Loading...
HomeMy WebLinkAboutLand Use Case.730 E Cooper Ave.0073.2016.ASLUVICINITY MAPLOCAL JURISDICTION:THE CITY OF ASPEN130 S. GALENA STREETASPEN, CO 81611TEL (970) 429-2761CONTACT: BY DEPARTMENTARCHITECT:MODIF. ARCHITECTURE1200 W. LAKE ST. SUITE 200CHICAGO, IL 60607TEL (773) 307-8420CONTACT: STEVE COUGHLIN, RA OR ROB AVILA, RA, LEED APLANDLORD:730 E. COOPER, LLC.2001 N. HALSTED ST., SUITE 304CHICAGO, IL 60614CONTACT: MARK HUNTTEL (312) 850-1680LAND PLANNER:ROMERO MANAGEMENT, LLC.1340 MOUNTAIN VIEW DR.ASPEN, CO 81611TEL (970) 618-8880CONTACT: DWAYNE ROMEROSTRUCTURAL ENGINEER:SP ENGINEERS LTD.134 N LASALLE SUITE 1930CHICAGO, IL 60602TEL (312) 332-2800CONTACT: MEHUL SHANI, SEEARTH RETENTION ENGINEER:CTL THOMPSON, INC.234 CENTER DRIVEGLENWOOD SPRINGS, CO 81601TEL (970) 945-2809CONTACT: JAMES KELLOGG, PEMEP ENGINEER:MKK CONSULTING ENGINEERS, INC.7600 E. ORCHARD RD., SUITE 250-SGREENWOOD VILLAGE, CO 80111-2518TEL (303) 796-6000CONTACT: CRAIG WATTS, PE, LEED APCITY OF ASPEN COMMUNITY DEVELOPMENTPART 1 - ZONING REQUIREMENTSITEMISSUECHAPTER/ARTICLEORDINANCE NO. 6,2016 ALLOWANCESAPPROVEDRESOLUTIONALLOWANCESSHEETNO.REMARKSPART 2 - BUILDING REQUIREMENTS (2015 INTERNATIONAL BUILDING CODE)1.08 Cumulative Floor Area26.710.2002.35:1(16,255 SF)1.05 Building Height1.01Min. Side Yard (Original St.)Min. Side Yard (west)Min. Rear Yard (Alley)1.07 Minimum Off Street Parking2.01 Occupancy Classification302.1-MIXED - A-2, R-1, S-2 G0012.02 Height & Area Limitationsa) exception to heightTable 504.3-65'/3 Stories/72,000 S.F. 47'-11"/4 Stories/ 29,584 S.F. G001-NOT TO EXCEED 48'-0"c) exception to area506.22.03 Types of Construction602Type IVG0012.04 Mixed Occupancy SeparationsTable 508.42.05 Req. Hrs of fire resistanceTable 601Exterior Bearing WallsTable 601G001Exterior Non-Bearing WallsTable 6011 HRInterior Bearing WallsTable 601Interior Non-Bearing WallsTable 601Primary Structural FrameTable 601Roof Construction and SecondaryMembersTable 6012.07 Fire Resistive Rqmnts701a) Fire Walls Construction706N/AN/Ab) Parapets705.11.1N/AN/Ac) Stairway Enclosures1023.22 HRS2 HRSd) Elevator Enclosures713e) Enclosure of wells & chutes713N/AN/Af ) Interior Wall & Clng finishes803.1Class B/CCOMPLIANT2.08 Fire Protection Systems901a) Sprinkler Systems901COMPLIANTPART 3 - EXIT REQUIREMENTS3.01 Applicability1003.1Must ComplyCOMPLIANT3.02 Max. F.A. per occupantTable 1004.1.2VARIESVARIES3.03 Minimum No. of ExitsTable 1006.3.123.04 Exit access travel distanceTable 1017.2 200'-0" MAXa) Increase permittedTable 1017.2 250'-0" MAXN/Ab) Dead end corridor1020.450'-0"3.05 Capacity of Exits1005.2" (DOORS) .3" (STAIRS)COMPLIANTMinimum width of Exits1005.132"Swing of Exit Doors1010.1.2.1COMPLIANTHardware1010.1.9.1COMPLIANTRevolving Doors1010.1.4.1N/ALandings1010.1.6COMPLIANTHandrails1011.11COMPLIANTConstruction1011.7COMPLIANTEnclosures1023.2COMPLIANTHeadroom1011.36'-8" MIN.0'PROJECT DATASCOPE OF WORKAPPLICABLE CODESZONING DATATOTAL GROSS FLOOR AREA:TOTAL ACTUAL PARKING:CL/PD - COMMERCIAL LODGE / PLANNED DEVELOPMENTSITE DEVELOPMENT DATACONSTRUCTION TYPE:OCCUPANCY CLASSES:FIRE PROTECTION SYSTEM:BUILDING HEIGHT:GROUND FLOOR:EXTERIOR BEARING WALLS:BUILDING DATA32,864 S.F.24 SPACES (VALET, BELOW GRADE)TYPE IV, NEW CONSTRUCTION,FULLY SPRINKLEREDA-2 ASSEMBLY, R-1 HOTEL (TRANSIENT),S-2 PARKING GARAGESPRINKLER SYSTEM,CODED SIGNAL SENDING SYSTEM47'-11" (MEASURED PER 2015 IBC)4,368 S.F.NONECONSTRUCTION OF A NEW, FREE-STANDING LODGING BUILDING.SCOPE OF WORK IS TO INCLUDE SITE IMPROVEMENTS.BUILDING CODE: INTERNATIONAL BUILDING CODE 2015MECHANICAL: INTERNATIONAL MECHANICAL CODE 2015PLUMBING: INTERNATIONAL PLUMBING CODE 2015ELECTRICAL: NATIONAL ELECTRICAL CODE 2014ACCESSIBILITY: ICC/ANSI A117.1 2003ENERGY: INTERNATIONAL ENERGY CONSERVATION CODE 2015FIRE CODE: INTERNATIONAL FIRE CODE 2015FUEL GAS: INTERNATIONAL FUEL GAS CODE 2015FIRE SUPPRESSION/DETECTION SYSTEM DRAWINGS AND CALCULATIONSWILL BE SUBMITTED TO THE BUILDING DEPARTMENT AND THE ARCHITECTFOR REVIEW AFTER THE JOB HAS BEEN AWARDED TO A GENERALCONTRACTOR. AT THAT TIME, THE FIRE SUPPRESSION CONTRACTORAWARDED THE JOB WILL PREPARE AND SUBMIT FOR REVIEW COMPLETEDRAWINGS AND CALCULATIONS IN COMPLETE COMPLIANCE WITH THECITY OF ASPEN, CO.2.06Exterior Wall Fire Resistance Rating Table 602Exception 4 - Class B roof covering.g) Shaft Enclosures 7132 HRS 2 HRS2 HRS2 HRSCOMPLIANTN/ACOMPLIANTFIRE SUPPRESSION NOTEBASED ON A-2 OCCUPANCYb) exception to no. of stories 504.4 4 Stories4 Stories--N/ANorth and West Walls1 HRN/AN/A N/AHT HTHT HT1 HR 1 HRREQUIREDAuto Sprinkler Systemh) Group R-1 Separation Walls420i) Group R-1 Horizontal Separation4201 HR 1 HRj) Corridors Table 1020.1 A-2 = 0 HRS, R-1 = 1/2 HRA-2 = 0 HRS, R-1 = 1/2 HR Auto Sprinkler System1 HR 1 HRk) Elevator Lobby 3006l) Combustable Materials on Exterior Walls 1406-COMPLIANTFloor Construction Table 601/10282 HRS at Exit Discharge LevelCIVIL ENGINEER:SOPRIS ENGINEERING, LLC.502 MAIN STREET, SUITE A-3CARBONDALE, CO 81623TEL (970) 704-0311CONTACT: YANCY NICHOL, PENonseparated OccupanciesAs Req'd by Sec. 420 As Req'd by Sec. 420LANDSCAPE ARCHITECT:CONNECT ONE DESIGN0123 EMMA ROAD, SUITE 200BASALT, CO 81612TEL (970-379-7869)CONTACT: GYLES THORNELYPROJECTLOCATIONDRAWING LIST3D PERSPECTIVE VIEWCOOPER AVE.ORIGINAL ST.2 Lower Levels1 HR 1 HRHT HTCOMPLIANTCOMPLIANTCOMPLIANTNorth and West WallsSec 601, Table 601 footnote c. In all occupancies, heavy timbershall be allowed where a 1hr or less fire-resistance is req'd.BASE LODGE26.710.20026.710.20026.710.20026.710.20026.710.2005'----Min. Front Yard (Cooper St.)26.710.200 0'CODE REQUIREMENT ACTUAL1.06 Public Amenity26.710.200Lodge Floor Area 26.710.200 1.9:1 (13,150 SF)1.10 Average Lodge Unit Size26.710.200Lodge Net Livable Area 26.710.200Commercial Floor Area26.710.200Commercial Net Leasable Area26.710.200Number of Lodge Units/Bedrooms26.710.2001.021.031.041.091.111.121.131.1435'-6" TOP OF 3RD FLOOR PARAPETON CORNER OF COOPER AVE. ANDORIGINAL ST. REMAINING PORTIONSOF BUILDING NOT TO EXCEED 38'.ELEVATOR NOT TO EXCEED 48',WHEN SETBACK ACCORDING TO26.575.0200'CL ZONE PERMITS 2:1 LODGE FAR3,910 SF ON SITE, PLUS 2,702 SFOFF-SITE AS SHOWN IN THISAPPROVED PLAN SET.APPROX. 201 SF7,784 SF0.42:1 (2,922 SF)2,360 SF38 UNITS/40 BEDROOMS/68 PILLOWS0'5'0'0'CL ZONE PERMITS A 0' SETBACK35'-6" TOP OF 3RD FLOOR PARAPETON CORNER OF COOPER AVE. ANDORIGINAL ST. REMAINING PORTIONSOF BUILDING NOT TO EXCEED 38'.ELEVATOR NOT TO EXCEED 48',WHEN SETBACK ACCORDING TO26.575.020CL ZONE PERMITS 38-40', PLUS STANDARDHEIGHT EXEMPTIONS OF SECTION 26.575.020.EXCEPT AS NOTED, THE PROJECT IS SUBJECTTO THE MEASUREMENT METHODOLOGY ANDEXEMPTIONS IN THE LAND USE CODE AT THETIME OF LAND USE SUBMISSION.MINOR ADJUSTMENTS TO THE DIMENSIONS THATDO NOT EXCEED THE ALLOWANCES OFORDINANCE 6 MAY BE APPROVED THROUGHBUILDING PERMIT REVIEW.APPROXIMATELY 6,782 SF AND ASSHOWN ON PLANS IN EXHIBIT B OFORDINANCE 6.2323CL ZONE REQUIRES 21.36 PARKING SPACES.2.49:1(17,260 SF)CL ZONE PERMITS 2.5:1 CUMULATIVE FAR1.74:1 (12,050 SF)APPROX. 200 SF, MINOR CHANGESALLOWED PER SECTION 1 OF ORD. 67,784 SF0.66:1 (4,592 SF) CL ZONE PERMITS 1:1 COMMERCIAL FAR2,478 SF40 UNITS/40 BEDROOMS/80 PILLOWSScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.As indicated7/24/2016 8:40:06 AMASPEN, COG−0012016−0035−3−16COVER SHEET730 E. COOPER AVE.730 EAST COOPER AVENUEASPEN, COSHEET #TITLE1-TITLEG-001 COVER SHEET2-SURVEYSE-S-1.0 ISP VICINITY MAP, NOTES, AND CERTIFICATESSE-S-1.1 ISP - EXISTING CONDITIONS AND TOPOGRAPHY3-CIVIL ENGINEERINGSE-C-1.0 SITE PLANSE-C-2.0 SITE DEMOLITION PLANSE-C-3.0 GRADING PLANSE-C-4.0 UTILITY PLANSE-C-5.0 PRE AND POST BASIN DELINEATIONSE-C-6.0 PERFORMANCE GUARANTEE - LANDSCAPESE-C-6.1 PERFORMANCE GUARANTEE - PUBLIC FACILITIES &INFRASTRUCTURESE-C-6.2 PERFORMANCE GUARANTEE - STORMWATER & DRAINAGETIA TIA EXHIBIT4-LANDSCAPE ARCHITECTUREL1.0 EXISTING SITE CONDITIONSL1.1 TREE ANALYSIS STUDYL2.0 LANDSCAPE SITE PLANL4.0 PLANTING PLAN - STREET LEVELL4.1 PLANTING PLAN - ROOF LEVELL5.0 LANDSCAPE DETAILS - VEG. ROOFL5.1 LANDSCAPE DETAILS - VEG. WALL5-ARCHITECTURALPA-1 EXISTING PUBLIC AMENITYEC-1 EXISTING FLOOR PLANEC-2 EXISTING FLOOR PLANEL-1 EXISTING LODGINGPA-2 PROPOSED PUBLIC AMENITYPA-3 PROPOSED PUBLIC AMENITY - ROOFA-100 PROPOSED LOWER LEVEL 2 FLOOR PLANA-101 PROPOSED LOWER LEVEL 1 FLOOR PLANA-102 PROPOSED MAIN LEVEL FLOOR PLANA-103 PROPOSED SECOND LEVEL FLOOR PLANA-104 PROPOSED THIRD LEVEL FLOOR PLANA-105 PROPOSED ROOF TERRACE PLANFAR-1 FAR CALCULATIONSFAR-2 FAR CALCULATIONSFAR-3 FAR CALCULATIONSNL-1 NET LIVABLE PLANSNL-2 NET LIVABLE PLANSNL-3 NET LIVABLE PLANSA-200 PROPOSED EXTERIOR ELEVATIONSA-201 PROPOSED EXTERIOR ELEVATIONSA-230 PROPOSED SIGNAGE ELEVATIONA-240 PROPOSED OUTDOOR LIGHTINGA-250 EXTERIOR LIGHTING CALCULATIONSA-310 PROPOSED EXTERIOR WALL SECTIONSA-320 PROPOSED EXTERIOR MATERIALS7-STRUCTURALS1.1 STRUCTURAL GENERAL NOTESS2.1 FOUNDATION AND BASEMENT LEVEL 2 PLANS2.2 BASEMENT LEVEL 1 FRAMING PLANS2.3 FIRST FLOOR FRAMING PLANS2.4 SECOND AND THIRD FLOOR FRAMING PLANS2.5 ROOF AND UPPER ROOF FRAMING PLANGrand total: 50APPROVED PLAN SETNO. DATE BYDESCRIPTION x x xxxxxxxxxxxxxxx x xxxxxxxxxxxxxx11.00'PROPOSED PARKINGPROPOSED LOADING & UNLOADINGPROPOSED PARKINGPROPOSED LOBBYENTRANCEPROPOSED RETAIL BENTRANCEPROPOSED RETAIL AENTRANCECOURTYARD 5.00' PERMEABLE PAVERS 5.00' LANDSCAPE AREA 8.00' PEDESTRIAN CORRIDOR 2.00' GUTTER PAN PROPO S E D PARKIN G PROPOSED ASPHALT REPLACEMENT PROPOSED ADA CROSS WALKS WITH DETECTABLE WARNING 11.00' 5.00' 8.00' 22.00' 38.00' 4.50' 8.00' PEDESTRIAN CORRIDOR BIKE LANETRAVEL LANETRAVEL LANEBIKE LANEPARKINGPROPOSED 14 STATION WE-CYCLE FACILITY 8.00' PARALLEL PARKING 11.00' TRAVEL LANE 11.00' TRAVEL LANE 18.00' EXISTING DIAGNOL PARKING PROPO S E D PARKIN G 5.00' 8.00' PROPOSED FLUSH CURB PROPOSED 6" VERTICAL CURB PROPOSED 6" VERTICAL CURB 22.00' 22.00' PROPOSED ALLEY ENTRANCE EXISTING COTTON WOOD TREE TO BE PROTECTED, CONTRACTOR TO INSTALL TREE GRATE, SEE LANDSCAPE PLAN FOR ALL PLANTING AND TREE DETAILS 22.00' 22.00' RELOCATED EXISTING STOP SIGN RELOCATED HIGHWAY SIGNS ORIGINAL STREETEAST CO O P E R A V E N U E 730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ 76.18' ORIGINAL STREET R.O.W. 73.70' E. COOPER R.O.W. LOT R LOT S LOT Q LOT P LOT H LOT I LOT G HWY 8 2 / E A S T COOP E R A V E PROPOSED BUILDING ROOF PROPOSED BUILDING ROOF PROPOSED BUILDING OUTLINE PROPOSED BUILDING OUTLINE APPROX LOCATION OF PROPOSED TREES (TYP) SEE LANDSCAPE PLANS APPROX LOCATION OF PROPOSED TREES (TYP) SEE LANDSCAPE PLANS PROPOSED CAR ELEVATOR PROJECT BENCHMARK FOUND #5 REBAR AND 1.25" PLASTIC CAP L.S. #15198 ELEV = 7933.78 LEFT TURN MOVEMENT ONTO PROPOSED CAR ELEVATOR. SEE PROFILE FOR CAR ON THIS SHEET. ϯϬ͘ϬϬΣΖ ϯϬ͘ϬϬΣΖ R29.00' R2.00' R2.00' R15.00' R10.00' R10.00' R15.00' APPROX LOCATION OF EXISTING TREES 2.00' GUTTER PAN PROPOSED SNOWMELT CONCRETE PROPOSED VEGETATED ZKK&͕цϱϱϯ^&͕^ LANDSCAPE DRAWINGS FOR SIZE AND MATERIAL 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243SITE PLANJOB NO. SHEET SE-C-1.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BYCITY OF ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R PROPOSED SIGN PROPOSED LEGEND EXISTING LEGEND EXISTING EASEMENT EXISTING PROPERTY LINE EXISTING WIRE FENCE EXISTING ROCK WALL PROPOSED ASPHALT PAVEMENT PROPOSED CONCRETE/SIDEWALK PROPOSED PAVERS G:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-SITE.dwg SE-C-1.0........................SITE PLAN SE-C-2.0........................SITE DEMOLITION PLAN SE-C-3.0........................GRADING PLAN SE-C-4.0........................UTILITY PLAN SE-C-5.0........................PRE AND POST BASIN DELINEATION CIVIL SHEET LEGEND BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATIONLock to Lock Time Width Track : : : feet Composite Passenger Vehicle 6.0 6.33 6.33 9.423.00 16.75 Steering Angle 26.4: PROPOSED SNOWMELT CONCRETE XGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGASXGAS x x xxxxxxxxxugugugugugugugugugugugugugugugugugugugugugugugugugXEL XEL XEL XEL XE L XELXELXEL XEL XEL XEL XEL XEL XEL XEL XELXELXELXEL XFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOX FO X F O X F O X F O X FO X FO X FO X FO XTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XW L XWL XWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWL XWL XWL XWL XWL XWLXWLXWLXWLXWLXWLXWLXWLXWLss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss ss XTV XTV XTV XTV XTV XT V XTVXTVXUTXUTXUTXUTXUTXUTXUTXUT XUT XUT XUT X U T X U T XU T XUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUT XUT XUT XUT XUT XUT XUTXUTXUTXUT XUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTX U T X U T X U T XU T XU T XU T XU T XU T X U T X U T X U T XU T XU T XU T XU T XUT XUT XUT XUT XUT XU T XU T XUTxxxxxxX CONTRACTOR TO REMOVE EXISTING TREE CONTRACTOR TO REMOVE AND RELOCATE EXISTING FIRE HYDRANT. SEE UTILITY PLAN C4.0 FOR DETAILS CONTRACTOR TO REMOVE ALL GAS METERS CONTRACTOR TO REMOVE ELECTRIC METERS CONTRACTOR TO SAW CUT ASPHALT TO NEAT CLEAN EDGE CONTRACTOR TO SAW CUT ASPHALT TO NEAT CLEAN EDGE (TYP.) X CONTRACTOR TO REMOVE EXISTING "NO PARKING ANYTIME" SIGN XX X CONTRACTOR TO REMOVE AND RELOCATE EXISTING HWY 82, PUBLIC PARKING, SCENIC BYWAY AND STOP SIGN CONTRACTOR TO REMOVE EXISTING "NO PARKING ANYTIME" SIGN X CONTRACTOR TO REMOVE EXISTING "NO PARKING ANYTIME" SIGN X CONTRACTOR TO REMOVE AND REPLACE EXISTING "ONE WAY" SIGN X CONTRACTOR TO REMOVE AND REPLACE EXISTING PARKING SIGN XCONTRACTOR TO REMOVE EXISTING "BUCKHORN ARMS BLDG" SIGN CONTRACTOR TO REMOVE EXISTING LANDSCAPE WALL CONTRACTOR TO REMOVE EXISTING BUCKHORN ARMS BLDG AS WELL AS ALL STAIRWAYS, ROOFS, AND OVERHANGS. CONTRACTOR TO SAW CUT ASPHALT TO NEAT CLEAN EDGE (TYP.) EXISTING ASPHALT TO BE REMOVED AND REPLACED TO INSTALL ELECTRIC CONDUIT TO PROPOSED 3 PHASE TRANSFORMER AT 730 E. COOPER. SEE UTILITY PLAN C4.0 FOR DETAILS EAST C O O P E R A V E N U E ORIGINAL STREETxxxxxxxxxxxxxxxCONTRACTOR TO ABANDON EXISTING WATER SERVICE AT MAIN PER C.O.A. SPECIFICATIONS AND REQUIRMENTS CONTRACTOR TO REMOVE EXISTING CURB TO NEAREST JOINT FOR INSTALLATION OF PROPOSED CURB INLET 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243SITE DEMOLITION PLANJOB NO. SHEET SE-C-2.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BYCITY OF ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-DEMO.dwg GENERAL SITE DEMOLITION NOTES: 1. EXISTING CONDITIONS BASED UPON ISP SURVEY PERFORMED BY SOPRIS ENGINEERING LLC. DATE OF SURVEY DEC-JANUARY 2015-2016. 2. THE LOCATIONS OF UNDERGROUND UTILITIES HAVE BEEN PLOTTED BASED ON UTILITY MAPS, LOCATES, OR OTHER INFORMATION PROVIDED BY UTILITY COMPANIES AND ACTUAL FIELD LOCATIONS IN SOME INSTANCES. THESE UTILITIES, AS SHOWN, MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATION OF UTILITIES PRIOR TO CONSTRUCTION. 3. ALL UTILITIES, BOTH UNDERGROUND AND OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGES TO, OR INTERRUPTION OF, SERVICES CAUSED BY THE CONSTRUCTION. 4. THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS TO THE SITE BOUNDARIES AND SPECIFIED RIGHT OF WAY. THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR EXPRESSED CONSENT OF THE OWNER OR DEVELOPMENT REPRESENTATIVES. 5. CONTRACTOR TO COORDINATE ALL UTILITY LINEWORK WITH THE RESPECTIVE UTILITY COMPANIES PRIOR TO CONSTRUCTION. ALL UTILITY WORK SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THE UTILITY PROVIDER. EXISTING STORM SEWERXSDXSD EXISTING PROPERTY LINE EXISTING WATER MAINXWLXWL EXISTING SANITARY SEWER MAIN EXISTING ELEC, TELE, CABLE, GASXETCGXETCG EXISTING GAS XETC XETC EXISTING TELEPHONE XGAS XGAS XGAS EXISTING UNDERGROUND ELECTRIC EXISTING CABLE EXISTING ELEC, TELE, CABLE XUT XUT XUT XEL XEL XEL XTV XTV XTV XSA XSA PROPOSED SAWCUT LINE (LIMIT OF DISTURBANCE) DEMO LEGEND ABANDON EXISTING UTILITIESxx ASPHALT REMOVAL CURB REMOVAL SIDEWALK/CONCRETE REMOVAL LANDSCAPE WALL REMOVAL BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION SURVEY SITE 2706.59 SQ FT 0.06 ACRES x x xxxxxxxxxxx3.2%2.0%2.0%3.2%5.2%0.8% 2.0% 3.5% 2.0% 0.6% 2.0% 2.0% 6.3% 1.0% 0.4%2.7%2.0%2.1%1.5%4.3%0.9% 5.0%1.8%4.6%1.6%3.0%2.0% 5.2%2.0%2.0% 2.0%0.0%2.0% 2.5%4.5%2.0% 0.9% 2.0%2.0%5.0%2.0%2.4%2.0% 0.5%0.5%1.9%5.0% 4.7% 3.6%3.6%5.0%5.0%5.0%5.0%2.0%4.3%4.5%9.5%5.0%5.0%2.0% 0. 0 % 10.4%0.0%2.0%1.9%3.1%7.2%3.0%1.6%1.7%8.3%2.0%4.4%0.7%2.0%2.0% 2.0% 0.0%0.2%2.2% PROPOSED AREA DRAIN FOR COURTYARD SIZE AND FINAL LOCATION TBD PROPOSED DRYWELL IN BASEMENT. DRYWELL FOR WATER QUALITY AND TO CAPTURE AND PUMP OUT 10 AND 100 YEAR STORMS. FINAL SIZING AND CALCULATIONS TBD PROPOSED PRESSURE PIPE TO DISCHARGE 100 YEAR STORM EVENTS FROM BASEMENT DRYWELL INTO PROPOSED INLET AND C.O.A. STORM SYTEM FINAL SIZING TBDPROPOSED PERMEABLE PAVERS EX STORM INLET RIM=7936.10' INV IN (S) 36" CMP=31.16' INV OUT (N) 36" CMP=31.08' EX STORM MH RIM=7936.10' INV IN (S) 36" CMP=31.16' INV OUT (N) 36" CMP=31.08' PROPOSED STORM INLET TO BE PLACED ON 36" STORM SEWER ASSUMED INVERT=7928.45. CONTRACTOR TO VERIFY EXISTING INVERT PRIOR TO CONSTRUCTION. PROPOSED HDPE PIPE TO BE MIN DEPTH OF COVER OF 3' SIZE TBD 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243SITE GRADINGJOB NO. SHEET SE-C-3.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BYCITY OF ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R DRAINAGE DIRECTION/SLOPE SPOT ELEVATION EXAMPLE: TOP OF CONCRETE @ 7900.00' = BOW = BOTTOM OF WALL EOA = EDGE OF ASPHALT EX = EXISTING GRADE FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE FL = FLOW LINE HP = HIGH POINT LP = LOW POINT MATCH EX = MATCH EXISTING RIM = RIM ELEVATION TBC = TOP BACK OF CURB TOC = TOP OF CONCRETE SPOT ELEVATION LEGEND 2.0% G:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-GRD.dwg FINAL GRADING & DRAINAGE NOTES: 1. EXISTING CONTOURS ILLUSTRATED HEREIN ARE AT 1 FT INTERVAL. 2. PROPOSED CONTOURS ARE AT 0.5' INTERVALS. 3. GRADE LANDSCAPE AND HARDSCAPE SURFACES AROUND BUILDING PERIMETER AS NEEDED TO PROVIDE POSITIVE DRAINAGE AWAY FROM EXTERIOR WALLS. SURFACE RUNOFF TO BE DIRECTED TO STORMWATER TREATMENT/DETENTION FACILITIES AS DESCRIBED WITHIN PLANS & ASSOCIATED DRAINAGE STUDY INCLUDED WITHIN BUILDING PERMIT APPLICATION. 4. CONTRACTOR TO VERIFY GRADES ACROSS SITE TO INSURE THAT THE INSTALLATION OF THE DRAINAGE IMPROVEMENTS ARE IN COMPLIANCE WITH THE INTENT OF THE DESIGN RECOMMENDATIONS ILLUSTRATED HEREIN AND ON THE DRAINAGE PLAN. THE ENGINEER OF RECORD SHOULD BE MADE AWARE OF ANY EXISTING GRADES THAT MAY IMPEDE THE CONSTRUCTION OF THE GRADING AND DRAINAGE IMPROVEMENTS. 5. ROOF DRAIN SYSTEM BY OTHERS. 6. THIS PROPERTY IS SITUATED IN ZONE "X" (AREA DETERMINED TO BE OUTSIDE THE 500-YEAR FLOOD PLAIN) AS SHOWN ON THE FLOOD INSURANCE RATE MAP PREPARED BY F.E.M.A. FOR PITKIN COUNTY COLORADO, COMMUNITY-PANEL NUMBER 08097C0204 C, EFFECTIVE DATE: JUNE 4, 1987. 7. INSTALL INLET PROTECTION AT ALL INLETS. 8. AT ALL TIMES DURING CONSTRUCTION AND UNTIL FINAL COMPLETION AND ACCEPTANCE OF THE WORK, THE CONTRACTOR SHALL PREVENT THE FORMATION OF ANY AIRBORNE DUST NUISANCE IN SUCH A MANNER THAT IT WILL CONTAIN DUST PARTICLES TO THE IMMEDIATE AREA OF THE WORK. THE CONTRACTOR MUST PERFORM SUCH TREATMENT WITHIN 2 HOURS AFTER NOTIFICATION BY THE CITY THAT AN AIRBORNE DUST NUISANCE EXISTS. 9. THE CONTRACTOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES (BMP's) TO MINIMIZE THE TRANSPORTATION OF SEDIMENT BEYOND THE LIMITS OF DISTURBANCE. 10. THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS TO THE AREA WITHIN THE LIMITS OF DISTURBANCE, THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR CONSENT OF THE PROPERTY OWNER INVOLVED. 11. ALL EXISTING AND PROPOSED GATE VALVES AND MANHOLE COVERS MUST BE ADJUSTED SUCH THAT THE TOP IS SET 1 2" BELOW FINAL GRADE. 12. COMPACTION IN EXCAVATED AREAS SHALL BE 95% MODIFIED PROCTOR DENSITY. 13. THE UTILITIES AS SHOWN, MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION. 14. ALL SPOT ELEVATIONS AND GRADING CONCEPTS SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ANY DEVIATIONS SHALL BE COORDINATED WITH THE ENGINEER OF RECORD AND LANDSCAPE ARCHITECT. 15. NO CROSS CONNECTIONS BETWEEN FOUNDATION DRAINS AND SURFACE DRAINS SHALL BE PERMITTED. 16. THE PUBLIC PEDESTRIAN AREAS HAVE BEEN DESIGNED PER THE AMERICAN'S WITH DISABILITIES ACT (ADA) STANDARDS. THE MAIN PEDESTRIAN CORRIDORS HAVE BEEN DESIGNED W/ A MAX CROSS SLOPE OF 2.0%. THE CONTINUOUS LONGITUDINAL SLOPES AREA ALL LESS THAN THE MAX, 5% SLOPE. HAND-I-CAP RAMPS SHALL BE CONSTRUCTED W/ ADA AND C.O.A. STANDARDS. PROPOSED CONTOUR PROPOSED CONTOUR INTERVAL PROPOSED STORM SEWER EXISTING CONTOUR EXISTING CONTOUR INTERVAL EXISTING STORM SEWERXSDXSDXSDXSD EXISTING EASEMENT EXISTING PROPERTY LINE PROPOSED UNDERDRAIN>>>> PROPOSED SAWCUT LINE (LIMIT OF DISTURBANCE) GRADING & EROSION CONTROL LEGEND BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXGASXEL XEL XEL XEL XE L XELXELXEL XEL XEL XEL XEL XEL XEL XEL XELXELXELXEL XFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOX FO X F O X F O X F O X FO X FO X FO X FOXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTV XTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXTVXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXFOXWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWL XWL XWL XWL XWLXWLXWLXWLXWLXWLXWLXWLXWLXSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XTV XTV XTV XTV XTV XT V XTVXTVXUTXUTXUTXUTXUTXUTXUTXUT XUT XUT XUT X U T X U T XU T XUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUT XUT XUT XUTXUTXUT XUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTXUTX U T X U T X U T XU T XU T XU T XU T XU T X U T X U T X U T XU T XU T XU T XU T XUT XUT XUT XUT XUT XU T XU T XUTXSAXSAxxxxxxWLSVCUTVUTVUTVUTVUTVUTVFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELTELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELGASGASGASGASGASUELUELUELUELUELUELUELUELUELUELUELUELU E L U E L UEL UEL UEL UEL UEL UEL UEL UEL UELUELUELUELUELUELUELUELUELUELCONNECT PROPOSED GAS LINE TO EXISTING 4" PE LINE. CONTRACTOR TO COORDINATE WITH SOURCE GAS FOR INSTALLATION CONTRACTOR TO CAP AND PLUG EXISTING 3/4" PE LINE GOING INTO EXISTING BUILDING CONTRACTOR TO LOCATE EXISTING SEWER STUB OFF NEW 10" SEWER MAIN. EXISTING STUB IS WEST OF MH C4-2-1. EXISTING SEWER SERVICE EAST OF MH C4-2.1, TO BE ABANDONED AT THE MAIN PER ASPEN CONSOLIDATED SANITATION DISTRICT STANDARDS AND SPECIFICATIONS CONTRACTOR TO LOCATE EXISTING SWITCH CABINET AND 3 PHASE TRANSFORMER. CONTRACTOR TO COORDINATE WITH CITY OF ASPEN ELECTRIC DEPARTMENT FOR CONNECTION, AND INSTALLATION OF PROPOSED 3 PHASE POWER CONTRACTOR TO INSTALL (2) 4" CONDUITS (1) FROM EXISTING SWITCH CABINET AT WEST END OF ALLEY AND (1) FROM 3 PHASE TRANSFORMER ALSO AT WEST END OF ALLEY CONTRACTOR TO INSTALL 7'X7' VAULT AND 3 PHASE TRANSFORMER CONTRACTOR TO LOCATE EXISTING TELECOMMUNICATIONS MH. CONTRACTOR TO INSTALL (1) 4" CONDUIT AND (1) 2" CONDUIT FOR CENTURY LINK TELEPHONE AND FIBER OPTIC TO PROPOSED BASE 1 BUILDING. CONTRACTOR TO COORDINATE W/ CENTURY LINK CONTRACTOR TO LOCATE EXISTING COMCAST CABLE PEDESTAL. CONTRACTOR TO COORDINATE WITH COMCAST TO SPLICE AND RELOCATE EXISTING PEDESTAL PROPOSED RELOCATION OF EXISTING COMCAST PEDESTAL PROPOSED ELECTRIC METER, TELEPHONE, CABLE AND FIBER PEDESTAL PROPOSED GAS METER CONTRACTOR TO LOCATE EXISTING WATER MAIN AND COORDINATE WITH COA WATER DEPARTMENT FOR INSTALLATION OF TAP; INSTALL 4" DIP WATER SERVICE PER COA WATER DEPARTMENT STANDARDS CONTRACTOR TO RELOCATE EXISTING FIRE HYDRANT SOUTH TO PROPOSED LOCATION EXISTING TELECOMMUNICATION VAULT TO REMAIN SECONDARY ELECTRIC TO FEED OUTLETS AT BASE OF PROPOSED STREET TREES SMH C-4-2.1 RIM=7930.32' INV IN (E) 12" PVC=7923.81' INV OUT (W) 12" PVC=7923.72' SMH RIM=7927.77' INV IN (E) 12" PVC=7921.43' INV OUT (W) 12" PVC=7922.19' 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243SITE UTILITY PLANBASE LODGE / 730 E. COOPER AVENUEJOB NO. SHEET SE-C-4.