minor Development and Setback Variation, PUBLIC HEARING V. 7:00 ADJOURN Next Resolution Number: 2 TYPICAL PROCEEDING- 1 HOUR, 10 MINUTES FOR MAJOR AGENDA ITEM, NEW BUSINESS Provide proof of legal notice (affidavit of notice for PH) Staff presentation (5 minutes) Board questions and clarifications (5 minutes) Applicant presentation (20 minutes) Board questions and clarifications (5 minutes) Public comments (close public comment portion of hearing) (5 minutes) Applicant Rebuttal Chairperson identified the issues to be discussed (5 minutes) HPC discussion (15 minutes) Motion (5 minutes) *Make sure the motion includes what criteria are met or not met. No meeting of the HPC shall be called to order without a quorum consisting of at least four (4) members being present. No meeting at which less than a quorum shall be present shall conduct any business other than to continue the agenda items to a date certain. All actions shall require the concurring vote of a simple majority, but in no event less than three (3) concurring votes of the members of the commission then present and voting. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 1 Chairperson Greenwood called the meeting to order at 4:34 p.m. Commissioners in attendance: Gretchen Greenwood, Jeffrey Halferty, Nora Berko, Roger Moyer, Scott Kendrick, Richard Lai. Absent were Bob Blaich and Willis Pember. Staff present: James R. True, City Attorney Nicole Henning, Deputy City Clerk Amy Simon, Historic Preservation Planner Sara Yoon, Historic Preservation Planner APPROVAL OF MINUTES: Mr. Moyer motioned to approve January 17th minutes, Mr. Kendrick seconded. Mr. Moyer motioned to approve January 24th minutes, Mr. Kendrick seconded. PUBLIC COMMENT: None. COMMISSIONER COMMENT: Ms. Berko thanked the City and staff for making the Colorado Preservation conference available to them. She said it was really great and wonderful to see what is happening all around the state. DISCLOSURE OF CONFLICT: None. PROJECT MONITORING: None. STAFF COMMENTS: None. CERTIFICATES OF NO NEGATIVE EFFECT: Ms. Simon mentioned that she issued one for 811 E. Hopkins, which is a new house on a lot that contains two miner’s cottages. The property owner asked to put a roof over a deck with no visibility issues regarding the historic structures, so she signed off on it. CALL UPS: None. PUBLIC NOTICE: Ms. Simon said she has provided this to Mr. True for St. Mary’s. Mr. True stated that he has reviewed it and it is good. NEW BUSINESS: 104 S. Galena – St. Mary’s Church Amy Simon This is in for final review and there will be discussion of revisions to the front porch, details of a proposed addition. Most of the addition is below grade with no visual impacts, but there is a pavilion at ground level that is an entry to the new space and is the subject of a lot of discussion. The applicant has decided to retain what they have now, but make improvements to it. The massing in every shape and placement is resolved so the board needs to focus on the detailing. The church did not have a protected entry originally and significant snow would develop where people gather. The railings and steps will now run right towards main street to be more welcoming to the public. At the front of the building, there are two fixed arched shaped windows. Originally these were double hung and they would like to restore them as such. There are a few actions that staff has already signed off on. There are new front porch and alley light fixtures and two doors facing east and west that had solid wood panels replaced with glazing so there will be restoration to put back to the original appearance. Moving on to the social hall addition, she reminded the board to focus on material selection. The north façade is mostly glass and P1 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 2 she wants to make sure that mullions in the glass façade align with some sort of horizontal elements to the church to make sure of a strong relationship. She noted that a few of the materials need to be seen in person. There is a brick screen wall to be freestanding and does not attach to the pavilion itself. She said should strengthen the wording of the resolution regarding Phase 1 and Phase 2 of the project. Phase 1 is the front porch and window restoration. Phase 2 is the construction of the social hall. City Council has given the applicant five years of vested rights to prepare for this construction and allow them more time to fundraise and prepare. Mr. Moyer asked if the windows which were removed, were kept and no one knows what happened to them. He then asked if they will put in wood windows and Ms. Simon said it is expected to put in wood windows. APPLICANT PRESENTATION: Patrick Rawley of Stan Clausen Associates and Marina Skiles of Charles Cunniffe Architects along with Father Hilton of St. Mary’s Church. Father Hilton thanked everyone for considering the proposal and said they are very pleased with the work so far and with the results of the interior work. One of the key parts of the renovation is dealing with the north face effectively and historically. It’s a two-phased project so they are hoping that the board will grant permission to continue. Welcoming and safety are the primary concerns of the entryway. They will be replacing heavy brick beams with lighter wood ones so it will be aesthetically much better than what they have now. By lightning its presence, it’s less detrimental to the historic structure. They feel this is an effective design and hope everyone on the board agrees. Mr. Rawley described plans on screen. He mentioned that the original approved plan was called up by council in 2016 and it was suggested that the above grade portion of the social hall to the rear of the lawn and that is essentially the condition being brought forth today. He pointed out the brick screen that zoning was considering a fence, not a wall. He said it is important to have an all-weather connector for people to access and is integral to the building. Ms. Skiles pointed out the size and shape of the connector. They have made this as thin and transparent as possible and it attaches to the church as short and thin as it can be. It is on either side of the historic windows and do not want to damage the historic structure at all. There are sourced bricks which are very crisp against the eroded one and the mullions are as thin as possible. The front porch, the north face and the social hall are their top priority. They want to take care of the exterior construction in the off season and have a welcoming front porch by Memorial Day so that is the critical path right now. They need a covered entry and they are going for u shaped stairs so you can go out on the sides or in the front. While the original roof was metal, the church always had a cedar shake roof so they would like to have that again and they do need gutters. They fully intend to keep the lilacs as well, which some of the parishioners had asked about. As for the windows, they would not only like for them to be double hung, but also functional to open up to a coffee shop and an office on the inside. All of the stained-glass windows on the second floor, are double hung and functioning. The church has a revocable encroachment license because the steps are on CDOT’s property. They have been working with CDOT and the Engineering department to maintain this license. Mr. Rawley played a one-minute long video for the board showing how everything will look. Mr. Kendrick asked what the material is on the new stairs. Ms. Skiles said it is snow melted concrete. P2 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 3 Ms. Greenwood asked if they are tearing off the structure or just remodeling the existing and Ms. Skiles said just remodeling because there was damage done to the brick previously do they don’t want to mess with the brick anymore. Mr. Moyer asked which is least expensive and Ms. Skiles said they believe the presentation before them is least expensive and least intrusive to the historic face. Mr. Halferty asked if they looked at other materials for the vertical columns on the north façade because there are no other timber elements besides the shake. Ms. Skiles said they spent a lot of time looking at having no columns and making it as open as possible and looked at a thinner brick and steel, but they decided on timber because the building committee thought it was the best option to use timber that they already have from inside of the church, which was removed from the old ceiling. She also noted that the columns were drawn as 8x8. Mr. Moyer asked how they will be treated. Ms. Skiles said they would replane them, but make sure that they still maintain their character. They are too scratchy right now, but maintain character without splinters. Mr. Moyer suggested stiff brushing them and put an oil on and have the wonderful old patina. Ms. Greenwood asked if the detail of the columns will go straight up to into a wood ceiling. She also asked what their design concept was with the columns and the reasoning behind it. Ms. Skiles said that structurally, they needed a certain amount of mass so when they looked at a very thin steel column, it was much thinner because of the load capacity of the steel. As far as design, it started with structure. She said they worked through 25 designs over the last year and the design that was chosen is supposed to maintain an elegant simplicity without being as heavy as brick. Ms. Greenwood asked if they have to have four columns and Ms. Skiles said no, they don’t have to have four, they chose to. Ms. Simon clarified that since the pavilion is further down the road, some of the details don’t need to be agonized over right now. Part of the decisions will be more from staff and monitor to be pushed down the road to resolve on another day. Staff are recommending that you approve tonight and we have listed a series of conditions for both phase one and two. Mr. Moyer asked if there is a space between the screen and the wall behind it and Ms. Skiles said yes. Mr. Rawley said it’s integral to the structure and the roof is not there. He also noted that the screen is made of brick. PUBLIC COMMENT: Ms. Simon entered a letter from Lisa Markalunas into the record and summarized it for the board. Ms. Markalunas stated that she is concerned about the lilacs being preserved and with how the connector attaches to the church. She also mentioned light spillage from the glazing on the north façade. She appreciates HPC’s efforts and just wants to minimize the impacts to the above grade part of the addition. Ms. Simon said the recommended considerations of approvals that the board can start with are pages 23 and 24 of the packet. Ms. Greenwood said she feels that the design of the addition is the best solution. She really likes the stairs and said they are welcoming and an obvious solution to help open up the entry way. The columns are a bit befuddling from a design standpoint with the sloping roof, but she likes the way they have the P3 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 4 metal at the base of the columns. She suggested that perhaps they could enhance or show more of the metal in a smaller detail and more at the top as it joins the underside of the roof so it takes away some of the bulkiness of the columns that she is feeling. She said she doesn’t understand why there are four. And Mr. Rawley said it’s because of the four gospels. Ms. Skiles said they are happy to take a look at that. Ms. Greenwood said that if they accentuate the black metal, perhaps it might speak a bit to the pavilion and maybe there should be some relationship visually. The pavilion is quite nice and a good solution. It’s quiet and allows the west side of the building to be prominent. She feels that it speaks to today and is in total favor of moving this forward. Mr. Halferty said this was an excellent presentation. He mentioned that he wasn’t here for the prior presentation. What strikes him as most difficult is the columns, the material and number of them and how they are grouped together, but he does understand the function and the flow of the entry. He understands trying to salvage the timber, but feels it is underdeveloped regarding spacing and being too bulky. He is completely for the exiting stairs and the railing to meet the code requirements. It’s nice that the roof is going back to cedar shake and it should be a product of its own time, but his biggest problem are the columns. Regarding the pavilion in the back, the materials and detailing is something that staff and monitor can look into. He could definitely approve of this proposal. Mr. Lai said that first of all, the pavilion is a very sensitive design project that he likes very much and it has just the right connection with the old building and yet it is very modern and will be a great asset to the street and the church itself. When he looks at the façade, he prefers the original design, but he understands the need for protection. He is a bit uneasy with the columns and wonders if the new columns really fit in with the old façade. He urged them to reconsider this a bit. He looks for handrails at his age and offered a friendly suggestion to add a single rail down the center on the north entryway, which would be helpful to the older parishioners. Would like to have an option on either side. Mr. Kendrick said he agreed with the others regarding the columns. He said they don’t seem much lighter and feels he would like to see a more developed design. He likes how it’s been opened up as well as the view to the glass and the additional access. In terms of the pavilion, he thinks it’s a great design and said it’s a very modern take and thinks it’s a great plan. Mr. Moyer said he likes the columns, but the way they meet the roof is a little strange. He likes Ms. Greenwood’s suggestions. He said he thinks there is enough spacing between them and he would put a plaque on them designating them as the original roof beams. He thinks they have done a great job and now that he understands everything that is going on with the pavilion and the connector, he thinks it is quite good. He mentioned that the brick is clever on the screen. Regarding the additional railings on the entry, keep this as simple as possible and don’t over clutter it. He thinks its fine the way it is. Ms. Berko said there isn’t much to add, but feels they have come a long long way and she is excited to see it on the inside. The entryway still feels heavy to her and she is in agreement with everyone on the columns. Ms. Greenwood mentioned the condition listed in the staff memo about not wrapping the stairs around the corners of the columns, but she finds this to be graceful and welcoming. She then asked if the board is comfortable with staff and monitor continuing to work on the columns together. The board said they are fine with it and Ms. Simon said she is fine with that as well. Ms. Greenwood said she is fine with all other conditions that staff has listed except for #1. She would like to change this to “prior to building P4 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 5 permit submittal, restudy the front columns for further detail to reduce the mass and study the connection of the columns to both concrete steps and to the ceiling of the porch.” MOTION: Mr. Moyer motioned to approve based on the changes to the conditions that Ms. Greenwood made, Mr. Kendrick seconded. All in favor, motion carried. Project monitor: Mr. Kendrick and Mr. Halferty volunteered. Ms. Simon gave a summary of the work session with City Council that took place. She said it was a two- hour discussion about benefits. She said it was a sticky conversation and a couple of council members who have decided the benefits have gone too far and need more reflection. They feel that too much pressure is being put on historic development in regard to all of the benefits and that HPC may be giving away more than is needed to achieve their goals. They are going to begin a process of public input from historic property owners and community members to gain additional feedback. They may show some case study projects and return to council with some results. She said that the floor area bonus was a huge thing and they were not as enthusiastic about waivers being given out. Ms. Greenwood said council was very interested and didn’t know a lot about it, but want to know more about projects we are approving. A couple of the council members are in favor of wiping out bonuses completely because they feel the developers don’t need it. She said she tends to agree with them because she owns a historic home and is paying employee housing fees on it and when she sells it, she will have to pay that fee. She originally got a setback variance and that was it. She said she is proud and it’s a privilege to own a historic home. She said they seemed adamant about making cuts. Ms. Simon said they need to remember the power of goodwill so they need to find that balance. She said that Ms. Yoon pointed out that if we let go of benefits, we aren’t getting them back again. They need to be very careful with this conversation. Ms. Yoon said she thinks that we as a commission should discuss ways to allow certain benefits to certain projects. It’s a strength for them to have this toolkit so they should be more careful about applying certain bonuses to certain projects. Touching the toolkit is something we need to tread lightly on. We should keep this pool available to us. Ms. Simon agreed and said there is an inequity of how the benefits are being distributed so everyone will be hearing much more about this. Mr. Lai said he agrees with Ms. Greenwood. He said it may sound a little patronizing, but likened it to spoiling children; it doesn’t happen all at once, it happens very very gradually so we need to keep our eye on the ball. Ms. Simon said it was certainly not a historic preservation lovefest. Mr. Kendrick said that moving forward, we need to look at what the applicant really needs, not what they can get. Ms. Simon and Ms. Yoon gave a quick summary and presentation of the preservation conference they attended in Denver. MOTION Mr. Halferty motioned to adjourn at 6:19 p.m., Mr. Kendrick seconded. P5 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 14TH, 2018 6 _____________________________ Nicole Henning, Deputy City Clerk P6 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 28TH, 2018 1 Chairperson Greenwood called the meeting to order at 4:36 p.m. Commissioners in attendance: Gretchen Greenwood, Jeffrey Halferty, Nora Berko, Roger Moyer, Bob Blaich, Willis Pember. Absent were Scott Kendrick and Richard Lai. Staff present: James R. True, City Attorney Nicole Henning, Deputy City Clerk Amy Simon, Historic Preservation Planner Sara Yoon, Historic Preservation Planner APPROVAL OF MINUTES: None. PUBLIC COMMENT: None. COMMISSIONER COMMENT: Mr. Pember said he was invited by the Aspen Art Museum to introduce the last architecture series lecture with Todd Williams who is currently working on the Obama Presidential Center among other projects. He and his partner, Billy Chen, are longtime heroes of Mr. Pember. This will be shown on Grass Roots TV and suggested that everyone look it up, but please don’t watch his introduction as the noise levels were off. He said that Mr. Williams did a great job and it was really fascinating stuff. He said it was fun interacting with his hero and that Mr. Williams had asked to see his resume and some of his projects so it was wonderful for him. He mentioned that his partner, Billy, wasn’t there and that they usually do the presentations together. He said they live above Carnegie Hall and are adorable and unlike any other professionals they are likely to meet. DISCLOSURE OF CONFLICT: Mr. Pember noted that he does not have a conflict of interest, but has worked on the elements in the presentation tonight. In the core, he was the lead designer for the Wagner Park pavilion in 2001 and also the information pavilion in 2005 as well as the kiosk at the Wheeler and the clock tower and worked closely with Parks and the landscape people on the plaza and parts of the playground, but can remain objective. He has no horse in the race or bone to pick with anyone. Mr. True mentioned that he had a discussion with Mr. Pember about this and there is no technical conflict but he can be objective by stating his history. Mr. Pember said he is also not currently working with the city. PROJECT MONITORING: Ms. Simon said she has the restudy of the front porch of St. Mary’s for