Loading...
HomeMy WebLinkAboutLand Use Case.1039 E Cooper Ave.A003-98 RECEIVED COMES REID &WALDRON MAR 1 2 1998 ,-.rv, r, 1 niN Real Estate • Rentals • Property Management COMMUNITY DEVELOPMENT MEMORANDUM DATE: March 6, 1998 TO: Christopher Bendon, Planner City of Aspen, Community Development Department FROM: Mick Spalding, President Coates, Reid and Waldron Property Management RE: CHATEAU ROARING FORK CONDOMINIUMS STREAM MARGIN EXEMPTION 1039 EAST COOPER I am writing in regards to Item #7 on the application from Chateau Roaring Fork for their parking lot repairs and replacement. Item #7 says the applicant is encouraged to grant an access easement along the south side of the property to the City of Aspen for the purpose of providing fishermen's access to the Roaring Fork River. I can not grant that access on behalf of the Condominium Association. In order to give an easement, the ownership would have to vote. I can put that before the Board at their next meeting. As a fisherman, this suggestion is hard for me to understand, because the water that is accessed from the south side of the building is rather high and fast. In order to get to fish along the river, one would either have to walk south in front of the Roaring Fork Apartments which the Roaring Fork Condominiums do not own, or walk on the private decks of homeowners at the Chateau Roaring Fork Condominiums. Parking is also a problem I foresee. Would fishermen be able to park in the parking lot? That would make enforcement impossible for us. MS /kps Attachment cc: Bob Fritsch, Yampah Builders, Inc. Aspen Office 720 Fast Hyman Avenue • Aspen. Colorado 81611 • (970) 925 - 1400 • FAX (970) 920 - 3765 Snowmass Office: P.O. Box 6450 • Suite 113. Snowmass Center • Snowmass Village, Colorado 81615 (970) 923 - 4700 • FAX (970) 923 - 4198 MEMORANDUM TO: Stan Clauson, Community Development Director TT THRU: Julie Ann Woods, Deputy Director ` r ' ' ' FROM: Christopher Bendon, Planner F Lit t ,5 1999 RE: Chateau Roaring Fork Condominiums Stream Mrrg;$emption 1039 East Cooper Avenue OMMUN OEVE` CiiIOFASPEN DATE: February 26, 1998 SUMMARY: The Chateau Roaring Fork Condominium Association is requesting a Stream Margin Review Exemption to reconstruct and improve the existing parking lot. The improvements include a heated drain pan and a drywell to replace the current surface runoff which enters Cooper Avenue and eventually the river. Staff and the appropriate referral agencies have reviewed this applicant and recommend approval with conditions. APPLICANT: Chateau Roaring Fork Condominiums Association. Managed by Coates Reid and Waldron and represented by Robert Fritsch, Yampa Builders. LOCATION: 1039 East Cooper Avenue. ZONING: Residential Multi - Family (RMF) REVIEW PROCEDURE: Reconstruction of existing development within the Stream Margin may be exempted by the Community Development Director. STAFF COMMENTS: Review criteria and Staff Findings have been included as Exhibit "A." Agency referral comments have been included as Exhibit "B." The application has been included as Exhibit "C." RECOMMENDATION: Staff recommends the Community Development Director approve this Stream Margin Exemption with the following conditions: 1 1. Prior to issuance of a building permit, the applicant shall provide a drainage report which sizes the drywell appropriately, based on soil percolation and seasonal water tables. 2. The applicant shall submit a Dust Control Mitigation Plan prior to issuance of a building permit. 3. Prior to issuance of a building permit, the applicant shall submit an erosion control plan which maintains sediment on -site during and after construction. 4. The applicant shall maintain construction materials and debris on -site and not within public rights -of -way. The applicant should encourage employees to park elsewhere and carpool. 5. The applicant shall abide by all noise ordinances. Construction activity is limited to the hours between 7 a.m. and 10 p.m. 6. The applicant should include an oil and sand separator immediately before the dry well to prevent contaminants from entering the dry well system. The drywell opening should be lined with a geotextile fabric. The applicant should consider a round man hole cover. The applicant should place the drainage inlet 1/2 inch below final grade to prevent damage from snow plows. 