Loading...
HomeMy WebLinkAboutLand Use Case.323 W Main St.HPC30-9412 € . E. PaCLLFL_j 4 Aspen Medical Center Minor His. I HPC30-94 2735-124-53-007 J L 1 Tr .. CASELOAD SUMMARY SHEET City of Aspen Historic Preservation Committee DATE RECEIVED: 09/07/94 CASE NUMBER: HPC30-94 DATE COMPLETE: PARCEL ID#: 2735-124-53-007 PROJECT NAME: Aspen Medical Center Minor Historic Development Project Address: 323 West Main APPLICANT: Aspen Medical Center Cono. Associates Applicant Address: 323 West Main REPRESENTATIVE: Stephen Connor and Paul Taddune Representative Address/Phone: 600 E. Hopkins, #301 Aspen, CO 925-9190 TYPE OF APPLICATION: 1 STEP: X 2 STEP: 3 STEP: HPO Insubstantial Amendment or Exemption: HPC Meeting Dates: P&Z Meeting Date: CC Meeting Dates: 1st 2nd REFERRALS: Planning Building Zoning City Engineer Parks Dept. City Attorney DATE REFERRED: INITIALS: DUE: FINAL ROUTING: DATE ROUTED: INITIAL: City Atty City Clerks Office Other: FILE STATUS AND LOCATION: COMMENTS: - 4, MEMORANDUM To: Aspen Historic Preservation Committee From: Amy Amidon, Historic Preservation Officer Re: 323 W. Main Street, Aspen Medical Center- Minor Date: September 13, 1994 SUMMARY: The applicant requests HPC approval to replace and slightly modify windows on the north side of the structure, to add a window on the west side and to add an exterior exit stair on the east side of the building. Other work involved in this project involves repair or replacement of windows and the roof. This type of activity qualifies for staff sign off (no hpc review required). Staff has no objections to the proposed replacement of materials. This is not a historic structure, but it is located in the Main Street Historic District. APPLICANT: Stephen Connor and Paul Taddune. LOCATION: 323 W. Main Street, the east 9.5' of Lot B, all of Lot C and west 1/2 of Lot D, Block 45, City and Townsite of Aspen. PROJECT SUMMARY AND REVIEW PROCESS: All development in an "H, " Historic Overlay District must meet all four Development Review Standards found in Section 7-601 of the Aspen Land Use Code in order for HPC to grant approval. 1. Standard: The proposed development is compatible in character with designated historic structures located on the parcel and with development on adjacent parcels when the subject site is in a "H," Historic Overlay District or is adjacent to an Historic Landmark... Response: This proposal involves very minor changes to the exterior appearance of the structure. The proposed window changes improve the overall visual balance of the main facade. The staircase will not be easily visible from the street and is required for safety. 2. Standard: The proposed development reflects and is consistent with the character of the neighborhood of the parcel proposed for development. .. Response: This proposal will have no impact on the character of the Main Street Historic District. 3. Standard: The proposed development enhances or does not detract from the cultural value of designated historic structures located on the parcel proposed for development or on adjacent parcels. Response: The proposed development has no impact on the cultural value of any designated historic structure. 4. Standard: The proposed development enhances or does not diminish from the architectural integrity of a designated historic structure or part thereof. Response: The proposed development has no effect on the architectural integrity of any historic structure. ALTERNATIVES: The HPC may consider any Of the following alternatives: 1) Approve the Minor Development application as submitted. 2) Approve the Minor Development application with conditions to be met prior to issuance of a building permit. 3) Table action to allow the applicant further time for restudy. (specific recommendations should be offered) 4) Deny the request, finding that the application does not meet the Development Review Standards. RECOMMENDATION: Staff recommends HPC approve the proposal as submitted. Additional Comments: USE APPLICAnON FEe{ . ATImaEENT 1 . 