Mr. Kendrick and Mr. Halferty to look at, but since Mr. Kendrick is absent tonight, she asked Mr. Halferty if he will be available within the next couple of days for a meeting. He said he will be available. CERTIFICATES OF NO NEGATIVE EFFECT: None. CALL UPS: None. PUBLIC NOTICE: None. PRESENTATION: Aspen Pedestrian Mall Mike Albert of Design Workshop, Darla Callaway of Design Workshop and Tina Bishop of Mundus Mr. Albert said that he appreciates all the feedback and they are hoping to move the conversation forward and continue the dialogue. He mentioned that they feel like there was some catching up to do since the P7 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 28TH, 2018 2 first time they presented to HPC. They are here because in 2006, this was a top ten goal by City Council to focus on the improvement of the mall and the infrastructure. This provided a moment in time and a platform to elevate Aspen’s most notable public space for the next 50 years. Their project boundary includes areas of Mill & Galena as well as Cooper & Hyman. The key issues are: to maintain the historical integrity and character of the malls while upgrading the infrastructure and access, explore innovative ways to improve the storm water infrastructure, replace utilities, retain the malls as an urban park, increase the mall’s accessibility and engage the public and business owners. We wanted to balance a strong local presence and also bring in a higher level of expertise lacemaking, sustainable infrastructure and historic preservation. The project has five phases and they are currently in phase 2, which is the conceptual planning and design. Mr. Albert recapped the previous HPC meetings that were held on the mall presentation. He said this time, they are presenting a refined conceptual plan. They are requesting HPC’s recommendation to move the project forward to the next phase of design. The feedback from the first HPC meeting was that the Independence node by Ralph Lauren is one of the weaker areas and there was a comment about a water feature being integrated, there was a question about replicating the bricks and the rollout of the project. In the second meeting, there were points of agreement regarding: 1. Intersection treatments 2. the Durant connection 3. Fire features. Additional study was requested on bricks, lighting, outdoor dining, sister cities plaza and programming. Ms. Bishop took over to give some historical context. We’ve looked at the chronology of the mall and how it evolved over time, we did an analysis of the fabric that has remained and spatial relationships and they pulled together some principles and guidance on where to go in the future. This project was very research based with a solid foundation. They have documented the extent of the historic fabric that remained. Ms. Bishop continued to show some slides of the original mall before there was any construction. The mall was completed between 1976-1980. The greater extent of change came during the 2000’s. The modifications over time include things such as, sister cities, pavilion, the circular bench, clock tower, kiosk, info panel, playground, fire hearth and tree replacements. She then showed a diagram of how the mall is broken up into different sections. The nodes are meant to be connectors of each section of the mall and the brick is an important contributing factor. Ms. Callaway laid out the basic needs of the mall project regarding infrastructure and electrical. The items that need attention are: pipes, electrical lines, conceptual utility layouts, water, storm drains, fiber and electrical. What is currently under review by owners are: sewer, gas, cable, primary electrical. The mall today doesn’t meet current storm water standards of today. They are looking at permeable brick paving and high rate tree soils, but these options are not character defining. Where needed, they will look at an underground storage or structured conditions. As far as the bricks go, they had originally purchased 500,000 and used about 320,000 to construct the mall. They are down to about 30,000 now that is kept in storage for repairs. They do not have enough existing supply for the repairs or replacement and they are not ADA compliant. For a new brick strategy, they will: 1. Look at the original fabric and see what can remain in place. 2. Look at brick to be salvaged or reused during construction. 3. Look at custom bricks to be developed using Poston block, culver block, Athens block, Indy block, and Egyptian. The chosen brick would have to match in texture, size and pattern. There has to be documentation of pattern, inventory, design of the brick on the mall. Emergency access is another issue, especially pertaining to outdoor dining. P8 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 28TH, 2018 3 Mr. Albert said that over the last month, they have digested the feedback and come to you now with a refined plan of which the key takeaways are: similar opinations: maintain character, realign Wagner Park, create an open view to Wagner, relocate bathroom, integrate fountain at Sister Cities, build in flexibility for outdoor dining, connect to Durant, narrow intersection crossing distances and remove excessive planters. There are differing opinions on the following: outdoor dining locales, replacement of the crab apples with non-fruit bearing trees, a community table/water feature at the Independence node and public art management. Ms. Callaway mentioned the trees and said there are 57 new trees proposed whether new or being replaced. They will not increase the lighting, but maintain the same amount of light as well as seasonal lighting. There will be street signage added onto the lighting. We used to have it and will bring this back. For the future, the following are the areas of focus: contributing feature design, architectural RFP, physical mock ups, construction phasing and cost budgeting. Mr. Moyer said there should be no tables against the buildings and that he would rather see it in the middle. This to him, is too structured and it’s not the “messy vitality” that aspen has always been known for. Ms. Greenwood said she agrees with Mr. Moyer. His feeling about the center is that people want to be able to walk that as well and said the mall commission needs to have better regulations. Mr. Halferty also agrees with the other two. He said there are a lot of moving parts, but he is with the others on the messy vitality and things not being so orchestrated. Mr. Pember said there is a complex relationship between CCLC and the mall leases and said he’s not comfortable weighing in on this. Ms. Berko said there are places she avoids like the dancing fountain and she said it seems complicated and needs some variety. Mr. Blaich said he is hearing two sides; being messy and structured. He said he lived in Europe for a long time and what he loves most is the messy vitality and he likes the idea of the eating and drinking zone away from the buildings. Mr. Woods said that you’re getting both sides of the issue here and this design allows for both of these ideas and said they are laying this out to be flexible. Mr. Blaich addressed the Wagner Park and Mill Street node and said he missed the last meeting, but was at the walk through and he likes this direction very much and the functional aspects. He likes opening up the vista to the park and says it is a major step forward. He asked what happened to the utility building that HPC approved for the city and Mr. Woods said it will be incorporated into the restrooms or such. Ms. Callaway said they will integrate it all together. Ms. Berko asked about the water features turning off at night and Mr. Albert said yes, that is plan and the water will be recycled or recirculated. Ms. Greenwood said it’s a nice gathering place for the community and feels a space like that is needed and she feels they solved that. Mr. Moyer likes all of the nodes and he likes the LED lighting and said it’s mellow. Mr. Pember asked if they will they still call this the Sister Cities plaza and Mr. Albert said yes. Mr. Woods said that space has been dedicated and it is important to not lose this designation. Ms. Greenwood thinks opening up the view to Wagner Park should be done as much as possible and that maybe putting the restroom below grade is a good idea. It’s just a functional building and says she feels the opposite of Mr. Pember. She loves the building that Mr. Pember has done, but this space needs to be opened up. Ms. Bishop said for the most part, all areas of the mall have integrity. Mill has a little more diminished integrity because of the changes. Telling the story of that building and how it changed over time, is important to telling the story. P9 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 28TH, 2018 4 Mr. Moyer asked if they decide to bring down the current restroom building, if there has been discussion about keeping a clock tower there. Mr. Albert said they would like feedback on the clock tower and its presence. From the comments collected, there has not been a clear for or against the clock tower so it hasn’t been settled yet. Mr. Pember said it is a nice vertical accent in a horizontal space and doesn’t think it would be unfriendly to keep there and said that maybe it should be taller. Ms. Greenwood said in general, the board is in favor of the direction for this node. Mr. Halferty asked how they determine how many restrooms are needed for the area. He also asked if they are considering moving the restrooms to the south, he thinks they should still be functional for people at the Wheeler and not have to walk so far to use a restroom. He is with everyone on the clock tower and thinks it’s an excellent vertical element. Mr. Moyer said he likes the Independence/Paradise node and there just needs to be room for one car to park and one to pass. Mr. Blaich said he likes it as well. Darla said they are looking to keep it the same size. Mr. Wheeler said the steel and basic structure are in good shape on this node. The internal workings need to be reworked and Mr. Woods said it’s the perfect location. Ms. Greenwood said a nicer looking building would be great and Mr. Wheeler said it was built as a moveable structure and this will be part of the architectural RFP. Ms. Callaway said they will keep the fire pit as a special occasion item for Winterskol and such. Mr. Wheeler said that Council felt it was important to not burn all the time due to fossil fuels and Ms. Callaway said the police department asked that it not burn all the time due to the late nights calls. Ms. Berko said the more we can go in the direction of environmental consciousness is better so reusing and repurposing instead of scrape and replace. That should be a guiding factor. Mr. Pember said there are a lot of design aspects that will change and it needs to be for the better. Regarding the Ki Davis, Ms. Greenwood said that it’s a nice extension to the mall. She asked if it will be a colored concrete and Mr. Albert said It will match the language of the gondola plaza, which is a warm tone. The fountain is at street level today and will be going to be further off of the street so people can gather around it. Mr. Wheeler said the street is one-way and has been a long-term commitment and it has only been that way for the past ten years roughly and it has worked well and makes it easier for pedestrians. They have got nothing but good feedback on Galena being one-way. There are very strong businesses along that street and it’s a very active street. Mr. Albert said he would like brick and lighting feedback. Ms. Greenwood said they have done a good job and they are on the right track. Ms. Berko said she feels they have a good handle on it all and said the more they can keep, the better. Mr. Blaich asked what 30,000 bricks would cover and Mr. Albert answered 10 percent of the mall. Mr. Woods said they are going to keep working on understanding the pattern of the bricks on the mall because it is almost like an abstract painting. He said you have to do flyovers to get a feel for the character and there is still a lot of work to do on this. Mr. Pember said an abstract mix is key to keep that intent and repurpose. He likes the lighting plan and he likes the bollards. P10 II.B. REGULAR MEETING HISTORIC PRESERVATION COMMISSION FEBRUARY 28TH, 2018 5 Mr. Halferty said he has the same philosophy and doesn’t mind the bollards. He says they should keep the bricks the same and keep the matrix the same and Mr. Blaich seconded. Ms. Greenwood thanked them for taking in their comments and she feels it’s great developed plan from when they last met. Mr. Halferty asked about removing the fruit bearing trees and asked them to talk more about the cottonwoods or spruce trees because some people are talking about the urban forest being too much and a haven for bears. He asked if they have a proximation of trees to be removed, etc. Mr. Albert threw back up a slide on the screen with a graph of trees to be removed and said this is the best that they know will be impacted at this point. He said they heard back that people like how it is. Mr. Woods said it will be mixed age forest, but some cottonwoods have to come down. Mr. Woods said this was a really helpful meeting and that they felt they did a poor job last time presenting. He thanked the board for the input received and mentioned that they felt a bit beat up last time and they learned a lot from that experience. Mr. Moyer motioned to adjourn, Mr. Blaich seconded at 6:52 p.m. ___________________________________ Nicole Henning, Deputy City Clerk P11 II.B. C:\Program Files (x86)\neevia.com\docConverterPro\temp\NVDC\8C417E3E-0DCF- 4ADD-BE00-ABC2369215C0\13672.doc 3/22/2018 HPC PROJECT MONITORS- projects in bold are under construction Nora Berko 1102 Waters 417/421 W. Hallam 602 E. Hyman 210 S. First 530 W. Hallam 333 W. Bleeker Bob Blaich Lot 2, 202 Monarch Subdivision 232 E. Bleeker 609 W. Smuggler 209 E. Bleeker 300 E. Hyman, Crystal Palace 128 E. Main, Sardy House Gretchen Greenwood 28 Smuggler Grove 135 E. Cooper 1280 Ute 211 E. Hallam 124 W. Hallam 411 E. Hyman 300 E. Hyman, Crystal Palace 101 W. Main, Molly Gibson Lodge 201 E. Main 834 W. Hallam Willis Pember 305/307 S. Mill 534 E. Cooper Jeff Halferty 540 E. Main and Holden-Marolt 980 Gibson 845 Meadows, Aspen Meadows Reception Center 232 E. Main 541 Race Alley 310/330 E. Main (Hotel Jerome) 201 E. Hyman 208 E. Main 533 E. Main Roger Moyer 517 E. Hyman (Little Annie’s) 500 W. Main 406 S. Mill 223 E. Hallam Richard Lai 122 W. Main Scott Kendrick 533 E. Main Sheri Sanzone Need to assign: 134 W. Hopkins 517 E. Hopkins 422/434 E. Cooper 529-535 E. Cooper, Stein Building 420 E. Hyman 110 W. Main, Hotel Aspen 301 Lake P12 II.F. TYPICAL PROCEEDING- 1 HOUR, 10 MINUTES FOR MAJOR AGENDA ITEM, NEW BUSINESS Provide proof of legal notice (affidavit of notice for PH) Staff presentation (5 minutes) Board questions and clarifications (5 minutes) Applicant presentation (20 minutes) Board questions and clarifications (5 minutes) Public comments (close public comment portion of hearing) (5 minutes) Applicant rebuttal (5 minutes) Chairperson identifies the issues to be discussed (5 minutes) HPC discussion (15 minutes) Motion (5 minutes) *Make sure the motion includes what criteria are met or not met. No meeting of the HPC shall be called to order without a quorum consisting of at least four (4) members being present. No meeting at which less than a quorum shall be present shall conduct any business other than to continue the agenda items to a date certain. All actions shall require the concurring vote of a simple majority, but in no event less than three (3) concurring votes of the members of the commission then present and voting. Procedure for amending motions: A “friendly amendment” to a Motion is a request by a commissioner to the commissioner who made the Motion and to the commissioner who seconded it, to amend their Motion. If either of these two do not accept the “friendly” amendment request, the requesting commissioner may make a formal motion to amend the Motion along the lines he/she previously requested. If there is no second to the motion to amend the Motion, there is no further discussion on the motion to amend, it dies for a lack of a second; discussion and voting on the Motion may then proceed. If there is a second to the motion to amend the Motion, it can be discussed and must be voted upon before any further discussion and voting on the Motion for which the amendment was requested. If the vote is in favor of amending the Motion, discussion and voting then proceeds on the Amended Motion. If the vote on the motion to amend fails, discussion and voting on the Motion as originally proposed may then proceed. P13 II.K. 1 MEMORANDUM TO: Aspen Historic Preservation Commission FROM: Amy Simon, Historic Preservation Officer RE: 135 E. Cooper Avenue- Substantial Amendment, Public Hearing DATE: March 28, 2018 ______________________________________________________________________________ SUMMARY: 135 E. Cooper Avenue is listed on the Aspen Inventory of Historic Landmark Sites and Structures, as well as the National Register of Historic Places. The site contains the 1888 Dixon-Markle house and outbuilding. In 2003, HPC approved a Major Development review on the property that entailed moving the house slightly to the north and east of the original location, constructing an addition along the west side of the house, and constructing a new garage along the alley. The project included a 500 square foot floor area bonus and setback variances to accommodate existing and newly created conditions. The project won a Preservation Honor award upon completion in 2005. The applicant, who constructed the addition, has had a long standing concern with the one- story linking element of the project, in that it is not possible to move directly between with upper floors of the house. A number of versions of a proposed two story connector have been reviewed by HPC over the last decade, at worksessions and public hearings. Ultimately, in 2015 HPC approved a new connector with conditions to be resolved by staff and monitor. The approved solution is depicted in Exhibit C. The applicant has the right to construct this connector so long as a complete building permit is submitted before July 16, 2018, when Vested Rights expire. P14 IV.A. 2 The applicant has continued to study the 2015 project and is concerned with the cost and impacts. The applicant has reconsidered the goal and instead of trying to accommodate a stair in the connector, a simpler solution has been devised to place a new second floor hallway on top of the existing one story connector. This revision is to be reviewed as a Substantial Amendment and is subject to the “old” HPC design guidelines, which were replaced in 2016. The height, size and placement of the connector on this site has been an important issue to HPC over the years. That said, staff finds that the revision complies with the design guidelines to a much greater extent than the approved approach, which staff did not support. Staff recommends HPC accept this amendment with conditions. APPLICANT: Chris Pat Aspen LLC, represented by Eigelberger Architecture and Design. (Please note that representatives have changed since the application was initially submitted.) PARCEL ID: 2735-131-04-003. ADDRESS: 135 E. Cooper Avenue, Lots H and I, and the easterly 5 feet of Lot G, Block 70, City and Townsite of Aspen. ZONING: RMF, Residential Multi-Family. SUBSTANTIAL AMENDMENT All changes to HPC approved plans that materially modify the location, size, shape, materials, design, detailing or appearance of the building elements as originally depicted must be approved by the HPC as a Substantial Amendment. The Commission is asked to review the application, the staff analysis report and the evidence presented at the hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines and other relevant regulations under the HPC’s purview. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny. Staff Response: When the renovation of this house was reviewed in 2003, the applicant requested a two story connector, which the board did not allow. In the subsequent years, the applicant was troubled with functional concerns with the layout of the house. HPC held a worksession on this topic in 2012 followed by four public hearings before approval for a two story connector was granted with conditions in 2015. HPC’s conditions in 2015 were that the connector must sit below the eave of the Victorian and that it be as transparent as possible with any necessary mullions in a dark finish. A solution was achieved, as shown in Exhibit C, however the addition is impactful, projecting into view on the east side of the property and requiring the total demolition of an existing below grade spa area. Staff finds that the newly proposed Substantial Amendment achieves HPC’s objectives from 2015 and adequately meets the design guidelines regarding connectors. This is a modification to an existing addition, some of the characteristics of which HPC might view differently today than in 2003. The purpose of a connector is to make a light-handed attachment to historic fabric and to P15 IV.A. 3 provide some breathing space between the volume of the resource and the volume of the new addition. The Amendment addresses these goals by remaining within the north/south limits of the Victorian, proposing a limited upper floor hallway of approximately 55 square feet in size, and being constructed of glass with no mullions. The proposed new connector requires a historic window on the upper floor to be removed. The applicant suggests shifting the historic window to a new location directly on the north side of the connector. Staff recommends against this as removing a historic feature and then placing it in a non-historic location is making not one, but two changes to the building. We recommend that no new windows be added to the west side of the Victorian. As part of this HPC review, the applicant plans changes to the yard between the house and outbuildings. Stairs from the backyard to the below grade spa are to be removed. Four trees along the alley are to be eliminated in order to create an on-site parking space protected by a sliding fence on the rear lot line. New paving and amenities such as seating and artwork are planned. Staff’s only concern is the material of the patio and walkways. Bluestone, a non-native stone is proposed, installed in a contemporary manner. Staff recommends the use of red brick/pavers or sandstone, with the possible use of other paving as a minor element, be required for review and approval by staff and monitor. As a corner lot, the use of materials that are consistent with Victorian era is a priority. Guideline 1.9 states: P16 IV.A. 4 1.9 Maintain the established progression of public-to-private spaces when considering a rehabilitation project.  This includes a sequence of experiences, beginning with the "public" sidewalk, proceeding along a "semi-public" walkway, to a "semi-private" porch or entry feature and ending in the "private" spaces beyond.  Provide a walkway running perpendicular from the street to the front entry. Meandering walkways are discouraged, except where it is needed to avoid a tree.  Use paving materials that are similar to those used historically for the building style. Concrete, wood or sandstone may be appropriate for certain building styles. Finally, at an unknown time, two trees were planted on the east side of the Victorian and stand to damage and obscure the building. Staff requests the applicant agree to their removal as part of this project, rather than through a separate enforcement action. ___________________________________________________________________________ DECISION MAKING OPTIONS: The HPC may: • approve the application, • approve the application with conditions, • disapprove the application, or • continue the application to a date certain to obtain additional information necessary to make a decision to approve or deny. P17 IV.A. 5 ______________________________________________________________________________ RECOMMENDATION: Staff recommends that this Substantial Amendment be approved with the following conditions: 1. A historic window on the west elevation of the house is approved to be removed. It is not approved to be relocated and no new window opening may be added on this façade. 2. The new patio and walkways between the back of the Victorian and the outbuildings are to be red brick/pavers or sandstone, with the possible use of other paving as a minor element. The applicant is to provide a design for review and approval by staff and monitor. 3. The requirement to submit for building permit by July 16, 2018, in compliance with the 2015 Development Order, remains in effect. 4. This approval supersedes and replaces the approval for the two story stair connector represented in Exhibit C. The Municipal Code does not allow multiple versions of a land use approval to be valid at one time. 5. The applicant is asked to commit to the removal of the two spruce trees on the east side of the Victorian as part of this Amendment. Exhibit: Resolution #___, Series of 2018 A. Design Guidelines B. Application C. Graphics representing June 2015 proposal, approved with conditions “Exhibit A, Relevant Design Guidelines, 135 E. Cooper Avenue- Minor Review ” 1.9 Maintain the established progression of public-to-private spaces when considering a rehabilitation project.  This includes a sequence of experiences, beginning with the "public" sidewalk, proceeding along a "semi-public" walkway, to a "semi-private" porch or entry feature and ending in the "private" spaces beyond.  Provide a walkway running perpendicular from the street to the front entry. Meandering walkways are discouraged, except where it is needed to avoid a tree.  Use paving materials that are similar to those used historically for the building style. Concrete, wood or sandstone may be appropriate for certain building styles. 1.13 Revisions or additions to the landscape should be consistent with the historic context of the site.  Select plant and tree material according to its mature size, to allow for the long-term impact of mature growth.  Reserve the use of exotic plants to small areas for accent.  Do not cover grassy areas with gravel, rock or paving materials. 1.14 Additions to the landscape that could interfere with historic structures are inappropriate. P18 IV.A. 6  Do not plant climbing ivy or trees too close to a building. New trees should be no closer than the mature canopy size.  Do not locate plants or trees in locations that will obscure significant architectural features or block views to the building.  It is not appropriate to plant a hedge row that will block views into the yard. 10.3 Design a new addition such that one's ability to interpret the historic character of the primary building is maintained.  A new addition that creates an appearance inconsistent with the historic character of the primary building is inappropriate.  An addition that seeks to imply an earlier period than that of the primary building also is inappropriate.  An addition that seeks to imply an inaccurate variation of the primary building's historic style should be avoided.  An addition that covers historically significant features is inappropriate. 10.4 Design a new addition to be recognized as a product of its own time.  An addition should be made distinguishable from the historic building, while also remaining visually compatible with these earlier features.  A change in setbacks of the addition from the historic building, a subtle change in material or a differentiation between historic, and more current styles are all techniques that may be considered to help define a change from old to new construction. 10.6 Design an addition to be compatible in size and scale with the main building.  An addition that is lower than or similar to the height of the primary building is preferred. 10.7 If it is necessary to design an addition that is taller than a historic building, set it back substantially from significant facades and use a "connector" to link it to the historic building.  A 1-story connector is preferred.  The connector should be a minimum of 10 feet long between the addition and the primary building.  The connector also should be proportional to the primary building. 10.8 Place an addition at the rear of a building or set it back from the front to minimize the visual impact on the historic structure and to allow the original proportions and character to remain prominent.  Locating an addition at the front of a structure is inappropriate.  Additional floor area may also be located under the building in a basement which will not alter the exterior mass of a building.  Set back an addition from primary facades in order to allow the original proportions and character to remain prominent. A minimum setback of 10 feet on primary structures is recommended. 10.9 Roof forms should be similar to those of the historic building.  Typically, gable, hip and shed roofs are appropriate.  Flat roofs are generally inappropriate for additions on residential structures with sloped roofs. P19 IV.A. 7 10.10 Design an addition to a historic structure such that it will not destroy or obscure historically important architectural features.  For example, loss or alteration of architectural details, cornices and eavelines should be avoided. 10.11 On a new addition, use exterior materials that are compatible with the historic materials of the primary building.  The new materials should be either similar or subordinate to the original materials. 10.14 The roof form and slope of a new addition should be in character with the historic building.  If the roof of the historic building is symmetrically proportioned, the roof of the addition should be similar.  Eave lines on the addition should be similar to those of the historic building or structure. P20 IV.A. A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) APPROVING A SUBSTANTIAL AMENDMENT FOR 135 E. COOPER AVENUE, LOTS H AND I, AND THE EASTERLY 5 FEET OF LOT G, BLOCK 70, CITY AND TOWNSITE OF ASPEN, COLORADO RESOLUTION #__, SERIES OF 2018 PARCEL ID: 2735-131-04-003. WHEREAS, the applicant, Chris Pat Aspen LLC, represented by Eigelberger Architecture and Design, requested a Substantial Amendment approval for 135 E. Cooper Avenue, Lots H and I, and the easterly 5 feet of Lot G, Block 70, City and Townsite of Aspen. The property is a designated landmark; and WHEREAS, Section 26.415.070 of the Municipal Code states that “no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;” and WHEREAS, for Substantial Amendment, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project’s conformance with the design guidelines per Section 26.415.070.E.2.f of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, Amy Simon, in her staff report dated March 28, 2018, performed an analysis of the application and recommended that the review standards and design guidelines were met with conditions; and WHEREAS, during a duly noticed public hearing on May 28, 2018, the Historic Preservation Commission considered the application, found the application was consistent with the applicable review standards and guidelines and approved the application with conditions by a vote of __ to ___. NOW, THEREFORE, BE IT RESOLVED: That HPC approves a Substantial Amendment for the property located at 135 E. Cooper Avenue, Lots H and I, and the easterly 5 feet of Lot G, Block 70, City and Townsite with the following conditions: 1. A historic window on the west elevation of the house is approved to be removed. It is not approved to be relocated and no new window opening may be added on this façade. 2. The new patio and walkways between the back of the Victorian and the outbuildings are to be red brick/pavers or sandstone, with the possible use of other paving as a minor element. The applicant is to provide a design for review and approval by staff and monitor. 3. The requirement to submit for building permit by July 16, 2018, in compliance with the 2015 Development Order, remains in effect. P21 IV.A. 4. This approval supersedes and replaces the approval for the two story stair connector represented in Exhibit C. The Municipal Code does not allow multiple versions of a land use approval to be valid at one time. 5. The applicant is asked to commit to the removal of the two spruce trees on the east side of the Victorian as part of this Amendment. APPROVED BY THE COMMISSION at its regular meeting on the 28th day of March, 2018. Approved as to form: Approved as to content: _________________________________ ____________________________________ Andrea Bryan, Assistant City Attorney Gretchen Greenwood, Chair Attest: _________________________________ Nicole Henning, Deputy City Clerk P22 IV.A. ALIUS DESIGN CORPS LLC | ASPEN, CO | 719.331.9211 |MICHAEL@ALIUSDC.COM Aspen Historic Preservation Commission c/o Amy Simon Substantial Amendment to Minor Development Approval 12/14/2017 Project: 135 E. Cooper Please accept this application to modify the approved connector in accordance with the criteria stipulated in Resolution #17, series of 2016 whereby three specific criteria items were established which would drive the design of the connector. Subsequent to the establishment of those criteria the applicant had presented schematic drawings to HPC staff and the HPC monitor which were approved in concept. The application wishes to refine and improve upon that design with this application. Please find below written response to the pertinent design criteria. In addition to the specific criteria below regarding the connector this application also represents a reduction in the overall Floor Area used on the property via decommissioning of the attic level Floor Area. A portion of this Floor Area will be re-allocated to the second level connector demonstrated in the associated plans. The remainder of the floor area and its future allocation will be contemplated in a separate application to be submitted subsequent to this application for the connector. Context The criteria established in the aforementioned Resolution for the design of the connector are as follows: 1. The new connector shall be redesigned so that it does not interrupt the fascia of the west side of the historic resource, to be reviewed and approved by staff and monitor. If this cannot be accomplished, the project must be brought back to the full board for further review and determination before proceeding. 2. The metal components of the new connector shall have a dark finish, to be reviewed and approved by staff and monitor. 3. The new connector shall be as transparent as possible, to be reviewed and approved by staff and monitor. Based on this criteria the applicant’s architect at the time presented these schematic drawings which were approved by staff and monitor. The design of the connector centered on a glass enclosed staircase with a volume that traveled vertically from the lower, sub-grade level to the upper level traveling across three vertical stories. The applicant wishes to improve upon this design by eliminating such a massive volume by concentrating the connector on top of the existing second level deck whereby eliminating the need for such a large staircase. P23 IV.A. ALIUS DESIGN CORPS LLC | ASPEN, CO | 719.331.9211 |MICHAEL@ALIUSDC.COM Existing Design Criteria and Responses 1. The new connector shall be redesigned so that it does not interrupt the fascia of the west side of the historic resource, to be reviewed and approved by staff and monitor. If this cannot be accomplished, the project must be brought back to the full board for further review and determination before proceeding. Response: The new 2nd story connector maintains the separation between the roof of the new structure and the fascia of the west side of the historic resource. 2. The metal components of the new connector shall have a dark finish, to be reviewed and approved by staff and monitor. Response: The metal components of the connector have a dark finished as shown in the material sample reference provided. The metal will be minimal in order to achieve structural stability and integrity while limiting the visual impact of the metal. 3. The new connector shall be as transparent as possible, to be reviewed and approved by staff and monitor. Response: The new connector is made entirely of transparent glass within a minimal profile metal frame. The connector is set back on top of the existing deck to further minimize the impact of the connector from the street view. The head height of the connector is kept to code minimum to further reduce the visual impact of the connector. Thank you for your consideration of this application. I will look forward to discussing it with you and the members of HPC. Alius Design Corps LLC By: Michael Edinger, its President P24 IV.A. P25 IV.A. COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Authorized Agent representing the property owner. The following certification shall accompany the application for a permit. ___________________________________ _________ ___________________________ I, the property owner, certify as follows: (pick one) This property is not subject to a homeowner’s association or other form of private covenant. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature ____________________________ Date _________________ Owner Printed Name ________________________ OR Authorized Agent Signature ___________________________ Date _________________ Authorized Agent Printed Name _______________________ ADDRESS UNIT #PARCEL ID # ADDRESS: ____________________________PERMIT NUMBER: _______________________________ August 2017 P26 IV.A. P27 IV.A. P28 IV.A. P29 IV.A. AHPC Substantial Amendment Review 135 E. Cooper 1 CITY OF ASPEN PRE-APPLICATION SUMMARY PLANNER: Amy Simon, amy.simon@cityofaspen.com DATE: 9.8.17 PROJECT: 135 E. Cooper Avenue REPRESENTATIVE: Michael Edinger, michael@aliusdc.com DESCRIPTION: 135 E. Cooper Avenue is listed on the Aspen Inventory of Historic Landmark Sites and Structures, as well as the National Register of Historic Places. The site contains the 1888 Dixon-Markle house and a historic outbuilding. In 2004, an HPC approved addition was constructed on the property. The owner has since approached the Historic Preservation Commission a number of times to discuss modifying the one story link that connects the two-story Victorian structure to the adjacent two-story addition. In July 2015, HPC approved a Minor development application to alter the link, with conditions stated in HPC Resolution #21, Series of 2015. After study, the applicant felt that the link could not be re-designed as directed and returned to HPC in May 2016 with a revised proposal, which was denied. Additional design work resulted in new drawings which HPC staff and monitor found to comply with Resolution #21, Series of 2015. The applicant was given authorization to proceed with a building permit. The owner would like to re-visit the connector again. A new design requires a Substantial Amendment to the Minor Development approval and will be subject to the Historic Preservation Guidelines in place in 2015. Vested Rights for the 2015 approval expire on July 16, 2018 and if a complete building permit for the approved project or any approved amendment is not submitted before that date, the 2015 approval will be null and void, requiring any alteration to the property to be subject to a new land use application in compliance with the 2016 Historic Preservation design guidelines and any other updated Municipal Code provisions. This Amendment request will not extend the Vested Rights beyond July 16, 2018 under any circumstances. Relevant Land Use Code Section(s): 26.304 Common Development Review Procedures 26.415.070.E.2 Substantial Amendments 26.575.020 Calculations and Measurements 26.710.090 RMF Zone District A link to the Municipal Code is here: http://www.aspenpitkin.com/Business-Navigator/Get-Approval-to-Develop/Refer-to-Land-Use-Code/ A link to the HPC Application is here: http://www.aspenpitkin.com/Portals/0/docs/businessnav/ApprovaltoDevelop/Land%20Use%20HPC %20Packet%20MAY%202017.pdf P30 IV.A. 2 Review by: Staff for complete application and recommendation, HPC for decision Public Hearing: Yes, at HPC (posting of notice only) Planning Fees: $1,950 for up to 6 billable hours. Additional/less hours will be billed/refunded at a rate of $325 per hour. Referral Fees: None Total Deposit: $1,950 To apply, submit 1 copy of the following information:  Completed Land Use Application and signed fee agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (not older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  A site improvement survey (not older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado.  HOA Compliance form (Attached.)  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards and design guidelines relevant to the development application and is consistent with land use approvals associated with the property.  Representations of building materials and finishes.  