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BYCITY OF ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSISSUE FOR RECORDATIONKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-UTIL.dwg PROPOSED WATER VALVE PROPOSED CURB STOP PROPOSED GAS METER/VALVE PROPOSED ELECTRIC TRANSFORMER PROPOSED ELECTRIC METER PROPOSED TELEPHONE PEDESTAL PROPOSED CATV PEDESTAL PROPOSED SEWER CLEANOUT PROPOSED LIGHT POLE PROPOSED SIGN PROPOSED STORM INLET PROPOSED GAS PROPOSED TELEPHONE GAS GAS PROPOSED UNDERGROUND ELECTRIC PROPOSED CABLE PROPOSED STORM SEWER TEL TEL UEL UEL UTV UTV EXISTING ELECTRIC MANHOLE EXISTING DRAINAGE DRY-WELL EXISTING SEWER MANHOLE EXISTING TELEPHONE MANHOLE EXISTING UTILITY MANHOLE EXISTING FIRE HYDRANT EXISTING WATER VALVE EXISTING CURB STOP EXISTING GAS METER EXISTING ELECTRIC TRANSFORMER EXISTING ELECTRIC METER EXISTING TELEPHONE PEDESTAL EXISTING CATV PEDESTAL EXISTING SEWER CLEANOUT EXISTING LIGHT POLE EXISTING SIGN EXISTING STORM INLET EXISTING STORM SEWER EXISTING EASEMENT EXISTING PROPERTY LINE EXISTING WATER MAINXWLXWL EXISTING SANITARY SEWER MAIN EXISTING GAS EXISTING TELEPHONE XGAS XGAS XGAS EXISTING UNDERGROUND ELECTRIC EXISTING CABLE XUT XUT XUT XEL XEL XEL XTV XTV XTV XSA XSA PROPOSED UNDERDRAIN>>>> 1. ALL MINIMUM DEPTHS, SEPARATION DISTANCES, MATERIALS AND/OR USE OF CONDUIT SHALL BE CONFIRMED AND COORDINATED WITH THE UTILITY PROVIDER. 2. ALL UTILITY LINES AND/OR CONDUITS TO BE BACKFILLED WITH SUITABLE MATERIAL FREE OF ROCKS >1 ‘86(&/$66$**5(*$7(%$6(0$7(5,$/)25%('',1*$1'2568,7$%/(216,7(0$7(5,$/ INSTALL PER UTILITY PROVIDER SPECIFICATIONS. BACKFILL TRENCHES WITH SUITABLE ONSITE MATERIALS. MINIMUM COMPACTION 95% IN PAVED AREAS. 3. GAS AND ELECTRIC TO BE INSTALLED IN SEPARATE TRENCHES. SEWER SERVICES TO BE INSTALLED A MINIMUM 10' FROM WATER SERVICES AS FEASIBLE. COMMUNICATIONS MAY BE INSTALLED IN COMBINED TRENCHES PER CONSTRUCTION FEASIBILITY AS LONG AS MINIMUM SEPARATION DISTANCES AND DEPTHS OF BURY ARE MAINTAINED. INSTALL WARNING TAPE OVER ALL UTILITY LINES. UTILITY SERVICE MINIMUM DEPTH WATER--------------------------------7.0' SEWER--------------------------------5.0' ELECTRIC----------------------------4.0' CABLE TV----------------------------3.0' PHONE--------------------------------3.0' GAS----------------------------------- 3.0' 1. CONTRACTOR TO COORDINATE ABANDONMENT, RELOCATION, AND BURIAL OF THE EXISTING UTILITIES WITH THE UTILITY PROVIDERS. CONTRACTOR TO PROVIDE ALL TRENCHING, BEDDING, AND BACKFILL WORK NECESSARY FOR UTILITY RELOCATION. 2. THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS WITHIN THE LIMITS OF CONSTRUCTION. CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR CONSENT OF THE PROPERTY OWNER(S) INVOLVED. 3. THE LOCATIONS OF UNDERGROUND UTILITIES HAVE BEEN PLOTTED BASED ON UTILITY MAPS, LOCATES OR OTHER INFORMATION PROVIDED BY UTILITY COMPANIES AND ACTUAL FIELD LOCATIONS IN SOME INSTANCES. THESE UTILITIES, AS SHOWN MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATION OF UTILITIES PRIOR TO CONSTRUCTION. 4. CONTRACTOR TO POTHOLE AND VERIFY ALL UTILITIES PRIOR TO CONSTRUCTION TO VERIFY LOCATION, SIZE AND DEPTH OF UTILITIES AND TIE IN POINTS. 5. ALL UTILITIES, BOTH UNDERGROUND AND OVERHEAD, SHALL BE MAINTAINED IN CONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY DAMAGES TO, OR INTERRUPTION OF, SERVICES CAUSED BY THE CONSTRUCTION. 6. CONTRACTOR TO COORDINATE ALL UTILITY LINEWORK WITH THE RESPECTIVE UTILITY COMPANY PRIOR TO CONSTRUCTION. 7. ALL SITE AND UTILITY WORK SHALL BE IN COMPLIANCE WITH CITY OF ASPEN RULES & REGULATIONS A PRE-CONSTRUCTION MEETING IS REQUIRED PRIOR TO COMMENCEMENT OF WORK.. GENERAL UTILITY NOTES: SHALLOW UTILITY NOTES: UTILITY PLAN LEGEND PROPOSED ELECTRIC TELEPHONE & CABLEETCETC x xxxxxxxxxxxxEX BASIN 1 EX BASIN 2 x x xxxxxxxxxXEL XEL XEL XEL XE L XELXELXEL XEL XEL XEL XEL XEL XEL XEL XELXELXELXEL xxxxPOST BASIN 1 POST BASIN 2POST BASIN 3ROOF DRAINED TO CENTRAL DRAINS AND SENT TO BASEMENT DRYWELL PERMEABLE PAVERS APPROX 490 SQ FT GREEN ROOF APPROX 950 SQ FT PROPOSED INLET TO DRYWELL IN BASEMENT PROPOSED DRYWELL, SIZE TBD PROPOSED STORM INLET TO BE INSTALL AT INVERT OF EXISTING STORM LINE PROPOSED 100 YEAR STORM DISCHARGE PIPE TO BE ROUTED FROM DRYWELL IN BASEMENT 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 Know what's R OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PRE AND POST BASIN DELINEATIONJOB NO. SHEET SE-C-5.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BYCITY OF ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSG:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-DRN.dwg BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxSUBJECT PROPERTY BOUNDARY EAST C O O P E R A V E N U E SOUTH ORIGINAL STREET730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT R LOT S LOT Q LOT P LOT I LOT H LOT G BLOCK 105 ALLEY 20.20' S. ORIGINAL STREET 76.18' ROW E. COOPER AVENUE 73.70' ROW 730 E. COOPER AVE SUBJECT PROPERTY E. MAI N S T R E E T ( H W Y 8 2 )S. ORIGINAL STREET (HWY 82)ASPEN, CO E. COO P E R A V E N U E E. COO P E R A V E N U E ( H W Y 8 2 ) 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - LANDSCAPEJOB NO. SHEET SE-C-6.0 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg LANDSCAPE GUARANTEE: THIS EXHIBIT ILLUSTRATES THE EXTENTS OF LANDSCAPING ASSOCIATED WITH RE-VEGETATING AND STABILIZING THE SITE UNDER THE SCENARIO THAT THE PROJECT HALTS AND HAS BEEN PREPARED IN SUPPORT OF THE LANDSCAPE PERFORMANCE GUARANTEE. NOTES: 1. ASSUMES EXISTING BUILDING HAS BEEN REMOVED IN FULL AND ROUGH GRADING IS IN APPROPRIATE CONDITION TO RECEIVE TOPSOIL. 2. OFFSITE STABILIZATION IS NOT INCLUDED IN THIS GUARANTEE. PLEASE REFER TO PUBLIC FACILITIES & INFRASTRUCTURE GUARANTEE AND STORMWATER & DRAINAGE GUARANTEE FOR ADDITIONAL INFORMATION. ONSITE TOPSOIL, GRASS SEED AND TEMPORARY IRRIGATION. ONSITE LANDSCAPING PERFORMANCE GUARANTEE GENERAL VICINITY MAP SCALE: 1" = 200' BASE MAPPING: 2015 GOOGLE EARTH AERIAL PHOTO BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx x xxxxxxxxxS. ORIGINAL STREET 76.18' ROW SOUTH ORIGINAL STREETBLOCK 105 ALLEY 20.20' SUBJECT PROPERTY BOUNDARY LOT G LOT H LOT I LOT Q LOT S LOT R 730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT P E. COOPER AVENUE 73.70' ROW EAST C O O P E R A V E N U E REFER TO LANDSCAPE GUARANTEE PLAN FOR SITE RECLAMATION PEDESTRIAN CROSSING PAVEMENT MARKINGS PEDESTRIAN CROSSING PAVEMENT MARKINGS LANDSCAPING (TYP) LANDSCAPING (TYP) LANDSCAPING (TYP) ADA RAMP ADA RAMP BARRIER CURB & GUTTER - TYPE A (TYP) BARRIER CURB & GUTTER - TYPE A (TYP) 8.0'5.0' 8.0'5.0' 8.0' 5.0' 8.0'22.0' (2) ON S T R E E T P A R A L L E L PARKIN G S T A L L S (3) ON STREET PARALLELPARKING STALLS(2 STANDARD, 1 OVERSIZE)8.0' 22.0' 5.0' SIDEWALK BIKE LANE STRIPING CENTERLINE STRIPING BIKE LANE STRIPING EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER APPROXIMATE LIMITS OF DISTURBANCE 8.0' 38.0' 22.0' PROPOSED TREE (TYP) 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - PUBLIC FACILITIES & INFRASTRUCTUREJOB NO. SHEET SE-C-6.1 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg NOTES: 1. THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PUD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. SITE IMPROVEMENTS LEGEND PROPERTY BOUNDARY PROPOSED LIMITS OF DISTURBANCE PROPOSED LANDSCAPING PROPOSED ASPHALT PROPOSED CONCRETE PUBLIC FACILITIES & INFRASTRUCTURE GUARANTEE BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx x xxxxxxxxx730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT S LOT R LOT Q LOT G SOUTH ORIGINAL STREETS. ORIGINAL STREET 76.18' ROW EAST C O O P E R A V E N U E E. COOPER AVENUE 73.70' ROW LOT P LOT H SUBJECT PROPERTY BOUNDARY LOT I BLOCK 105 ALLEY 20.20' PROPOSED STORMWATER DRYWELL SIZE AND FINAL CALCULATION TBD PROPOSED PRESSURIZED HDPE TO DRAIN TO PROPOSED INLET AND C.O.A. STORM SYSTEM STORMWATER DISCHARGE PIPE TO TAKE STORMWATER FROM PROPOSED DRYWELL VIA PUMP TO PROPOSED INLET PROPOSED INLET TO CONNECT TO EXISTING C.0.A. STORM DRAIN SYSTEM 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - STORMWATER & DRAINAGEJOB NO. SHEET SE-C-6.2 DATE: 07-15-2016NO.REVISIONBY DATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg NOTES: 1. THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PUD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. SITE IMPROVEMENTS LEGEND PROPERTY BOUNDARY PROPOSED LIMITS OF DISTURBANCE PROPOSED LANDSCAPING PROPOSED ASPHALT PROPOSED CONCRETE STORMWATER & DRAINAGE GUARANTEE BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxSUBJECT PROPERTY BOUNDARY EAST C O O P E R A V E N U E SOUTH ORIGINAL STREET730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT R LOT S LOT Q LOT P LOT I LOT H LOT G BLOCK 105 ALLEY 20.20' S. ORIGINAL STREET 76.18' ROW E. COOPER AVENUE 73.70' ROW 730 E. COOPER AVE SUBJECT PROPERTY E. MAI N S T R E E T ( H W Y 8 2 )S. ORIGINAL STREET (HWY 82)ASPEN, CO E. COO P E R A V E N U E E. COO P E R A V E N U E ( H W Y 8 2 ) 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - LANDSCAPEJOB NO. SHEET SE-C-6.0 DATE:07-15-2016NO.REVISIONBYDATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg LANDSCAPE GUARANTEE: THIS EXHIBIT ILLUSTRATES THE EXTENTS OF LANDSCAPING ASSOCIATED WITH RE-VEGETATING AND STABILIZING THE SITE UNDER THE SCENARIO THAT THE PROJECT HALTS AND HAS BEEN PREPARED IN SUPPORT OF THE LANDSCAPE PERFORMANCE GUARANTEE. NOTES: 1.ASSUMES EXISTING BUILDING HAS BEEN REMOVED IN FULL AND ROUGH GRADING IS IN APPROPRIATE CONDITION TO RECEIVE TOPSOIL. 2.OFFSITE STABILIZATION IS NOT INCLUDED IN THIS GUARANTEE. PLEASE REFER TO PUBLIC FACILITIES & INFRASTRUCTURE GUARANTEE AND STORMWATER & DRAINAGE GUARANTEE FOR ADDITIONAL INFORMATION. ONSITE TOPSOIL, GRASS SEED AND TEMPORARY IRRIGATION. ONSITE LANDSCAPING PERFORMANCE GUARANTEE GENERAL VICINITY MAP SCALE: 1" = 200' BASE MAPPING: 2015 GOOGLE EARTH AERIAL PHOTO BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx x xxxxxxxxxS. ORIGINAL STREET 76.18' ROW SOUTH ORIGINAL STREETBLOCK 105 ALLEY 20.20' SUBJECT PROPERTY BOUNDARY LOT G LOT H LOT I LOT Q LOT S LOT R 730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT P E. COOPER AVENUE 73.70' ROW EAST C O O P E R A V E N U E REFER TO LANDSCAPE GUARANTEE PLAN FOR SITE RECLAMATION PEDESTRIAN CROSSING PAVEMENT MARKINGS PEDESTRIAN CROSSING PAVEMENT MARKINGS LANDSCAPING (TYP) LANDSCAPING (TYP) LANDSCAPING (TYP) ADA RAMP ADA RAMP BARRIER CURB & GUTTER - TYPE A (TYP) BARRIER CURB & GUTTER - TYPE A (TYP) 8.0'5.0' 8.0'5.0' 8.0' 5.0' 8.0'22.0' (2) ON S T R E E T P A R A L L E L PARKIN G S T A L L S (3) ON STREET PARALLELPARKING STALLS(2 STANDARD, 1 OVERSIZE)8.0' 22.0' 5.0' SIDEWALK BIKE LANE STRIPING CENTERLINE STRIPING BIKE LANE STRIPING EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER EXISTING CURB AND GUTTER APPROXIMATE LIMITS OF DISTURBANCE 8.0' 38.0' 22.0' PROPOSED TREE (TYP) 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - PUBLIC FACILITIES & INFRASTRUCTUREJOB NO. SHEET SE-C-6.1 DATE:07-15-2016NO.REVISIONBYDATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg NOTES: 1.THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PUD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. SITE IMPROVEMENTS LEGEND PROPERTY BOUNDARY PROPOSED LIMITS OF DISTURBANCE PROPOSED LANDSCAPING PROPOSED ASPHALT PROPOSED CONCRETE PUBLIC FACILITIES & INFRASTRUCTURE GUARANTEE BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION x x xxxxxxxxxxxxxxxx x xxxxxxxxxxxxxxxx x xxxxxxxxx730 E. COOPER AVENUE NORA D. KELLY TRUST цϲ͕ϵϮϲ^͘&͘ цϬ͘ϭϲZ^ LOT S LOT R LOT Q LOT G SOUTH ORIGINAL STREETS. ORIGINAL STREET 76.18' ROW EAST C O O P E R A V E N U E E. COOPER AVENUE 73.70' ROW LOT P LOT H SUBJECT PROPERTY BOUNDARY LOT I BLOCK 105 ALLEY 20.20' PROPOSED STORMWATER DRYWELL SIZE AND FINAL CALCULATION TBD PROPOSED PRESSURIZED HDPE TO DRAIN TO PROPOSED INLET AND C.O.A. STORM SYSTEM STORMWATER DISCHARGE PIPE TO TAKE STORMWATER FROM PROPOSED DRYWELL VIA PUMP TO PROPOSED INLET PROPOSED INLET TO CONNECT TO EXISTING C.0.A. STORM DRAIN SYSTEM 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 OPRISESNGINEERING, LLC.CIVIL CONSULTANTS15243PERFORMANCE GUARANTEE - STORMWATER & DRAINAGEJOB NO. SHEET SE-C-6.2 DATE:07-15-2016NO.REVISIONBYDATE502 MAIN STREETCARBONDALE, CO 81623(970) 704-0311FAX: (970)-704-0313DESIGNED BY730 E. COOPER AVE, ASPEN, COLORADODRAWN BYCHECKED BYDATEINITIALSKnow what's R G:\2015\15243\CIVIL\Civil DWGs\PLOT\15243-PERFORMANCE GUARANTEES.dwg NOTES: 1.THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PUD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. SITE IMPROVEMENTS LEGEND PROPERTY BOUNDARY PROPOSED LIMITS OF DISTURBANCE PROPOSED LANDSCAPING PROPOSED ASPHALT PROPOSED CONCRETE STORMWATER & DRAINAGE GUARANTEE BASE LODGE / 730 E. COOPER AVENUEISSUE FOR RECORDATION xx x xx xxxx x xx xxLOT PLOT HLOT QLOT ILOT RCOURTYARDLOT SRETAIL A ENTRA N C E LOBBY ENTR A N C E730 E. COOPER AVENUENORA D. KELLY TRUSTцϲ͕ϵϮϲ^͘&͘цϬ͘ϭϲZ^PROPOSEDBUILDING OUTLINERETAIL B ENTRA N C E 6" VERTICALCURB (TYP)PARKI N G LOADI N G & UNLO A D I N G 6" VERTICALCURB (TYP)PARKI N GPROPOSED 14STATIONWE-CYCLE FACILITYAPPROX LOCATIONOF PROPOSEDTREES (TYP)5.0'LANDSCAPE,SLOPES <5%8.0'DETACHEDSIDEWALKPROPOSED BI-DIRECTIONALHANDICAP RAMPS, BULB OUTTRAFFIC CALMING FEATURE,IMPROVED CROSSWALK18.0'DETACHEDSIDEWALK18.0'DETACHEDSIDEWALK156" VERTICALCURB (TYP)66677DRIVEWAYREMOVALDRIVEWAYREMOVALLONGESTPEDESTRIANTRAVEL PATH= 170 FTSTRAIGHTPATH= 125 FTDIRECTNESS FACTOR= 170 FT / 125 FT = 1.4999OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS TIA SITE PLAN & DIRECTNESS FACTOR EXHIBIT BASE LODGE / 730 E. COOPER AVENUE PLANNED DEVELOPMENT DETAILED REVIEWJOB NO. 15243TIA EXHIBITDATE: 04-20-2016NO.REVISION BY DATE 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 CITY OF ASPEN, COLORADOG:\2015\15243\CIVIL\Civil DWGs\PLOT\SHEET SET\15243-SITE.dwg ':+56+0)5+6'%10&+6+105L1.0#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION NORTH SCALE: 3/16"=1'-00"EXISTING 16" DBH CONIFER TREETO BE REMOVED. SEE L4.0 FOR MITIGATION TREES EXISTING COTTONWOOD TO BE PROTECTED 10'15'20'5'CANOPY SIZE - DISTANCE FROM TRUNK#22418#.55'6 $#5'.1&)' '#56%112'4 #52'0%1.14#&1ISSUE & REVISION DATESPlot Date: 07/15/16 Project #:241Drawn By:JUChecked By:GTPERMIT SET02/08/1605/02/1607/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G 123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621 WWW.CONNECTONEDESIGN.COM | 970.379.1030 1PLANNED DEVELOPMENT DETAILED REVIEWISSUE FOR RECORDATIONLOCATION OF SECTION CUTNORTH64''#0#.;5+5567&;L1.1SCALE: 3/8"=1'-00" FRONT OF BLDG BEHIND STEPBACK 5' BLDG STEPBACK36" DIA COTTONWOOD TRUNKBRANCH OVERHANGINGPROPOERTY LINE TO BEREMOVEDPROPERTY LINE .#0&5%#2'5+6'2.#0L2.0#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION NORTH 0'SCALE: 3/16"=1'-00"10'5'BENCH PROPOSED DRIP-IRRIGATED STREET TREE WITH ELECTRICAL OUTLET - REF. L4.0 RETAIL ENTRYRETAIL ENTRYOPERABLEWINDOW HOTEL ENTRYRETAIL ENTRYRETAIL ENTRYBENCH PROPOSED DRIP-IRRIGATED STREET TREE WITH ELECTRICAL OUTLET - REF. L4.0 SOUTH ORIGINAL STREETEAST COOPER AVENUEPROPOSED DRIP-IRRIGATED STREET TREE WITH ELECTRICAL OUTLET - REF. L4.0 DUMPSTERACCESSEMERGENCY EXIT EXISTING COTTONWOOD TREE DECORATIVE CONCRETE BAND, TYP.9'-0"5'-0"1'-4"5'-0"3'-2" 8'-0"3'-2"3'-2"2'-0"3'-0"2'-7"2'-7"3'-2"3'-2"3'-2"3'-2"3'-2"3'-2"3'-2"3'-2" 1'-4"5'-0"3'-2"3'-2"PROPOSED DRIP-IRRIGATED STREET TREE WITH ELECTRICAL OUTLET - REF. L4.0 WECYCLE BIKE STATION STOP SIGN ALLEYELECTRICAL TRANSFORMER WALL FEATURE PROPERTY LINE TRUNCATED DOME TACTILE PAVING HIGHWAY SIGN FIRE HYDRANT TRUNCATED DOME TACTILE PAVING PROPERTY LINEPROPERTY LINEPARKING SIGN PARKING SIGN ELECTRICAL OUTLETS EXISTING FENCE TO REMAIN HARDSCAPE - MATERIAL T.B.D. GREY CONCRETE- FINISH TYPE 1 GREY CONCRETE - FINISH TYPE 2 HARDSCAPE- MATERIAL T.B.D. DECORATIVE PEBBLE BAND MATERIALS LEGEND PAVERS RE: CIVIL LOADING AND DROP OFF PARKING SPACE #1 LOADING AND DROP OFF PARKING SPACE #2 LOADING AND DROP OFF PARKING SPACE #3 HOTEL ENTRY PROPERTY LINE SNOWMELTED AREA 2.#06+0)2.#0Ä564''6.'8'.L4.0#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION NORTH 0'SCALE: 3/16"=1'-00"10'5'RIGHT-OF-WAY PLANTING MIX 1 HOTEL ENTRY RETAIL ENTRYRETAIL ENTRYSERVICEWINDOW HOTEL ENTRYRETAIL ENTRYRETAIL ENTRYRIGHT-OF-WAY PLANTING MIX 1 PROPOSED MITIGATION STREET TREE SOUTH ORIGINAL STREETEAST COOPER AVENUEPROPOSED MITIGATION STREET TREE DUMPSTERACCESSDUMPSTERACCESSEMERGENCY EXIT EXISTING COTTONWOOD TREE DUMPSTER ACCESS RIGHT-OF-WAY PLANTING MIX 1 PROPOSED MITIGATION STREET TREE RIGHT-OF-WAY PLANTING MIX 2 PROPOSED MITIGATION STREET TREE ALLEYMITIGATION STREET TREE AMELANCHIER X GRANDIFLORA 'CUMULUS' RIGHT-OF-WAY PLANTING MIX 1 - HELICTOTRICHON SEMPERVIRENS x 'SAPHIRSPRUDEL' - SEDUM KAMTSCHATICUM RIGHT-OF-WAY PLANTING MIX 2 - SEDUM SPIRIUM 'RED CARPET' - STACHYS BYZANTINA 'SILVER CARPET' - BOUTELOUA GRACILIS PLANTING LEGEND 2.#06+0)2.#0Ä411(.'8'.L4.1#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION NORTH SCALE: 3/16"=1'-00"684 SF DECORATIVE PEBBLE 191 SF SEDUM TILE 122 SF SEDUM TILE122 SF SEDUM TILE 40 SF SEDUM TILE40 SF SEDUM TILE 38 SF SEDUM TILE SEDUM TILE MOUNTAIN MIX BY HYDROTECH TOTAL AREA ON ALL ROOF LEVELS: 553 SF GLASS RAILING - REF. ARCH. REF. UPPER ROOF PLAN BELOW MAIN ROOF PLAN UPPER ROOF PLAN .#0&5%#2'&'6#+.5Ä8')411(L5.0#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION .#0&5%#2'&'6#+.5Ä8')9#..L5.1#22418#.55'6$#5'.1&)''#56%112'4#52'0%1.14#&1ISSUE & REVISION DATES Plot Date: 07/15/16 Project #:241 Drawn By:JU Checked By:GT PERMIT SET 02/08/16 05/02/16 07/15/16L A N D S C A P E A R C H I T E C T U R E ā L A N D P L A N N I N G123 EMMA ROAD | SUITE 200 | BASALT | CO | 81621WWW.CONNECTONEDESIGN.COM | 970.379.1030PLANNED DEVELOPMENT DETAILED REVIEW ISSUE FOR RECORDATION TYPICAL VEGETATED WALL AREA NOTES: x PLANT MATERIAL TO BE USED IN VEGETATED AREAS SHALL BE HEDRA HELIX (ENGLISH IVY) x VEGETATED WALL MAY BE AUGMENTED WITH ARTIFICIAL MATERIAL TO MINIMIZE SEASONAL/SOLAR EFFECTS AND SUPPLEMENT OVERALL AESTHETICS. x ARCHITECTURAL BACKGROUND MODEL MAY VARY FROM LATEST DESIGN. 600.3 S.F.PUBLIC AMENITY626.88 S.F.PUBLIC AMENITYScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/32" = 1’−0"7/15/2016 8:04:02 AMASPEN, COPA−12016−0035−3−16EXISTING PUBLIC AMENITY730 E. COOPER AVE. 3/32" = 1'-0"1EXISTING PUBLIC AMENITY CALCULATIONNO. DATE BY DESCRIPTION NET LEASABLE AREA - 2377SFCOMMON AREA - 74SFNET LEASABLE AREA - 2377SFCOMMON AREA - 74 SFScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 1/4" = 1’−0"7/15/2016 8:28:31 AMASPEN, COEC−12016−0035−3−16EXISTING FLOOR PLAN730 E. COOPER AVE.NO. DATE BY DESCRIPTION COMMON AREA - 334SFNET LEASABLE AREA - 1374SFCOMMON AREA - 334 SFLEASABLE AREA - 530SFLEASABLE AREA - 844SFScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 1/4" = 1’−0"7/15/2016 8:28:34 AMASPEN, COEC−22016−0035−3−16EXISTING FLOOR PLAN730 E. COOPER AVE.NO. DATE BY DESCRIPTION NET LIVABLE AREA - 2238SFCOMMON AREA -49 SFPER ORDINANCE NO.2(SERIES OF 2015)EXISTING LODGING BEDROOMS = 4EXISTING LODGE PILLOWS = 8ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 1/4" = 1’−0"7/15/2016 8:30:38 AMASPEN, COEL−12016−0035−3−16EXISTING LODGING730 E. COOPER AVE.NO. DATE BY DESCRIPTION STREETPARKINGPROPERTY LINE730 E. COOPER3 STORY MIXED-USE BUILDING(RETAIL AND LODGING)LODGE PICK-UPDROP-OFFLODGE PICK-UPDROP-OFFON-SITE PUBLIC AMENITY(COURTYARD)397.32 SFALLEYFIRE SEPARATION DISTANCE10' - 1"FIRE SEPARATION DISTANCE38' - 1"FIRE SEPARATION DISTANCE36' - 10"R.O.W. CENTERLINER.O.W. CENTERLINETRANSFORMERSTREETPARKINGSTREETPARKING300 S.F.COVEREDTRASH AREAEXISTINGADJACENT RESIDENTIAL BUILDING(N.I.C.)LANDSCAPEAREALANDSCAPEAREALANDSCAPEAREAON-SITEPUBLICAMENITY(WALKWAY)497.16 SFON-SITEPUBLICAMENITY(LANDSCAPEAREA)113.40 SF(TOTAL)EXISTING TREE TOBE PROTECTED.WE-CYCLESTATIONEXISTING BIKE LANEEXISTING BIKE LANEPUBLICAMENITYRIGHT OF WAYIMPROVEMENTS2,702.49 SFBUILDINGOVERHANGBUILDINGOVERHANGPICK-UPWINDOWOPERABLEWINDOWS ANDBAR TOPBOLLARD, TYP.FIRE SEPARATION DISTANCE5' - 0"ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 1/8" = 1’−0"7/24/2016 8:40:08 AMASPEN, COPA−22016−0035−3−16PROPOSED PUBLIC AMENITY730 E. COOPER AVE. 1/8" = 1'-0"1PROPOSED PUBLIC AMENITY SITE PLANNO. DATE BYDESCRIPTION DNMECHANICALSCREENINGELEV. #1403ROOF TERRACE407STAIR #1402ELEV. #2404STAIR #2405OUTDOORTERRACEOUTDOORTERRACECOURTYARDBELOWMECHANICAL AREA4012903 S.F.PUBLIC AMENITYMECHANICALSCREENINGMECHANICAL AREA406ELEV. LOBBY400GREEN ROOF AREA191.36 SFSCREEN WALL,6' HIGH MAX.SCREEN WALL,6' HIGH MAX.SCREEN WALL,6' HIGH MAX.SCREEN WALL,6' HIGH MAX.SCREEN WALL,6' HIGH MAX.SCREEN WALL,6' HIGH MAX.ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:04:05 AMASPEN, COPA−32016−0035−3−16PROPOSED PUBLIC AMENITY - ROOF730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED PUBLIC AMENITY - ROOF TERRACE LEVELNO. DATE BY DESCRIPTION UPUP12345678910111213ABCDEFGJ11.1E.1F.1KSTAIR #1L202MECHANICAL RM.L203CAR ELEVATORL204STAIR #2L205VALET PARKINGL200ELEV.L201HYDRAULICCAR LIFT, TYP.24 PARKING SPACES PROVIDED123456789101112131415161718192021222324E.25.15' - 7"9' - 3"10' - 0"10' - 9"10' - 9"10' - 9"10' - 0"2' - 1"3' - 7"6' - 6"2' - 8"2' - 3"5' - 10"1' - 2"10' - 11"10' - 11"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"10' - 11"10' - 11"1' - 1"69' - 3"100' - 0"4' - 6"4' - 6"9' - 0"9' - 4"1' - 7"7' - 8"12' - 0"7' - 10"8' - 8"16' - 6"17' - 3"2"3' - 4"23' - 8"27' - 5"19' - 11"28' - 11"8' - 8"20' - 2"38' - 11"5' - 1"57' - 8"94' - 7"50' - 3"ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:31 AMASPEN, COA−1002016−0035−3−16PROPOSED LOWER LEVEL 2 FLOOR PLAN730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED LOWER LEVEL 2 FLOOR PLANNO. DATE BY DESCRIPTION UPUPUPDNSTAIR #2L104STAIR #1L105ELEVATORL102ELEVATORL103122.13456789101112136.17.1ABCDEFGJ11.1LIBRARYL108MECHANICAL ROOML112CAR ELEVATORL115HAMAML110WOMEN'S LOCKERROOML109BARL107CORRIDORL101LOUNGEL100MOP SINKL113E.1F.1KWATER SERVICE23'-0" +/-STAIR #3L1145' - 7"9' - 3"3' - 7"6' - 6"4' - 11"5' - 10"10' - 9"10' - 9"10' - 0"2' - 1"1'-1 1/2"9'-4"1'-6 3/4"10'-11"9'-0 1/4"9'-0 1/4"5'-5 1/4"3'-7"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"10'-10 3/4"5'-10 1/2"5'-0 1/2"1'-1 1/4"12'-2 1/4"7'-0"8'-0"55'-2"6 3/4"1'-10"1'-0"1'-1 1/4"1'-5"98'-6"1 1/4"21'-5 3/4"5"7'-0"8'-10"54'-4"1'-1 1/4"6 3/4"19'-11 3/4"7'-6 1/4"8'-9"21'-6"9'-0 1/2"8'-9 3/4"5'-9 3/4"8'-3 1/4"19'-5 1/4"2'-10 3/4"38'-3"16'-8 3/4"35'-9 3/4"2'-0"2'-10 3/4"20'-3 1/2"8'-11 3/4"8'-1"13'-4 1/2"5'-0 1/2"84'-10 1/2"9'-10 1/2"99'-9 1/2"63'-2"19'-5 1/4"37'-6 3/4"28'-8 3/4"17'-8 3/4"19'-5 1/4"19'-5 1/4"12'-4 1/2"5'-8 1/2"10'-0"7'-4"19'-10 1/4"10'-0"7'-9"15'-5"3'-9"16'-5"5'-9"6'-5 3/4"5'-9"16'-5 1/4"7'-0"12'-2 1/4"DEDICATED OUTSIDEAIR UNITBOILERBOILERDHWTANKDHWTANKMEN'S LOCKERL1111' - 1"18' - 1"1' - 1"E.25.12' - 8"2' - 3"3' - 7"6' - 6"23' - 8"12' - 0"17' - 3"7' - 8"18' - 6"BACK OF HOUSEL106ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:32 AMASPEN, COA−1012016−0035−3−16PROPOSED LOWER LEVEL 1 FLOOR PLAN730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED LOWER LEVEL FLOOR PLANNO. DATE BY DESCRIPTION DNUPDNUPSTAIR #1106ELEVATOR105ELEVATOR103STAIR #210434" HIGHPICK-UPCOUNTER122.13456789101112136.17.1ABCDEFGJ11.1E.1F.1K1/4" / 1'-0"-0' - 7"-0' - 9 1/2"DN1/2" ADA DOORTHRESHOLDTRANSFORMERDNSKI STORAGE107RECEPTION108LOBBY/EXIT DISCHARGE100OFFICE109COURTYARD112RETAIL/RESTAURANTSPACE 'A'1025'-6 3/4"9'-3 1/4"3'-6 1/2"6'-5 3/4"4'-11"5'-10 1/4"10'-9 1/4"10'-9 1/4"10'-0 1/4"2'-1 1/4"1'-1 1/2"9'-4"1'-6 3/4"10'-11"9'-0 1/4"9'-0 1/4"5'-5 1/4"3'-7"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"10'-10 3/4"5'-10 1/2"5'-0 1/2"1'-1 1/4"8 1/2"29'-9 1/2"5"8'-9"5"18'-1 3/4"5"9'-3 1/4"5"7'-9 1/2"5"21'-1 1/2"10 3/4"7 3/4"30'-8 1/4"8"7'-9"8"20'-10 1/2"5'-1"8"18'-8 1/2"6"11'-8"8"7'-4"8"13'-7 1/2"2 1/4"10'-0 1/4"10 3/4"17'-2"10 3/4"8 1/2"17'-5 1/2"6"39'-4 1/2"8"16'-5"8"5'-9"8"6'-5 3/4"8"5'-9"8"16'-5 1/4"8"10'-0"31'-5"3'-10"9'-6"3'-10"36'-3 3/4"5'-1 1/4"5'-0"7'-8 3/4"56'-6 1/2"8 1/4"13'-5 1/4"6'-8 1/2"4'-2 1/2"4'-9 1/4"13'-3 1/2"4'-10"4'-2 1/2"4'-10"22'-3 1/4"6'-7 1/4"14'-2 1/4"4'-0 1/2"7'-3 1/2"69'-3 1/4"CAR ELEVATOR10216' - 2"1/8" / 1'-0"0' - 1 5/16"DNDN0' - 4"0' - 7"0' - 9"-0' - 6 3/4"-1' - 3 5/8"DNE.25.1BOLLARD, TYP.ELEC.111STORAGE110STAIR #3113300 SF COVEREDTRASH/UTILITY AREA114EGRESS CORRIDOR115RETAIL/RESTAURANTSPACE 'B'10118' - 6"6' - 3"4' - 8"4' - 7"18' - 7"5' - 2"23' - 8"12' - 0"9' - 6"19' - 1"5' - 0"7' - 10"12' - 11"11' - 1"3' - 10"20' - 0"16' - 0"ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:33 AMASPEN, COA−1022016−0035−3−16PROPOSED MAIN LEVEL FLOOR PLAN730 E. COOPER AVE. 3/16" = 1'-0"2MAIN FLOOR PLANNO. DATE BY DESCRIPTION DNUPTOTAL: 20 UNITSADA DORMUNITSTAIR #1201STAIR #2202COURTYARDBELOWELEVATOR203ELEVATOR204ø 5' - 0"TYP. DORMUNITø 5' - 0"ø 5' - 0"GUEST ROOM205GUEST ROOM206GUEST ROOM224GUEST ROOM215GUEST ROOM216GUEST ROOM217GUEST ROOM222GUEST ROOM208GUEST ROOM225ø 5' - 0"BUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNKBEDBUNKBEDBUNKBEDBUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNK BEDBUNK BEDBUNK BEDBUNK BEDGUEST ROOM221BEDROOM220A1A-3103A-3102A-310122.13456789101112136.17.1ABCDEFGJROLL INSHOWER11.1BUNK BEDGUEST ROOM220GUEST ROOM209E.1F.1KGUEST ROOM207ADA GUESTROOM5'-6 3/4"9'-3 1/4"3'-6 1/2"6'-5 3/4"4'-11"5'-10 1/4"10'-9 1/4"10'-9 1/4"10'-0 1/4"2'-1 1/4"3'-4 1/4"1'-1 1/2"9'-4"1'-6 3/4"10'-11"9'-0 1/4"9'-0 1/4"5'-5 1/4"3'-7"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"10'-10 3/4"5'-10 1/2"5'-0 1/2"1'-1 1/4"8 1/4"11'-2 1/2"11'-2"17'-9 1/2"18'-4"17'-9 3/4"11'-2"11'-2 3/4"7 3/4"5'-0"9'-3 1/4"53'-6 1/2"1'-5 1/2"8 1/4"9'-4"31'-5"17'-2"35'-8 3/4"5'-0 1/2"7 3/4"5'-0"8'-0"54'-8 3/4"1'-6 1/2"6'-9"5"22'-7 3/4"4'-5"17'-0 1/4"10'-3 1/2"6'-11"6'-10"9'-5 3/4"10'-3 1/4"10'-3"10'-3"9'-5 3/4"5'-1 1/4"4'-11 3/4"4'-10 1/4"4'-7 3/4"5'-2 1/2"4'-8"4'-9"4'-9 1/4"16'-3 1/4"4'-3"4'-4 1/4"8'-6"10'-8 1/2"10'-3 1/4"10'-3"10'-3"9'-5 3/4"6'-10"4'-5 1/4"6'-10"10'-4 1/2"8'-6"9'-6"6'-3"5'-0"9'-1"4'-3"6'-5 1/4"9'-5 1/4"4'-9 1/4"4'-9"5'-1 1/4"5'-1"4'-9 1/4"4'-9"5'-1 1/4"4'-9"4'-4"21'-2 3/4"17'-6 1/2"8'-6 1/4"8'-6 1/4"17'-3 3/4"21'-6 1/4"10'-3 1/2"7'-0 1/4"4'-5"11'-4 1/4"9'-0 1/2"8'-6"9'-6 1/4"6'-3"5'-0"7'-9"4'-3"6'-5 1/4"9'-5 1/4"16'-3 1/4"4'-9"5'-0"4'-7 1/4"6'-10 1/2"3'-5 1/2"4'-8"4'-9 1/4"3'-4 1/4"6'-2 1/4"5'-6 3/4"5'-0"4'-6"4'-9"4'-4 1/4"23'-7 1/4"26'-8"26'-8"4'-4"5'-3 1/4"2'-9 3/4"17'-0 1/2"16'-0 3/4"10'-2 1/4"10'-2 1/4"16'-0 3/4"16'-5"5'-9"6'-5 3/4"5'-9"16'-5 1/4"4'-5"9'-2 1/2"6'-8"E.25.1GUEST ROOM218GUEST ROOM219GUEST ROOM223GUEST ROOM211GUEST ROOM212GUEST ROOM213GUEST ROOM214CORRIDOR200ROLL INSHOWERScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:35 AMASPEN, COA−1032016−0035−3−16PROPOSED SECOND LEVEL FLOOR PLAN730 E. COOPER AVE. 3/16" = 1'-0"1SECOND FLOOR PLANNO. DATE BY DESCRIPTION UPDNCOURTYARDBELOWELEVATOR304ELEVATOR303STAIRS #2302STAIRS #1301ADA DORMUNITø 5' - 0"ø 5' - 0"ø 5' - 0"ø 5' - 0"CORRIDOR300GUEST ROOM325GUEST ROOM306GUEST ROOM307GUEST ROOM324GUEST ROOM308GUEST ROOM309TYP. DORMUNITGUEST ROOM311GUEST ROOM312GUEST ROOM313GUEST ROOM314GUEST ROOM315GUEST ROOM317GUEST ROOM318GUEST ROOM319BUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNKBEDBUNKBEDBUNKBEDBUNKBEDBUNK BEDBEDROOM320A1A-3103A-3102A-310122.13456789101112136.17.1ABCDEFGJ11.1GUEST ROOM316E.1F.1TOTAL: 18 UNITSADAGUESTROOMGUEST ROOM3109'-3 1/4"3'-6 1/2"6'-5 3/4"4'-11"5'-10 1/4"10'-9 1/4"10'-9 1/4"10'-0 1/4"2'-1 1/4"8'-0"54'-8 3/4"1'-6 1/2"6 3/4"8 1/4"9'-4"31'-5"17'-2"35'-8 3/4"5'-0 1/2"7 3/4"1'-1 1/2"9'-4"1'-6 3/4"10'-11"9'-0 1/4"9'-0 1/4"5'-5 1/4"3'-7"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"10'-10 3/4"5'-10 1/2"5'-0 1/2"1'-1 1/4"8 1/4"98'-8 1/4"7 3/4"6'-9"22'-7 3/4"8'-6"9'-6"7'-9"4'-3"6'-5 1/4"9'-3 1/4"10'-3 1/2"4'-4 1/4"11'-5"23'-7 1/4"8'-6"9'-6 1/4"16'-2 3/4"10'-8 1/2"10'-3 1/4"10'-2"10'-4 1/4"9'-5 3/4"4'-5 1/4"4'-7 3/4"5'-0"4'-10 1/4"5'-0"4'-9 1/4"5'-0"4'-11 1/2"5'-0"3'-11"9'-0"21'-3"17'-6 1/2"8'-6 1/4"8'-6 1/2"17'-6 3/4"21'-3 1/4"9'-6"10'-3"10'-3"10'-3"9'-5 3/4"9'-0 1/2"4'-4"4'-9 1/4"4'-9"5'-1 1/4"5'-2 1/4"4'-7 3/4"5'-2 1/4"4'-8 3/4"4'-2 1/4"7'-9"4'-3"6'-4 3/4"9'-5 3/4"5'-3 1/4"2'-9 3/4"16'-3 1/4"4'-5 3/4"5'-3"4'-5 1/4"6'-10 3/4"3'-4 1/2"4'-8"3'-4 1/4"6'-7 1/2"5'-1 3/4"4'-11 3/4"4'-6"16'-2 3/4"4'-5 1/4"16'-5"5'-9"6'-5 3/4"5'-9"16'-5 1/4"4'-5"16'-3 1/4"17'-0 1/4"8'-11 1/4"E.25.1BUNKBEDBUNKBEDSTORAGE345WOMEN'S344BUNKBEDBUNKBEDSTORAGE342MEN'S343GUEST ROOM321GUEST ROOM320ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:37 AMASPEN, COA−1042016−0035−3−16PROPOSED THIRD LEVEL FLOOR PLAN730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED THIRD FLOOR PLANNO. DATE BY DESCRIPTION DNDNELEV. #1403STAIR #1402ELEV. #2404STAIR #2405COURTYARDBELOWMECHANICAL AREA406MECHANICAL AREA4011A-3103A-3102A-310122.13456789101112136.17.1ABCDEFGJ11.1E.1F.1GREEN ROOFAREA, TYP.MECHANICALROOF AREAMECHANICALROOF AREA3' - 6"3' - 6"3' - 6"3' - 6"ELEV. LOBBY4009'-3 1/4"3'-6 1/2"6'-5 3/4"4'-11"5'-10 1/4"10'-9 1/4"10'-9 1/4"10'-0 1/4"2'-1 1/4"1'-1 1/2"9'-4"1'-6 3/4"10'-11"9'-0 1/4"9'-0 1/4"9'-0 1/4"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"10'-10 3/4"5'-10 1/2"5'-0 1/2"1'-1 1/4"1'-6 1/2"47'-6 3/4"3'-4"17'-3 1/2"3'-5 3/4"55'-6 3/4"9'-3 1/4"17'-3 1/2"11'-2 1/2"7'-9"18'-2 3/4"18'-5 1/2"1'-0"17'-11 1/2"17'-3 1/2"18'-5 1/4"3'-6"55'-6 1/2"18'-5"16'-5 1/4"5'-9"6'-5 3/4"5'-9"16'-5"1'-0"18'-8 1/2"11'-2 1/2"7'-9"7'-7"10 3/4"11'-5 1/2"8 1/4"10 1/4"17'-1 1/2"13'-6 3/4"3'-4"3'-2 3/4"8 1/4"98'-6 1/4"2'-6"17'-2"35'-8 3/4"5'-0 1/2"7 3/4"9'-3 1/4"53'-2 1/4"2'-8 1/4"6 3/4"1'-9 3/4"10 1/2"15 TONVRFCONDENSER15 TONVRFCONDENSER15 TONVRFCONDENSER15 TONVRFCONDENSER25' - 5"21' - 3"21' - 3"21' - 5"21' - 5"E.25.144' - 6"ELEVATOR SETBACK21' - 5"ELEVATOR SETBACK39' - 0"456789106.17.1DEFE.1GREEN ROOFAREA, TYP.ROOFSCUPPER, TYP.4'-11"5'-10 1/4"10'-9 1/4"4 1/4"1'-4 1/4"9'-0 1/4"9'-0 1/4"5'-5 1/4"3'-7"3'-7"5'-5 1/2"9'-0 1/2"9'-0 1/2"56'-10 1/2"1'-4 1/4"17'-4"22'-3 1/4"17'-3 1/2"1'-2"5'-9 3/4"1'-2"5'-5"1'-2"MECHANICALAREA BELOW(OPEN TO SKY)MECHANICALAREA BELOW(OPEN TO SKY)E.25.1ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:39 AMASPEN, COA−1052016−0035−3−16PROPOSED ROOF TERRACE PLAN730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED ROOF TERRACE PLAN 3/16" = 1'-0"2PROPOSED UPPER ROOF PLANNO. DATE BY DESCRIPTION STAIR #2L104STAIR #1L105ELEVATORL102ELEVATORL103LIBRARYL108MECHANICAL ROOML112CAR ELEVATORL115HAMAML110WOMEN'S LOCKERROOML109BARL107CORRIDORL101LOUNGEL100MOP SINKL113STAIR #3L114NON-UNITCOMMON AREA2,188.64 SF(EXEMPTSUBGRADE)NON-UNITCOMMON AREA LODGE3,991.11 SF (EXEMPT SUBGRADE)MEN'S LOCKERL111BACK OF HOUSEL106NON-UNIT COMMON AREACOMMERCIAL AREA (NET LEASABLE)NON-UNIT LODGE AREANON-UNIT COMMON AREA (EXEMPT)NON-UNIT COMMON AREA (EXEMPT - ROOF TERRACE)HATCH PATTERN LEGENDLODGE AREA (GUESTROOMS)STAIR #1L202MECHANICAL RM.L203CAR ELEVATORL204STAIR #2L205VALET PARKINGL200ELEV.L201HYDRAULICCAR LIFT, TYP.24 PARKING SPACES PROVIDED123456789101112131415161718192021222324NON-UNITCOMMON AREA6,179.75 SF(EXEMPTSUBGRADE)ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.As indicated7/15/2016 8:03:35 AMASPEN, COFAR−12016−0035−3−16FAR CALCULATIONS730 E. COOPER AVE. 3/16" = 1'-0"2PROPOSED LOWER LEVEL 1 - FAR 3/16" = 1'-0"1PROPOSED LOWER LEVEL 2 - FARZONING INFORMATION & CALCULATIONS:ZONING: (CL) COMMERCIAL LODGENET LOT AREA: 6,927 SF (69.27'x100')ZONING ALLOWANCE (2.5:1): 17,260 SFLOWER LEVEL: 0% EXPOSED WALLS (100% EXEMPT)CALCULATIONS:GROSS FLOOR AREA:COMMERCIAL SPACE: 2,477.32 SFLODGING SPACE: 14,372.69 SFNON-UNIT SPACE: 6,041.15 SFGROSS NON-UNIT AREA:1ST: 2,113.11 SF2ND: 498.26 SF3RD: 995.77 SF4TH: 55.93 SFLL: 2,378.08 SFTOTAL: 6,041.15 SFGROSS UNIT FLOOR AREA (MINUS NON-UNIT):LODGE FLOOR AREA + COMMERCIAL FLOOR AREA=6,041.15 + 14,372.69 = 20,413.84TOTAL NON-UNIT FLOOR AREA (MINUS LOWER LEVELS):1ST FLOOR + 2ND FLOOR + 3RD FLOOR + ROOF TERRACE=2,113.11 + 498.26 + 995.77 + 55.93 = 3,663.07 SFPERCENTAGE OF USE CATEGORY PER BUILDING FLOOR AREA:COMMERCIAL: [(2,477.32/20,413.84)x100] = 12.14%LODGING: [(14,372.69/20,413.84)x100] = 70.40%APPLICATION OF USE PERCENTAGES TO NON-UNIT FLOOR AREA:COMMERCIAL: 3,663.07 x 12.14% = 444.70 SFLODGING: 3,663.07 x 70.40% = 2,578.80 SFFINAL FLOOR AREA:TOTAL FAR FOR COMMERCIAL: 2,477.32+444.70=2,922.02 SF(0.42:1)TOTAL FAR FOR LODGE:[(14,372.69-3,801.67)+2,578.80]=13,149.82(1.90:1)CUMULATIVE: 16,071.84 SF (2.32:1)GROSS LODGE AREA:1ST: 743.41 SF2ND: 5,162.56 SF3RD: 4,665.05 SF4TH: 0 SFLL: 3,801.67 SFTOTAL: 14,372.69 SFLOWER LEVEL 1: 6,179.75 SFTOTAL FAR: 16,251.49 SF (2.34:1 FAR)NON-UNIT COMMON AREA: 2,378.08 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 3,801.67 SF (BLUE)2ND LEVEL: 5,660.82 SFLODGING AREA: 4,552.01 SF (RED)NON-UNIT COMMON AREA: 498.26 SF (ELEVATORS/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SF3RD LEVEL: 5,660.82 SFLODGING AREA: 4,054.50 SF (RED)NON-UNIT COMMON AREA: 995.77 SF (ELEVATOR/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SFNON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)NON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)ROOF LEVEL: 4,814.68 SFNON-UNIT COMMON AREA: 4,758.75 SF (ALL AREAS)DEDUCTIONS: 4,758.75 SF (DECK, MECHANICAL, STAIR/ELEVATOR)GROSS AREA TOWARDS FAR: 55.93 SFNON-UNIT LODGE AREA: 55.93 SFLOWER LEVEL 2: 6,179.75 SFNON-UNIT COMMON AREA: 6,179.75 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 0 SF (BLUE)FLOOR AREA SUMMARY:MAIN LEVEL: 5,545.03 SFCOMMERCIAL AREA: 2,477.32 SF (RED)NON-UNIT COMMON AREA: 2,113.11 SF (PURPLE)DEDUCTIONS: 211.19 SF (GREEN)GROSS AREA TOWARDS FAR: 4,367.76 SFNON-UNIT LODGE AREA: 743.41 SF (BLUE)NO. DATE BY DESCRIPTION ADA DORMUNITSTAIR #1201STAIR #2202COURTYARDBELOWELEVATOR203ELEVATOR204TYP. DORMUNITGUEST ROOM205GUEST ROOM206GUEST ROOM224GUEST ROOM215GUEST ROOM216GUEST ROOM217GUEST ROOM222GUEST ROOM208GUEST ROOM225BUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDGUEST ROOM221BEDROOM220AROLL INSHOWERBUNK BEDGUEST ROOM220GUEST ROOM209GUEST ROOM207ADA GUESTROOMTOTAL: 35 BEDS ON 2ND FLOORTOTAL: 20 UNITS ON 2ND FLOORBEDS TYPES 2ND FLOOR:TWINS = 10QUEENS = 25LODGING AREA4,552.01 SFNON-UNITCOMMON AREA498.26 SFNON-UNIT COMMON AREALODGE 610.55 SFGUEST ROOM218GUEST ROOM219GUEST ROOM223GUEST ROOM211GUEST ROOM212GUEST ROOM213GUEST ROOM214CORRIDOR200NON-UNIT COMMON AREACOMMERCIAL AREA (NET LEASABLE)NON-UNIT LODGE AREANON-UNIT COMMON AREA (EXEMPT)NON-UNIT COMMON AREA (EXEMPT - ROOF TERRACE)HATCH PATTERN LEGENDLODGE AREA (GUESTROOMS)STAIR #1106ELEVATOR105ELEVATOR103STAIR #210434" HIGHPICK-UPCOUNTER1/4" / 1'-0"-0' - 7"-0' - 9 1/2"DN1/2" ADA DOORTHRESHOLDUPTRANSFORMERDNSKI STORAGE107RECEPTION108LOBBY/EXIT DISCHARGE100OFFICE109COURTYARD112RETAIL/RESTAURANTSPACE 'A'102COMMERCIAL AREA629.71 SFNON-UNITCOMMONAREA2,113.11 SFCOMMERCIAL AREA1,847.61 SFNON-UNITCOMMON AREALODGE743.41 SFCAR ELEVATOR102ELEC.111STORAGE110STAIR #3113300 SF COVEREDTRASH/UTILITY AREA114EGRESS CORRIDOR115RETAIL/RESTAURANTSPACE 'B'101NON-UNITCOMMON AREA211.19 SF(EXEMPT IN CLZONE)ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.As indicated7/15/2016 8:03:37 AMASPEN, COFAR−22016−0035−3−16FAR CALCULATIONS730 E. COOPER AVE. 3/16" = 1'-0"2PROPOSED SECOND FLOOR - FAR 3/16" = 1'-0"1MAIN FLOOR PLAN - FARZONING INFORMATION & CALCULATIONS:ZONING: (CL) COMMERCIAL LODGENET LOT AREA: 6,927 SF (69.27'x100')ZONING ALLOWANCE (2.5:1): 17,260 SFLOWER LEVEL: 0% EXPOSED WALLS (100% EXEMPT)CALCULATIONS:GROSS FLOOR AREA:COMMERCIAL SPACE: 2,477.32 SFLODGING SPACE: 14,372.69 SFNON-UNIT SPACE: 6,041.15 SFGROSS NON-UNIT AREA:1ST: 2,113.11 SF2ND: 498.26 SF3RD: 995.77 SF4TH: 55.93 SFLL: 2,378.08 SFTOTAL: 6,041.15 SFGROSS UNIT FLOOR AREA (MINUS NON-UNIT):LODGE FLOOR AREA + COMMERCIAL FLOOR AREA=6,041.15 + 14,372.69 = 20,413.84TOTAL NON-UNIT FLOOR AREA (MINUS LOWER LEVELS):1ST FLOOR + 2ND FLOOR + 3RD FLOOR + ROOF TERRACE=2,113.11 + 498.26 + 995.77 + 55.93 = 3,663.07 SFPERCENTAGE OF USE CATEGORY PER BUILDING FLOOR AREA:COMMERCIAL: [(2,477.32/20,413.84)x100] = 12.14%LODGING: [(14,372.69/20,413.84)x100] = 70.40%APPLICATION OF USE PERCENTAGES TO NON-UNIT FLOOR AREA:COMMERCIAL: 3,663.07 x 12.14% = 444.70 SFLODGING: 3,663.07 x 70.40% = 2,578.80 SFFINAL FLOOR AREA:TOTAL FAR FOR COMMERCIAL: 2,477.32+444.70=2,922.02 SF(0.42:1)TOTAL FAR FOR LODGE:[(14,372.69-3,801.67)+2,578.80]=13,149.82(1.90:1)CUMULATIVE: 16,071.84 SF (2.32:1)GROSS LODGE AREA:1ST: 743.41 SF2ND: 5,162.56 SF3RD: 4,665.05 SF4TH: 0 SFLL: 3,801.67 SFTOTAL: 14,372.69 SFLOWER LEVEL 1: 6,179.75 SFTOTAL FAR: 16,251.49 SF (2.34:1 FAR)NON-UNIT COMMON AREA: 2,378.08 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 3,801.67 SF (BLUE)2ND LEVEL: 5,660.82 SFLODGING AREA: 4,552.01 SF (RED)NON-UNIT COMMON AREA: 498.26 SF (ELEVATORS/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SF3RD LEVEL: 5,660.82 SFLODGING AREA: 4,054.50 SF (RED)NON-UNIT COMMON AREA: 995.77 SF (ELEVATOR/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SFNON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)NON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)ROOF LEVEL: 4,814.68 SFNON-UNIT COMMON AREA: 4,758.75 SF (ALL AREAS)DEDUCTIONS: 4,758.75 SF (DECK, MECHANICAL, STAIR/ELEVATOR)GROSS AREA TOWARDS FAR: 55.93 SFNON-UNIT LODGE AREA: 55.93 SFLOWER LEVEL 2: 6,179.75 SFNON-UNIT COMMON AREA: 6,179.75 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 0 SF (BLUE)FLOOR AREA SUMMARY:MAIN LEVEL: 5,545.03 SFCOMMERCIAL AREA: 2,477.32 SF (RED)NON-UNIT COMMON AREA: 2,113.11 SF (PURPLE)DEDUCTIONS: 211.19 SF (GREEN)GROSS AREA TOWARDS FAR: 4,367.76 SFNON-UNIT LODGE AREA: 743.41 SF (BLUE)NO. DATE BY DESCRIPTION NON-UNIT COMMON AREACOMMERCIAL AREA (NET LEASABLE)NON-UNIT LODGE AREANON-UNIT COMMON AREA (EXEMPT)NON-UNIT COMMON AREA (EXEMPT - ROOF TERRACE)HATCH PATTERN LEGENDLODGE AREA (GUESTROOMS)ELEV. #1403STAIR #1402ELEV. #2404STAIR #2405COURTYARDBELOWMECHANICAL AREA406MECHANICAL AREA401GREEN ROOFAREA, TYP.MECHANICALAREAMECHANICALAREA3' - 6"3' - 6"3' - 6"3' - 6"ELEV. LOBBY40019' - 4"21' - 7"21' - 3"21' - 5"55' - 6"21' - 5"19' - 4"21' - 7"21' - 3"NON-UNITCOMMON AREA356.94 SF (EXEMPT)NON-UNITCOMMON AREA232.68 (EXEMPT)NON-UNITCOMMON AREA232.68 (EXEMPT)NON-UNITCOMMON AREA203.89 SF (EXEMPT)NON-UNITCOMMON AREA356.94 SF (EXEMPT)NON-UNITCOMMON AREA2903 SF (EXEMPTDECK)NON-UNITCOMMON AREA472.62 SF(EXEMPT)NON-UNIT COMMON AREALODGE 55.93 SFELEVATOR304ELEVATOR303STAIRS #2302STAIRS #1301CORRIDOR300GUEST ROOM325GUEST ROOM306GUEST ROOM307GUEST ROOM324WOMEN'S344GUEST ROOM308GUEST ROOM309GUEST ROOM311GUEST ROOM312GUEST ROOM313GUEST ROOM314GUEST ROOM315GUEST ROOM317GUEST ROOM318GUEST ROOM319MEN'S343GUEST ROOM321BEDROOM320AGUEST ROOM310GUEST ROOM316STORAGE345STORAGE342COURTYARDBELOWLODGING AREA4,054.50 SFNON-UNITCOMMON AREA995.77 SFNON-UNIT COMMON AREALODGE 610.55 SFTYP. DORMUNITBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDROLL INSHOWERBUNK BEDADA GUESTROOMBUNK BEDBUNK BEDBUNK BEDBUNK BEDTOTAL: 33 BEDS ON 3RD FLOORTOTAL: 18 UNITS ON 3RD FLOORBEDS TYPES 3RD FLOOR:TWINS = 10QUEENS = 23ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.As indicated7/15/2016 8:03:40 AMASPEN, COFAR−32016−0035−3−16FAR CALCULATIONS730 E. COOPER AVE.ZONING INFORMATION & CALCULATIONS:ZONING: (CL) COMMERCIAL LODGENET LOT AREA: 6,927 SF (69.27'x100')ZONING ALLOWANCE (2.5:1): 17,260 SFLOWER LEVEL: 0% EXPOSED WALLS (100% EXEMPT)CALCULATIONS:GROSS FLOOR AREA:COMMERCIAL SPACE: 2,477.32 SFLODGING SPACE: 14,372.69 SFNON-UNIT SPACE: 6,041.15 SFGROSS NON-UNIT AREA:1ST: 2,113.11 SF2ND: 498.26 SF3RD: 995.77 SF4TH: 55.93 SFLL: 2,378.08 SFTOTAL: 6,041.15 SFGROSS UNIT FLOOR AREA (MINUS NON-UNIT):LODGE FLOOR AREA + COMMERCIAL FLOOR AREA=6,041.15 + 14,372.69 = 20,413.84TOTAL NON-UNIT FLOOR AREA (MINUS LOWER LEVELS):1ST FLOOR + 2ND FLOOR + 3RD FLOOR + ROOF TERRACE=2,113.11 + 498.26 + 995.77 + 55.93 = 3,663.07 SFPERCENTAGE OF USE CATEGORY PER BUILDING FLOOR AREA:COMMERCIAL: [(2,477.32/20,413.84)x100] = 12.14%LODGING: [(14,372.69/20,413.84)x100] = 70.40%APPLICATION OF USE PERCENTAGES TO NON-UNIT FLOOR AREA:COMMERCIAL: 3,663.07 x 12.14% = 444.70 SFLODGING: 3,663.07 x 70.40% = 2,578.80 SFFINAL FLOOR AREA:TOTAL FAR FOR COMMERCIAL: 2,477.32+444.70=2,922.02 SF(0.42:1)TOTAL FAR FOR LODGE:[(14,372.69-3,801.67)+2,578.80]=13,149.82(1.90:1)CUMULATIVE: 16,071.84 SF (2.32:1)GROSS LODGE AREA:1ST: 743.41 SF2ND: 5,162.56 SF3RD: 4,665.05 SF4TH: 0 SFLL: 3,801.67 SFTOTAL: 14,372.69 SF 3/16" = 1'-0"2PROPOSED ROOF TERRACE PLAN 3/16" = 1'-0"1PROPOSED THIRD FLOOR PLAN - FARLOWER LEVEL 1: 6,179.75 SFTOTAL FAR: 16,251.49 SF (2.34:1 FAR)NON-UNIT COMMON AREA: 2,378.08 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 3,801.67 SF (BLUE)2ND LEVEL: 5,660.82 SFLODGING AREA: 4,552.01 SF (RED)NON-UNIT COMMON AREA: 498.26 SF (ELEVATORS/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SF3RD LEVEL: 5,660.82 SFLODGING AREA: 4,054.50 SF (RED)NON-UNIT COMMON AREA: 995.77 SF (ELEVATOR/STAIRS)DEDUCTIONS: 0 SFGROSS AREA TOWARDS FAR: 5,660.82 SFNON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)NON-UNIT LODGE AREA: 610.55 SF (CORRIDOR)ROOF LEVEL: 4,814.68 SFNON-UNIT COMMON AREA: 4,758.75 SF (ALL AREAS)DEDUCTIONS: 4,758.75 SF (DECK, MECHANICAL, STAIR/ELEVATOR)GROSS AREA TOWARDS FAR: 55.93 SFNON-UNIT LODGE AREA: 55.93 SFLOWER LEVEL 2: 6,179.75 SFNON-UNIT COMMON AREA: 6,179.75 SF (PURPLE)DEDUCTIONS: 6,179.75 SF (SUBGRADE EXEMPT)GROSS AREA TOWARDS FAR: 0 SFNON-UNIT LODGE AREA: 0 SF (BLUE)FLOOR AREA SUMMARY:MAIN LEVEL: 5,545.03 SFCOMMERCIAL AREA: 2,477.32 SF (RED)NON-UNIT COMMON AREA: 2,113.11 SF (PURPLE)DEDUCTIONS: 211.19 SF (GREEN)GROSS AREA TOWARDS FAR: 4,367.76 SFNON-UNIT LODGE AREA: 743.41 SF (BLUE)NO. DATE BY DESCRIPTION UPUPDNUPUPSTAIR #2L104STAIR #1L105ELEVATORL102ELEVATORL103LIBRARYL108MECHANICAL ROOML112CAR ELEVATORL115HAMAML110WOMEN'S LOCKERROOML109BARL107CORRIDORL101LOUNGEL100MOP SINKL113STAIR #3L114DEDICATED OUTSIDEAIR UNITBOILER7'-0"7' - 0"6' - 6"7' - 0"BOILERDHWTANKDHWTANKMEN'S LOCKERL111BACK OF HOUSEL106STAIR #1L202MECHANICAL RM.L203CAR ELEVATORL204STAIR #2L205VALET PARKINGL200ELEV.L201HYDRAULICCAR LIFT, TYP.24 PARKING SPACES PROVIDED123456789101112131415161718192021222324ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:03:41 AMASPEN, CONL−12016−0035−3−16NET LIVABLE PLANS730 E. COOPER AVE.LOWER LEVEL 1 ROOM SCHEDULENumber Name AreaL100 LOUNGE 333 SFL101 CORRIDOR 629 SFL102 ELEVATOR 42 SFL103 ELEVATOR 42 SFL104 STAIR #2 127 SFL105 STAIR #1 127 SFL106 LIBRARY 729 SFL106 BACK OF HOUSE 523 SFL107 BAR 745 SFL109 WOMEN'S LOCKERROOM336 SFL110 HAMAM 428 SFL111 MEN'S LOCKER 156 SFL112 MECHANICAL ROOM 287 SFL113 MOP SINK 31 SFL114 STAIR #3 132 SFL115 CAR ELEVATOR 284 SF4954 SFNO NET LEASABLE OR NET LIVABLE ON THIS LEVELTOTAL AREA:COMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACESUMMARY:MAIN LEVEL: 4,919 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 2,237 SFPUBLIC AMENITY: 894 SF3RD LEVEL: 5,007 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 3,572 SFTOTAL COMMON AREA: 1,435 SFPUBLIC AMENITY: 2ND & 3RD-0 SFROOF LEVEL: 3,673 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 770 SFPUBLIC AMENITY: 2,903 SFTOTAL COMMON AREA: 15,554 SFLOWER LEVEL 1 : 4,954 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 4,954 SFPUBLIC AMENITY: 0 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 7,649 SFTOTAL PUBLIC AMENITY: 3,225 SFTOTAL BUILDING AREA: 28,797 SF 3/16" = 1'-0"2LOWER LEVEL-NLACOMMON SPACECOMMON SPACECOMMON SPACETOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 5,131 SFPUBLIC AMENITY: 0 SFLOWER LEVEL 2 : 5,131 SF 3/16" = 1'-0"1LOWER LEVEL 2 - NLALOWER LEVEL 2 ROOM SCHEDULENumber Name AreaL200 VALET PARKING 4163 SFL201 ELEV. 42 SFL202 STAIR #1 127 SFL203 MECHANICAL RM. 382 SFL204 CAR ELEVATOR 284 SFL205 STAIR #2 132 SF5131 SFNO NET LIVABLE OR NET LEASABLE ON THIS LEVELTOTAL AREA:COMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACE2ND LEVEL: 5,104 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 4,077 SFTOTAL COMMON AREA: 1,027 SFPUBLIC AMENITY: 0 SFNO. DATE BY DESCRIPTION DNUPDNUPDNUPADA DORMUNITSTAIR #1201STAIR #2202COURTYARDBELOWELEVATOR203ELEVATOR204TYP. DORMUNITGUEST ROOM205GUEST ROOM206GUEST ROOM224GUEST ROOM215GUEST ROOM216GUEST ROOM217GUEST ROOM222GUEST ROOM208GUEST ROOM225BUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNK BEDBUNK BEDBUNK BEDBUNK BEDSTORAGEHOOKSSTORAGEHOOKSBUNK BEDBUNK BEDBUNK BEDBUNK BEDGUEST ROOM221BEDROOM220AROLL INSHOWERBUNK BEDGUEST ROOM220GUEST ROOM209GUEST ROOM207ADA GUESTROOMGUEST ROOM218NET LIVABLEBEDROOMGUEST ROOMSTAIR #1106ELEVATOR105ELEVATOR103STAIR #210434" HIGHPICK-UPCOUNTER1/4" / 1'-0"-0' - 7"-0' - 9 1/2"DN1/2" ADA DOORTHRESHOLDTRANSFORMERDNSKI STORAGE107RECEPTION108LOBBY/EXIT DISCHARGE100OFFICE109COURTYARD112RETAIL/RESTAURANTSPACE 'A'102NET LEASABLE AREANET LEASABLEAREA10' - 0"10' - 0"3' - 0"3' - 0"18' - 2"30' - 8"28' - 0"18' - 6"20' - 10"30' - 8"9' - 1"19' - 2"4' - 6"6' - 6"CAR ELEVATOR102ELEC.111STORAGE110STAIR #3113300 SF COVEREDTRASH/UTILITY AREA114EGRESS