Loading...
HomeMy WebLinkAboutLand Use Case.205 S Mill St.0079.2013.ASLU THE CITY OF .ASPEN City of Aspen Community Development Department CASE NUMBER 0079.2013.ASLU PARCEL ID NUMBERS 273707338004 PROJECTS ADDRESS 205 MILL ST PLANNER SARA NADOLNY CASE DESCRIPTION WIRELESS TELECOMM REPRESENTATIVE VTECH — BRAD JOHNSON DATE OF FINAL ACTION 5.16.14 CLOSED BY ANGELA SCOREY ON: 6.25.14 AFFIDAVIT OF PUBLIC NOTICE REQUIRED BY SECTION 26.304.070 AND CHAPTER 26.306 ASPEN LAND USE CODE l/ ADDRESS OF PROPERTY: S "J, Aspen, CO STATE OF COLORADO ) ss. County of Pitkin ) V C j ,f./` i ✓1 (name, please print) being or representing an Applicant to the City of Aspen, Colorado, hereby personally certify that I have complied with the public notice requirements of Section 26.304.060 (E) or Section 26.30,6.010 (E) of the Aspen Land Use Code in the following manner: Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen no later than fourteen (14) days after final approval of a site specific development plan. A copy of the publication is attached he7-eto. Publication of notice: By the publication in the legal notice section of an official paper or a paper of general circulation in the City of Aspen Pater than fifteen (15) days after an Interpretation has been rendered. A copy of the ublication is attached hereto. C Signa The fore oing"Affidavit of Notice"was a o ed e efore me this 61;..D day of £� , 201 by PUBLIC NOTICE DEVELOPMENT APPROVAL WITNESS MY HAND AND OFFICIAL SEAL Notice is hereby given to the general public of the approval of a site specific development plan,and the creation of a vested property right pursuant to My to expires: ( l the Land Use Code of the City of Aspen and Title 24,Article 68,Colorado Revised Statutes,pertain- ing to the following described property:The Mill Street Plaza at 205 S.Mill Street,Lots D,E,F,G, H and I,Block 81,City and Townsite of Aspen, State of Colorado,PID#2737-073-38-004. On May 19th,2014,the Community Development Director granted an administrative Notice of Approval for ar Ll Wireless Telecommunication Equipment allowing the addition of two omni-style antennas and sup- porting equipment to be added to the rear roof of the subject site. For further information contact Sara Nadolny at the Aspen Community Develop- ment Dept.,130 S.Galena St,Aspen,C010rado, �7�� sara.nadolny @cityofaspen.com,(970)429-2739. ATTACHMENTS: CHRISTOPHER LUNDGREN City of Aspen NOTARY PUBLIC Published in The Aspen Times on May 22,2014 (10203667) COPY OF THE PUBLICATION STATE OF COLORADO NOTARY ID 20144000722 COMMISSION EXPIRES JAN.09,2018 DEVELOPMENT ORDER of the City of Aspen Community Development Department This Development Order, hereinafter "Order", is hereby issued pursuant to Section 26.304.070, "Development Orders", and Section 26.308.010, "Vested Property Rights", of the City of Aspen Municipal Code. This Order allows development of a site specific development plan pursuant to the provisions of the land use approvals, described herein. The effective date of this Order shall also be the initiation date of a three-year vested property right. The vested property right shall expire on the day after the third anniversary of the effective date of this Order, unless a building permit application submittal is accepted and deemed complete by the Chief Building Official, pursuant to Section 26.304.075, or unless an exemption, extension, reinstatement, or a revocation is issued by City Council pursuant to Section 26.308.010. After Expiration of vested property rights, this Order shall remain in full force and effect, excluding any growth management allotments granted pursuant to Section 26.470, but shall be subject to any amendments to the Land Use Code adopted since the effective date of this Order. This Development Order is associated with the property noted below for the site specific development plan as described below. Mill Street Plaza Associates LLC c/o M&W Properties 602 E. Cooper Ave, Suite 202, Aspen CO 81611 Property Owner's Name, Mailing Address Lots D E F G H and I Block 81 City and Townsite of Aspen County of Pitkin State of Colorado; commonly known as 205 S. Mill Street, Aspen, Colorado 81611 Legal Description and Street Address of Subject Property The Applicant has been approved to install two non-penetrating roof mounted omni antennas with related supporting equipment including cables non-penetrating cable trays, cable hangar and grounding kits on the roof of the subject site buildin&. Written Description of the Site Specific Plan and/or Attachment Describing Plan Administrative Approval from the Community Development Director received on May 16, 2014. Land Use Approvals) Received and Dates (Attach Final Ordinances or Resolutions) May 22, 2014 Effective Date of Development Order (Same as date of publication of notice of approval.) May 23, 2017 Expiration Date of Development Order (The extension, reinstatement, exemption from expiration and revocation may be pursued in accordance with Section 26.308.010 of the City of Aspen Municipal Code.) Issued this 16th day of May, 2014, by the City of Aspen Community Development Director. Chris Bendon, Community Development Director NOTICE OF APPROVAL WIRELESS TELECOMMUNICATION SERVICES FACILITIES AND EQUIPMENT APPROVAL FOR THE ADDITION OF TWO OMNI ANTENNAS TO THE ROOF OF MILL STREET PLAZA, COMMONLY KNOWN AS 205 S. MILL STREET, CITY OF ASPEN, COUNTY OF PITKIN, COLORADO. Parcel ID No. 2737-073-38-004 APPLICANT: Black and Veach for Verizon Wireless SUBJECT & SITE OF APPROVAL: 205 S. Mill St, Mill Street Plaza, involving the approval of wireless telecommunication services facilities and equipment. This is an administrative review. SUMMARY: The Applicant has requested approval for the installation of two non-penetrating roof mounted omni antennas with related supporting equipment such as a hybrid cable, non- penetrating cable trays, cable hangars and grounding kits (Exhibit A-2). The equipment is proposed to be located on the south-western edge area of the rooftop. The Mill Street Plaza is within the Commercial Core (CC) zone district that also has a Historic Overlay, requiring review by the City's Historic Preservation Planner. The building currently hosts six Verizon Wireless omni antennas, which are attached to the building's western alley side. None of these existing devices are to be removed per this proposal. The Applicant had initially requested the new antennas to be placed alongside the existing antennas, however this request was denied by the City's Historic Preservation Planner on the basis that this western side of the building was becoming increasingly crowded and that such a bulk of equipment was out of character with the building and the district. The Applicant was instructed to examine alternatives that would reduce the equipment's visibility and provide greater compatibility with the surrounding environment. STAFF EVALUATION: Pursuant to Section 26.575.130, Wireless telecommunications services facilities and equipment must comply with a list of general provisions and review standards. These requirements seek to ensure compatibility with the building and surrounding development. Depending on the type of telecommunication device installed (i.e. monopole, whip antenna, ground tower, etc.), specific requirements apply. This plan includes the installation of two rooftop antennas, therefore many of the criteria are not applicable. The majority of the compliance standards are in the form of screening and aesthetic qualities to limit the visual impact of the equipment. 1 Staff has concluded that the visual impact of the new wireless equipment will be reduced by the Applicant's intention to paint the antennas black, screen them behind the building's parapet wall, and to maximize the setback by placing the equipment at the rear southwestern side of the building (away from the streets and pedestrian ways). The Code recommends the clustering of wireless equipment, and although this new equipment is found on the roof rather than attached to the western wall of the building, it is situated adjacent to the existing equipment. In this way all wireless equipment is found within a predictable area of the building exterior. The antennas reach approximately 7' beyond the parapet wall, and do not require a variance to achieve this height. All support and/or switching devices are either beneath the parapet wall or stored within the building. All conduits (electrical and coax) are on the roof and also beneath the parapet. No lighting or signage (other than the required telephone contact numbers) is proposed through this plan. For Staff's response to the review criteria see "Exhibit B." The plans have been reviewed for a Certificate of No Negative Effect with the City's Historic Preservation Planner, who has found these plans to be in compliance. Staff finds all applicable criteria to be met in regards to the application. DECISION: Staff finds that the wireless telecommunication services and equipment application for the addition of two omni antennas and associated supporting equipment to the roof of 205 S. Mill Street, provided by Verizon Wireless, to meet the requirements of the Code, and APPROVES the applicant's request. APPROVED BY: go, Chris Bendon Date Community Development Director Attachments: Exhibit A— Site Plan and Equipment Location Plan Exhibit B —Review Criteria and Staff findings Exhibit C—Application 2 Exhibit A-1 Site Plan ACCESS LADDER TO ROOF VERIZON WIRELESS EQUIPMENT ROOM WITH ACCESS IN LOWER MENS RE�pSTR00MS BEHIND ART . HOPKIIVS AVE. HORIZONTAL HYBRID CABLE ROUTE IN CEILING.ATTACH TO COAX O 4'-0"O.C. MIN P INSTALL(2)NEW NON—PENETRATING ROOF MOUNT W/GPS ANTENNA.(2) 2 NEW RRH AND(1)NEW OVP MOUNTED TO PIPE MAST RE:2/A2.1 L ( t IT j do MOUNTED COURTYARD PROVIDE 2HR MASONRY FIRE TOPPING AT PENETRATION 2 FIBER CONDUIT ' ROOFTOP EQUIPMENL(IYP.) NEW HYBRID CABLE IN 0 CI 1 v1 NEW 4"CONDUIT FOLLOW `(E)COAX ROUTE FROM I Q a EQUIP ROOM APPRO. 100 1 Q Q LF. RE:A2.1 �') y-—_——— — 1 J B11IDING VERIZON WIRELESS 0 CONDENSING UNITS (6)VERIZON WIRELESS OMNI ANTENNAS RE:A2.1 _J NOTE ALL ITEMS EXISTING U.N.O. NORTH I 1 SITE PLAN scALe. to s a is trte^=ro° Exhibit A-2 (3) 7/6"COAX ROUTED THROUGH CONDUIT Equipment Location Plan COAX, FIBER FRI a REGERANT LINES ROUTED 1 EXISTING VERTICAL CONDUITS(TYP.) VERIZON WIRELESS ROOFTOP CONDENSING UNITS (4) 7/8"COAX (TRANE MODEL 6 4NB4060Et000BA) ROUTED THROUGH CONDUIT C J r ROOFTOP EQUIPMENT C�1 (TYP.) CPS o TE ...._,.�.. LL PCs 6',4. `PCs . a 10,`O. LTE". CELL 8',7. 4''7. NORTH 2 EXISTING ANTENNA CONFIGURATION V 3.2-1'0 s NEW 12"NON- PENETRATING CABLE NEW RRH PNdSP1542 TRAY sIM TO SITE PRO NEW AWS OMNI ANTENNA NEW HYBRID CABLE TO MAIN OVP APPROX 106 LF. (2) NEW NON-PENETRATING - 7/8"COAX v� ROOF MOUNT(NO BALLAST (3) (3) 7/ THROUGH REQUIRED SITE PRO dTRPD-HD !1.DU' OR sIM. RE: i&2/A4.0 TED fIBER& NEW RRH REFRIGERANT 4xt2 NEW AWS OMNI]AN LINES ROUTED IN (E)VERTICAL NEW MAIN OVP CONDUITS (TYP.) 0-0• ATTACH NEW O HYBRID CABLE TO NEW 4"CONDUIT INSIDE OF VERT TO ROOF. ., o PARAPET ON (E PAINT 70 MATCH �' CONDUIT MOU (E) BUILDING. VERIZON WIRELESS ROOFTOP ATTACH O 4'-D" CONDENSING UNITS O.C.VERT. W/ - (TRANE MODEL® 4NS4060EI000 ) CONDUIT CLAMPS 0 NOTES, ANC114ORS() ROOFTOP EQUIPMENT 1. ADD (2)AWS OMNI ANTENNAS o O (TYP.) 2. SITE WILL NEED RRH FOR AWS NEAR THE ANTENNAS. CPS 3. ADD HYBWFLEX CABLE AND RAYCAP LTE ❑ UNITS TO SUPPORT RRH. 4, PAINT NEW ANTENNAS,OVP AND RRH CELL BLACK TO MATCH (E)ANTENNNAS. REMOUNT PCs 5. ROUTE HYBRIDFLEX CABLE WITH (E)DUIT CON BPoCK FACADE 6-4" COAX APPROX 100 LF WITH MASONRY 6'9" PCS 6 DIAGRAM/AND INFORMAT)ON CABLE TIES PAINT TO 10•� 7. REFER TO STRUCTURAL INFORMAIICN MATCH BUILDING O LTE FROM M.D. MILLER DATED 03/11/14 41'��. 8' 7, 8- ALL ITEMS EXISTING U.N.O. (E) kA It 4.