Loading...
HomeMy WebLinkAboutcoa.lu.su.Bay St.1973MEMO TO: Bruce Gillis, Ac~ing Chairman, Aspen Planning and Zoning Commission FROM: Dave Ellis, City Engineer RE: Bay Street Estate Subdivision -Preliminary Plat DATE: July 10,1973 1) The major problem of the area is the inadequate existing right-of-way. Dedication of land to provide for a 60' wide right-of-way will be required; this will amount to a strip approxi- mately 20' in width along the frontage. 2) The subdivider should be required to enter into a covenant running with the land to join any future storm drainage district or street im- provement district,' including paving, sidewalks, and curb and gutter. 3) The building design and/or site plan should incorporate the capability for storm water retention. 4) The landscaping plan should essentially be the protection of existing trees and shrubs. This can be provided for on the landscaping notes included on the plat. 5) Aspen Metropolitan Sanitation District must be assured an easement for the existing sewer if they do not already have one. This would apply to any other existing utilities.