CORRIDOR115RETAIL/RESTAURANTSPACE 'B'101ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:03:45 AMASPEN, CONL−22016−0035−3−16NET LIVABLE PLANS730 E. COOPER AVE.SECOND LEVEL ROOM SCHEDULENumber Name Area200 CORRIDOR 686 SF201 STAIR #1 127 SF202 STAIR #2 127 SF203 ELEVATOR 42 SF204 ELEVATOR 42 SF205 GUEST ROOM 163 SF206 GUEST ROOM 165 SF207 GUEST ROOM 165 SF208 GUEST ROOM 166 SF209 GUEST ROOM 201 SF211 GUEST ROOM 294 SF212 GUEST ROOM 145 SF213 GUEST ROOM 141 SF214 GUEST ROOM 290 SF215 GUEST ROOM 206 SF216 GUEST ROOM 167 SF217 GUEST ROOM 167 SF218 GUEST ROOM 171 SF219 GUEST ROOM 157 SF220 GUEST ROOM 197 SF220A BEDROOM 87 SF221 GUEST ROOM 165 SF222 GUEST ROOM 306 SF223 GUEST ROOM 306 SF224 GUEST ROOM 165 SF225 GUEST ROOM 253 SF5104 SFTOTAL AREA:NET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACENET LIVABLENET LIVABLENET LIVABLE 3/16" = 1'-0"2SECOND FLOOR PLAN - NLAMAIN LEVEL ROOM SCHEDULENumber Name Area100 LOBBY/EXIT DISCHARGE 568 SF101 RETAIL/RESTAURANTSPACE 'B'597 SF102 RETAIL/RESTAURANTSPACE 'A'1763 SF103 ELEVATOR 41 SF104 STAIR #2 127 SF105 ELEVATOR 40 SF106 STAIR #1 127 SF107 SKI STORAGE 181 SF108 RECEPTION 142 SF109 OFFICE 161 SF110 STORAGE 85 SF111 ELEC. 29 SF112 COURTYARD 322 SF113 STAIR #3 182 SF114 300 SF COVEREDTRASH/UTILITY AREA268 SF115 EGRESS CORRIDOR 284 SF4919 SFNET LEASABLENET LEASABLETOTAL NET LEASABLE: 2,360 SFTOTAL AREA:COMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACEPUBLIC AMENITYCOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACE 3/16" = 1'-0"1MAIN FLOOR PLAN - NLATOTAL NET LIVABLE: 4077 SFTOTAL AREA:SUMMARY:MAIN LEVEL: 4,919 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 2,237 SFPUBLIC AMENITY: 894 SF3RD LEVEL: 5,007 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 3,572 SFTOTAL COMMON AREA: 1,435 SFPUBLIC AMENITY: 2ND & 3RD-0 SFROOF LEVEL: 3,673 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 770 SFPUBLIC AMENITY: 2,903 SFTOTAL COMMON AREA: 15,554 SFLOWER LEVEL 1 : 4,954 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 4,954 SFPUBLIC AMENITY: 0 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 7,649 SFTOTAL PUBLIC AMENITY: 3,225 SFTOTAL BUILDING AREA: 28,797 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 5,131 SFPUBLIC AMENITY: 0 SFLOWER LEVEL 2 : 5,131 SF2ND LEVEL: 5,104 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 4,077 SFTOTAL COMMON AREA: 1,027 SFPUBLIC AMENITY: 0 SFNO. DATE BY DESCRIPTION DNDNELEV. #1403STAIR #1402ELEV. #2404STAIR #2405COURTYARDBELOWMECHANICAL AREA406MECHANICAL AREA401GREEN ROOFAREA, TYP.MECHANICALAREAMECHANICALAREA3' - 6"3' - 6"3' - 6"3' - 6"ELEV. LOBBY40019' - 4"21' - 7"21' - 3"21' - 5"55' - 6"21' - 5"19' - 4"21' - 7"21' - 3"PUBLIC AMENITYAREAROOF TERRACE407ELEVATOR304ELEVATOR303STAIRS #2302STAIRS #1301CORRIDOR300GUEST ROOM325GUEST ROOM306GUEST ROOM307GUEST ROOM324WOMEN'S344GUEST ROOM308GUEST ROOM309GUEST ROOM311GUEST ROOM312GUEST ROOM313GUEST ROOM314GUEST ROOM315GUEST ROOM317GUEST ROOM318GUEST ROOM319MEN'S343GUEST ROOM321BEDROOM320AGUEST ROOM310GUEST ROOM316STORAGE345STORAGE342COURTYARDBELOWTYP. DORMUNITBUNK BEDBUNK BEDBUNK BEDBUNK BEDBUNK BEDROLL INSHOWERBUNK BEDADA GUESTROOMBUNK BEDBUNK BEDBUNK BEDBUNK BEDNET LIVABLEBEDROOMGUEST ROOMScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:03:49 AMASPEN, CONL−32016−0035−3−16NET LIVABLE PLANS730 E. COOPER AVE. 3/16" = 1'-0"2PROPOSED ROOF TERRACE PLANROOF LEVEL ROOM SCHEDULENumber Name Area400 ELEV. LOBBY 45 SF401 MECHANICAL AREA 193 SF402 STAIR #1 127 SF403 ELEV. #1 42 SF404 ELEV. #2 42 SF405 STAIR #2 127 SF406 MECHANICAL AREA 194 SF407 ROOF TERRACE 2903 SF3673 SFNO NET LIVABLE OR NET LEASABLE ON THIS LEVELTOTAL AREA:COMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACEPUBLIC AMENITYTOTAL AREA:NET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLENET LIVABLETOTAL NET LIVABLE: 3,572 SFCOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACENET LIVABLE 3/16" = 1'-0"1PROPOSED THIRD FLOOR PLAN - FARTHIRD LEVEL ROOM SCHEDULENumber Name Area300 CORRIDOR 749 SF301 STAIRS #1 127 SF302 STAIRS #2 127 SF303 ELEVATOR 42 SF304 ELEVATOR 42 SF306 GUEST ROOM 163 SF307 GUEST ROOM 165 SF308 GUEST ROOM 163 SF309 GUEST ROOM 167 SF310 GUEST ROOM 196 SF311 GUEST ROOM 283 SF312 GUEST ROOM 139 SF313 GUEST ROOM 139 SF314 GUEST ROOM 286 SF315 GUEST ROOM 200 SF316 GUEST ROOM 165 SF317 GUEST ROOM 165 SF318 GUEST ROOM 165 SF319 GUEST ROOM 154 SF320 GUEST ROOM 197 SF320A BEDROOM 87 SF321 GUEST ROOM 241 SF324 GUEST ROOM 243 SF325 GUEST ROOM 253 SF342 STORAGE 37 SF343 MEN'S 137 SF344 WOMEN'S 137 SF345 STORAGE 37 SF5007 SFCOMMON SPACECOMMON SPACECOMMON SPACECOMMON SPACESUMMARY:MAIN LEVEL: 4,919 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 2,237 SFPUBLIC AMENITY: 894 SF3RD LEVEL: 5,007 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 3,572 SFTOTAL COMMON AREA: 1,435 SFPUBLIC AMENITY: 2ND & 3RD-0 SFROOF LEVEL: 3,673 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 770 SFPUBLIC AMENITY: 2,903 SFTOTAL COMMON AREA: 15,554 SFLOWER LEVEL 1 : 4,954 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 4,954 SFPUBLIC AMENITY: 0 SFTOTAL NET LEASABLE: 2,360 SFTOTAL NET LIVABLE: 7,649 SFTOTAL PUBLIC AMENITY: 3,225 SFTOTAL BUILDING AREA: 28,797 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 0 SFTOTAL COMMON AREA: 5,131 SFPUBLIC AMENITY: 0 SFLOWER LEVEL 2 : 5,131 SF2ND LEVEL: 5,104 SFTOTAL NET LEASABLE: 0 SFTOTAL NET LIVABLE: 4,077 SFTOTAL COMMON AREA: 1,027 SFPUBLIC AMENITY: 0 SFNO. DATE BY DESCRIPTION SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"T/O ELEVATOR SHAFT49' - 10"T/O STAIRWELL44' - 5"CONCRETE BASE, TYP.INSULATED,LOW-LIGHTEMITTANCECLEARGLAZING, TYP.STEEL AND GLASSRAILING, TYP.CANOPY SUPPORTCABLE, TYP.ELEVATOR SHAFTBEYONDEXPOSED GLULAMBEAMS AND COLUMNS, TYP.VEGETATED WALL,TYP. SEELANDSCAPEDRAWINGS.DECORATIVE STEELCOUNTER WEIGHT, TYP.DECORATIVE STEELPULLEY,TYP.FUTURE SIGNAGE122.13456789101112136.17.111.1B/O CANOPY14' - 8"NORTHEAST PROPOSEDGRADE0' - 0"SOUTHEAST GRADE3' - 4 3/32"RETAIL 'A' FIN. FLOOR2' - 8 17/32"LOBBY FIN. FLR.2' - 0 29/32"RETAIL 'B' FIN. FLR.0' - 9 31/32"T/O RAILING39' - 5"HANGING SIGNFUTURE SIGNAGESTAIRWELL WALLBEYONDELEVATOR OVERRUN5.1T/O ARCHITECTURALELEMENT37' - 8"T/O ELEVATOR ABOVE GRADE47' - 11"36' - 2"NORTHEAST EXIST. GRADE0' - 2 1/4"36' - 2"MOSTRESTRICTIVEGRADE32' - 10"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"T/O ELEVATOR SHAFT49' - 10"T/O STAIRWELL44' - 5"CONCRETE BASE, TYP.INSULATED,LOW-LIGHT EMITTANCECLEAR GLAZING, TYP.STEEL AND GLASS RAILING,TYP.CANOPY BEYONDCANOPY SUPPORTCABLEELEVATOR SHAFTBEYONDEXPOSED GLULAMBEAMS AND COLUMNS, TYP.VEGETATED WALL,TYP. SEE LANDSCAPEDRAWINGS.DECORATIVE STEELCOUNTER WEIGHTDECORATIVE STEELPULLEY BEYONDGROUND LEVEL OPERABLEWINDOWS (TYP)ABCDEFGJE.1F.1KB/O CANOPY14' - 8"SOUTHWEST PROPOSEDGRADE2' - 2 3/4"SOUTHEAST GRADE3' - 4 3/32"RETAIL 'A' FIN. FLOOR2' - 8 17/32"T/O RAILING39' - 5"HANGING SIGNEXTERIOR LIGHTINGELEVATOR OVERRUNT/O MECHANICAL AREA41' - 3"E.2T/O ARCHITECTURALELEMENT37' - 8"34' - 5"34' - 5"SOUTHWEST EXIST. GRADE1' - 9 3/8"MOSTRESTRICTIVEGRADE32' - 10"33' - 9"ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:02:52 AMASPEN, COA−2002016−0035−3−16PROPOSED EXTERIOR ELEVATIONS730 E. COOPER AVE. 3/16" = 1'-0"1EAST ELEVATION 3/16" = 1'-0"2SOUTH ELEVATIONNO. DATE BY DESCRIPTION PROPOSED NORTHWESTGRADE-1' - 2 5/8"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"T/O ELEVATOR SHAFT49' - 10"T/O STAIRWELL44' - 5"ELEVATOR SHAFTBEYONDDISTRESSED METAL PANELS(TYP.) 1/3 RUNNING BONDTRANSFORMERBOARD-FORMEDCONCRETE SCREEN WALLVEGETATED WALL,TYP. SEE LANDSCAPEDRAWINGS.STEEL ANDGLASS RAILINGSTEEL AND GLASS RAILINGDISTRESSED METALPANELS (TYP.) 1/3RUNNING BOND122.13456789101112136.17.111.1SOUTHWEST PROPOSEDGRADE2' - 2 3/4"T/O RAILING39' - 5"MECHANICAL UNITSCREENINGCONCRETE BASE, TYP.MECHANICAL UNITSCREENINGEXPOSED GLULAMBEAMS AND COLUMNS,TYP.INSULATED,LOW-LIGHT EMITTANCECLEAR GLAZING, TYP.EXTERIOR LIGHT FIXTURE, TYP.5.1T/O ARCHITECTURALELEMENT37' - 8"EXIST. NORTHWEST GRADE-0' - 10 5/8"MOST RESTRICTIVEGRADE37' - 5"37' - 5"33' - 9"PROPOSED NORTHWESTGRADE-1' - 2 5/8"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"T/O ELEVATOR SHAFT49' - 10"T/O STAIRWELL44' - 5"CONCRETE BASE, TYP.EXPOSED GLULAMBEAMS AND COLUMNS, TYP.STEEL AND GLASS RAILING, TYP.CANOPY BEYONDCANOPY SUPPORTCABLEELEVATOR SHAFTBEYONDDECORATIVE STEELCOUNTER WEIGHTDECORATIVE STEELPULLEYINSULATED,LOW-LIGHT EMITTANCECLEAR GLAZING, TYP.DISTRESSED METAL PANEL(TYP) 1/3 RUNNIGN BONDABCDEFGJE.1F.1KB/O CANOPY14' - 8"NORTHEAST PROPOSEDGRADE0' - 0"RETAIL 'B' FIN. FLR.0' - 9 31/32"T/O RAILING39' - 5"EXTERIOR LIGHTFIXTURE, TYP.CAR ELEVATOR DOORVEGETATEDWALL, TYP. SEELANDSCAPEDRAWINGS.TRANSFORMEROVERHEAD SECTIONALDOORS9' - 0"10' - 0"T/O MECHANICAL AREA41' - 3"E.2OVERRUNELEVATORT/O ARCHITECTURALELEMENT37' - 8"EXIST. NORTHWEST GRADE-0' - 10 5/8"MOST RESTRICTIVEGRADE37' - 5"37' - 5"36' - 2"ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:03:06 AMASPEN, COA−2012016−0035−3−16PROPOSED EXTERIOR ELEVATIONS730 E. COOPER AVE. 3/16" = 1'-0"1WEST ELEVATION 3/16" = 1'-0"2NORTH ELEVATIONNO. DATE BY DESCRIPTION SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"PARAPET36' - 2"T/O ELEVATOR SHAFT49' - 10"T/O STAIRWELL44' - 5"A-2302A-2306SIGNAGE SHOWNFOR REFERENCE ONLY.TENANT SIGNAGETO BE UNDERSEPERATE PERMIT.SIGNAGE SHOWNFOR REFERENCE ONLY.TENANT SIGNAGETO BE UNDERSEPERATE PERMIT.B/O CANOPY14' - 8"NORTHEAST PROPOSEDGRADE0' - 0"B/O LIGHT FIXTURE10' - 4 3/8"RETAIL 'A' FIN. FLOOR2' - 8 17/32"LOBBY FIN. FLR.2' - 0 29/32"RETAIL 'B' FIN. FLR.0' - 9 31/32"T/O RAILING39' - 5"A-2307A-2307SimEXIST. NORTHWEST GRADE-0' - 10 5/8"PARAPET36' - 2"5' - 0"1' - 6"1"7"1' - 2"7"HANGING SIGNSQUARE FOOTAGE = 5.99 SF(5'-0" x 1'-2/3/8")2"9"3"2' - 4"WHITE CUTOUT LETTERS(DOUBLE SIDED)DISTRESSED METAL PANELFINISH TO MATCH BUILDINGCONCEALED FASTENERS4"4' - 5"4"PAINTEDLETTER FACE, TYP.METAL LETTER RETURN TOMATCH BUILDING , TYP.LETTER SUPPORT , TYP.FREESTANDING LETTERSIGN = 6 S.F.(1'-0 7/16" x 5'-9 1/2")PAINTEDLETTER FACE, TYP.METAL LETTER RETURN TOMATCH BUILDING, TYP.FREESTANDING LETTERSIGN = 6 S.F.( 10 11/16" x 6'-7")LETTER SUPPORT, TYP.5' - 0"2"DISTRESSED METAL PANELFINISH TO MATCH BUILDINGCONCEALED FASTENERSEQEQLETTER FACE(DOUBLE SIDED)1011AB11.1"RETAIL"SIGN LOCATIONCANOPY OPENSTRUCTURE6786.17.1AB"BASE" SIGNLOCATIONCANOPY OPENTIMBER STRUCTUREScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.As indicated7/15/2016 8:03:14 AMASPEN, COA−2302016−0035−3−16PROPOSED SIGNAGE ELEVATION730 E. COOPER AVE. 3/16" = 1'-0"1PROPOSED SIGNAGE ELEVATION - EAST 1" = 1'-0"2PROPOSED HANGING SIGN DETAIL 1" = 1'-0"6PROPOSED CANOPY SIGNAGE DETAIL 1" = 1'-0"7PROPOSED CANOPY RETAIL SIGNAGE DETAIL 1" = 1'-0"3PROPOSED HANGING SIGN SIDE PROFILE 1/4" = 1'-0"5RETAIL ENTRANCE CANOPY PLAN, TYP. 1/4" = 1'-0"4MAIN ENTRY CANOPY PLANNO. DATE BY DESCRIPTION 122.13456789101112136.17.1ABCDEFGJ11.1E.1F.1KLIGHT FIXTURETYPE "A", TYP.LIGHT FIXTURE TYPE "B"LIGHT FIXTURE TYPE "B"LIGHT FIXTURETYPE "B", TYP.LIGHT FIXTURETYPE "A", TYP.LIGHT FIXTURETYPE "A", TYP.LIGHT FIXTURETYPE "A", TYP.69' - 3"5' - 7"9' - 3"10' - 0"10' - 9"10' - 9"10' - 9"10' - 0"2' - 1"3' - 7"6' - 6"4' - 11"5' - 10"100' - 0"1' - 2"10' - 11"10' - 11"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"9' - 0"10' - 11"10' - 11"1' - 1"5' - 10"5' - 0"3' - 7"5' - 5"5' - 5"3' - 7"9' - 4"1' - 7"TYP.1' - 6"TYP.1' - 6"TYP.1' - 6"7'-10 7/8"8'-0 1/8"8'-2 5/8"8'-4 3/8"9'-7"10'-3 5/8"8'-2 1/8"8'-2 1/8"8'-4 7/8"8'-4 1/4"7'-10 5/8"7'-10 5/8"7'-4 3/8"7'-4 3/8"7'-0 1/4"7'-0 1/4"7'-0 1/4"10'-7 1/8"10'-4 5/8"10'-4 3/8"9'-11 5/8"9'-7 1/2"9'-2 1/8"8'-4 1/2"8'-8 1/2"8'-6 1/2"8'-1 1/2"8'-8 1/4"7'-6 1/4"7'-0 7/8"12' - 2 1/8"14' - 0 5/8"12' - 9 11/16"12' - 9 11/16"X'-XX"INDICATES MOUNTING ELEVATIONABOVE EXTERIOR GRADEEQ.3' - 0"EQ.EQ.3' - 7"EQ.EQ.3' - 7"EQ.LIGHT FIXTURETYPE "B", TYP.E.25.1ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/16" = 1’−0"7/15/2016 8:03:18 AMASPEN, COA−2402016−0035−3−16PROPOSED OUTDOOR LIGHTING730 E. COOPER AVE. 3/16" = 1'-0"1REFLECTED CEILING PLAN - EXTERIOR LIGHTINGEXTERIOR FIXTURE TYPE "B" - BEGA #3502LEDEXTERIOR FIXTURE TYPE "A" - LITHONIA #OLVTWMNO. DATE BY DESCRIPTION 4.44.48.84.55.75.710.13.81.31.31.21.00.91.01.11.31.32.02.01.61.41.21.41.61.92.02.72.52.21.81.61.82.22.62.74.12.92.52.12.02.22.63.02.93.02.82.52.42.52.83.13.02.73.13.13.02.93.13.23.12.82.53.13.53.63.63.63.53.22.62.43.04.34.04.04.03.02.40.50.71.01.41.92.30.50.71.01.42.12.83.30.60.91.21.92.83.45.00.71.11.62.33.13.64.00.91.52.23.23.94.13.71.22.03.24.45.04.73.21.52.54.15.46.53.22.61.62.84.36.11.62.64.14.71.62.53.73.91.72.74.05.11.83.15.06.71.93.45.67.91.83.15.16.91.72.74.25.61.62.64.05.41.83.04.86.51.93.45.67.81.83.35.57.61.72.94.56.01.62.64.05.31.72.84.66.31.83.35.88.21.83.56.21.73.05.17.21.52.64.15.51.52.64.15.61.73.05.27.31.83.46.08.71.73.15.37.61.52.64.05.51.42.33.74.21.42.44.25.31.42.75.07.42.32.42.42.21.91.81.82.12.32.32.12.12.12.01.61.10.70.50.40.30.30.20.20.20.30.40.60.71.01.31.51.71.71.71.61.51.31.10.80.60.40.30.23.52.62.72.92.62.32.42.73.02.92.82.82.82.62.01.40.90.60.60.40.20.20.20.20.40.60.50.81.11.51.92.12.02.01.91.91.61.20.90.60.40.30.21.42.23.13.82.62.52.62.93.13.02.93.33.42.01.50.90.60.80.60.20.20.20.20.50.70.60.81.21.52.22.72.12.02.02.51.81.20.90.70.40.30.22.83.13.33.43.33.12.82.42.93.43.64.14.24.13.63.43.03.14.14.24.54.44.44.54.13.23.24.54.74.74.75.13.34.95.45.12.72.34.14.13.91.42.85.27.74.03.74.15.38.49.87.67.16.67.07.55.95.96.38.28.26.46.26.48.18.07.87.57.67.77.68.08.38.46.75.95.66.46.65.25.05.16.56.15.55.55.35.84.73.32.92.62.44.23.92.92.31.71.22.24.16.16.65.43.43.85.16.57.46.96.25.96.16.15.75.96.16.66.66.26.06.26.56.96.86.76.96.86.77.07.26.86.45.85.55.55.55.25.25.25.65.45.25.14.94.84.13.53.12.63.23.23.12.62.11.50.91.52.53.74.13.72.92.83.74.95.34.94.54.54.74.94.64.64.85.15.14.94.74.95.35.45.25.35.45.45.35.35.55.55.14.74.54.54.54.44.34.44.54.54.44.24.13.93.63.12.82.92.82.62.62.21.71.30.71.01.52.02.22.11.91.92.42.93.23.13.03.13.33.43.33.23.33.43.43.33.33.43.73.73.63.73.93.93.73.73.83.83.53.43.33.43.43.33.33.43.53.43.33.23.13.02.82.62.42.32.22.22.01.71.41.00.70.91.11.21.21.21.41.51.71.81.91.92.02.12.22.22.12.12.22.22.12.22.32.42.42.42.52.62.62.52.52.52.52.42.32.32.32.32.32.42.42.42.42.32.32.22.22.12.01.81.71.61.61.51.31.00.80.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.10.20.20.20.20.30.30.30.30.50.50.40.40.70.70.60.51.11.10.90.71.61.51.21.02.01.91.61.22.72.31.91.53.52.52.11.73.22.62.31.92.82.62.41.92.62.82.51.92.43.12.51.92.82.31.80.80.80.80.80.80.80.80.80.80.40.10.10.10.10.10.10.10.10.10.10.10.12.30.50.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.7/15/2016 8:03:29 AMASPEN, COA−2502016−0035−3−16EXTERIOR LIGHTING CALCULATIONS730 E. COOPER AVE.PHOTOMETRIC RENDERINGPHOTOMETRIC MEASUREMENTS - 3'-0" ABOVEGRADENO. DATE BY DESCRIPTION PROPOSED NORTHWESTGRADE-1' - 2 5/8"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"AB16'-9 3/4"10'-0"10'-4"3"T/O RAILING39' - 5"FIXED/DECORATIVESTEEL PULLEY SYSTEM1" BRAIDED STEELCABLEINTERNALLYILLUMINATED SIGNAGEOPEN GLULAMCANOPY/TRELLISSTRUCTURE W/DECORATIVE STEELPLATE CLADDINGGLULAM COLUMN W/DECORATIVE STEELPLATE CLADDINGTAPERED CAST INPLACE CONC. PIERWALL MOUNTEDLIGHT FIXTURESSTEEL CANOPY CLEATFIXED DECORATIVESTEEL COUNTERWEIGHTGLASS RAILINGGLULAM BEAMGLULAM BEAMGLULAM BEAMHEAVY TIMBER CLT ROOFSTRUCTURE W/ RIGID INSULATION &LIGHT WEIGHT TOPPING SLABGLULAM DIAGONALBRACINGGLULAM DIAGONALBRACINGHEAVY TIMBER CLT FLOORSTRUCTURE W/ LIGHTWEIGHT TOPPING SLABGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGHOPES " THERMAL EVOLUTION"STEEL STOREFRONT SYSTEMLED CEILINGMOUNTED LIGHTFIXTUREVEGETATED WALL,TYP. SEE LANDSCAPEDRAWINGS.STEEL STRUCTUREEARTH RETENTION SYSTEMWITH CONC. GRADE BEAMINSULATED BASEMENTSTEEL STUD ANDGYPSUM FACED WALL.PROPERTY LINE5' - 0"PROPOSED NORTHWESTGRADE-1' - 2 5/8"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"ABT/O RAILING39' - 5"GLULAM COLUMN W/DECORATIVE STEELPLATE CLADDINGWALL MOUNTEDLIGHT FIXTUREGLASS RAILINGHEAVY TIMBER CLT DECK W/ RIGIDINSULATION & LIGHT WEIGHTTOPPING SLABGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGHOPES " THERMAL EVOLUTION"STEEL STOREFRONT SYSTEMGLULAM BEAMBEYONDHEAVY TIMBER CLT FLOORSTRUCTURE W/ LIGHT WEIGHTTOPPING SLABHOPES " THERMAL EVOLUTION"STEEL STOREFRONT SYSTEMGLULAM BEAMBEYONDTAPERED CAST INPLACE CONC. PIERSTEEL STRUCTUREEARTH RETENTION SYSTEMWITH CONC. GRADE BEAMINSULATED BASEMENT STEELSTUD AND GYPSUM FACED WALL.DECORATIVEPEBBLESPROPERTY LINERAILING SETBACK3' -6" (MIN)HEAVY TIMBER CLT FLOORSTRUCTURE W/ LIGHT WEIGHTTOPPING SLABWINDOW SHADE/BLINDSWINDOW SHADE/BLINDSPROPOSED NORTHWESTGRADE-1' - 2 5/8"SECOND FLOOR15' - 7"THIRD FLOOR25' - 7"ROOF TERRACE35' - 11"PARAPET36' - 2"AB16'-9 3/4"10'-0"10'-4"3"T/O RAILING39' - 5"FIXED/DECORATIVESTEEL PULLEY SYSTEM1" BRAIDED STEELCABLEINTERNALLYILLUMINATED SIGNAGEOPEN GLULAMCANOPY/TRELLISSTRUCTURE W/DECORATIVE STEELPLATE CLADDINGGLULAM COLUMN W/DECORATIVE STEELPLATE CLADDINGTAPERED CAST INPLACE CONC. PIERWALL MOUNTEDLIGHT FIXTURESTEEL CANOPY CLEATFIXED DECORATIVESTEEL COUNTERWEIGHTGLASS RAILINGGLULAM BEAMGLULAM BEAMGLULAM BEAMHEAVY TIMBER CLT ROOFSTRUCTURE W/ RIGID INSULATION &LIGHT WEIGHT TOPPING SLABHEAVY TIMBER CLT FLOORSTRUCTURE W/ LIGHT WEIGHTTOPPING SLABGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGGLULAM BEAM W/DECORATIVE STEELPLATE CLADDINGSTEEL STRUCTUREEARTH RETENTION SYSTEMWITH CONC. GRADE BEAMINSULATED BASEMENTSTEEL STUD ANDGYPSUM FACED WALL.PROPERTY LINEGLULAM BEAM W/DECORATIVE STEELPLATE CLADDING5' - 0"WINDOW SHADE/BLINDSWINDOW SHADE/BLINDSScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif. 3/8" = 1’−0"7/15/2016 8:03:32 AMASPEN, COA−3102016−0035−3−16PROPOSED EXTERIOR WALL SECTIONS730 E. COOPER AVE. 3/8" = 1'-0"1PROPOSED CANOPY SECTION 3/8" = 1'-0"3PROPOSED WALL SECTION 3/8" = 1'-0"2PROPOSED CANOPY SECTIONNO. DATE BY DESCRIPTION ScalePROJECT NUMBERDATEDRAWN BYCHECKED BY7−15−16 RA ORDINANCE NO. 6 (SERIES OF 2016) ’APPROVED PLAN SET’ EXHIBITBASE LODGEmodif.modif.7/15/2016 8:03:33 AMASPEN, COA−3202016−0035−3−16PROPOSED EXTERIOR MATERIALS730 E. COOPER AVE.VEGETATED WALL SYSTEMHEAVY TIMBER WINDOW SLATSFOLDING OVERHEAD WINDOWWOOD TIMBER CEILINGCONCRETE PIERBOARD FORMED CONCRETEDISTRESSED METAL PANELSGLULAM BEAM CONNECTIONSNO. DATE BY DESCRIPTION CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT March, 2016 City of Apen|130 S. Galena St.|(970) 920 5050 ATTACHMENT 2 – LAND USE APPLICATION PROJECT: Parcel ID # (REQUIRED) APPLICANT: Phone #: REPRESENTIVATIVE: Name: _________________________________________________________________________________________________ Address:________________________________________________________________________________________________ Phone#: TYPE OF APPLICATION: (Please check all that apply): EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) PROPOSAL: (Description of proposed buildings, uses, modifications, etc.) Have you attached the following? FEES DUE: $ $1,950 Pre-Application Conference Summary Attachment #1, Signed Fee Agreement Response to Attachment #3, Dimensional Requirements Form Response to Attachment #4, Submittal Requirements – including Written Responses to Review Standards 3-D Model for large project All plans that are larger than 8.5” X 11” must be folded. A disk with an electric copy of all written text (Microsoft Word Format) must be submitted as part of the application. Large scale projects should include an electronic 3-D model. Your pre-application conference summary will indicate if you must submit a 3-D model. GMQS Exemption Conceptual PUD Temporary Use GMQS Allotment Final PUD (& PUD Amendment) Special Review Subdivision Conceptual SPA ESA – 8040 Greenline, Stream Subdivision Exemption (includes Margin, Hallam Lake Bluff, Condominiumization) Mountain View Plane Final SPA (&SPA Commercial Design Review Lot Split Amendment) Residential Design Variance Lot Line Adjustment Small Lodge Conversion/ Expansion Conditional Use Other: Name: Base Lodge Recordation Documents Review Location: 730 East Cooper Avenue 2737-073-20-008 Name: 730 East Cooper, LLC; Mark Hunt, Manager Address: 2001 North Halsted Road #304; Chicago, IL 60614 312.850.1680 Dwayne Romero; Romero Management, LLC 1340 Mountain View Drive; Aspen, CO 81611 970.618.8880 Review of Recordation Documents Existing commercial building with retail, lodge, and restaurant uses. Approved for redevelopment as a mixed-use building with commercial and lodging uses. See Development Order. Recordation of development agreement and approved plan set. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT March, 2016 City of Apen|130 S. Galena St.|(970) 920 5050 ATTACHMENT 3 DIMENSIONAL REQUIREMENTS FORM Location: ______________________________________________________________________________ Zone District: ______________________________________________________________________________ Lot Size: _______________________________________________________________________________ Lot Area: _______________________________________________________________________________ (For the purpose of calculating Floor Area, Lot Area may be reduced for areas within the high-water mark, easement, and steep slopes. Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: _____________ Proposed: _________________________________ Number of residential units: Existing: _____________ Proposed: _________________________________ Existing: _____________ Proposed: _________________________________ Proposed % of demolition (Historic properties only): ______________ DIMENSIONS: Floor Area: Existing: _____________ Allowable: ___________Proposed ____________ Principal bldg. height: Existing: _____________ Allowable: ___________Proposed____________ Access. Bldg. height: Existing: _____________ Allowable: __________ Proposed_____________ On-Site parking: Existing: _____________ Required: ___________Proposed_____________ % Site coverage: Existing: _____________ Required: ___________Proposed_____________ % Open Space: Existing: _____________ Required: ___________Proposed_____________ Front Setback: Existing: _____________ Required ____________Proposed _____________ Rear Setback: Existing: _____________ Required: ___________Proposed _____________ Combined F/F: Existing: _____________ Required ___________ Proposed _____________ Side Setback: Existing: _____________ Required: ___________Proposed _____________ Side Setback: Existing: _____________ Required ___________ Proposed _____________ Combined Sides: Existing: _____________ Required ___________ Proposed _____________ Distance between Bldgs. Existing: _____________ Required: ___________ Proposed _____________ Existing: _____________ Required: ___________Proposed: _____________ Existing non-conformities or encroachments: __________________________________________________ _______________________________________________________________________________________ Variations requested: _____________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ Base Lodge Project: ______________________________________________________________________________ Applicant: ___________________________________________________________________________ 730 East Cooper Avenue; Aspen, CO 81611 Commercial Lodge - CL 6,000 s.f. 6,000 s.f. None - Recordation Documents 3,751 0 0 3,751 0 All dimensions, please refer to Development Order Number of bedrooms: 0 Existing conditions. 