`2 NORTFI Exhibit B Review Criteria Subsection 26.575.130.F Review standards. The following standards are designed to foster the City's safety and aesthetic interests without imposing unreasonable limitations on wireless telecommunication services facilities and equipment: 1. Setbacks. At a minimum, all wireless telecommunication services facilities and equipment shall comply with the minimum setback requirements of the underlying zone district; if the following requirements are more restrictive than those of the underlying zone district, the more restrictive standard shall apply. a) All facilities shall be located at least fifty (50) feet from any property lines, except when roof-mounted (above the eave line of a building). Flat-roof mounted facilities visible from ground level within one-hundred (100) feet of said property shall be concealed to the extent possible within a compatible architectural element, such as a chimney or ventilation pipe or behind architectural skirting of the type generally used to conceal HVAC equipment. Pitched-roof-mounted facilities shall always be concealed within a compatible architectural element, such as chimneys or ventilation pipes. Staff Response: The proposal involves two omni antennas that will be mounted to the roof of the building. The antennas will be located at the rear of the roof, on the south western side so as to be located near the existing antennas, and will be concealed to the extent possible by the building's parapet from the rear. The antennas will be painted black to match the existing antennas, and to camouflage their presence. Staff finds this criterion to be met. b) Monopole towers shall be set back from any residentially zoned properties a distance of at least three (3) times the monopole's height (i.e., a sixty (60) foot setback would be required for a twenty (20) foot monopole) and the setback from any public road, as measured from the right-of-way line, shall be at least equal to the height of the monopole. Staff Response: The applicant is proposing two omni-whip style antennas. This development is proposed in the Commercial Core Zone District, which is not a residentially zoned district. The antennas are proposed to be located at the far end of the building, away from both S. Mill St. and E. Hopkins Ave. Staff finds this criterion to be met. c) No wireless communication facility maybe established within one-hundred (100) feet of any existing, legally established wireless communication facility except when located on the same building or structure. Staff Response: The applicant is proposing to locate the antennas on a structure where at least six other wireless antennas already exist. Staff finds this criterion to be met. 1 d) No portion of any antenna array shall extend beyond the property lines or into any front yard area. Guy wires shall not be anchored within any front yard area, but may be attached to the building. Staff Response: The proposed antenna and supporting structure will not extend beyond the property lines or into the front yard area of the lot. Staff finds this criterion to be met. 2. Height. The following restrictions shall apply: a) Wireless telecommunication services facilities and/or equipment not attached to a building shall not exceed thirty-five (35) feet in height or the maximum permissible height of the given Zone District, whichever is more restrictive. Staff Response: The proposed antennas measure approximately 5.83' in height. Staff finds this criterion to be met. b) Whenever a wireless telecommunication services antenna is attached to a building roof, the antenna and support system for panel antennas shall not exceed five (5) feet above the highest portion of that roof, including parapet walls and the antenna and support system for whip antennas shall not exceed ten (10) feet above the highest portion of that roof, including parapet walls. Staff Response: The proposed antennas are attached to the roof. The antenna and support system will not exceed the 10' of allowable height, as measured above the parapet wall. Staff finds this criterion to be met. c) The Community Development Director may approve a taller antenna height than stipulated in b. above if it is his or her determination that it is suitably camouflaged, in which case an administrative approval may be granted. Staff Response: The proposed antenna meet the height requirements as outlined above. There is no request for the allowance of a taller antenna height. Staff finds this criterion to be not applicable. d) If the Community Development Director determines that an antenna taller than stipulated in b. above cannot be suitably camouflaged, then the additional height of the antenna shall be reviewed pursuant to the process and standards (in addition to the standards of this Section) of Chapter 26.430 (Special review). Staff Response:Staff finds this criterion to be not applicable. e) Support and/or switching equipment shall be located inside the building, unless it can be fully screened from view as provided in the "Screening" standards (26.475.130 and 26.575.130.F.5) below. Staff Response: Proposed support equipment will be fully screened by the building's parapet walls, and located at the rear of the building's rooftop. Staff finds this criterion to be met. 3. Architectural compatibility. Whether manned or unmanned, wireless telecommunication services facilities shall be consistent with the architectural style of the surrounding architectural environment (planned or existing) considering exterior materials, roof form, scale, mass, color, texture and character. In addition: 2 Staff Response: The proposed facilities are consistent with the surrounding architectural environment. They will be located on the roof,painted black, and mimic the style of the existing wireless antennas on the building. Staff finds this criterion to be met. a) If such facility is accessory to an existing use, the facility shall be constructed out of materials that are equal to or of better quality than the materials of the principal use. Staff Response: The proposed equipment is not accessory to any existing use. The antennas will be free-standing and secured to the roof with non penetrating mounts. Staff finds this criterion to be not-applicable. b) Wireless telecommunication services equipment shall be of the same color as the building or structure to which or on which such equipment is mounted or as required by the appropriate decision-making authority (Community Development Director, Historic Preservation Commission, Planning and Zoning Commission or City Council, as applicable). Staff Response: The proposed antennas will be painted black to ensure a low profile as well as to match the existing antennas found on the building. Staff finds this criterion to be met. c) Whenever wireless telecommunication services equipment is mounted to the wall of a building or structure, the equipment shall be mounted in a configuration designed to blend with and be architecturally integrated into a building or other concealing structure, be as flush to the wall as technically possible and shall not project above the wall on which it is mounted. Staff Response: The antennas are not proposed to be mounted to the walls. Staff finds this criterion to be met. d) Monopole support buildings, which house cellular switching devices and/or other equipment related to the use, operation or maintenance of the subject monopole, must be designed to match the architecture of adjacent buildings. If no recent and/or reasonable architectural theme is present, the Community Development Director may require a particular design that is deemed to be suitable to the subject location. Staff Response: The proposed support equipment located on the roof will be screened to the extent possible by the building's parapet, and will be low profile so that it does not stand out from the rest of the building. Staff finds this criterion to be met. e) All utilities associated with wireless communication facilities or equipment shall be underground (also see "Screening" below). Staff Response: There are no utilities proposed that will require their placement underground. Staff finds this criterion to be not applicable. 4. Compatibility with the natural environment. Wireless telecommunication services facilities and equipment shall be compatible with the surrounding natural environment considering land forms, topography and other natural features and shall not dominate the landscape or present a dominant silhouette on a ridge line. In addition: 3 a) If a location at or near a mountain ridge line is selected, the applicant shall provide computerized, three-dimensional, visual simulations of the facility or equipment and other appropriate graphics to demonstrate the visual impact on the view of the affected ridges or ridge lines; an 8040 Greenline Review, pursuant to the provisions of Section 26.435.030, may also be required. Staff Response: The antennas are proposed to be located within the City's Commercial Core area. Staff finds this criterion to not be met. b) Site disturbances shall be minimized and existing vegetation shall be preserved or improved to the extent possible, unless it can be demonstrated that such disturbance to vegetation and topography results in less visual impact to the surrounding area. Staff Response: No disturbance of the site's natural environment is proposed with this application. Staff finds this criterion to not be met. c) Surrounding view planes shall be preserved to the extent possible. Staff Response: The proposed antenna have no impact on the designated view planes. Staff finds this criterion to be met. d) All wireless telecommunication services facilities and equipment shall comply with the Federal Communication Commission's regulations concerning maximum radio frequency and electromagnetic frequency emissions. Staff Response: The Applicant has indicated that the proposed equipment shall comply with the FCC regulations concerning maximum radio frequency and electromagnetic frequency emissions. Staff finds this criterion to be met. 5. Screening. Roof-and-ground-mounted wireless telecommunication services facilities and equipment, including accessory equipment, shall be screened from adjacent and nearby public rights-of-way and public or private properties by paint color selection, parapet walls, screen walls, fencing, landscaping and/or berming in a manner compatible with the building's and/or surrounding environment's design, color, materials, texture, land forms and/or topography, as appropriate or applicable. In addition: Staff Response: The two proposed roof mounted antennas will be screened to the extent possible by the building's parapet, and painted black. They will be placed on the rear of the building's roof, such that they are not visible from the either street. Staff finds this criterion to be met. a) Whenever possible, if monopoles are necessary for the support of antennas, they shall be located near existing utility poles, trees or other similar objects; consist of colors and materials that best blend with their background; and, have no individual antennas or climbing spikes on the pole other than those approved by the appropriate decision- making authority (Community Development Director, Historic Preservation Commission, Planning and Zoning Commission or City Council, as applicable). Staff Response: Monopoles are not associated with this application. Staff finds this criterion to be met. b) For ground-mounted facilities, landscaping may be required to achieve a total screening effect at the base of such facilities or equipment in order to screen the 4 mechanical characteristics; a heavy emphasis on coniferous plants for year-round screening may be required. Landscaping shall be of a type and variety capable of growing within one (1) year to a landscape screen which satisfactorily obscures the visibility of the facility. Staff Response: The proposal does not include any ground-mounted facilities. Staff finds this criterion to be met. c) Unless otherwise expressly approved, all cables for a facility shall be fully concealed from view underground or inside of the screening or monopole structure supporting the antennas; any cables that cannot be buried or otherwise hidden from view shall be painted to match the color of the building or other existing structure. Staff Response: All cables proposed with this application will be on the roof and screened by the rooftop parapet of the building. Staff finds this criterion to be met. d) Chain link fencing shall be unacceptable to screen facilities, support structures or accessory and related equipment (including HVAC or mechanical equipment present on support buildings); fencing material, if used, shall be six (6) feet in height or less and shall consist of wood, masonry, stucco, stone or other acceptable materials that are opaque. Staff Response: There is not fencing associated with this application. Staff finds this criterion to be not applicable. e) Notwithstanding the foregoing, the facility shall comply with all additional measures deemed necessary to mitigate the visual impact of the facility. Also, in lieu of these screening standards, the Community Development Director may allow use of an alternate detailed plan and specifications for landscape and screening, including plantings, fences, walls, sign and structural applications, manufactured devices and other features designed to screen, camouflage and buffer antennas, poles and accessory uses. For example, the antenna and supporting structure or monopole may be of such design and treated with an architectural material so that it is camouflaged to resemble a tree with a single trunk and branches on its upper part. The plan should accomplish the same degree of screening achieved by meeting the standards outlined above. Staff Response: Staff finds no need for additional measures to mitigate the visual impact of the facility. Staff finds this criterion to be not-applicable. 