HomeMy WebLinkAboutLand Use Case.1350 Mountain View Dr.0021.2007.ASLU_
....
Fde Felt gecord Uavg*e Form Reoot(s Format
lab Help
{
�.'. hump i
.... _.
Main Custom Fields -Fe
� ey [Uwns Parcek
Pooling Status Fee Summary flouting H�stpy Attachmads
-:....
gr ......._... ,_. .__. ---
Pemit Typal �Atpen Lard Use
._______ ._ .. _______ --
Pafmdp rW21.2W2 ASLU
Addmss 11350 MOUNTAIN-VIEW DR
�-� AptAWe
Qti
gp Qty rASPEN
SIaM ED 1611
i Master Permd —
RoWsig Queue asMA7 Aq>bad IOah5SI2007
_
Pf*cl ;.
Status Jpenm Approved
_ .................�
DescrVion (VARIANCE ADDITION TO SINGLE FAMILYRESIDENCE Issued 1 ,
i
Fwd j
? Submitted'RYANHOFFNER - 920.9A28
Clock lRurrsq pays' D Expaes 03)3012006 _
Last Name.FPISH
Fust Nama'ADAM &KATHY 1356 MDUNiAiN NEW OR
(ASPEN CO 81611
' } Phone 1
j} ?v OwnerlsAWkcant?
__ ........ _.__._,____.,--------- „__.,.__. ...
Last Name.FPISH
First Name;ADAM&KATHY
Phone 4970)309 2910 Gun q
' -27608
Londe
Lad Name; J,
Firer Name
i'
! Enter fine doted name
_ _ AnDenGoldbl r.:. Reemd: 2 of 2
RD
CITY OF ASPEN COMMUNITY DEVELOPME ARTMENT
Agreement for Payment of City of Aspen Development Application Fees
CITY OF ASPEN (hereinafter CITY) and ADAM r ism A
(hereinafter APPLICANT) AGREE AS FOLLOWS:
1. APPLICANT has submitted to CITY an application for
rZESIOeNT -)^L_ DES16N srAl40/AV-0 yM2.IANL.c
(hereinafter, THE PROJECT).
2. APPLICANT understands and agrees that City of Aspen Ordinance No. 48 (Series of
2006) establishes a fee structure for Land Use applications and the payment of all processing fees is a
condition precedent to a determination of application completeness.
3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed
project, it is not possible at this time to ascertain the full extent of the costs involved in processing the
application. APPLICANT and CITY further agree that it is in the interest of the parties that
APPLICANT make payment of an initial deposit and to thereafter permit additional costs to be billed
to APPLICANT on a monthly basis. APPLICANT agrees additional costs may accrue following their
hearings and/or approvals. APPLICANT agrees he will be benefited by retaining greater cash liquidity
and will make additional payments upon notification by the CITY when they are necessary as costs are
incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to
process APPLICANT'S application.
4. CITY and APPLICANT further agree that it is impracticable for CITY staff to
complete processing or present sufficient information to the Planning Commission and/or City Council
to enable the Planning Commission and/or City Council to make legally required findings for project
consideration, unless current billings are paid in full prior to decision.
5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right
to collect full fees prior to a determination of application completeness, APPLICANT shall pay an
initial deposit in the amount of $ which is for — hours of Community
Development staff time, and if actual recorded costs exceed the initial deposit, APPLICANT shall pay
additional monthly billings to CITY to reimburse the CITY for the processing of the application
mentioned above, including post approval review at a rate of $235.00 per planner hour over the initial
deposit. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further
agrees that failure to pay such accrued costs shall be grounds for suspension of processing, and in no
case will building permits be issued until all costs associated with case processing have been paid.