7. The applicant is encouraged to grant an access easement along the south side of the property to the City of Aspen for the purpose of providing fisherman's access to the Roaring Fork River. APPROVAL I hereby approve this Stream Margin Exemption for reconstruction of an existing parking lot and addition of a heated drain pan and drywell system for the Chateau Roaring Fork Condominiums, 1039 East Hopkins Avenue, with the above conditions listed 1 -7. date O t ( 4 Q0 Stan Ct uson, Community Development Director ATTACHMENTS' Exhibit A -- Review Criteria and Staff Findings Exhibit B -- Referral Agency Comments Exhibit C -- Application Post -it® Fax Note 7671 Date Co./Dept. Co./Dept. GI _Ma 1 tpc0401; tip web MEMORANDUM To: Chris Bendon, Planner Thru: Nick Adeh, City Engineer / d From: Chuck Roth, Project Engineer ClC_ Date: February 13, 1998 Re: Chateau Roaring Fork Stream Margin Exemption (1039 East Cooper Avenue) The Development Review Committee has reviewed the above referenced application at their February 4, 1998 meeting, and we have the following comments: 1. Drainage - The roof and parking lot currently drain to the Roaring Fork River via East Cooper Avenue. The applicant has explained the need to provide on site detention for storm water. The applicant needs to provide a copy of the drainage report, based on soils percolation test and seasonal water table evaluation, that sizes the drywell for review and acceptance by the Engineering Department prior to approval of the application. The excavated drywell opening should be lined with geotextile fabric prior to placement of screened gravel and inside the drywell pre -cast sections. No overflow pipe is allowed for discharge into river. There should be an oil separator sand trap to capture parking lot pollutants that would reduce the performance of the drywell. A round inlet grate might perform better than a square one. 2. Sediment Containment - I have spoken with the contractor regarding site drainage during construction. The approval must include the following condition: Site drainage must be kept on the applicant's private property during construction and must not enter public rights -of -way or the Roaring Fork River. The applicant must submit an erosion control plan both for construction period and post - development phase. 3. Streets Department - Construction debris must be kept on site and may not be allowed on East Cooper Avenue or East Durant Avenue. Parking in the general area is limited. The contractor should provide employee parking elsewhere and carpool as needed. The inlet grate to the drywell should be installed 1/2" below the pavement in order to prevent snow plow blades from damage. 1 4. Parks Department - They are interested in a public access to the Roaring Fork River. They will contact the applicant. 5. Work in the Public Right -of -way - Given the continuous and unapproved work and development in public rights -of -way adjacent to private property, we advise the applicant as follows: The applicant must receive approval from city engineering (920 -5080) for design of improvements, including landscaping, within public rights -of -way, parks department (920 -5120) for vegetation species, and streets department (920 -5130) for mailboxes , street and alley cuts, and shall obtain permits for any work or development, including landscaping, within public rights -of- way from the city community development department. DRC Attendees Staff: Chris Bendon, Jack Reid, Julie Ann Woods, Rebecca Schickling, John Krueger, Tom Bracewell, Ed VanWalraven, Chuck Roth 98M24 2 Tigspe JJafec/cSanifafion ' /rid 565 North Mill Street Aspen, Colorado 81611 Tele. (970) 925 -3601 FAX #(970) 925 -2537 Sy Kelly - Chairman Michael Kelly Paul Smith • Treas. Frank Loushin Louis Popish • Secy. RECEIVED Bruce Matherly, Mgr. • February 2, 1998 FEB 0 3 1998 ASPEN /Pi I nuN Chris Bendon COMMUNITY DEVELOPMENT Community Development 130 S. Galena Aspen, CO 81611 Re: Chateau Roaring Fork Stream Margin Review Dear Chris: The addition of a heated drain pan to the Chateau Roaring Fork parking area should have no effect upon our ability to serve this development. As you know we cannot accept any clear water flows to our collection system. Directing the heated drain pan snow melt flows to a dry well, as is suggested by.the applicant, eliminates our concern regarding a potential clear water connection. You may want to consider requiring an