6. Lighting and signage. In addition to other applicable sections of the code regulating signage or outdoor lighting, the following standards shall apply to wireless telecommunication services facilities and equipment: a) The light source for security lighting shall feature down-directional, sharp cut-off luminaries to direct, control, screen or shade in such a manner as to ensure that there is no spillage of illumination off-site. Staff Response: No lighting is proposed with this application. Staff finds this criterion to be not-applicable. 5 Staff Response:No lighting is proposed with this application. Staff finds this criterion to be not-applicable. c) The display of any sign or advertising device other than public safety warnings, certifications or other required seals on any wireless communication device or structure is prohibited. Staff Response: There are no signs or advertising devices associated with this application. Staff finds this criterion to be met. d) The telephone numbers to contact in an emergency shall be posted on each facility in conformance with the provisions of Chapter 26.510, Signs, of this Title. Staff Response: The Applicant will post the emergency contact numbers in accordance with the provisions of Chapter 26.510. Staff finds this criterion to be met. 7. Access ways. In addition to ingress and egress requirements of the Building Code, access to and from wireless telecommunication services facilities and equipment shall be regulated as follows: a) No wireless communication device or facility shall be located in a required parking, maneuvering or vehicle/pedestrian circulation area such that it interferes with or in any way impairs, the intent or functionality of the original design. Staff Response: The proposed antennas are not located in any vehicle/pedestrian circulation area, they are located on the building's rooftop. Staff finds this criterion to be met. b) The facility must be secured from access by the general public but access for emergency services must be ensured. Access roads must be capable of supporting all potential emergency response vehicles and equipment. Staff Response: Rooftop access is available for necessary maintenance and emergency personnel through the building. Staff finds this criterion to be met. c) The proposed easements for ingress and egress and for electrical and telephone shall be recorded at the County Clerk and Recorder's Office prior to the issuance of building permits. Staff Response: No easements are required as part of this application. Staff finds this criterion to be not-applicable. (Ord. No. 1-2002 § 18; Ord. No. 52-2003, §§ 14, 15) 6 PROJECTTEAM )RAWING INDEX ` OWNER: SITE ACQUISITIONIST: SHEET DESCRIPTION \✓/ MILL STREET BRAD JOHNSON T1.0 TITLE SHEET venVp wireless PLAZA ASSOCIATES, LLC BLACK do VEATCH CORP. A1.0 SITE PLAN C/O M&W PROPERTIES 304 INVERNESS WAY SOUTH VERIZON WIRELESS SERVICES - S ATTN: DEBBIE ROBERTS SUITE 400 A2.0 EQUIPMENT PLANS 3131 S.VAUGHN WAY,SUITE 550 205 S. MILL STREET, SURE 301A ENGLEWOOD, CO 80112 AURORA,Co 80014 veriZon wireless ASPEN, CO 81611 PHONE: 303.229.4681 A2.1 EQUIPMENT DETAILS 970.925.8032 PROJECT INFORMATION: ARCHITECT: A2.2 ANTENNA PLAN & RF DATA CLIENT: SITE NE CHARLES STECKLY A3.0 ELEVATION CO3 ASPEN VERIZON WIRELESS cm SITE I.D.j PROJECT: SMR - AWS YS CONSTRUCTION ENGINEER 5935 S. ZING ST. A3.1 ELEVATION g CHAD WEBER SUITE 280 3131 S. VAUGHN WAY LTTTLETON, CO 80127 A4.0 DETAILS 205 SOUTH MILL ST.#1 10 SITE NAME: C 0 3 ASPEN SUITE A, PHONE: .93.932.9974 A4.1 DETAILS ASPEN,CO.8161 1 AURORA, .5 8.670 FAX: 303.932.6561 ..,(L,y�� CELL: 303.503.6700 REV: DATE: DESCRIPTION: BY: SITE I.D. l • 185 STRUCTURAL. A 0--U CD REVIEW JDL OTEGUI STRUCTURAL ADDRESS: 208 SOUTH MILL ST. # 1 1 O SERVICES, LLC MICHAEL OTEGUI 10812 WEST POWERS PLACE CO 80127 ASPEN, CO 8161 1 LEON, PHONE: 720.9.981.51.5333 3 DRAWING SYMBOL LEGEND GENERAL NOTES 1. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, AND THIS SET OF x PLANS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSED ONLY, UNLESS NOTED OTHERWISE. THE PROJECT DATA VICINITY MAP SECTION CUT GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS, EQUIPMENT, LABOR, AND ANYTHING ELSE DEEMED NECESSARY TO COMPLETE INSTALLATIONS AS DESCRIBED HEREIN. 1 JURISDICTION: – CITY OF ASPEN 2. PRIOR TO THE SUBMISSION OF BIDS, THE CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE AND FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT, WITH THE ZONING DESIGNATION: – CC 4 XX X 2 INTERIOR ELEVATION CONSTRUCTION AND CONTRACT DOCUMENTS, FIELD CONDITIONS AND CONFIRM THAT THE PROJECT MAY BE FLAG ACCOMPUSHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION. ANY ERRORS, OMISSIONS, OR LEGAL DESCRIPTION – LOT D. BLOCK 81, 0 DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING. 205 S. MILL ST, ASPEN CO 3 82 3. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH CONSTRUCTION OCCUPANCY GROUP: – U PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE CONSTRUCTION X EXTERIOR ELEVATION DRAWINGS/CONTRACT DOCUMENTS. CONSTRUCTION TYPE: – V–B FLAG 4. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN. THE CONTRACTOR FULLY SPRINKLERED: – N/Ay SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES Sp PLANS PREPARED BY: X AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. NO. OF STORIES: – 2 DETAIL OR PLAN 5. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MANUFACTURER'S/ GOVERNING CODES: �O ENLARGEMENT VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE 2009 IBC, 2009 IMC, 2009 IFC, 2009 IECC, 2011 NEC yF CSAi PRECEDENCE. A.D.A. COMPLIANCE: SITE y�'� �• CHARLES STECKLY ARCHITECTURE,Ine. 6. ALL WORK PERFORMED ON PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE THIS FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. ��Y h ARCHITECTURE-PLANNING-DESIGN WITH ALL APPUCABLE CODES, REGULATIONS, AND ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES f� AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBUC yry 5935 SOUTH ZANG STREET,SUITE 280 A f REVISION AUTHORITY, MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL y. LITTLOFFICE COLORADO 127 OFFICE 303.9329974 CODES BEARING ON THE PERFORMANCE OF THE WORK. k• FAX 303.9316561 EL SPOT ELEVATION 7. THE STRUCTURAL COMPONENTS OF THIS PROJECT SITE/FACILITY ARE NOT TO BE ALTERED BY THIS (L LICENSURE NO: T CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. GTy 1 8. ANTENNA SUPPORTING STRUCTURE IS UNDER A SEPARATE CONTRACT. THE CONTRACTOR SHALL ASSIST Ci• ®� l – — GRID REFERENCE ANTENNA INSTALLATION SUBCONTRACTOR IN TERMS OF COORDINATION AND SITE ACCESS. ERECTION LAT: 39.18971 v SUBCONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF PERSONNEL AND PROPERTY FROM E ELECTRICAL HAZARDOUS EXPOSURE TO OVERHEAD DANGERS. LONG: –106.82 N.T.S. 9. GENERAL CONTRACTOR SHALL PROVIDE AT THE PROJECT SITE A FULL SET OF CONSTRUCTION PROJECT DESCRIPTION DIRECTIONS TO SITE T TELCO DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR THE USE BY E/T ELEC do TELCO ALL PERSONNEL INVOLVED WITH THE PROJECT. INSTALL (2) NEW AWS OMNI ANTENNAS ON (E) BUILDING. MODIFY FROM VERIZON WIRELESS OFFICE: TAKE 1-225 TO 1-70 WEST. 10. DETAILS INCLUDED HEREIN ARE INTENDED TO SHOW END RESULT OF DESIGN. MINOR MODIFICATIONS (E) MOUNTING FRAME. INSTALL HYBRID CABLE AND AWS TAKE EXIT 195 TO MERGE ONTO CO-91 SOUTH. CONTINUE TO EQUIPMENT. US-24 EAST. TURN RIGHT ONTO EAST 9TH ST. TURN LEFT ONTO —CDAx— COAXIAL CABLE MAY BE REQUIRED TO SUIT JOB CONDITIONS OR SITUATIONS, AND SUCH MODIFICATIONS SHALL BE HARRISON AVE. TO CO-82 WEST. TURN RIGHT ONTO SOUTH DRAWN BY: CHK: APV: GAS— GAS LINE INCLUDED AS PART OF THE SCOPE OF WORK. ORIGINAL ST. TURN LEFT ONTO SOUTH MILL ST. SITE WILL BE ON JDL TN CS 11. THE FACILITY IS CELLULAR RADIO EQUIPMENT AND ANTENNAS. RIGHT. CONSULTANT: v WATER LINE 12. THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, S SEWER LINE EASEMENTS, PAVING, CURBING, ETC. DURING CONSTRUCTION UPON COMPLETION OF WORK. CONTRACTOR SANITARY SEWER SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE PROPERTY. —FITTER— FIBER OPTIC CABLE 13. CONTRACTOR SHALL ENSURE THE GENERAL WORK AREA IS KEPT CLEAN AND HAZARD FREE DURING GENERAL CONTRACTOR NOTE APPROVAL BLOCK OVERHEAD UTILITIES CONSTRUCTION AND DISPOSE OF ALL DIRT, DEBRIS, RUBBISH AND REMOVE EQUIPMENT NOT SPECIFIED AS 3 REMAINING ON THE PROPERTY, PREMISES SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT CONTRACTOR SHALL VERIFY ALL PLANS AND EXISTING DIMENSIONS ° CHAIN LINK FENCE SPOTS, DUST, OR SMUDGES OF ANY NATURE. AND CONDITIONS ON THE JOB SITE AND SHALL IMMEDIATELY NOTIFY x r, THE ARCHITECT IN WRITING OF ANY DISCREPANCIES BEFORE 0 14. THE ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION AND ARCHITECTS TITLE SIGNATURE WOODEN FENCE �--o-- / PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME. CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE SHEET TITLE: NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR THEE DRAWINGS ARE ONLY TO SCALE WHEN PLOTTED ON 2436 OWNER y —––— LEASE AREA/ SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND SHEET. USE GRAPHIC SCALE WHEN PLOTTED ON 11x17 SHEET. s PROPERTY BOUNDARY IMPROVEMENTS IN ACCORDANCE WITH THE INTENT IffDER SHALL BEAR THE CALL BEFORE YOU DIG – COLORADO LAW REQUIRES 3 WORKING ENGINEER �E RESPONSIBILITY OF NOTIFYING (IN WRITING) THE AR /N I ( LICTS, ERRORS, OR DAYS NOTICE FOR CONSTRUCTION PHASE. UTILITY NOTIFICATION CONSTRUCTION MGR. TITLE SHEET RAILROAD TRACKS OMISSIONS PRIOR TO THE SUBMISSION OF CO OF DISCREPANCIES CENTER OF COLORADO – 1-800-922-1987 E'n THE CONTRACTOR SHALL PRICE THE MORE COSTLY 0 R IRECTED OTHERWISE. THESE DRAWINGS MAY NOT SHOW ALL UNDERGROUND PIPING AND PROJECT MANAGER STEEL STUD UTILITIES. THE CONTRACTOR SHALL EXERCISE EXTREME CARE �'�'7(��� 15. SPECIAL INSPECTION TESTING REQUIRED SPECIAL IN$1�f�j j PERFORMED BY AN �� CX CX)C)C)CXXS BATT INSULATION INDEPENDENT SPECIAL INSPECTOR PER SECTION 1701 dF1Q}1E lJtlll^+R�11p$VING CODE (UBC) FOR THE DURING ALL EXCAVATION AND OTHER CONSTRUCTION ACTIVITIES. SHEET NUMBER: m N FOLLOWING: VERIZON WIRELESS IS RESPONSIBLE FOR ALL UTILITY LOCATES AND ACKNOWLEDGMENT OR 'SIGN–OFF' BY PARTIES TO THE CONSTRUCTION $o ----5280---- EXISTING TOPOGRAPHY UTILITY RELOCATIONS REQUIRED FOR THIS INSTALLATION. VERIZON DRAWINGS DOES NOT CONSTITUTE ALTERATION OF THE LEASE TERMS. m m° 80— A. CONCRETE: DURING THE TAKING OF CONCRETE T I STRUCTURAL WIRELESS WILL SCHEDULE AND COORDINATE ALL WORK WITH THE 1 . 0 a rn PROPOSED TOPOGRAPHY REINFORCING AND STRUCTURAL CONCRETE, VERIFYp 0� AND GRADE. OWNER TO ENSURE NO DISRUPTION TO OWNERS OPERATIONS. i I I , t f f`��l rl WATER DRAINAGE FLOW B. BOLTS, AND ANCHORS IN CONCRETE HOLD–DOWN AAL*8h'BOLTS,"1RS�L�`3I��, LENGTH, TYPE O (EXPANSION, EPDXY) AND SPACING. J va HYBRID CABLE LENGTH FROM MAIN OVP O HYBRID CABLE LENGTH FROM MAIN OVP O ANTENNAS PDF eNODE SHELTER TO MAIN OVP O ANTENNAS TO SECTOR REMOTE RADIO HEADS B -r. v wireless c w N VERIZON WIRELESS SERVICES SIZE LENGTH QTY. NOTES SECTOR SIZE LENGTH QTY. NOTES 1X1 HYBRID (2) 1/2 COAX 3131 S.VAUGHN WAY,SUITE 550 RRH AWS AURORA,Co 80014 MOUNT RRH TO BACK OF MAIN OVP O 6X12 MAIN OVP O X SECTOR X 1X1 8'-0" (2) ANTENNA PIPE MOUNT SHELTER HyuRIU CAULL ANTENNAS (2) 1%2" COAX PROJECT INFORMATION: 135 LF. 1X1 HYBRID RRH AWS sITE NAME MOUNT MAIN OVP TO CO3 ASPEN SITE I.D. 6X12 135'-0" (1) AVAILABLE SPACE ON 185 BUILDING O ANTENNA LOCATION 205 SOUTH MILL ST.#1 10 ASPEN,CO.8 161 1 REV: DATE: DESCRIPTION: BY: A 09/20/13 CD REVIEW JDL 3 HYBRID CABLE CHART 2 HYBRID CABLE DIAGRAM ACCESS LADDER TO ROOF VERIZON WIRELESS EQUIPMENT ROOM WITH ACCESS IN LOWER NSRESTROOMS BEHIND ART RE A2O E HOpK/NS AVE PLANS PREPARED BY CSA i 2" FIBER CONDUIT CHARLES STECKLYARCH/TECTURE,Inc. ARCHITECTURE-PLANNING-DESIGN 5935 SOUTH ZANG STREET,SURE 280 1. COURTYARD LITTLETON,COLORADO 80127 OFFICE EW HYBRID GABLE 2 FAX 4 AX 303.9326561 U FOLLOW (E) COAX ROUTE LICENSURE NO: � IN ROOFTOP CABLE TRAY Q APPROX 135 L.F. 02 ROOFTOP EQUIPMENT (IYP.) 0 vi I 0 0 0 VERIZON WIRELESS I 0 BUILDING 0 O CONDENSING UNITS I DRAWN BY: CHK: APV: JDL TN CS (6) VERIZON WIRELESS OMNI CONSULTANT: ANTENNAS INSTALL (2) NEW OMNI ANTENNAS FOR TOTAL OF (8) OMNI ANTENNAS RE: A2.2 rn 3 a o_ ul O U W 6 SHEEP TITLE: O K NE SITE v� y PLAN H c SHEET NUMBER: 'C 271 Y) aW NORTH Al R O �� 1 SITE PLAN SCALE: 16' a' 0 16' a 1/16"=1'-0" 1'-9' 2'-5' � \veenZZon wireless VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 GROUND M BAR AURORA,Co 8001 4 I n PROJECT INFORMATION: r. SUPERCELL SUPERCELL SRE NAME N PDF SC 4812 ROUTER Sc 4812 A/C CO3 ASPEN SITE I.D. 185 2'--g 2'-8` 6` 2'-8` 1'-9` 8" 2'-8` 2'-6" 205 SOUTH MILL ST.