1) Project Nan•• . Aspen Medical Center Building Connor/Taddune Office Remodel 2) Project Location 323 West Main Street, Aspen, CO; Aspen Medical Center Condominiums, according to Plat filed April 1, 1981, in Plat Book 13 at .Page 21; the easterly ** (inlicate street address, lot & block Inmber, legal descripticn where appropriate) 3) Present Zoning Office with historic. overlay 4) Int Size 5) Applicant's Name, Address & Ibcne # Towne Centre Properties Ltd. Liability Co., TAD Properties Ltd. Liability Co., and J. Sterling Baxter, all comprising the Aspen Medical Center' Condominium Association, 323 West Main Street, Aspen, Colorado 81611 6) Representative's Name, Address & Ibcne # Stephen R. Connor and/or Paul J. Taddune, 600 E. Hopkins, Suite 301, Aspen, Colorado 81611 (303) 925-9190 Typd of Application (please check all that amly): .4 . Conditional Use Conceptual SPA ~ Concep9131 Histmic Dev. Special Deview Final SEA - 1Nnal Historic Dev. 8040 Greenline conceptual PUD A (Mlnar Histaric Dev. 1 Stream Margin · · Final POD Historic Demolition leintain yiew Plane Subdivisicn Histodc Desigriatiai Condominilmizal-2 won · - ~I™Ct/Map Amendment · - (2*73 Allotment Ict SpliVIot Line GMDS E>=ption Adjustment 8) Description of Existing Uses ·0=ber and % type of existing st:ructures; awroocimate sq. ft.; number of bedroans; an, previous approvals granted to the preperty). Office and residential condominium uses 9) Description of Develciment Application Applicant seeks to replace and install windows, add a second access stairway, and repair roof to building code requirements, in connection with interior remodel of condominium units 4 and 5 10) Have you attached the following? Response to Attadiment 2, Mininum Sukinission Ocntents Response to Attachment 3, Specific Sulnission Contents Response to Attachment 4, Review Standards for your Awlication ** 9.5 feet of Lot B, all of Lot C and the westerly 1/2 of Lot D, Block 45, , City and Townsite of Aspen lilillia SUPPLEMENT TO HISTORIC PRESERVATION DEVELOPMENT APPLICATIONS IMPORTANT Three sets of clear. iu-Illlabeled drawings must be submitted in a format no larger than 11 x17", OR one dozen sets of blueprints may be submitted in lieu of the 11»xlr format. Towne Centre Properties Ltd. Liability Co., TAD 1 APPLICANT: Properties Ltd. Liability Co., and J. Sterling Bax r, all comprising the Aspen Medical Center Condomintu Assn ADDRESS: 323 West Main Street, Aspen, Colorado 81611 ZONE DISTRICT: "o" LOT SIZE (SQUARE FEET): EXISTING FAR: ALLOWABLE FAR: PROPOSED FAR: EXISTING NET LEASABLE (commercial): PROPOSED NET LEASABLE (commercial): EXISTING % OF SITE COVERAGE: PROPOSED % OF SITE COVERAGE: EXISTING % OF OPEN SPACE (Commerdal): PROPOSED % OF OPEN SPACE (Commer.): EXISTING MAXIMUM HEIGHT: Princioal Bldg.. / Accessory Bl®: PROPOSED MAXIMUM HEIGHT: Principal Bldg.: / Accessory Bldg: PROPOSED % OF DEMOLITION: EXISTING NUMBER OF BEDROOMS: PROPOSED NUMBER OF BEDROOMS: EXISTING ON-SITE PARKING SPACES: ON-SITE PARKING SPACES REQUIRED: SETBACKS: EXISTING: ALLOWABLE: PROPOSED: Front: Front: Front: Rear: Reac Rear: Side: Side: 5 Side: Combined Front/Rear: Combined Frt/Rr: Combined Front/Rear: EXISTING NONCONFORMITIES/ ENCROACHMENTS: VARIATIONS REQUESTED (eligible for Landmarks Onlv: character comoatibilitv finding must be made by HPC): FAR: Minimum Distance Between Buildings: SETBACKS: Front: Parking Spaces: Rear: Open Space (Commerdal): Side: Height (Cottage Infill Only): Combined Frt./Rr: Site Coverage (Cottage Infill Only): 0 . TAI)DUKE & GUEST . ATTORNEYS AT LAW ALPINE BANK Bun.DING 600 EAST HOPKINS, Sun-k 301 ASPEN. COLORADO 81611 PAUL J. TAI)DUNE, RC. TELEPHONE (303) 925-9190 WILLIAM K. GUEST, RC. FACSIMILE (303) 925-9199 ANDREW H. BuSCHER September 7, 1994 City of Aspen Historic Preservation Commission Aspen/Pitkin County Planning Department ATTN: Ms. Amy Amidon, Historical Preservation Officer 130 South Galena Street Aspen, Colorado 81611 RE: Application for Minor Historic Development: Aspen Medical Center Building, 326 West Main Street, Aspen, Colorado 81611 Dear Amy: Please accept this letter as an application to the Historic