CITY OF ASPEN APPLICANT
By: B
Chris Bendon ZN� �hyy
Community Development Director Date:
Billing Address and Telephone Number:
Required
196a MUNNrnIN VIEW OZVE
ASP&M G v 81,411
(��v►- 3on - z°I to
C: \Documents and Settings \johannahr \Desktop \LUFeeAgree.doc
ATTACHMENT 2 —LAND USE APPLICATION
APPLICANT:
Name: ADAM # KAri'Y FRISLH
Location: 139'0 r10W4T- JN VIEW DR. &I T 30 "L" ". wES: MtADaW JciAODN I6164
(Indicate street address, lot & block number, legal description where appropriate)
Parcel ID # (REQUIRED) 2.77 3 So 13 015 [>a B
REPRESENTATIVE:
Name: WYAN HoFFNEIZ 5TWDl0 13 AR.GHITEGTS
Address: Sul we) G,2,+t4D6 PLA41✓ # ),Q+
Phone #: 97-0. 01 +2 8
PROJECT:
Name: FP,4SGH AyyiTION
Address: 135U 11o1n.NTAw V1cL✓ DRIVE ArSFEAI, GU,
Phone #: 3Of) • 2°110
TYPE OF APPLICATION: (please check all that apply):
❑
Conditional Use
❑
Conceptual PUD
❑
Conceptual Historic Devt.
❑
Special Review
❑
Final PUD (& PUD Amendment)
❑
Final Historic Development
❑
Design Review Appeal
❑
Conceptual SPA
❑
Minor Historic Devt.
❑
GMQS Allotment
❑
Final SPA (& SPA Amendment)
❑
Historic Demolition
❑
GMQS Exemption
❑
Subdivision
❑
Historic Designation
❑
ESA — 8040 Greenline, Stream
❑
Subdivision Exemption (includes
❑
Small Lodge Conversion/
Margin, Hallam Lake Bluff,
condominiumization)
Expansion
Mountain View Plane
F]
Lot Split
El
Temporary Use
Other: VAR IANGe
❑
Lot Line Adjustment
❑_
Text/Map Amendment
EXISTING CONDTnONS: (description of existing buildings uses previous approvals, etc.)
.5lNhLe RAVIJL�l ONE STOR`I 12r51GeNz -,a LATH AN A1i'lcGHED �'WZ>
GA:R. G7,kTZPrhG
PROPOSAL: (description of proposed buildings uses modifications etc.)
A 706 5.t. ADD/r10N TV A- SI.VhLt ONiE srniaY MCSIDEdGJSr.
T11E AJ1jPcA -1 1N1_t4ADCS A NIASre2— 9U1TE� UFFILC � FHTQ.y /F4rnD2aoY1
Have you attached the following? FEES DuE: $
NSA ❑ Pre - Application Conference Summary
& Attachment #1, Signed Fee Agreement
WA ❑ Response to Attachment #3, Dimensional Requirements Form
Rr Response to Attachment #4, Submittal Requirements- Including Written Responses to Review Standards
All plans that are larger than 8.5" X 11" must be folded and a Floppy disk with an electric copy of all
written text (Microsoft Word Format) must be submitted as part of the application.
r
N...
Apra 2, 2007
City of Aspen Community Development
130 S. Galena Street
3rd Floor
Aspen, CO 81611
RE: Administrative Variance to the Residential Design Standards
Attn: Planning Staff / Joyce Allgaier
The applicant seeks a variance to the Residential Design Standard for the requirement that the
entry door be no more that ten feet (10' -0 ") back from the front most wall of the building. The
proposed entry is an addition to a non - conforming front door setback. The existing front door
is currently setback twenty four (24' -0 ") from the front most wall of the residence. The new
entry addition improves the existing non - conformance with a setback of eighteen feet (18' -0 ")
from the front most wall of the building. The proposed entry complies with the street facing
door and covered porch requirements of the Design Standard.
a. The proposed addition maintains an appropriate pattern of design to the existing
residence. This addition does not create any new roollines or massing to the
existing home. The proposed entry is a benign addition to the 1960's era home
that is consistent with the architecture and the neighborhood. Any attempt to
conform to this design standard would impact the home by creating a "scabbed
on" addition.
b. The front most wall of the residence is the attached two car garage that was an
addition to the original 1960's home. This earlier garage addition creates an unfair
constraint to the current Residential Design Standards because this addition was
built prior to any design standards and is what created the original non-conformity.