#1 10 ASPEN,CO.81 61 1 0 m 3 2'-0 4'-7 SERVICE REV: DATE: DESCRIPTION: BY: Y DISCONNECTS �.`. e, INSTALL NEW AWS 2'-11` A 09/20/13 CD REVIEW JpL 1 eNODE B AWS LTE COAX ENTRY--,, eNODE B eNODE B PORT o (n O 7 � 1 COLUMN � > POLYPHASER TRANSFORMER \ r PORT W/ (7) 7/8" COAX do FILTER o a n FIBER PORT MEN'S THRU WALL 4'-1` •� ROOM m NEW MAIN 1• 1'-10' n FE & MSDS i A OVP J-BOX / TELCO AC CONTROL ART CONCEALING A/C o BOARD / ACCESS DOOR N MANUAL �� ITEMS ARE 200A 10 TRANSFER EXISTING UNLESS VIEW OF COAX ROUTE 18'-11" PANEL SWITCH 9'-8• NOTED OTHERWISE NORTH PLANS PREPARED BY: 1 EQUIPMENT PLAN SCALE: y 1 p z 1 CSAi 7 = L CXARLES STECKLY ARCNITECTURE,Inc. ARCHITECTURE-PLANNING.DESIGN NEW 6GA TO PDF 5935 SOUTH ZANG STREET.SUITE 280 LITTLETON.COLORADO 80127 FROM MAIN OVP OFFICE 303.932.9974 (7) 7/8` COAX APPROX 23 L.F. FAX 303.932.6561 M3 LICENSURE NO: 1 POLYPHASER G 6GA f INACTIVE COAX POLYPHASER TO GPS - COLUMN 61 COAX ENTRY PORT AND POLYPHASER DIAGRAM DRAWN BY: CHK: APv: a 1I °i O �I JDL TN CS CONSULTANT: 6 6G ER ER IBER IBER FIBE 0 e a LIGHTS (TYP) 12" CABLE TRAY in (TYP.) c Z - m w NEW FIBER TO AWS eNODE B FROM SHEET TITLE: MAIN OVP APPROX / 0 23 L.F. N E / ;' EQUIPMENT 21- PLANS � 2< - o NOTE, SHEET NUMBER: c c°v ALL ITEMS ARE yam° 9'-8" EXISTING UNLESS w VIEW OF COAX ENTRY PORT AND POLYPHASER NOTED OTHERWISE A2 . 0 a NORTH !N SCALE: y 1' p 2' 2 1 REFLECTED CEILING PLAN �a vevenZon wireless v✓_�'+,,.z :'31h. , - ' a;. _. VERIZON WIRELESS SERVICES + - 3131 S.VAUGHN WAY,SUITE 550 AURORA,CO 80014 - -S' PROJECT INFORMATION: SRE NAME CO3 ASPEN a� i SITE I.D. 1 I •• �.s-�. � 185 205 SOUTH MILL ST.#1 10 I � T ASPEN,CO.81 61 1 REV: DATE: DESCRIPTION: BY: - -: A 09I20I13 CD REVIEW JDL VIEW OF BATTERIES VIEW OF EQUIPMENT RACKS PDF RACK LORAINE POWER SYSTEMS MODEL 1211A2 (6) 24 VDC RECTIFIERS IN USE (1) -48 VDC RECTIFIERS IN USE VIEW OF ART CONCEILING ACCESS DOOR VIEW OF EQUIPMENT RACKS PLANS PREPARED BY: MARCONI CSAi CHARLES 3TECKL Y ARCHITECTURE,Inc. ARCHITECTURE-PLANNING-DESIGN IF an we 5935 SOUTH ZANG STREET,SURE 280 r UTTLETON,COLORADO 80127 « I..:_.... .. OFFICE:303.932.9974 -- FAX 303.932.6561 it • BATTERY RACK LICENSURE NO: I ABSOLYTE GB I{ IOOG33 1600A SN: X0914004 (12) BATTERIES TOTAL INSTALLED: 12/09/05 ■ - - - RECT RECT RECT RECT ® 1 2 3 4 DRAWN BY: CHK: APV: --E - - + JOL TN CS 12 9 8 CONSULTANT: RECT RECT SPACE SPACE 5 8 11 to 7 'A N co co 0 U w =2 . e a SHEET TITLE: O N a 5 EQUIPMENT DETAILS 3a 0 o BATTERY CELLS SHEET NUMBER: N SPILL (TYP) VIEW OF PDF VIEW OF ENODE B AND TRANSFORMER CONTAINMENT o� A2 . I ry0 2 EQUIPMENT ROOM PHOTOGRAPHS 1 RACK ELEVATIONS �a ve�n wireless ROUTED ED COAX VERIZON LESS SERVICES ROUTED THROUGH CONDUIT 3131 S.VAUGHN WAY,SUITE 550 AURORA,Co 80014 COAX, FIBER do REFRIGERANT PROJECT INFORMATION: LINES ROUTED I EXISTING STE NAME VERTICAL CO3 ASPEN CONDUITS (TYP.) SITE I.D. 185 205 SOUTH MILL ST.#1 10 VERIZON WIRELESS ROOFTOP ASPEN,CO.E3161 1 CONDENSING UNITS (4) 7/8• COAX (TRANE MODEL 1f 4NB406OE1000BA) REV: DATE: DESCRIPTION: BY: ROUTED THROUGH A 09 M13 CD REVIEW JDL CONDUIT O" ROOFTOP EQUIPMENT � �(TYP.) CC0AX--- GPS 'COAX O u ELL IAX PCs 6_4. PCS `Cp '0'-0. LTE CELL 8,7• 4-7- NORTH 4 VIEW OF ANTENNAS 2 EXISTING ANTENNA CONFIGURATION SCALE: 5' 3'2'1'0 5' PLANS PREPARED BY: 3,16„=1'_0” CSAi CHARLES STECKLY ARCHITECTURE,Inc. (3) 7/8• COAX ARCHITECTURE-PLANNING-DESIGN ROUTED THROUGH 5935 SOUTH ZANG STREET,SUITE 280 CONDUIT LITTLETONI COLORADO 80127 MATERIALS OFFICE: GENERAL: PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY FOR RECEIVING, INSTALLING, TESTING COAX, FIBER dt FA)( 03.932.6561 3 303.932.9974 AND ADJUSTING ANTENNA CABLES FROM THE ANTENNA TO THE CONNECTORS AT THE BASE TRANSMISSION SYSTEM (BTS). THIS SHALL INCLUDE ALL EQUIPMENT SHOWN OR REQUIRED FOR A COMPLETE OPERATING REFRIGERANT LICENSURE NO: SYSTEM. ANTENNA, ANTENNA CABLES, CONNECTORS, AND FITTINGS SHALL BE THIRD PARTY FURNISHED LINES ROUTED I COMPONENTS AS SHOWN ON THE BILL OF MATERIALS. EXISTING VERTICAL 2. MATERIALS CONDUITS (TYP.) NEW HYBRID CABLE TO MAIN A. ANTENNA CABLES: AS SCHEDULED OVP APPROX 135 LF. VERIZON WIRELESS ROOFTOP ATTACHED TO BOTTOM OF B. ANTENNA CONNECTORS: AS SCHEDULED CONDENSING UNITS HANDRAIL W/ SS CLIPS O C. CABLE HANGERS: INSTALLED AT MAXIMUM 4' SPACING REMOUNT (TRANE MODEL III 4NB406OE1000BA) 4'-0. O.C. HORIZ. PAINT CONDUIT TO DARK BRONZE TO MATCH FAE D. GROUNDING KITS: AS SPECIFIED WTHKMASONRY EXTEND (E) HANDRAIL HANDRAIL TIES PAINT TO O ROOFTOP EQUIPMENT RE: A4.0 3. INSTALLATION � MATCH BUILDING (TYP.) NEW ANTENNA MOUNT DRAWN BY: CHK: APV: ) REINFORCEMENT A. ANTENNA CABLE LENGTHS SHALL BE FIELD MEASURED PRIOR TO PURCHASE OF CABLE. INSTALLER SHALL BRACE (TYP, JDL TN CS NOTIFY VERIZON WIRELESS OF THE OVERALL LENGTH REQUIRED. RE: A4.0 B. CABLES SHALL BE LABELED IN ACCORDANCE WITH VERIZON WIRELESS SPECIFICATIONS. o sx12 O CONSULTANT: NEW MAIN OVP ATTACHED TO C. ALL OUTSIDE CABLE CONNECTIONS SHALL BE COVERED WITH WEATHERPROOFING TAPE. GPS sxlz\sx12 ❑ REINFORCED MOUNT WITH D. THE MINIMUM BENDING RADIUS FOR ALL ANTENNA CABLES SHALL BE AS SHOWN BELOW OR AS PER THE LTE \6x12 VALMONTSCP10W PIPE TO \ 3 MANUFACTURER, WHICHEVER IS MORE CONSERVATIVE: MOUNT OR SIM. E: CELL 6x12 / N CABLE IN AIR / CABLE TRAY IN CONDUIT \6x12\ RE: 1 A4.1 1/2• 5• 10• 61-4• PCS sxi?\ NEW RRH ATTACHED TO 6x1 REINFORCED MOUNT WITH 7/8• 10• 18• 6'—g• PCS 2 sx/ VALMONT JDAC OR SIM. a 1 5/8• 20• 28• /p•� • \6x 2 RE: 1/A4.1 SIM. (TYP.) w E. CABLES SHALL BE INSTALLED WITH THE MINIMUM NUMBER OF BENDS. CABLES SHALL NOT BE LEFT p L� CEL 6x12 oUNTERMINATED IN THE FIELD. 41'_3• 8',�• x12 SHEET TITLE: F. GROUNDING KITS — AFTER INSTALLATION OF GROUND STRAPS, THE CONNECTION SHALL BE MADE WEATHER �4IESi �E) k4lyp 4'-7, NEW 2 E TIGHT USING WEATHERPROOFING KITS AS IDENTIFIED ABOVE. GROUND PIGTAILS SHALL BE BROUGHT OUT IN 1. ADD (2) AWS OMNI ANTENNAS. �� 4' AWS ANTENNA PLAN H THE DOWNWARD DIRECTION FROM THE CONNECTIONS TO THE ANTENNA CABLE WITHOUT ANY SHARP BENDS 2. SITE WILL NEED RRH FOR AWS NEAR 6• '—? LTE NEW w� (MINIMUM BEND RADIUS 10' AND CONNECTION SHALL BE MADE TO GROUNDING SYSTEM. THE ANTENNAS. �0 AWS & RF DATA m 3. ADD HYBRIFLEX CABLE AND RAYCAP 6'�4• LTE 3 m UNITS TO SUPPORT RRH. 1 �R 5. ROUTE NHYBRIADFLEX CABLE WITH (E) 4,p N H,iND 18 8.61— 4• —0 SHEET NUMBER: >N COAX APPROX 135 LF n 6. RE: 2&3/A1.0 3/A1.0 FOR HYBRID CABLE �NNq m n DIAGRAM AND INFORMATION uOUlyr A2 . 2 T �w I k NORTH ry° 3 ANTENNA NOTES AND REQUIREMENTS 1 1 PROPOSED ANTENNA CONFIGURATION I SCALE: 5' 3'2'1'0 s' 2a 3/16"=1'-0" ve�n wireless NOTES: 1. PAINT ALL NEW ANTENNAS VERIZON WIRELESS SERVICES BUCK TO MATCH (E) MOUNTING HARDWARE AND 3131 S.VAUGHN WAY,SUITE 550 CABLE AURORA,Co BOO 14 2. ALL ITEMS ARE EXISTING UNLESS NOTED OTHERWISE PROJECT INFORMATION: SITE NAME CO3 ASPEN SITE I.D. 185 (6) VERIZON WIRELESS OMNI 205 SOUTH MILL ST.#1 10 ANTENNAS. INSTALL (2) NEW OMNIS ASPEN.CO.8161 1 FOR TOTAL OF (8) OMNI ANTENNAS REV: DATE: DESCRIPTION: BY: RE: A2.2 A 09120/13 CD REVIEW JDL ROOFTOP EQUIPMENT PS ANTENNA :: L L-TH'HE 1.. Y Li'1 T lLi 111 1 1 t I T LfrC t TL'LYLt�1 T L - i t 1 Lfll_ts�.L1ri 1tr Lrrx T L r . 1xrr�riTiT__ i_ L 1•.,:x r ROOF ACCESS Q PLANS PREPARED BY: LADDER O Z ZZZZ RESTAURANT DECK E+ CSAi ON NW CORNER OF Yd ° BUILDING c f 9 Z z 2 CHARLES STECKLY ARCHITECTURE,Inc. 10 ° ARCHITECTURE-PLANNING-DESIGN m Z_ I I S O � � p O 5915 SOUTH ZANG STREET,SURE 280 p m H ~ LTTTLETON.COLORADO 80127 O O 9 OFFICE 303.972.9974 FAX 303.9316561 O LICENSURE NO: F 0 0000 RAILING .rT. 1xi ,�j DRAWN BY: CHK: APV: TiTH"- t 1 riTxLrr LTrz rr : riT �T T tr JDL TN CS riT r J rrJ -r JxiT L x r--� tr LT 1.T?L a "�'.^til '�L 5.�.1 TLLTL `L'�'ILI LIr lliC 1,4Z L"' 'S.LI i`S CONSULTANT: x �Tr`xrT=trr''. �xrz�i�L,iL,C.r:rrlTt-ti L'`r rliJ Tl t t.T rrl 'iTLTi•,�iTi` r'i`r�r Gx�-.1i lcl�rr xLYl rrrtr`- :rL.tLr1 . m d m rn U Z W a a SHEET TITLE: O U N ELEVATION m� L� 3a N r SHEET NUMBER: N A3 . 0 11w ry° 1 NORTH ELEVATION SCALE: 4' 2' 0 4' T.EL 1 1/4'=1'-0" ven wireless Zo VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 AURORA,CO 80014 NOTES: PROJECT INFORMATION: 1. PAINT ALL NEW ANTENNAS SITENAME BLACK TO MATCH (E) CO3 ASPEN MOUNTING HARDWARE AND STELO. CABLE 185 2. ALL ITEMS ARE EXISTING UNLESS NOTED OTHERWISE 205 SOUTH MILL ST.#1 10 ASPEN,C0.81611 REV: DATE: DESCRIPTION: BY: REMOUNT CONDUIT TO A 09120/13 CD REVIEW Job BRICK FACADE WITH MASONRY TIES PAINT TO MATCH BUILDING NEW MAIN OVP (6) VERIZON WIRELESS OMNI ATTACHED TO ANTENNAS. INSTALL (2) NEW OMNIS REINFORCED MOUNT FOR TOTAL OF (8) OMNI ANTENNAS WITH VALMONT RE: A2.2 SCP10W PIPE TO PIPE MOUNT OR SIM. NEW RRH ATTACHED TO RE: 1/A4.1 REINFORCED MOUNT WITH VALMONT #DAC OR SIM. RE: 1/A4.1 SIM. (TYP.) NEW REINFORCED MOUNT RE: A4.0 ...sir'-,-` r� - .'-c t �'- TT' '-,. __❑ z�fi_ ❑ _ _- .Y�i �c'- rr-r 'T'-�-�-T-r-. �x'-7 4 x,. '�r_�, .�-s•;.. --i--�-1� '�s-� � � PLANS PREPARED BY: Z z � CSAi r - 5 < a - I a o - - µ` ms a CHARLES STECKLY ARCHITECTURE,Inc. _ r - '—r s- `? -rz.,�r .�_��� O ARCHITECTURE-PLANNING-DESIGN O O 5935 SOUTH ZANG STREET,SURE 280 r .' �.�4',. - �-� Z OFFICE:303.932.997 Y l-.i_ -13}SL rz:4 11-41 }�—L 7-•�-.S>�iT'�T�'_Y 1 T Y ti _Sr T i�",T`i � i'T� --- 17 O �J m LICENSURE NO: r T T -C'TIT.x.L r r� rL•--1`�'".T- lx--�� _ '3'T _�! SJ 'T1T7'ZL Ti - f.SiT"11'L1 L.t'il�'ll.S� DRAWN BY: CHK: APV: JDL TN CS ��_x'µ1 r`:� .;� ->*tT-,z7-•i--� .�'_r�'--- '-�� '''�T' CONSULTANT: m 3 v n O O U Z w a n SHEET TITLE: O U K ELEVATION �a �o SHEET NUMBER, �N jo i N co 'm A3 . 1 F' o Lo 1 SOUTH ELEVATION @ ALLEY 0 SCALE: 4' 2' 0 4' 2'-0' Vol 1•_0• ,'_D• venVn wireless VERIZON WIRELESS SERVICES 3'0 PIPE MOUNT WELDED 3131 S.VAUGHN WAY,SUITE 550 AURORA,Co 80014 TO EXISTING MOUNTING BENT PLATE HSS TO PL PROJECT INFORMATION: ST E NAME CO3 ASPEN SITE I.D. � 18rJ O 205 SOUTH MILL ST.#1 10 ASPEN,CO.81611 u3 NEW VERIZON WIRELESS ^ REV: DATE: DESCRIPTION: BY: OMNI ANTENNA U) A OSIM13 CD REVIEW JDL 2 N • W (E) BENT PLATE OVER CAP FLASHING a m (NOT AT NEW ANTENNA LOCATION) (E) PARAPET q LiI N_ -H HSS 1 1/2-X 1 1/2-X 3/16' SUPPORT RAIL MOUNTED TO (E) BUILDING BELOW 3"0 PIPE MOUNT L` HSS 1 1/2"X 1 1/2"X 3/16' WELDED TO EXISTING >: _ WELDED (TYP) MOUNTING PL +I 8 8' io I 2-3/8'0 PIPE to 1'-4' GUARDRAIL, PAINT BLACK TO MATCH (E) AND NEW PLANS PREPARED BY: MOUNTS (TYP) VALMONT CROSSOVER 2 PLAN DETAIL @ ANTENNA MOUNT REINFORCING 3 CALEB:" CSAi PLATE KR SCX7—U OR EQUIVALENT CNARLESSTECKLYARCHITECTURF Inu ARCHITECTURE-PLANNING-DESIGN V-4' NOTES: $935 SOUTH ZANG STREET,SURE 2110 1. VERIFY EXISTING MASONRY WALL NEW MAIN OVP ATTACHED LITTLETON,COLORADO 80127 CONSTRUCTION ASSEMBLY IN FIELD. NOT TO REINFORCED MOUNT WITH GUARD RAIL SUPPORT OFFICE 303.9329974 FAX 303.9326561 ARCHITECT PRIOR TO FABRICATION/INSTALL IF VALMONT #SCP1OW PIPE TO RE: A2.3 CONDITIONS VARY FROM DETAILS SHOWN. PIPE MOUNT OR SIM. LICENSURE No: PL TO L do 2. PAINT ALL NEW STEEL REINFORCEMENT, RE: 1/A4.1 L TO HSS 3/16' ANTENNAS & MOUNTING TO MATCH (E) PIPE GUARDRAIL TO EXTEND I ANTENNAS NEW RRH ATTACHED N 30' BEYOND ANTENNA EXTEND (E) VALMONT 1(EDAC OR SIM. REINFORCED MOUNT WTH MOUNTS (TYP) RE: 1&2/A4.0 HANDRAIL RE: 1/A4.1 SIM (TYP.) HSS 1 1/2"X 1 1/2-X (E) BENT PLATE OVER CAP (E) FLASHING 3/16' WELDED BENT (TYP) FLASHING (E) ROOF SHEATHING o MECHANICAL HSS 1 1/2'X 1 DUCT 3/16" SUPPORT RAIL RAIL MOUNTED TO (E) In BUILDING = HSS TO HSS DRAWN BY: CHK: APV: (TYP) T&B 3/16' JDL TN CS I N W HSS 1 1/2•X 1 1/2"x CONSULTANT: 9 3/16' WELDED BENT (TYP) 3 A2 HSS 1 1/2' x 1 1/2'x a 3/16' SUPPORT RAIL � EXISTING CMU WALL W/ - MOUNTED TO E BUILDING , o (TYP) TdcB O BRICK VENEER 15 �= Tt L w HILT] HR HY-20 SLEEVE z U) EPDXY ANCHOR, STAINLESS --.r T T �s�i , �� SHEETTmE: < O STEEL — PROVIDE 1/2' x 12" 1/2'0 MASONRY O O ANCHOR MUST E CENTERED 2 E WINDOW HEAD IN CMU CELL (TYP) ANCHORS O 24' O.C. A4.0 TQcB (E) REINFORCED ANTENNA (E) BRICK BUILDING DETAILS MOUNTS _m B a (E) WINDOW SYSTEM 3 6'-7' 17'-4' N N SHEET NUMBER: jd N Q� A4 . 0 °k 13 ANTENNA MOUNT REINFORCEMENT DETAIL SCALE: 1 PARTIAL ELEVATION DETAIL @ ANTENNA MOUNT REINFORCEMENT SCALE: 1 1/2'=1'-0' 3/8"=V-0" �a ven wireless Zo VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 AURORA,Co 80014 PROJECT INFORMATION: SITE NAME CO3 ASPEN SITE I.D. 185 205 SOUTH M I LL ST.