Loading...
HomeMy WebLinkAboutLand Use Case.210 W Main St.0004.2017.AHPC 300 SO SPRING ST | 202 | ASPEN, CO 81611 970.925.2855 | BENDONADAMS.COM February 15, 2017 Ms. Amy Simon Historic Preservation Officer City of Aspen 130 So. Galena St. Aspen, Colorado 81611 RE: 210 West Main Street Conceptual Application Ms. Simon: Please accept this request to redevelop the property located at 210 West Main Street (Lots P & Q, Block 51, Parcel ID 2735-124-40-009). The 6,000 square foot site is located in the Mixed Use Zone District/Main Street Historic District. The property is not an historic resource. Exemption from Moratorium: The proposal is exempt from the current moratorium on new development applications. Section 3 of Ordinance 7, Series of 2016 states: “The following land use applications shall be exempt from this temporary moratorium…2. Any land use application seeking a Development Order for a project consisting of 100% Affordable Housing as that term is defined at Section 26.104.100 of the Aspen Municipal Code.” This application is submitted pursuant to the Land Use Code is place at the time of land use application submittal. Existing Conditions: The property was originally developed with eight studio apartments and is currently developed with 7 studio apartments and 1 live/work space. The main building houses six studios, all free- market, averaging just under 400 sq. ft. apiece. The alley building houses Suzanne’s Haircutting in apartment 7, a 435 sq. ft. space, and a Category 1 rental unit in apartment 8, which is 260 sq. ft. The site has six legal parking spaces, along the alleyway, two short of the current requirement. An existing curb cut along Main Street provides access to the property in addition to alley access. 210 West Main Street Conceptual HPC Review 300 SO SPRING ST | 202 | ASPEN, CO 81611 970.925.2855 | BENDONADAMS.COM Table 1: Existing units Unit Bedrooms Total Net livable Area Minimum Size Requirement 1 studio 343 500 2 studio 453.5 500 3 1 460.8 500 4 1 399.9 500 5 studio 369.9 500 6 studio 362.5 500 7 studio 435.1 500 8 studio 260.2 500 TOTAL 8 3084.9 Previous Approvals: The Planning and Zoning Commission, via Resolution 39-1995, approved apartment 7 to function as a “mixed commercial/residential use.” The staff report described the use as a live/work space – “The unit will remain a residential unit as the salon will operate only during business hours.” As noted above, apartment 8 was required mitigation for the live/work unit. The deed restriction (Reception #386545) for apartment 8 was a condition of the change-in-use approval. Exhibit 14 includes meeting minutes from the Planning and Zoning Commission meeting in 1995. As highlighted in the meeting minutes: “Ted Guy, the applicant, stated, we agree with the conditions and restrictions outlined in the memorandum. The deed restriction that has been presented to us by the Housing Authority does allow us, if we terminate the commercial use of this Unit #7, to apply to the Housing Authority to remove the deed restriction on Unit #8, since it is no longer required. So, we have no problem with staff’s recommendations.” Removal of the live/work space and in turn, the deed restriction on apartment 8, is proposed. In addition, a Land Use Code Interpretation was rendered by the City in January of 2015, which ties use and the mitigation together within a project: effectively, if the use is removed, then the mitigation is no longer required. The Interpretation is included as Exhibit 13 for easy reference. Proposal: The application proposes redevelopment of the site as 100% affordable housing, eight two- bedroom apartments, in exchange for Certificates of Affordable Housing Credit. Removal of the live/work space and lifting the Category designation of apartment 8 is proposed, thereby returning all eight units to free-market status prior to redevelopment. A three story building with surface parking along the alley is proposed to contain eight two-bedroom units. Open space is proposed through an internal courtyard and required setbacks. As a residential project, the public amenity requirement is not applicable. Category 3 rental units are proposed with the ability to convert to “for sale” units in the future. Units are proposed as shown below: 210 West Main Street Conceptual HPC Review 300 SO SPRING ST | 202 | ASPEN, CO 81611 970.925.2855 | BENDONADAMS.COM Table 2 : Proposed unit sizes and configurations Unit Bedrooms Unit Net livable Assigned Storage Outside Unit Total Net livable Area (including storage) Minimum Size Requirement FTEs 101 2 846.1 80 926.1 900 2.25 102 2 868.9 80 948.9 900 2.25 201 2 839.3 80.5 919.8 900 2.25 202 2 848.8 80.5 929.3 900 2.25 203 2 868.9 80.1 949 900 2.25 301 2 868.9 80.9 949.8 900 2.25 302 2 848.8 81 929.8 900 2.25 303 2 839.3 81 920.3 900 2.25 TOTALS 16 7,473 18 The proposed building reuses existing material from the current building. A trombe wall solar collecting system is proposed for the front façade. This is an active system where the glass protects the pipes and increases heat gain. A heat exchanger and storage tanks are used to preheat returning water for heat and domestic hot water. Horizontal lap siding is proposed, which is consistent with the primarily wood 19th century landmarks within the Historic District. Pursuant to Land Use Code Section 26.515.030 Required number of off-street parking spaces, an existing deficit of parking may be maintained when a property is redeveloped. The existing deficit of two parking spaces is proposed to be maintained in the redevelopment. Six surface parking spaces are proposed. The side streets have ample parking, as demonstrated with the current condition. Required trash area for multi-family residential of less than 10 units is 12 ft. wide by 10 ft. deep by 10 ft. high or 120 sq. ft. in size. The proposed trash area, accessed off the alley is 14 ft. 7 in. by 7 ft. 8.5 in. by 8.5 ft. for a total of 112 sq. ft. We look forward to discussing the alternate dimensions with Environmental Health as part of the review process. Due to location within the Historic District, this project is reviewed by the Historic Preservation Commission for demolition approval, and for compatibility with surrounding landmarks and consistency with the purpose and intent of the Historic Preservation program. A 3-D rendering will be provided to Planning Staff prior to the public hearing. This application requests the following reviews of the Historic Preservation Commission: • Conceptual Major Development Review (Exhibit 1) • Demolition for properties within the Main Street Historic District (Exhibit 1) • Residential Design Standard Review (Exhibit 2) • Special Review for 1.25:1 FAR (Exhibit 3) 210 West Main Street Conceptual HPC Review 300 SO SPRING ST | 202 | ASPEN, CO 81611 970.925.2855 | BENDONADAMS.COM We look forward to discussing this project with you and with the Historic Preservation Commission as we feel that it is a great addition to the Main Street Historic District, ensures that the property remains multi- family housing, and provides affordable housing units within walking distance to downtown. Please contact me with any questions or concerns: 925-2855 or chris@bendonadams.com. Kind Regards, Chris Bendon, AICP Principal BendonAdams, LLC Attachments: 1 –Major Development Conceptual Review and Demolition 2 – Residential Design Standards – Multi-family Buildings 3 – Special Review 4 – TIA 5 - Pre-Application conference summary 6 - Vicinity Map 7 – Land Use Application and Dimensional Requirements Form 8 – Authorization to represent 9 – Disclosure of ownership 10 – Agreement to pay form 11 – HOA compliance form 12 – list of owners within 300 ft. 13 – City of Aspen Land Use Code Interpretation dated January 30, 2015 14 – Planning and Zoning Resolution 39, Series of 1995 and meeting minutes 15 - Context photographs 16 - Drawings, survey, rendering to be produced prior to public hearing Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 1 of 15 Exhibit 1 HPC Major Development Conceptual Review Demolition 26.415.060.B.2 The City of Aspen Historic Preservation Design Guidelines, as amended, which are on file with the Community Development Department, will be used in the review of requests of certificates of no negative effect or certificates of appropriateness. Conformance with the applicable guidelines and the common development review procedures set forth in Chapter 26.304 will be necessary for the approval of any proposed work: Please find an analysis of the Main Street Historic District Design Guidelines and Objectives. The project conforms with the Historic Preservation Design Guidelines including Chapters 1 & 12. Chapter 1 – Site Planning and Landscape Design: 1.1 All projects shall respect the historic development pattern or context of the block, neighborhood or district. • Building footprint and location should reinforce the traditional patterns of the neighborhood. • Allow for some porosity on a site. In a residential project, setback to setback development is typically uncharacteristic of the historic context. Do not design a project which leaves no useful open space visible from the street. The building and circulation tower are oriented to parallel to Main Street. The building is L-shaped to allow porosity and open space on the site for residents, while defining a street edge that reinforces the pattern of development in the Historic District. 1.2 Preserve the system and character of historic streets, alleys, and ditches. When HPC input is requested, the following bullet points may be applicable. • Retain and preserve the variety and character found in historic alleys, including retaining historic ancillary buildings or constructing new ones. • Retain and preserve the simple character of historic ditches. Do not plant flowers or add landscape. • Abandoning or re-routing a street in a historic area is generally discouraged. • Consider the value of unpaved alleys in residential areas. • Opening a platted right of way which was abandoned or never graded may be encouraged on a case by case basis. Not applicable. 1.3 Remove driveways or parking areas accessed directly from the street if they were not part of the original development of the site. • Do not introduce new curb cuts on streets. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 2 of 15 • Non-historic driveways accessed from the street should be removed if they can be relocated to the alley. Not applicable. 1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual impact. • If an alley exists at the site, the new driveway must be located off it. • Tracks, gravel, light grey concrete with minimal seams, or similar materials are appropriate for driveways on Aspen Victorian properties. Not applicable. 1.5 Maintain the historic hierarchy of spaces. • Reflect the established progression of public to private spaces from the public sidewalk to a semi- public walkway, to a semi private entry feature, to private spaces. A walkway is provided from Main Street sidewalk to the project. 1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential projects. • Meandering walkways are not allowed, except where it is needed to avoid a tree or is typical of the period of significance. • Use paving materials that are similar to those used historically for the building style and install them in the manner that they would have been used historically. For example on an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light grey concrete, brick or red sandstone are appropriate private walkway materials for most landmarks. • The width of a new entry sidewalk should generally be three feet or less for residential properties. A wider sidewalk may be appropriate for an AspenModern property. A perpendicular walkway is provided from the Main Street sidewalk to the project. 1.7 Provide positive open space within a project site. • Ensure that open space on site is meaningful and consolidated into a few large spaces rather than many small unusable areas. • Open space should be designed to support and complement the historic building. Open space is provided within the project site, behind the circulation tower. 1.8 Consider stormwater quality needs early in the design process. • When included in the initial planning for a project, stormwater quality facilities can be better integrated into the proposal. All landscape plans presented for HPC review must include at least Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 3 of 15 a preliminary representation of the stormwater design. A more detailed design must be reviewed and approved by Planning and Engineering prior to building permit submittal. • Site designs and stormwater management should provide positive drainage away from the historic landmark, preserve the use of natural drainage and treatment systems of the site, reduce the generation of additional stormwater runoff, and increase infiltration into the ground. Stormwater facilities and conveyances located in front of a landmark should have minimal visual impact when viewed from the public right of way. • Refer to City Engineering for additional guidance and requirements. The project shall comply with City Engineering stormwater requirements. At a conceptual level, onsite drywells are proposed to handle drainage. 1.9 Landscape development on AspenModern landmarks shall be addressed on a case by case basis. Not applicable. 1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere with or block views of historic structures are inappropriate. • Site furnishings that are added to the historic property should not be intrusive or degrade the integrity of the neighborhood patterns, site, or existing historic landscape. • Consolidating and screening these elements is preferred. Not applicable. 