Preservation Commission (HPC) for Minor Development pursuant to Section 7-601E of the Land Use Regulations of the City of Aspen. This application is submitted in connection with the remodel and repair of Units 4 and 5, Aspen Medical Center Condominiums, according to the plat filed April 1, 1981, in Plat Book 13 at Page 21. The applicants, Towne Centre Properties Ltd. Liability Co. and TAD Properties Ltd. Liability Co., have a contract with J. Sterling Baxter to purchase Units 4 and 5, as well as the remaining units of the project. After the closing, which will occur as soon as a building permit is issued, Towne Centre Properties Ltd. Liability Co., TAD Properties Ltd. Liability Co., and J. Sterling Baxter will comprise all members of the Aspen Medical Center Condominium Association. Submitted herewith are plans entitled "Connor-Taddune Office Remodel" prepared by Theodore K. Guy Associates, P.C., Architects and Structural Engineers, dated August 31, 1994, which depict the proposed remodel and repairs. In connection with the interior remodeling of Units 4 and 5, the plans call for the following: * The existing roof is in disrepair and will need to be removed and replaced (see Sheets A3.3 and A)®4). * On the south side, the current bank of windows are in disrepair and are in need of removal and replacement, .. City of Aspen Historic Preservation Commission September 7, 1994 Page -2- the elongated window in the middle will be removed to accommodate a mechanical chase, and new windows will be installed to harmonize with existing windows (see Sheet A3.4) * On the east side, a stairway is proposed to provide a building code required second exit to the building. The stairway has been carefully designed to accommodate snow and ice conditions. The stairway will not encroach into the side yard setback. There will be no overhang so there will be no increase in FAR. Existing windows will be converted to doors (see Sheets A3.3 and A3.4). * The windows on the north side of the building are in disrepair and will be replaced and slightly modified (see Sheet A3.3). In connection with the removal and replacement of the windows, the sign standard on the front of the building will also be removed. * A new window will be added to the west side to provide light to the existing staircase and the existing single windows which are in disrepair will be replaced (See A3.4). The plans also provide a representation of the major building materials to be used for the remodel and repair, which are intended to be consistent with the current design of the building. As can be seen from the enclosed plans, the remodel and repair will enhance the character and appearance of the building. The remodel and repair will have no negative impact on the character of the neighborhood. A check in the amount of $105 as the application fee is enclosed. Thank you in advance for your attention and consideration in this matter. Very truly yours, TADDUNE & GUEST 1--/2 - Paul J. Taddune .. City of Aspen Historic Preservation Commission September 7, 1994 Page -3- The foregoing has been read and approved by the undersigned as Buyer and Seller of that Agreement of Purchase and Sale of Real Property executed as of the 5th day of August, 1994. SELLER: BUYER: TOWNE CENTRE PROPERTIES LTD. LIABILITY CO. 1 ,»«801/ 94/ ULt€L_ Ii-.-u- BY: ~,3. Sterling< Baxter ' / Stephen R. Connor , 4lanQ 3~L TAD PROPERTIES LTD. LIABILITY CO. =--T-**%':53 Paul J. Taddune PJT:km Enclosure CC: J. Sterling Baxter Leonard M. Oates, Esq. p\lt\histpres.906 .. Sec. 7-141. Amendments. (e) Table No. 3-A Building Permit Fees is hereby amended to read as follows: TABLE NO. 3-A BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $2,000 $45.00 $2,001.00 to $25,000.00 $45.00 for the first $2,000.00 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 to $50,000.00 $252.00 for the first $25,000.00 plus $6.50 for each additional $ 1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $414.50 for the first $50,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 and up $639.50 for the first $100,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hourq $75.00/hr. (Minimum charge = two hours). 