#1 10 ASPEN,CO.81611 REV: DATE: DESCRIPTION: BY: A 09Y20/13 CD REVIEW JDL PLANS PREPARED BY: 6 NOT USED 4 NOT USED 2 NOT USED -! CSAi ,, CHARLES STECKLYARCNITECTURE,In c. ARCHITECTURE-PLANNING-DESIGN 5935 SOUTH ZANG STREET,SURE 290 3'0 PIPE WELDED TO UTTLET0N,C0 LORAD080127 MOUNTING PLATE OFFICE 303.932.9974 FA'303.932.656 1 LICENSURE NO: DRAWN BY: CHK: APV: JDL TN CS CONSULTANT: OVP 0 U Z W IL co a MOUNTING BRACKET SHEETTITLE: o PROVIDED BY U � MANUFACTURER E N DETAILS VALMONT #SCP10W PIPE 3 a TO PIPE CLAMP SET. c� N NII SHEET NUMBER: j N NEW 2 3/8-0 SC D40 ',..... '...,.. NOTE: RRH MOUNT IS a GALVANIZED MOUNTING SIMILAR PIPE (TYP.) A4 . aW m� yO 5 NOT USED 3 NOT USED 1 OVP MOUNTING DETAIL SCALE: Ea N.T.S. A-" \00000 veriMn wireless VERIZON WIRELESS SERVICES - IF 3131 S.VAUGHN WAY,SUITE 550 veriMn wireless AURORA,CO 80014 PROJECT CT INFORMATION SITE NAME CO3 ASPEN SITE I.D. 185 PROJECT: S M R-AW S 205 SOUTH MILL ST.#110 ASPEN,CO.81611 SITE NAME: CO3 ASPEN TOWER INFORMATION SITE I.D.#: 185 ADDRESS: 205 SOUTH MILL ST. #110 CONSULTANT ASPEN , CO. 81611 PROJECT DESCRIPTION VICINITY MAP DRAWING INDEX A 09/20/13 CD REVIEW JDL INSTALL(2)NEW OMNI ANTENNA ON NEW NON-PENETRATING ROOF SHEET DESCRIPTION C 09/30113 CLIENT COMMENTS JDL C 01/31/14 CD REVIEW SOK MOUNT.INCLUDE(2)NEW RRH AND(1)NEW OVP.INSTALL NEW T1.0 TITLE SHEET D 02/13/14 CLIENT COMMENTS SOK COAX AND EQUIPMENT. E 03/12/14 CO REVIEW SOK G1.0 GENERAL NOTES DIRECTIONS FROM VERIZON WIRELESS OFFICE:TAKE 1-225 TO 1-70 WEST.TAKE A1.0 SITE PLAN EXIT 195 TO MERGE ONTO CO-91 SOUTH.CONTINUE TO US-24 A2.0 EQUIPMENT PLANS EAST.TURN RIGHT ONTO EAST 9TH ST.TURN LEFT ONTO HARRISON AVE.TO CO-82 WEST.TURN RIGHT ONTO SOUTH 82 A2.1 ANTENNA PLAN&RF DATA ORIGINAL ST.TURN LEFT ONTO SOUTH MILL ST SITE WILL BE ON A3.0 PARTIAL NORTH ELEVATION RIGHT. F A3.1 PARTIAL SOUTH ELEVATION yh. � t �1 A4.0 DETAILS PROJECT DATA fig° Sr O A4.1 DETAILS JURISDICTION: CITY OF ASPEN �i• ZONING DESIGNATION: CC F, y ATTACHMENT LEGAL DESCRIPTION SITE OOq yh STRUCTURAL CALCULATIONS BY; LOT D,BLOCK 81, 205 S MILL ST,ASPEN CO �"v M.D.MILLER,P.E.DATED 03/11/2014 C7, OCCUPANCY GROUP: U CONSTRUCTION TYPE: V-B FULLY SPRINKLERED: NO �. cgs 1ff� -_ NO.OF STORIES: 2 GOVERNING CODES IF APPLICABLE: 2009 IBC,2009 IMC,20091FC,2009 IECC,2011 NEC, N 5935 SOUTH ZANG STREET,SUITE 280 LITTLETON,COLORADO 80127 A.D.A.COMPLIANCE: LAT: 39.18971 OFFICE:303.932.9974 THIS FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. LONG:-106.82 m 3 0 H a g� PROJECT TEAM v TITLE SHEET OWNER CLIENT SITE ACQUISITION RF ENGINEER ARCHITECT –°� MILL STREET VERIZON WIRELESS BRAD JOHNSON VERIZON WIRELESS CHARLES STECKLY,AIA PLAZA ASSOCIATES,LLC CONSTRUCTION ENGINEER BLACK&VEATCH CORP AIJAZ YOUSUF CSAi ate+ C/O M&W PROPERTIES CHAD WEBER 304 INVERSION WAY SOUTH 3131 S.VAUGHN WAY, 5935 S.ZANG STREET o ATTN:DEBBIE ROBERTS 3131 S.VAUGHN WAY SUITE 400 SUITE 550 SUITE 280 T 1 602 EAST COOPER AVE, SUITE 550 ENGLEWOOD,CO 80112 AURORA,CO 80014 LITTLETON,CO 80127 O N SUITE 202 AURORA,CO 80014 PHONE:303.229.4681 PHONE:303.873.2643 PHONE:303.932.9974 d ASPERCO 81611 CELL:303.503.6700 FAX:303.932.6561 ■ O 970.925.8032 C)CL flue• °���""' 1.DRAWINGS. .JOT TO BE SCALED,WRITTEN DIMENSIONS TAKE PRECEDE D THIS t SET OF PLANS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSED ONLY,UNLESS NOTED OTHERWISE THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE ven AMin wireless FURNISHING ALL MATERIALS,EQUIPMENT,LABOR,AND ANYTHING ELSE DEEMED NECESSARY ti TO COMPLETE INSTALLATIONS AS DESCRIBED HEREIN. VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 s 2.PRIOR TO THE SUBMISSION OF BIDS,THE CONTRACTORS INVOLVED SHALL VISIT THE JOB AURORA,CO 80014 SITE AND FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED •��.. PROJECT INFORMATION PROJECT,WITH THE CONSTRUCTION AND CONTRACT DOCUMENTS,FIELD CONDITIONS AND SITE NAME CONFIRM THAT THE PROJECT MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING a WITH CONSTRUCTION.ANY ERRORS,OMISSIONS,OR DISCREPANCIES ARE TO BE BROUGHT TO CO3 ASPEN THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING. SITE I.D. -� 185 ® I 3.THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH 205 SOUTH MILL ST.#110 CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE ASPEN,CO.81611 IW CONSTRUCTION DRAWINGS/CONTRACTDOCUMENTS. TOWER INFORMATION s 4.THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN.THE ".��� CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,METHODS, TECHNIQUES,SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. CONSULTANT �I..- Ali - 5.THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. 6.ALL WORK PERFORMED ON PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,REGULATIONS,AND ORDINANCES.CONTRACTOR LORAINE POWER SYSTEMS SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS,ORDINANCES,RULES,REGULATIONS MODEL 1211A2 AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY,MUNICIPAL AND UTILITY COMPANY EQUIPMENT ROOM ACCESS DOOR (6)24 VDC RECTIFIERS IN USE SPECIFICATIONS,AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE A 09120113 CD REVIEW JDL CONCEALED BY ARTWORK (1) 48 VDC IN USE B 09/30113 CLIENT COMMENTS JDL PERFORMANCE OF THE WORK. C 01131114 CD REVIEW SOK D 02/13114 CLIENT COMMENTS SOK 7.THE STRUCTURAL COMPONENTS OF THIS PROJECT SITE/FACILITY ARE NOT TO BE ALTERED E 03112114 CD REVIEW SOK 7 - VIEW OF ART CONCELING ACCESS DOOR 4 - PDF BY THIS CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. 8.ANTENNA SUPPORTING STRUCTURE IS UNDER A SEPARATE CONTRACT.THE CONTRACTOR SHALL ASSIST ANTENNA INSTALLATION SUBCONTRACTOR IN TERMS OF COORDINATION AND SITE ACCESS.ERECTION SUBCONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF PERSONNEL AND PROPERTY FROM HAZARDOUS EXPOSURE TO OVERHEAD DANGERS. 9.GENERAL CONTRACTOR SHALL PROVIDE AT THE PROJECT SITE A FULL SET OF CONSTRUCTION DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR THE USE BY ALL PERSONNEL INVOLVED WITH THE PROJECT. 10.DETAILS INCLUDED HEREIN ARE INTENDED TO SHOW END RESULT OF DESIGN.MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS OR SITUATIONS,AND SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE SCOPE OF WORK. 11.THE FACILITY IS CELLULAR RADIO EQUIPMENT AND ANTENNAS. may ' 12.THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING I► IMPROVEMENTS,EASEMENTS,PAVING,CURBING,ETC.DURING CONSTRUCTION UPON .� COMPLETION OF WORK.CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE — - OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE PROPERTY. 13.CONTRACTOR SHALL ENSURE THE GENERAL WORK AREA IS KEPT CLEAN AND HAZARD • � FREE DURING CONSTRUCTION AND DISPOSE OF ALL DIRT,DEBRIS,RUBBISH AND REMOVE r EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY,PREMISES SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT SPOTS,DUST,OR SMUDGES OF ANY NATURE. 14.THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION AND laa w •_ -;•, °_ CONTRACTORS BIDDING THE COMPLETE HE JOB ARE NEVERTHEL SCAUT CAUTIONED HAOT MINOR OMISSIONS INSTALL 2 NEW NON-PENETRATING rte" 10OG33 1600A N OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE SAID ROOF MOUNT W/NEW ANTENNAS SN:X - CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH PLUS &OVP (12)TOOTAL TAL 4 THE INTENT OF THESE DOCUMENTS.THE BIDDER SHALL BEAR THE RESPONSIBILITY OF mm RE:A2..1 1 - - INSTALL DATE:12.09.05 NOTIFYING(IN WRITING)THE ARCHITECT/ENGINEER OF ANY CONFLICTS,ERRORS,OR OMISSIONS PRIOR TO THE SUBMISSION OF CONTRACTOR'S PROPOSAL.IN THE EVENT OF 5935 SOUTH ZANG STREET,SUITE 280 DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, LITTLETON,COLORADO 80127 - PROPOSED EQUIPMENT LOCATION 3 - BATTERY UNLESS DIRECTED OTHERWISE. OFFICE:303.932.9974 15.SPECIAL INSPECTION TESTING REQUIRED SPECIAL INSPECTIONS SHALL BE PERFORMED BY 3 _ CONTRACTOR SHALL VERIFY ALL PLANS AND EXISTING DIMENSIONS AND CONDITIONS ON THE AN INDEPENDENT SPECIAL INSPECTOR PER SECTION 1701 OF THE UNIFORM BUILDING CODE ,t JOB SITE AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES (UBC)FOR THE FOLLOWING: BEFORE PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME, O A.CONCRETE:DURING THE TAKING OF CONCRETE TEST SPECIMENS AND PLACING o CALL BEFORE YOU DIG-COLORADO LAW REQUIRES 3 WORKING DAYS NOTICE FOR STRUCTURAL REINFORCING AND STRUCTURAL CONCRETE,VERIFY REINFORCING SIZE, 'z ` CONSTRUCTION PHASE. PLACEMENT AND GRADE. 0- a THESE DRAWINGS MAY NOT SHOW ALL UNDERGROUND PIPING AND UTILITIES.THE CONTRACTOR B.BOLTS,AND ANCHORS IN CONCRETE HOLD-DOWN ANCHOR BOLTS,INSPECT SIZE,LENGTH, o SHALL EXERCISE EXTREME CARE DURING ALL EXCAVATION AND OTHER CONSTRUCTION TYPE(EXPANSION,EPDXY)AND SPACING. cv ACTIVITIES. N n UTILITY NOTIFICATION CENTER OF WYOMING-1-800-849-2476 �N GENERAL NOTES VERIZON WIRELESS IS RESPONSIBLE FOR ALL UTILITY LOCATES AND UTILITY RELOCATIONS UNDERGROUND SERVICE ALERT 3¢ 1 +C REQUIRED FOR THIS INSTALLATION.VERIZON WIRELESS WILL SCHEDULE AND COORDINATE ALL UTILITY NOTIFICATION CENTER OF COLORADO "- WORK WITH THE OWNER TO ENSURE NO DISRUPTION TO OWNERS OPERATIONS. 1-800-922-1987 N N > CORE DRILL NEW ENTRY PORT. WWW.UNCC.ORG SUBCONTRACTORS SHALL VERIFY ALL PLANS&EXISTING DIMENSIONS&CONDITIONS ON THE JOB ROUTE NEW HYBRID THROUGH RE: SITE&SHALL IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE 3 WORKING DAYS UTILITY NOTIFICATION PRIOR TO CONSTRUCTION 2/A2.0 PROCEEDING WITH THE WORK OR BE RESPONSIBLE FOR SAME G1 . 0 o c-'I0 5 - ENTRY PORT 2 - GENERAL CONTRACTOR NOTES 1 - GENERAL NOTES �a HYBRID CABLE LENGTH FROM MAIN OVP @ HYBRID CABLE LENGTH FROM MAIN OVP @ ANTENNAS TN eNODE EQ. ROOM TO MAIN OVP @ ANTENNAS TO SECTOR REMOTE RADIO HEADS B verimn wireless ¢ VERIZON WIRELESS SERVICES Wm J 3131 S.VAUGHN WAY,SUITE 550 SIZE LENGTH QTY. NOTES SECTOR SIZE LENGTH OTY. NOTES (2) 1/2" COAX AURORA,CO 80014 1X1 HYBRID RRH AWS PROJECT INFORMATION MOUNT MAIN OVP TO PIPE MAST OF MAIN OVP O 6X12 MAIN OVP O X SECTOR SITE NAME X 1X1 6'-0" (1) NEW NON-PENETRATING ROOF MOUNT SHELTER HYEIRID CAtj[E`__ ANTENNAS (2) 1/2" COAX RE:1/A4.0 106 L.F. 1X1 HYBRID RRH AWS CO3 ASPEN MOUNT MAIN OVP TO PIPE SITE I.D. MAST OF NEW MOUNT MAIN OVP TO PIPE MAST OF 185 6X12 106'-0" (1) NON-PENETRATING ROOF X 1X1 15'-0" (1) NEW NON-PENETRATING ROOF MOUNT 205 SOUTH MILL ST.#110 MOUNT RE:1/A4.0 ASPEN,CO.81611 RE:1/A4.0 TOWER INFORMATION 3 HYBRID CABLE CHART 2 HYBRID CABLE DIAGRAM CONSULTANT A 09/20/13 CD REVIEW JDL ACCESS LADDER TO ROOF B 09(30/13 CLIENT COMMENTS JDL C 01/31114 CD REVIEW SOK D 02/13114 CLIENT COMMENTS SOK VERIZON WIRELESS EQUIPMENT E 03112/14 CDREVIEW SOK ROOM WITH ACCESS IN LOWER NSRESTROOMS BEHIND ART RE A2.0 f NppK"NS 4VE HORIZONTAL HYBRID CABLE ROUTE IN CEILING. ATTACH TO COAX O 4'-0" O.C. MIN x INSTALL (2) NEW NON-PENETRATING ROOF MOUNT W/ GPS ANTENNA, (2) 2 NEW RRH AND (1) NEW OVP — MOUNTED TO PIPE MAST RE: 2/A2.1 _ _ _ COURTYARD & 1/A4.0 —� 1 � PROVIDE 2HR MASONRY FIRE Q TOPPING AT PENETRATION 2 FIBER CONDUIT \ I EQUIPMENT (TYP.) NEW HYBRID CABLE IN O U NEW 4" CONDUIT FOLLOW (E) COAX ROUTE FROM EQUIP ROOM APPROX 100 Q a Q L.F.�E: A2.1 I \— — — — — — — /'i 0 � BUILDING VERIZON WIRELESS \ `Y CONDENSING UNITS 5935 SOUTH ZANG STREET,SUITE 280 LITTLETON,COLORADO 80127 (6) VERIZON WIRELESS OMNI OFFICE:303.932.9974 ANTENNAS RE: A2.1 m 3 c 0 5 U) Z U) V Q O J U G t2i1 n d" N NOTE SITE PLAN ALL ITEMS EXISTING U.N.O. y N N� O a`o NORTH Al . 0 11 ry SCALE: 16' 8' 0 16' �o 1 SITE PLAN 1,16~=L1- ~ ve✓r-i Mn wireless VERIZON WIRELESS SERVICES '. 3131 S.VAUGHN WAY,SUITE 550 I AURORA,CO 80014 GROUND BAR < -- - - PROJECT INFORMATION N SITE NAME CO3 ASPEN r SUPERCELL SUPERCELL x w i' ppF SC 4812 FIBER/ SC 4812 A/C SITE I.D. 185 w ROUTER 205 SOUTH MILL ST.#110 7. m 2' 9- 2'-8- 6 2'-8" V-9- 8- 2'-8- 2'-6- ASPEN,CO.81611 TOWER INFORMATION 0 m n 2'-0" 4'-7- SERVICE DISCONNECTS INSTALL NEW AWS a of I eNODE B IN NEW HEAVY DUTY FRAME Al LTE CONSULTANT NODE B PORT ENTRY--,, I-- INSTALL NEW MAI eNODE B \ O o OVP IN TOP OF I N FRAME O \ r1 � j.., COLUMN � lr�tJ ;;: �j � s-� POLYPHASER TRANSFORMER L „ll PORT W/ (7) 7/8• COAX & FILTER O A 09/20/13 CD REVIEW JOL n FIBER PORT H MEN'S mTHRU WALL 4'-1- 1'-9" x� 13'-1- ROOM B 09/30/13 CLIENTCOMMENTS JDL FE & MSDS C 01/31/14 CD REVIEW SOK 1- 1'-10" ^ / D 02/13/14 CLIENT COMMENTS SOK J-BOX / E 03/12114 CO REVIEW SOK TELCO AC CONTROL ART CONCEALING LIC0 BOARD / ACCESS DOOR N ID NOTE MANUAL ALL ITEMS ARE VIEW OF COAX ROUTE&NEW HYBRID CABLE ROUTE 200A 10 TRANSFER EXISTING UNLESS SWITCH NOTED OTHERWISE 18'-11- PANEL NORTH 1 EQUIPMENT PLAN SCALE 2' V 0 2' vz•• NEW 6GA TO PDF 4 WAY CPS FROM MAIN OVP SPUTTER W/ (1) (7) 7/8- COAX APPROX 23 L.F. PORT AVAILABLE POLYPHASER NEW CORE DRILL O O RE: A1.0 FOR 6GA ROUTING • _ _ _.. _. NEW FIBER TO AW INACTIVE COAX POLYPHASER eNODE B FROM TO CPS - MAIN OVP APPROX COLUMN COAX ENTRY PORT AND POLYPHASER DIAGRAM 6 L.F. a _ - p�p a O to 5935 SOUTH ZANG STREET,SUITE 280 COAX ENTRY IN —FIBER— LITTLETON,COLORADO 80127 WALL/ CLG OFFICE:303.932.9974 60 6.12 x12 6 2 NEW MAIN OVP IN 0 \ TOP OF RACK 0 LIGHTS (TYP) ° _q 12- CABLE TRAY o 'c_ (TYP.) v uj en U O � 7.. p v2i E EQUIPMENT PLANS NOTE N O ALL ITEMS ARE 18-11• g'-8" NOTED OTHERWISE EXISTING UNLESS o� VIEW OF COAX ENTRY PORT AND POLYPHASER A 2 00 NORTH SCALE: . 