HomeMy WebLinkAboutordinance.council.043-00 ORD~N~,NCE NO. 43
(SERIES OF 2000) ,
AN ORDINANCE OF THE ASPEN CITY COUNCIL APPROVING A
SUBDIVISION EXEMPTION LOT SPLIT FOR LOTS 1 AND 2 OF THE
PROPERTY TO BE KNOWN AND DEDICATED AS THE SANDUNES L. P.
ANNEXATION LOCATED AT 815 WEST MAIN STREET, CITY OF ASPEN,
PITKIN COUNTY, COLORADO.
Parcel ID: 2735-123-17-001
WHEREAS, the Community Devalopmant Department received an applicatinn
from Susan Horsey, applicant, represented by Jennifer Causing for a Subdivision
Exemption Lot Split for Lots 1 and 2 of the Sandunes L. P. Annexation located at 815
West Main Street, City of Aspen, Pitkin County; and
WHEREAS, pursuant to Sections 26.480.040(B), the Aspen City Council, in
accordance with the procedures, standards, and limitations of this Chapter, shall by
ordinance approve, approve with conditions, or disapprove a development application for
a Subdivision Exemption Lot Split, after recommendation by the Community
Development Department, pursuant to Section 26.480,040(B); and,
WHEREAS, the community Development Department reviewed the application
for a Subdivision Exemption Lot Split for Lots 1 and 2 of the Sandunes L. P. Annexation
located at 815 West Main Street, City of Aspen, Pitkin County, Colorado and
recommended approval; and,
WttEREAS, the Aspen City Council has reviewed and considered the development
proposal under the applicable provisions of the Municipal Code as identified herein, has
reviewed and considered the recommendation of the Community Development Director, the
applicable referral agencies, and has taken and considered public comment at a public
hearing; and,
WHEREAS, the City Council finds that the development proposal meets or exceeds
all applicable development standards and that the approval of the development proposal,
with conditions, is consistent with the goals and elements of the Aspen Area Community
Plan; and,
WltEREAS, the City Council finds that this Ordinance furthers and is necessary for
the promotion of public health, safety, and welfare.
NOW, THEREFORE, BE IT ORDAINED BY THE ASPEN CITY COUNCIL AS
FOLLOWS:
Section 1
pursuant to the procedures and standards set forth in Title 26 of the Aspen Municipal Code,
the Subdivision Exemption Lot Split for Lots 1 and 2 of the property to be known and
dedicated as the Sandunes L. P. Annexation located at 815 West Main Street, City of Aspen,
Pitkin County, is approved with the following conditions:
12
1. That the applicant agrees that land use approvals decided upon in this application
for Subdivision Exemption Lot Split for Lots 1 and 2 of the SandUnes L. P.
Annexation are contingent upon successful annexation and rezoning to R-15 of the
Sandunes L. P. Lots 1 and 2 into the City of Aspen. Failure of this annexation into
the City of Aspen shall render all land use approvals by the City of Aspen null
and void pursuant to this Ordinance;
2. That the applicant submits a drainage mitigation plan meeting with the approval
of the City Engineering Department to address temporary sediment control and
containment plans for run-off for the construction phase and erosion control, soil
stabilization, and re-vegetation in disturbed areas;
3. That the applicant shall install a sprinkler system because the residence is larger
than 5,000 square feet as per the requirements of the City of Aspen Fire
Department;
4. That the applicant shall not line public roads with equipment or trucks during
construction. Enforcement by the Building Department may result in project
shutdown;
5. That the applicant submits a construction traffic maintenance plan to the
Engineering Department for approval;
6. That the applicant shall indicate the top of slope and a line drawn at a 45 degree
angle from top of slope for the stream bank by a Professional Land Surveyor
using the three point method;
7. That the applicant submit adequately scaled site cross sections performed by a
Professional Land Surveyor;
8. That the applicant submit a site survey which is dated within the past 12 months
and fully represents the easements of record;
9. That the applicant shall not track mud onto City streets during construction. A
washed rock or other style mud rack must be installed during construction;
10. That the applicant delineate and place appropriate construction and silt fencing at
the 15-foot setback line from the top of slope which shall remain untouched and
unaltered during and after construction;
11. That the building envelope previously determined by Pitkin County be revoked
upon annexation into the City and that the applicant shall adopt all dimensional
requirements set forth in the R-15 zone district;
13
12. That the applicant agrees to acquire all necessary approvals from the City of
Aspen in the event that the ditch nmn~ng through the property is requested to be
turned off for construction;
13. That no lining or placement of large rocks in the ditch is allowed;
14. That no storage of construction materials occur within the dripline of existing
trees and that construction fencing be installed to protect all existing trees, and
that no excavating within the dripline of existing trees occur;
15. That the applicant grant a fishing easement for Castle Creek to the City of Aspen;
16. That the applicant submit a utility plan to the City Utility Department prior to the
application of a building permit;
17. That the applicant enter into a new raw water agreement with the City Water
Department for the lot. Two separate agreements will be required to show the
applicable square footage to be irrigated on each lot;
18. That as a result of the Colorado Department Of Transportation (CDOT) State
Highway 82 realignment (EAP) in the near future, water service for the new lot
may be received from 7th St;
19. That the current service tap for the lot containing the old barn structure shall be
abandoned in accordance with City standards;
20. That a new 8" service line be installed from 7th Street as required by the Aspen
Consolidated Sanitation District (ACSD) because the existing sewer service lines
are inadequate to allow proper additional flow from the new structure.
Additionally, the applicant shall present detailed sewer service plans to ACSD so
that an accurate estimation of fees is calculated; and
21. That the applicant shall grant a suitable and practical sewer easement trom me
service line which shall be installed from 7th Street in order to provide adequate
sewer service to the Bruce Berger property. This shall be accurately shown and
described on the final plat as recorded in the Pitkin County Clerk and Recorder's
office prior tO the application of building permits.
Section 2:
;Fhis Ordinance shall not effect any existing litigation and shall not operate as an abatement
of any action or proceeding now pending under or by virtue of the ordinances repealed or
amended as herein provided, and the same shall be conducted and concluded under such
pr/or ordinances.
14
Section 3:
If any section, subsection, sentence, clause, phrase, or portion of this ordinance is for any
reason held invalid or unconstitutional in a court of competent jurisdiction, such portion
shall be deemed a separate, distinct and independent provision and shall not affect the
validity of the remaining portions thereof.
INTRODUCED, READ AND ORDERED PUBLISHED as provided by law, by the City
Council of the City of Aspen on this 28* day of August, 2000.
Kathry~ S.~h, City Clerk
FINALLY, adopted, passed and approved this 23ra day of October, 2000.
,~' /Rachel Richards, May~r
City Clerk ~ ~
Approved as to form:
Jo~nn ~oi'ce[tor, City Attorney
C:\My Documents\Current Cases\Sandtmes\Lot Split Annexation\SandunesMemoCG4.doe
15