2. Reinspection fees assessed under provisions of Section 305(g) ........................... $50.00/hr. 3. Inspections for which no fee is specifically indicated ................................... $50.00/hr. (Minimum charge = one-half hour). 4. Additional plan check review required by changes, additions or revisions to approve plang $50.00/hr. (Minimum charge = one-half hour). Note: Valuation is to be based upon current building valuation data as provided by the International Conference of Building Officials and published in Building Standards with a regional modifier of 1.3 or other evidence of value, whichever is greatest, as determined by the Building Official. 9 .. hazardous conditions or improvements, shall be eliminated or removed within ten (10) days of expiration of a permit. (3) Before such work can be recommenced, a new permit shall be first obtained. Such permit shall issue for a permit fee equal to one half (1/2) the amount required for a new permit - for such work provided no changes have been made or will be made in the plans and specifications for such work, and provided further that the work has not been abandoned for a period exceeding 180 days. Continuation of work will be determined by inspections as required. (4) The provisions of subparagraph 3 to the contrary notwithstanding, no permit shall reissue for any construction or activity prohibited by law at the time of the application for reissuance. Section 2-4 UBC Section 304(a) is amended to read as follows: Section 304(a). Permit Fees. The fee for each building permit shall be as set forth in the following schedule, which shall not amend, affect, nor supersede the application of Table No. 3-A when that Table is referred to elsewhere in this code. ' .R . L CONNOR / TAPPUNE OFFICE REMODEL 64QL . THEODORE K GUY ASSOCIATES PC 4RCHITECTS AND STRUCTURAL ENGINEERS l i ABBREVIATIONS ~ MATERIALS ~BOL LIBRARY SHEET INDEX ~ *.Ase.6-*= A.. EARTH METAL DOVER ACT a.,c»«Ss /--L #t=&&# 4.15*,6-2 ACL Slora~ Al.O NFORMATON SHEET S- 17-7-1 O, sin- 21.1 EXISTINS FLOOR. PL-ANS / DEMOLITION PLANS ARC•WITECTPRAL ARC,64. AT 0 /~~\_Or,/2 Nblell 01-2 EXISTINe FLOOR PLANS / DEMOLITION PLANS Ilt=1 'CH AQ.1 RENOVATION PLANS ED•.5 ,-. 1 -1 50€5-7 •-6.' Il-4 elecroi '47 ~ils F,Li. INSULATION A:2.2 RENOVATION PL»15 IVA¥*4 ~ __PETALL '...DEK AB.1 EXISTINS NOKTH / F€ST ELEVATIONS / DEMOLIT)ON THEODORE K GUY Cd-8. ==2-4& G.T. S./1 BATT Oer.NL ..... -1._Derr ".BU 9.4.-4 Mi#* E V Ae-2 EXISTNe SOUTH / E,ST EL.EVATIONS / DEHOLmON ASSOCIATES PC C<>.1 r.:::1 lilli *3.3 NORTH / reST ELEVATIONS CONTIN•le GOIT. DETA eRAVEL Rlec . ,RCA,rTELTS NAD . AS.4 SOUTH / EAST ELEVAnONS DOUBLE FINISHES STRUCTURAL- ENG»4!EERS MASONRY , ZX»EL CE'rlt- ~ E.A - E.EV O. L r//1 1 1 A.4.1 BUILDIN<S SECTIONS OBT. 86 M Pri=- BLOGI 6./.SUM BOARD ~ZAT,04 F.O. BOX 1640 22220 ,·tyrr. 62 64,65 6. r///A F'HOhE (303) 't21-316-1 6.L BA©ACT,CO-ORJOO 81621 gUIP'.NI/"LL„*= bre BRIOK PL./ITER *€0,·17 MT. FAK (303) 97-4813 9-COF SLOPE '116*=X .€ G©.22 HORIZC}GAL_ .111'RliZ S.b. 22IATER De'l- 1--------1 rm~1 .en STOhE CER.»40 TIE LF. 1 El.....Jet Ar·.Fl F./Tv»,1 LI'*SmS»k U}/ert. 7 '02-0- - - =1:*=TE NE. CF:7771 F37955 0". *29*ALT STOE 1 *'FER.0 .133 =ERF IL/7 24XX f·f>462- 42**KWE SG,. L»E Imm*WRI ibbbLLLRL REEDNF. CONCRETE 0-9=En RECID. r€>03 MISC RESt- r.'DC>·t 'n...O- ~EV. = 1:£:2211 mje E. F'INISH 0,€R/,RAMIVS 5**CD -0 STEEL SlIps. INT. El- MAR~< STUDS THIC•c T.~54. TA- N *= -%=D....I $320/PLATE * ~ TCP <7 LEI>SE TOP OF rV,_L- TA TOT. ISI*E B.I IL,v. TRAN5 #EICSE 12=-1 /.T,4 .44'C" &%*/(rep c'V".'les e..4.0 #NORTHJ VER[•v IN PE.L.,D V.1... VERT. VE.ns.k. i-I) V- L A:-2- C ..ric 29 *M UXTAN~r =b. ,*00' Mn- ./ /0. 