0 �0 2 REFLECTED CEILING PLAN z 1' o z' A )JLL 4 verimn wireless VERIZON WIRELESS SERVICES (3) 7/8" COAX 3131 S.VAUGHN WAY,SUITE 550 ROUTED THROUGH AURORA,CO 80014 System No. CAJ1014 CONDUIT (Formerly System No. 133) PROJECT INFORMATION F Rating — 2 Hr COAX, FIBER & SITE NAME T Rating — 0 Hr REFRIGERANT CO3 ASPEN Rating At Ambient — Less Than 1 CFM/sq ft (See Item 4) 2 LINES ROUTED I SITE I.D. Rating At 400 F — Less Than 1 CFM/sq ft (See Item 4) A EXISTING VERTICAL 185 Section A—A CONDUITS (TYP.) 205 SOUTH MILL ST.#110 ASPEN,CO.81611 1. Floor or Wall Assembly — Min. 3-1/4 in. thick reinforced lightweight or normal weight VERIZON WIRELESS ROOFTOP TOWER INFORMATION (100-150 pcf) concrete. Wall may also be constructed of any UL Classified Concrete CONDENSING UNITS Blocks'. Max, diameter of circular opening is 6 in. TRANE MODEL 4N84060Et0008A 2 See Concrete Block (CAZT) category in the Fire Resistance Directory for names of (4) 7/8" COAX ( ) manufacturers. ROUTED Through Penetrations — One metallic pipe or conduit to be centered within the firestop THROUGH - system. A nominal annular space of 3/4 in. is required within the firestop system. Pipe CONDUIT ,,--ROOFTOP EQUIPMENT (TYP) CONSULTANT of conduit to be rigidly supported on both sides of floor or wall assembly. The following 3' types and sizes of metallic pipes or conduits may be used: A. Steel Pipe — Nom 4 in. diameter (or smaller) Schedule 10 (or heavier) steel pipe. GPS 4 B. Conduit — Nom 4 in. diameter (or smaller) steel electrical metallic tubing or steel 0 TE conduit. Packing Material — Min. 4 pcf mineral wool bott insulation firmly packed into opening as a CELL ❑ permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as require to accommodate the required thickness of fill material. Min PCS thickness of packing material in floors and walls to be 2-3/4 in. and 2-1/4 in., PCS A 09/20113 CDREVIEW JDL respectively. 6', . 8 09/30/13 CLIENT COMMENTS JDL Fill,Void or Cavity Material+ — Sealant — Min 1/2 in. thickness o fill material applied within g LTE c. 01/31114 CDREVIEW SOK annulus, flush with top surface of floor or with both surfaces of wall. As an alternate, the 101-0, 0 CELL D 02n3114 CLIENT COMMENTS SOK permanent forming material (Item 3) may be omitted if the fill material thickness is E 03112/14 CD REVIEW SOK increased to a min 1-1/2 in. 8'-7- 4'—>" • Bearing the UL Classification Marking Minnesota Mining & Mfg. Co. — Types FB-2000, FB-2000+, FB 2003 (floors only). (Note: L Ratings apply only when FB-2000+ is used.) NORTH 4 2 HR FIREPROOFING 2 EXISTING ANTENNA CONFIGURATION SCALE: 5' 3'2'1'0 5' 3/16"=1'-0" NEW 12" NON— PENETRATING CABLE NEW RRH TRAY SIM TO SITE PRO NEW AWS OMNI ANTENNA PN/SP1542 1. GENERAL: PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS NECESSARY FOR RECEIVING, INSTALLING, TESTING NEW HYBRID CABLE AND ADJUSTING ANTENNA CABLES FROM THE ANTENNA TO THE CONNECTORS AT THE BASE TRANSMISSION TO MAIN OVP SYSTEM (BTS). THIS SHALL INCLUDE ALL EQUIPMENT SHOWN OR REQUIRED FOR A COMPLETE OPERATING APPROX 106 L.F. SYSTEM. ANTENNA, ANTENNA CABLES, CONNECTORS, AND FITTINGS SHALL BE THIRD PARTY FURNISHED a (2) NEW NON—PENETRATING COMPONENTS AS SHOWN ON THE BILL OF MATERIALS. ROOF MOUNT (NO BALLAST (3) 7/8" COAX � REQUIRED SITE PRO #TRPD—HD 2. MATERIALS ROUTED THROUGH Z OR SIM. CONDUIT RE: 1&2/A4.0 A. ANTENNA CABLES: AS SCHEDULED B. ANTENNA CONNECTORS: AS SCHEDULED COAX. FIBER & I NEW RRH C. CABLE HANGERS: INSTALLED AT MAXIMUM 4' SPACING REFRIGERANT 412 NEW AWS OMNI LINES ROUTED IN D. GROUNDING KITS: AS SPECIFIED (E) VERTICAL NEW MAIN OVP CONDUITS (TYP.) N 0�0" 3. INSTALLATION °D ATTACH NEW •5935 SOUTH ZANG STREET,SUITE 280 A. ANTENNA CABLE LENGTHS SHALL BE FIELD MEASURED PRIOR TO PURCHASE OF CABLE. INSTALLER SHALL - HYBRID CABLE TO LSOUTH ZA COLORADO 80127 NOTIFY VERIZON WIRELESS OF THE OVERALL LENGTH REQUIRED. NEW 4" CONDUIT ° INSIDE OF OFFICE:COLORADO B. CABLES SHALL BE LABELED IN ACCORDANCE WITH VERIZON WIRELESS SPECIFICATIONS. VERT TO ROOF. o PARAPET ON (E) C. ALL OUTSIDE CABLE CONNECTIONS SHALL BE COVERED WITH WEATHERPROOFING TAPE. PAINT TO MATCH ^/ CONDUIT MOUNT D. THE MINIMUM BENDING RADIUS FOR ALL ANTENNA CABLES SHALL BE AS SHOWN BELOW OR AS PER THE (E) BUILDING.O.C. VERT. W/ VERIZON WIRELESS ROOFTOP m MANUFACTURER, WHICHEVER IS MORE CONSERVATIVE: ATTACH 4'-0" _ CONDENSING UNITS o CABLE IN AIR / CABLE TRAY IN CONDUIT CONDUIT CLAMPS (TRANE MODEL i1' 4N84060E10008A) NOTES: m 1/2" 5" 10" & MASONRY ROOFTOP EQUIPMENT 1. ADD (2) AWS OMNI ANTENNAS. U) ANCHORS (TYP) 2. SITE WILL NEED RRH FOR AWS NEAR U 7/8" 10" 18" ° (TYP') THE ANTENNAS. Z 1 5/8" 20" 28" GPS 3. ADD HYBRIFLEX CABLE AND RAYCAP U) E. CABLES SHALL BE INSTALLED WITH THE MINIMUM NUMBER OF BENDS. CABLES SHALL NOT BE LEFT LTE ❑ UNITS TO SUPPORT RRH. M UNTERMINATED IN THE FIELD. 4. PAINT NEW ANTENNAS, OVP AND RRH O CELL BLACK TO MATCH (E) ANTENNAS. Of F. GROUNDING KITS — AFTER INSTALLATION OF GROUND STRAPS, THE CONNECTION SHALL BE MADE WEATHER REMOUNT PCS 5. ROUTE HYBRIDFLEX CABLE WITH (E) 2 E TIGHT USING WEATHERPROOFING KITS AS IDENTIFIED ABOVE. GROUND PIGTAILS SHALL BE BROUGHT OUT IN CONDUIT TO 6'-4. COAX APPROX 100 L,F N� THE DOWNWARD DIRECTION FROM THE CONNECTIONS TO THE ANTENNA CABLE WITHOUT ANY SHARP BENDS BRICK FACADE 6',9" PCS 6. RE: 2&3/A1.0 FOR HYBRID CABLE ANTENNA PLAN & d N (MINIMUM BEND RADIUS 10") AND CONNECTION SHALL BE MADE TO GROUNDING SYSTEM. WITH MASONRY DIAGRAM AND INFORMATION d� TIES PAINT TO 10•— 7. REFER TO STRUCTURAL INFORMATION RF DATA 3� MATCH BUILDING 0" LTE CEL FROM M.D. MILLER DATED 03/11/14 No 41' 3, 8•\7- 8. ALL ITEMS EXISTING U.N.O. y`"' (fJ FlgHO 4'-7- � L 4' 6, �? A2 . 1 m� NORTH O 3 ANTENNA NOTES AND REQUIREMENTS 1 1 PROPOSED ANTENNA CONFIGURATION SCALE: 5' 3'2'1'0 5' �a ven wireless NOTES: VERIZON WIRELESS SERVICES 1. PAINT ALL NEW ANTENNAS, OVP 3131 S.VAUGHN WAY,SUITE 550 AND RRHS BLACK TO MATCH AURORA,CO 80014 ( E UNTING HARDWARE AND PROJECT INFORMATION 2. ALL ITEMS ARE EXISTING SITE NAME UNLESS NOTED OTHERWISE CO3 ASPEN SITE I.D. 185 205 SOUTH MILL ST.#110 ASPEN,CO.81611 (6) (E) VERIZON WIRELESS OMNI INSTALL (2) NEW VERIZON TOWER INFORMATION ANTENNAS. RE: A2.1 WIRELESS OMNIS FOR TOTAL OF (8) OMNI ANTENNAS RE: A2.1 (2) NEW RRH do (1) MAIN OVP MOUNTED TO NEW NON-PENETRATING ROOF MOUNT RE: A2.1 CONSULTANT ROOFTOP EQUIPMENT (TYP.) PS ANTENNA A 09/20/13 CD REVIEW J B 09/30/13 CLIENT COMMENTS JDL C 01/31/14 CD REVIEW SOK D 02/13114 CLIENT COMMENTS SOK FF E 03/12/14 CO REVIEW SOK N ROOF ACCESS z LADDER O z z RESTAURANT DECK z Li ON NW CORNER OF z I a BUILDING I a '00 z z z o io Z vO 1 C9 a O m z I O v o 0 o p m r r I m O M r O r 000 RAILING 5935 SOUTH ZANG STREET,SUITE 280 LITTLETON,COLORADO 80127 OFFICE:303.932.9974 m 3 a 0 a1 m to O U z W a 0 O U Of 2 E PARTIAL NORTH ELEVATION 00 C N d �N o� A3 . 0 aw 1 PARTIAL NORTH ELEVATION SCALE: �o a' r 0 a' venZjn wireless VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 AURORA,CO 80014 PROJECT INFORMATION SITE NAME CO3 ASPEN SITE I.D. 185 205 SOUTH MILL ST.#110 ASPEN,CO.81611 TOWER INFORMATION NOTES: 1. PAINT ALL NEW ANTENNAS. OVP AND RRHS BLACK TO MATCH (E) MOUNTING HARDWARE AND CABLE 2. ALL ITEMS ARE EXISTING CONSULTANT INSTALL (2) NEW OMNIS FOR (6) (E) VERIZON WIRELESS OMNI UNLESS NOTED OTHERWISE NEW MAIN OVP do RRH ATTACHED TOTAL OF (8) OMNI ANTENNAS RE: ANTENNAS RE: A2.1 TO NON-PENETRATING ROOF MOUNT A2.1 NO BALLAST REQUIRED. PAINT TO MATCH EXISTING ANTENNAS. NEW RRH ATTACHED TO RE: 1/A4.0 NON-PENETRATING ROOF MOUNT. PAINT TO MATCH EXISTING ANTENNAS RE: 1/A4.0 A 09/20/13 CD REVIEW JDL REMOUNT CONDUIT TO B 09/30/13 CLIENT COMMENTS JDL BRICK FACADE WITH C 01/31/14 CD REVIEW SOK MASONRY TIES PAINT TO D 02/13/14 CLIENT COMMENTS SOK MATCH BUILDING E 03/12/14 CD REVIEW SOK AN I TuiumuLi Val 2 Z z z W W � CO z O I a W Z a � o 0 o z � i 0 O J I j N M M O r 5935 SOUTH ZANG STREET,SUITE 280 LITTLETON,COLORADO 80127 OFFICE:303.932.9974 3 a M V) U Z W a U) a m O U Cf 2 E PARTIAL SOUTH a ELEVATION �a N O N d _o A3 . 1 aW SCALE: �q 1 PARTIAL SOUTH ELEVATION Ca ALLEY 4' 2' 0 4' ve ri Mn wireless VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 AURORA,CO 80014 NEW NON-PENETRATING ROOF MOUNT (NO PROJECT INFORMATION BALLAST REOUIRED). SITE PRO /TRPH-HD OR SITE NAME SIM (TYP) CO3 ASPEN SITE I.D. NEW MAIN OVP & RRH ATTACHED TO 185 NON-PENETRATING ROOF MOUNT WITH VALMONT 205 SOUTH MILL ST.#110 #DAC MOUNT OR SIM. - RE: A4.1 ASPEN,CO.81611 TOWER INFORMATION NEW RRH ATTACHED TO NON-PENETRATING ROOF MOUNT WITH VALMONT #SCP1OW PIPE TO PIPE MOUNT OR SIM. - RE: A4.1 NEW 12" NON-PENETRATING CABLE O CONSULTANT TRAY SIM TO SITE PRO PN#SP1542 0 A 09/20113 CD REVIEW JDL 5 09/30113 CLIENT COMMENTS JDL C 01/31/14 CD REVIEW SOK D 02/13/14 CLIENT COMMENTS SOK E 03112/14 CD REVIEW SOK 2 PLAN DETAIL @ ANTENNA SCALE: N.T.S NEW VERIZON WIRELESS OMNI ANTENNA RE: A2.1 (TYP) I 2 3/8" SCH 90 GALV PIPE NEW MAIN OVP & RRH ATTACHED TO NON-PENETRATING ROOF MOUNT WITH VALMONT #DAC MOUNT OR SIM. 5935 SOUTH ZANG STREET,SUITE 280 RE: A4.1 LITTLETON,COLORADO 80127 OFFICE:303.932.9974 m a O 0 4 0 U 2 W 0) Q O U of NE SET FRAME ON 1/2' ISOLATION PAD ON ROOF DECK DETAILS d N >N� V N O v N �N `m (E) ROOF ASSEMBLY d� aw A4 . 0 11 m SCALE: ry0 1 ELEVATION DETAIL @ ANTENNA N.T.S. �a veriA-Mn wireless VERIZON WIRELESS SERVICES 3131 S.VAUGHN WAY,SUITE 550 AURORA,CO 80014 PROJECT INFORMATION SITE NAME CO3 ASPEN SITE I.D. 185 205 SOUTH MILL ST.#110 ASPEN,CO.81611 TOWER INFORMATION CONSULTANT A 09/20/13 CD REVIEW JDL B 09/30/13 CLIENT COMMENTS JDL C 01/31/14 CD REVIEW SOK 0 02/13/14 CLIENT COMMENTS SOK E 03/12114 CD REVIEW SOK 6 NOT USED 4 NOT USED 2 NOT USED PIPE AT TRIPOD MT. r 5935 SOUTH ZANG STREET,SUITE 280 LITTLETON,COLORADO 80127 OFFICE:303.932.9974 OVP 3 v rn O Z W a rn a MOUNTING BRACKET 0 PROVIDED BY U MANUFACTURER It "E DETAILS a� VALMONT /SCP10W PIPE 3 a TO PIPE CLAMP SET. cv 00 N NEW 2 3/8"0 SCD40 NOTE: RRH MOUNT IS GALVANIZED MOUNTING SIMILAR o� PIPE (TYP.) A4 .w �0 5 NOT USED 3 NOT USED 1 OVP MOUNTING DETAIL SCALE: F'o CL N.T.S. wireless CO3 ASPEN VIEW 1-WEST FROM S. MILL ST. 1 � Q ZLU L�J ^ O.O)cl)o N W o V W o ce PROPOSED CONDITIONS-(2)NEWANTENNAS, (2)RRH, OVP Property of PREPARED BY CHARLES STECKLY ARCHITECTURE INC. (This photo simulation is for illustrative purposes only) M.D. MILLER P.E., P.T. LTD. PHONE: 303.901.6296 FAX: 303.526.2706 VERIZON WIRELESS SITE: CO3 ASPEN 205 SOUTH MILL ST #110 ASPEN, CO 81611 03/11/14 PREPARED FOR: il F 5935 S. ZANG ST. °• SUITE 280 ��,.••,.......••'���� LITTLETON, CO. 80127 3/11/2K14 MARVIN MILLER P.E. 2009 IBC VERIZON WIRELESS SITE 185 75 PSF SNOW CO3 ASPEN 90 MPH V3 S EXP B 205 SOUTH MILL ST. #110 ASPEN, CO. 81611 03/03/14 1 ' F = qz G CF AF 20' 15' - 4" qZ= (12.8 - 6.7) 1.53 G = 1.53 Cv= RND = 1.2 0= 1.3 Ai= 1.31 RND =2.50 RND = 63.3 #/SF 0 8' PSF = 78.54 #/SF 0 5' W = (63.3'8)+(78.54"5)-(417.2"2.92)- PLAN (41.2 ' 2.92) 30.34 SQFT W = (506.48)+(392.7)-(1216.2)-(120.3) W = -437 NO BALLAST REQUIRED OK 7' - 2 3/4" 46'8" 5'10' 458.4 # / 30.34 SQFT 2.7" O.D. = 15.1 PSF 41.2 #SF / 105 = 14.3% 24.2# 1'3" x i'3" x 8.2" 50# RRH THIS ADDITIONAL LOAD IS SEVERAL 343# TRI-POD MOUNT FEET AWAY FROM EXISTING ROOF LOADS AND IS 327 LESS PER SF.FT. THAN EXISTING LOADS. ASSUMING SAME ROOF CONSTRUCTION THIS IS ORIGINAL ROOF LOAD 75 ROOF SNOW LOAD 15 15 105 PSF BLACK & VE H Building a World of difference: December 5, 2013 Via FedEx Delivery Attn: Sara Nadolny City of Aspen Community Development Dept. 130 S. Galena, Aspen, CO 81611 RE: Wireless Telecom Application Site Address: 205 S. Mill Street, Aspen, CO Parcel #: 273707338004 Verizon Wireless Site Name: CO3 Aspen (AWS) Dear Sara, I am writing to you on behalf of Verizon Wireless which has a wireless communications facility located on or within the Property at the above referenced location. Verizon Wireless would like to modify its antennas on the existing site and enclosed 2 copies of the necessary application and submittal requirements per a pre-application meeting held on 10/10/13. 