1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees and shrubs. • Retaining historic planting beds and landscape features is encouraged. • Protect historically significant vegetation during construction to avoid damage. Removal of damaged, aged, or diseased trees must be approved by the Parks Department. • If a significant tree must be removed, replace it with the same or similar species in coordination with the Parks Department. • The removal of non-historic planting schemes is encouraged. • Consider restoring the original landscape if information is available, including original plant materials. Not applicable. 1.12 Provide an appropriate context for historic structures. See diagram. • Simplicity and restraint are required. Do not overplant a site, or install a landscape which is overtextured or overly complex in relationship to the historic resource, particularly in Zone A. In Zone A, new planting shall be species that were used historically or species of similar attributes. • In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in height, sod, and low shrubs are often appropriate. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 4 of 15 • Contemporary planting, walls and other features are not appropriate in Zone A. A more contemporary landscape may surround new development or be located in the rear of the property, in Zone C. • Do not cover areas which were historically unpaved with hard surfaces, except for a limited patio where appropriate. • Where residential structures are being adapted to commercial use, proposals to alter the landscape will be considered on a case-by-case basis. The residential nature of the building must be honored. • In the case of a historic landmark lot split, careful consideration should be given so as not to over plant either property, or remove all evidence of the landscape characteristics from before the property was divided. • Contemporary landscapes that highlight an AspenModern architectural style are encouraged. Not applicable. 1.13 Additions of plant material to the landscape that could interfere with or block views of historic structures are inappropriate. • Low plantings and ground covers are preferred. • Do not place trees, shrubs, or hedgerows in locations that will obscure, damage, or block significant architectural features or views to the building. Hedgerows are not allowed as fences. • Consider mature canopy size when planting new trees adjacent to historic resources. Planting trees too close to a landmark may result in building deteriorate or blocked views and is inappropriate. • Climbing vines can damage historic structures and are not allowed. Not applicable. 1.14 Minimize the visual impacts of landscape lighting. • Landscape and pathway lighting is not permitted in Zone A (refer to diagram) on Aspen Victorian properties unless an exception is approved by HPC based on safety considerations. • Landscape, driveway, and pathway lighting on AspenModern properties is addressed on a case- by-case basis. • Landscape light fixtures should be carefully selected so that they are compatible with the building, yet recognizable as a product of their own time. • Driveway lighting is not permitted on Aspen Victorian properties. • Landscape uplighting is not allowed. Landscape lighting will be addressed during Final Design Review. 1.15 Preserve original fences. • Fences which are considered part of the historic significance of a site should not be moved, removed, or inappropriately altered. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 5 of 15 • Replace only those portions of a historic fence that are deteriorated beyond repair. • Replacement elements must match the existing. Not applicable. 1.16 When possible, replicate a missing historic fence based on photographic evidence. Not applicable. 1.17 No fence in the front yard is often the most appropriate solution. Reserve fences for back yards and behind street facing façades, as the best way to preserve the character of a property. Not applicable. 1.18 When building an entirely new fence, use materials that are appropriate to the building type and style. • The new fence should use materials that were used on similar properties during the period of significance. • A wood fence is the appropriate solution in most locations. • Ornate fences, including wrought iron, may create a false history are not appropriate for Aspen Victorian landmarks unless there is evidence that a decorative fence historically existed on the site. • A modest wire fence was common locally in the early 1900s and is appropriate for Aspen Victorian properties. This fence type has many desirable characteristics including transparency, a low height, and a simple design. When this material is used, posts should be simply detailed and not oversized. Not applicable. 1.19 A new fence should have a transparent quality, allowing views into the yard from the street. • A fence that defines a front yard must be low in height and transparent in nature. • For a picket fence, spacing between the pickets must be a minimum of 1/2 the width of the picket. • For Post-WWII properties where a more solid type of fence may be historically appropriate, proposals will be reviewed on a case-by-case basis. • Fence columns or piers should be proportional to the fence segment. Not applicable. 1.20 Any fence taller than 42” should be designed so that it avoids blocking public views of important features of a designated building. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 6 of 15 • A privacy fence should incorporate transparent elements to minimize the possible visual impacts. Consider staggering the fence boards on either side of the fence rail. This will give the appearance of a solid plank fence when seen head on. Also consider using lattice, or other transparent detailing on the upper portions of the fence. • A privacy fence should allow the building corners and any important architectural features that are visible from the street to continue to be viewed. • All hedgerows (trees, shrub bushes, etc.) are prohibited in Zones A and B. Not applicable. 1.21 Preserve original retaining walls • Replace only those portions that are deteriorated beyond repair. Any replacement materials should match the original in color, texture, size and finish. • Painting or covering a historic masonry retaining wall or covering is not allowed. • Increasing the height of a retaining wall is inappropriate. Not applicable. 1.22 When a new retaining wall is necessary, its height and visibility should be minimized. • All wall materials, including veneer and mortar, will be reviewed on a case by case basis and should be compatible with the palette used on the historic structure. Not applicable. 1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will be reviewed on a case by case basis. Not applicable. 1.24 Preserve historically significant landscapes with few or no alterations. • An analysis of the historic landscape and an assessment of the current condition of the landscape should be done before the beginning of any project. • The key features of the historic landscape and its overall design intent must be preserved. Not applicable. 1.25 New development on these sites should respect the historic design of the landscape and its built features. • Do not add features that damage the integrity of the historic landscape. • Maintain the existing pattern of setbacks and siting of structures. • Maintain the historic relationship of the built landscape to natural features on the site. • All additions to these landscapes must be clearly identifiable as recent work. • New artwork must be subordinate to the designed landscape in terms of placement, height, material, and overall appearance. Place new art away from significant landscape features. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 7 of 15 • Avoid installing utility trenches in cultural landscapes if possible. Not applicable. 1.26 Preserve the historic circulation system. • Minimize the impact of new vehicular circulation. • Minimize the visual impact of new parking. • Maintain the separation of pedestrian and vehicle which occurred historically. Parking is proposed along the alley 1.27 Preserve and maintain significant landscaping on site. • Protect established vegetation during any construction. • If any tree or shrub needs to be removed, replace it with the same or similar species. • New planting should be of a species used historically or a similar species. • Maintain and preserve any gardens and/or ornamental planting on the site. • Maintain and preserve any historic landscape elements. Not applicable. Chapter 12 – Accessibility, Architectural Lighting, Mechanical Equipment, Service Areas, & Signage 12.1 Address accessibility compliance requirements while preserving character defining features of historic buildings and districts. • All new construction must comply completely with the International Building Code (IBC) for accessibility. Special provisions for historic buildings exist in the law that allow some flexibility when designing solutions which meet accessibility standards. The proposed new building intends to meet all IBC requirements for accessibility. 12.2 Original light fixtures must be maintained. When there is evidence as to the appearance of original fixtures that are no longer present, a replication is appropriate. The existing building is not a designated landmark and is proposed to be demolished. 12.3 Exterior light fixtures should be simple in character. • The design of a new fixture should be appropriate in form, finish, and scale with the structure. • New fixtures should not reflect a different period of history than that of the affected building, or be associated with a different architectural style. • Lighting should be placed in a manner that is consistent with the period of the building, and should not provide a level of illumination that is out of character. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 8 of 15 • One light adjacent to each entry is appropriate on an Aspen Victorian residential structure. A recessed fixture, surface mounted light, pendant or sconce will be considered if suited to the building type or style. • On commercial structures and AspenModern properties, recessed lights and concealed lights are often most appropriate. Light fixtures, cut sheets and a more refined lighting plan will be included in the final design application for Final Review. 12.4 Minimize the visual impacts of utilitarian areas, such as mechanical equipment and trash storage. • Place mechanical equipment on the ground where it can be screened. • Mechanical equipment may only be mounted on a building on an alley façade. • Rooftop mechanical equipment or vents must be grouped together to minimize their visual impact. Where rooftop units are visible, it may be appropriate to provide screening with materials that are compatible with those of the building itself. Use the smallest, low profile units available for the purpose. • Window air conditioning units are not allowed. • Minimize the visual impacts of utility connections and service boxes. Group them in a discrete location. Use pedestals when possible, rather than mounting on a historic building. • Paint mechanical equipment in a neutral color to minimize their appearance by blending with their backgrounds • In general, mechanical equipment should be vented through the roof, rather than a wall, in a manner that has the least visual impact possible. • Avoid surface mounted conduit on historic structures. Mechanical equipment is generally located in the basement. 12.5 Awnings must be functional. • An awning must project at least 3 feet, and not more than 5 feet from the building façade. • An awning may only be installed at a door or window and must fit within the limits of the door or window opening. • Awnings are inappropriate on AspenModern properties unless historic evidence shows otherwise. Awnings are not proposed at this time. 12.6 Signs should not obscure or damage historic building fabric. • Where possible, install a free standing sign that is appropriate in height and width. Consolidate signage for multiple businesses. • Mount signs so that the attachment point can be easily repaired when the sign is replaced. Do not mount signage directly into historic masonry. • Blade signs or hanging signs are generally preferred to wall mounted signs because the number of attachment points may be less. • Signs should be constructed of wood or metal. • Pictographic signs are encouraged because they add visual interest to the street. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 9 of 15 12.7 Sign lighting must be subtle and concealed. • Pin mounted letters with halo lighting will not be approved on Aspen Victorian buildings. • The size of a fixture used to light a sign must be minimized. The light must be directed towards the sign. If possible, integrate the lights into the sign bracket. 12.8 Locate signs to be subordinate to the building design. • Signs should be located on the first floor of buildings, primarily. • Signs should not obscure historic building details. 