Photographs and other exhibits to illustrate the proposed changes.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen. Once the application is determined to be complete, submit:  A digital copy of the application emailed to amy.simon@cityofaspen.com. Please provide text and graphics as separate files.  12 copies of the project graphics.  Total deposit for review of the application. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. P31 IV.A. VICINITY MAP | 135 E. COOPER | 08.09.2017 ALIUS DESIGN CORPS | MICHAEL@ALIUSDC.COM | 719.331.9211P32 IV.A. 1875 SF 535 SF NO CHANGE TO EXISTING A B C H I J K L D F N P Q R ST U E G O M 535 SF NO CHANGE TO GUEST HOUSE 1875 SF AREA CALCULATIONS CONDITIONED LIVING SPACE COVERED EXTERIOR GARAGE FAR CALC BASED ON EXISTING HOUSE- NO PROPOSED CHANGE TO GARAGE OR GUEST HOUSE 4084 SF FAR Total Area EXISTING AREA (MAIN HOUSE): LOWER LEVEL AREA:273 (COUNTABLE SF) MAIN LEVEL AREA:1565 SF UPPER LEVEL AREA:1407 SF ATTIC:280 SF GARAGE(EXEMPT):231 SF (NO CHANGE) GUEST HOUSE: MAIN LEVEL:509 SF (NO CHANGE) LOWER LEVEL:50 SF (NO CHANGE) EXTERIOR FRONT PORCH(EXEMPT):NO CHANGE TOTAL EXISITNG 4,084 SF PROPOSED AREA PROPOSED AREA (MAIN HOUSE): LOWER LEVEL AREA:273 (NO CHANGE) MAIN LEVEL AREA:1565 SF (NO CHANGE) UPPER LEVEL AREA:1462 SF ATTIC:280 SF GUEST HOUSE: MAIN LEVEL: 509 SF (NO CHANGE) LOWER LEVEL:50 SF (NO CHANGE) EXTERIOR FRONT PORCH (EXEMPT)NO CHANGE TOTAL AREA FOR PROPOSED:4,139 SF EXISTING AREA: FAR Total Area 4139 SF ALLOWABLE AREA FAR Total Area 4180 SF A B C WALL AREA = 143 9' - 2"22' - 9 1/8" WALL AREA = 208 9' - 0"15' - 10" WALL AREA = 140 9' - 0"15' - 6 1/2" D E F WALL AREA = 18 G H I WALL AREA = 72 SF EXPOSED = 42 SF9' - 0"2' - 0"9' - 0"8' - 0" 2' - 3 1/2"9' - 0"WALL AREA = 18 9' - 0"2' - 0"9' - 0"35' - 6" 6' - 6 3/4" 42 SF WALL AREA = 21 21' - 7" WALL AREA = 320 WALL AREA = 195 J K 9' - 0"10' - 7" EXPOSED = 69 SF 69 SF 9' - 0"8' - 4 1/2"17' - 9 1/2" 26' - 2"8' - 0"WALL AREA = 236 EXPOSED = 76 76 SF L 26 SF 5' - 0 1/2"M 4' - 6 1/8" WALL AREA = 41 EXPOSED = 26 SF 5' - 0 1/2"4' - 1"3' - 1" 5' - 5 1/8" WALL AREA = 49 EXPOSED = 35 SF 35 SF N R 9' - 0"3' - 3" WALL AREA = 29 SF O 9' - 0"3' - 0" WALL AREA = 27 9' - 0"7' - 10 1/4" P 4' - 9" 12' - 3 3/4"9' - 0"31 SF WALL AREA = 111 EXPOSED = 43 S T U 3' - 8 1/4"9' - 0"WALL AREA = 34 9' - 0"7' - 9" WALL AREA = 70 9' - 0"4' - 7 5/8" WALL AREA = 42 WALL AREA = 71 6"6"6"EGRESS LIGHTWELL EGRESS LIGHTWELL LOWER LEVEL ACCESS/EGRESS EGRESS LIGHTWELL 6"MAIN HOUSE LOWER LEVEL ONLY: TOTAL WALL AREA: 1940 SF TOTAL AREA EXPOSED: 279 SF RATIO FOR CALCULATION: 279/1940 = .143 TOTAL FLOOR AREA OF MAIN HOUSE LOWER LEVEL = 1910 SF (.143) = 273 SF COUNTED TOWARDS FAR These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue As indicatedA360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:56:54 AM A0-01 AREA CALCULATIONS135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/8" = 1'-0"A0-01 1 EXISTING LOWER LEVEL FLOOR PLAN SCALE : 1/8" = 1'-0"A0-01 2 PROPOSED LOWER LEVEL FLOOR PLAN SCALE : 1/8" = 1'-0"A0-01 3 WALLS CALCULATION 2018.02.09 1 PERMIT SUBMITTALP33 IV.A. UP UP 1565 SF 231 SF 509 SF 61 SF OF STAIR EXISTING 73 SF 30 SF 186 SF NO CHANGE TO GUEST HOUSE NO CHANGE TO GARAGE 1565 SF 231 SF 509 SF 73 SF 30 SF 186 SF NO CHANGE TO GUEST HOUSE NO CHANGE TO GARAGE MAIN LEVEL AREA CALCULATIONS CONDITIONED LIVING SPACE COVERED EXTERIOR GARAGE FAR CALC BASED ON EXISTING HOUSE- NO PROPOSED CHANGE TO GARAGE OR GUEST HOUSE 4084 SF FAR Total Area EXISTING AREA (MAIN HOUSE): LOWER LEVEL AREA:273 (COUNTABLE SF) MAIN LEVEL AREA:1565 SF UPPER LEVEL AREA:1407 SF ATTIC:280 SF GARAGE(EXEMPT):231 SF (NO CHANGE) GUEST HOUSE:MAIN LEVEL:509 SF (NO CHANGE)LOWER LEVEL:50 SF (NO CHANGE)EXTERIOR FRONT PORCH(EXEMPT):NO CHANGE TOTAL EXISITNG 4,084 SF PROPOSED AREA PROPOSED AREA (MAIN HOUSE): LOWER LEVEL AREA:273 (NO CHANGE) MAIN LEVEL AREA:1565 SF (NO CHANGE) UPPER LEVEL AREA:1462 SF ATTIC:280 SF GUEST HOUSE: MAIN LEVEL: 509 SF (NO CHANGE) LOWER LEVEL:50 SF (NO CHANGE) EXTERIOR FRONT PORCH (EXEMPT)NO CHANGE TOTAL AREA FOR PROPOSED:4,139 SF EXISTING AREA: FAR Total Area 4139 SF ALLOWABLE AREA FAR Total Area 4180 SF 701 SF 706 SF 1462 SF These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue As indicatedA360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:56:57 AM A0-02 AREA CALCULATIONS135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/8" = 1'-0"A0-02 1 EXISTING MAIN LEVEL FLOOR PLAN SCALE : 1/8" = 1'-0"A0-02 2 PROPOSED MAIN LEVEL FLOOR PLAN SCALE : 1/8" = 1'-0"A0-02 3 EXISTING UPPER LEVEL SCALE : 1/8" = 1'-0"A0-02 4 PROPOSED UPPER LEVEL 2018.02.09 1 PERMIT SUBMITTALP34IV.A. UP UP AREA CALCULATIONS CONDITIONED LIVING SPACE COVERED EXTERIOR GARAGE FAR CALC BASED ON EXISTING HOUSE- NO PROPOSED CHANGE TO GARAGE OR GUEST HOUSE 4084 SF FAR Total Area EXISTING AREA (MAIN HOUSE): LOWER LEVEL AREA:273 (COUNTABLE SF)MAIN LEVEL AREA:1565 SF UPPER LEVEL AREA:1407 SF ATTIC:280 SF GARAGE(EXEMPT):231 SF (NO CHANGE) GUEST HOUSE: MAIN LEVEL:509 SF (NO CHANGE) LOWER LEVEL:50 SF (NO CHANGE) EXTERIOR FRONT PORCH(EXEMPT):NO CHANGE TOTAL EXISITNG 4,084 SF PROPOSED AREA PROPOSED AREA (MAIN HOUSE):LOWER LEVEL AREA:273 (NO CHANGE)MAIN LEVEL AREA:1565 SF (NO CHANGE)UPPER LEVEL AREA:1462 SFATTIC:280 SF GUEST HOUSE: MAIN LEVEL: 509 SF (NO CHANGE) LOWER LEVEL:50 SF (NO CHANGE) EXTERIOR FRONT PORCH (EXEMPT)NO CHANGE TOTAL AREA FOR PROPOSED:4,139 SF EXISTING AREA: FAR Total Area 4139 SF ALLOWABLE AREA FAR Total Area 4180 SF 280 SF280 SF These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue As indicatedA360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:56:58 AM A0-03 AREA CALCULATIONS135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/8" = 1'-0"A0-03 3 PROPOSED ATTIC LEVEL SCALE : 1/8" = 1'-0"A0-03 4 EXISTING ATTIC LEVEL 2018.02.09 1 PERMIT SUBMITTALP35 IV.A. UP UP UP 11 A A D D E E F F 3.13.1 44 55 C C G G 22 3 3 GARAGE 113 LIVING 101 SITTING 102 POWDER 103 HALL 104 LINK 105 105 SITTING 107 ENTRY 100 EAST COOPER AVENUECURBBBQ. BEDROOM 112SITTING/KITCHEN 110 MUD 109 3' - 6" 3' - 6" REMOVAL OF BBQ AREA DEMO OF EXISTING STONE WALL AND STAIR CASE EXISTING WINDOWS AT CONNECTOR TO BE REPLACED EXISTING PATH TO BE REMOVED EXISTING WINDOWS TO REMAIN 2' - 0"20' - 5 1/8"5' - 6"8' - 7 1/8" 1' - 6 1/8"9' - 3"11' - 8"5' - 6"8' - 7 1/8"3' - 2 1/8"9' - 0 1/4"1 5/8"2' - 2"B B EXISTING SPA TO REMAIN REMOVE EXISTING PAVING EXISTING TREES TO REMOVED STAIRS DOWN TO SPA TO BE REMOVED TREES TO BE REMOVED IF REQUIRED These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/4" = 1'-0"A360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:56:59 AM A105a EXISTING MAIN LEVEL FLOOR PLAN135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A105a 1 EXISTING MAIN LEVEL FLOOR PLANP36 IV.A. UP UP UP UP GRASS SLIDING FENCE GATE ON WHEEL GLIDE DRIVING GRASS PAVERS EGRESS LADDER REMOVE EXISTING STAIRCASE TO BASEMENT EXISTING GARAGE PARKING AREA 11 A A D D E E F F 3.13.1 44 55 C C G G 2 3 3 GARAGE 113 LIVING 101 SITTING 102 HALL 104 LINK 105 105 SITTING 107 ENTRY 100 BEDROOM 112SITTING/KITCHEN 110 MUD 109 POWDER 103 *NOTE: NO CHANGE TO THIS UNIT NO CHANGES PROPOSED TO EXISITNG EXISTING 2' - 0" 2 A303 1 A303 LOW BOOKSHELF GARDEN SCULPTURE NEW STEPPING STONES EXISTING OUTDOOR CHAIR 17' - 9"NEW 5' - 5 1/4" EXISTING LINK EXISTING SUNKEN SPA AREA - REDUCED AREA TO 99 SF NEW STONE WALL 3' - 5 1/2"6' - 4 1/2" 4' - 6 3/4"1' - 1 1/32"6' - 6 13/16"12' - 3 15/32"NEW WINDOWS FRONT PORCH FRONT PORCH 13' - 8 17/32"6' - 10 1/2"8' - 4 15/32"6' - 1 1/32" 11' - 8 5/8" KITCHEN 023 8' - 9 7/8" 9' - 1"20' - 8 3/4"21' - 7"B B 5' - 10"10' - 0" EXISTING PATH -REPLACE WITH NEW PAVERS PERMEABLE SURFACE *NEW IMPERVIOUS PAVING SHALL NOT EXCEED ALLOWABLE PER CITY ENGINEERING STANDARDS. These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/4" = 1'-0"A360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:57:00 AM A105b PROPOSED MAIN LEVEL FLOOR PLAN135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A105b 1 PROPOSED MAIN LEVEL FLOOR PLAN 2018.02.09 1 PERMIT SUBMITTALP37 IV.A. 11 A A D D E E F F 3.13.1 44 55 C C G G 22 3 3 B B EXISTING ROOF AND RAILINGS TO BE REMOVED DN. UP. REMOVAL OF EXISTING WINDOW REMOVAL OF EXISTING DOOR These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/4" = 1'-0"A360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/22/18 8:57:01 AM A106a EXISTING UPPER LEVEL FLOOR PLAN135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A106a 1 EXISTING UPPER LEVEL FLOOR PLANP38 IV.A. UP UP 11 A A D D E E F F 3.13.1 44 55 C C G G 22 3 35' - 11 3/4"3' - 10 1/2"11' - 3"13' - 11 3/8"14' - 8 7/8"5' - 11 1/2"3' - 6"11' - 7 1/2"14' - 5 3/8" MASTERBATHROOM 015 MASTERCLOSET 016 MASTER BEDROOM 017 BEDROOM 1 018 BATH 1 019 BEDROOM 2 020 BATH 2 021 HALL 022 9' - 10 1/2"3' - 6 1/2"3' - 10 1/2"5' - 2"6' - 2 1/2"4' - 6 1/4" 4' - 11 5/8"6' - 8 1/2"2' - 0 1/2"3' - 10 1/2"5' - 2"5' - 11 1/4"11' - 3"7' - 5 3/8"3' - 11"3' - 6"2 A303 1 A303 SLOPED ROOF 2% NEW GLASS CONNECTOR 8' - 4 1/2"1' - 11 23/32" NEW GLASS FLOOR FURNITURE4' - 4 13/32"21' - 7"5' - 10" 14' - 1 7/8"9' - 4 7/8"11' - 7 3/8"1' - 0"21' - 0 1/4"B B 10' - 0"These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/4" = 1'-0"A360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/12/18 9:22:10 AM A106b PROPOSED UPPER LEVEL FLOOR PLAN135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A106b 1 PROPOSED UPPER LEVEL FLOOR PLAN 2018.02.09 1 PERMIT SUBMITTALP39 IV.A. 11 A A D D E E F F 3.13.1 44 55 C C G G 22 3 3 2 A303 1 A303 B B NEW GLASS ROOF CONNECTOR EXISTING ROOF EXISTING ROOF EXISTING ROOF EXISTING ROOF SLOPED ROOF BELOW AT CONNECTOR WALKWAY SLOPE 2%These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/4" = 1'-0"\\Mac\Home\Desktop\135 Cooper Ave\17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/11/18 5:39:34 PM A107 ROOF PLAN135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A107 1 ATTIC LEVEL PROPOSED Copy 1P40 IV.A. F J 2 3 D F F A302X 2 A303X 1 A302X 1 11 A A D D E E F F 3.13.1 4 55 C C G G 22 3 3 A303X 2 LIVING 101 LINK 105 105 SITTING 107 SITTING/KITCHEN 110 MUD 109 BEDROOM 112 GARAGE 113 POWDER 103 EXISTING FIREPLACE EQEQ2' - 0"EQ EQ 6' - 4 7/8" EQ EQ 2' - 0"11' - 11 1/2"4' - 1 17/32"2' - 0"EQEQ2' - 0"2' - 8"EQEQ2' - 0" EQ EQ 3' - 6"2' - 0"A2 A1 A2 A2 A2 A2 A2 A2 A2 A2 A2 A1 A1 A1 A1 D1 D1 A2 D1 A1 3' - 6" TWO NEW LIGHTS OVER ISLAND NO CHANGES PROPOSED TO EXISITNG *NOTE: NO EXTERIOR CHANGES PROPOSED TO EXISTING4' - 0"4' - 3 15/32"EQEQ2 A303 1 A303 A1 A1 A1 GLASS FLOOR ABOVE STEEL LIGHT COVE A5031 B B GENERAL ELECTRICAL NOTES: 1. LUTRON ARCHITECTURAL STYLE FOR ALL OUTLETS 2. ALL OUTLETS CENTERED IN BASEBOARD 3. SEE INTERIOR ELEVATIONS FOR CORRECT OUTLET PLACEMENT 4. ALL OUTLETS IN WET LOCATIONS (BATHROOMS, KITCHEN, ETC.) ARE GFCI PER CODE 5. CAT 6/1 GIG MINIMUM FOR ALL DATA 6. TWO NETWROK DATA/ONE CABLE/ONE OUTLET AT EACH TV LOCATION 7. ALL OUTLETS ARE TO BE CENTERED BELOW SWITCHING WHERE APPLICABLE 8. ALL THERMOSTATS ARE CENTERED ABOVE SWITCHING 9. ALL SWITCH PLATES AND OUTLETS ARE DESIGNER SERIES IN SATIN FINISH (COLOR TO BE VERIFIED WITH ARCHITECT) 10. ALL USB OUTLETS ARE TO BE LUTRON NTR-15-UBTR 11. ALL FLOOR OUTLETS HAVE RECESSED PLUGS WITH A STAIN BRASS SB COVER 12. ALL OUTLETS ABOVE COUNTERS ARE HORIZONTAL AND CENTERED ON SPLASH UNLESS NOTED OTHERWISE (SEE INTERIOR ELEVATIONS) 13. OUTLETS AND LIGHTING ARE ALWAYS CENTERED IN BOARDS WHERE APPLICABLE 14. PROVIDE EXTRA WHIP FOR ALL OUTLET LOCATIONS FOR ADJUSTMENTS IN THE FIELD 15. DEFAULT FOR SWITCHING HEIGHTS IS 52" UNLESS NOTED OTHERWISE 16. DEFAULT FOR THERMOSTAT IS 62" UNLESS NOTED OTHERWISE 17. DEFAULT GFCI OUTLETS IN GARAGE ARE 42" ABOVE FFL HORIZONTAL 18. PROVIDE OUTLET SPACING PER NEC REQUIREMENTS -VERY WITH ARCHITECT IF MORE OUTLETS ARE REQUIRED. SWITCH, DOUBLE PLATE SWITCH, SINGLE PLATE 3-WAY SWITCH DIMMER FLOOR OUTLET -DUPLEX FLOOR OUTLET -SINGLE GFCI WP DUPLEX OUTLET -GROUND FAULT CIRCUIT INTERRUPTER DUPLEX OUTLET -WATER PROOF DUPLEX OUTLET -HALF HOT LED LIGHT STRIP WALL MOUNTED FIXTURE SURFACE MOUNTED FIXTURE JUNCTION BOX RECESSED DIRECTIONAL LIGHTING/ELECTRICAL SYMBOLS DATA These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue As indicated\\Mac\Home\Desktop\135 Cooper Ave\17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/11/18 5:45:40 PM A109 PROPOSED RCP MAIN LEVEL135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/4" = 1'-0"A109 1 PROPOSED MAIN LEVEL 2018.02.09 1 PERMIT SUBMITTALP41 IV.A. EXISTING HISTORIC EXISTINGPROPOSED ELEVATION MODIFICATION EXISTING HISTORICEXISTINGPROPOSED ELEVATION MODIFICATION8'-2"15'-5"15'-3"8'-2"15'-5"15'-3"HISTORIC BOTTOM OF EAVE ELEVATIONCONNECTOR ROOF ELEVATION CONNECTOR FFLELEVATION EXISTING FFLELEVATION FIRSTFLOORVIF 2"NEW PROPOSED SECOND STORY TO CONNECTOR GLASS ROOF NEW LOWER GLASS WITH SUPPORT COLUMNS BLACK METAL FASCIA EXISTING FOUNDATION NEW PROPOSED SECOND STORY TO CONNECTOR NEW LOWER GLASS WITH SUPPORT COLUMNS DARK METAL FASCIA EXISTING FOUNDATION PROPOSED AREA OF WORK PROPOSED AREA OF WORK REPLACE EXISTING SLIDING DOOR REPLACEMENT FOR EXISTING SLIDING GLASS DOOR DARK BRONZE (COLOR) CLAD FENESTRATION SYSTEM HISTORIC BOTTOM OF EAVE ELEVATIONCONNECTOR ROOF ELEVATION CONNECTOR FFLELEVATION EXISTING FFLELEVATION FIRSTFLOOR REPLACE EXISTING SLIDING DOORS REMOVE EXISTING RAILS EXISTING FOUNDATION DARK BRONZE (COLOR) CLAD FENESTRATION SYSTEM EXISTING SPA EXISTING LIGHT WELL EXISTING EXTERIOR STAIRS TO SPA AND ABOVE EXISTING EXTERIOR BELOW GRADE WALL EXISTING STAIRS3'-0"8"PROPOSED REMOVAL OF EXISTING WHITE PAINTED STEEL GUARDRAIL 5'-0"9'-7"10'-2 15/16"EXISTING SPA EXISTING LIGHT WELL EXISTING EXTERIOR STAIRS TO SPA AND ABOVE EXISTING EXTERIOR BELOW GRADE WALL EXISTING STAIRS PROPOSED TO BE REMOVED3'-0"2'-0"GLASS GUARDRAIL 5'-0"9'-7"11'-7"STONE WALL These documents are the property ofEAD. Any unauthorized use without thewritten consent of EAD is prohibited bylaw. EAD disclaims responsibility forthese documents if they are used wholeor in part at any other location and forany other application other than theoriginal intent. If you are not theintended recipient, you are herebynotified that any dissemination,distribution or reproduction of thesedocuments is prohibited by law.Copyright c 2016 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 3/8" = 1'-0"16009-Bridge House_2017-11-06_detached.rvt11/6/17 2:51:41 PM A302 NORTH/SOUTH ELEVATION135 COOPER RESIDENCE136 COOPER STREET,ASPEN COLORADO201228 Author Checker SCALE : 3/16" = 1'-0" 1C NORTH ELEVATION EXISTING 10/03/2017 PRICING SCALE : 1/8" = 1'-0" 2C NORTH ELEVATION PROPOSED SCALE : 3/16" = 1'-0" 1C SOUTH ELEVATION EXISTING SCALE : 1/8" = 1'-0" 2C SOUTH ELEVATION PROPOSED 220 West Main Street, Suite 201 Aspen, Colorado 81611 Office: 970-300-3423 SCALE : 1/4" = 1'-0" 3A EXISTING SECTION AT LIGHTWELL/SPA WITH STAIR SCALE : 1/4" = 1'-0" 3B PORPOSED SECTION AT LIGHTWELL/SPA WITH REMOVAL OF STAIR REMOVE EXISTING GUARDRAIL REMOVE EXISTING STAIRCASEREMOVE EXISTING WALL SCALE :NA 3C EXISTING EXTERIOR STAIR TO BASEMENT/LIGHTWELL/SPA FILL IN PORTION OF STAIRCASE TO FINISH LEVEL OF BACKYARD EXISTING SPAEXISTING DECK TO REMAIN EXISTING EGRESS TO REMAIN REMOVE AND REPLACE WHITE RAILP42 IV.A. LOWER LEVEL-10' - 6" MAIN LEVEL0" F UPPER LEVEL9' - 9 5/8" 1 A303 7' - 7 3/4"SLOPE 2%6' - 9 7/16"6' - 7 25/32"TOP OF CONNECTOR F.F. OF CONNECTOR 8' - 2 7/8"3' - 2"EXISTING SHED ROOF METAL SOFFIT EXISTING SPA AREA -REDUCED AREA TO 99 SF 3' - 4" 9" 3' - 7" 15' - 3 3/8" GLASS RAILING NEW STONE EXISTING SPA LOWER LEVEL-10' - 6" MAIN LEVEL0" 3.14 3 UPPER LEVEL9' - 9 5/8" 2 A303 8' - 9 1/8"9' - 3 5/8"6' - 8"7' - 7 3/4"2' - 3"1' - 6 3/4"GLASS ROOF STEEL JOIST STEEL JOIST WITH BLIND CONNECTION TO GIRDER GLASS FLOOR 15' - 3 3/8"15' - 3 3/8"7' - 0 1/2"BASE OF ROOF ELEVATION TOP OF ROOF ON GLASS CONNECTOR 15' - 4 5/8"1' - 0 1/2"1' - 2 1/4"HISTORIC HOUSE EXISTING HOUSE 8 1/4"STAIRS UP 8' - 2 7/8" F.F. OF CONNECTOR STEEL COLUMN SUPPORT These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue 1/2" = 1'-0"A360://17008 - 135 Cooper - 2017/17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/12/18 9:15:59 AM A303 SECTIONS @ LINK135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/2" = 1'-0"A303 2 CROSS SECTION @ LINK B SCALE : 1/2" = 1'-0"A303 1 CROSS SECTION @ LINK AP43 IV.A. MAIN LEVEL0"5' - 0"SLIDING GATE PAINTED WOOD TO MATCH EXISTING EXISTING GARAGE3' - 0"2 13/16" 1' - 6"1' - 6"STONE GLASS RAIL 1' - 6"2"These documents are the property of EAD. Any unauthorized use without the written consent of EAD is prohibited by law. EAD disclaims responsibility for these documents if they are used whole or in part at any other location and for any other application other than the original intent. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction of these documents is prohibited by law.Copyright c 2015 by EIGELBERGER ARCHITECTURE & DESIGNSCALE: Plot Date Drawn By Checked By Project No. Date Issue As indicated\\Mac\Home\Desktop\135 Cooper Ave\17008 - 135 Cooper - v2017 - Glass Connection ONLY A.rvt3/11/18 5:39:35 PM A503 DETAILS AT EXTERIOR135 E. COOPER AVE.135 E. COOPER AVE.ASPEN, COLORADO 81611201228 Author Checker SCALE : 1/2" = 1'-0"A503 1 DETAIL AT SLIDING GATE SCALE : 1 1/2" = 1'-0"A503 2 RAILING/GUARDRAIL DRIVABLE GRASS PAVERSBLUE STONE PAVERS P44IV.A. P45IV.A. A B 5 4 3.5 1 2 F G J JIHG FEDCA 5 7 6 8 4 3 1 K L 10 9 3 UP 19 R @ 7" = 11'-1" T@ 11"18R@7"T@11"PROJECT SCALE EXISTING LOWER LEVEL FLOOR PLAN 1/4" = 1'-0" 16024.00 XXXEXISTING LOWER LEVEL FLOOR PLAN 1/4" = 1'-0" 1 XXX 0 2 4 8 Scale: 1/4" = 1'-0" ..\..\..\..\..\..\Office\MARKETING\Signatures\stamp.jpg COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID #273516104003135 E. COOPER AVE.C THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE --NP46IV.A. A B 5 4 3.5 1 2 F G J JIHG FEDCA 5 7 6 8 4 3 1 K L 10 9 3 UP DN UP 19R@7"11"TREADST@ 11" 19 R @ 7" = 11'-1" 18R@7" T@11" UP1R@7"3R@6"2R@6"UP 3R@6" PROJECT SCALE EXISTING MAIN LEVEL FLOOR PLAN 1/4" = 1'-0" 16024.00 XXXEXISTING MAIN LEVEL FLOOR PLAN 1/4" = 1'-0" 1 XXX 0 2 4 8 Scale: 1/4" = 1'-0" ..\..\..\..\..\..\Office\MARKETING\Signatures\stamp.jpg COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID #273516104003135 E. COOPER AVE.C THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE --NP47IV.A. A B 5 4 3.5 1 2 F G J JIHG FEDCA 5 7 6 8 4 3 1 K L 10 9 3 DN UP DN DN14R@ 7 7/16"16R@ 7 1/4"19 R @ 7" = 11'-1" PROJECT SCALE EXISTING UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 16024.00 XXXNEXISTING UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 1 XXX 0 2 4 8 Scale: 1/4" = 1'-0" ..\..\..\..\..\..\Office\MARKETING\Signatures\stamp.jpg COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID #273516104003135 E. COOPER AVE.C THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE --P48IV.A. A B 5 4 3.5 1 2 F G J JIHG FEDCA 5 7 6 8 4 3 1 K L 10 9 3 DN 14 R @ 7" T @ 11" UP 3 R @ 6-1/4" UP 4 R @ 7-1/8" T @ 11" T @ 11" PROJECT SCALE PROPOSED UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 16024.00 A-203PROPOSED UPPER LEVEL FLOOR PLAN 1/4" = 1'-0" 1 A-203 0 2 4 8 Scale: 1/4" = 1'-0" ..\..\..\..\..\..\Office\MARKETING\Signatures\stamp.jpg COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID #273516104003135 E. COOPER AVE.C THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE --NP49IV.A. 4'-0" 11"7"5'-3"11'-11"15'-7 1/4"16'-1 3/4"7'-2 3/8" 8 3/4" 4'-4" 10'-1 0 " 11'-7 5 / 3 2 " 4'-0"11'-1"9'-7"11"7"1'-3 3/4" 4'-9" 11"6 1/4"7 1/8"11"7'-7 1/4"9'-3 3/4"8'-8 3/4"14'-7 19/32" 8'-0"6'-8"7'-0 1/2"1'-1 15/16"1'-6 3/4"2'-4 3/8"9'-7"PROJECT SCALE PROPOSED SECTION CUTS 1/2" = 1'-0" 16024.00 XXXPROPOSED SECTION CUT B 1/4" = 1'-0" 1 XXX 0 1 2 4 Scale: 1/2" = 1'-0"Scale: 1/2" = 1'-0" ..\..\..\..\..\..