oil and sand separator immediately before the dry well to keep contaminants from entering the dry well. Please call if you have any questions. Sincerely, Bruce Matherly District Manager EPA Awards of Excellence 1976•1986•1990 Regional and National A MEMORANDUM To: Chris Bendon, Planner, Planning Office From: Nancy MacKenzie , Environmental Health Specialist Date: February 10, 1998 Re: Chateau Roaring Fork Stream Margin Exemption 1039 East Hopkins Parcel ID # The Aspen /Pitkin Environmental Health Department has reviewed the Chateau Roaring Fork land use submittal under authority of the Municipal Code of the City of Asnen, and has the following comments. WATER QUALITY IMPACTS: erection 11 -1.3 "For the purpose of maintaining and protecting its municipal water supply from injury and pollution, the city shall exercise regulatory and supervisory jurisdiction within the incorporated limits of the City of Aspen and over all streams and sources contributing to municipal water supplies for a distance of five (5) miles above the points from which municipal water supplies are diverted." The drainage plan (snowmelt system and drywell) to mitigate the water quality impacts from drive and parking areas will be evaluated by the City Engineer. This application is not expected to impact down stream water quality and should be an improvement to the existing situation. AIR QUALITY: Sections 11-2.1 "It is the purpose of the air quality section of the Municipal Code] to achieve the maximum practical degree of air purity possible by requiring the use of all available practical methods and techniques to control, prevent and reduce air pollution throughout the city..." The Land Use Regulations seek to 'lessen congestion" and "avoid transportation demands that cannot be met" as well as to "provide clean air by protecting the natural air sheds and reducing pollutants ". FUGITIVE DUST A fugitive dust control plan is required which includes, but is not limited to fencing, watering of haul roads and disturbed areas, daily cleaning of adjacent paved roads to remove mud that has been carried out, speed limits, or other measures necessary to prevent windblown dust from crossing the property line or causing a nuisance. CONFORMANCE WITH OTHER ENVIRONMENTAL HEALTH LAWS NOISE ABATEMENT: Section 16 -1 "The city council finds and declares that noise is a significant source of environmental pollution that represents a present and increasing threat to the public peace i 4 7 and to the health, safety and welfare of the residents of the City of Aspen and it its visitors. Accordingly, it is the policy of council to provide standards for permissible noise levels in various areas and manners and at various times and to prohibit noise in excess of those levels." During construction, noise can not exceed maximum permissible sound level standards, and construction cannot be done except between the hours of 7 a.m. and 10 p.m. It is very likely that noise generated during the construction phase of this project will have some negative impact on the neighborhood. The applicant should be aware of this and take measures to minimize the predicted high noise levels. 2 LAND USE APPLICATION PROJECT: t � Name: 1 E 24 � - -- T Location: /D ' £- _r' / , (Indicate street address, lot : block number, 1 `.al description where appropriate) APPLICANT: 717- Name: 6 p-tv t.-. //1 '� Address: / P 39 � C / t r Phone #: r- zee 5 � REPRESENTATIVE: `) �— Name: Address: r1 15 - 6 73 . 4- 7/1a q — Phone #: o y5 l 7� ^ 9' S " TYPE OF APPLICATION: (please check all that apply): ❑ Conditional Use ❑ Conceptual PUD ❑ Conceptual Historic Devt. ❑ Special Review ❑ Final PUD (& PUD Amendment) ❑ Final Historic Development O Design Review Appeal ❑ Conceptual SPA ❑ Minor Historic Devt. ❑ GMQS Allotment ❑ Final SPA (& SPA Amendment) ❑ Historic Demolition ❑ GMQS Exemption ❑ Subdivision ❑ Historic Designation By ESA - 8040 Greenline, Stream ❑ Subdivision Exemption (includes ❑ Small Lodge Conversion/ Margin, Hallam Lake Bluff, condominiumization) Expansion Mountain View Plane ��yy--� � "�"te q, �,, ❑ Lot Split ❑ Temporary Use ®' Other: .4tra ' ❑ Lot Line Adjustment ❑ Text/Map Amendment CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) n GLO�L� i y 1 :�' , Goa,- .1.4L.2.- caklar .,l. ` 174.