'CCD 261: 221/EVIW ------- BITE / BUILDINe DATA ------- .I-------i-------- ------- DU\LDINe OCOFAMOY 68·000 6Rt©UP B, DIVISION 2 ------- -------*--------- SCRUARE FOOTA,SE ----i-- -----0----------- UPPER LEVEL 1482 S.F. ATTIC LEVEL 213 S.F. ~ CONNOR - TAPPUNE I Z . OFFICE REMODEL 22=2 22 UBC 1991 UFG 1991 55894 923 FEST MAN STREET *PB, C.OLORADO 44% §283§ -Ce. 441= PRA/*t PREP C+EC,CEI> PRINTED 02»31-44 ft:/50,0/Lit INFORMATION SHEET Al.O CO••·rib,rT T,eCXCDOME K ®Irr,asoc,•TO PCL · 79:.? min in" ' · 0 0 933€IHEIH Hval a3103klla 38 al,0 21 %22*2¥& 01 , 1 1 THEODORE K GUY ~ ASSOCIATES PC A ' ARCHITECTS AND STRUCTURK ENGNEERS l-= LN~ 3 _ - C : : FLO. BOX 1640 ' 1 : 23280 Hrrf. 22 SheAL.T. 01.OF<+00 812,21 0 0 F'MOKE (32) 421-8161 $ I : E / i FAX (303, 91-4813 il·J~-1~~· -4----·fl·1--~ ir=~n i i !1 -·--~Lu„=1.4 : =22 .1 1. I ................1 11 - 1 14 - H |,a,NDON e,CST,46 i 4/ 11 . tr-1 ST...1 . FL<2 : \.1 11 1 5 : 5 - -2-/ - . 9 - __6=- 1»54 INIT 2 REMOVE 2505·The el< AMP' ---- 1 RELOCATE -1-*O 1 - 1 2' 3 FLOOR h.eTE ..INED Ae ReaMRED "-*- ,, , ~~ El- 7(2-1. ~ FOK WDN BATW•2027 177 6,.:- r.--·.-·-1--. ................1-------·, --41 M Y :i 3 - c,ce·r.e ST#Y BCUM TO M Rm·~/MP • NATO•IN 1 1 i REEMOVE /,ALLS / U.../ 4 .. Re==25, TO AL.,6,1 Mrn, : 900£5 •e Do,4 11 ·,-3 ·· u il \ -,11 . /1 Rng,=127C=246 itt i !!r...al~ 9 * 1- /<~ i '£'gLBe 10 0~-46 -TO m: 0/fle,IN. C<5*45,710,4. C.4 . UN'T 1 i: \ 1 54AA DIST,«S f :: 1 ISINK.S /}OCA, : : 11 .fl~ / 1 Excelk, r,/.Tr• i .t / J I>O V»STE LIES : :1 :1 i 1 1,•e ••4:~1~zrp : 2-- / - REIC 821£52 :: ibA<*§9.4.. E - 7 FiRCM EXT. r~~!.LS '' 1 1-/2 ----------------- 9 \\»f=™6 . 40800 - - - r ------- .----------------I. 61!Eiptififfifficififfi ------- 1 7 1 1 CONNOR - TAIXUNE 1 1 1 1 1 1 OFFICE REMODEL 323 YEST MAN STREET ,•ep..54, COJXKDO 1 1 1 1 1 UPPER FLOOR PLAN LOKER FLOOR PLAN JOS - 44122 I 1/4'•1'47 0 1/4'•1'·O' IPRA)*t C•·ECKED: F'RlhrrED. 02-31-94 21:ML.Im.:i pEMOLmON LEGEND PEMOL-mON NOTES ~ _~ EXISTING FLOOR FLAN / DEMOUTION PLAN reer EX}ST[Ne hALL 1 ALL er,•SUM 90,40 AND BATT TO REMAIN INSULATION - EXTERIOR FNALLS TO BE REMOVED. 1 OPENNES AT REMOVED »DC»e SHALL BE INFILLED F'ill 2x )+C. 6 n/LL. DOOK STUD nAL.L TO MATC,4 EXOSTING k B OR re,€041 TO el.MLI»kS CONSTRUCnON. - : BE RD,a/ED PULL.5 TO EE FNSHED TO MATCH DOSTINS. 01.1 = 10*L 60,•r--£64rT TMIODOW,Z K 61,y AMOC~~TES re LS?FEBESUBEL.1.2iFEL~ -ist - ... 1 i1 E~0~~~~~~~1 THEODORE K GUY ...............................1 . 1. -........................ e ASSOCIATES FC ~RCHITEOTS AMP STNUCTURAL ENGINEERS PO Eky< 1640 23250 ••rer. 82 SABACE. GOLOR-ADO 81621 PHOME (309) 921-3161 PAX (308) Col-/Se 0 - - REMP/5 505-™<5 LZ77 efrk.Acnies AND r•ALLS I MATo•€=> •RE••a Ae swc•,4, :.1 ./7 /ATOW 1 R.MSTORE 2,06-r»46 FLOC»k rALLS i Ca,Ne / £ AD*EXT TO t)5•OLE'04 f·Ilit. : %14 li i e pirJ- 1-- ~1 j A i i i j : 1„2 th jff/////////h :t.ILIClIA 1'1jllilliill bi-·. ------- S21£St ------------------- ------- ; ~il ; -uL__j-L..._.jL-_VL------P;·, ------- ' ' CONNOR - TAPOUNE 523 ZEST MAIN STREET ~EFEN, COLDFUDO A-rTIO FLAN Joe. 44122 0 1/4•1'-C IP./+I// C+·ECJ<Eck f•RiNTED: 06-31-44 2~L.Im.:t EX]STING FLOOFT PLAN / DEMOLITION PLAN t 31.2 COF•fR»,rT DeDPOR, K 614 ASSOCUTES PC I &12.,...........·······················,············· -mi·····ini······im······.LID··:···:#mmmmM==m#69:4 .................................. .r..,6.--'. =mm ..................... .. I .. | ~ A•LL- rl, 8/ NALS ~ ~ 1 1 1 1 9 1 ZS;~:u:.TE 1 1 r'M--1-1 - .......r»--·--4 ··············-' - -~-7-1 ... . ~ · THEODORE K GU¥ - i ASSOCIATES PC l 09 : UNIT 3 ~ ~ OFFIce . ARCHZTECTS AND 1 OFFICE E STRUG-™RAL ENGINEERS i „ovme Be' R-14 ed . A EOSTNS FLU · : a<496,1.*To• PLOX le.40 - 1 re b I·CL /017 VI.V. 9.-RER , 2250 ,·Irt. 82 PHO,E (309) ccl-3161 FAX (303) €71-483 PJJ 1 1 T ..wAN m 11 9 5*94.7- Com:po 51621 . : 9 4 1 0,-10 i I 9/41.- ,1 R A-- A[-leN <2> <i» z. , 11111 1 ====nam== 1 EL- 1912,-3 5/3~ # 2hs Ft-£DC* c,-r/DRAA= 4 1[-73 9 CORK.'RE-- U ' 11 - -- Am/RETARIAL : m..... .................................. .i, . - fl A--1 ? 11 Q 1 /®,113 'I , 2 1~ UNIT 2 1 Ir r-<1>-1 +1 CONFERENCE / T i 1 . A : 1»:1 . 1 011 i . t- LIBRARY E 41 - 1 41 2 3 0 A : - ............... 11 1 E i x X<> . 1 . .1 i 1& 40m- ~-g 1 rio- I. r.1 P CH I 1 , .i .1- 'recx:~• 60 + 65£DR.ET,421AL UNIT 1 1-no* ~ 155' 1 T. 4 0 b le 1 *-1'i= i -*-,L -. Ini OFFICE i UPPER fl ®111 4»2 Laeer 111@ R 821£52 ((S.G.E.) a ~1 2. 