Sincerely,
Ryan Hoffner, AIA
Studio B Architects
S[4[
IMPROVEMENT SURVEY
SECTION 1, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE SIM. PRINCIPAL MERIDIAN
CITY OF ASPEN, PITKIN COUNTY, COLORADO
LOT 3, BLOCK 1
WEST MEADOW SUB- DIVISION
1350 MOUNTAIN VIEW DRIVE
ASPEN, COLORADO 61611
PROPOSED ADDITION
REBAR AND
NF _601".
I SITE PLAN
$GALE: 1:1D
LOT 1
CITY CF aww
GPS MONUMENT
SI.
YS REBM
BENCHMARK'1=7
. .77m.Oa "•d.i
/ P5j 4L16' '
Dtz
Ap
0ti
^ry / d
D11
/ IX M4NSio`'''/ 0121 \..,
DLS
rooD GE
DIV
OILS LOT 3, BLK 1
16,975 SOFT. m(record) GL1z
/ OL1P D10• O16'
D �Q;DLii D14
\` ONE STORY
<
` FRAME RESIDENCE
` .n2dsa C
Mtd'
rINCH PIPE \ �-\ /•]az61e PROPOSED ADD 10
\
` o DID
• • \ •S� MIZ
y
DLI Y y� i
72.0'
DRAINAGFIUTILITY
EASEMENT p \
Bk 2A PG. 245 ?Op ' \ \ D6'
DLI
9l \
'91• Dfi- D114
+d' •\
LOT 2
01 DID
\ a
DL1I'
,•IRON PIPE
.]ezdFa -•
LOT 4
T'
�502`�W
PAVED DRIVEWAY •\
.]02535 \
DIY
u'
REBARAIq
RPC L30161A
De
DIT Dua
DOT
::1
Z
O
LU
9
p
Q
U
cl)N
1.1..
w
90
Zo
2 w 0.
Q
m
PROPOSED ADDITION
6.0'
\
DRAINAGE/UTILTTY
\�
EASEMENT
BK. 2A PG. 245
,•IRON PIPE
.]ezdFa -•
LOT 4
T'
�502`�W
PAVED DRIVEWAY •\
.]02535 \
DIY
u'
REBARAIq
RPC L30161A
De
DIT Dua
DOT
::1
Z
O
LU
9
p
Q
U
cl)N
1.1..
w
90
Zo
2 w 0.
Q
m
ma
E
r�
o..
To
SrtE PLAN
Al2
} I t 1 3F -102' �.. �. lk I
O
~
>0
> O
Q
Q
U
CO
LL
W ❑
Z �
O
Zo
oz
Wa
�U)
m
-
ma
EXISTING
FLOOR PLAN
X2.1
----------------------------------------------- i
z
>
0
E
❑0
o
>
z
C)
D
Cl)
o
w
CL
U)
LL
M
12722ME
FLOOR PLANS
A2.1
soon OEM
L2IEXISTING SOUTH ELEVATION
SGLE: Vi' =1' -0'
40.tl
...wsa
w..ae ww.
L IIPM
o
co
~
o�
30
�
=
U
C/)
LL
wo
?o
o
z
zo
LU
Q
ma
°s
8"
Or�Yp Ta-
EXISTING
ELEVATIONS
X3.1
2 SOUTH ELEVATION
� / SG1LE'tl1' =1' -0'
gee 000.s
Z
>�
O
~
O
30
p
wo
Q
z0
0
Z O
0
U
U
a
o N
nQ
LL
- ma
ELEVATIONS
A3.1