- eL-14 7 T ' L °'a ed2- PROPOSAL: (description of proposed buildings, uses, modifications, etc.) / h oliacity cfru,-411 Have you attached the following? FEES DUE: $ 7/5 ❑ Pre - Application Conference Summary ❑ Attachment #1, Signed Fee Agreement O Response to Attachment #2, Dimensional Requirements Form O Response to Attachment #3, Minimum' Submission Contents O Response to Attachment #4, Specific Submission Contents ❑ Response to Attachment #5, Review Standards for Your Application m 1 • O (f) r to r ,„1\ X O O W-2 O -7 hi t 't, � � ) Mr „ III r W O O (D fin (D jy 1 f '. , O N N N 7 p a ,W ' ■ y ;, . IV N CP. n O 1 l n ■ E ti 4 �`:. O U1O 00 cu3 A..— - m U " to 71 I - o n r G) o n n n n n n n o r n o o ( - c:0 W m 0 7 Q . r � � --, � _ �, a u - u' n 1 l ti m C ?I W m 0 I S u _ 7_ i c 1 n ° m co n 0 2 Nj 1 0 r ° r t , 1 c r r [ m N .0 0 m m ' i•- ar, 1 =! CTI _ u ° � l �' N L a ` IT co _ I O D D f11 V n �V W - 0 f r � C n 1 1 v •, j < C> ° _ N to , u n 0 3 _� VI O O - 1 j . m O N V T W 3 o, sc.:. N i , io O V = C, m m m 1i Li -a 1 (\ 1 ". h 1M PA I N(, HO C ca .r - -r c z imucCnmm W mD n a I ° n r o ri i om r�l 0 N W m Z y Go v t 1, ° w -o . , (.) a 0I-13 ra ?= m U m J m U co CO c∎ 7:1 m m r a E-.) in y �-;11: 5: e " 1 1 I s . + * C m w LT-I < n ' m 0 ii n c F N N t m y [ j ^ c? u. n N n ooA T o m a � o " � �l � 1 , Hs. a ^ '� 1 � /x, O • l NO m `J �+ i + ' ' I 1 1 l /1 O \ Cn 7.I w W a .2 m .e3 '1� m N 'w I'• .t N ° e 0) - , 1 I I ' ., klf�,- .� fl �� � F ✓ ro % I I 1 ��1� II / '1 .1 c. i f , a ) (i 9 I 1 I _ /ill I ; / k � R'i:i SL (� �� li H 'i ' u < <.� i � 3.1i-ea-4 11 LI pi I e l l i `f raj.' JJ 3Jlrfja u:... .�._➢ u SG d a i v Y V 1 D V 4 .4 - \ ..,.:' f 1 I k ,, y { N 1 .l m 1r // j f ! .. --' FI �5 1 + 1 1 O Ii G 1'I t' P d. ) W 1 � it . [i. 1 I 1 1�"S I f f l • fr! 1. �� f.1 _ II fl Ii fl .� 1 o' :i o ' I 1 1 ' S i I I ,l - l am � , 1 1 . to j e � � ° ^ 064‘!!' y . ASPEN/PITIC N COMMUNITY DEVELOPMENT DEPARTMENT Agreement for Payment of City of Aspen Development Application Fees (Please Print Clearly) qq CITY OF ASPEN (hereinafter CITY) and � 2 L� � 7i Ala fit (hereinafter APPLICANT) AGREE AS FOLLOWS: 1. APPLICANT has submitted to CITY an application for a (hereinafter, THE PROJECT). 2. APPLICANT understands and agrees that City of Aspen Ordinance No. 43 (Series of 1996) establishes a fee structure for land use applications and the payment of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. APPLICANT and CITY further agree that it is in the interest of the parties to allow APPLICANT to make payment of an initial deposit and to thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees he will be benefited by retaining greater cash liquidity and will make additional payments upon notification by the CITY when they are necessary as costs are incurred. CITY agrees it will be benefited through the greater certainty of recovering its full costs to process APPLICANTS application. 4. CITY and APPLICANT further agree that it is impracticable for CITY staff to complete processing or present sufficient information to the Planning Commission and/or City Council to enable the Planning Commission and/or City Council to make legally required findings for project approval, unless current billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect full fees prior to a determination of application completeness, APPLICANT shall pay an initial deposit in the amount of $ 7/5" a which is for hours of Planning staff time, and if actual recorded costs exceed the initial deposit, APPLICANT shall pay additional monthly billings to CITY to reimburse the CITY for the processing of the application mentioned above, including post approval review. Such periodic payments shall be made within 30 days of the billing date. APPLICANT further agrees that failure to pay such accrued costs shall be grounds for suspension of processing. CITY OF ASPEN APPLICANT Signature: g ' jJ"P Stan auso Date: / _ "'.r / y /t' y r Community Development Director Printed Name: IF er /I 4 ts City of Aspen Mailing Address: yg m f h g /d e r5, Z' N56 fiwy (, a /.eww osdf,or % ev 6—, S /60/ l e CO Sli S REID ez. IVALDRO 41 Peal Estate • kernels • Property Management January 13, 1998 RE: Authorized Representative for Chateau Roaring Fork permits & exemptions. To whom it may concern, please be advised that as the Association Manager for the Chateau Roaring Fork condominium complex, Coates, Reid and Waldron authorizes Yampah Builders, Inc., Robert Fritsch to act as the