0 6 EUU 412 ·······- I U 41- .p L uuc OphIS. CUT. 2,0,6 1 ~ >2*10 HDR 0 ""' F.A /lf -615 1 +4~Ne P,/ 1;210 4 MeRS. BEAR +OR 0/ \ 1....P.,Con MIP VER!/¥ SUPPCWT -------- ---------~~~--------*-~-- 3 SU- TO 3.- AFF. C»4 IO. BEL-01 1 1 9 ------- CONNOR-TAPPLINE ' U -• 1/7 24'-1 1/:· 6 OFFICE REMOPEL 1 1 .... L L 24'-1 - 1 ' ~, Be-e· , 923 YAST MAN STRET ' ASPEN, COLORADO 1 1 1 UPPER FLOOR PLAN LOFNER FLOOR PLAN - 0 1/4'• 1 -0' 0 1/4.•1'·Cr Joe. 44122 DRAret /3/0 C'·EC•<ED: RMP 08-31-44 RENOVATION NOTES MARTInON /,NALL LE,ENIP GENERAL NOTES 2~C.m1.:i 1. ALL EXTmUOR rW..1-5 TO BE 9 EASTIN6 r<#1-1. I. Do.st,c.LEWAr--6 - Co:r,cr **==0.-e,e~ co,C~-46 R=Ne,LATED r•TH R-11 BATT 7 ll/<2173*SES 0~t Med#6 ~~C~S•6~3k>4 RENOVATION PLAN ,£SULATOL 2. C.>It¥ .™ ALL *-LIC•,BLE Bltr»* COCeS .0 CO-ORM -TW ,·ter~,AL AKED = hEA A,41 2. AL.L. NErt KTmitOR riN.15 0 3. ALL I»e-Z»* TO ... g Pl*-6 ..206 )01-57 C~le-ee- CONMeRENCE ROOM. 01,1,106, 4 BATHROOM SNALL BE SOUND - 2,4 51'CO ~ALL •9 5/8- 6•(F. , Exerm,o• n•u.6 To 02 2- Ir 16· o.c Il.lie hcrm) c,r•e</lee. Mr-Mi To heULATED raTH R-11 BATT «> BP. EA. 9105 - FULL €16€ ST,fiCT-AL FL„-258 INWLATION ' MALLS. v To UICE€SOE OFF CaLINS ~T~~~ 2.4 A¥ 1. O.C. UIJEIA NOTmp cm•el/•ft *2= TO 5. ALL KE,416¥-P. BO. ri~LL . 2*6 STUD Via:.1. YV 5/8- 6-rP. SURFAC/3 SHALL BE 5/8. THK. d> 132. EA DZE - FUL +€16*T 6 CROP•,4 ALL Vn©6.-*DeTD *O> RAPT™L -JOSTS ,+O ~,-re~D L·P. V TO '©ERSCE OP CED•e 1. ~ .Aspeem P./el,/M......e .Den.....04 A2.1 4 PRM/UDE NEF~ ~45ULATihle GLAZR•G / ALL EXISTINe r,NI>O,6 B ,€,LIP ALL PU~'I·* ™.-6 *le,4 - PODdeLE. COO«P••LTE r€™ C.8*2- ~Cce- TO REMAIN. •. 112 - ee C. T,eee PR~P·,•5,6 6 C»c.I TO 6~,~C•LL¥ Ce--C- Tw! 624·e-~.*. *R! O- Twe re« Trwe CO-%) 6 -,Bea_/ PO• CO--M•.6 0-=* ' I.'U.=n. PABR,C•likS»•1 -k*men .O Tm-Maa o. #)8.I/%. T,e AR¢>,f-317 ANC>/O* 816*IER 0.4,U_ BE WOr/00· »ry VAR.1*Te; r- *kae»·,5 C. COOr,04 1/4//m .413€ D~Ar,·66 10. COW-·R~CTC, TO -OVO- -C•(IrmS- rf'™ 1-6*3-IC»e C~ ~~-~Ch'~2 eah/A-DC C» ' C.<P·r'R,6,rr T,Eopole K Ger ASSOCWTeS /0 x. *: d: 4~-: I 41.9 2 * . 4. I.- : : + .- --~~r..,* =- , i 'p- f.-= * I =7 4 ·3i;E!%~6;2*?M'T:--v F;--:1 ;1~:T:rr:.7i: .-i:·to:--:. .. ...·'1I~i£2I - :1-7 -4.:=13~·?t-T??FaTe'Et3?i:?RMI:FF-~·· :·:· ··· · -·-···c :····E-·f;·:93 f.y· 1:· : ·:·+ --- · ~~ "-"51ir3V-i-49-' ... THEODORE K GUY ASSOCIATES PC AR,C,MrmoTS Ne ' ' ' STRUCTURAL EMENENS 0 - C Li --FID. BOX 1,40 23280 Arff. 82 BAE>ALT. COLOI;KADD 51621 F44O€ (BOB) Cl-3161 FAX (303) C-1-4513 \ 09'ENTO 1 Bao)A l/ /74?li z mt z (MA>01·•U•·4 UVE .OAD • t>C) ref) 2,\0 I GOAT. LEPSER re 1 2-ded NALS El_ 321·-0 18 T.-12(70 FEISTUP -4 ----. -------------- ----- ---- ----- ---- ax- -2=---- -------- ------- ----- L 2,10 0 '8. CC - 2£06 521£652 ------- ------- EEL.OvT CONNOR - TAPPUNE - - - OFFICE REMODEL LULU 523 »EST MAIN STREET AE#PEN . COLORADO 11 1 Joe K. 44122 DRA-t EXP C+€61€P: PRINTED: 02>-31-44 2:~LIm,:i ATTIC LEVEL PLAN REMONA-DON PL»t 0 1/4'• 1'.0- A2.2 - co-.»,rr 1,eoc:>on K eurr,MOC,•TES Fc 0 0 *-- .. THEODORE K GUY ASSOCIATES FO *DHETS ED STRUCTURAL ENGNEERS 9 + 2250 My«. 82 SASALT COLORADO 81621 ¢ TO- ROSE PHO,E (303) 427-3161 1'81-101/•4- •/- FAX (303) Cj-452 = De, lie ROO-e TOBI 45«»U /O.C> I ..CED i TC- PLATE #, I MI~M EAVE 1 7 7•C.4·-51/4' r- -7« 1.:UNI, 7 '793-5 w.- - 1 - 1 11 1 ' 0,1.2/ 19.-DOR - ~ 1 FRO.'DE OF"'41;46 , <Al, I tlle·-3 3,3. i thi VIA-L FOR Nel A-*- , i i i | 1 L-----J 4 l- FLO, - 1912·€- .----- .----- -------1---1 © 1.C»€R FLOOR 1907-5 18 262 222£/5 - F 1 1 -un Err A l, 1 Ill 1 IN - ----------------- 11 1 11 111111 1 1 11, 11 1 1 ~ 1-0,€R FLOC»K 1 ' p :1;: 1 , ir»·14---a ------- ------------------· 1 \ 1 J U 1 11- 719=#5/m· ------- ·------------------ ------- . 11 1 ' CONNOR - TADOUNE 10- 1-3 _ OFFICE REMODEL . 323 F€ST MAIN STREET ASPDA , C.OLCBJOC> E><5TINe NORTH ELEVATION 0 1/4-= 1-7 EXISTING )NEST ELEVATION • VA"= 1'-0- -109 - 44122 PRAnt KCA/DRO C+EC•<EP: F'RINTED: 06-31-44 2~L.Imi EXETING EXTERJOR ELEVATORS A3.1 col•·fRe.rr Tieopot K Wr ASSOC,•Ins /C k· i... I ~"I--.-.'...~.1, r. ,...i , ... ...·3,r -,- .···9,-···..