12.9 Preserve historic signs. As a residential building, signage is not proposed. Main Street Historic District Guidelines - Conceptual Street & Alley Systems: 7.1 Preserve the historic district’s street plan. 7.2 Maintain the traditional character and function of an alley where it exists. The proposed building is perpendicular to Main Street which is consistent with historic development patterns. Parking: 7.3 Parking shall not be positioned between the building and the street. Visual impacts shal be mnimized in one or more of the following ways: • Parking shall be placed undergoround or in a structure wherever possible. • Where surgace parking must be provided, it shall be located to the rear of the interior of the property, hebind the structure. • Surface parking shall be externally buffered with landscpaing and internally planted and landscpaed to soften parkign areas. 7.4 Underground parking access shall nto have a negative impact on the characer of the street. Underground parking access shall be: • Located on a secondary street where feasible – except where alley access is feasible. • Deisgned with the same attention to detail and materials as the primary building façade. • Integrated into tehbuilding design. Surface parking is proposed off the alley. Building Placement: 7.5 Respect historic settlement patterns. • Site a new building in a way similar to historic buildings in the area. This includes consideration fo building setbacks, entry orientation and open space. 7.6 Where a sidewalk exists, maintain its historic material and position. • Historically sidewalks were detached from the curb, and separated by a planting strip. 7.7 Minimize the use of curb cuts along the street. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 10 of 15 • Provide auto access along an alley wherever possible. • New curb cuts are not permitted. • Whenever possible, remove an existing curb cut. The proposed building complies with the required setbacks within the Main Street Historic District. Curb cuts are not proposed. The existing Main Street curb cut, shown at right, will be abandoned. Site: 7.8 Provide a walk to the primary building entry, perpendicular from the public sidewalk. A sidewalk from Main Street is proposed to access the project. Orientation: 7.9 Orient a new building in a manner that is similar to the orientation of buildings during the mining era, with the primary entrance facing the street. • The building should be oriented parallel to the lot lines, maintaining the traditional grid pattern of the block. • A structure or each street facing unit in the case of a multi-family structure, should have a primary entrance that faces the street. The entrance ot the structure should be at an appropriate residential scale and visible from the street. The building is oriented parallel to lots lines. The units are accessed from a ground-level courtyard. Building Alignment: 7.10 When cosntructing a new building, locate it to fit within the range of yard dimensions seen in the block historically during the mining era. The proposed building meets the 10 ft. setback requirement for Main Street, which repeats the pattern of setbacks within the Historic District. Secondary Structures: 7.11 Locate a new secondary structure in a manner that is similar to those seen historically in the district. • Secondary structures should be placed along the alley edge. Not applicable. Building Height, Mass & Scale 7.12 A new structure should step down in scale where it abuts a single story historic structure. Not applicable. A single story historic structure is not adjacent to this property as shown in Figure 2. Figure 1: Current curb cut along Main Street. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 11 of 15 7.13 A new building or addition should reflect the range and variation in building height of the Main Street Historic District. • Refer to the zone district regulations to determine the maximum height limit on the subject property. • A minimum second story floor to ceiling height of 9 ft. should be used in a method that is respectful to historic buildings. • Additional height, as permitted in the zone district, may be added for one or more of the following reasons: - The primary function of the building is civic. (i.e. the building is a Museum, Performance Hall, Fire Station, etc.) - Some portion of the property is affected by a height restriction due to its proximity to a historic resource, or location within a View Plane, therefore relief in another area may be appropriate. - To benefit the livability of Affordable Housing units. - To make a demonstrable (to be verified by the Building Department) contribution To the building's overall energy efficiency, for instance by providing improved daylighting. A three story 100% affordable housing building is proposed. 8 ft. floor to ceiling heights are proposed for all units. The proposed building is 32 ft. The Commercial Design Standards allow an increase in height from 28 ft. to 32 ft. As noted above, height up to 32 ft. may be added based on specific review criteria. The ability to increase to 32 ft. benefits the livability of the affordable housing units by allowing taller floor to ceiling heights within the units. Existing heights within the block, based on the City’s SketchUp model, are shown in the graphic below: (from west to east) Innsbruck 27.5 ft; office building 21.75 ft; current 210 Main building 23.75 ft., Tyrolean Lodge 27.25 ft. Figure 2: Proposed street elevation. Subject property is indicated with arrow. Figure 3: Streetscape with building heights. Note: larger image is included in the drawing set. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 12 of 15 7.14 Design a new building to appear similar in scale to those in the district during the mining era. • Generally, a new building should be one to two stories in height. A three story building with a flat roof is proposed to accommodate 8 affordable housing units. The surrounding context of large two story buildings supports a three story building in this location. See streetscape in Figures 2 and 3 above. 7.15 On larger structures, subdivide the mass into smaller “modules” that are similar in size to single family residences or Victorian era buildings seen traditionally on Main Street. • Other subordinate modules may be attached to the primary building form. In order to accommodate 8 affordable housing units and to provide some open space on the site, the project is three stories. The circulation is separate from the building into a separate tower which breaks up the mass on the site and provides surface area for the proposed trombe wall passive solar collector. The proposed separate veritical modules are connected with an outdoor walkway, similar to the massing of the adjacent Tyrolean Lodge, an AspenModern property. Building Height, Mass and Scale: 7.13 A new building or addition should reflect the range and variation in building height of the Main Street Historic District. The proposed building reflects the range of heights and variation within the block along Main Street. The buildings within the blockface are all two stories in height. A range of building modules are found as shown below. The proposed building fits within the context of the neighboring buildings. Figure 4: Analysis of building modules Annabelle Inn Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 13 of 15 Figures 5 & 6: Analysis of building modules. Top: adjacent building. Bottom: Tyrolean Lodge adjacent to property. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 14 of 15 7.14 Design a new building to appear similar in scale to those in the district during the mining era. The proposed building has a flat roof which relates to the range of building forms within the block. The proposed building has strong ties to the Tyrolean Lodge (shown above) which is vertically oriented and broken into two masses with a connecting passageway. Modules of 25 ft., 7 ft., and 14.5 ft. are proposed facing Main Street to break up the mass. Vertical elements are proposed on the front façade to accommodate the Trombe Wall solar collection system and to relate to the adjacent Tyrolean Lodge, and the verticality of the larger 19th Century residences found on Main Street. Demolition of properties located within a Historic District 26.415.080. Demolition of designated historic properties or properties within a historic district. It is the intent of this Chapter to preserve the historic and architectural resources that have demonstrated significance to the community. Consequently no demolition of properties designated on the Aspen Inventory of Historic Landmark Site and Structures or properties within a Historic District will be allowed unless approved by the HPC in accordance with the standards set forth in this Section. 4. The HPC shall review the application, the staff report and hear evidence presented by the property owners, parties of interest and members of the general public to determine if the standards for demolition approval have been met. Demolition shall be approved if it is demonstrated that the application meets any one of the following criteria: a) The property has been determined by the City to be an imminent hazard to public safety and the owner/applicant is unable to make the needed repairs in a timely manner, b) The structure is not structurally sound despite evidence of the owner's efforts to properly maintain the structure, c) The structure cannot practically be moved to another appropriate location in Aspen or d) No documentation exists to support or demonstrate that the property has historic, architectural, archaeological, engineering or cultural significance and Additionally, for approval to demolish, all of the following criteria must be met: a) The structure does not contribute to the significance of the parcel or Historic District in which it is located and b) The loss of the building, structure or object would not adversely affect the integrity of the Historic District or its historic, architectural or aesthetic relationship to adjacent designated properties and c) Demolition of the structure will be inconsequential to the historic preservation needs of the area. Exhibit 1 210 W. Main Street Conceptual Design Reviews & Demolition Page 15 of 15 No documentation exists to support that the property has historic significance. The loss of this building will not adversely affect the integrity of the Historic District: the building does not contribute to the significance of the District. Figures 7 & 8: Current photographs of 210 West Main St. Exhibit 2- 210 W. Main Street RDS Page 1 of 2 Exhibit 2 Residential Design Standards (Multi-family Residential) 26.410.010.B Applicability. Except as outlined in Section 26.410.010.C, Exemptions, this Chapter applies to all residential development in the City, except for residential development within the R-15B zone district. Specific applicability for each standard is identified within each standard. 26.410.040 Multi-family standards A. Applicability. Unless states otherwise below, the design standards in this section shall apply to all multi-family development. B. Design standards. 1. Building Orientation (Flexible). (c) Standard. The front façade of a building shall be oriented to face the street on which it is located. The front façade faces Main Street. 2. Garage Access (Non-flexible). (c) Standard. A multi-family building that has access from an alley or private street shall be required to access parking, garages and carports from the alley or private street. The parking is accessed along the alley. 3. Garage Placement (Non-flexible). (c) Standard. The front of a garage or the front-most supporting column of a carport shall be set back at least ten (10) feet further from the street than the front façade of the principal building. Not applicable. The parking is accessed along the alley. 4. Entry Connection (Non-flexible). (c) Standard. A building shall provide a visual and/or physical connection between a primary entry and the street. On a corner lot, an entry connection shall be provided to at least on (1) of the two intersecting streets. A walkway, perpendicular to Main Street, is proposed to create a physical and visual connection between the project and the street. 5. Principal Window (Flexible). (c) Standard. At least one (1) street-facing principal window or grouping of smaller windows acting as a principal window shall be provided for each unit facing the street. On a corner unit with street frontage on two streets, this standard shall apply to both street-facing facades. Exhibit 2- 210 W. Main Street RDS Page 2 of 2 Each street facing unit has a group of windows facing the street to enhance a pedestrian friendly environment and to contribute to the residential character of the Main Street Historic District. Exhibit 3 – Special Review 210 W. Main St. Page 1 of 3 Exhibit 3 Special Review 26.4130.040. Review standards for special review. No development subject to special review shall be permitted unless the Planning and Zoning Commission makes a determination that the proposed development complies with all standards and requirements set forth below. A. Dimensional requirements. Whenever the dimensional requirements of a proposed development are subject to special review, the development application shall only be approved if the following conditions are met. 1. The mass, height, density, configuration, amount of open space, landscaping and setbacks of the proposed development are designed in a manner which is compatible with or enhances the character of surrounding land uses and is consistent with the purposes of the underlying zone district. 