730 East Cooper, LLC; Mark Hunt , Manager BUS_RE/5962031.1 730 East Durant Avenue, Second Floor, Aspen, Colorado 81611-1557 Telephone: 970.925.6300 Fax: 970.925.1181 www.shermanhoward.com Curtis B. Sanders Sherman & Howard L.L.C. Direct Dial Number: 970.300.0114 E-mail: csanders@shermanhoward.com March 14, 2016 City of Aspen Community Development Department 130 South Galena Street Aspen, Colorado 81611 Re: 730 E. Cooper, LLC, a Colorado limited liability company; Certificate of Ownership Dear Sir or Madam: I am an attorney licensed by the State of Colorado to practice law. This letter shall confirm and certify that 730 E. Cooper, LLC, a Colorado limited liability company, is the owner of all improvements (collectively, the “Improvements”) currently located on the Easterly 9.27 feet of Lot Q, and all of Lots R and S, Block 105, City and Townsite of Colorado (the “Real Property”), and that further, 730 E. Cooper, LLC is also the tenant under a Net Ground Lease dated March 13, 2000 (“Net Ground Lease”) with respect to the Real Property, between The Simon P. Kelly Trust and the Nora D. Kelly Trusts Dated January 4, 1993, as Landlord and The Buckhorn Arms, LLC as Tenant, a Short Form of which was recorded on March 13, 2000 as Reception No. 441336, Pitkin County, Colorado, and which Net Ground Lease was assigned to and assumed by 730 E. Cooper, LLC pursuant that certain Bill of Sale, Assignment and Assumption Agreement dated March 5, 2013, between The Buckhorn Arms, LLC as assignor and 730 E. Cooper, LLC as assignee, and recorded April 2, 2013 as Reception No. 598272, Pitkin County, Colorado. 730 E. Cooper, LLC’s interest in the Real Property pursuant to the Net Ground Lease is subject to the following matters of record: 1. Reservations and exceptions as set forth in the Deed from the City of Aspen recorded in Book 59 at Page 330, 461 and Book 79 at Page 54. 2. Mineral and mineral rights as set forth in Deeds recorded in Book 98 at Page 517, Book 125 at Page 1, Book 106 at Page 481, Book 106 at Page 482 and Book 131 at Page 81. 2 BUS_RE/5962031.1 3. Terms, conditions, provisions and obligations as set forth in Short Form of Net Ground Lease recorded March 13, 2000 as Reception No. 441336. 4. Easements, rights of way and all matters as disclosed on Improvement Survey Plat of the Real Property recorded September 5, 2008 in Survey Plat Book 88 at Page 34. 5. Terms, conditions, provisions, obligations and all matters as set forth in Ordinance No. 2, Series of 2009 by City of Aspen Council recorded April 14, 2009 as Reception No. 558000. 6. Terms, conditions, provisions and obligations as set forth in Covenant Agreement in Association with Aspen City Council Ordinance No. 2 (Series of 2009) recorded April 14, 2009 as Reception No. 558001. 7. Terms, conditions, provisions and obligations as set forth in Bill of Sale, Assignment and Assumption Agreement recorded April 2, 2013 as Reception No. 598272, Pitkin County, Colorado. 8. Notice of Lien of City of Aspen Water Department recorded October 22, 2014, as amended by Notice of Lien recorded December 10, 2015 as Reception No. 625472. 9. Terms, conditions, provisions and obligations as set forth in Resolution No. 1, Series of 2015 recorded January 13, 2015 as Reception No. 616672. 10. Terms, conditions, provisions and obligations as set forth in Ordinance No. 2, Series of 2015 recorded March 2, 2015 as Reception No. 617733. 11. Notice of Lien of City of Aspen Water Department in the amount of $7,4323.55 recorded December 10, 2015 as Reception No. 625472. Sincerely, Curtis B. Sanders CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Hillary Seminick, 429-2741 DATE: June 28, 2016 PROJECT: Base Lodge Planned Development – Recordation Documents REPRESENTATIVE: Mark Hunt DESCRIPTION: The Applicant has land use approvals to develop the Base Lodge property at 730 E. Cooper Ave. with 38 lodge bedrooms with 68 pillows, 2,922 sf of commercial net leasable space, and a sub-grade parking garage with 23 spaces. The following final documents are required: PD/Subdivision Agreement, Development Agreement, an Approved Plan Set, and Performance Guarantees. The applicant currently has a deadline of January 3, 2017 to record the documents (180 days from issuance of Development Order). If additional time is needed, the applicant may request an extension. All documents are reviewed administratively. No public hearings are required. In addition to Planning staff review, the Engineering and Parks Departments, and City Attorney’s Office will review the recordation documents. Relevant Land Use Code Section(s): 26.304 Common Development Review Procedures 26.445 Planned Development 26.490 Approval Documents 26.590 Timeshare http://www.aspenpitkin.com/depts/38/citycode.cfm Review by: • Staff for complete application and approval of documents Planning Fees: Planning Deposit – $975 for 3 hours (additional time is billed at $325 per hour) Referral Fees: Parks Department - $650 flat fee Engineering Department - $325 deposit (additional time is billed at $275 per hour) City Attorney’s Office – no deposit, but time is billed at $325 per hour Total Deposit: $1,950 To apply, submit the following information:  Proof of ownership with payment.  Signed fee agreement.  Applicant’s name, address and telephone number in a letter signed by the applicant which states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current certificate from a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Total deposit for review of the application.  4 Hard copies of the complete application packet and maps; 2 full-size sets of plans.  Electronic copy of all document. Word format is preferred for all text documents Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. Base Lodge PD Agreement Page 1 DEVELOPMENT AGREEMENT FOR BASE LODGE PLANNED DEVELOPMENT THIS DEVELOPMENT AGREEMENT (hereinafter the “Agreement” or the “PD Development Agreement”) is made and entered into this _____ day of _____________, 2016, by and between THE CITY OF ASPEN, COLORADO, a municipal corporation (hereinafter referred to as “City”), and 730 E. Cooper LLC, a Colorado limited liability company (herein after referred to as “APPLICANT”). W I T N E S S E T H: WHEREAS, APPLICANT has submitted to the City for approval an application for the following land use review approvals for the development of a lodge and commercial space located at 730 East Cooper Avenue, City of Aspen, Pitkin County, legally described as Lots R and S, and the east 9.27 square feet of Lot Q, Block 105, City and Townsite of Aspen (the “Property”): • Planned Development – Project Review and Detailed Review, pursuant to Aspen Municipal Code Chapter 26.445. • Growth Management Review – Replacement of Existing Commercial and Lodge Development, pursuant to Aspen Municipal Code Chapter 26.470. • Growth Management Review –Lodge Development, pursuant to Aspen Municipal Code Chapter 26.470. • Growth Management Review – Affordable Housing, pursuant to Aspen Municipal Code Chapter 26.470. • Commercial Design Review, pursuant to Aspen Municipal Code Section 26.412; and, Collectively, the foregoing is referred to as the “Project”. WHEREAS, Pursuant to Ordinance No. 2 (Series of 2015) (“Ordinance 2”) adopted on February 9, 2015, and recorded as Reception No. 617733 in the Office of the Clerk and Recorder of Pitkin County, Colorado, the Aspen City Council granted Project Review approval, Growth Management approvals, Conceptual Commercial Design approval, for a Site Specific Development Plan for Base Lodge, 730 E. Cooper Avenue, for development of a lodge containing 42 lodge units including 44 bedrooms; and WHEREAS, Ordinance 2 granted certain variations to the underlying zone district requirements pertaining to the employee generation rate, the number of and location of parking spaces required for the project, and increased height to accommodate bathrooms to serve the rooftop deck amenity; and WHEREAS, Ordinance No. 6 (Series of 2016) (“Ordinance 6”) was adopted on March 21, 2016, and recorded as Reception No. 629514 in the Office of the Clerk and Recorder of Pitkin County, Colorado, amending Sections 1, 3, 4, 6, and 13 of Ordinance 2 so as to modify the employee housing generation rates, the parking requirements and the height of the Lodge Building by eliminating the bathrooms on the roof, all of which are consistent with the underlying zone district, thus no variations Base Lodge PD Agreement Page 2 from the underlying zone district were sought or finally approved and the lodge unit density decreased as a result; and WHEREAS, on June 21, 2016, the Planning and Zoning Commission granted Planned Development Detailed Review and Final Commercial Design Review Approvals for the Project in the configurations depicted on the Approved Plan Set to be recorded concurrently with this Development Agreement pursuant to Planning and Zoning Commission Resolution No. 4, (Series of 2016) (the “Approval Resolution”) recorded on July 15, 2016 as Reception No. 630675; and WHEREAS, the APPLICANT has submitted to the City for execution and recordation, the Approved Plan Set and Development Agreement (collectively “Plans and Agreement”) for the Project in compliance with the form, content, and timing requirements of Chapter 26.490; and WHEREAS, City has fully considered the Plans and Agreement, the other terms and conditions included in Ordinances 2 and 6, the Approval Resolution, and the effects of the proposed development and improvement of said lands on adjoining and neighboring properties and property owners; and WHEREAS, City has imposed certain conditions and requirements in connection with its approval of the Project and the execution and recordation of the Plans and Agreement, such matters being necessary to protect, promote and enhance the public welfare; and WHEREAS, APPLICANT is willing to acknowledge, accept, abide by and faithfully perform the conditions and requirements imposed by the City of Aspen in approving the Project; and WHEREAS, the Plans and Agreement meet the requirements of Aspen Municipal Code Chapter 26.490 ensuring each item and condition of approval is documented to the satisfaction of the Community Development Director, the City Engineer, the City Attorney, and the Mayor; and WHEREAS, no building permit submission for development on the Property will be accepted by City until the Plans and Agreement have been accepted, signed and recorded; and WHEREAS, under the authority of Sections 26.490.070 of the Aspen Municipal Code, the City is entitled to certain financial guarantees as described herein and APPLICANT is prepared to provide such guarantees as hereinafter set forth. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements herein contained, the approval, execution and acceptance of the Plans and Agreement for recordation by City, and for other good and valuable considerations, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: Base Lodge PD Agreement Page 3 ARTICLE I. PURPOSE AND EFFECT OF PLANNED DEVELOPMENT AGREEMENTAND APPROVED PLAN SET 1. Purpose. The purpose of the Plans and Agreement Set is to set forth the complete and comprehensive understanding and agreement of the parties with the respect to the development of the Property and to enumerate all terms and conditions under which such development may occur. 2. Effect. It is the intent of the parties that, upon the recording of the Plans and Agreement, the Plans and Agreement, Ordinances 2 and 6, and the Approval Resolution (as defined below), shall effectively supersede and replace in their entirety, as they apply to the Property, all previously recorded and unrecorded subdivision, planned unit development and other land use approvals and related plats, maps, declarations, subdivision agreements, development agreements, site-specific resolutions and ordinances, and other documents and agreements encumbering the Property. In the event of any inconsistencies between the provisions of Ordinances 2 and 6, the Approval Resolution and the Plans and Agreement, the provisions of the Approval Resolution shall control; provided, however, that the Approved Plan Set (as defined below in Article II, Section 3) will control over the conceptual plans attached to the Approval Resolution. ARTICLE II ZONING, REGULATORY APPROVALS, DEVELOPMENT AND USE REQUIREMENTS AND RESTRICTIONS 1. Zoning and Regulatory Approvals. Final zoning and regulatory approvals for the Project described/depicted in Ordinances 2 and 6, the Approval Resolution, this Agreement, and the Approved Plan Set are hereby granted, including the entitlements set forth below: A. Use, Density and Dimensional Allowances & Limitations: The ability to construct and operate a lodge and commercial spaces on the Property in a building (the “Project”) consistent with the density and dimensional allowances and limitations set forth at Exhibit A, containing thirty-eight (38) lodge units, accessory lodge uses and amenities, and commercial spaces in the configurations depicted on the Approved Plan Set to be recorded concurrently with this Agreement. Use of the commercial spaces shall be those uses allowed as permitted and conditional uses in the applicable zone district, as may be amended from time to time. B. Growth Management Credits and Allotments: Reconstruction Credits. Based on the pre-existing development at 730 E. Cooper Ave. (aka Buckhorn Lodge), the APPLICANT is entitled to the following reconstruction credits, pursuant to Land Use Chapter 26.470: • A total of 4 lodging bedrooms, 8 lodge pillows, are credited toward the Project’s lodge GMQS allotment request. Base Lodge PD Agreement Page 4 • A reconstruction credit of 3,751 square feet of commercial net leasable area is credited toward the Project’s 2,478 square feet of commercial net leasable area, with the extra 1,273 square feet being applied to the lodge bedrooms. Growth Management Allotments. The following growth management allotments have been granted to the Project: • 36 lodging bedrooms = 72 lodging pillows. Added to the reconstruction credits, the Project has approval for up to 40 lodging bedrooms or 80 pillows. C. Parking: • Twenty-three (23) off-street parking spaces for the use by Project owners, operators, guests, patrons, and employees shall be provided on-site, subject to the provisions of Article I, Section 11 below. • Two (2) on-street parking spaces shall be signed loading zones. The approved location is as depicted in the Approved Plan Set. D. Affordable Housing: • The Commercial Lodge (CL) Zone District employee generation rate of 0.6 Full Time Equivalent employees (“FTE”) per bedroom is established for the Project. Affordable housing mitigation shall be provided in the form of cash in lieu in accordance with the rate in place at the time of building permit submittal for Category 4 or in the form of affordable housing credits at the Category 4 level. • Unless otherwise waived, any further increase in lodge bedrooms or commercial net leasable area requires affordable housing mitigation at the rate defined in the Land Use Code at the time of application. • Any changes to the approved lodge unit density shall require a recalculation of the required affordable housing mitigation, as the percentage of mitigation required for this project is based upon the average net livable area of the lodge units approved through Ordinance 6. E. Public Spaces: • Providing on- and off-site ground level and rooftop public amenity space improvements satisfies the Public Amenity Space requirements. See also Article I, Section 14. 2. Easements. APPLICANT shall grant certain perpetual easements as follows: A. Public Access. A perpetual public pedestrian access easement also benefitting the City of Aspen providing access for the ground level courtyard and roof top public amenity spaces. The easement shall be provided prior to issuance of a Certificate of Occupancy for the Project. B. Utilities. Dedication of easements for public utilities that are not entirely contained within the public rights-of-way or existing easements. The easements shall be provided prior to issuance of a Certificate of Occupancy for the Project. Base Lodge PD Agreement Page 5 3. Approved Plan Set. An Approved Plan Set will be recorded with this Development Agreement. The Approved Plan Set shall include, at a minimum, the following, and all uses, building permit applications, and final development of the Project shall be substantially consistent with that depicted in the Approved Plan Set, as may be duly amended: A. An illustrative site plan showing the layout of planned improvements as depicted in the exhibits of the Approval Resolution. B. An architectural character plan showing the massing, fenestration, and materials of building as generally depicted in in the exhibits of the Approval Resolution. C. Dimensioned drawings of the building within the Project showing dimensions for all zoning parameters in graphic and tabular format and as described in the Approval Resolution. D. An exterior lighting plan meeting the City’s outdoor lighting standards. See also Article I, Sections 7.I and 19 below. E. A Landscape Plan that has been reviewed and approved by the Parks Department as indicated by a required signature on the Landscape sheets. F. Public improvements plan showing improvements to public infrastructure. G. Civil Engineering plans showing improvements to the site and surrounding affected area. H. Storm water and drainage plan showing improvements to the public storm water system. 4. Development and Use Requirements and Restrictions. The architectural designs of the Project and its approved uses, site plan, layout, setbacks, density, bulk, heights and massing are illustrated in the Approved Plan Set recorded concurrently with this Development Agreement, and collectively constitute the site-specific development plan approval. Land uses allowed on the property shall be those permitted and conditional uses described in applicable zoning, as may be amended from time to time. 5. Affordable Housing Obligations and Calculation. The following Obligations and calculation methodology for affordable housing apply to the Project: A. The Commercial Lodge (CL) Zone District employee generation rate is 0.6 FTEs per lodging bedroom and 4.7 FTEs per 1,000 square feet of net leasable commercial space. The Project represents a gross employee generation of 35.65 FTEs. • 40 bedrooms x .6 FTEs per bedroom = 24 FTEs • 2,478 s.f. of n.l. commercial x 4.7 FTEs / 1,000 s.f. of n.l. = 11.65 FTEs Base Lodge PD Agreement Page 6 B. The pre-existing 4 lodging bedrooms and 3,751 square feet of net leasable commercial space result in a credit of 20.03 FTEs. • 4 bedrooms x .6 FTEs per bedroom = 2.4 FTEs • 3,751 s.f. of n.l. commercial x 4.7 FTEs / 1,000 s.f. of n.l. = 17.63 FTEs C. The Project represents a net increase of 18.02 FTEs. The Project has an average lodge unit size below 300 square feet. Under the provisions of Code Section 26.470.070.8.2, housing mitigation is required for 10% of this additional FTE generation, or 1.8 FTEs. • 35.65 FTEs – 20.03 FTEs = 18.02 FTEs • 18.02 FTEs x .1 = 1.80 FTEs. D. Minor adjustments to the measurements of the Project discovered during building permit review shall cause an adjustment of this Affordable Housing Obligation by using the calculation methodology stated above. E. Unless otherwise waived, any further increase in lodge bedrooms or commercial net leasable area requires affordable housing mitigation at the rate defined in the Aspen Municipal Code at the time of application. F. The Certificate of Occupancy for the Project shall not be issued by City until the Affordable Housing Obligation has been provided by APPLICANT. The mitigation shall be provided in the form of cash in lieu in accordance with the rate in place at the time of building permit submittal for Category 4 or in the form of Certificates of Affordable Housing Credits for Category 4. G. This Affordable Housing Obligation being provided by APPLICANT as defined in this Agreement satisfies or exceeds all required affordable housing mitigation for the Project. 6. Construction in Accordance with Plans. Construction of the Project, and all of its component parts, shall be accomplished in substantial compliance with this Development Agreement and the Approved Plan Set. During the building permit process, the City Engineering Department will review and approve final drainage and sidewalk design and utility plans submitted with the building permit application. In the event of any conflict between the Approved Plan Set and a duly approved building permit for the Project, the building permit shall govern and control. 7. Building Permit Submission Requirements. In addition to the standard submission requirements for a building permit, APPLICANT shall submit the following prior to or as part of the building permit application for the Project: A. Signed copies of Ordinance 2, Ordinance 6, the Approval Resolution, this Agreement, and the Approved Plan Set. B. A letter from the primary contractor stating that Ordinance 2, Ordinance 6, the Approval Resolution, this Agreement, and the Approved Plan Set have been read and understood. Base Lodge PD Agreement Page 7 C. A tree removal plan, a tree protection plan, and a tree removal permit. See also Article II, Section 12, Tree Permits and Protection Requirements, below. D. A full major drainage report that meets URMP and Engineering Design Standards. See also Article II, Section 18.A below. E. Detailed civil engineering plans for the installation and/or relocation of all sidewalks and gutters and utilities, and a survey showing results from potholing and determining the depth to utilities. See also Article II, Section 18.B below. F. Plans that show proposed overhangs into the public street right of way. Any overhangs into this right of way must have a minimum height of 7’, and plans shall include information on how the overhang is supported. No overhangs are allowed in the alley right of way. See also Article II, Section 18.C below. G. An excavation stabilization plan shall be submitted to the Engineering Department. See also Article II, Section 18.D below. H. The Construction Management Plan shall describe mitigation for parking, staging/encroachments, and truck traffic. See also Article II, Section 9 below. I. Specifications for Low Light emission glazing for outdoor lighting. See also Article II, Section 19 below. J. Fire Mitigation plans showing compliance with applicable codes. See also Article II, Section 21 below. 