·.. .·... .. ~ -....·„. u.. u..... - ,>r••-mimr=Z"E!5F•'977:917•1·· i,t···.91:t.,~-c:·::·· · ~er,ritu~····:·-'·····:· ···'= -.--·.,~:·r-:·.. ·.:· · :tk-fi····..:-:.~k:St~W·:r:fallt¢:~9··01'1-9 1,fe·~:tw.mi,M:T#·,ti.qr. *1€:'X'!>.k.11•~: 2.3~R!9,£:66*-t=m· 2..2.. ..... · I...2-2.-... -==-7---p·:=--:,=c·:th·-•:··=··- ·;:~:~·4/KE?,62£2·..:.~:.:. :::...-4.4/0.2./Ai?..?:I<E€- r=:i,=2deC=Tl:€-E i-:fai ~.Ai.i z.:i.2-:..2--=.:=4-:==29·;JU~i#Smi~£/7&--m#-24-*~&77/7-8EETI'~~7~T .. .. THEODORE K GUY ASSOCIATES FS AMETS AMP 3 - 3 STRUCTURAL ENGNEERS 23280 H,rr. 82 SAE>ALT, COJ-OKAS© 01821 PHOIE (303) 927-516-1 r TOI-IC»E FAx ace> 42-1-4513 ,j¢32336- ~me,;iov4 -- DOST. re·CON TO BE 22?Jf2~kg~~ EXEST•·16 ROO,•46 -TO BE | "b'</VED I •=FOCED nALL -43,1 TO MA eXIT,le STDOOD - -- *i- 41 i -433%1*li- i / --~- *~S&Vy, 1-a=.= \ = %/*-51/4 4 - 1 1 T TOP PLATE P • LCIN EAVE -1 ,-------I ............... ===...=== r-----' 7100-91/4- .- 6--ROMR/NE. 1 F*.2/015 OPIE-* 1 1 ---1=5== I kNAOON TO BEE REMC•/ED :4 i:ru=„2 -04 6 -PER M.OCR 1 AND *4r91.LID FV STUD /'YAL.L , -- 1 DOO.. 1-LL 'REA _·-- ' , A V **•ml STUP t---- -1 TO 56- A./.r. FINg/TO 71•».sla~ --------M-- - IMATCHEISH,46 SOWS 1..n'T~$TTIO& 1 ' i.---- J - 1 -g AL 4 - FLCX= 1¢112·-1 1 1.-=T 1 S~-M- COOLER TO 1BE REMOVED ."L M.19•·1 TO 110 ~ L.CY•Et MLOCK 7 -'qc"-51/r· Fli 1-2222- m##r 28/5 S=12£52 T 0/ LL i ~ 7F 7 0 .0,.E*o, - --1---- 4- 1 -09-0 3.- 1 1 \ - 0------ .----------- ----- 9==: I gul 1, - - , . I U nOCD PeCK , ' - I . 1 ' .-----I----------- MOSE 1 1 - SLLC.OC.K , ~ .6. ... - CONNOR-TAPPUNE ,k T, 0- el•e , --1 OFFICE REMODEL 1 -044-4 1/4~ 1 923 FEST MAIN STREET EXISTING SOUTH ELEVATION ~ AePDA , C.OLOR.ADO - EXISTING EAST ELEVATION • VA-= 1'-C· • 1/4·.1-0 ass • 4418 PR,2,+2 O··ECKED: FRINTEC>: 06-3144 it:25(2011/4 EXISTING EXTERIOR ELEVATIONS AS.2 c,op,» Er T,eocpoRE K eur,esoc,~Tes FC r•_. ... THEODORE K eU¥ ASSOCIATES PC, *wmETS NO 9 + FLO. BOX 1640 2280 +err. 52 BASALT CO.-0!020 61621 TOM RD®E F'HONE (303) C't-alt>-7 -•558=:Sbl ~ ~.~,BU 1/4· •/- FAx (302) £[27-4/13 1-06 -C- 1-ROA EAVE | \ *2N:2:ZAti L - i TCP F'LATE 4 0 -SH EAVE V -7924·-5 1/4 79 *- 4~ r*C~ REPLACE ENSI·*46 61.Alfhe , TOP• 4ATE 0• 1-0,7 EAvr 1922-5 1/4· - \ 1 N. ~ L.-ER FLCXX 1 / 26&-r'R»·€~--~~~0 7 1916·-5 5/2- 17=7em 1 F - TO1~~~~~~~ ~ 2 U'./9 n-OC:•K C===2, 1 -Milo'-1 0 - :~ L.42 eLAZINS r.1/ 0(2844 .-=.=:======== "OC»N ®LAZ]h,6 1 ~ 10/'eR PUX,t 7 74'Te ve- 2£m RZMARKS 2:1[ /1==4 ----- .I -------- ------ 1 11 1 lili I 1 1! 1 11 111111 M 1 1 H 1 4 11 111 Hhcl 11 1~1 111 8 !1 - - 1 1 10·e• = A lilli 1 11 1 114 1 ------- L V ..0-0 s.. 14 1 3-- / dy - i- 7 19=-2 5/5 ------- -----I----------- ~ TOP OF SLAB CONNOR - TAPIPUNE OFFICE REMODEL 7 1844-41/4 1 1 1 923 YEST MAN STKEET AePESk, C.OUINDO NORTH ELEVATION FNEST ELEVATION e 1/4=1'47 el/4- = 1'-Cr JOS *s 44122 IP<,4,- kkA/ORD C+ECJ<Erk PRINTED: 08-81-44 2~I./0114 EXTERIOR ELEVATIONS AB.3 corrR» ,·r =2 K.r¥,aSOC,•dES PO ... THEODORE K GUY ASSOCIATES PO ,•RC+4rrECTS MAD STRUGWRAL ENGINEERS FLO. BOX 1640 3- 23,10 HEACEW O•NO BASALT, COLCAUDO 81621 ME:-p VER.Irr Des·r»*s 1 23280 -tr. 52 PHO,E (305) el-516-1 FAX (3232 cul-4513 ~A *To= 1001'-101/4' •/- -~492 - .-cae:k f TO D·-<7 FiRC>-1 EAVI z ™9k .. ' 7~2-LFIE TS 3%3/3/e> x /€1-5355 e•K/C.•crT 1.-11 1 =Unf- L ...ff X t> f'C-). BOLT TO COLL...V > 5/4- O BO...5. rro. 1 TOP' PLATE 1 x 3/12>- /€1.-PED B/R | FULL 61-ASSI BAT TO WAVE I ¢ * 1/4- r,De•I~ 6RAnhe /e l l i/2 x 11/2- 0,4 »ecx Cr COUMN) I r·54 90. r•R.»·E . Ine>,€1-:XP SJPPORT 8 • LON EAVE ./hc'Ch A)*Lrs r'er'P) F.....=. ,-I 1,499#ErA. 11 ,, , .A :>oc, rv ' %M/&*$-< 1---- 1 Up. M,oc~ i ' L-- E,r···-Ime . ' \. 7 ---»·-e Bm· 1412-1· ~fitt~ Ic - =I=Il= dp/.leR FLOOR .IC|11 ,~~ ~' i / . 11 / T 12*10.8, STRJhee< I 1 oel.,00. E - O TYPICAL) FULL PE)41,k 4-22)+ Mk•-UM) Ir•,1. CCNI. I !3EhO 1 1 21 MNII' 0:5'7 &@1*£47 t~ -- 131<24452, 26= Sm:MEE: 1 19CT--5 le- | VV 1/2·>b,b B. /L , aor. s...O/,s./ ------ - -I----- ------ 44*"**rm/ 1 78 4/as-ne ca_ 47* (Dat -[CP I &66~ El e l-1-; .-=Ill,= -=.