\Office\MARKETING\Signatures\stamp.jpg COPYRIGHT 2015 THUNDERBOWL ARCHITECTS ASPEN, COLORADOPARCEL ID #273516104003135 E. COOPER AVE.C THUNDERBOWLARCHITECTSTHUNDERBOWL ARCHITECTS 300 S. SPRING ST. SUITE 201 ASPEN, CO 81611 (970) 710-2938 DATE -- PROPOSED SECDTION CUT A 1/4" = 1'-0" 1 XXX 0 1 2 4 Scale: 1/2" = 1'-0"Scale: 1/2" = 1'-0"P50IV.A. CONCEPTUAL 3D DESIGN THUNDERBOWL ARCHITECTS Page 1P51IV.A. CONCEPTUAL 3D DESIGN THUNDERBOWL ARCHITECTS Page 2P52IV.A. CONCEPTUAL 3D DESIGN THUNDERBOWL ARCHITECTS Page 3P53IV.A. CONCEPTUAL 3D DESIGN THUNDERBOWL ARCHITECTS Page 4P54IV.A. CONCEPTUAL 3D DESIGN THUNDERBOWL ARCHITECTS Page 5P55IV.A. 500 W. Main Street Page 1 of 10 MEMORANDUM TO: Aspen Historic Preservation Commission FROM: Sarah Yoon, Historic Preservation Planner THRU: Amy Simon, Historic Preservation Officer RE: 500 W. Main Street- Minor Development, Setback Variation, Public Hearing DATE: March 28, 2018 ______________________________________________________________________________ SUMMARY: 500 W. Main Street, also known as the Mesa Store, is a 6,000 square foot historic landmark located in the Mixed-Use zone district and the Main Street Historic District. This applicant previously received Land Use approval for constructing an addition containing commercial space and free market unit. The applicant has since withdrawn these plans, and any existing approvals will need to be vacated if a new approval is granted. This historic landmark is mostly situated on Lot S but built to the extents of the south and east property lines. An encroachment agreement is in place for elements of the front façade and the historic porch, which project past the property line. The adjacent Lot R is currently used to accommodate parking needs. In lieu of expanding the building, the applicant will restore the resource as planned and maximize use of the structure through an interior remodel. This revised scope is going through a permit review with the city. Staff approval was granted for all exterior work consistent with HPC’s past approval. HPC is asked to conduct a Minor Development Review and Setback Variation and to consider the following items: 1.) rebuild the overhanging roof over the stairs on the west elevation 2.) reconstruct two missing historic chimneys for use as mechanical flues 3.) restore and add new window and door openings to the west elevation 4.) proposed site work on Lot R APPLICANT: 500 W. Main Street LLC, represented by Rowland + Broughton. PARCEL ID: 2735-124-43-007. ADDRESS: 500 W Main Street, Lots R & S, Block 30, City and Townsite of Aspen, Colorado. ZONING: Mixed-Use (MU). P56 IV.B. 500 W. Main Street Page 2 of 10 500 W. Main Street - 1955 500 W. Main Street - 2015 MINOR DEVELOPMENT The procedure for a Minor Development Review is as follows. Staff reviews the submittal materials and prepares a report that analyzes the project’s conformance with the design guidelines and other applicable Land Use Code Sections. This report is transmitted to the HPC with relevant information on the proposed project and a recommendation to continue, approve, disapprove or approve with conditions and the reasons for the recommendation. The HPC will review the application, the staff analysis report and the evidence presented at the hearing to determine the project’s conformance with the Design Guidelines. The HPC may approve, disapprove, approve with conditions, or continue the application to obtain additional information necessary to make a decision to approve or deny. If the application is approved, the HPC shall issue a Certificate of Appropriateness and the Community Development Director shall issue a Development Order. The HPC decision shall be final unless appealed by the applicant or a landowner within three hundred (300) feet of the subject property in accordance with the procedures set forth in Chapter 26.316. Staff Response: The proposed plan includes the rebuilding of the overhanging roof along the west façade of the historic structure back to an approximation of an earlier configuration, which will require a front setback variation, since the roof will extend into the front setback. New electric/gas meters and heat pumps are to be located under the exterior staircase, and the trash enclosures and transformer are at the far northwest corner of the property towards the alley. New fences are proposed on the east and west property lines. Two of the missing historic chimneys along the ridgeline of the roof are proposed to be reconstructed. Please note that the outdoor living features shown on the east side of the property were a last minute addition to the application, and staff was not able to prepare a review applying the Commercial Design Standards for pedestrian amenity. This work will be addressed through a Certificate of No Negative Effect. HPC input on design considerations that staff should bear in mind is welcome. P57 IV.B. 500 W. Main Street Page 3 of 10 VARIATION FOR WEST ROOF CHANGE: The exact construction date for the existing exterior stair on the west façade of the historic structure cannot be determined, but early photographs dating to the 1940s clearly portray this feature. When compared to the older photographs, the exterior staircase and the roof overhang have been modified over the years. The applicant proposes to rebuild the overhanging roof to relate to its early appearance, and meet the current Building Code requirements. Due to the location of the resource on the south and east property lines and the encroachment easement for the front façade, the rebuilding of the roof overhang will require a setback variation to be granted. 500 W. Main Street - 1953 500 W. Main Street - 2015 The relatively flat roof overhang that tucks under the eave is redesigned with a 4/12 pitch that closely resembles earlier photographs. The proposal attaches a new downspout to one of the rearmost columns of the existing stairs. Land Use Code – Criteria for granting Variances/Variations: C. Variances. Dimensional variations are allowed for projects involving designated properties to create development that is more consistent with the character of the historic property or district than what would be required by the underlying zoning's dimensional standards. 1. The HPC may grant variances of the Land Use Code for designated properties to allow: a) Development in the side, rear and front setbacks; b) Development that does not meet the minimum distance requirements between buildings; c) Up to five percent (5%) additional site coverage; d) Less public amenity than required for the on-site relocation of commercial historic properties. 2. In granting a variance, the HPC must make a finding that such a variance: a) Is similar to the pattern, features and character of the historic property or district; and/or b) Enhances or mitigates an adverse impact to the historic significance or architectural character of the historic property, an adjoining designated historic property or historic district. P58 IV.B. 500 W. Main Street Page 4 of 10 The applicant’s proposal to rebuild the overhanging roof above the stairs with a pitch based on the earliest configuration of this element follows the recommendations for historical research and physical evidence and HP Design Guidelines 5.4 and 5.5. Staff, therefore, supports the applicants request for a 0’-0” front yard setback for the roof overhang. The location of the new downspouts is in a location that is farthest removed from view and meets HP Design Guideline 7.10. but the proposed materiality needs to be provided for review. Proposed West Elevation: Downspout - 2018 NEW WINDOWS: The applicant proposes to add a number of openings on the west façade that were not part of the review for the Certificate of No Negative that was issued in January. Window 11, currently altered, and door 200 are historic openings that are documented. The applicant proposes to restore window 11 back to the historic configuration, and replace the non-historic door 200 with an appropriate new door.. The other highlighted openings are either new openings or lack historic documentation. The new proposed openings on the west elevation require discussion. Generally, adding new windows and doors on a character defining façade is restricted, or not allowed, but the guidelines provide more flexibility for secondary walls. (HP Design Guidelines 3.7 and 4.5). The five new openings are relatively modest in size, and keep with the overall character of the historic resource. Staff requests additional detail for the proposed replacements and requires historical accuracy for any restored openings. P59 IV.B. 500 W. Main Street Page 5 of 10 Existing West Elevation Proposed West Elevation - 2018 MECHANICAL EQUIUPMENT: The applicant locates new electric/gas meters and heat pumps under the exterior stairs where mechanical equipment is currently located. The equipment and meters are enclosed screened by a fence and accessible through a gate. The method of attachment for the meters is not clearly defined in the drawings. Without descriptions or details, the meters seem to be attached to the wall of the historic building. Staff recommends another solution for these elements that will not require direct attachment to the historic resource. The proposed site plan relocates the trash enclosures and transformer unit to the far northeast corner of the property. 11 200 P60 IV.B. 500 W. Main Street Page 6 of 10 The new location proposed for the trash enclosures and the transformer are appropriate to the site and takes HP Design Guideline 12.4 into consideration. Staff would like to note that the applicant will need to comply with Environmental Health requirements. Proposed Site Plan – 2018 CHIMNEYS: Historic images show four chimneys lining the ridge of the historic roof. Sometime between the 1950s and the 1970s, these elements were remodeled and today only one altered brick chimney remains on the ridge. The applicant proposes to reconstruct two missing brick chimneys along the ridge of the roof for use as flues. Staff supports the applicants plans to reconstruct the historic brick chimneys its original location which is in line with HP Design Guideline 7.5, but requires careful study and examination of historical documentation, as well as evidence in the physical fabric to accurately locate and reconstruct these original elements. The drawings representing the reconstruction of the chimneys are not accurate in height and design detail. Staff requires adequate historic research be conducted and included in the plans before reconstruction as recommended in HP Design Guideline 6.4 and 6.5. P61 IV.B. 500 W. Main Street Page 7 of 10 Chimney Detail – 1900 Chimney Detail – 1953 ______________________________________________________________________________ DECISION MAKING OPTIONS: The HPC may: • approve the application, • approve the application with conditions, • disapprove the application, or • continue the application to a date certain to obtain additional information necessary to make a decision to approve or deny. ______________________________________________________________________________ STAFF RECOMMENDATION: Staff recommends that HPC approval of the application submitted with the following conditions: 1. The request for a front setback variation of a 0’-0” front yard setback to rebuild the overhanging roof to match an earlier configuration is approved. 2. The exact location of window 11 will be based on review of framing once exposed. 3. Cut sheets for new windows and doors must be reviewed and approved by staff. 4. Provide plans confirming the location of the meters/equipment which are to be detached from the building to the extent possible, will be reviewed and approved by staff. 5. Review historic photos and provide detail reconstructing all three chimneys to a historically accurate appearance. 6. Submit site work for Certificate of No Negative Effect. 7. The previous approvals are vacated hereby as the Municipal Code does not allow multiple land use approvals to be valid at one time. EXHIBITS: Resolution #__, Series of 2018 A. Design Guidelines B. Application P62 IV.B. 500 W. Main Street Page 8 of 10 Exhibit A, Design Guidelines 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. 1.12 Provide an appropriate context for historic structures. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is overtextured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. • In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. 1.18 When building an entirely new fence, use materials that are appropriate to the building type and style. • The new fence should use materials that were used on similar properties during the period of significance. • A wood fence is the appropriate solution in most locations. • Ornate fences, including wrought iron, may create a false history are not appropriate for Aspen Victorian landmarks unless there is evidence that a decorative fence historically existed on the site. • A modest wire fence was common locally in the early 1900s and is appropriate for Aspen Victorian properties. This fence type has many desirable characteristics including transparency, a low height, and a simple design. When this material is used, posts should be simply detailed and not oversized. P63 IV.B. 500 W. Main Street Page 9 of 10 1.22 When a new retaining wall is necessary, its height and visibility should be minimized. • All wall materials, including veneer and mortar, will be reviewed on a case by case basis and should be compatible with the palette used on the historic structure. 3.2 Preserve the position, number, and arrangement of historic windows in a building wall. • Enclosing a historic window is inappropriate. • Do not change the size of an original window opening. 3.5 Preserve the size and proportion of a historic window opening. • Changing the window opening is not permitted. • Consider restoring an original window opening that was enclosed in the past. 4.2 Maintain the original size of a door and its opening. • Altering its size and shape is inappropriate. It should not be widened or raised in height. 5.4 If reconstruction is necessary, match the original in form, character and detail. • Match original materials. • When reconstructing an original porch or balcony without historic photographs, use dimensions and characteristics found on comparable buildings. Keep style and form simple with minimal, if any, decorative elements. 5.5 If new steps are to be added, construct them out of the same primary materials used on the original, and design them to be in scale with the porch or balcony • Steps should be located in the original location. • Step width should relate to the scale of entry doors, spacing between posts, depth of deck, etc. • Brick, red sandstone, grey concrete, or wood are appropriate materials for steps. 5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly where visible from the street. • If handrails or guardrails are needed according to building code, keep their design simple in character and different from the historic detailing on the porch or balcony. 6.4 Repair or replacement of missing or deteriorated features are required to be based on original designs. • The design should be substantiated by physical or pictorial evidence to avoid creating a misrepresentation of the building’s heritage. • When reconstruction of an element is impossible because there is no historical evidence, develop a compatible new design that is a simplified interpretation of the original, and maintains similar scale, proportion and material. 6.5 Do not guess at “historic” designs for replacement parts. • Where scars on the exterior suggest that architectural features existed, but there is no other physical or photographic evidence, then new features may be designed that are similar in character to related buildings. • Using ornate materials on a building or adding new conjectural detailing for which there is no documentation is inappropriate. P64 IV.B. 500 W. Main Street Page 10 of 10 7.5 Preserve original chimneys, even if they are made non-functional. • Reconstruct a missing chimney when documentation exists. 7.10 Design gutters so that their visibility on the structure is minimized to the extent possible. • Downspouts should be placed in locations that are not visible from the street if possible, or in locations that do not obscure architectural detailing on the building. • The material used for the gutters should be in character with the style of the building. 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. • Place mechanical equipment on the ground where it can be screened. • Mechanical equipment may only be mounted on a building on an alley façade. • Rooftop mechanical equipment or vents must be grouped together to minimize their visual impact. Where rooftop units are visible, it may be appropriate to provide screening with materials that are compatible with those of the building itself. Use the smallest, low profile units available for the purpose. • Window air conditioning units are not allowed. • Minimize the visual impacts of utility connections and service boxes. Group them in a discrete location. Use pedestals when possible, rather than mounting on a historic building. • Paint mechanical equipment in a neutral color to minimize their appearance by blending with their backgrounds • In general, mechanical equipment should be vented through the roof, rather than a wall, in a manner that has the least visual impact possible. • Avoid surface mounted conduit on historic structures. P65 IV.B. HPC Resolution #__, Series of 2018 Page 1 of 2 A RESOLUTION OF THE ASPEN HISTORIC PRESERVATION COMMISSION (HPC) GRANTING CONCEPTUAL MINOR DEVELOPMENT AND VARIATIONS FOR THE PROPERTY LOCATED AT 500 WEST MAIN STREET, LOTS R & S, BLOCK 30, CITY AND TOWNSITE OF ASPEN, COLORADO RESOLUTION #__, SERIES OF 2018 PARCEL ID: 2735-124-43-007 WHEREAS, the applicant, 500 W. Main Street LLC., represented by Rowland + Broughton, has requested HPC approval for Conceptual Minor Development and Variations for the property located at 500 West Main Street, Lots R & S, Block 30, City and Townsite of Aspen, Colorado; and WHEREAS, Section 26.415.070 of the Municipal Code states that “no building or structure shall be erected, constructed, enlarged, altered, repaired, relocated or improved involving a designated historic property or district until plans or sufficient information have been submitted to the Community Development Director and approved in accordance with the procedures established for their review;” and WHEREAS, for Conceptual Minor Development Review, the HPC must review the application, a staff analysis report and the evidence presented at a hearing to determine the project’s conformance with the City of Aspen Historic Preservation Design Guidelines per Section 26.415.070.C.3.b and c of the Municipal Code and other applicable Code Sections. The HPC may approve, disapprove, approve with conditions or continue the application to obtain additional information necessary to make a decision to approve or deny; and WHEREAS, the HPC may approve setback variations according to Section 26.415.110.C.1.a, Variances; and WHEREAS, HPC reviewed the project on March 28, 2018. HPC considered the application, the staff memo and public comments, and found the proposal consistent with the review standards and granted approval with conditions by a vote of __ to __. NOW, THEREFORE, BE IT RESOLVED: That HPC hereby approves Conceptual Minor Development and Variation review for 500 West Main Street with the following conditions: 1. HPC hereby grants the following dimensional variances: a. A 0’-0” front yard setback to allow for the rebuilding of the overhanging roof on the west elevation. 2. The exact location of window 11 will be based on review of framing once exposed. 3. Cut sheets for new windows and doors must be reviewed and approved by staff. P66 IV.B. HPC Resolution #__, Series of 2018 Page 2 of 2 4. Provide plans confirming the location of the meters/equipment which are to be detached from the building to the extent possible, will be reviewed and approved by staff. 5. Review historic photos and provide detail reconstructing all three chimneys to a historically accurate appearance. 6. Submit site work for Certificate of No Negative Effect. 