8. Building Permit Issuance Requirements. In addition to the standard requirements for issuance of a building permit, APPLICANT must satisfy the following conditions before City will issue a building permit: A. APPLICANT shall pay all impact fees associated with the construction of the Project under its building permit application; the fees shall be those applicable per the fee schedule in place at the time of building permit submission and shall be payable upon issuance of the full building permit. B. APPLICANT shall provide sufficient evidence of financing and performance guaranties, as required in Article III, Section 3 below. C. APPLICANT shall provide site protection and site enhancement escrow funds, as required in Article III, Sections 4 and 5 below. 9. Construction Management Plan Requirements. A construction management plan (CMP) shall be submitted to the City Engineer in conjunction with the first building permit application for the Project. The CMP must include a planned sequence of construction that minimizes construction impacts to the public. If the project is phased, a CMP for each phase will be required. The plan shall describe management of parking, staging/encroachments, truck and construction traffic during peak traffic and seasonal periods, noise, dust, erosion/sediment pollution, and emergency access during construction. 10. Calculations and Measurements. The calculations and measurements applicable to the Project are shown on the Plat and Plan. The provisions of the Aspen Municipal Code as such were in Base Lodge PD Agreement Page 8 effect on October 20, 2014, which is the date of application submittal for this PD, including but not limited to the provisions for measuring improvements, shall be in effect through the vested period, or the issuance of a Certificate of Occupancy for the Project, whichever is later. Subsequent improvements shall be measured according to the method in effect at the time of submission of any required permit application for such improvement. Minor adjustments to Project dimensions, which do not exceed the limitations of Ordinance 6, 2016, may be approved by the Community Development Director. 11. Parking: The following requirements shall be provided: A. Loading Zone: Two on-street parking spaces in the Original Street right of way shall be signed loading zones – the approved location is depicted in the Approved Plan Set. B. On-site Parking: APPLICANT shall provide for use by its guests and employees, twenty-three (23) parking spaces provided in an on-site, subgrade parking lot served by a lift and operated by valets and accessed from the alley. Additional parking spaces may be provided; however there shall not be a reduction of spaces below the 23-space requirement without a duly approved amendment to Ordinance 6. APPLICANT and/or any operator of the lodge or commercial spaces shall not be allowed to use city street parking passes for its lodge or commercial users, guests, or employees unless the onsite parking garage is at capacity. The off-street parking spaces are for the sole use of the commercial and lodging components of the project and shall not be condominiumized as separate units, sold to, rented to or used by the general public or any entity other than the owner(s) of the commercial and lodging components of the project and its operators, guests, patrons, or employees. Parking shall only be used for the parking of vehicles associated with the on-site, permitted uses. 12. Tree Permits and Protection Requirements. Prior to issuance of a building permit for any demolition or significant site work, tree removal permits are required. All tree permits must be approved prior to submission of the building permit application(s). The following tree protection requirements shall apply with respect to all trees being preserved: A. Cottonwood in City ROW: The tree protection zone around the cottonwood must be fenced off and no activity or storage of material shall be allowed within until the end of the Project construction when new exterior hardscape can be installed. New pavers in the tree protection zone must not have more than 6 inches of excavation and any excavation in this zone requires hand digging. No grate is required at the base of the cottonwood; the Applicant shall provide a large diameter opening to allow for future growth. The diameter shall be approved by the City Forester during building permit review. No electric lines are allowed within tree protection zone of the cottonwood. This will require electric lines to come from the alley on the east heading south then west, up to the newly planted ROW trees. The construction dumpster shall be placed far enough east to insure branches of cottonwood tree are safe. The spill kit shall be located well Base Lodge PD Agreement Page 9 outside of the tree protection zone. No branches on cottonwood tree will be pruned without the permission of the City Forester. The new water line must be outside of the tree protection zone and the location must be approved by City Forester. All air spading and root pruning along the micropile wall shall be performed by a licensed arborist. B. Mitigation: Mitigation for tree removals must be met by paying cash in lieu, planting on site or in the adjacent rights of way, or a combination of these methods, pursuant to Aspen Municipal Code section 13.20. Plantings on the roof shall not qualify as mitigation. C. Landscaping and Sidewalk Landscaped Area: Landscaping in the public rights-of-way (“ROW”) will be subject to landscaping in the ROW requirements, which require adequate irrigation pressure and coverage; if a system is not in place, one will need to be added by APPLICANT. Installation of a root barrier along the edge of sidewalks is strongly encouraged. New ROW tree species to be selected and approved by the City Forester during building permit review. 13. Landscaping. All development within the Property or adjacent rights of way shall comply with the Landscape Plans recorded as part of the Approved Plan Set filed concurrently with this Development Agreement. APPLICANT shall be responsible for implementing the Landscape Plans, as herein provided. APPLICANT shall have the right to plant additional vegetation within the Property or supplement with other materials as desired as it may consider appropriate from time to time, via any applicable city permits. 14. Public Amenity Requirements. The ground floor of the Project will include a public amenity courtyard. The courtyard will be accessible through the lobby area and from the five (5) foot wide walkway that will run along the entire west side of the Property. There will also be a restaurant take- out/pick-up window and bench seating area that is open to the public and accessible from the five-foot wide walkway, in addition to on-site landscaped sidewalk reliefs adjacent to the structure. Together, the courtyard, the pick/up window and bench seating area, the walkway, and the landscaped reliefs provide 1,005 square feet of public amenity space. In addition, an outdoor rooftop terrace will be provided to serve the guests of the Project and it will also be open to the general public. The outdoor rooftop terrace will contain approximately 2,900 square feet of public amenity space. In addition, there are another approximately 2,700 square feet of public amenity space improvements in the adjacent rights of way. The provision of these public spaces fully satisfies and exceeds all public amenity requirements for the Project. A. Hours of Operation. Public hours of access for the rooftop deck shall be from 11 AM to 10 PM, seven days per week. These hours of operation may be changed from time to time by the operator of the Project as reasonably necessary to accommodate occasional closures for private events, maintenance and operational needs. Notwithstanding the foregoing, the rooftop terrace shall not be used by guests or the public between 2:00 AM and sunrise. Maintenance activities are allowed at any time. Base Lodge PD Agreement Page 10 B. Certain Design Requirements. The rooftop terrace space shall not be enclosed with permanent walls/windows or otherwise enclosed as interior conditioned space. This shall not prohibit the use of umbrellas, trellis structures, shade sails or similar improvements. The ground level courtyard may be enclosed with a roof and walls through an administrative amendment approved by the Community Development Director. C. Easement for Access to Public Amenity Areas. The APPLICANT shall provide a perpetual access easement granting the public and the City of Aspen the right of access to the public amenity areas described in this Section 14, prior to issuance of a Certificate of Occupancy for the Project. 15. Sanitation District Requirements. Aspen Consolidated Sanitation District (ACSD) service is contingent upon compliance with the District’s rules, regulations, and specifications, which are on file at the District office. In addition, the following requirements, as may be applicable, pertain to ACSD service relative to the Project: A. ACSD will review the approved Drainage plans to assure that clear water connections (roof, foundation, perimeter, patio drains) are not connected to the sanitary sewer system. B. On-site utility plans require approval by ACSD. C. Oil and Sand separators are required for parking garages and vehicle maintenance establishments. Driveway entrance drains must drain to drywells. Elevator shafts drains must flow thru an o/s interceptor. Oil and Grease interceptors (not traps) are required for all food processing establishments. D. Old service lines must be excavated and abandoned at the main sanitary sewer line according to specific ACSD requirements and prior to soil stabilization. Soil nails are not allowed in ROW. E. Below grade development may require installation of a pumping system. Above grade development shall flow by gravity. F. One tap is allowed for each building. Shared service line agreements may be required where more than one unit is served by a single service line. G. Permanent improvements are prohibited in sewer easements or rights of way. Landscaping plans will require approval by ACSD where soft and hard landscaping may impact public ROW or easements to be dedicated to the District. H. All ACSD fees must be paid prior to the issuance of a building permit. I. Where additional development would produce flows that would exceed the planned reserve capacity of the existing collection system and/or treatment system, an additional proportionate fee will be assessed to eliminate the downstream collection system or treatment capacity constraint. Additional proportionate fees would be collected over time from all development in the area of concern in order to fund the improvements needed. Base Lodge PD Agreement Page 11 J. Where additional development would produce flows that would overwhelm the planned capacity of the existing collection system and/or treatment facility, the development will be assessed fees to cover the costs of replacing the entire portion of the system that would be overwhelmed. The District would fund the costs of constructing reserve capacity in the area of concern (only for the material cost difference for larger line). K. A “Line Extension Request” and a “Collection System Agreement”, as applicable, shall be submitted for this Project. Both are ACSD Board of Director’s action items. L. Pool drain sizing shall be approved by the District. M. Any glycol heating and snowmelt system must be designed to prohibit any discharge of glycol to any portion of the public and private sanitary sewer system. The glycol storage areas must have approved containment facilities. The applicant’s engineer shall furnish average and peak flows as well as proposed service size prior to final design. 16. Water Department Requirements. APPLICANT shall comply with the City of Aspen Water System Standards, with Title 25 of the Municipal Code, and with the applicable standards of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code, as required by the City of Aspen Water Department. All Water System Distribution standards in place at the time of building permit shall apply, and all tap fees will be assessed per applicable codes and standards. Utility placement and design shall meet adopted City of Aspen standards. All water services to buildings with Fire sprinkler systems will require fire flow calculations from a professional engineer. Adequate spacing and separation of utilities is required. 17. Environmental Health Department Requirements. The State of Colorado mandates specific mitigation requirements with regard to asbestos. Additionally, code requirements to be aware of when filing a building permit include: a prohibition on engine idling, regulation of fireplaces, fugitive dust requirements, noise abatement. The trash/recycling enclosure meets the minimum requirements outlined in Title 12 by including 300 square feet of trash and recycling storage as shown in the Approved Plan Set. APPLICANT shall comply with all applicable laws and regulations. 18. Engineering Requirements. The Project shall be compliant with all sections of the City of Aspen Municipal Code, Title 21 and all construction and excavation standards published by the Engineering Department, unless otherwise approved by the City Engineer and shall satisfy the following requirements: A. Drainage: The project shall meet the Urban Runoff Management Plan Requirements and provide a full major drainage report that meets URMP and Engineering Design Standards with building permit submittal. B. Sidewalk/Curb/Gutter: The corner of Cooper Ave and Original St will have a pedestrian bulb out to mitigate the long crossing distances and level of pedestrian traffic in this area, as shown in the Approved Plan Set. All sidewalk curb and gutter shall meet the Engineering Standards of City of Aspen Municipal Code Title 21. Directional ADA ramps are required on the corner of Cooper Ave. and Original St. Base Lodge PD Agreement Page 12 C. Encroachments: Any overhangs into a public right of way must have a minimum height of 7’. No overhangs are allowed in the alley right of way. Locate all utility pedestals and electric transformers to within the property boundary. D. Excavation Stabilization: Due to the proximity of the neighboring property and the excavation of the building, an excavation stabilization plan shall be submitted to the Engineering Department prior to building permit submittal. E. CMP: The Construction Management Plan shall describe mitigation for: parking, staging/encroachments, and truck traffic. F. Survey Requirement: Pothole and provide depth to utilities on the survey as part of building permit submittal. 19. Outdoor Lighting and Signage. All outdoor lighting and all signage shall meet the requirements of the Aspen Municipal Code unless otherwise varied. Low light emission glazing specifications shall be provided in the building permit application. 20. Transportation. The TDM and MMLOS measures described below shall be implemented. APPLICANT or the operators of the commercial and lodging components of the Project shall satisfy the following requirements, the details of which are set forth in Exhibit B: • Provide bus passes to employees that live down valley. • Prior to arrival, provide lodging guests with information about RFTA. • Provide for local and airport shuttle service. • Partner with WeCycle to provide bicycles for guests and employees. Amendments to the Transportation measures may be approved pursuant to the procedures and standards of Chapter 26.630 of the Land Use Code. 21. Fire Mitigation. All codes adopted by the Aspen Fire Protection District shall be met, unless otherwise approved by the Fire Marshall. This includes but is not limited to access (International Fire Code (IFC), 2003 Edition, Section 503), approved fire sprinkler and fire alarm systems (IFC, as amended, Section 903 and 907). 22. Impact Fees: Transportation Demand Management (TDM)/Air Quality Impact Fee and Park Dedication Fee. Prior to the issuance of any building permits for the Lodge Building, APPLICANT shall pay the TDM/Air Quality Fee and the Park Dedication Fee pursuant to Aspen Municipal Code Section 26.610.090 as may be applicable, according to the rates in effect at the time of application for the building permit. A. Fee Credits or Refunds for Alternate Project. In the event this Agreement is terminated of record and a new PD Development Agreement is recorded for an approved alternate project on the Property, all impact fees paid by APPLICANT in accordance with the provisions of Article I above, will be credited against the same fees due and payable under the new PD Development Agreement. In the event the fees paid pursuant to this Agreement exceed the amount of the fees due and payable under the new PD Development Agreement, the City will refund the difference to APPLICANT. Base Lodge PD Agreement Page 13 ARTICLE III IMPROVEMENTS & FINANCIAL ASSURANCES 1. Public Improvements. Prior to the issuance of a Certificate of Occupancy for the Project, APPLICANT shall accomplish the public improvements as depicted and approved by the City Engineering Department in the Approved Plan Set. The public improvements and their estimated costs are set forth in the Guaranteed Work Exhibits defined in Article III, paragraph 3 below. 2. Construction Schedule. A construction schedule for the above-described improvements shall be submitted to the City Engineering Department at the same time that the guarantees described in Section 3.1 below are provided. 3. Performance Guaranties. Prior to issuance of a building permit for the Project, APPLICANT shall provide performance guaranties pursuant to Aspen Municipal Code 26.490.070. 3.1 Required Performance Guaranties. The required Performance Guaranties are as follows: A. Landscape Guarantee. To ensure successful implementation of the landscape plan and the continued maintenance and replacement of the landscaping for a period of two (2) years after installation. The unit costs and quantities for the landscape plan are set forth on Exhibit C attached hereto and incorporated herein by this reference. APPLICANT shall have the right to plant additional vegetation within the Property as it may consider appropriate from time to time, via any applicable city permits. B. Public Facilities and Public Infrastructure Guarantee. In order to ensure installation of necessary public facilities and public infrastructure planned to accommodate the Project and as required under this site specific development plan approval, the APPLICANT shall provide a guarantee to ensure the successful installation of all public facilities and infrastructure. The unit costs and quantities for the public facilities and infrastructure are set forth on Exhibit D attached hereto and incorporated herein by this reference. C. Storm Water and Drainage Improvements Guarantee. In order to ensure successful implementation of storm water and drainage infrastructure planned to accommodate the Project and as required under this site specific development plan approval, the APPLICANT shall provide a guarantee to ensure the successful installation of all storm water and drainage infrastructure. The unit costs and quantities for the Storm Water and Drainage Improvements are set forth on Exhibit E attached hereto and incorporated herein by this reference. 3.2 Amount of Guaranties. The work to be completed that is subject to guarantees is described in Exhibits C, D and E (collectively, the “Guaranteed Work Exhibits”) and is referred to hereinafter collectively as the “Guaranteed Work”. The amount of the guaranties described in subparagraphs 3.1 A, B and C above shall be in an amount no more than one-hundred-and- fifty percent (150%) of the estimated cost of the Guaranteed Work, provided that the costs shall be adjusted to current market conditions in the event an application for a building permit for the Project is filed later than one year after recordation of this Development Agreement. Base Lodge PD Agreement Page 14 Providing the guarantees for the Guaranteed Work shall be a condition of issuance of the building permit for the Project. 3.3 Form and Timing of Guarantees. It is the policy of the City that prior to requiring a monetary guarantee, the City shall pursue every non-monetary performance guarantee option, such as permitting or completion sequencing, in order to minimize the financial impact of performance guarantees on a project. Therefore, the requirements to provide the aforesaid guaranties shall be structured so that the issuance of the final Certificate of Occupancy for the Project shall be conditioned upon completion of the Guaranteed Work and in the event said work is not substantially complete by the time that all other conditions to the issuance of said Certificate of Occupancy are satisfied, then APPLICANT shall provide a cash escrow with the City or a bank or savings and loan association or an irrevocable sight draft or letter of commitment from a financially responsible lender, or any other financial security acceptable to the City Attorney in the amount of one-hundred-and-fifty percent (150%) of the estimated cost of the then incomplete Guaranteed Work. The additional 50% included in the above 150% amount is referred to hereinafter as the “50% Excess Amount”. The guarantee shall give the City the unconditional right upon demand to partially or fully complete or pay for any Guaranteed Work or pay any outstanding bills or to withdraw funds upon demand to partially or fully complete or pay for any Guaranteed Work or pay for any improvement or pay any outstanding bills for work done thereon by any party. For purposes hereof “Substantially Complete” or “Substantial Completion” shall mean that the City has inspected the Guaranteed Work and has reasonably determined that they are Substantially Complete in compliance with applicable specifications and has issued a Certificate of Substantial Completion or similarly intended form of approval. 