2. The applicant demonstrates that the proposed development will not have adverse impacts on surrounding uses or will mitigate those impacts, including but not limited to the effects of shading, excess traffic, availability of parking in the neighborhood or blocking of a designated view plane. The proposed project requests Special Review approval to increase the floor area from 1:1 to 1.25:1 as permitted within the Main Street Historic District. The application proposes about a 1.23:1 FAR; however the full 1.25:1 is requested to cover any errors in floor area calculations. The entire project includes 8 affordable housing units with an emphasis on livability and high quality: each two-bedroom unit provides over 900 square feet of living space, two bathrooms, and ample storage. The units are arranged around a common courtyard, providing social opportunities for the residents and open space that allows additional windows for the units. The floor area increase enables 8 spacious units of deed restricted affordable rental housing. As demonstrated in Exhibit 1, the proposed mass is consistent with the existing buildings in the blockface and across the street namely, the Tyrolean Lodge, Annabelle Inn and the Innsbruck. The proposed mass is similar to the Tyrolean Lodge massing, an AspenModern property. The proposed building is broken into two vertical modules facing Main Street. The modules are connected with exterior hallways. The proposed height is within the allowances of the Main Street Historic District through Commercial Design Standard review. Minimum setbacks are met. A figure ground diagram of the existing buildings is shown below in Figure 1. The black line delineates front property lines. The proposed building will be placed in a similar location to the current condition. The building face of 210 W. Main Street is about 23 ft. from the property line; however decks and steps are around 15 ft. from the property line. The proposed location of the building is about 10 ft. from the property line, which is the minimum front yard setback for Main Street. Bringing the building to the 10 ft. setback will soften the adjacent Annabelle Inn which sits on the property line. Exhibit 3 – Special Review 210 W. Main St. Page 2 of 3 The proposed density of 8 units replaces the existing 8 units on the site. Multi-family housing is identified within the purpose of the Mixed Use zone district and consistent with the existing use on the property. Multi-family residential uses are found throughout the Historic District, for example: 518 W. Main Street, 7th and Main Affordable Housing, and the Ullr to name a few. The property has historically been used for multi-family residential units and has consistently served a local population. The replacement units will continue this use pattern, and the new building will improve the overall aesthetics of the block. The neighborhood has on-street parking available on the side streets on a regular basis. The project proposes to maintain the existing deficit of 2 parking spaces. Currently, the 8 residential units only have 6 parking spaces which has been adequate for the residents. The proposal is to maintain the density and the parking configuration. Street parking is readily available at nighttime. Photographs below show available parking during the week on side streets within a block of the property. Figure 1: Existing setbacks within blockface. Arrow indicates subject property. Exhibit 3 – Special Review 210 W. Main St. Page 3 of 3 Figures 2 – 4: Available parking on surrounding side streets in early February. DATE: PROJECT NAME: PROJECT ADDRESS: APPLICANT CONTACT INFORMATION: NAME, COMPANY, ADDRESS, PHONE, EMAIL Peak Hour Max Trips Generated MMLOS TDM Total Trips Mitigated PM 5.3 10 0.06 10.06 0.00 A driveway curbcut on Main Street is proposed to be removed. The pedestrian experience along Main Street will be greatly improved by the removal of this curb. Include any additional information that pertains to the MMLOS plan in the space provided below. Enter Text Here TDM Explain the proposed end of trip facilities strategy below. The provision of convenient facilities for pedestrians and cyclists encourages these types of alternative modes, thus reducing SOV trips. Non-residential projects may provide facilities such as showers, secure bicycle lockers, personal lockers, changing spaces, etc. Project Description In the space below provide a description of the proposed project. Replacement of an existing multi-family building with a new multi-family building. No increase in unit density is proposed. MMLOS Explain what driveways are removed and how this benefits the pedestrian experience. Chris Bendon BendonAdams 300 S. Spring St. #202, Aspen, CO 970-925-2855 chris@bendonadams.com Summary and Narrative: Narrative: 2/15/2017 King Louise 210 West Main Street Trip Generation SUMMARY Trip Mitigation NET TRIPS TO BE MITIGATED Click on the "Generate Narrative" Button to the right. Respond to each of the prompts in the space provided. Each response should cover the following: 1. Explain the selected measure. 2. Call out where the measure is located. 3. Demonstrate how the selected measure is appropriate to enhance the project site and reduce traffic impacts. 4. Explain the Enforcement and Financing Plan for the selected measure. 5. Explain the scheduling and implementation responsibility of the mitigation measure. 6. Attach any additional information and a site map to the narrative report. Exhibit 4 APCHA and the City may decide to audit the HOA to determine the effectiveness of the proposed measures. Scheduling and Implementation Responsibility of Mitigation Measures Provide an overview of the scheduling and implementation responsibility for the proposed transportation mitigation measures. Transportation mitigation measures are the responsibility of the HOA. Monitoring and Reporting Provide a monitoring and reporting plan. Refer to page 17 in the Transportation Analysis Guidelines for a list of monitoring plan requirements. Components of a Monitoring and Reporting Plan should include (1) Assessment of compliance with guidelines, (2) Results and effectiveness of implemented measures, (3) Identification of additional strategies, and (4) Surveys and other supporting data. Pedestrian Directness Factor (See callout number 9 on the MMLOS sheet for an example) Bicycle Parking Enforcement and Financing Provide an overview of the Enforcement and Financing plan for the proposed transportation mitigation measures. There is no enforcement required for the proposed measures. MMLOS Site Plan Requirements Include the following on a site plan. Clearly call out and label each measure. Attach the site plan to the TIA submittal. Slopes Between Back of Curb and Sidewalk Removed Driveway(s) 2% Slope at Pedestrian Driveway Crossings Extra storage to store bicycles and other alternative modes of transportation. Explain the proposed trip reduction marketing/incentive program in the space provided. A trip reduction marketing programs should include a number of the following strategies: orientation to trip reduction programs and benefits; orientation to specific alternative transportation modes such as bus service information, bike/walk route maps, etc.; publishing of web or traditional informational materials; events and contests such as commuter fairs, new employee orientations, bike to work days, etc.; educational opportunities such bicycle commute/repair classes; web or traditional materials aimed at guests/customers such as bike/walk maps, free transit day passes, etc.; incentive programs such as prizes, rewards or discounts for alternative commuting. Bus routes, bike routes, and other similar programs that relate to in town residents will be provided in the HOA packet for future tenants or purchasers. Include any additional information that pertains to the TDM plan in the space provided below. = input = calculation DATE: PROJECT NAME: PROJECT ADDRESS: APPLICANT CONTACT INFORMATION: NAME, COMPANY, ADDRESS, PHONE, EMAIL Minor Entering Exiting Total Entering Exiting Total Commercial (sf)-435.0 sf -0.68 -0.31 -0.99 -0.72 -1.08 -1.80 Free-Market Housing (Units)0 Units 0.00 0.00 0.00 0.00 0.00 0.00 Affordable Housing (Units)8 Units 2.88 3.12 6.00 3.92 3.20 7.12 Lodging (Units)0 Units 0.00 0.00 0.00 0.00 0.00 0.00 Essential Public Facility (sf)0.0 sf 0.00 0.00 0.00 0.00 0.00 0.00 2.20 2.81 5.01 3.20 2.12 5.32 Land Use Trip Rate %Entering %Exiting Trip Rate %Entering %Exiting Commercial 2.27 0.69 0.31 4.14 0.4 0.6 Free-Market Housing 0.67 0.29 0.71 0.82 0.56 0.44 Affordable Housing 0.75 0.48 0.52 0.89 0.55 0.45 Lodging 0.25 0.57 0.43 0.31 0.52 0.48 Essential Public Facility 0.86 0.62 0.38 1.66 0.4 0.6 Chris Bendon BendonAdams 300 S. Spring St. #202, Aspen, CO 970-925-2855 chris@bendonadams.com Trip Generation 2/15/2017 AM Peak Average PM Peak Average Trips Generated AM Peak-Hour PM Peak-Hour TOTAL NEW TRIPS ASSUMPTIONS ASPEN TRIP GENERATION Is this a major or minor project? 210 West Main Street King Louise Net New Units/Square Feet of the Proposed ProjectProposed Land Use *For mixed-use (at least two of the established land uses) sites, a 4% reduction for AM Peak-Hour and a 14% reduction for PM Peak-Hour is applied to the trip generation. Instructions: IMPORTANT: Turn on Macros: In order for code to run correctly the security settings need to be altered. Click "File" and then click "Excel Options." In the "Trust Center"category, click "Trust Center Settings", and then click the "Macro Settings"category. Beneath "Macro Settings" select "Enable all Macros." Sheet 1. Trip Generation: Enter the project's square footage and/or unit counts under Proposed Land Use. The numbers should reflect the net change in land use between existing and proposed conditions. If a landuse is to be reduced put a negative number of units or square feet. Sheet 2. MMLOS: Answer Yes, No, or Not Applicable under each of the Pedestrian, Bike and Transit sections.Points are only awarded for proposed (not existing) and confirmed aspects of the project. Sheet 3. TDM: Choose the mitigation measures that are appropriate for your project. Sheet 4. Summary and Narrative: Review the summary of the project's mitigated trips and provide a narrative which explains the measures selected for the project. Click on "Generate Narrative" and individually explain each measure that was chosen and how it enhances the site or mitigates vehicle traffic. Ensure each selected measure make sense Minor Development -Inside the Roundabout Major Development -Outside the Roundabout Helpful Hints: 1. Refer to the Transportation Impact Analysis Guidelines for information on the use of this tool. 2. Refer to TIA Frequently Asked Questions for a quick overview. 2. Hover over red corner tags for additional information on individual measures. 3. Proposed TDM or MMLOS measures should be new and/or an improvement of existing conditions. A project will not receive credit for measures already in place. Proposed TDM or MMLOS measures should also make sense in the context of project location and future use. Transportation Impact Analysis TIA Frequently Asked Questions = input = calculation 10 Category Sub.Measure Number Question Answer Points 1 Does the project propose a detached sidewalk where an attached sidewalk currently exists? Does the proposed sidewalk and buffer meet standard minimum widths? 0 2 Is the proposed effective sidewalk width greater than the standard minimum width?0 3 Does the project propose a landscape buffer greater than the standard minimum width?0 0 4 Does the project propose a detached sidewalk on an adjacent block? Does the proposed sidewalk and buffer meet standard minimum widths? 0 5 Is the proposed effective sidewalk width on an adjacent block greater than the standard minimum width?0 6 Is the proposed landscape buffer on an adjacent block greater than the standard minimum width?0 0 7 Are slopes between back of curb and sidewalk equal to or less than 5%?Yes 0 8 Are curbs equal to (or less than) 6 inches?Yes 0 9 Is new large-scale landscaping proposed that improves the pedestrian experience? Properties within the Core do not have ample area to provide the level of landscaping required to receive credit in this category. 0 10 Does the project propose an improved crosswalk? This measure must get City approval before receiving credit. 0 0 11 Are existing driveways removed from the street?Yes 5 12 Is pedestrian and/or vehicle visibility unchanged by new structure or column?Yes 0 13 Is the grade (where pedestrians cross) on cross-slope of driveway 2% or less?Yes 0 14 Does the project propose enhanced pedestrian access points from the ROW? This includes improvements to ADA ramps or creating new access points which prevent pedestrians from crossing a street. 0 15 Does the project propose enhanced pedestrian or bicyclist interaction with vehicles at driveway areas?0 5 16 Is the project's pedestrian directness factor less than 1.5?Yes 0 17 Does the project propose new improvements which reduce the pedestrian directness factor to less than 1.2? A site which has an existing pedestrian directness factor less than 1.2 cannot receive credit in this category. 0 18 Is the project proposing an off site improvement that results in a pedestrian directness factor below 1.2?* 0 19 Are traffic calming features proposed that are part of an approved plan (speed humps, rapid flash)?*0 0 20 Are additional minor improvements proposed which benefit the pedestrian experience and have been agreed upon with City of Aspen staff? 0 21 Are additional major improvements proposed which benefit the pedestrian experience and have been agreed upon with City of Aspen staff? 