7. The previous approvals are vacated hereby as the Municipal Code does not allow multiple land use approvals to be valid at one time. 8. A development application for a Final Development Plan shall be submitted within one (1) year of the date of approval of a Conceptual Development Plan. Failure to file such an application within this time period shall render null and void the approval of the Conceptual Development Plan. The Historic Preservation Commission may, at its sole discretion and for good cause shown, grant a one-time extension of the expiration date for a Conceptual Development Plan approval for up to six (6) months provided a written request for extension is received no less than thirty (30) days prior to the expiration date. APPROVED BY THE COMMISSION at its regular meeting on the 28th day of March, 2018. Approved as to Form: Approved as to Content: ______________________________ ____________________________ Andrea Bryan, Assistant City Attorney Gretchen Greenwood, Chair ATTEST: ______________________________ Nicole Henning, Deputy City Clerk P67 IV.B. AHPC Minor Development 500 W Main St. 1 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Amy Simon, 429.2758 DATE: February 12, 2018 PROJECT: 500 West Main Street APPLICANT: R+B TYPE OF APPLICATION: HPC Minor Development DESCRIPTION: The Applicant proposes minor exterior changes to the property at 500 W. Main. The site is a designated landmark located within the Main Street Historic District. It is zoned Mixed Use (MU) and is 6,000 square feet in area. The historic resource, a large false-front structure known as Mesa Store, features an exposed exterior stair along the west façade. The stair is original to the design of the building, but was reconstructed and altered around the 1960s. The applicant proposes to rebuild the stair and overhanging roof to an appearance that is as authentic as possible while meeting current Building Code. It is anticipated that a front yard setback variation will be needed to restore the stair and roof covering to the earlier configuration, flush with the south façade of the building. The applicant may also request setback variations related to ground mounted mechanical equipment. The addition of screens to the historic windows may be proposed. HPC will conduct a Minor Development review of the project. This is a one-step hearing, meaning that all exterior alterations, sitework and landscaping, will be presented to HPC at the same time. Staff recommendations and the HPC decision will be based on the Historic Preservation Design Guidelines. Below are links to relevant documents: Historic Preservation Land Use Application form: https://www.cityofaspen.com/DocumentCenter/Home/View/305 Land Use Code: https://www.cityofaspen.com/191/Municipal-Code HPC Design Guidelines: https://www.cityofaspen.com/DocumentCenter/Home/View/310 Land Use Code Section(s) 26.304 Common Development Review Procedures 26.415.070.C Certificate of Appropriateness for a Minor development 26.415.110.C Historic Preservation Benefits, Variances 26.575.020 Calculations and Measurements 26.710.180 Mixed Use (MU) zone district P68 IV.B. 2 Review by: Staff for completeness and recommendations. HPC for determinations. Public Hearing: Yes. Referral Agencies: None Planning Fees: $1,300 for 4 billable hours (additional/fewer hours will be billed/refunded at a rate of $325 per hour) To apply, submit 1 copy of the following information:  Completed Land Use Application and signed fee agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (not older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  A site improvement survey (not older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado.  HOA Compliance form (Attached).  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards relevant to the development application and relevant land use approvals associated with the property.  Written responses to all review criteria.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen. Once the application is determined to be complete, submit:  A digital copy of the application emailed to amy.simon@cityofaspen.com. Please provide text and graphics as separate files.  12 copies of the project graphics.  Total deposit for review of the application. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. P69 IV.B. City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and Property Phone No.: Owner (“I”): Email: Address of Billing Property: Address: (Subject of (send bills here) application) I understand that the City has adopted, via Ordinance No., Series of 2011, review fees for Land Use applications and payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $___________flat fee for ____________________ $____________ flat fee for ____________________________________ $___________ flat fee for ___________________ $_____________ flat fee for____________________________________ For Deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy including consequences for no-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render and application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $________________ deposit for_____________ hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $________________ deposit for _____________ hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: Property Owner: ________________________________ _______________________________________________ Jessica Garrow, AICP Community Development Director Name: _______________________________________________ Title: ____________________________________________________ City Use: Fees Due: $____Received $_______ P70 IV.B. City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 ATTACHMENT 2 - Historic Preservation Land Use Application PROJECT: Name: Location: (Indicate street address, lot & block number or metes and bounds description of property) Parcel ID # (REQUIRED)___________________________________________________________ Applicant: Name: Address: Phone #: _______________________Fax#:___________________E-mail:_______________________________________________ REPRESENTATIVE: Name: Address: Phone #: _______________________Fax#:___________________E-mail:________________________________________________ TYPE OF APPLICATION: (please check all that apply): Historic Designation Certificate of No Negative Effect Certificate of Appropriateness -Minor Historic Development -Major Historic Development -Conceptual Historic Development -Final Historic Development -Substantial Amendment Relocation (temporary, on or off-site) Demolition (total demolition) Historic Landmark Lot Split EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) ___________________________________________________________________________________________________________ PROPOSAL: (description of proposed buildings, uses, modifications, etc.) ________________________________________________________________________________________________________ P71 IV.B. City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 General Information Please check the appropriate boxes below and submit this page along with your application. This information will help us review your plans and, if necessary, coordinate with other agencies that may be involved. YES NO   Does the work you are planning include exterior work; including additions, demolitions, new construction, remodeling, rehabilitation or restoration?   Does the work you are planning include interior work, including remodeling, rehabilitation, or restoration?   Do you plan other future changes or improvements that could be reviewed at this time?   In addition to City of Aspen approval for a Certificate of Appropriateness or No Negative Effect and a building permit, are you seeking to meet the Secretary of the Interior’s Standards for Rehabilitation or restoration of a National Register of Historic Places Property in order to qualify for state or federal tax credits?   If yes, are you seeking federal rehabilitation investment tax credits in Conjunction with this project? (Only income producing properties listed on the National Register are eligible. Owner-occupied residential properties are not.)   If yes, are you seeking the Colorado State Income Tax Credit for Historical Preservation? Please check all City of Aspen Historic Preservation Benefits which you plan to use:  Rehabilitation Loan Fund  Conservation Easement Program  Dimensional Variances  Increased Density  Historic Landmark Lot Split  Waiver of Park Dedication Fees  Conditional Uses  Tax Credits  Exemption from Growth Management Quota System P72 IV.B. City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 ATTACHMENT 3 - Dimensional Requirements Form (Item #10 on the submittal requirements key. Not necessary for all projects.) Project: Applicant: Project Location: Zone District: Lot Size: Lot Area: (For the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing:__________Proposed:_________________ Number of residential units: Existing:__________Proposed:_________________ Proposed % of demolition: __________ DIMENSIONS: (write N/A where no requirement exists in the zone district) Floor Area: Height Existing:_________Allowable:__________Proposed:________ Principal Bldg.: Existing:_________Allowable:__________Proposed:________ Accessory Bldg.: Existing:_________Allowable:__________Proposed:________ On-Site parking: Existing:_________Required:___________Proposed:________ % Site coverage: Existing:_________Required:___________Proposed:________ % Open Space: Existing:_________Required:___________Proposed:________ Front Setback: Existing:_________Required:___________Proposed:________ Rear Setback: Existing:_________Required:___________Proposed:________ Combined Front/Rear: Indicate N, S, E, W Existing:_________Required:___________Proposed:________ Side Setback: Existing:_________Required:___________Proposed:________ Side Setback: Existing:_________Required:___________Proposed:________ Combined Sides: Existing:_________Required:___________Proposed:________ Distance between buildings: Existing:_________Required:___________Proposed:________ Existing non-conformities or encroachments and note if encroachment licenses have been issued: _____________________________________________________________________________ _____________________________________________________________________________ Variations requested (identify the exact variances needed): ______________________________ ______________________________________________________________________________ P73 IV.B. COMMUNITY DEVELOPMENT DEPARTMENT November, 2014 City of Aspen | 130 S. Galena St. | (970) 920-5090 Permit No. _______________ Homeowner Association Compliance Policy All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. The following certification shall accompany the application for a permit. Subject Property: _______________________________________________ _______________________________________________ _______________________________________________ I, the property owner, certify as follows: (pick one) □ This property is not subject to a homeowners association or other form of private covenant. □ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. □ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: _________________________ date:___________ Owner printed name: _________________________ or, Attorney signature: _________________________ date:___________ Attorney printed name: _________________________ P74 IV.B. Page 1 of 1 15 February 2018 Amy Simon City of Aspen Community Development Department 130 S. Galena Street, 3rd Floor Aspen, Colorado 81611 RE: Mesa Store – 500 W. Main Street – HPC Minor Development Dear Amy, As the property owner of 500 W. Main Street we submit this Land Use Application for the Minor Development for the Mesa Store, located within the Main Street Historic District. Rowland+Broughton Architecture’s employees are authorized to act on behalf of 500 West Main Street, LLC. Thank you. Sincerely, John Rowland, AIA Rowland+Broughton Architecture / Urban Design / Interior Design 500 West Main Street, LLC 234 E. Hopkins Avenue Aspen, Colorado 81611 970-544-9006 P75 IV.B. Page 1 of 1 MEMORANDUM Project: Mesa Store, 500 W. Main Street Subject: Project Description Date: 22 March 2018 This project consists of: - Rebuild exterior stair overhang roof to an appearance that more closely matches the historic condition. - Restore two chimney locations. - Restore the west elevation windows and add two small windows. - Addition of two water features, planters, seating and a BBQ area. This project complies with the Historic Preservation Design Guidelines in numerous ways, most specifically in rehabilitating an important commercial building located within the Main Street Historic District. P76 IV.B. 500 W. Main St. N VICINITY MAP P77IV.B. PROFORMA TITLE REPORT SCHEDULE A 1. Effective Date: January 31, 2017 at 8:00 AM Case No. PCT24641PRO 2. Policy or Policies to be issued: Proposed Insured: PROFORMA 3. Title to the FEE SIMPLE estate or interest in the land described or referred to in this Commitment is at the effective date hereof vested in: 500 WEST MAIN STREET, LLC, A COLORADO LIMITED LIABILITY COMPANY 4. The land referred to in this Commitment is situated in the County of PITKIN State of COLORADO and is described as follows: LOTS R AND S, BLOCK 30, CITY AND TOWNSITE OF ASPEN PITKIN COUNTY TITLE, INC. 601 E. HOPKINS, ASPEN, CO. 81611 970-925-1766 Phone/970-925-6527 Fax 877-217-3158 Toll Free AUTHORIZED AGENT Countersigned: P78 IV.B. SCHEDULE B - SECTION 1 REQUIREMENTS THIS REPORT IS FURNISHED FOR INFORMATIONAL PURPOSES ONLY, IT IS NOT A CONTRACT TO ISSUE TITLE INSURANCE AND SHALL NOT BE CONSTRUED AS SUCH. IN THE EVENT A PROPOSED INSURED IS NAMED THE COMPANY HEREBY RESERVES THE RIGHT TO MAKE ADDITIONAL REQUIREMENTS AND/OR EXCEPTIONS AS DEEMED NECESSARY. THE RECIPIENT OF THIS INFORMATIONAL REPORT HEREBY AGREES THAT THE COMPANY HAS ISSUED THIS REPORT BY THEIR REQUEST AND ALTHOUGH WE BELIEVE ALL INFORMATION CONTAINED HEREIN IS ACCURATE AND CORRECT, THE COMPANY SHALL NOT BE CHARGED WITH ANY FINANCIAL LIABILITY SHOULD THAT PROVE TO BE INCORRECT AND THE COMPANY IS NOT OBLIGATED TO ISSUE ANY POLICIES OF TITLE INSURANCE P79 IV.B. SCHEDULE B SECTION 2 EXCEPTIONS The policy or policies to be issued will contain exceptions to the following unless the same are disposed of to the satisfaction of the Company: 1. Rights or claims of parties in possession not shown by the public records. 2. Easements, or claims of easements, not shown by the public records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, any facts which a correct survey and inspection of the premises would disclose and which are not shown by the public records. 4. Any lien, or right to a lien, for services, labor, or material heretofore or hereafter furnished, imposed by law and not shown by the public records. 5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this Commitment. 6. Taxes due and payable; and any tax, special assessment, charge or lien imposed for water or sewer service or for any other special taxing district. 7. Reservations and exceptions as set forth in the Deed from the City of Aspen recorded in Book 59 at Page 223 providing as follows: "That no title shall be hereby acquired to any mine of gold, silver, cinnabar or copper or to any valid mining claim or possession held under existing laws". 8. Terms, conditions and obligations of Ordinance No. 32 and Ordinance No. 60, designating Lots R and S, Block 30, City and Townsite of Aspen as Historic District, recorded in Book 314 at Page 338 and in Book 321 at Page 51. 9. Terms, conditions, provisions and obligations as set forth in Encroachment Agreement recorded in Book 553 at Page 109. 10. Easements, rights of way and all matters as disclosed on Survey of subject property recorded April 6, 1998 in Plat Book 44 at Page 71. 11. Terms, conditions, provisions, obligations and all matters as set forth in Resolution of the The Aspen Historic Preservation Commission recorded September 13, 1999 as Reception No. 435423 as Resolution No. 38 Series 1999. 12. Terms, conditions, provisions, obligations and all matters as set forth in Resolution of the Aspen Historic Preservation Commission recorded October 19, 2016 as Reception No. 633130 as Resolution No. 32-2016. 13. Easements, rights of way and all matters as disclosed on Improvement Survey Plat of subject property recorded November 10, 2016 in Plat Book 116 at Page 43. 14. Deed of Trust from : 500 W. MAIN STREET, LLC, A COLORADO LIMITED LIABILITY COMPANY To the Public Trustee of the County of PITKIN For the use of : ANB BANK Original Amount : $3,160,000.00 Dated : June 30, 2016 Recorded : June 30, 2016 Reception No. : 630378 15. Assignment of Leases and Rents given in connection with the above Deed of Trust recorded June 30, 2016 as Reception No. 630379. 16. Any existing leases and tenancies. P80 IV.B. PITKIN COUNTY TITLE, INC. 601 E. HOPKINS, THIRD FLOOR ASPEN, CO 81611 970-925-1766/970-925-6527 FAX TOLL FREE 877-217-3158 WIRING INSTRUCTIONS FOR ALL TRANSACTIONS REGARDING THE CLOSING OF THIS FILE ARE AS FOLLOWS: ALPINE BANK-ASPEN 600 E. HOPKINS AVE. ASPEN, CO. 81611 ABA ROUTING NO. 102103407 FOR CREDIT TO: PITKIN COUNTY TITLE, INC., ESCROW ACCOUNT ACCOUNT NO. 2021 012 333 REFERENCE:PCT24641PRO/PROFORMA P81 IV.B. P82IV.B. P83IV.B. P84IV.B. P85IV.B. P86IV.B. P87IV.B. P88IV.B. P89IV.B. P90IV.B. P91 IV.B. P92 IV.B. EXHIBIT AFFIDAVIT OF PUBLIC NOTICE REQUIRED"BY-SECTION"26:304:060(E); ASPEN'GAND USE CODE ADDRESS OF PROPERTY: I ' r� � �,� (' �`7\spen, CO SCHEDULED PUBLIC HEARING DATE: 20 STATE OF COLORADO ) ss. County of Pitkin/ / ) I,�himia �h (name, please print) being or representing an Applicant to the City of Aspen, Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) days prior to the public hearing. A copy of the publication is attached hereto. JPosting of notice: By posting of notice, which form was obtained from the Community Development Department, which was made of suitable, waterproof materials, which was not less than twenty-two (22) inches wide and twenty-six (26) inches high, and which was composed of letters not less than one inch in height. .�Said notice was posted at least fifteen(15) days prior to the public hearing JRA on the day of 0441,g 2049-1 to and including the date and time / of the public hearing. A pihillbkraph of the posted notice (sign) is attached hereto. ✓ Mailing of notice. By the mailing of a notice obtained from the Community Development Department, which contains the information described in Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to the public hearing, notice was hand delivered or mailed by first class postage prepaid U.S. mail to all owners of property within three hundred (300) feet of.the property subject to the development application. The names and addresses of property owners shall be those on the current tax records of Pitkin County as they appeared no more than sixty (60) days prior to the date of the public hearing. A copy of the owners and governmental agencies so noticed is attached hereto. Neighborhood Outreach: Applicant attests that neighborhood outreach, summarized and attached, was conducted prior to the first public hearing as required in Section 26.304.035, Neighborhood Outreach. A copy of the neighborhood outreach summary, including the method of public notification and a copy of any documentation that was presented to the public is attached hereto. (continued on next page) J Mineral Estate Owner Notice. By the certified mailing of notice, return receipt requested, to affected mineral estate owners by at least thirty(30) days prior to the date scheduled for the initial public hearing on the application of development. The names and addresses of mineral estate owners shall be those on the current tax records of Pitkin County. At a minimum, Subdivisions, PDs that create more than one lot, and new Planned Developments are subject to this notice requirement. fl" Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision be made by repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map shall be available for public inspection in the planning agency during all business hours for fifteen (15) days prior to the public hearing on such amendments. y �� �� 1�.L6 v�.-t"� Signature The fbA%e�going"Affidavit of Notice"was acknowledged before me this day of `/�1L12c� 20re,by fah V -'�- �i CEctok•,k WITNESS MY HAND AND OFFICIAL SEAL -.KIM L MEYER �dp�0c.Efate otNew 1kxk 140:01ME4950329 My commission expires: ''Ouelilled In Kings Courcy -Cbrnmissfon Expires AAAI 24,20' - ��-- Notary Public ATTACHMENTS AS APPLICABLE: • COPYOFTHEPUBLICATION • PHOTOGRAPH OF THE POSTED NOTICE(SIGN) • LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BYMAIL • APPLICANT CERTIFICATION OF MINERAL ESTATE 0WAERS NOTICE AS REQUIRED BYC.R.S. §24-65.5-103.3 1 3/20/2018 Vdicom,Inc.Mail-Fwd:Posted Images of 135 E.Cooper Ave. V I D I C O M Patricia O'Brien<pobrien@cityb—com> Fwd: Posted images of 135 E.Cooper Ave. —1—message Pot n<pa en®dtybuu.w -- o:PavitlaO73den<pobrien®vidicom.mm> Time of sign posting —Fmwardm Sto"age— �Y . w From;Cassendn.Stovons<ss;a�mlss(o7clgelbelgecwm> �I Date:Mon,Mar 12,2018 at 12:21 PM 1/J� Subject:Posted images of 135 E.Cooper Ave. /A •') To:Amy Simon<amy simon@olyofaspen,com> YYY Ott, Cc.Christy Few<c'erer@cfybuz com>,Cdstof Eigelixnger<citst-+ - atoms,PamIcm O'Brien<pobdanQdtybuzzw > Amy, Please see attached Me posted Images of the sign at 135 E.Cooper. We will continue with the mailing and a0klavit. Thank you, Caaandre J.sterem Srnv PrejmsrmFrl A,wxmal aaic<, . ' dl...et!'odlwn.um EIGELBERGER ' AItcIIfIQNPeImw Ie:Sytamvn n:n SwLL E IAa v.J'oy,L+IN9lr }:b WVN AIvnS vµsilo Mt Npen.Colmaro 9'611 mw,elgeNegc+mm IL vn+�:lautgoF.mn:egvR+vretrvd rrmtnlugranmNeqt't�egn'_nr[NropuW �^ 1 N, 1 I hftpsl/mail.google.coMmail/u/0/?ui=2&ik=ce0973014d&jsver-N4xiTacRcEg.en.