representative in securing exemptions and permits for the repaving project at 1039 East Cooper. Respectfully, Michele Gallegos Association Manager Aspen Office: 720 Fast ligmen Avenue • Aspen. Colorado S1611 • (970) 925 -1400 • FAX (970) 920 Snomnase Office PO. Box 6450 • Sole 113 Snowiness Cenlrr • Snowiness Wlare Colorado 81615 (970) 945-4700 • FAX (970) 923 - 4196 CITY OF ASPEN PRE - APPLICATION CONFERENCE SUMMARY PLANNER: Chris Bendon, 920.5072 DATE: 12.31.97 PROJECT: Chateau Roaring Fork REPRESENTATIVE: OWNER: TYPE OF APPLICATION: 0 step - ESA Exemption DESCRIPTION: Replacing paved area Land Use Code Section(s) 26.68.040 Stream Margin Exemption Review by: Staff Public Hearing: NO Referral Agencies: Engineering, Environmental Health, Parks, ACSD Planning Fees: Planning Deposit Minor ($450) Referral Agency Fees: Engineering, Minor ($110); Env. Health, Minor ($155) Total Deposit: $575 (additional hours are billed at a rate of $180/hour) To apply, submit the following information: 1. Proof of ownership 2. Signed fee agreement 3. Applicant's name, address and telephone number in a letter signed by the applicant which states the name, address and telephone number of the representative authorized to act on behalf of the applicant. 4. Street address and legal description of the parcel on which development is proposed to occur, consisting of a current certificate from a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner's right to apply for the Development Application. 5. Total deposit for review of the application 6. 5_ Copies of the complete application packet and maps. HPC = 12; PZ = 10; GMC = PZ +5; CC = 7; Referral Agencies = 1/ea.; Planning Staff = 1 7. An 8 1/2" by 11" vicinity map locating the parcel within the City of Aspen. 8. Site improvement survey including topography and vegetation showing the current status, including all easements and vacated rights of way, of the parcel certified by a registered land surveyor, licensed in the state of Colorado. (This requirement, or any part thereof, may be waived by the Community Development Department if the project is determined not to warrant a survey document.) 9. Additional materials as required by the specific review. Please refer to the application packet for specific submittal requirements or to the code sections noted above. 10. A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards relevant to the development application. Please include existing conditions as well as proposed. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. Nancy MacKenzie, 03:51 PM 3/27,6 -, Re: Wednesday's DRC meeting`T6 ! X- Sender: nancym @comdev Date: Tue, 03 Feb 1998 15:51:05 -0700 To: Chuck Roth <chuckr @ci.aspen.co.us> From: Nancy MacKenzie <nancym @ci.aspen.co.us> Subject: Re: Wednesday's DRC meeting location Cc: chrisb @ci.aspen.co.us Chuck and Chris Since I can't be at the meeting - EHD comments for the DRC meeting tomorrow on the Chateau Roaring Fork Stream Margin Exemption would be : 1) engineering will review the drainage plan 2)a Fugitive Dust Control Plan must be on file with Environmental Health Dept before any building permits can be issued. I didn't copied in on the other LUR you are reviewing, probaby the comments would be similar.. ?? nancy At 12:19 PM 2/2/ 98 -0700, you wrote: >The Sister Cities meeting room is needed by others. >We will meet at the meeting room at the Fire Department - 1:30-3:00 >Thank you. Nancy MacKenzie 920 -5076 minted for Christopher Bendon <chrisb @ci.aspen.co.us> 1 ....... _........... MEMORANDUM TO: Plans were routed to those departments checked -off below: 4 City Engineer O Zoning Officer O Housing Director Parks Department O Aspen Fire Marshal O City Water 4 Aspen Consolidated Sanitation District O Building Department r Environmental Health O Electric Department O City Attorney O Streets Department O Historic Preservation Officer O Pitkin County Planning FROM: Chris Bendon, Planner Community Development Department 130 So. Galena St.; Aspen, CO 81611 Phone 920.5090 Fax 920.5439 RE: Chateau Roaring Fork Stream Margin Exemption 1039 East Hopkins DATE: January 30, 1998 REFERRAL SCHEDULE DRC MEETING DATE:(note new time: 1:30 -3:00) February 4, 1998 SECOND DRC MEETING DATE (if necessary) February 11, 1998 OTHER REFERRALS DUE TO ENGINEER & PLANNER: February 11, 1998 ENGINEERING REFERRAL DUE TO PLANNER: February 13,1998 Thank you, Chris.