0 0 5Pedestrian Total* MMLOS Input Page Subtotal SubtotalSidewalk Condition on Adjacent BlocksSidewalk Condition on Project FrontageSubtotal Instructions: Answer Yes, No, or Not Applicable to each measure under the Pedestrian, Bike and Transit sections. Subtotal Subtotal PedestriansSubtotalAdditional Proposed ImprovementsTOTAL NUMBER OF TRIPS MITIGATED:Pedestrian RoutesTraffic Calming and Pedestrian NetworkDriveways, Parking, and Access Considerations Category Sub.Measure Number Question Answer Points 22 Is a new bicycle path being implemented with City approved design?0 23 Do new bike paths allow access without crossing a street or driveway?0 24 Is there proposed landscaping, striping, or signage improvements to an existing bicycle path?0 25 Does the project propose additional minor bicycle improvements which have been agreed upon with City of Aspen staff?0 26 Does the project propose additional major bicycle improvements which have been agreed upon with City of Aspen staff?0 0 Bicycle Parking27 Is the project providing bicycle parking?Yes 5 5 5 Category Sub.Measure Number Question Answer Points 28 Is seating/bench proposed?0 29 Is a trash receptacle proposed?0 30 Is transit system information (signage) proposed?0 31 Is shelter/shade proposed?0 32 Is enhanced pedestrian-scale lighting proposed?0 33 Is real-time transit information proposed?0 34 Is bicycle parking/storage proposed specifically for bus stop use?0 35 Are ADA improvements proposed?0 0 36 Is a bus pull-out proposed at an existing stop?0 37 Is relocation of a bus stop to improve transit accessibility or roadway operations proposed?0 38 Is a new bus stop proposed (with minimum of two basic amenities)?0 0 0 Bicycles Total* Transit Total*BicyclesModifications to Existing Bicycle PathsTransitBasic AmenitiesSubtotal Subtotal Enhanced AmenitiesSubtotal Subtotal Category Measure Number Sub. Question Answer Strategy VMT Reductions Will an onsite ammenities strategy be implemented?No Which onsite ammenities will be implemented? Will a shared shuttle service strategy be implemented?NA What is the degree of implementation? What is the company size? What percentage of customers are eligible? 3 Nonmotorized Zones Will a nonmotorized zones strategy be implemented?0.00% 0.00% Category Measure Number Sub. Question Answer Strategy VMT Reductions Will a network expansion stragtegy be implemented? What is the percentage increase of transit network coverage? What is the existing transit mode share as a % of total daily trips? Will a service frequency/speed strategy be implemented? What is the percentage reduction in headways (increase in frequency)? What is the existing transit mode share as a % of total daily trips? What is the level of implementation? Will a transit access improvement strategy be implemented? What is the extent of access improvements? 7 Intercept Lot Will an intercept lot strategy be implemented?0.00% 0.00% Category Measure Number Sub. Question Answer Strategy VMT Reductions Will there be participation in TOP? What percentage of employees are eligible? Is a transit fare subsidy strategy implemented? What percentage of employees are eligible? What is the amount of transit subsidy per passenger (daily equivalent)? Is an employee parking cash-out strategy being implemented? What percentage of employees are eligible? Is a workplace parking pricing strategy implemented? What is the daily parking charge? What percentage of employees are subject to priced parking? Is a compressed work weeks strategy implemented? What percentage of employees are participating? What is the workweek schedule? Is an employer sponsered shuttle program implemented? What is the employer size? What percentage of employees are eligible? Is a carpool matching strategy implemented? What percentage of employees are eligble? Is carshare participation being implemented? How many employee memberships have been purchased? What percentage of employees are eligble? Is participation in the bikeshare program WE-cycle being implemented? How many memberships have been purchased? What percentage of employees/guests are eligble? Is an end of trip facilities strategy being implemented?Yes What is the degree of implementation? Low What is the employer size? Small Is a self-funded emergency ride home strategy being implemented? What percentage of employees are eligible? Is a carpool/vanpool priority parking strategy being implemented? What is the employer size? What number of parking spots are available for the program? Is a private employer shuttle strategy being implemented? What is the employer size? What percentage of employees are eligible? Is a trip reduction marketing/incentive program implemented?Yes What percentage of employees/guests are eligible?100% 1.08% 0.00% 1.08% 1. 22% work trips represents a mixed-used site (SF Bay Area Travel Survey). See Assumptions Tab for more detail. Maximum Reduction Allowed in CategoryTransit System Improvements Strategies1 2 4 5 6 8 9 10 4.00% 0.00% 0.00% 0.00% 0.00% 0.00% Maximum Reduction Allowed in Category Maximum Reduction Allowed in Category 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Bikeshare Program 0.00% TDM Input Page 0.00% 1.00% 0.00%Commute Trip Reduction Programs StrategiesOnsite Servicing Shared Shuttle Service Neighborhood/Site Enhancements Strategies0.00% 0.00% Network Expansion Service Frequency/Speed Transit Access Improvement Participation in TOP Transit Fare Subsidy Employee Parking Cash-Out Workplace Parking Pricing Compressed Work Weeks Employer Sponsored Vanpool Carpool Matching Carshare Program Self-funded Emergency Ride Home Carpool/Vanpool Priority Parking Private Employer Shuttle Trip Reduction Marketing/Incentive Program End of Trip Facilities Cross Category Maximum Reduction, Neighborhood and Transit Global Maximum VMT Reductions 11 12 13 14 15 21 16 17 18 19 20 Instructions TDM: Choose the mitigation measures that are appropriate for your project. Proposed TDM or MMLOS measures should be new and/or an improvement of existing conditions. A project will not receive credit for measures already in place. Proposed TDM or MMLOS measures should also make sense in the context of project location and future use. Directness Fact or: 1.3 Walkin g Distance: 54 ft C row F lies Dist ance: 41 ft Crow Flies Distance: 41 fttf 45 :ecnatsiD gniklaWAccess Point Bicycle Parking 6’ < 5% CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Justin Barker, 970.429.2797 DATE: 6/28/16 PROJECT: 210 W. Main Street UPDATED: 2/8/17 REPRESENTATIVE: Chris Bendon, BendonAdams REQUEST: Major Development for property within a Historic District, Residential Design Review, Demolition DESCRIPTION: The Applicant would like to demolish the existing development located at 210 W. Main Street and redevelop the property. It is a 6,000 Sq. ft. lot in the Mixed Use (MU) zone district. Although the property is not designated, it is located within the Main Street Historic District. The current development contains one commercial space, one (1) deed-restricted AH unit, and six (6) free market units. The Applicant would like to develop the entire site with affordable housing to create Affordable Housing Credits. The maximum cumulative FAR in the MU Zone District is 1:1; which may be increased to 1.25:1 by Special Review. The criteria outlined in Sec. 26.430.040.A Dimensional Requirements shall be addressed for any FAR increase. In terms of design, the Applicant shall address the requirements in Chapters 1 & 12 of the recently adopted Historic Preservation Design Guidelines. The proposed development will need to meet the requirements for residential multi-family development of Chapter 26.515, Off Street Parking, or will otherwise require Special Review. The project is also subject to the Residential Design Standard requirements for multi-family development, Section 26.410.040. Other issues that will need to be addressed are current requirements for on- site trash, utility and recycling areas, and the City’s guidelines for Traffic Impact mitigation. The Historic Preservation Commission (HPC) reviews all development within the Historic District and will perform all reviews for this project. There will be two steps; Conceptual Review and Final Review. Both the demolition of existing multi-family housing and the development of affordable housing require Growth Management review. GMQS may be reviewed after Conceptual Review is granted. A separate pre-application addressing Final HPC Review of a Major Development and GMQS review will be required. The establishment of Affordable Housing Credits will be reviewed concurrently with the development of affordable housing at Final. Affordable housing units developed by, or in association with: the City of Aspen, Pitkin County, the Aspen/Pitkin County Housing Authority, or similar government or non-governmental organization (NGO) that receives public funds for the purpose of building affordable housing are not eligible for Affordable Housing Credits. REVIEW PROCESS: Step 1: HPC Conceptual Major Development, Demolition, Residential Design Standard Review, Special Review (if needed) City Council has an optional call-up of the consolidated application. Step 2: HPC Final Major Development, GMQS, Establishment of Affordable Housing Credits Exhibit 5 Below are links to the Land Use Application form and Land Use Code for your convenience: Land Use App: http://www.aspenpitkin.com/Portals/0/docs/City/Comdev/Apps%20and%20Fees/2013%20land%20use%20app%20fo rm.pdf s Land Use Code: http://www.aspenpitkin.com/Departments/Community-Development/Planning-and-Zoning/Title-26-Land-Use-Code/ Historic Preservation Design Guidelines: http://www.aspenpitkin.com/Portals/0/docs/City/Comdev/HPC/New%20Historic%20Preservation%20Guideli nes.pdf Transportation Impact Analysis Requirements: http://www.aspenpitkin.com/Departments/Community-Development/Planning-and-Zoning/Current-Planning/ Land Use Code Section(s) 26.304 Common Development Review Procedures 26.410 Residential Design Standards 26.415.070(D) Historic Preservation – Major Development Review 26.415.080 Demolition of properties within a historic district 26.430 Special Review 26.515 Off-street Parking 26.575.020 Calculations and Measurements 26.610 Impact Fees 26.630 Transportation Impact Analysis Guidelines 26.710.180 Mixed Use zone district and Municipal Code Section 12.10 Space Allotment for Trash and Recycling Storage Review by: Staff for complete application Review agencies for recommendation Historic Preservation Commission for decisions Public Hearing: Yes, at HPC Planning Fees: $1,950 for 6 hours of staff time Referral Fees: $325 deposit – Engineering $975 flat fee – Parks $975 flat fee – Environmental Health Total Deposit: $4,225 (additional planning hours over deposit amount are billed at a rate of $325/hour; additional engineering hours over deposit are billed at a rate of $325/hour) To apply, submit the following information:  Completed Land Use Application and signed fee agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  HOA Compliance form (Attached)  Documentation showing the proposal meets all Transportation Mitigation Requirements as outlined in the City’s Transportation Impact Analysis Guidelines and Mitigation Tool, available online at: http://www.aspenpitkin.com/Departments/Community-Development/Planning-and-Zoning/Recent- Code-Amendments/. A copy of the tool showing trips generated and the chosen mitigation measures should be included with the application.  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards relevant to the development application and relevant land use approvals associated with the property.  A site improvement survey (no older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado.  Written responses to all review criteria.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen.  List of adjacent property owners within 300’ for public hearing.  A proposed site plan.  Scaled drawings of all proposed structure(s) or addition(s) depicting their form, including their height, massing, scale, proportions and roof plan; and the primary features of all elevations.  Preliminary selection of primary exterior building materials.  Supplemental materials to provide a visual description of the context surrounding the designated historic property or historic district including at least one (1) of the following: diagrams, maps, photographs, models or streetscape elevations.  1 Complete Copy of all application materials. If the copy is deemed complete by staff, the following items will then need to be submitted:  1 digital PDF copy of the complete application packet  12 sets of all graphics printed at 11x17  Total deposit for review of the application.  A sketch up model will be required for the public hearing. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. Exhibit 6 210 West Main Street – Vicinity Map City of Aspen Community Development Department Aspen Historic Preservatio Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Applica on Requirements, Updated: March 2016 ATTACHMENT 3 - Dimensional Requirements Form (Item #10 on the submittal requirements key. Not necessary for all projects.) Project: Applicant: Project Location: Zone District: Lot Size: Lot Area: (For the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high water mark, easements, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing:__________Proposed:_________________ Number of residential units: Existing:__________Proposed:_________________ Proposed % of demolition: __________ DIMENSIONS: (write N/A where no requirement exists in the zone district) Floor Area: Height Existing:_________Allowable:__________Proposed:________ Principal Bldg.: Existing:_________Allowable:__________Proposed:________ Accessory Bldg.: Existing:_________Allowable:__________Proposed:________ On-Site parking: Existing:_________Required:___________Proposed:________ % Site coverage: Existing:_________Required:___________Proposed:________ % Open Space: Existing:_________Required:___________Proposed:________ Front Setback: Existing:_________Required:___________Proposed:________ Rear Setback: Existing:_________Required:___________Proposed:________ Combined Front/Rear: Indicate N, S, E, W Existing:_________Required:___________Proposed:________ Side Setback: Existing:_________Required:___________Proposed:________ Side Setback: Existing:_________Required:___________Proposed:________ Combined Sides: Existing:_________Required:___________Proposed:________ Distance between buildings: Existing:_________Required:___________Proposed:________ Existing non-conformities or encroachments and note if encroachment licenses have been issued: _____________________________________________________________________________ _____________________________________________________________________________ Variations requested (identify the exact variances needed): ______________________________ ______________________________________________________________________________ 210 W Main Street King Louise, LLC 210 W Main Street, Aspen CO Mixed Use 6,000 sf 6,000 sf 435 0 7-8 8 100 3,282 sf 23.75’28’30’ n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a none Special review requested for 1:25:1 FAR n/a n/a 5’ (E)5’5’ 5’ (W)5’5’ 10’10’10’ 5’5’5’ 6 6 6 about 7361 sf7500 sf special review Exhibit 7 City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 ATTACHMENT 2 - Historic Preservation Land Use Application PROJECT: Name: Location: (Indicate street address, lot & block number or metes and bounds description of property) Parcel ID # (REQUIRED)___________________________________________________________ Applicant: Name: Address: Phone #: _______________________Fax#:___________________E-mail:_______________________________________________ REPRESENTATIVE: Name: Address: Phone #: _______________________Fax#:___________________E-mail:________________________________________________ TYPE OF APPLICATION: (please check all that apply): Historic Designation Certificate of No Negative Effect Certificate of Appropriateness -Minor Historic Development -Major Historic Development -Conceptual Historic Development -Final Historic Development -Substantial Amendment Relocation (temporary, on or off-site) Demolition (total demolition) Historic Landmark Lot Split King Louise Affordable Housing 210 West Main Street, Block 51, Lots P and Q City and Townsite of Aspen King Louise, LLC Chris Bendon, BendonAdams 300 So Spring Street, Suite 202, Aspen CO 81611 925-2855 chris@bendonadams.com X X X Conceptual Residential Design X Special Review EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) _________Eight resident____ i________al apartments wi________th smal____l hai____r sal____on__________________________________________________________________ PROPOSAL: (description of proposed buildings, uses, modifications, etc.) _______Eight resi_____denti______al apartments______________________________________________________________________________________ 27 351 244 0009 PO Box 1467, Basalt, Colorado 81621 970 927 3167 tkga@tkga.net City of Aspen Community Development Department Aspen Historic Preservation Land Use Packet City of Aspen|130 S. Galena Street.| (970) 920 5090 Historic Land Use Application Requirements, Updated: March 2016 General Information Please check the appropriate boxes below and submit this page along with your application. This information will help us review your plans and, if necessary, coordinate with other agencies that may be involved. YES NO  Does the work you are planning include exterior work; including additions, demolitions, new construction, remodeling, rehabilitation or restoration?  Does the work you are planning include interior work, including remodeling, rehabilitation, or restoration?  Do you plan other future changes or improvements that could be reviewed at this time?  In addition to City of Aspen approval for a Certificate of Appropriateness or No Negative Effect and a building permit, are you seeking to meet the Secretary of the Interior’s Standards for Rehabilitation or restoration of a National Register of Historic Places Property in order to qualify for state or federal tax credits?   If yes, are you seeking federal rehabilitation investment tax credits in Conjunction with this project? (Only income producing properties listed on the National Register are eligible. Owner-occupied residential properties are not.)   If yes, are you seeking the Colorado State Income Tax Credit for Historical Preservation? Please check all City of Aspen Historic Preservation Benefits which you plan to use:  Rehabilitation Loan Fund  Conservation Easement Program  Dimensional Variances  Increased Density  Historic Landmark Lot Split  Waiver of Park Dedication Fees  Conditional Uses  Tax Credits  Exemption from Growth Management Quota System X X X X Exhibit 8 Form 5011000 (6-22-10) Page 1 of 2 ALTA Plain Language Commitment (6-17-06) Title Insurance Commitment ISSUED BY First American Title Insurance Company Commitment INFORMATION The Title Insurance Commitment is a legal contract between you and the Company. It is issued to show the basis on which we will issue a Title Insurance Policy to you. The Policy will insure you against certain risks to the land title, subject to the limitations shown in the Policy. The Company will give you a sample of the Policy form, if you ask. The Policy contains an arbitration clause. All arbitrable matters when the Amount of Insurance is $2,000,000 or less shall be arbitrated at the option of either the Company or you as the exclusive remedy of the parties. You may review a copy of the arbitration rules at http://www.alta.org/. The Commitment is based on the land title as of the Commitment Date. Any changes in the land title or the transaction may affect the Commitment and the Policy. The Commitment is subject to its Requirements, Exceptions and Conditions. THIS INFORMATION IS NOT PART OF THE TITLE INSURANCE COMMITMENT. YOU SHOULD READ THE COMMITMENT VERY CAREFULLY. If you have any questions about the Commitment, contact: FIRST AMERICAN TITLE INSURANCE COMPANY 1 First American Way, Santa Ana, California 92707 TABLE OF CONTENTS AGREEMENT TO ISSUE POLICY 1 CONDITIONS 2 SCHEDULE A Insert 1. Commitment Date 2. Policies to be Issued, Amounts and Proposed Insureds 3. Interest in the Land and Owner 4. Description of the Land SCHEDULE B-I - REQUIREMENTS Insert SCHEDULE B-II - EXCEPTIONS Insert AGREEMENT TO ISSUE POLICY We agree to issue policy to you according to the terms of the Commitment. When we show the policy amount and your name as the proposed insured in Schedule A, this Commitment becomes effective as of the Commitment Date shown in Schedule A. If the Requirements shown in this Commitment have not been met within six months after the Commitment Date, our obligation under this Commitment will end. Also, our obligation under this Commitment will end when the Policy is issued and then our obligation to you will be under the Policy. Our obligation under this Commitment is limited by the following: The Provisions in Schedule A. The Requirements in Schedule B-I. The Exceptions in Schedule B-II. The Conditions on Page 2. This Commitment is not valid without SCHEDULE A and Sections I and II of SCHEDULE B. (This Commitment is valid only when Schedules A and B are attached) This jacket was created electronically and constitutes an original document Copyright 2006-2009 American Land Title Association. All rights reserved. The use of this form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. [[ Exhibit 9 Form 5011000 (6-22-10) Page 2 of 2 ALTA Plain Language Commitment (6-17-06) CONDITIONS 1.DEFINITIONS (a) "Mortgage" means mortgage, deed of trust or other security instrument. (b) "Public Records" means title records that give constructive notice of matters affecting your title according to the state statutes where your land is located. 2.LATER DEFECTS The Exceptions in Schedule B - Section II may be amended to show any defects, liens or encumbrances that appear for the first time in the public records or are created or attached between the Commitment Date and the date on which all of the Requirements (a) and (c) of Schedule B - Section I are met. We shall have no liability to you because of this amendment. 3.EXISTING DEFECTS If any defects, liens or encumbrances existing at Commitment Date are not shown in Schedule B, we may amend Schedule B to show them. If we do amend Schedule B to show these defects, liens or encumbrances, we shall be liable to you according to Paragraph 4 below unless you knew of this information and did not tell us about it in writing. 4.LIMITATION OF OUR LIABILITY Our only obligation is to issue to you the Policy referred to in this Commitment, when you have met its Requirements. If we have any liability to you for any loss you incur because of an error in this Commitment, our liability will be limited to your actual loss caused by your relying on this Commitment when you acted in good faith to: Comply with the Requirements shown in Schedule B - Section I or Eliminate with our written consent any Exceptions shown in Schedule B - Section II. We shall not be liable for more than the Policy Amount shown in Schedule A of this Commitment and our liability is subject to the terms of the Policy form to be issued to you. 5.CLAIMS MUST BE BASED ON THIS COMMITMENT Any claim, whether or not based on negligence, which you may have against us concerning the title to the land must be based on this Commitment and is subject to its terms. Copyright 2006-2009 American Land Title Association. All right reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. 16003520 - B American Land Title Association ALTA Commitment Form Adopted 6-17-06 First American Title Insurance Co. Commitment No.: 16003520 SCHEDULE A 1. Effective Date: February 7, 2017 at 07:45 AM 2. Policy or Policies to be issued: Amount Premium A. ALTA Owners Policy (06/17/06)TBD $0.00 Proposed Insured: TBD Certificate of Taxes Due $0.00 Endorsements: Additional Charges:$0 Total $0.00 3. The estate or interest in the land described or referred to in this Commitment is Fee simple. 4. Title to the Fee simple or interest in the land is at the Effective Date vested in: KING LOUISE LLC, a Colorado limited liability company 5. The land referred to in the Commitment is described as follows: SEE EXHIBIT A ATTACHED HERETO For informational purposes only, the property address is: 210 West Main Street, Aspen, CO 81611. Attorneys Title Insurance Agency of Aspen, LLC By: Winter VanAlstine Authorized Officer or Agent FOR INFORMATIONAL PURPOSES OR SERVICES IN CONNECTION WITH THIS COMMITMENT, CONTACT: Attorneys Title Insurance Agency of Aspen, LLC, 715 West Main Street, Suite 202, Aspen, CO 81611, Phone: 970 925-7328, Fax: 970 925-7348. Copyright 2006-2009 American Land Title Association. All right reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. 16003520 - B American Land Title Association ALTA Commitment Form Adopted 6-17-06 First American Title Insurance Co. Commitment No.: 16003520 SCHEDULE B 1. Requirements: 1. Pay the agreed amounts for the interest in the land and/or the mortgage to be insured. 2. Pay us the premiums, fees and charges for the policy. 3. Documents satisfactory to us creating the interest in the land and/or the mortgage to be insured must be signed, delivered and recorded. 4. You must tell us in writing the name of anyone not referred to in this Commitment who will get an interest in the land or who will make a loan on the land. We may then make additional requirements or exceptions. 5. Payment of all taxes, charges and assessments, levied and assessed against the subject premises which are due and payable. 6. A Certification of Taxes due listing each taxing jurisdiction shall be obtained from the County Treasurer or an authorized agent (pursuant to Senate Bill 92-143, CRS 10-11-122). 7. Receipt by the Company of the appropriate affidavit as to new construction and indemnifying the Company against any unfiled materialmen's or mechanic's liens. 8. Warranty Deed must be sufficient to convey the fee simple estate or interest in the land described or referred to herein, from King Louise, LLC, a Colorado limited liability company, to TBD, the proposed insured, Schedule A, item 2A. NOTE: C.R.S. Section 38-35-109(2) required that a notation of the purchaser's legal address, (not necessarily the same as the property address) be included on the face of the Deed to be recorded. 9. Record a Statement of Authority to provide prima facie evidence of existence of KING LOUISE LLC, a Colorado limited liability company, an entity capable of holding property, and the name of the person authorized to execute instruments affecting title to real property as authorized by C.R.S. Section 38-30-172. 10. Certificate of Good Standing from the Colorado Secretary of State for KING LOUISE LLC, a Colorado limited liability company. 11. A copy of the properly signed and executed Operating Agreement if written, for KING LOUISE LLC, a Colorado limited liability company, to be submitted to the Company for review. 12. Additional Requirements may be included once the name of the Buyer is provided. 13. Improvement Survey Plat sufficient in form, content and certification acceptable to the Company. Exception will be taken to adverse matters disclosed thereby. (REQUIREMENT SATISFIED). 