&view=pt&search=sent&1h=16244284de l9dedf&si ml=16244284de l9dedf&mb=1 ;. }, ,�;� --��o --=--_.cam'•-`7_ ='o 'r - -.' -l�.t-i:�r_c 'yam• •_� ' � ft' lr��F t_)SJ� l`� �), � C `p '� r7,,yi�FKJ- G �_ � • � � '•�� .tet - - - (. r,t MO o� NOLL G T. 1r1+1pIYYIYY' 1� • � �� �. � '; ' -_.• X11I I fir �i 0 yY -CSL`, it C_?fi = 'J�Faa 1 . ~"�:• —Substantial nment v 2PProval granted in 2015. affecting •. 9Lhis • • .•• is Chris 1PfO { pa I J�S-Pen. LLC. 1107 Fifth AVenue. ry , a c - 93S. New York, NY 10128. For further information contact �/1 �w Aspen aPlanning '_• �. �1 r tt3 r fry �t t' res. •1 ., r 1 r'� x -W. IY'-✓ �'°:r�, Mr .t Y�j /'! i�( y d{�I yy •y �r +iAb 1 ✓ (. j �l a 4•` C lJ.� r 1{ p �1/� r�J . ; )G.I..® •r�y�, 1. `fi:iTh h\a' y �_ �+r .?•.�,r . .�/Gia�w� rr (2t + r . °r^G�ril5xh•4�� j t '��f �-(���yE-�• [^ � a. �1 it bfTIV O�y \Y',G`� ., �.yt r y, ^•r fr 't lty.�..n+a s.� ' %.w ..y4 tGS'.t_T_`.xY•sli�i �. ..�'•i."�...:S�,.J"'y•" �:4�R:it .•n4.._., t r. r`T THE CITY OF ASPEN City of Aspen 130 S.Galena Street,Aspen,CO 81611 p:(970)920.5000 f:(970)920.5197 w:www.aspenpitkin.com NOTICE OF PUBLIC HEARING 135 E. Cooper Avenue Public Hearing: 4:30 p.m.,Wednesday, March 28, 2018 Meeting Location: City Hall, City Council Chambers 130 S. Galena Street,Aspen, CO 81611 Project Location: 135 E.Cooper Avenue Legal Description: Lots H and I, and the easterly 5 feet of Lot G, Block 70,City and Townsite of Aspen,. PID#2735-131-04-003 Description: The applicant requests a Substantial Amendment to a Minor Development approval granted in 2015 Land Use Reviews: Substantial Amendment Decision Making Body! Historic Preservation Commission Applicant: CHRISPAT Aspen LLC, 1107 Fifth Avenue,#3S, New York, NY 10128 More Information: For further information related to the project,contact Amy Simon at the City of Aspen Community Development Department, 130 S.Galena St.,Aspen,CO, (970) 429-2758,amy.simon@cityofaspen.com. Published in the Aspen Times on March 8,2018 . I ogLStieAv;age9e1mB9D I edn-dad Wa9wel-gW4japu9eamWe4elFallda9 L igljL2ge6/eDiQane@zaliV i JeadAMM Wpe,pSa%enb4quated/waadl 4ed i 1 BROADSCOPE PTY LTD BARNES ROBERT M DANCING BEAR RES OWNERS ASSOC INC 149 RIVERTON DR 6445 SENECA RD 411 S MONARCH ST ROSSMOYNE WESTERN AUSTRALIA 6148, MISSION HILLS,KS 88208 ^' ASPEN,CO 81611 r PINES LODGE DEV LLC ZEFF CAPITAL LP CALLAHAN PATRICIA LIVING TRUST 2353 IRVINE AVE 555 E DURANT AVE 184 MOUNTAIN LAUREL DR NEWPORT BEACH,CA 92660 ASPEN,CO 81611 ASPEN,CO 81611 SCULL JAMES E LIMELIGHT SUB/PUD BARRETT STEVEN R PO BOX 2051 E HYMAN AVE 150 N MARKET ASPEN,CO 81612 ASPEN,CO 81611 WICHITA,KS 67202 DANCING BEAR RES OWNERS ASSOC INC MURPHY JULIANNE RUTH S WILLIAM R JR R WICHMANN VICTORIA 411 S MONARCH ST 100 E COOPER AVE#8 119 E COOPER ST#4 ASPEN,CO 81611 ASPEN,CO 816111763 ASPEN,CO 81611 VERMONT AVE LLC NEW YORK AVE LLC SCHAPIRO PATRICIA 623 E HOPKINS AVE 623 E HOPKINS AVE LLC 1685 TAMARAC DR l ASPEN.CO 81611 ASPEN,CO 81611 GOLDEN,CO 80401 j { JACARANDA ASPEN LLC SALISBURY JAMES A REV TRUST SHENNAN MELISSA A PO BOX 11980 , 1 101 MONTROSE ST 1242 N LAKE SHORE DR 94S 't ASPEN,CO 81612 MORGANTON,NC 28655 CHICAGO,IL 60610 ASPEN WILD CONDO ASSOC CHART HOUSE PROJECT OWNER LLa, HATCHER HUGH S 101 E COOPER AVE 0115 BOOMERANG RD 0520113 205 E DURANT AVE APT 2E IE ASPEN,CO 81611 ASPEN,CD 81611 !S ASPEN,CO 81611 GROOS NICHOLAS D RUDERMAN ERIC P&MIMI E IU BERHORST FAMILY REV TRUST 210 N INDUSTRIAL PARK RD 3773 E CHERRY CREEK N OR#575 )II 7161 LINDENMERE DR HASTINGS,MI 49058 DENVER,CO 802093825 BLOOMFIELD HILLS,MI 48301 0 e .0 VANOVER STEFANIE KAI THREE REEDS LLC tlt LARRAC INV LLC SERIES H PO BOX 3394 2224 VIA SEVILLE RD NW 640 FM 474 ASPEN,CO 81612 ALBUUUEROUE,NM 87104-3096 BOERNE,TX 78006 N WOLPERT FAMILY REV TRUST KAPLAN BARBARA JOHNSTON MARGARET S 2280 KOHLER DR 3076 EDGEWOOD RD 30 DEXTER ST BOULDER,CO 80305 PEPPER PIKE,OH 44124 DENVER,CO 80220 109LSa4Gdwal14an m I eaBp3dM1doda=dxamau0GwIepua0 L i dwa3/wao-/janeoloE) I s{agelSsauppy J&-)d cse3 i ®09LS °AL@ Io9lstiawlPeae�al ,nn I .dndglwagaialiaW481apugemnLpe4aeeaWas I uaafed/ww'Aa fed i sjuege5/e3'A9AEgZaIIV i ®load Ase3assauPepsawnbp1 i r—_GILLUM.ANNECAIN CONSTANCE M&DOUGLAS_M WINFIELD ARMS CONDO ASSOC 205 E DURANT ST#1B 1960 HUDSON ST 600 E HOPKINS AVE 0203 ASPEN,CO 81611 DENVER,CO 80220 ASPEN,CO 81611 PARRA KEVIN REV TRUST MARK KENNETH A PAY-ASE PROPERTIES LLC 75-1 HO'OLEI CIR 10 KATH CT 2200 ROSS AVE#3838 WAILER,HI 96753 SAYVILLE.NY 117821537 DALLAS,TX 75201 MAGES LAWRENCE M 8 MARY K COOPER ST LOFT CONDO ASSOC ZAUNER HEINZ J REV TRUST 216 LINDEN AVE COMMON AREA 0451 STAGECOACH LN WILMETTE.IL 60091 ASPEN,CO 81611 CARBONDALE,CO 81623 HOMONY MICHAEL J ASPEN SKIING COMPANY LLC DANCING BEAR PROJECT OWNER LLC 202 BLUE BONNET BLVD PO BOX 1248 0115 BOOMERANG RD#5201 B SAN ANTONIO,TX 78209 ASPEN,CO 81612 ASPEN,CO 81811 r LARKIN THOMAS&MARYANN PRODINGER IRMA WAYNE TIMOTHY&JILL C 1 SHELDRAKE LN PO BOX 1245 965 PEARL ST t� PALM BEACH GARDENS,FL 33418-6820 ASPEN,CO 81612 DENVER,CO 602031 306 S GARMISCH TOWNHOMES CONDO HANKIN STUART W&BRITNEY P WOW LIFT ONE LLC 16130 VENTURA BLVD#320 ' 1 124 E DURANT AVE#7 4824 E MARSTON OR ENCINO,CA 91436 ASPEN,CO 61611 PARADISE VALLEY,AZ 852534054 KNAPP C EVAN REV TRUST WHITE JALEH REV TRUST MESSNER CHRISTIAN 233 E COOPER AVE#WS-2 960 E DURANT AVE#7 1 119 E COOPER AVE#21 ASPEN,CO 81611-1821 ASPEN,CO 816112053 ASPEN,CO 81611 ASPEW/PITKIN COUNTY HOUSING AUTH 0.01 DANCING BEAR RES OWNERS ASSOC INC COX HEATHER J 210 E HYMAN AVE#202 411 S MONARCH ST 555 E DURANT#4A ASPEN,CO 81611 ASPEN,CO 81611 ASPEN,CO 81611 BECKLEY KATHERINE PINES LODGE DEV LLC MARQUARDT HEIDI MARIE 100 FAST DEAN STREET#3A 2353 IRVINE AVE 1499 BLAKE ST#2A ASPEN,CO 81611 NEWPORT BEACH,CA 92660 DENVER,CO 80202 SILVERMAN MARC&MARILYN CASA KESS LLC SCHAYER CHARLES M III 937 DALE RD PO BOX 8442 2601 S QUEBEC ST 017 MEADOWBROOK,PA 19046 ASPEN,CO 81612 DENVER,CO 80231 10915 a1efAual�4anYaN1 I ,a Sp3drAQdawftac4a II w[e Pu9S I :smeldwwwoo-AmeDioE) slage SSWPPVJaDdAse •3 ; MLS Aida 109L9'ja4Vi"ge9almgl9n 1 vd"OdPlOgalalJal9WOPUMewnWe4el@mlMaa 1 �sluege6/e3•ALanegzalIV i ®I8adAse3OWOJpe,psaWnbq R4d9ed/W�' Ied CHART HOUSE PROJECT OWNER LLC PATERSON JOHN WHITE JALEH REV-TRUST 0115 BOOMERANG RD#52018 88 GRANGE RD SANDRINGHAM 960 E DURANT AVE#7 ASPEN,CO 81611 MELBOURNE VICTORIA AUSTRALIA 3191, ASPEN,CO 816112053 VISCONSI DOMINIC A JR LLOYD ZOE W EXEMPT TRUST HWFLLC 30050 CHAGRIN BLVD 9360 PO BOX 1845 PO BOX 1026 CLEVELAND,OH 441245774 WILSON,WY 83014 PALM BEACH,FL 33480 EVANS DAVID COURTNEY WOLF FAMILY TRUST BISSET KAREN I PO BOX 952 1221 MYRTLE AVE 6445 SENECA RD ASPEN,CO 81612 SAN DIEGO,CA 92103 MISSION HILLS,KS 66208 NELSON ARLENE HARLOW VIRGINIA TRUST FRY KATHERINE 119 E COOPER ST#6 0564 ESCALANTE PO BOX 5082 - ASPEN,CO 81611 CARBONDALE,CO 81623 SOOWMASS VILLAGE,CO 816155082 TYDEN FAMILY FARMS PTNP PINES LODGE DEV LLC CHU FAMILY TRUST , 19331 BEACH CLIFF BLVD 2353 IRVINE AVE 42 HILLSDALE DR ROCKY RIVER,OH 44116 NEWPORT BEACH,CA 92660 1 NEWPORT BEACH,Cl 926604234 LANE DAVID&PAIGE BOGIN ROBERT M DOLLE NORMA L REV TRUST 124 E DURANT AVE#2 ' 4280 SMEADOW BROOK LN 1103 HERITAGE DR ASPEN,CO 81611 EVERGREEN,CO 80439 CARBONDALE,CO 81623 JCS GARMISCH LLC - DOLLE NORMA L REV TRUST NODDING PAMELA G PO BOX 11636 1103 HERITAGE DR 1 2601 SHELTINGHAM DR ALEXANDRIA,LA 71315 CARBONDALE,CO 81623 WELLINGTON,FL 33414 CHAPLIN ARLENE S WAYNE DANCING BEAR RES OWNERS ASSOC INC UFT ONE LLC 54 LAGORCE CIR 411 S MONARCH ST 24 LINDENWOOD LN MIAMI BEACH,FL 33141 ASPEN,CO 81611 LITTLETON,CO 60127 ILLINOIS AVE LLC COHEN JACK DAVID 8RAYMAN WALTER W TRUST 4120117 623 E HOPKINS AVE LLC 305 S ASPEN ST#3 344,ROCKWELLLN ASPEN,CO 81611 ASPEN,CO 81611 - .KANSAS CITY,MO 641122363 DANCING BEAR RES OWNERS ASSOC INC TREMOLS LUCILA eKY BLUE LLC 411 S MONARCH ST 205 E DURANT AVE#3D 5743 CORSA AVE#101 ASPEN,CO 81611 ASPEN,CO 81611 NESTLAKE VILLAGE.CA 91362 109LSGId—.Lkwvwn I ,a6pgdnftdawcbmoaau96uoIepuaS 1saedwaW00IGaAOlOs 009l$ . ®il2a A 10919/JenV7Pe9eDaIzm011 I sdrvdad Pl*gw3lWO&WsPu9e"4xNelVzal" i qua cl/wm'Alane3ed isy3ege5/eaN8ne@zalIV i jeadRse3asswpe,psauanbq 1 _JPL LLC TRENTLY TRUST GLENOCK INVESTMENTS LLC 2201 E CAMELBACK RD#650 16130 VENTURA BLVD#320 400 E MAIN ST#2 PHOENIX,AZ 85016 ENCINO,CA 91436 ASPEN,CO 81611 COHN PETER L VANOVER STEFANIE SEVERY FAMILY TRUST PO BOX 2138 533 E HOPKINS AVE 8815 YUBA CIR#11038 ASPEN,CO 61612 - ASPEN,CO 81611 HUNINGTON BEACH,CA 92646 PETERSEN CRISTINA CORTES CENTRAL VIEW TOWNHOMES CONDO PINES LODGE DEV LLC MONTE CHIMBORAZO 559.3 107 E HYMAN AVE 2353 IRVINE AVE MEXICO D F 11000, ASPEN,CO 81611 NEWPORT BEACH,CA 92660 MACDONALD KENNETH HUGH REV TRUST NORTH CAROLINA AVE LLC PENNSYLVANIA AVE LLC 44 W HANNUM 623 E HOPKINS AVE 623 E HOPKINS AVE SAGINAW.MI 48602 ASPEN,CO 81611 ASPEN,CO 81611 v SLOAN SUSAN MARIE BULL RUN ENTERPRISES LLC SOUTH POINT CONDO.ASSOC 500 S ORANGE AVE PO BOX 75 205 E DURANT AVE#30 SARASOTA,FL 34236 CANADIAN,TX 79014 ASPEN,CO 81611 .� PINES LODGE CONDO ASSOC DANCING BEAR RES OWNERS ASSOC INC MOP LLC 152 E DURANT AVE ' 411 S MONARCH ST 9101 ALTA DR#1801 ASPEN,CO 81611 ASPEN,CO 81611 LAS VEGAS,NV 89145 1 HEIN FAMILY TRUST GLIBBER NICHOLAS J SOUTH POINT 2J LLC 9420 WILSHIRE BLVD#400 PO BOX 870 ' - 15 S WILLOW CT BEVERLY HILLS.CA 90212 ASPEN,CO 81612 ASPEN.CO 81611 DUNN DAVID&POLLY NEWMAN KERRY J&RICKI R CHAPIN ANZLE TRUST 611 S UPPER BROADWAY 617 PRINCE DR 1887 STILLWATER ST CORPUS CHRISTI,TX 78401 NEWBURGH,IN 47630 ST PAUL,MN 55110-8507 LEE FRANCIS A III CHART HOUSE PROJECT OWNER LLC GUNION JOHN F _706.NORMANDY 0115 BOOMERANG RD#5201 B 1004 MARINA CIR MOORESVILLE.NC 28117 ASPEN,CO 81611 DAVIS,CA 95616 FERAL VENTURE CAPITAL LLC CAYTON ANDREA TRUST LOFINO MICHAEL D JR 6226 N RIVIERA DR 2379 EARLS CT 100 E COOPER AVE APT 3 OKLAHOMA CITY.OK 73112 LOS ANGELES,CA 90077 ASPEN,CO 81611 109lSawIdwajA—VM 1 oa6P3dndodesodzau48ull6u0Ie Pua9 1 �Abb !sawdum/waAeoloo i spgelsswppveIaa'd�e3 ®09LS ®A� wti ® I EasyrPeelOAddressLabels ; Go toaveryoom/templates; aE2Vo 5160 i Boda"llmtom;pmPo"Ed9eo I UwAwiyTemPwe51601 —DUPLEX-INVESTMENTS LLC DANCING.BEAR.RES.OWNERS.AS_S-OC INC CHART HOUSE PROJECT OWNER LLC 10607 N PENNSYLVANIA AVE 411 S MONARCH ST 0115 BOOMERANG RD#52018 OKLAHOMA CITY,OK 73120 ASPEN,CO 81611 ASPEN,CO 81611 CARSON LLC CHART HOUSE PROJECT OWNER LLC SMITH FRANK FORD JR 6 KATHARINE LIND 1562 S 187TH CIR 0115 BOOMERANG RD#52018 2506 STRATFORD OR OMAHA,NE 68130 ASPEN,CO 81611 AUSTIN,TX 78746 COHEN SANDRA IRREV TRUST - TENNESSEE AVE LLC CJM INVESTMENTS LLC 6000 ISLAND BLVD*2608 623 E HOPKINS AVE 1340 W HENDERSON ST#2W AVENTURA,FL 33160 ASPEN,CO 81611 CHICAGO,IL 60657 VORTEX INVESTMENTS LLC HOLDER STEPHANIE DANCING BEAR RES CONDO ASSOC 15 W 6TH ST#2400 100 E COOPER AVE#5 411 S MONARCH ST TULSA,OK 74119 ASPEN,CO 81611 - ASPEN,CO 81612 CHART HOUSE PROJECT OWNER LLC RINGSBY GRAY GOLDREICH ELIZABETH&HILTON 0115 BOOMERANG RD#52018 220 APUWAI ST 2204 BRADBURY CT, ASPEN,CO 81611 HAIKU,HI 967084821 1 PLANO,TX 75093 i TRESTMAN EVAN F TRUST SCHUMACHER JENNIFER PACIFIC AVE LLC 111 VETERANS BLVD#1700 ' 1 PO BOX 445 623 E HOPKINS AVE METAIRIE.LA 70005 WOODY CREEK,CO 81656 ASPEN,CO 81611 CARRIGAN RICHARD A JR LIFT ONE CONDOMINIUM ASSOC YOMAC MANAGEMENT LIMITED 2044 AUDUBON AVE#BT505 131 E DURANT AVE 410 GILES BLVD E NAPERVILLE,IL 605635352 ASPEN,CO 81611 WINDSOR ONTARIO CANADA N9A4C6, TIMBER RIDGE CONDO ASSOC KENT STACEY KNAPP MICHAEL P MARITAL TRUST 100 E DEAN ST 457 SCHOONER LN 3516 GOODWOOD DR BE ASPEN,CO 81611 CARBONDALE,CO 81623 GRAND RAPIDS.MI 49546 SPAULDING RICHARD W&THOMPSON ELEi SALISBURY JAN ETHRIDGE REV TRUST HUNT CHRISTINA 200-WHEELER.RD.F.L.2 101,MON7ROSE ST 28526 EVERGREEN MANOR DR BURLINGTON,MA 018035501 MORGANTON.NC 28655. EVERGREEN,CO 80439 GILLESPIE JOHN E REV TRUST GEORGIEFF KATHERINE REV LVG TRUST WINFIELD ARMS CONDO ASSOC 775 GULFSHORE DR #4219 11 TOPPING LN 600 E HOPKINS AVE#203 DESTIN,FL 32541 ST LOUIS,MO 63131 ASPEN,CO 81611 1 �tiquettes d'adresse Easy Peelo Allez a averyca/9abarits Pat aoelymm/patell>9 1 o..aV.a�.1.�.1.,��1in An.M�lnle�ehonlPoo-uuo 1 UtlOsezle Ga6adtAwry51601 Rve 5160® Easy Peel®Address Labels Go toaverycom/templates t Bend along line to ingmePo{wp Edge I Use AveryTemplate51601 DORNBUSCH ELLIOT&JESSICA NAPI HOLDINGS LLC RUMSEY LIVING TRUST BISCAYNE BLVD#808 PO BOX 8907 1325 PACIFIC HWY#1902 AVENTURA,FL 33180 ASPEN,CO 81612 SAN DIEGO.CA 92101 CABELL JOSEPH TRUST GUTNER TODDI L GST DESC TRUST FOUR JLM LLC 1765 ALA MOANA BLVD 260 N DEERE PK DR 101 DESTIN LN HONOLULU,HI 96815 HIGHLAND PARK,IL 60035 RIVER RIDGE,LA 70123 UHLFELDER FAMILY INVESTMENTS RLLP ROARING FORK RIVER MANAGEMENT LLC 415 SOUTH ASPEN ST LLC 210 AABC OAA 1233 EDLIN PL 162 WEST MEADOW DR#2 ASPEN,CO 81611 MINNEAPOLIS,MN 55416 VAIL.CO 81657 LEDINGHAM DAVID CHARLES PRODINGER IRMA DANCING BEAR PROJECT OWNER LLC 124 E COOPER ST PO BOX 1245 0115 BOOMERANG RD 95201 B ASPEN,CO 81611 ASPEN,CO 81612 ASPEN,CO 81611 SKI TOWN GORSKI LLC SHAW ROBERT KEBER VINCENT M III 9012 W 126TH ST 5408 BIRCHMAN AVE 1301 WAZEE#2E PALOS PARK,IL 60464 FORT WORTH,TX 76107 'DENVER,CO 80204 PENTHOUSE ONE&TWO LLC SMITH NATHANIEL THOMAS ROSSI HALSTON A&TAYLOR R PO BOX 11980 706 NORMANDY 8135 RIDGEFIELD DR ASPEN,CO 81611 MOORESVILLE,NC 28117 HUNTINGTON BEACH,CA 92646 MAGES ELIZABETH J IMHOF FAMILY TRUST 210 COOPER CONDO ASSOC 2828 HARRISON ST ; 2409 GREEN ST I 210 E COOPER AVE EVANSTON,IL 60201 SAN FRANCISCO,CA 94123 ASPEN,CO 81611 MOUNTAIN GETAWAY PROPERTIES LLC DANCING BEAR RES OWNERS ASSOC INC HEIN FAMILY TRUST 9 ISLAND AVE#2103 411 S MONARCH ST 9420 WILSHIRE BLVD#400 MIAMI BEACH,FL 33139-1343 ASPEN,CO 81611 BEVERLY HILLS,CA 90212 KULLGREN NANCY A LACY ROANE M JR&ANN MINYARD CLYNE VICTORIA 205 E DURANT AVE UNIT 2-C PO BOX 21625 7630115TH PL NE ASPEN,CO 81611 WACO.TX 76702 KIRKLAND.WA 98033 HEIM WILLIAM D CHART HOUSE PROJECT OWNER LLC MCKENZIE PAIGE PARAVANO 124 E DURANT AVE#1 0115 BOOMERANG RD#52918 4133 33RD RD NORTH ASPEN,CO 81611-1769 ASPEN,CO 81611 ARLINGTON,VA 22207 Petamyx"/Patents ; tdquettes d'adresse Easy Peel' Allez6 avery.ca/gabarits� . I Replluklahachulea8nclanh Jerlereim PopW I UtilbaleGabadtAvery5160I ar, v�RYe 516WEasyPeelaAddress;Labels Go toaverycom/templates l� I Bend along llnetDopmPopup Edge• I UwAveryTamptate51601 201 EH INVESTMENTS LLC LARRABEE DONALD C JR PINES LODGE DEV LLC 10880 WILSHIRE BLVD#2222 1417 POTTER DR STE 105 2353 IRVINE AVE LOS ANGELES,CA 90024 COLORADO SPRINGS,CO 80909 NEWPORT BEACH,CA 92660 233 COOPER ASPEN LLC DANCING BEAR RES OWNERS ASSOC INC 306 S GARMISCH TOWNHOMES CONDO 1035 N DEARBORN ST FL 19 411 S MONARCH ST 16130 VENTURA BLVD#320 CHICAGO,IL 60610 ASPEN,CO 81611 ENCINO,CA 91436 TOWNE PLACE CONDO ASSOC FAULKNER JOHN L TAYLOR FAMILY PROP LLC 730 E DURANT AVE 2433 ROCKINGHAM ST 5920 E WATERFORD RD ASPEN,CO 81611 ARLINGTON,VA 22207 HARTFORD,WI 53027 TOMLINSON JAMES KAMINER NINA SILVER QUEEN LLC 457 SCHOONER LN 15 WILLIAM ST#D4 PO BOX 24540 CARBONDALE.CO 81611 NEW YORK,NY 10005 OKLAHOMA CITY,OK 73124 DOLLE NORMA L REV TRUST IMREM SUE GORDON REVOC TRUST CHART HOUSE PROJECT OWNER LLC 1103 HERITAGE DR 1240 N LAKE SHORE DR#27B 0115 BOOMERANG RIS #52018 CARBONDALE,CO 81623 CHICAGO,IL 60610 1ASPEN,CO 81611 I LIFT ONE 105 LLC DANCING BEAR PROJECT OWNER LLC DUNN DAVID&POLLY 7268 S TUCSON WY I 0115 BOOMERANG RD#5201 B 611 S UPPER BROADWAY ENGLEWOOD,CO 80112 ASPEN,CO 81611 CORPUS CHRISTI,TX 78401 SKI TOWN DONCER LLC ELLIS PAUL DAVID HOLYOAKE LAURENCE M a COX HEATHER. 7660 W 124TH PL 100 E DEAN ST #2F 555 E DURANT#4A PALOS HEIGHTS,IL 60463 ASPEN,CO 81611 ASPEN,CO 81611 LEE FRANCIS A GOOD THUNDER CONDO ASSOC BRYAN HELEN 706 NORMANDY PO BOX 871 2011 LAKE SHORE DR MOORESVILLE.NC 28117 ASPEN,CO 81612 .AUSTIN,TX 78746 FUQUA ALVAH D JR&DIANNE L MONARCH ON THE PARK CONDO ASSOC DER BERGHOF CONDO ASSOC 446 LAKE SHORE DR 233 E COOPER AVE COMMON AREA SUNSET BEACH,NC 28468 ASPEN,CO 81611 110 E COOPER AVE ASPEN,CO 81611 NORTH LAUDERDALE PETROLEUM LLC KEEFE MERRY L REV TRUST DATUSE LLC 6318 23RD ST NW 119 E COOPER#11 41213 27 COMMERCIAL RD BOCA RATON.FL 33434 ASPEN,CO 81611 NEWSTEAD OLD 4006 AUSTRALIA, PataVarXmm/Pa6n1ti ; t6wettes d'admsse Easy Peel' Allezhaveryca/gabarits; 1 ReOimhlahactu a8nderMierlembmd Poo- e 1 UtillmleGabadtAl 51601 RYe 516CP Easy PeePAddressLabels i Go toaverycom/templates; I BendalongOnetowpm Popep Edge• I UmAmyTemplaoe518OI CHARTHOUSE PROJECTOWNERLLC TAROCH HOLDINGS LTD SHEFFER BARBARA —0115BO6MERANG"RD E5201B-- -315 E HYMAN AVE 5305 PO BOX 2763 ASPEN,CO 81611 ASPEN,CO 81611-2909 BASALT,CO 81621 SOUTH POINT CONDO LLC KIKEN KENNETH MARK CORKSCREW LLC 150 N MARKET 1499 BLAKE ST#2A PO BOX 24540 WICHITA,KS 67202 DENVER,CO 80202 OKLAHOMA CITY,OK 73124 NOBLE GUY T KAUFMAN STEVEN TRUST SEVERY CHARLES LAMB PO BOX 9344 0554 ESCALANTE 30 DEXTER ST ASPEN,CO 81612 CARBONDALE,CO 81623 DENVER,CO 80220 JOBE MARCIA CHART HOUSE PROJECT OWNER LLC MOLLICONI CHARLES A PO BOX M-3 0115 BOOMERANG RD#52018 119 E COOPER#10 ASPEN,CO 81612 ASPEN,CO 81611 ASPEN,CO 81611 0 ASPENIPITKIN COUNTY HOUSING AUTH 0.01 SIMPSON JANET MARIE VANDER WALL ASSET PRO TRUST 210 E HYMAN AVE#202 233 E COOPER AVE#205 PO BOX 189 1 i ASPEN,CO 81611 ASPEN,CO 81611 'LONE PINE,CA 935410189 PINES LODGE DEV LLC CASPER MARY LYNN JODIS MELISSA 2353 IRVINE AVE , 1 124 E DURANT AVE 08 119 E COOPER AVE#1 NEWPORT BEACH,CA 92660 ASPEN,CO 81611 ASPEN,CO 81611 ONEAL PROPERTIES LLC LEVY HELEN JOAN TRUST FEINBERG HELEN HOUGH 8100 E CAMELBACK RD 931 421 WARWICK RD 1 2701 SUNSET WAY SCOTTSDALE,AZ 85251 KENILWORTH,IL 60043-1145 ST PETE BEACH,FL 33706 LARKIN FRED C SPOUSAL TRUST CHART HOUSE PROJECT OWNER LLC GOZON BENJAMIN&HEIDI Z LVG TRUST ONE COVE LN 0115 BOOMERANG RD#5201 B 8606 W FREISTADT RD BOW MAR,CO 80123 ASPEN,CO 81611 MEQUON,WI 53097 r CROCKETT RUFUS ALPINE PETROLEUM LLC LEATHERMAN ROBERT D PO BOX 3837 435 E MAIN ST PO BOX 11930 ASPEN,CO 81612 ASPEN,CO 81611 ASPEN,CO 81612 FARR BRUCE K&GAIL H WARREN MATTHEW L LLOYD JAMES OTIP TRUST 589 SOCIETY HILL CIR 2022 BASELINE DR PO 8OX 1845 THE VILLAGES,FL 321626128 GRAND JUNCTION,CO 81507 MLSON,WY 83014 Potaverymm/patenR kquettes d'adresse Easy Peel® of AllezA avery.La/gabarits� I Repllez0lahadiueaBndet"wiembold Popap• I UNlmle GabaitAwry5160I Rye 51600 i Easy PeeleAddressLibels Go toaverycom/templates 1 Bend along llnetompose Pop-up Edge* 1 UseAveryTemplate SI601 FELDMAN SELMA LORING PETER&ELIZABETH S DANCING BEAR RES CONDO ASSOC 3005 POINTE DR#2403 230 CONGRESS ST 411 S MONARCH ST MIAMI BEACH,FL 331397329 BOSTON,MA 02110 ASPEN,GO 81612 CLAUSEN FAMILY TRUST#1 ROSE JON E 6 RITA L PINES LODGE DEV LLC ' PO BOX 685 333 TRISMEN TER 2353 IRVINE AVE MORRIS,IL 50450 WINTER SPRINGS,FL 32789 NEWPORT BEACH,CA 92660 COOPER TWO LLC PARKER RICHARD C&KAREN S BRIGHT GALEN 950 HILL RD 3029 BAKER MOWS SE 205 E DURANT AVE 93D WINNETKA,IL 60093 ATLANTA,GA 303394814 ASPEN,CO 81611 GREINER JERRY M&TERESA U CHART HOUSE PROJECT OWNER LLC MACDONALD VALERIE 323 HOLMECREST RD 0115 BOOMERANG RD 952018 PO BOX 1681 JENKINTOWN,PA 19046 ASPEN,CO 81611 ASPEN,CO 81612 JACOBSON FAMILY TRUST VANTONGEREN LIDIA CHART HOUSE PROJECT OWNER LLC 3237 SUMMER WIND LN#1424 2000 E 12TH AVE BOX 8 0115 BOOMERANG R6#5201 B LITTLETON,CO 80129 DENVER,CO 80206 =ASPEN,CO 61611 i LU NANCY CHAO TRUST SEVERY RICHARD L PURVIS ROBERT K TRUST 15 ANSON RD I 30 DEXTER ST PO BOX 3089 HILLSBOROUGH,CA 94010 DENVER,CO 80220 ASPEN,CO 81612 DANCING BEAR RES OWNERS ASSOC INC KAISER HARRIS FAMILY TRUST OTT JOHN&CAROL 411 S MONARCH ST 12942 CHALON RD 129 LITTLE ELK CREEK AVE ASPEN,CO 81611 LOS ANGELES,CA 90049 SNOWMASS,CO 81654-9318 SOUTH POINT CONDO ASSOC LIFT ONE CONDOMINIUM ASSOC 306 S GARMISCH TOWNHOMES CONDO PO BOX 4100 131 E DURANT AVE 16130 VENTURA BLVD#320 BASALT,CO 81621 ASPEN,GO 81611 ENCINO,CA 91436 RUMSEY DANIEL W SEP PROP TRUST ASPEN WILD LLC KINGSBURY FAMILY TRUST 1325 PACIFIC HWY#1902 POINTE MILOU GRAND CARENAGE#11. PO BOX 198 SAN DIEGO,CA 92101 97133 SAINT BARTHELEMY HOLDERNESS,NH 03245 FRENCH WEST INDIES, PASCHALL BARBARA ROARING FORK PROPERTIES KOSTER DEREK N 6918 LUPTON DR N 9242 SOUTH SHORE OR 100 E DEAN ST #2E DALLAS,TX 75225 EAST TROY,WI 55120 ASPEN,CO 81611 Patrwy am/paterds i kquettesd'adresseEasy Peel® Allez6averyca/gabarits; I Repliezhlahadlurea8nderdvMerlerebord Popvp' 1 Utlkm[a GabadtAvery 51601 aloe Ir RYe 51600 Easy Peel®Address labels Go to averycom/templates� l� I Bend Wong Bnetoexpl Pop-up Ed90 I Use AvwyTmpLte5160r OFM HOLDINGS LP POPKIN PHILIP G MCKENZIE BART BRYAN -PO'B0X'541208 —PO BOX 7956 -- - — — 484030TH ST DALLAS,TX 75354 ASPEN,CO 81612 ARLINGTON,VA 22207 SCHAYER JANET A PITNER N KATHRYN ININDLE BRIAN 900 KINSEY AVE PO BOX 11930 7630 115TH PL NE KREMMLING,CO 80459 ASPEN,CO 81612 KIRKLAND,WA 98033 ASPEN TOWNHOUSES CENTRAL GINSBURG ANNE C 6 ROBERT 8 HANSEN JULIA S TRUST COMMON AREA 11206 BOCA WOODS LN 255 SEASPRAY AVE 124 E DURANT AVE BOCA RATON,FL 33428 PALM BEACH,FL 33480 ASPEN,CO 81611 PRENTICE GWYN A CZAJKOWSKI MICHAEL&SANDRA J GREGORY NEIL MARTIN&LYNETTE 2001 SHAWNEE MISSION PKY 2701 MIDLAND AVE#111 1801 PITTWATER RD SHAWNEE MISSION,KS 66205 GLENWOOD SPRINGS,CO 81601 MONA VALE NSW 2103 AUSTRALIA, HEIN FAMILY TRUST YEWER ELISABETH B HOTEL DURANT 9420 WILSHIRE BLVD 4TH FLR 6259 HWY 83 122 E DURANT BEVERLY HILLS,CA 90212 CHENEQUA,WI 53029 ASPEN,CO 81611 JRD 20041RREV TRUST INDIANA AVE LLC MURRAY EDWARD M JR&MELISSA A 510 BERING DR#455 1 623 E HOPKINS AVE 498 WOODBRIDGE WY HOUSTON,TX 77057 ASPEN,CO 81611 DURANGO.CO 81301 ATTERBURY ANDREW L AVERITT DON R GLISMANN JOHN P 2001 SHAWNEE MISSION PKY 6918 LUPTON ' 681 SOPRIS MOUNTAIN RANCH RD SHAWNEE MISSION,KS 66205 DALLAS,TX 75225 BASALT,CO 81621 TOWNE PLACE OF ASPEN CONDO ASSOC IN CARRUTHERS MARILYN 200 E DURANT AVE 101 E COOPER #301 ASPEN,CO 81611 ASPEN,CO 81611 Pabamyxor7patants i ttlquettesd'admmEasy Peel® AllezAaveryca/gabarits; IRePIImblabarhuma8nder6Mwierebord Popup• I' Ut015mIBGabarttAvwy51601 Mineral Estate Owner Notice. By the certified mailing of notice, return receipt requested, to affected mineral estate owners by at least thirty (30) days prior to the date scheduled for the initial public hearing on the application of development. The names and addresses of mineral estate owners shall be those on the.current tax records of Pitkin County. At a minimum, Subdivisions, SPAs or PUDs that create more than one lot, new Planned Unit Developments, and. new Specially Planned Areas, are subject to this notice requirement. Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision be made by repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map shall be available for public inspection in the planning agency during all business hours for fifteen (15) days prior to the public hearing on such amendments. Signature The foregoing "Affidavit of Notice" was acknowledged before me this g day of 4114 zL , 20J�g by NOTICE OF PUBLIC HEARING —� . - 135 E Cooper Avenue POEOC HpHag <:3gp.m:.waaoeaasv.A+amn zfi.zolB DESS MY HAND AND OFFICIAL SEAL `MMing luallon C, Hag,City Cimnpl_Ctnn1E m lW S.Galena$ked.AsenpCO81611 I •Pmled Lomtlon: . 135 E.Cooper Avenue LegelWxrptbre Lon Hang1.aM ma oasterN 5 nal d LW G.Block 70.Gtv a Townsln Of Aspen.PIOM273 131-01-003 Daacripl": TireapplicantrequestsaSaOsnntiaiAmer m tneMaarDevelopment >mmission expires: 07052 r appr oval granto0 m 2015 Dec Use Revng,B SU tOriC P l Amen0menl Decision Making Body: Historic AT Ae n Commisslon s'7` 1 v APplkanC CHRIBPAT Aspen LLC.1107 W Avenue, ,OO New York. i 10128 ..] Mon tdametion: For n inlonn8on e"n Bre prgect,mond.ArrryGW Simon at se n. . 1L L Aspen C 2758.ity Devebpnent Dapepment,130 B.Galena 51.,-Aspen,CO (9]0)12&2]58.anry.smon®dtyofaspen.mm. /Public 100Q° Ml I =BONNIEHILES LIC RADO 1038739 CTOBER3D 2911 ATTACHMENTS AS APPLICABLE: e COPY OF THE PUBLICATION e PHOTOGRAPH OF THE POSTED NOTICE (SIGN) e LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BY MAIL APPLICANT CERTIFICATION OF MINERAL ESTAE OWNERS NOTICE AS REQUIRED BY C.R.S. §24-65.5-103.3 AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE ADDRESS OF PROPERTY: A ! 3 f E • LFIn �✓Pi/ , Aspen, CO SCHEDULED PUBLIC HEARING DATE: Wed MadgA&�D�&e 4 , 20_LS' STATE OF COLORADO ) ss. County of Pitkin ) 11 J- - (name, please print) being or representing an Applicant to the City of A en, Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) days prior to the public hearing. A copy of the publication is attached hereto. 'Posting of notice: By posting of notice, which form was obtained from the Community Development Department,-which was made of suitable, waterproof materials, which was not less than twenty-two (22) inches wide and twenty-six (26) inches high, and which was composed of letters not less than one inch in height. Said notice was posted at-least fifteen(15)days prior to the public hearing on the day of , 20_, to and including the date and time of the public hearing. A photograph of the posted notice (sign) is attached hereto. Mailing of notice. By the mailing of a notice obtained from the Community Development Department, which contains the information described in Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to ;the public_hearing, notice was hand delivered or mailed by first class postage a3 j[td8 prepaid U.S. mail to all owners of property within three hundred (300) feet of the ,� u7�8UN YFaTL'v1 .10oAojc. property subject to the development application. The names and addresses of -F,(,T x,,.rtzpproperty,;owners shall be those on the current tax records of Pitkin County as they "appearedno-more than sixty (60) days prior to the date of the public hearing. A copy of the owners and governmental agencies so noticed is attached hereto. Neighborhood Outreach: Applicant attests that neighborhood outreach, summarized and attached, was conducted prior to the first public hearing as required in Section 26.304.035, Neighborhood Outreach. A copy of the neighborhood outreach summary, including the method ofpublic notification and a copy of any documentation that was presented to the public is attached hereto. (continued on next page) r EXHIBIT i s AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE ADDRESS.OF PROPERTY: 500 W. Main Street , Aspen, CO SCHEDULED PUBLIC HEARING DATE: March ZS , 20!� r STATE OF COLORADO ) ) ss. County of Pitkin ) I, Dana. Ga-r\sslp- )E�W5 (name, please print) being or representing an Applicant to the City of Aspen; Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26:304.060 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) days prior to the public hearing. A copy of the publication is attached hereto. Posting of notice: By posting of notice, which form was obtained from the Community Development Department, which was made of suitable,. waterproof materials, which was not less than twenty-two (22) inches wide and twenty-six (26) inches high, and which was composed of letters not less than one inch in height. Said notice was posted at least fifteen (15) days prior to the public hearing on the day of 20_, to and including the date and time of the public hearing. A photograph of the posted notice (sign) is attached hereto. Mailing of notice. By the mailing of a notice obtained from the Community Development Department, which contains the information described in Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to the public hearing, notice was hand delivered or mailed by first class postage prepaid U.S. mail to all owners of property within three hundred (300) feet of the property subject to the development application- The names and addresses of property owners shall be those on the current tax records of Pitkin County as they appeared no more than sixty (60) days prior to the date of the public hearing. A copy of the owners and governmental agencies so noticed is attached hereto. Neighborhood Outreach._ Applicant attests that neighborhood outreach, summarized and attached, was conducted prior to the first public hearing as required in Section 26.304.035, Neighborhood Outreach. A copy of the neighborhood outreach surmnaryy including the method of public notification and a copy of any documentation that was presented to the public is attached.hereto. (continued on next page) Mineral Estate Owner Notice. By the certified mailing of notice, return receipt requested, to affected mineral estate owners by at least thirty (30) days prior to the date scheduled for the initial public hearing on the application of development. The names and addresses of mineral estate owners shall be those on the current tax records of Pitkin County. At a minimum, Subdivisions, PDs that create more than one lot, and new Planned Developments are subject to this notice requirement. Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision be made by repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map shall be available for public inspection in the planning agency during all business hours for fifteen (15) days prior to the public hearing on such amendments. Signature The foregoing "Affidavit of Notice" was acknowledged before me this 28"day of lPibYuAw 201� , by p�� EtliS WITNESS MY HAND AND OFFICIAL SEAL LORENA LEnpA VARGAS My co mission expires: -7 ice-�'-O2--t EUTY y P11BUC-SrA7E OF COLORA W Notary 10 20174028180 Conmotlon EXP*M 7/12/2021 Notary Public ATTACHMENTS AS APPLICABLE: • COPY OF THE PUBLICATION • PHOTOGRAPH OF THE POSTED NOTICE (SIGN) • LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BY MAIL • APPLICANT CERTIFICATION OF MINERAL ESTATE OWNERS NOTICE AS REQUIRED BY C.R.S. §24-65.5-103.3 ta: r -• PUBLIC NOTICE, ®ate: March 28, 2018 Time: 4:30 PM Place: CityHall, 130 S. Galena St - City Council Chambers Purpose: j 00 W. Main Street LLC 234 E. o kin-, Avenue As en CO 81611 e uests HPC for design,approval . nd setback variations to reconstruct he exterior stairs on the west I levation of the existing building, and - equests approval for site work on his property. For more information r 4 ntact the Aspen PlanninDept. at 20-5144. I - 7 r I ii I, 10 S i I - J' AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.060 (E), ASPEN LAND USE CODE ADDRESS OF PROPERTY: , 100 1-y • mat VN c�� , Aspen, CO SCHEDULE PUBLIC HEARING DATE:. Wed 6r&ifi 2� /� �,20Lg' STATE OF COLORADO ) ss. County of Pitkin ) I, (name, please print) being or representing an Applicant to the City of-Aspen, do, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) of the Aspen Land Use Code in the following manner: VftPublication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen at least fifteen (15) days prior to the public hearing. A copy of the publication is attached hereto. Posting of notice: By posting of notice, which form was obtained from the Community Development Department, which was made of suitable, waterproof materials, which'was not less than twenty-two (22) inches wide and twenty-six (26) inches high, and which was composed of letters not less than one inch in height. Said notice was posted at least fifteen (15) days prior to the public hearing on the day of 120 to and including the date and time of the public hearing. A photograph of the posted notice (sign) is attached hereto. Mailing of notice. By the mailing of a notice obtained from the Community Development Department, which contains the information described in 'Section 26.304.060(E)(2) of the Aspen Land Use Code. At least fifteen (15) days prior to the public hearing, notice was hand delivered or mailed by first class postage prepaid U.S. mail to all owners of property within three hundred (300) feet of the :.•- Y�-�1�S��property_subject to the development application. The names and addresses of ?3 lH2! 304vit to n, o;mu�• property owners shall be those on the current tax records of Pitkin County as they aagaloo'to *Te =T Jcoaia�s o,appeared nojmore than sixty (60) days prior to the date of the public hearing. A ;,'- a�`'�� copy#otli`e",owners and governmental agencies so noticed is attached hereto. Neighborhood Outreach: Applicant attests that neighborhood outreach, summarized and attached, was conducted prior to the first public hearing as required in Section 26.304.035, Neighborhood Outreach. A copy of the neighborhood outreach summary, including the method of public notification and a copy of any documentation that was presented to the public is attached hereto. (continued on next page) t 2a !1H ! 31;hVi�l3 suvvyriati, pO:JAf1a1a0 as'^TAT2 Y� BEru�'tAZ04"*��Yfl1.iCiR >^ tSOt OEA�iDT�J23tirn{3sJpt?2iutiQ'1'!t.', Mineral Estate Owner Notice. By the certified mailing of notice, return receipt requested, to affected mineral estate owners by at least thirty(30) days prior to the date scheduled for the initial public hearing on the application of development. The names and addresses of mineral estate owners shall be those on the current tax records of Pitkin County. At a minimum, Subdivisions, SPAs or PUDs that create more than one lot, new Planned Unit Developments, and.new Specially Planned Areas, are subject to this notice requirement. Rezoning or text amendment. Whenever the official zoning district map is in any way to be changed or amended incidental to or as part of a general revision of this Title, or whenever the text of this Title is to be amended, whether such revision.be made by-repeal of this Title and enactment of a new land use regulation, or otherwise, the requirement of an accurate survey map or other sufficient legal description of, and the notice to.and listing of names and addresses of owners of real property in the area of the proposed change shall be waived. However, the proposed zoning map shall be available for public inspection in the planning agency during all business hours for -fifteen (15) days prior to the public hearing on such amendments. Signature The foregoing "Affidavit of Notice"was acknowledge before me this day of M44 11N 20Lf,- b NOTICE OF PUBLIC NEARING WITNESS MY HAND AND OFFICIAL SEAL RE:Sob W.Mein Stam ' �Nealna Wetlnes6ey.MmM 28.2018.0:30 PM _ I_I 7 ' Pm�ect Location.. 500W�Sc 1umnN GIrem,ers lao B.Galene s,..ASPen.co 6,6„ My commission expires: a-4cb2t-Jo) ,'Legal Oeemiptbn: Lok Rand S Elect,3D.City and Towrktte of Aspen,Colorado, i PID e273S124-e3,pW I DaacHplbn: Ttie ppp6cent meuests_design approval and seterta vada8wts to rocaneVucl r /l an exkro malon Na well ekvatbn of me existing xhumi,,arq reeoazk \ 'I appm+al lm site work L)YIn« LL )(4 1leS .Doc labs making Body: Historic Preservation Commission Notary Public M Applieam: 500 Main n Street,LLC,23a E.Hopkins Avenue, CO.81611 ore in ormmon: For fuller infomalnn related to the,W jw,apnh,0=1h Y.et the City a (AWn CO mmi�Development Depa imen1,13f1 S.Galena St..Aspen,CO, yaon®dtyofazpemmm. PUMtNed In to Aspen Times on Marts 8.2015. (0000205863) >gQ✓ 'h:a�;_ — BO IE ILES N UBLIC 47 ATTACHMENTS AS APPLICABLE: srAT ca oRADo Y I 005/038739 `j . e COPY OF THEPUBLICA TION NY OCTOBER30•x'- .- e PHOTOGRAPH OF THE POSTED NOTICE (SIGN) e LIST OF THE OWNERS AND GOVERNMENTAL AGENCIES NOTICED BY MAIL _e APPLICANT CERTIFICATION OF MINERAL ESTAE OWNERS NOTICE AS REQUIRED BY C.R.S. §24-65.5-103.3 BONNIE L SHILES NOTARY PUBLIC STATE OF COLORADO MYCAIBtS50NEP0tESOCTeBBt7 3D 2021 Pitkin County Mailing List of 300 Feet Radius From Parcel: 273512443007 on 02/28/2018 fTKIN COUNTI Instructions: This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. Disclaimer: Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. Mineral estate ownership is not included in this mailing list. Pitkin County does not maintain a database of mineral estate owners. Pitkin.County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. http://www.pitkinmai)sandmore.com FERGUS ELIZABETH DAWSON CARTER RICHARD P SCOTT BUILDING CONDO ASSOC PO BOX 1515 PO BOX 2932 400 W HOPKINS AVE ASPEN.CO 81612 TELLURIDE,CO 81435 - ASPEN,CO 81611 GOLDENBERG STEPHEN R&CHERYL J 501 WEST MAIN LLC NATIONWIDE THEATRES CORP 430 W HOPKINS AVE 532 E HOPKINS AVE PO BOX 847 ASPEN,CO 81611 ASPEN,CO 81611-1818 CARLSBAD.CA 92018 501 MAIN ASPEN LLC ALPINE BANK CHRISTIANA B101 LLC ALDRICH PL#200 OTTAWA AVE NW PO BOX 10000 2509 TARRYHILL PL GRAND RAPIDS,MI 49503 GLENWOOD SPRINGS,CO 81602 AUSTIN,TX 78703 ULLR CONDO LLC 430 WEST HOPKINS CONDO ASSOC MCCOY CARLTON 6450 AVENIDA CRESTA COMMON AREA PO BOX 9349 LA JOLLA,CA 92037 432 W HOPKINS AVE ASPEN,CO 81612 ASPEN,CO 81611 ASPEN SQUARE CONDO ASSOC 420 W MAIN LLC - SCHULMAN WILLIAM PAUL 617 E COOPER 424 PARK CIR#TH5 301 MERCER BLVD ASPEN,CO 81611 ASPEN,CO 81611 CHARLEVOIX,MI 49720 JEWISH RESOURCE CENTER CHABAD OF A7 KARBANK 430 LLC PERRY IAN MICHAEL 435 W MAIN ST 2000 SHAWNEE MISSION PKWY#400 426 E HYMAN AVE ASPEN,CO 81612 MISSION,KS 66205 ASPEN,CO 81611 433 BLEEKER KS LLC WAGNER HOLDINGS CORP LLC JOHNSTON FAMILY TRUST PO BOX 4068 605 E MAIN ST 2018 PHALAROPE ASPEN,CO 81612 ASPEN,CO 81611 COSTA MESA,CA 92626 BLEEKER STREET PROP LLC LHG HOLDING LLC ALPINE BANK PO BOX 491246 11777 SAN VICENTE BLVD 9TH FL PO BOX 10000 LOS ANGELES,CA 90049 LOS ANGELES,CA 90049 GLENWOOD SPRINGS,CO 81602 GARMISCH LODGING LLC GARMISCH LODGING LLC TOMS CONDO LLC 110 W MAIN ST 605 W MAIN ST#2 6 SHULL FARM RD ASPEN,CO 81611 ASPEN,CO 81611 ERWINNA,PA 18920 420 W MAIN LLC ALPINE BANK ASPEN ASPEN FAMILY HOLDINGS LLC 424 PARK CIR#TH5 PO BOX 10000 137 WESTVIEW DR ASPEN,CO 81611 GLENWOOD SPRINGS,CO 81602 ASPEN,CO 81611 SLONE MICHAEL DAVID II FORNELL CONDO ASSOC HY-MOUNTAIN TRANSPORT INC 4476 WATERSIDE CT 518 W MAIN ST 214 B AABC FAYETTEVILLE.AR 72703 ASPEN,CO 81611 ASPEN,CO 81611 GANT CONDO ASSC CITY OF ASPEN MICHAEL JACE 610 S WESTEND ST 130 S GALENA ST PO BOX 569 ASPEN,CO 816112142 ASPEN,CO 81611 ASPEN,CO 81612 HILLMAN TATNALL L REV TRUST 420 W MAIN LLC DUNKELBERG AMBER&KEVIN 504 W BLEEKER ST 424 PARK CIR#TH5 PO BOX 5804 ASPEN,CO 81611 ASPEN,CO 81611 SNOWMASS VILLAGE,CO 81615 ALPINE BANK ASPEN KATZMAN LORI ANN CORONA VANESSA LOPEZ PO BOX 10000 301 MERCER BLVD PO BOX 3670 GLENWOOD SPRINGS,CO 81602 CHARLEVOIX,MI 49720 ASPEN,CO 81612 FELER LAURIE&CLAUDIO CHRISTIANA A105 LLC CHRISTIANA UNIT D101 LLC 550 FOX RUN PO BOX 542 795 LAKEVIEW DR CARBONDALE,CO 81623 SAN MATEO,CA 94401 MIAMI BEACH,FL 33140 RAINBOW CONNECTION PROPERTIES LLC GANT CONDO ASSOC INC ASPEN SQUARE CONDO ASSOC 151 SUMMER ST#1109 610 S WESTEND ST 617 E COOPER MORRISON,CO 80465 ASPEN,CO 816112142 ASPEN,CO 81611 CARINTHIA CORP SMITH ANDREW C&DONNA G ASPEN SQUARE CONDO ASSOC 45 E LUPINE DR 3622 SPRINGBROOK ST 617 E COOPER ASPEN,CO 81611 DALLAS,TX 75205 ASPEN,CO 81611 LHG HOLDING LLC WERLIN LAURA B TRUST MACDONALD BETTE S TRUST 11777 SAN VICENTE BLVD 9TH FL 2279 PINE ST 15 BLACKMER RD LOS ANGELES,CA 90049 SAN FRANCISCO,CA 94115 ENGLEWOOD,CO 80110 BROOKS NORMAN A&LESLEE S STERTZER ELIANE C LEADINGHAM CAROLINE 16311 VENTURA BLVD#690 160 E 65TH ST#23E 518 W MAIN ST#A-102 ENCINO,CA 91436 NEW YORK,NY 10065 ASPEN,CO 81611 REECE MARK STUART DANIEL S&TAMARA B JMW GOLDEN LLC 518 W MAIN ST#A-102 PO BOX 3274 PO BOX 1860 ASPEN,CO 81611 ASPEN,CO 81612 BENTONVILLE,AR 72712 GARMISCH LODGING LLC HARRIS ANGELA WENDT ROBERT E 11 605 W MAIN ST#2 518 W MAIN ST#C107 350 MT HOLYOKE AVE ASPEN,CO 81611 ASPEN,CO 816111618 PACIFIC PALISADES,CA 90272 GARMISCH LODGING LLC JMW GOLDEN LLC ASPEN SQUARE CONDO ASSOC 110 W MAIN ST PO BOX 1860 617 E COOPER ASPEN,CO 81611 BENTONVILLE,AR 72712 ASPEN,CO 81611 BLOCKER LAURA G HAVANDJIAN GASTON MATIAS FISCHER SISTIE PO BOX 9213 518 W MAIN ST#B205 442 W BLEEKER ASPEN,CO 81612 ASPEN,CO 81611 ASPEN,CO 81611 420 W MAIN LLC SGSG ASPEN CONDO LLC PHILLIPS SHAUN E 424 PARK CIR#TH5 PO BOX 1383 518 W MAIN ST#8105 ASPEN,CO 81611 CRESTED BUTTE,CO 81224 ASPEN,CO 81611 OGUIN MEGAN L CLEANER EXPRESS TUCKER LUCY LEA 518 W MAIN ST#8203 435 E MAIN ST PO BOX 1480 ASPEN,CO 81611 ASPEN,CO 81611 ASPEN,CO 81611 420 W MAIN LLC SEAL MARK LINDAUER REBECCA F 424 PARK CIR#TH5 PO BOX 9213 1115 ELM ST ASPEN,CO 81611 ASPEN,CO 81612 AUSTIN,TX 78703 MAUPIN KENNETH ASPEN FSP ABR LLC NORTHWAY CONDO OWNERS ASSOC 518 W MAIN ST#C-207 11921 FREEDOM DR 9950 420 W MAIN ST ASPEN,CO 81611 RESTON,VA 20190 ASPEN,CO 81611 GARMISCH LODGING LLC DAHL W ROBERT&LESLIE A FORNELL CLARITY ELISE&PETER 605 W MAIN ST#2 83 PECKSLAND RD 518 W MAIN ST#6-206 ASPEN,CO 81611 GREENWICH,CT 06831 ASPEN,CO 81611 HESSIAN ASPEN LLC VANCE STEPHEN M DJORDJEVIC VLADAN 1470 GENE ST#B 625 E MAIN ST#1026 PO BOX 9566 WINTER PARK,FL 327894881 ASPEN,CO 81611 - ASPEN,CO 81612 FRIAS PROPERTIES OF ASPEN FRIAS PROPERTIES OF ASPEN 420 W MAIN LLC 730 E DURANT 730 E DURANT 424 PARK CIR#TH5 ASPEN,CO 81611 ASPEN,CO 81611 ASPEN,CO 81611 BONETTI MARYSUE ASPEN SQUARE CONDO ASSOC LHG HOLDING LLC PO BOX 569 617 E COOPER 11777 SAN VICENTE BLVD 9TH FL ASPEN,CO 81612 ASPEN,CO 81611 LOS ANGELES,CA 90049 ULLR HOMEOWNERS ASSOC PROMISE LAND LLC GARMISCH LODGING LLC 520 W MAIN ST 6412 S QUEBEC ST 110 W MAIN ST ASPEN,CO 81611 ENGLEWOOD,CO 801114628 ASPEN,CO 81611 ALPINE BANK 604 WEST LLC BLEEKER STREET PROP LLC PO BOX 10000 604 W MAIN ST PO BOX 491246 GLENWOOD SPRINGS,'CO 81602 ASPEN,CO 81611 LOS ANGELES,CA 90049 605 W BLEEKER LLC MCGUIRE JENNIFER ERIN CORTALE ITA PO BOX 5010 501 E DEAN ST PO BOX 12346 MONROE.CT 06468 ASPEN,CO 81611 ASPEN,CO 816129237 ASPEN SQUARE CONDO ASSOC HILLMAN DORA B TRUST SCHALL FAMILY TRUST 617 E COOPER 504 W BLEEKER 3841 HAYVENHURST DR ASPEN,CO 81611 ASPEN,CO 81611 ENCINO,CA 91436 ULLR HOMEOWNERS ASSOC CONNERFAMILY LLC PROMISE LAND LLC 520 W MAIN ST PO BOX 38 6412 S QUEBEC ST ASPEN,CO 81611 PALISADE,CO 81526 ENGLEWOOD,CO 801114628 KARBANK 430 LLC FAVORITE PRATHUAN HUERGO DELFINA 2000 SHAWNEE MISSION PKWY#400 PO BOX 9566 518 W MAIN ST#A101 MISSION,KS 66205 ASPEN,CO 81612 ASPEN,CO 81611