1 have enclosed the following: 1. Land Use Application 2. Dimensional Requirements Form 3. Agreement for Payment Form 4. Check for$975.00 5. Letter of Authorization 6. Pre-Application Meeting Summary 7. Assessor's Property Detail 8. Detailed Project Narrative 9. Vicinity Map 10. RF Compliance Letter 11. Photo Simulations 12. Drawings with Elevations 13. Signed Consent Letter for the modifications from the Property Owner Please let me know if you need anything else in order to process this application. I can be reached at 303-229-4681 or via email at JohnsonBW2 @BV.com. Sincerely, Brad Johnson Sr. Site Acquisition &Zoning Specialist Black and Veatch Corporation Consultant to Verizon Wireless RECEIVED Site Name:CO3 Aspen(AWS) Page 1 of 1 DEC 0 6 2013 CITY OF ,ASPEN COMMUNITY DEIIELOPMENI BLACK & VEATCH Building a World of difference: City of Aspen - Wireless Telecom (Administrative) - 11/15/13 Verizon Wireless - Antenna Modification - CO3 Aspen WIRELESS TELECOM - LETTER OF INTENT Property Owner Applicant Applicant's Representative Mill Street Plaza Associates, LLC Verizon Wireless Black&Veatch Corp. c/o M&W Properties 3131 S. Vaughn Way, Suite 550 304 Inverness Way South, Suite 400 602 E. Cooper Ave., Suite 202 Aurora, CO 80014 Englewood, CO 80112 Aspen, CO 81611 Attn: Debbie Essert Attn: Brad Johnson Attn: Debbie Roberts (303) 229-4681 JohnsonBW2@BV.com Site Name: CO3 Aspen (AWS) Site Address: 205 S. Mill Street, Aspen, CO 81611 Equipment Area: 402 sq. ft. + Space on Rooftop for Antennas Parcel Area: 18,000+/- sq. ft. Parcel #: 273707338004 Zoning: Commercial Core Historic District (CC) Process: Administrative Wireless Telecom Planner: Sara Nadolny Request: Administrative Wireless Telecom approval to allow the addition of two (2) omni/whip antennas, cables and equipment on an existing building rooftop in the CC Zone District. Request & Justification Verizon Wireless, the nation's largest wireless telecommunication provider with over 116 million subscribers, is in need of upgrading its antennas at an existing facility located at the above referenced site in order to ensure that adequate and uninterrupted service is maintained at all times per their License Agreement with the Federal Communications Commission (FCC) as well as provide the residents, businesses, and traveling public in the area with new and faster voice and data services. This site remains a critical component to the overall network and carries a high volume of call traffic every day making this an important site to receive these technological upgrades. Given this site is located on a building in the CC District, an administrative Wireless Telecom application shall be required to add antennas and equipment to the existing facility. Modification Design & Details The proposed installation shall consist of adding two (2) new omni/whip antennas on the building rooftop increasing the current total number of antennas from six (6) to eight (8) antennas. The existing antennas measure anywhere from 42" long by 2" in diameter to 79.2" tall by 4.6" in diameter. The two new antennas measure 70" tall by 2.7" in diameter. All new antennas shall be painted to match the existing antennas (black). Two (2) new equipment cabinets are also proposed. The new cabinets will be located inside the existing equipment room inside the building and shall not be seen from outside the building whatsoever. In addition, two (2) new cables linking the new omni/whip antennas to the equipment inside the building is required and will be run inside existing conduit. Three (3) new equipment boxes are required for the new antennas. Two of these boxes shall be located directly below the antennas and measure approximately 15" tall by 15" wide and 8" deep. The third box will be located between the two new antennas ap mess. a oximately 19" tall by 16" wide and 10" deep. All of these equipment boxes located near the 64A 4A painted to match the antennas. ( 62013 L11, R 3t si.Ld�iii tr Site Name:CO3 Aspen(AWS) Page 1 of 5 BLACK & EATCH Building a world of difference' Compliance with the City Land Use Code Section 26.304. Common Development Review Procedures Sec. 26.304.010. General. A pre-application meeting was held with Sara Nadolny on 10110113. An application for Administrative Wireless Telecommunications has been enclosed and is submitted for review and approval by the City of Aspen. A Building Permit shall be applied for when the zoning approval has been received. In addition, since this site is within a Historic District, Verizon Wireless is required to file a Section 106 for NEPA/SHIPO approval. Sec.26.304.020. Pre-Application Conference. A pre-application meeting was held with Sara Nadolny on 10110113. Sec.26.304.030. Application & Fees. The required application fee has been included as part of this application. The following items have been enclosed as part of this application: 1) Letter of Authorization from Verizon Wireless & Letter of Consent from the underlying property owner. 2) Property identification information. 3) Assessor's Information. 4) Vicinity Map. 5) Site Plan drawings with elevations. 6) A site improvement survey is not required. Facility is both on the building rooftop and contained within the existing building. 7) Letter of Intent demonstrating compliance with all relevant Land Use Codes. 8) Signed Fee Agreement. Sec. 26.304.040. Initiation of Application for Development Order. Black & Veatch Corp. is making this application, as authorized representative, on behalf of Verizon Wireless who has an active lease with the property owner of record that was entered into on June 11, 1991 and later amended on Oct. 6, 1999 and April 19, 2012. Sec. 26.304.050. Determination of Completeness and Review by the Community Development Director. An application for Administrative Review has been enclosed for review by the Community Development Director. This request shall not require public hearing review. Sec. 26.304.060. Review of a development application by decision-making bodies. An application for Administrative Review has been enclosed for review by the Community Development Director. This request shall not require public hearing review and is considered a permitted use in the CC District. Sec. 26.304.070. Development Orders. Sec. 26.304.075. Building Permit. A Building Permit shall be applied for once approval has been received from the Community Development Director. Section 26.575.130 Wireless Telecommunications Services Facilities & Equipment A. Intent and purpose. The existing facility and proposed modifications shall be compatible with the surrounding development and sensitive to and in scale and harmony with the character of the area. This shall continue to be accomplished through minimizing the visual, aesthetic and safety impacts of the facility through careful design, siting and antenna style choice. The existing facility makes use of a building in which the antennas have been attached to and the equipment has been placed inside the building. Site Name:CO3 Aspen(AWS) Page 2 of 5 L71 BLACK & VEA H Building a World of difference' B. Applicability. The proposed modifications to an existing wireless telecommunications facility shall continue to comply with all requirements for such facilities as listed in Section 26.575.130 of the City's Land Use Code. All necessary permits and approvals shall be obtained. C. Procedure. A pre-application meeting was held with Sara Nadolny on 10110113. An application for Administrative Wireless Telecommunications has been enclosed and is submitted for review and approval by the City of Aspen. A Building Permit shall be applied for when the zoning approval has been received. This facility is not located on a building of historical significance but is zoned CC. D. Application. The following items have been submitted for review with this application: 1) Site Plan drawings showing before and after conditions as they relate to the proposed modification to an existing wireless facility. 2) A site improvement survey is not required. Facility is on the building rooftop or contained within the existing building. 3)A landscape plan is not applicable. Facility is both on the building rooftop and contained within the existing building. 4) Elevation drawings have been provided. 5)A lighting plan is not applicable. No lighting is required for this facility. 6)A structural report/PE Letter shall be provided at the time a Building Permit is submitted. 7) The application shall comply with the regulations of the Federal Communications Commission with regard to maximum radio frequency and electromagnetic frequency emissions. A letter has been provided by the Radio Frequency Engineer confirming compliance with all FCC requirements. 8) The existing facility makes use of a building in which the antennas and equipment are mounted to. 9) The existing facility makes use of a building in which the antennas and equipment are mounted to and therefore complies with highest siting preference. 10)A pre-application meeting was held with Sara Nadolny on 10110113. This site continues to be an important coverage site for Verizon Wireless. Without this site, Verizon Wireless would have a significant gap in coverage in the City of Aspen. E. General provisions and requirements. 1) The existing facility makes use of a building in which the antennas and equipment are mounted to and is an allowed use in the CC Zone District. 2) The building mounted facility complies with the City's highest preference for facility siting. 3) Verizon Wireless operates in a licensed spectrum therefore minimizing the chances for interference. 4) The existing facility and proposed modification shall have no impact in airports or flight paths. 5) This facility is not located on a building of historic significance but is located within the CC Historic District. 6) The existing facility is not located on a public building, structure or public right-of-way. 7) The existing facility is not collocated on a tower. 8) The facility is maintained in a safe and clean manner. 9) The facility shall be removed if the site is no longer needed. F. Review standards. 1) The existing facility has antennas located on a building rooftop with the equipment inside the building and therefore complies with all setback requirements. 2) The proposed antennas shall be approximately 6-inches shorter than the existing antennas. The existing and proposed new antennas shall not be more than 10 feet above highest portion of roof as required by code. 3) The existing and proposed antennas shall be architecturally compatible with the building they are mounted to given their very thin profile. All existing and proposed antennas sh be painted to match the building (a black color was chosen by the City with the original z vat as well in in 2011 with a recent modification). Further, the location for the exis ' antennas is at the rear or alley side of the building making them difficult, if no to see from the main o Site Name:CO3 Aspen(AWS) Page 3 of 5 N 3V QBLACK & ''EATCH '` Building a World of difference: public rights-of-way. This is the location on the building that the City stipulated in the original zoning approval. 4) The existing facility has antennas located on a building rooftop with the equipment inside the building and therefore compatible with the natural environment. 5) The existing antennas are located toward the rear of the building rooftop and therefore minimize their visibility. Given the use of omni/whip style antennas and painting them a dark color, helps to further minimize their impact. 6) No lighting or signage is proposed with this request unless required by the FAA, FCC or other federal entity. 7) The existing facility has no impact on access ways. Section 26.710.140 Commercial Core (CC) Zone District A. Purpose. The proposed modifications to an existing rooftop mounted wireless facility shall not change the current mixed-use nature of the property. B. Permitted Uses. A building mounted wireless facility is an allowed use in the CC Zone District. C. Conditional Uses. A building mounted wireless facility is an allowed use in the CC Zone District. D. Dimensional Requirements. 1) Minimum Gross Lot Area. The existing wireless facility and proposed modifications shall have no impact on the property's lot size. 2) Minimum Net Lot Area Per Dwelling Unit. The existing wireless facility and proposed modifications shall have no impact on the lot area per dwelling unit. 3) Minimum Lot Width. The existing wireless facility and proposed modifications shall have no impact on the property's lot width. 4) Minimum Front Yard Setback. The existing wireless facility and proposed modifications shall have no impact on the current front yard setback. 5) Minimum Side Yard Setback. The existing wireless facility and proposed modifications shall have no impact on the current side yard setback. 