14. This Title Commitment is subject to underwriter approval. American Land Title Association ALTA Commitment Form Adopted 6-17-06 First American Title Insurance Co. Commitment No.: 16003520 SCHEDULE B (Continued) Copyright 2006-2009 American Land Title Association. All right reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. 16003520 - B 2. Schedule B of the policy or policies to be issued will contain exceptions to the following matters unless the same are disposed of to the satisfaction of the Company: 1. Any facts, rights, interests or claims which are not shown by the Public Records, but which could be ascertained by an inspection of the Land or by making inquiry of persons in possession thereof. 2. Easements, or claims of easements, not shown by the Public Records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and inspection of the Land would disclose, and which are not shown by the Public Records. 4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown in the Public Records. 5. Any and all unpaid taxes, assessments and unredeemed tax sales. 6. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records. 7. Taxes and assessments for the year 2016 and 2017, and subsequent years, a lien not yet due or payable. 8. Reservations and exceptions as set forth in the Deed from the City of Aspen providing as follows: "That no title shall be hereby acquired to any mine of gold, silver, cinnabar or copper or to any valid mining claim or possession held under existing laws", dated October 7, 1887, and recorded October 7, 1887, in Book 59 at Page 12, as Reception No. 020679. 9. Terms, conditions, provisions, agreements and obligations specified under the Patent, dated January 29, 1897, and recorded March 1, 1897, in Book 139 at Page 216, as Reception No. 060156. 10. Terms, conditions, provisions, agreements and obligations specified under An Ordinance Designating As An Historic District all of those Properties Abutting (on the North and South) Main Street Between Monarch and Seventh Streets, andall of Paepcke Park, Within the City of Aspen: Which Area is More Particularly Described as Lots K, L, M, N, O, P, Q, R and S of Block 18, 24, 30, 37, 44, 51, 58, 66, 73; Lots A, B, C, D, E, F, G, H and J of Blocks 19, 25, 31, 38, 45, 52, 59, 71; and all of Block 67 of the Original Aspen Townsite (Ordinance No. 60, Series of 1976), dated October 25, 1976, and recorded December 9, 1976, in Book 321 at Page 51, as Reception No. 189906. 11. Terms, conditions, provisions, agreements and obligations specified under the Occupancy Deed Restriction and Agreement for an Employee Dwelling Unit Approved Pursuant to Section 3-1510 of the Pitkin County Land Use Code, dated September 5, 1995, and recorded October 18, 1995, in Book 797 at Page 119, as Reception No. 386545. American Land Title Association ALTA Commitment Form Adopted 6-17-06 First American Title Insurance Co. Commitment No.: 16003520 SCHEDULE B (Continued) Copyright 2006-2009 American Land Title Association. All right reserved. The use of this Form is restricted to ALTA licensees and ALTA members in good standing as of the date of use. All other uses are prohibited. Reprinted under license from the American Land Title Association. 16003520 - B 12. Any existing leases or tenancies, and any and all parties claiming by, through or under said lessees. 13. Any and all notes, easements and recitals as disclosed on the Improvement Survey Plat, provided by Sopris Engineering - LLC, dated May 2007. 14. Deed of Trust from King Louise LLC, a Colorado limited liability company, to the Public Trustee of Pitkin County for the benefit of Alpine Bank, a Colorado Banking Corporation, to secure an indebtedness in the principal sum of $250,000.00, and any other amounts and/obligations secured thereby, dated May 20, 2016, and recorded June 7, 2016, as Reception No. 629837. ALTA Commitment 16003520 - B Exhibit A First American Title Insurance Co. Commitment No.: 16003520 EXHIBIT A PROPERTY DESCRIPTION The land referred to in this Commitment is described as follows: Lots P&Q, Block 51, CITY AND TOWNSITE OF ASPEN, Pitkin County, Colorado. First American Title Insurance Company DISCLOSURE STATEMENT Pursuant to C.R.S. 30-10-406(3)(a) all documents received for recording or filing in the Clerk and Recorder’s office shall contain a top margin of at least one inch and a left, right and bottom margin of at least one-half of an inch. The Clerk and Recorder will refuse to record or file any document that does not conform to the requirements of this section. NOTE: If this transaction includes a sale of the property and the price exceeds $100,000.00, the seller must comply with the disclosure/withholding provisions of C.R.S. 39-22-604.5 (Nonresident withholding). NOTE: Colorado Division of Insurance Regulations 8-1-2 requires that “Every title insurance company shall be responsible to the proposed insured(s) subject to the terms and conditions of the title commitment, other than the effective date of the title commitment, for all matters which appear of record prior to the time of recording whenever the title insurance company, or its agent, conducts the closing and settlement service that is in conjunction with its issuance of an owner’s policy of title insurance and is responsible for the recording and filing of legal documents resulting from the transaction which was closed. Pursuant to C.R.S. 10-11-122, the company will not issue its owner’s policy or owner’s policies of title insurance contemplated by this commitment until it has been provided a Certificate of Taxes due or other equivalent documentation from the County Treasurer or the County Treasurer’s authorized agent; or until the Proposed Insured has notified or instructed the company in writing to the contrary. The subject property may be located in a special taxing district. A Certificate of Taxes due listing each taxing jurisdiction shall be obtained from the County Treasurer or the County Treasurer’s authorized agent. Information regarding special districts and the boundaries of such districts may be obtained from the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor. NOTE: Pursuant to CRS 10-11-123, notice is hereby given: This notice applies to owner’s policy commitments containing a mineral severance instrument exception, or exceptions, in Schedule B, Section 2. A. That there is recorded evidence that a mineral estate has been severed, leased, or otherwise conveyed from the surface estate and that there is a substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property; and B. That such mineral estate may include the right to enter and use the property without the surface owner’s permission. NOTE: Pursuant to Colorado Division of Insurance Regulations 8-1-2, Affirmative mechanic’s lien protection for the Owner may be available (typically by deletion of Exception no. 4 of Schedule B, Section 2 of the Commitment from the Owner’s Policy to be issued) upon compliance with the following conditions: NOTE: Pursuant to Colorado Division of Insurance Regulations 8-1-2, Affirmative mechanic’s lien protection for the Owner may be available (typically by deletion of Exception no. 4 of Schedule B, Section 2 of the Commitment from the Owner’s Policy to be issued) upon compliance with the following conditions: A. The land described in Schedule A of this commitment must be a single family residence which includes a condominium or townhouse unit. B. No labor or materials have been furnished by mechanics or material-men for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. C. The Company must receive an appropriate affidavit indemnifying the Company against un-filed mechanic’s and material-men’s liens. D. The Company must receive payment of the appropriate premium. E. If there has been construction, improvements or major repairs undertaken on the property to be purchased within six months prior to the Date of the Commitment, the requirements to obtain coverage for unrecorded liens will include: disclosure of certain construction information; financial information as to the seller, the builder and or the contractor; payment of the appropriate premium, fully executed Indemnity Agreements satisfactory to the company, and, any additional requirements as may be necessary after an examination of the aforesaid information by the Company. No coverage will be given under any circumstances for labor or material for which the insured has contracted for or agreed to pay. First American Title Insurance Company NOTE: Pursuant to C.R.S. 38-35-125(2) no person or entity that provides closing and settlement services for a real estate transaction shall disburse funds as a part of such services until those funds have been received and are available for immediate withdrawal as a matter of right. NOTE: C.R.S. 39-14-102 requires that a real property transfer declaration accompany any conveyance document presented for recordation in the State of Colorado. Said declaration shall be completed and signed by either the grantor or grantee. NOTE: Pursuant to CRS 10-1-128(6)(a), It is unlawful to knowingly provide false, incomplete, or misleading facts or information to an insurance company for the purpose of defrauding or attempting to defraud the company. Penalties may include imprisonment, fines, denial of insurance and civil damages. Any insurance company or agent of an insurance company who knowingly provides false, incomplete, or misleading facts or information to a policyholder or claimant for the purpose of defrauding or attempting to defraud the policyholder or claimant with regard to a settlement or award payable from insurance proceeds shall be reported to the Colorado division of insurance within the department of regulatory agencies. NOTE: Pursuant to Colorado Division of Insurance Regulations 8-1-3, notice is hereby given of the availability of an ALTA Closing Protection Letter which may, upon request, be provided to certain parties to the transaction identified in the commitment. Nothing herein contained will be deemed to obligate the company to provide any of the coverages referred to herein unless the above conditions are fully satisfied. ATTORNEYS TITLE INSURANCE AGENCY OF ASPEN, LLC 715 West Main Street, Suite 202 Aspen, CO 81611 Attorneys Title Insurance Agency of Aspen, LLC Privacy Policy Notice PURPOSE OF THIS NOTICE Title V. of the Gramm-Leach-Bliley Act (GLBA) generally prohibits any financial institution, directly or through it affiliates, from sharing non-public personal information about you with a nonaffiliated third party unless the institution provides you with a notice of its privacy policies and practices, such as the type of information that it collects about you and the categories of persons or entities to whom it may be disclosed. In compliance with the GLBA, we are providing you with this document, which notifies you of the privacy policies and practices of Attorneys Title Insurance Agency of Aspen, LLC. We may collect nonpublic personal information about you from the following sources: Information we receive from you, such as on application or other forms. Information about your transactions we secure from out files, or from our affiliates or others. Information we receive from a consumer reporting agency. Information that we receive from others involved in your transaction, such as the real estate agent or lender. Unless it is specifically stated otherwise in an amended Privacy Policy Notice, no additional nonpublic personal information will be collected about you. We may disclose any of the above information that we collect about our customers or former customer to our affiliates or to nonaffiliated third parties as permitted by law. We also may disclose this information about our customers or former customers to the following types of nonaffiliated companies that perform marketing services on our behalf or with whom we have joint marketing agreements: Financial service providers such as companies engaged in banking, consumer finance, securities and insurance. Non-financial companies such as envelope stuffers and other fulfillment service providers. WE DO NOT DISCLOSE ANY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT SPECIFICALLY PERMITTED BY LAW. We restrict access to nonpublic personal information about you to those employees who need to know that information in order to provide products or services to you. We maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. TELEPHONE 970 925-7328 FACSIMILE 970 925-7348 Exhibit 10 Pitkin County Mailing List of 300 Feet Radius Pitkin County GIS presents the information and data on this web site as a service to the public. Every effort has been made to ensure that the information and data contained in this electronic system is accurate, but the accuracy may change. Mineral estate ownership is not included in this mailing list. Pitkin County does not maintain a database of mineral estate owners. Pitkin County GIS makes no warranty or guarantee concerning the completeness, accuracy, or reliability of the content at this site or at other sites to which we link. Assessing accuracy and reliability of information and data is the sole responsibility of the user. The user understands he or she is solely responsible and liable for use, modification, or distribution of any information or data obtained on this web site. This document contains a Mailing List formatted to be printed on Avery 5160 Labels. If printing, DO NOT "fit to page" or "shrink oversized pages." This will manipulate the margins such that they no longer line up on the labels sheet. Print actual size. From Parcel: 273512440009 on 02/13/2017 Instructions: Disclaimer: http://www.pitkinmapsandmore.com Exhibit 12 212 WEST HOPKINS LLC ASPEN, CO 81611 212 W