==I re -2./7 0 · /55 CLP EA SCE EPOIX »40* \E ft 1-0'ER /1-//M 1»0/--1 9,175 0 ./FUALJ · - ------- -I--------1---- -M,<35.0 5/y 0,5 &. i .r' A 1 1, I ~ -t-- · -' LJ f 1 7~1-2 - 1 4- 1 -- •- C.OICL,<R i Ll L 1...1. 1 .., I . 1 1 1 - CONNOR - TAPIPUNE i ~ TOP OF el,a ' 7 1894-4 W. ------...I--- OFFICE REMODEL PROPOSED SOUTH ELEVATION jeent C.OLOAADO PROPOSED EAST ELEVATION 0 1/4"= 1-C 323 FEST MAIN STREET 0 1/42 1'-0 NOTE: hen EXTROI ///TAL ST////Ii- S~IAL.1 BE Joe I 94122 5-6- rEJE r,Tw T RISERS A,011- -rWEAP CEPTM. TCP OF WAICORAL -ALL BE 30>' IPIKA)*t -1/DRS) ABOVE TREAC }*09·16. TO- C' 60-LOK,•L Al IALIVIAY SWALL BE 47 bee/E rvt,crwr C+ECKED: t.,SCE »*06'PU' AND VE,KniA-,0515 OF W.*CRAL »C) a<JARCXAL t»(Al BE CeeTRUOTEP O= 1 1/7 96•M. *TE€1 //E FRA:k 06-31-44 MUTH 4- X 4 /fl.IXE> STEEL_ HESH 8/Il•€54. 2/)25[1021/b EXTERIOR ELEVATIONS AS.4 c.orr,»,rr 1·)€000*7 K 611 ASSOCLATES /0 .. .*.-. - -I' ~C ~C~~~~ ~ .~~~~~'~T'j ;~t '7' U..i:;.mt::,·;.:;A;:UN~:9~Bi<·19· =·~:. d,~2.:4*ii .i!;12243-~ Zi'< -GR.r.~ :i:: ~:i:·.23·L.. i=i:jii-irrill-'-~0*HZ:P.:i;:R·:*212 - 3=N;12,?ti*24,~i;PE®%Eir,LTEINT&:2.JiTI/5-=&32%*1~JQ39& . THEODORE K GUY ASSOCIATES PC AROCECTS NAD STRUCTURAL ENGINEERS ¢ Tcp RE»E 701-)O1/4* •/- FLO. BOX 1640 - 23280 Vrlf. 52 XXX X X f - BABALT, COLO~ADO 51621 P,©KE (32) el-316-1 FAX (303) €-,-4513 i TO~ PLATE 0., • ••ew EAVE 0 -1104-51/4- - . _ ~ T, Pt-•fIC. ~, i TOP PLATE + 0 LC/1 EAVE 1'¤21-O1/e 7 1©Xy-9 1/4 -1 ZE:ZE' 7====. i 29 8 0000 T :101'EXJ./222 : 1 -7416·-5 M>· I - ' BNEZE:h= SECRETA•45 111 '' 2 00 00 L' 1 . 1 4 -R12-1 01 1 1 l illi,1 1 1 1 1 1 1 1 1 1 1.1 1 1 lilli SI&!B -1 ~ Lt//EX FLOP _ l ,ACT--5 1/3- 1 ~1111'111111111111111111 1 1.c»'ER Fl.DfA ' 1. 2£= S218652 7 19=-2 58 --1---- - 1- 1- -1 1 ~ ------- --0---- .----------------- ----- ------1 k ICP Or 9.18 12.::.3 ------- .----0-I---------- CONNOR-TADOUNE OFFICE REMODEL 523 YEST MAIN Sl~REET - BUILDING SECTION A BUILDING SECTION B O 1/4'• 1 -O AeF'EM, COLOR.~DO / 1/4-: 1-2 22 n. 44122 PRAP"# PNO C+FECLKED: FRINTEZ> 8/31/94 2~L.Im.Ci BUILDING SECTIONS A4.1 Te£*PORE K *trr •esoc·641!s re .. Historic Preservation Committee Minutes of September 13, 1994 Opposed - Martha and Tom In favor - Joe, Jake, Don, Roger Les and Donnelley offered to be the monitors. 323 W. MAIN STREET - ASPEN MEDICAL CENTER - MINOR DEVELOPMENT Amy: This is an existing non-historic building in the Main Street Historic District. They are proposing a new window on the west side and build an exterior staircase on the east side of the building. We did have some discussions a few months ago about requiring that new construction always incorporate fire exits and things like that into their original design but this is an existing building and I am recommending approval as submitted. MOTION: Roger made the motion that HPC approve the application submitted for 323 W. Main Street, Aspen Medical Center; second by Tom. All in favor, motion carries. Tom will be monitor. 610 W. HALLAM STREET - IGLEHART - LANDMARK DESIGNATION Chairman Joe Krabacher opened the public hearing. Public hearing closed. MOTION: Roger made the motion that HPC recommend landmark designation of lots P and Q less 7.5' of Lot P, Block 22, City and Townsite of Aspen finding that standards B (architectural importance) , E (neighborhood character) and F (community character) are met; second by Tom. All in favor, motion carries. ROUND II - INVENTORY OF HISTORIC SITE & STRUCTURES Amy: Every five years the HPC is required to re-evaluate our inventory of historic sites and structures. The process was done in 1991 and consultants were hired and they did a survey of the entire town, photographed ad documented and made recommendations to either add additional resources or delete ones that are on the list now. The inventory has been in place since 1980 and reviewed in 1986 and 1991. At the last hearing their were errors in the public notices and the entire project could not be finished before Roxanne Eflin left. I am ready to finish it. Before us tonight we have approximately 30 resources. I am recommending approval except for those under evaluation that need to be discussed. 12 ·