3.4. Inspection and Release of Guaranty. As portions of the required Guaranteed Work are completed, the City Engineer (or assigned staff as applicable) shall inspect them for compliance with the approved plans and specifications. The City Engineer shall accept the Guaranteed Work, or portions thereof, if they conform to the approved plans and specifications and shall authorize the release of one-hundred percent (100%) of the estimated costs of the Guaranteed Work as shown on the Guaranteed Work Exhibits (the “Estimated Costs”) and as portions of the Guaranteed Work are substantially completed, the City Engineer shall release further portions of the security for the Estimated Costs in increments of no less than 25% of their amount. The City Engineer may reject portions of the Guaranteed Work that does not conform to the approved plans and specifications, may require specific testing to confirm conformance, may require certain upgrades the achieve conformance, or may postpone the inspection to accommodate seasonal or other conditions. The City Engineer may delay acceptance of Guaranteed Work until other related Guaranteed Work, which is part of an overall system, is constructed. A. The remaining 50% Excess Amount shall be retained by the City for a period of up to two (2) years from the date of the applicable Certificate of Substantial Completion or Base Lodge PD Agreement Page 15 similarly intended form of approval final acceptance, to ensure the Guaranteed Work performs as designed. During this two-year period, the City Engineer (or assigned staff as applicable) may require the APPLICANT, at its sole cost, to perform certain testing, maintenance, upgrades, or replacement of the Guaranteed Work to ensure they perform as designed. The City Engineer may draw upon the escrowed funds or any surety to accomplish the same. Upon completion of the two-year period and a final inspection and acceptance by the City Engineer (or assigned staff as applicable), the remaining escrow funds or surety shall be released to APPLICANT. The City Engineer may extend the final inspection and acceptance period to accommodate seasonal or other conditions that prevent inspection. The City Engineer may authorize release of the remaining escrow funds or surety prior to the two-year period as performance risks diminish. The City Engineer may authorize release of the remaining escrow funds or surety by accepting a contractor’s performance warranty or guaranty, acceptable to the City Attorney B. Upon Delivery by APPLICANT of written notice that the Guaranteed Work or any part or parts thereof is complete and ready for inspection (“Request for Inspection”) along with a showing of the value of the Guaranteed Work or part(s) thereof completed, the City will, within 14 days, inspect the Guaranteed Work identified in the Request for Inspection, to determine whether or not such Guaranteed Work is Substantially Complete. If the City finds that the Guaranteed Work identified in the Request for Inspection is Substantially Complete, the City shall, within 7 days, deliver a written Certificate of Substantial Completion to APPLICANT and Escrow Agent. Upon receipt of a Certificate of Substantial Completion for Guaranteed Work identified in the Request for Inspection, the Escrow Agent shall immediately release to APPLICANT the total itemized amount per the Guaranteed Work Exhibits corresponding to all Guaranteed Work which the City has certified as Substantially Complete, less the 50% Excess Amount attributable to such work as provided for in Aspen Municipal Code 26.490.070 D, which shall be retained by the Escrow Agent. After any and all partial releases, and once all remaining Guaranteed Work, if any, is Substantially Complete, the amounts retained shall be immediately released by Escrow Agent to APPLICANT. C. If the cost to Substantially Complete the Guaranteed Work, or part(s) thereof is less than the corresponding amount itemized in each of the Guaranteed Work Exhibits and the City certifies that such Guaranteed Work, or part(s) thereof are Substantially Complete, the Escrow Agent shall immediately release to APPLICANT the total itemized amount per the Guaranteed Work Exhibits corresponding to all Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount required to be withheld pursuant to Aspen Municipal Code 26.490.070 D. D. If the City finds that all or a portion of the Guaranteed Work identified in the Request for Inspection is not Substantially Complete, the City shall furnish a letter of potential deficiencies to APPLICANT and Escrow Agent within fourteen (14) days of such Base Lodge PD Agreement Page 16 finding. Any such letter of potential deficiencies shall specify which Guaranteed Work identified in the Request for Inspection is potentially deficient. i. If a letter of potential deficiencies is used which specifies a portion of the Guaranteed Work identified in the Request for Inspection as potentially deficient, then all Guaranteed Work identified in such Request for Inspection that is not specified as being potentially deficient shall automatically be deemed Substantially Complete without requirement of any further action. APPLICANT need only provide written notice to Escrow Agent with a copy to the City that the Guaranteed Work not specified in the letter of potential deficiencies are Substantially Complete. Such notice to Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, Escrow Agent is authorized to immediately release to APPLICANT the total itemized amount per the Guaranteed Work Exhibits corresponding to all Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount attributable to such work. ii. If no letter of potential deficiency is furnished within the said fourteen (14) day period, all Guaranteed Work identified in the Request for Inspection shall automatically be deemed Substantially Complete without requirement of any further action. APPLICANT need only provide written notice to Escrow Agent, with a copy to the City that no letter of potential deficiency was provided as required hereunder. Such notice to Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, Escrow Agent is authorized to promptly release to APPLICANT the total itemized amount per the Guaranteed Work Exhibits corresponding to all Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount attributable to such work. iii. With Respect to any Guaranteed Work identified in the Request for Inspection that is specified as potentially deficient in a letter of potential deficiencies as provided hereunder, APPLICANT shall have a reasonable period of time to cure any such potential deficiencies. After performing cure measures, APPLICANT shall submit to the City a Request for Inspection, along with a showing of the cost of the Guaranteed Work completed. The City will, within 14 days, inspect the Guaranteed Work previously identified as potentially deficient to determine whether or not such Guaranteed Work have been made Substantially Complete. If the City reasonably finds that the Guaranteed Work previously identified as potentially deficient have been made Substantially Complete, the City shall, within 7 days, deliver a Certificate of Substantial Completion to APPLICANT and Escrow Agent. In such event, Escrow Agent shall release to APPLICANT within 5 days, the total itemized amount per the Guaranteed Work Exhibits corresponding to all Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount Base Lodge PD Agreement Page 17 attributable to such work. If the City fails to respond to APPLICANT Request for Inspection regarding cure measures taken as to previously identified potentially deficient Guaranteed Work within such 7 day period, all such Guaranteed Work identified in the Request for Inspection shall automatically be deemed Substantially Complete. APPLICANT need only provide written notice to Escrow Agent, with a copy to the City that no letter of potential deficiency was provided as required hereunder. Such notice to Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, Escrow Agent is authorized to promptly release to APPLICANT the total itemized amount of the Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount attributable to such work. iv. If the City reasonably finds that the Guaranteed Work previously identified as potentially deficient have not been made Substantially Complete then City and APPLICANT shall have 14 days after the date of the City’s finding, to reach written resolution regarding the Guaranteed Work determined by the City to be potentially deficient. If APPLICANT and the City are not able to reach resolution within such 14 day period then the City and APPLICANT agree to submit the dispute to the Board of Appeals and Examiners of the City of Aspen (hereinafter referred to as “Board”). The Board shall base its decision upon substantial evidence presented. The Board’s finding would be subject to review pursuant to C.R.C.P. Rule 106(a)(4) in accordance with the laws of the State of Colorado. (aa) If APPLICANT has not applied to the District Court for review of the determination of the Board within that time set forth pursuant to C.R.C.P. 106 (a )(4) and has not obtained a Certificate of Substantial Completion City regarding the potentially deficient Guaranteed Work within such time or such additional time as may be reasonably needed by APPLICANT under the circumstances, the City may cause the potentially deficient Guaranteed Work to be Substantially Complete and the costs of making the potentially deficient Guaranteed Work Substantially Complete shall be paid from the Escrow Funds; provided, however, that in so doing, the City’s expenses shall be commercially reasonable. If the City’s costs are less than itemized amounts for such Guaranteed Work per the Guaranteed Work Exhibits, the difference remaining shall be promptly paid to APPLICANT. (bb) If the Board finds that the City’s determination was correct, the APPLICANT shall have the right to take such corrective action as may be reasonably necessary to correct the Guaranteed Work found by the Board to be potentially deficient. Upon Completion of such corrective action, APPLICANT will submit to the City a Request for Inspection. If the City determines that Guaranteed Work found by the Board to be potentially deficient have been made Substantially Complete then the Base Lodge PD Agreement Page 18 City shall, within 7 days, deliver a Certificate of Substantial Completion of APPLICANT and Escrow Agent. In such event, Escrow Agent shall release to APPLICANT within five (5) days, the total itemized amount of the Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount attributable to such work. If the City determines that Guaranteed Work found by the Board to be potentially deficient remain potentially deficient then the City may cause such potentially deficient Guaranteed Work to be Substantially Complete and the Costs of making such potentially deficient Guaranteed Work Substantially Complete shall be paid from the Escrow Funds; provided, however, that in so doing, the City’s expenses shall be commercially reasonable. If the City’s costs are less than the itemized amounts for such Guaranteed Work per the Guaranteed Work Exhibits the difference remaining shall be promptly paid to APPLICANT. (cc) In the event the Board finds in favor of APPLICANT, then the Guaranteed Work at issue shall automatically be deemed Substantially Complete without requirement of any further action. APPLICANT need only provide written notice to Escrow Agent, with a copy to the City that the Board found in favor of APPLICANT. Such notice to Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the Board. Upon receipt of such notice, Escrow Agent is authorized to immediately release to APPLICANT the total itemized amount of the Guaranteed Work which the City has certified as Substantially Complete minus the 50% Excess Amount attributable to such work. E. If there are delays in performance hereunder due to abnormal adverse weather conditions, acts of God, casualties or any causes beyond the control of APPLICANT or the City, or by other causes which reasonably would justify delay, then the affected time period or deadline shall be extended for a reasonable period of time, as may be agreed upon by the parties. No agreement to extend may be unreasonably withheld or delayed. F. APPLICANT has the right to assign, by affidavit, the receiver or beneficiary of escrow funds or surety releases, such as to a contractor, owner, or other agent. The City Engineer may assign the inspection and release responsibilities under this Agreement to other City staff as necessary. In such case, all references to the City Engineer in this sub-section shall be to that assigned staff position. However, all tracking of the guarantee and releases thereof shall be maintained by the City Engineer. G. It is the express understanding of the parties that compliance with the procedure set forth in Article III below pertaining to the procedure for default and amendment of this Agreement shall be required with respect to the enforcement and implementation of the financial assurances and guarantees to be provided by APPLICANT as set forth above and in Article II, Sections 4 and 5 below; provided however that all procedures and requirements of this Article II, Section 3.2 D shall be exhausted by the City before any Base Lodge PD Agreement Page 19 action under Article III below is taken by the City with regard to matters pertaining to this Article II, Sections 3.1 and 3.2. 4. Site Protection Fund and Guaranty. Pursuant to the Aspen Municipal Code 26.490.060 B, before a Building Permit is issued for the Project, APPLICANT will deposit with a title company the sum of $100,000 (the “Site Protection Escrow Funds”) in the form of cash, wired funds or an irrevocable letter of credit and will execute an escrow agreement and instructions with the escrow agent which recites and agrees as follows: A. In the event construction work on the Project shall cease for sixty (60) days or longer (“work stoppage”) without a cure of such work stoppage, after fifteen days (15) days’ notice by the City, and such work stoppage not being a result of any event of force majeure, prior to a final inspection by the City of the work authorized by the Foundation/Structural Frame Permit for the Project, then the City in its discretion may draw upon the Site Protection Escrow Funds from time to time as needed for purposes of protecting and securing the Project site and improvements from damage by the elements and/or from trespass by unauthorized persons, and for purposes of improving the Project site to a safe condition such that it does not become an unattractive nuisance or otherwise pose a threat to neighbors or other persons; and B. Half (50%) of the Site Protection Escrow Funds shall be returned to the owner upon completion by the City of a final inspection of the work authorized by the Foundation/Structural Frame Permit on the project. The Community Development Director shall authorize partial releases, in increments of no less than 25% of said original escrow funds or surety, as portions of the project progress and public safety issues are reduced. The balance of funds shall be returned to the APPLICANT upon substantial completion of the Project to a “dried-in” condition. 5. Site Enhancement Fund and Guaranty. Pursuant to the Aspen Municipal Code 26.490.060 C, before a Building Permit is issued for the Project, APPLICANT will deposit with a title company the sum of $100,000 (the “Site Enhancement Escrow Funds”) in the form of cash, wired funds or an irrevocable letter of credit and will execute an escrow agreement and instructions with the escrow agent which recite and agree as follows: A. In the event construction work on the development of the Project shall cease for ninety (90) days or longer, prior to a final inspection by the City of the work authorized by a foundation/structural frame permit (“F/SFP”) for the Lodge Building and cessation of such construction work continues for a period of one hundred twenty (120) days after notice from the City to the owner specifying the subject work in reasonable detail, or if such breach cannot be cured reasonably within such one hundred twenty (120) day period and owner fails to commence and proceed diligently to cure such breach within a reasonable time period, then the City, in its reasonable discretion, may draw upon the Site Enhancement Escrow Funds from time to time as needed for the purposes of improving the appearance of any construction work not already completed on the site; and Base Lodge PD Agreement Page 20 B. The Site Enhancement Escrow Funds or any remaining balance thereof shall be returned to the owner, upon completion by the City of a final inspection and issuance of a Certificate of Occupancy for the Project or earlier when otherwise agreed to by APPLICANT and the City. The Community Development Director shall authorize partial releases, in increments of no less than 25% of said original escrow funds or surety, as portions of the project progress and aesthetic and public improvement issues are reduced. The balance of funds shall be returned to the APPLICANT no later than upon issuance of a Certificate of Occupancy for the Project. 6. Additional Terms of Escrow Agreements. The City of Aspen shall be named a third party beneficiary of all Escrow Agreements established under this Agreement, with the express right and authority to enforce the terms of the Agreement. Base Lodge PD Agreement Page 21 ARTICLE IV NONCOMPLIANCE AND REQUEST FOR AMENDMENTS OR EXTENSIONS 1. In the event that the City has reason to believe that the APPLICANT is not acting in substantial compliance with the terms of this Agreement, the City shall send the APPLICANT a notice of non-compliance, specifying the alleged noncompliance. After such notice is given, the APPLICANT and the City shall make good faith efforts to resolve the alleged lack of compliance. If the APPLICANT and the City are not able to reach a mutually acceptable solution within thirty (30) days of the City’s notice of non-compliance, the matter shall be submitted to the City Hearing Officer for a determination. The APPLICANT shall have the right to file a petition appealing the City Hearing Officer’s determination to City Council, which review by City Council shall be de novo. 2. Upon the receipt of such petition, the City Council shall promptly schedule a hearing to consider the matters set forth in the Hearing Officer’s determination of noncompliance and in the petition. The hearing shall be convened and conducted pursuant to the procedures normally established by the City Council for other hearings. If the City Council determines by a preponderance of the evidence that a noncompliance exists which has not been remedied, it may issue such orders as may be appropriate, including an order to remedy the non-compliance within such reasonable time as the City Council may determine, but not less than thirty (30) days. 3. Notwithstanding the foregoing, no order terminating any approval previously granted by the City Council, Planning and Zoning Commission or Historic Preservation Commission shall be issued without a finding of the City Council that substantial evidence warrants such action and affording the owner a reasonable time to remedy such noncompliance. A final determination of noncompliance which has not been remedied or for which no variance has been granted may, at the option of City Council, and upon written notice to the owner, terminate any of such approvals which are reasonably related to the requirement(s) with which the owner has failed to comply. Alternatively, the City Council may grant such variances, extensions of time or amendments to this Agreement as it may deem appropriate under the circumstances. 4. Within twenty (20) days of the receipt of an order from the City Council determining non- compliance, the APPLICANT may file with the City Council either a notice advising the City Council that it is in compliance or a written petition requesting a hearing to determine any one or both of the following matters: a. Whether the alleged noncompliance still exists, or b. Whether a variance, extension of time or amendment to this Agreement should be granted with respect to any such noncompliance that is determined to exist. 5. In addition to the foregoing, APPLICANT may, on its own initiative, at any time, petition the City Council for a variance, an amendment to this Agreement or an extension of one or more of the time periods required for performance hereunder. The City Council may grant such variances, amendments to this Agreement, or extensions of time as it may deem appropriate under the circumstances. The parties expressly acknowledge and agree that the City Council shall not unreasonably refuse to extend the time periods for performance if the owner demonstrates by a preponderance of the evidence that the reasons for the delay(s) which necessitate said extension(s) Base Lodge PD Agreement Page 22 are beyond the control of the owner, despite good faith efforts on its part to perform in a timely manner. ARTICLE V VESTED RIGHTS 1. The development approvals granted pursuant to Ordinances 2, 6, the Approval Resolution, as further memorialized in this Development Agreement and in the Approved Plan Set shall constitute a site-specific development plan and a vested property right pursuant to Aspen Municipal Code Section 26.308.01 attaching to and running with the Property and shall confer upon APPLICANT or its successors or assigns the right to undertake and complete the site specific development plan and use of said property under the terms and conditions of the site specific development plan including any approved amendments thereto. This site-specific development plan is vested until __________, 2019, the third anniversary of the Development Order for the Project. 2. However, any failure to abide by any of the terms and conditions attendant to this approval shall result in the forfeiture of said vested property rights, subject to the terms and provisions of Article III above. 3. As authorized by CRS Section 24-68-102(4)(a), City and APPLICANT agree that the site specific development plan for Base Lodge PD consists of and includes, but is not limited to, the number, permitted size, and configuration of the Project, the lodge units therein, the accessory lodge uses, the commercial units, amenities, parking, employee housing requirements, surety obligations, floor areas and other dimensional standards referred to in this Agreement, its exhibits and Ordinances 2 and 6, the Approval Resolution, and all other matters set forth in this Development Agreement and depicted and described in the Approved Plan Set, including architectural, utility, grading, drainage, landscape, outdoor lighting, and all other associated plans recorded concurrently therewith. For purposes of this Article V, this PD Development Agreement shall be considered a “development agreement” as that term is used in CRS Section 24-68-104(2). Base Lodge PD Agreement Page 23 ARTICLE VI GENERAL PROVISIONS 1. The provisions hereof shall be binding upon and inure to the benefit of APPLICANT and the City and their respective successors and assigns. 