HOPKINS AVE ASPEN HOUSE LLC CHICAGO, IL 60601 225 N COLUMBUS DR #100 GUNNING RALPH ASPEN, CO 81612 PO BOX 11912 ASPEN HOMEOWNERS ASSOCIATION ASPEN, CO 81611 311 W MAIN ST GUNNING JANINE L ASPEN, CO 81612 PO BOX 11705 PRICE DOUGLAS CABIN JOHN, MD 20818 PO BOX 220 MOUNTAIN LODGE HOLDINGS LLC ASPEN, CO 81611 605 W MAIN ST # 2 CRETE ASSOCIATES LP BRYN MAWR, PA 19010 1062 E LANCASTER AVE #30B HEINEMAN S MARLENE DALLAS, TX 753810323 PO BOX 810323 BROWDE DAVID A CHAPPAQUA, NY 10514 604 QUAKER RD TEMPKINS HARRY & VIVIAN MIAMI BEACH, FL 33139 605 LINCOLN RD #301 CHAMBERS PETE CABIN JOHN, MD 20818 PO BOX 220 SILVERSTEIN PHILIP & ROSALYN BRONX, NY 10463 25 KNOLLS CRESCENT APT 81 JACOBY FAMILY LP VERO BEACH, FL 32960 700 20TH ST KARP MICHAEL PHILADELPHIA, PA 19103 1630 LOCUST ST #200 SHEEHAN WILLIAM J & NANCY E FRANKFORT, IL 60423 10 GOLF VIEW LN RICKEL DAVID LANDSDALE, PA 19446 275 GOLDENROD DR SNYDER GARY ELKINS PARK, PA 19027 8324 BROODSIDE RD BOOKBINDER FISHDANCE & DELANEY LLC GRAND JUNCTION, CO 81503 164 LITTLE PARK RD WEST HOPKINS LLC POTOMAC, MD 20859 PO BOX 61510 BERGHOFF KRISTIN TRUST INDIANAPOLIS, IN 46236 9112 WALNUT GROVE DR BERGHOFF MICHAEL R TRUST INDIANAPOLIS, IN 46236 9112 WALNUT GROVE DR 2401 BLAKE LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 132 W MAIN LLC DENVER, CO 80202 1615 CALIFORNIA ST # 707 MONARCH I LLC LEAWOOD, KS 66211 4601 COLLEGE BLVD #350 DH ASE LLC WILMINGTON, DE 19808 2711 CENTERVILLE RD # 400 SEVEN SEAS INVESTMENT LLC WILMETTE, IL 60091 1120 MICHIGAN AVE 118 NORTH FIRST LLC ASPEN, CO 81611 623 E HOPKINS AVE TYROL APARTMENTS LLC ASPEN, CO 81611 200 W MAIN ST TYROLEAN LODGE LLC ASPEN, CO 81611 200 W MAIN ST SKILOFT LLC HOUSTON, TX 77046 11 GREENWAY PLAZA #2000 HITE HENRY HARRIS REVOC TRUST WOODY CREEK, CO 81656 PO BOX 155 HITE ANGELA R FAMILY TRUST WOODY CREEK, CO 81656 PO BOX 155 CHISHOLM EDITH S ASPEN, CO 81611 205 W MAIN ST STEVENSON KAREN H ASPEN, CO 81611 205 W MAIN ST CHISHOLM HEATHER M ASPEN, CO 81611 205 W MAIN ST 212 N SECOND ST LLC TAMPA, FL 33613 509 GUISANDO DE AVILA #201 ELKINS LESLIE KEITH TRUST HOUSTON, TX 77002 1001 FANNIN #700 233 WEST BLEEKER LLC ASPEN, CO 81611 400 E MAIN ST #2 CHOOKASZIAN DENNIS WILMETTE, IL 60091 1100 MICHIGAN AVE MARTIN SCOTT M ASPEN, CO 81611 PO BOX 51 SAND KATHERINE M ASPEN, CO 81612 PO BOX 51 GUNN ROBERT W FAMILY TRST MARBLEHEAD, MA 01945 409 OCEAN AVE GUERRA DONNA DALLAS, TX 75205 3622 SPRINGBROOK ST MAYER KEVIN ASPEN, CO 81611 222 W HOPKINS AVE #2 GROSVENOR DENIS TAOS, NM 875716922 209 CAMINO DE LA MERCED UNTI C FCB LLC SNOWMASS VILLAGE, CO 81615-6622 PO BOX 6622 GASTON JOHN & KATHERINE GREENWICH, CT 06831 16 BRYNWOOD LN GREENASPEN LLC KEY BISCAYNE, FL 33149 30 ISLAND DR GARMISCH LODGING LLC ASPEN, CO 81611 110 W MAIN ST TWIN COASTS LTD BOCA RATON, FL 33432 433 PLAZA REAL #275 INNSBRUCK CONDO ASSOC ASPEN, CO 81611 233 W MAIN ST BLUEGREEN VACATIONS UNLIMITED INC BOCA RATON, FL 33431 4960 CONFERENCE WY N #100 HOTEL ASPEN CONDO ASSOC ASPEN, CO 81611 COMMON AREA 110 W MAIN ST ASPEN MEDICAL CENTER CONDO ASSOC ASPEN, CO 81611 COMMON AREA W MAIN ST NORTHSTAR OFFICE BUILDING CONDO ASSOC ASPEN, CO 81611 COMMON AREA 122 W MAIN ST DIMITRIUS RALLI TRUST PASADENA, CA 91103 535 FREMONT DR HAYMAX LODGING LLC ASPEN, CO 81611 605 W MAIN ST #2 JES 2002 GRANTOR TRUST ASPEN, CO 81611 221 N STARWOOD DR SHIELD JULIET E ASPEN, CO 81611 221 N STARWOOD DR STEVENS BRUCE ASPEN, CO 81611 214 W BLEEKER ST STEVENS LESLEY ASPEN, CO 81611 214 W BLEEKER ST CITY OF ASPEN ASPEN, CO 81611 130 S GALENA ST KETTELKAMP GRETTA M PUEBLO, CO 81008 3408 MORRIS AVE LADA COMMUNITY PROPERTY TRUST LAS VEGAS, NV 89109 2860 AUGUSTA DR MELTON DAVID ASPEN, CO 81611 135 W MAIN ST GLICKMAN ADAM ASPEN, CO 81612 PO BOX 1207 RILEY AMY CLARK ASPEN, CO 81611 129 W BLEEKER ST NEWKAM PATRICK C ASPEN, CO 81611 211 W MAIN ST GUENTHER TODD ASPEN, CO 81611 121 W BLEEKER LLC NIMMO GUENTHER KELLY ASPEN, CO 81611 121 W BLEEKER ST PESIKOFF DAVID HOUSTON, TX 77098 1811 NORTH BLVD ROMANUS RAYMOND CALUMET CITY, IL 60409 19 RIVER OAKS DR TACO 2 LLC ASPEN, CO 81611 220 W MAIN ST #202 SPERAW ENDEAVORS LLC SNOWMASS VILLAGE, CO 81615 PO BOX 6575 WEST MAIN VENTURES ASPEN, CO 81612 PO BOX 11977 ASPEN MAIN OFFICE CONDO ASSOC ASPEN, CO 81611 220 W MAIN ST AJAX VIEW COMMERCIAL/NORTH STAR OFFICE ASPEN, CO 81611 132 W MAIN ST ASPEN CONDOS ASSOC ASPEN, CO 81611 COMMON AREA 311 W MAIN ST WEST SIDE CONDO ASSOC ASPEN, CO 81611 234 W HOPKINS AVE GARET CONDO ASSOC ASPEN, CO 81611 400 E MAIN ST #2 Exhibit 13 Exhibit 14 Exhibit 15 KING LOUISE AHASPEN, COLORADOARCHITECTS ANDSTRUCTURAL ENGINEERSP.O. BOX 164023280 TWO RIVERS ROADBASALT, COLORADO 81621PHONE (970) 927-3167FAX (970) 927-4813THEODORE K GUYASSOCIATES PCISSUE #, 02/15/17TKGA 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 EXISTING GROSS BUILDING AREA c EXISTING LIVABLE AREA 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 c 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 NEW GROSS FAR & DECK AREA Concrete side walk (typ)Bike Rack 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 NEW NET LIVABLE AREA Concrete side walk (typ)Bike RackNET LIVABLE FLOOR AREAUNIT 101846.2 SFUNIT 102868.9 SF 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 ALLEY BUILDING FLOOR PLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 FRONT BUILDING GARDEN LEVEL c 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 FRONT BUILDING MIDDLE LEVEL 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 FRONT BUILDING GARDEN LEVEL TYROLEAN LODGE LLC200 W MAIN STASPEN, CO 81611PARCEL NUMBER 273512440010SEVEN SEAS INVESTMENT LLC1120 MICHIGAN AVEWILMETTE, IL 60091PARCEL NUMBER 273512440007MAIN STR E E T FIRST STREETS75°09'1 1 " E 60.00'N14°50'49"E100.00'N75°09' 1 1 " W 60.00'S14°50'49"W100.00'GRAVEL A L L E Y BASIS OF BEARING100.0' R.O . W .(ASPHALT S U R F A C E )75.45' R.O.W.(ASPHALT SURFACE)20.40' R. O . W .(GRAVEL S U R F A C E ) LOTS P & Q SURVEYOR'S CERTIFICATE I hereby state that this Improvement Survey Plat was prepared by Sopris Engineering, LLC (SE) for King Louise LLC . I furthermore state that the improvements on the above described parcel on this date, February 3, 2017, except utility connections are entirely within the boundaries of the parcel except as shown, that there are no encroachments upon the described premises by improvements on any adjoining premises, except as indicated, and that there is no apparent evidence or sign of any easement crossing or burdening any part of said parcel, except as noted. I furthermore state that this property is subject to reservations, restrictions, covenants and easements of record or in place. I furthermore state, the relative positional accuracy of this survey does not exceed 1:15,000. ______________________________________ Mark S. Beckler L.S. #28643 IMPROVEMENT SURVEY PLAT MAP OF: SHEET 1 OF 1 LOTS P AND Q BLOCK 51 A PARCEL OF LAND SITUATED IN THE NW1 4 OF SECTION 7TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6th P.M. COUNTY OF PITKIN, STATE OF COLORADO NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGALACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 SOPRISENG@SOPRISENG.COM KK 27113 02/14/17 27113 ISP 2017.DWG VICINITY MAP SCALE: 1" = 2000' GENERAL UTILITY NOTES: 1. The locations of underground utilities have been plotted based on utility maps, construction/design plans, other information provided by utility companies and actual field locations in some instances. These utilities, as shown, may not represent actual field conditions. It is the responsibility of the contractor to contact all utility companies for field location of utilities prior to construction. GAS VALVE CURB STOP ELECTRIC METER TELEPHONE PEDESTAL CATV PEDESTAL EXISTING CONDITIONS LEGEND 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 010 10 20 10 405 LOTS P AND Q,BLOCK 51, CITY AND TOWNSITE OF ASPEN COUNTY OF PITKIN STATE OF COLORADO PROPERTY DESCRIPTION LIGHT POLE WOODEN FENCE NOTES 1) Date of Survey: May 2007, January 2011,Updated: February 3, 2017 2) Date of Preparation: February 8, 2017. 3) Basis of Bearing: A bearing of S 14°50'49" W between the found #5 rebar and 1.25" plastic cap L.S. 2547 monumenting the Northeast boundary corner of Lot Q, and the set 1.50" brass disk L.S. 28643 2' witness corner monumenting the Southeast boundary corner of Lot Q, as shown . 4) Basis of Survey: Basis of Survey: The Plat of The City of Aspen, Pitkin County Colorado by G.E. Buchanan dated December 15, 1959, various documents of record and the found monuments, as shown. 5) This survey does not constitute a title search by Sopris Engineering, LLC (SE) to determine ownership or easements of record. For all information regarding easements, rights of way and/or title of record, SE relied upon the above saidplats described in note 4. And the title commitment prepared by Pitkin County Title, Inc., Effective date: February 07, 1994 Case No. PCT-8342C2. No new title work was supplied for this update. SITE XConcrete side walk (typ)Bike RackSITEPLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 SITEPLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 X Concrete side walk (typ)Bike Rack 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 BASEMENT LEVEL PLAN FIRST LEVEL PLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 X Concrete side walk (typ)Bike Rack NET LIVABLE FLOOR AREA UNIT 101 846.2 SF UNIT 102 868.9 SF SECOND LEVEL PLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 THIRD LEVEL PLAN 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 EXTERIOR ELEVATIONS 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 EXTERIOR ELEVATIONS c EXTERIOR ELEVATIONS 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 BUILDING SECTIONS 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 970.927.3167 | tkga@tkga.net TKGA KALH/TKG Theodore K Guy Associates PC REMARKS JOB #: SHEET TITLE: COPYRIGHT THEODORE K GUY ASSOCIATES PC DRAWN: PRINTED: CHECKED: DATE originalKING LOUISE210 W MAIN STASPEN, COLORADOTKG 16103 KingLouiseRestored021317 JAJS.vwx 2/18/17 STRUCTURAL ENGINEERING common sense solutions ARCHITECTURE PLANNING Box 1640, Basalt, CO 81621 DESIGN REVIEW03/24/2016 TYROLEAN LODGE LLC200 W MAIN STASPEN, CO 81611PARCEL NUMBER 273512440010SEVEN SEAS INVESTMENT LLC1120 MICHIGAN AVEWILMETTE, IL 60091PARCEL NUMBER 273512440007MAIN STREETFIRST ST R E E T S75°09'11"E60.00'N14°50'49"E 100.00'N75°09'11"W60.00'S14°50'4 9 " W 100.00'GRAVEL ALLEYBASIS OF B E A R I N G100.0' R.O.W.(ASPHALT SURFACE)75.45' R. O . W .(ASPHAL T S U R F A C E )20.40' R.O.W.(GRAVEL SURFACE)LOTS P & QSURVEYOR'S CERTIFICATEI hereby state that this Improvement Survey Plat was prepared by SoprisEngineering, LLC (SE) for King Louise LLC .I furthermore state that the improvements on the above described parcel onthis date, February 3, 2017, except utility connections are entirely within theboundaries of the parcel except as shown, that there are no encroachmentsupon the described premises by improvements on any adjoining premises,except as indicated, and that there is no apparent evidence or sign of anyeasement crossing or burdening any part of said parcel, except as noted. Ifurthermore state that this property is subject to reservations, restrictions,covenants and easements of record or in place. I furthermore state,the relative positional accuracy of this survey does not exceed 1:15,000.______________________________________Mark S. Beckler L.S. #28643IMPROVEMENT SURVEY PLAT MAP OF:SHEET 1 OF 1LOTS P AND Q BLOCK 51A PARCEL OF LAND SITUATED IN THE NW14 OF SECTION 7TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6th P.M.COUNTY OF PITKIN, STATE OF COLORADONOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGALACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARSAFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON.SOPRIS ENGINEERING - LLCCIVIL CONSULTANTS502 MAIN STREET, SUITE A3CARBONDALE, COLORADO 81623(970) 704-0311 SOPRISENG@SOPRISENG.COMKK 27113 02/14/17 27113 ISP 2017.DWGVICINITY MAPSCALE: 1" = 2000'GENERAL UTILITY NOTES:1. The locations of underground utilities have been plotted based onutility maps, construction/design plans, other information provided byutility companies and actual field locations in some instances. Theseutilities, as shown, may not represent actual field conditions. It is theresponsibility of the contractor to contact all utility companies for fieldlocation of utilities prior to construction.GAS VALVECURB STOPELECTRIC METERTELEPHONE PEDESTALCATV PEDESTALEXISTING CONDITIONS LEGEND1 inch = ft.( IN FEET )GRAPHIC SCALE010102010405LOTS P AND Q,BLOCK 51,CITY AND TOWNSITE OF ASPENCOUNTY OF PITKINSTATE OF COLORADOPROPERTY DESCRIPTIONLIGHT POLEWOODEN FENCENOTES1) Date of Survey: May 2007, January 2011,Updated: February 3, 20172) Date of Preparation: February 8, 2017.3) Basis of Bearing: A bearing of S 14°50'49" W between the found #5 rebarand 1.25" plastic cap L.S. 2547 monumenting the Northeast boundary corner ofLot Q, and the set 1.50" brass disk L.S. 28643 2' witness corner monumentingthe Southeast boundary corner of Lot Q, as shown .4) Basis of Survey: Basis of Survey: The Plat of The City of Aspen, PitkinCounty Colorado by G.E. Buchanan dated December 15, 1959, variousdocuments of record and the found monuments, as shown.5) This survey does not constitute a title search by Sopris Engineering, LLC (SE)to determine ownership or easements of record. For all information regardingeasements, rights of way and/or title of record, SE relied upon the above saidplats described in note 4. And the title commitment prepared by Pitkin CountyTitle, Inc., Effective date: February 07, 1994 Case No. PCT-8342C2. No new titlework was supplied for this update.SITE