2. This PD Development Agreement shall be subject to and construed in accordance with the laws of the State of Colorado. 3. If any of the provisions of this PD Development Agreement or any paragraph, sentence, clause, phrase, word, or section or the application thereof in any circumstance is invalidated, such invalidity shall not affect the validity of the remainder of this PD Development Agreement, and the application of any such provision, paragraph, sentence, clause, phrase, word, or section in any other circumstances shall not be affected thereby. 4. In the event of any conflict between Approval Resolution and this Agreement, the terms and provisions of the Approval Resolution shall govern and control. 5. This PD Development Agreement contains the entire understanding between the parties hereto with respect to the transactions contemplated herein, and except as otherwise specifically provided herein, may be altered or amended from time to time only by written instruments executed by all parties hereto that are affected by the proposed amendment. 6. Numerical and title headings contained in this PD Development Agreement are for convenience only, and shall not be deemed determinative of the substance contained herein. As used herein, where the context requires, the use of the singular shall include the plural and the use of any gender shall include all genders. 7. Upon execution of this PD Development Agreement by all parties hereto, City agrees to approve and execute the Final Plat and the Final PD Development Plans for the Base 1 Lodge PD, and to accept the same for recordation in the office of the Clerk and Recorder for Pitkin County, Colorado, upon payment of the recordation fee by the APPLICANT. 8. Notices to be given to the parties to this PD Development Agreement shall be considered to be given if hand-delivered or if deposited in the United States Mail to the parties by registered or certified mail at the addresses indicated below, or such other addresses as may be substituted upon written notice by the parties or their successors or assigns: City of Aspen City Manager and City Attorney 130 South Galena Street Aspen, CO 81611 APPLICANT: 730 E. Cooper LLC Base Lodge PD Agreement Page 24 2001 N. Halsted Street #304 Chicago, Il 60614 With copies to: Herbert S. Klein, Esq. Klein Cote Edwards Citron, LLC 101 S. Mill St. #200 Aspen, CO 81611 and: Jeffrey Richman, Esq. General Counsel M Development 2001 N. Halsted Street #304 Chicago, Il. 60614 9. This PD Development Agreement may be executed in counterparts, in which case all such counterparts together shall constitute one and the same instrument, which is binding on all of the parties thereto, notwithstanding that all of the parties are not signatory to the original or the same counterpart. Facsimile or electronic signatures shall be treated as original signatures hereon. 10. The terms, conditions, provisions and obligations herein contained shall be deemed covenants that run with and burden the real property more particularly described herein and any and all owners thereof or interests therein, their respective successors, grantees or assigns, and further shall inure to the benefit of and be specifically enforceable by or against the parties hereto, their respective successors, grantees or assigns. Base Lodge PD Agreement Page 25 IN WITNESS WHEREOF, the parties have hereunto set their hands and seals as of the day and year first above written. CITY: City of Aspen, Colorado, a municipal corporation By:_____________________________________ Mayor __________________________ Linda Manning, City Clerk APPROVED AS TO FORM: __________________________ James R. True, City Attorney APPLICANT: APPLICANT: ____________________________________ By:____________________________________ ____________________, title:______________ [Remainder of this page intentionally left blank; notary blocks on following page] Base Lodge PD Agreement Page 26 STATE OF COLORADO ) ) ss. COUNTY OF PITKIN ) The foregoing instrument was acknowledged before me this ____ day of ____________, 2016, by Steven Skadron as Mayor and Linda Manning as City Clerk of the City of Aspen, Colorado, a municipal corporation. Witness my hand and official seal. My commission expires: ________ ______________________________ Notary Public STATE OF COLORADO ) ) ss. COUNTY OF _________ ) The foregoing instrument was acknowledged before me this ____ day of ____________, 2016, by ______________as ___________________ of _____________________________. Witness my hand and official seal. My commission expires: ________ ______________________________ Notary Public Base Lodge PD Agreement Page 27 MORTGAGEE CONSENT CERTIFICATE The undersigned being the holder of a lien on the Property pursuant to a Deed of Trust (the “Deed of Trust”) recorded on ____________________ as Reception Number ________________ recorded ________________, hereby consents to and approves the recording of this PD Development Agreement, and hereby agrees that any foreclosure of the Deed of Trust will not affect the validity of this PD Development Agreement, which will remain in place following any foreclosure, and hereby subordinates the lien of said Deed of Trust to the matters set forth herein. Executed this ____ day of ___________, 2016. ____________ Bank By:____________________________________ ____________________, Title:______________ STATE OF __________ ) ) ss. COUNTY OF __________ ) The foregoing Mortgagee Consent Certificate was acknowledged before me this ____ day of ____________, 2016 by _________________________ as _____________ of ___________________________Bank. Witness my hand and official seal. My commission expires: ________ ______________________________ Notary Public Base Lodge PD Agreement Page 28 EXHIBIT LIST A. Dimensional Requirements and Density B. TIA Narrative C. Landscape Plan Costs and Quantities D. Public Facilities and Infrastructure Costs and Quantities E. Storm Water and Drainage Improvements Costs And Quantities Base Lodge PD Agreement Page 29 EXHIBIT “A” DENSITY AND DIMENSIONAL REQUIRMENTS CL Zone District Requirement* Ordinance No 6, 2016 Dimensions Approved Dimensions Min. Front Setback (Cooper Ave.) No Requirement 0’ 0’ Min. Side Setback (Original St.) No Requirement 0’ 0’ Min. Side Setback (West) No Requirement 5’ 5’ Min. Rear Setback No Requirement 0’ 0’ Maximum Height 38’-40’ for a three story building 35’-6” top of third floor parapet on corner of Cooper Ave and Original St.; remaining portions of building not to exceed 38’; Elevator not to exceed 48’, when setback according to Section 26.575.020 35’-6” top of third floor parapet on corner of Cooper Ave and Original St.; remaining portions of building not to exceed 38’; Elevator not to exceed 48’, when setback according to Section 26.575.020 Min. Public Amenity Site Specific 10%- 25% Approximately 6,782 s.f. and as shown in Exhibit B, Ordinance No. 6 3,910 s.f. on-site, plus 2,702 s.f. off-site; 6,610sf total (95%), matching exactly that shown in the Approved Plan Set Minimum Off- Street Parking Spaces 21.36 spaces 23 spaces 23 spaces Max. Cumulative Floor Area 2.5:1 (17,315sf) 2.49:1 (17,260 s.f.) 2.35:1 (16,255 s.f.) Max. Lodge Floor Area 2:1 (13,852sf) 1.74:1 (12,051 s.f.) 1.9:1 (13,150 s.f.) Average Lodge Unit Size No Requirement Approximately 200, minor changes allowed per Section 1, Ordinance No. 6 Approximately 201 s.f. Max. Lodge Net Livable Area N/A 7,784 s.f. 7,700sf Max. Commercial Floor Area 1:1 (6,926sf) .66:1 (4,592 s.f.) 0.42:1 (2,922 s.f.) Max. Commercial Net Leasable Area N/A 2,487 s.f. 2,360 s.f. Number of Lodge Units/Bedrooms N/A 40 units/40 bedrooms/80 pillows 38 units/40 bedrooms/68 pillows * Minor changes that do not exceed the zoning limitations of Ordinance No. 6 may be made. Except as specified, the project is subject to (may avail itself of) the exemptions in the Land Use Code in effect on October 20, 2014, which is the date of original application submittal for this PD. Base Lodge PD Agreement Page 30 EXHIBIT “B” TIA NARRATIVE MMLOS In the space provided call out the effective sidewalk width and the percentage of the site which meets or exceeds the minimum standard width. Explain the site constraints for areas which do not meet the minimum width. Minimum sidewalk width of 8 feet for commercial developments will be provided for the entire site (100%). There are not any site constraints limiting the 8 feet minimum width for public commercial uses. Explain the proposed improved crosswalk and how this improvement benefits the pedestrian experience and the site as a whole. An improved crosswalk includes measures such as incorporating a corner bulb out or defining a crosswalk path with colored concrete. Simply re- striping a crosswalk will not receive credit. This measure must be pre-approved by City staff. A roadside bulb out is proposed at the northwest corner of Cooper Avenue and Original Street. This bulb out will be landscaped and will act as a traffic calming/slowing feature at the intersection as it will decrease the road width on both approaches. The bulb out will reduce the distance required to cross each street for pedestrians and cyclists. The intersection already exhibits a high level of pedestrian traffic and with the addition of the lodge, more pedestrian traffic is expected. City Market (and its loading dock area) is located across Cooper Avenue from the lodge. The sidewalks in the bulb out will include directional ADA handicap ramps and detectable warnings. Explain what driveways are removed and how this benefits the pedestrian experience. The main driveway entrance to the existing site is on Cooper Avenue and a smaller secondary driveway entrance exists on Original Street. The majority of the Original Street side of the site, from the main curbcut northward to the alley, functions like a continuous curbcut as vehicles park between the sidewalks and the buildings but in this right-of-way, accessing said parking from both the curbcut and the alley side; Dominos Pizza has often maintained a delivery vehicle in this space as well. Both of the existing driveway entrances will be closed and replaced with curb, gutters and detached sidewalks. This benefits the pedestrian experience by removing possible crossings/conflicts with vehicles. Pedestrian safety increases with detached sidewalks moving pedestrians farther away from the roads and not having to cross driveway entrances on the entire site. Describe the enhanced pedestrian access point(s). This measure is to improve pedestrian access to the site from the ROW. It includes adding additional access points which prevent pedestrians and bicyclists from crossing a street, improvements to the project's ADA ramps in the ROW, and improvements to existing access points. A roadside bulb out is proposed at the northwest corner of Cooper Avenue and Original Street. Currently there is a single direction handicap ramp that points diagonally into the middle of the intersection. The proposed bulb out will include bi-directional handicap ramps that will be perpendicular to the road crossing and direct pedestrian and bicycle traffic straight across the road crossings rather than diagonally into the center of the intersection. The bulb out will also reduce the distance required to cross each street for pedestrians and cyclists than what currently exists. The intersection already exhibits a high level of pedestrian traffic and with the addition of the lodge, more Base Lodge PD Agreement Page 31 pedestrian traffic is expected. City Market is located across Cooper Avenue from the lodge. Moreover, the existing building entrances are almost exclusively located behind a driveway and parking area, making pedestrian access less than ideal. The proposed new structure will include several accessible pedestrian access points/entries alongside the Original Street sidewalks as well as via a new walkway to be provided along the entire westerly boundary of the site. Explain any additional minor bicycle improvements which have been agreed upon with City of Aspen staff. An unsponsored WE-cycle station exists on the Cooper Avenue side of the site. The station is not currently sponsored by any private entities. It has been proposed that Base Lodge will sponsor the WE-cycle station with the development of the site. As a result, the unsponsored station will then be moved to another location in the City of Aspen where needed, thereby providing onsite bicycle improvements as well as enhancements elsewhere in the City of Aspen by virtue of moving the station to a beneficial location. TDM The project proposes onsite amenities. Describe the combination of amenities below. Providing a combination of creative onsite amenities reduces the need for SOV trips throughout the day. Services within the development that will reduce the need for auto trips include grocery, restaurant, recreation rental, dry cleaning, child care, bicycle repair stations, etc. A combination of amenities is required. A WE-cycle station exists on the Cooper Avenue side of the site. The station is not currently sponsored by any private entities. It has been proposed that Base Lodge will sponsor the WE-cycle station with the development of the site. As a result, the unsponsored station will then be moved to another location in the City of Aspen where needed. WE-cycle will eliminate SOV trips by offering guests a quick and convenient way to get around Aspen and to events, by providing employees with a healthy way to get to and from work. Base Lodge will provide guests and employees with We-cycle passes. City Market in Aspen is located directly south of the site, across Cooper Avenue. A restaurant is proposed on the main floor level of the lodge building. Retail is proposed on the main floor level of the lodge building. The hotel lobby includes a room that will be made available for overnight storage of hotel guest’s bicycles and skis depending on the season on a first-come first-served basis and as space remains available. A lounge and bar area is proposed on the basement floor level of the lodge. The basement level is also to include a hamam (group steam room), potentially eliminating trips that might otherwise be taken to a spa/gym. Further, men's and women's locker rooms, which are associated with the hamam, will be made available and include showers and storage for use by employees who might bicycle to work. Explain the proposed shared shuttle service strategy in the space below. The use of hotel or other customer service vehicles to shuttle employees can maximize the use of on-site resources while reducing SOV trips. The successful project will creatively consider the use of necessary business vehicles for shuttle purposes. For example, a health club with a guest shuttle could provide employee transfers to a transit center or park and ride. Note, the provision of a hotel shuttle alone does not qualify for this measure. Base Lodge will contract with an existing shuttle service provider for local and airport shuttle service. Base Lodge PD Agreement Page 32 Explain below the transit fare subsidy strategy. The successful project will provide subsidized/discounted daily or monthly public transit passes for the RFTA valley system. These passes can be partially or wholly subsidized by the project, with additional points being provided for larger subsidies. Many entities use revenue from parking to offset the cost of such a project. Base Lodge will provide bus passes to employees who live down valley. Provide details for the proposed bike share program participation. Bike sharing provides access to a fleet of bicycles for short trips, thus reducing SOV travel. The successful project will provide memberships to the existing WE-cycle program. Include details on how many WE-cycle memberships will be purchased and whether these will be made available to guests, employees, or both. A WE-cycle station exists on the Cooper Avenue side of the site. The station is not currently sponsored by any private entities. It has been proposed that Base Lodge will sponsor the WE-cycle station with the development of the site. As a result, the unsponsored station will then be moved to another location in the City of Aspen where needed. The hotel will actively encourage use of WE-cycle by providing all guests upon check in with a WE-cycle pass for the duration of their stay. All employees, including valet parkers, will be offered season passes for access to the WE-cycle system and encouraged to ride WE-cycle to and from work and for work related errands, especially as there will be no on-site automobile parking available to employees. Further, men's and women's locker rooms, which are associated with the hamam in the basement level, will be made available and include showers and storage for use by employees who might bicycle to or during work. Include any additional information that pertains to the TDM plan in the space provided below. Although specific credit has not been claimed for "end of trip facilities", the basement level locker rooms will be available for use by hotel employees in the manner prescribed for such “end of trip facilities.” Enforcement and Financing Provide an overview of the Enforcement and Financing plan for the proposed transportation mitigation measures. The MMLOS measures described herein do not require any financing or enforcement. If approved, the applicant will be held to the proposed development, which guarantees the measures, and a PD/Development Agreement will memorialize each requirement. The applicant will finance the development privately and, once built, will require no enforcement. Participation in the TOP and provision of the transit fare subsidy program will be provided and paid for the first five years of ownership to each applicant, tenant, or hotel operator, as applicable. The applicant, tenant, or hotel operator, as applicable, is responsible for enrolling in the programs and payment for usage outside of the membership fees. The TDM measures will be included in lease agreements and reviewed by the applicant, tenant, or hotel operator, as applicable, who will accept the terms by means of executing/agreeing to their lease. The WE-cycle commitments will be agreed to in a legally binding private contract between WE-cycle Aspen (through Mirte Mallory) and the applicant; the applicant will be responsible for initial installation and associated costs, as well as yearly sponsorship for a period of not less than five (5) years from the hotel’s official opening and enough access passes to make the system reasonably accessible for hotel employees and guests alike. Again, these commitments will be memorialized in the PD/Development Agreement between the applicant and the City. Base Lodge PD Agreement Page 33 Scheduling and Implementation Responsibility of Mitigation Measures Provide an overview of the scheduling and implementation responsibility for the proposed transportation mitigation measures. All MMLOS items will be completed during the construction phase of the project. They will be part of the plan set submitted to the City of Aspen Building Department for Engineering review. The applicant understands the issuance of a Certificate of Occupancy is contingent upon satisfactory installation of the MMLOS improvements, as reviewed and approved by the Engineering Department. These items will be the responsibility of the applicant, tenant, or hotel operator, as applicable, and shall be memorialized in the PD/Development Agreement. TOP and Transit Fare Subsidy TDM measures will be implemented when the applicant, tenant, or hotel operator, as applicable, sign their lease agreements. Please refer to the above narrative relative to WE-cycle Enforcement and Financing for an explanation of the scheduling and implementation responsibilities. Monitoring and Reporting Provide a monitoring and reporting plan. Refer to page 17 in the Transportation Analysis Guidelines for a list of monitoring plan requirements. Components of a Monitoring and Reporting Plan should include (1) Assessment of compliance with guidelines, (2) Results and effectiveness of implemented measures, (3) Identification of additional strategies, and (4) Surveys and other supporting data. The property manager or other representative of the owner will issue a survey to the commercial applicant, tenant, or hotel operator, as applicable, on an annual basis. This simple survey will determine what level of use they engage in for the TDM measures and if they have effectively reduced trips. The survey results will be issued as an annual report to the City of Aspen Transportation Department. Amendments This transportation impact mitigation plan may be amended from time to time according to the procedures and standards of Chapter 26.630 of the City of Aspen Land Use Code. Base Lodge PD Agreement Page 34 EXHIBIT “C” LANDSCAPE PLAN COSTS AND QUANTITIES IN CASE OF A SITE RESTORATION REQUIREMENT (Project Landscape listed under Public Facilities Costs) LANDSCAPING ITEM QUANTITY UNIT UNIT COST COST 6" TOPSOIL 130 CY $35.00 $ 4,550.00 GRASS SEED AND TEMPORARY IRRIGATION 6926 SF $1.50 $ 10,389.00 TOTAL $ 14,939.00 Base Lodge PD Agreement Page 35 EXHIBIT “D” PUBLIC FACILITIES AND INFRASTRUCTURE COSTS AND QUANTITIES ITEM QUANTITY UNIT UNIT COST COST CLASS 6 AGGREGATE BASE COURSE (6" UNDER ALL ASPHALT AND SIDEWALKS) 152 CY $ 55.00 $ 8,360.00 HANDICAP RAMPS 2 EA $ 800.00 $ 1,600.00 CROSSWALK PAVEMENT MARKINGS 450 SF $ 15.00 $ 6,750.00 TRUNCATED DOMES 64 SF $ 50.00 $ 3,200.00 CONCRETE SIDEWALKS 2220 SF $ 8.00 $ 17,760.00 PERMEABLE PAVERS 500 SF $ 25.00 $ 12,500.00 TYPE A CURB AND GUTTER - CATCH CURB 260 LF $ 42.00 $ 10,920.00 HOT MIX ASPHALT - 5" DEPTH 4664 SF $ 8.00 $ 37,312.00 TREES 4 EA $ 1,250.00 $ 5,000.00 SEEDING AND TEMPORARY IRRIGATION 990 SF $ 1.50 $ 1,485.00 WE-CYCLE STATION 1 LS $ 30,400.00 $ 30,400.00 SUBTOTAL $ 135,539.00 MOBILIZATION 1 LS $ 7,500.00 $ 7,500.00 TRAFFIC CONTROL 1 LS $ 10,500.00 $ 10,500.00 CONSTRUCTION SURVEYS, OBSERVATION, TESTING & AS-BUILTS 1 LS $ 10,500.00 $ 10,500.00 SUBTOTAL $ 28,500.00 TOTAL $ 164,039.00 Base Lodge PD Agreement Page 36 EXHIBIT “E” STORM WATER AND DRAINAGE IMPROVEMENTS COSTS AND QUANTITIES ITEM QUANTITY UNIT UNIT COST COST DRYWELL 1 EA $ 12,000.00 $ 12,000.00 PUMP. PIPING, CURB INLET 1 LS $ 12,000.00 $ 12,000.00 SUBTOTAL $ 24,000.00 MOBILIZATION 1 LS $ 2,500.00 $ 2,500.00 CONSTRUCTION SURVEYS, OBSERVATION, TESTING & AS-BUILTS 1 LS $ 2,500.00 $ 2,500.00 SUBTOTAL $ 5,000.00 TOTAL $ 29,000.00