6) Minimum Rear Yard Setback. The existing wireless facility and proposed modifications shall have no impact on the current rear yard setback. 7) Minimum Utility/Trash/Recycle Area. The existing wireless facility and proposed modifications shall have no impact on the current utility, trash or recycle area. 8) Maximum Height. The existing wireless facility and proposed modifications shall little to no impact on the current height of the building or rooftop antennas. All new antennas shall be mounted at almost the same mounting height as the existing antennas (approximately 6-inches shorter) and still within the 10 foot maximum height limit for whip antennas above the highest portion of rooftop. 9) Minimum Distance Between Buildings. The existing wireless facility and proposed modifications shall have no impact on the distance between buildings. 10) Public Amenity Space. The existing wireless facility and proposed modifications shall have no impact on the public amenity space. 11) Floor Area Ratio. The existing wireless facility and proposed modifications shall have no impact on the current FAR. 12) Maximum Multi-Family Residential Dwelling Unit Size. The existing wireless facility and proposed modifications shall have no impact on the current dwelling unit size. 13) Maximum Lodge Unit Size. The existing wireless facility and proposed modifications shall have no impact on the current lodge unit size. 14) Commercial/Residential Ratio. The existing wireless facility and proposed modifications shall have no impact on the current commercial to residential ratio. Section 26.575.020(B)1(d) Calculations and Measurements d. Chimneys, antennas and other appurtenances. Antennas, chimneys, flues, vents or similar structures shall not extend over ten (10) feet above the specified maximum height limit, except for roofs with a pitch of 8:12 or greater, these elements may not extend more than two (2)feet above the Site Name:CO3 Aspen(AWS) Page 4 of 5 © BLACK & VEA ` H Y, Building a World of difference: ridge. Both the existing and proposed antennas mounted to this building's rooftop shall not extend above the roofline by more than 10 feet. Summary As demonstrated above, the Verizon Wireless proposal shall comply with all standards and requirements as listed in the City's Land Use Code for granting administrative approvals for modifications to existing building mounted facilities in the CC District per Section 26.304, Section 26.710.140, Section 26.575.020(B)1(d) as well as for wireless telecommunication facilities in Section 26.575.130. The integrity of the Verizon Wireless network continues to rely on this site and this site shall continue to comply with the intent of the City's Land Use Code. The proposed modifications shall not cause any visual or other negative impacts on the area and shall be extremely minimal in nature while at the same time, offering the residents, businesses, and traveling public with better and faster voice and data technologies. Brad Johnson Sr. Site Acquisition &Zoning Specialist Black& Veatch Corp. 0 Site Name:CO3 Aspen(AWS) Page 5 of 5 VerffO wireless Verizon Wireless Network Department 3131 South Vaughn Way,Ste.550 Aurora,CO 80014 Letter of Authorization 'I'o Whom It May Concern: Verizon Wireless(VAW) LLC,d/b/a Verizon Wireless,hereby authorizes Black& Veatch Corporation, its attorney's, agents,or representatives to represent Verizon Wireless in real estate transactions and make any necessary zoning petitions including the filing of building permit applications. Ail Matt utle'r Its: Real Estate Manager Date: Sworn to before me this'---.)' day of i ` 'i- ���+� --- ,2009 Notary public: - - - - - - - DENISE. FULLER My Commission Expires:? � — STATE NOTARY PUBLIC OF COLORADO !SEC 0 6 2013 C'TyY O ,400pZ�1 r,V'prl,;,VITY DEVEcOri EIV BLACK & VE 'CH Building a world of difference' Confirmation of Consent To: Black&Veatch Corporation 304 Inverness Way South, Suite 400 Englewood, CO 80112 Attention: Brad Johnson RE: Verizon Wireless Site Name: CO3 Aspen (AWS) Located at 205 S. Mill Street, Aspen, CO 81611 To Whom it May Concern: Consent is hereby given to Colorado RSA No. 3 Limited Partnership, d/b/a Verizon Wireless so that they can modify their communication equipment, cables, accessories and any other items necessary to achieve the successful, secure and ongoing operation of its telecommunication facilities located at the above-referenced address. Specifically, Verizon Wireless is approved for: • Install additional equipment inside Verizon Wireless' leased equipment room. This equipment shall fit within the existing space and not require any additional room at this time. • Add two (2) new whip/omni antenna on the building rooftop/parapet. The new antennas are approximately the same height as the existing antennas. All new antennas shall be painted to match the existing antennas. • Add two (2) new small equipment boxes below the antennas and one (1) new small equipment box between the antennas. • Add one (1) new cable run to serve the new antennas. Verizon Wireless is planning to utilize the existing conduit currently on the building for the new cable. In the event this conduit cannot be used, Verizon Wireless would propose adding one (1) additional 2" conduit to the new antennas. This cable shall follow the same route as the existing coax cables. Printed Name: G L/O 4, Z� Date: Title: Site Name:CO3 Aspen(AWS) Page 2 of 2 A Parcel Detail Page 1 of 3 Pitkin County Assessor Parcel Detail Information Assessor Property Scare I Assessor Subset Query I Assessor Sales Search Clerk& Recorder Reception Search I Treasurer Tax Search Search GIS Map I GIS Help Basic Building Characteristics I Value Summary Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Otvner Detail I Land Detail I Photographs Tax Account Parcel Property 2012 Mill Area Number Number Type Levy 001 11 R001434 j 273707338004]1 COMM/RES 11 32.325 Primary Owner Name and Address MILL STREET PLAZA ASSOC LLC 602 E COOPER#202 ASPEN, CO 81611 Additional Owner Detail Business Name =MILL REET PLAZA Legal Description Subdivision: CITY AND TOWNSITE OF ASPEN Block: 81 Lot: D AND:- Lot: Thru I Location ` Physical Address: 205 S MILL ST ASPEN 2013 Subdivision: CITY AND TOWNSITE ASPEN ASPEN i,,CWj1,jN1 y 1,'.:VEL0PMic.:N1 Land Acres: 0.000 Land Sq Ft: 18,000 http://www.pitkinassessor.org/assessor/parcel.asp?AccountNumber=RO01434 11/4/2013 Parcel Detail Page 3 of 3 Commercial/Industrial Building Occurrence 0 Characteristics SPECIAL PURPOSE SECO FD 3,267 MERCH FIRST FLOOR: 1111,603 MERCH BASEMENT 6 319 FINISHED: ' SPECIAL PURPOSE BSMT 2 145 FIN: OFFICE SECOND FLOOR: 2,750 Total Area: 126,084 Property Class: MULTI-USE(3 OR MORE)IMPS Actual Year Built: I 1982 Effective Year Built: 111990 Quality of Construction: GOOD-BASE Exterior Wall: GOOD BASE Interior Wall: GOOD-BASE Neighborhood: COA COMMERCIAL "A" CORE Top of Page Assessor Database Search Options Pitkin CollntV 110111e Page The Pitkin County Assessor's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Pitkin County Assessor's Offices are unable to warrant any of the information herein contained. Copyright©2003 - 2012 Good Turns Software. All Rights Reserved. Database&Web Design by Good Turns Software. http://www.pitkinassessor.org/assessor/parcel.asp?AccountNumber=R001434 11/4/2013 VaYm,pwireless We never stop working for you.-w Verizon Wireless David Kennard Cherry Creek 1 David.Kennard @verizonwireless.com Suite 550 Direct Dial 303-873-2663 3131 So. Vaughn Way Direct Fax 303-873-2682 Aurora, CO 80014 November 14, 2013 RE: CO3 Aspen, 205 S. Mill Street, Aspen, CO Dear City of Aspen, I am writing this letter to provide you with information regarding maximum radio frequency and electromagnetic frequency emissions with respect to our facility located at 205 S. Mill Street in Aspen, CO. This site is currently on the air and Verizon Wireless will be changing antenna models in order that we may broadcast in the 2100 MHz spectrum and provide AWS service. The antennas and equipment are currently in compliance with all applicable Federal Communication Commission's regulations concerning maximum radio frequency and electromagnetic frequency emissions. All new antennas and equipment as part of this request shall also comply with all applicable Federal Communication Commission's regulations concerning maximum radio frequency and electromagnetic frequency emissions. Verizon Wireless is committed to assuring the safety and welfare of its employees, the public and the environment through the compliance with all applicable Federal Communication Commission's regulations including those concerning maximum radio frequency and electromagnetic frequency emissions. Sincerely, Verizon Wireless David Kennard Senior RF Engineer Verizon Wireless/Mountain Region !SEC 0 6 2013 GI a Y OF ASPEN LF1 BLACK & VEATCH Building a World of diff erence" City of Aspen — Wireless Telecom (Administrative) — 11/14/13 Verizon Wireless — Antenna Modification — CO3 Aspen VICINITY MAP c9 j^✓Fr .Q � c W an W$3t � Z Elallam st � � y n wBiQBkerSt a yHaRafiSt o3Sr .SrGrbsunAve r. z Md rn St w c B!°Pk , E kf,'arn e n 47 South A'1° {T r Sr h 3t 4 Frar 7 Oa✓ nj1 w `° � St c ✓° G mite f_aji @yn _ d < �0Pk1nsAt.� d2 0 � RioGranaep✓ argt e� �'�J � c E y twain St 2 y e h lyyo {2 Motel Jerome c° r7 g PkinsAve 4 Aspen ti Paepcke MalsuhLa ( It z PltkinCounty E eye. C tr y Park & Plaza W tyymanAv nsgte EMafn a° i v y e {2 c Q ee Wheeler Kenici tt to Querl Linlalight, Opera Fi�a �koPkins Aye 'r clj h Loaf S m m � E h '")""IAvo g O` Mopiinsgve f to Wagner cape:q� NQ 65 h condnmin¢Qms c EDurar7Ave Park YBelly UP ECOpRerpie 82 EMynlanAve g ff 'rUan SI C Chs?ef A.�yxen� U Dal r° Aspen Ski S C'oPerAve R�m,nlain F Durant 1 Gl/be,R St Q �I Aspen Ave 1 ii 7 y m W Tne Gantkr g� �y Srtdrk St h ii 205 S. Mill Street, Aspen, CO 81611 Site Name:CO3 Aspen Page 1 of 1 BLACK & VEITCH Building a WOClII of difference' Confirmation of Consent To: Black&Veatch Corporation 304 Inverness Way South, Suite 400 Englewood, CO 80112 Attention: Brad Johnson RE: Verizon Wireless Site Name: CO3 Aspen (AWS) Located at 205 S. Mill Street, Aspen, CO 81611 To Whom it May Concern: Consent is hereby given to Colorado RSA No. 3 Limited Partnership, d/b/a Verizon Wireless so that they can modify their communication equipment, cables, accessories and any other items necessary to achieve the successful, secure and ongoing operation of its telecommunication facilities located at the above-referenced address. Specifically, Verizon Wireless is approved for: • Install additional equipment inside Verizon Wireless' leased equipment room. This equipment shall fit within the existing space and not require any additional room at this time. • Add two (2) new whip/omni antenna on the building rooftop/parapet. The new antennas are approximately the same height as the existing antennas. All new antennas shall be painted to match the existing antennas. • Add two (2) new small equipment boxes below the antennas and one (1) new small equipment box between the antennas. • Add one (1) new cable run to serve the new antennas. Verizon Wireless is planning to utilize the existing conduit currently on the building for the new cable. In the event this conduit cannot be used, Verizon Wireless would propose adding one (1) additional 2" conduit to the new antennas. This cable shall follow the same route as the existing coax cables. Printed Name: �-- Date: Title: RECTIVED DEC 0 6 2013 Site Name:CO3 Aspen(AWS) Page 2 of 2 '_0M MAIfY DEVELOPMENT venz.owireless Verizon Wireless Network Department 3131 South Vaughn Way,Ste.550 Aurora,CO 80014 Letter of Authorization 'I'o Whom It May Concern: Verizon Wireless(VAW) LLC, d/b/a Verizon Wireless,hereby authorizes Black& Veatch Corporation, its attorney's,agents,or representatives to represent Verizon Wireless in real estate transactions and make any necessary zoning petitions including the filing of building permit applications. Matt Adder Its: Real Estate Manager Date: Sworn to before me this',---,j day of�s ` ."T. 't � >� � . ,2009 Notary Public: DENISE FULLER NOTARY PUBLIC My Commission Expires: AY% STA% TE TC OF COLORADO t(ECEIVED DEC 06 2013 01 FY OF ASPEN COMI !!":NI Y DEVELDPMEN7 Parcel Detail Page 1 of 3 Pitkin County Assessor Parcel Detail Information Assessor Property Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search I Treasurer Tax Search Search GIS Map ( GIS Help Basic Buildinw Characteristics I Value Summary Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Owner Detail I Land Detail I Photo�raLhs Tax Account Parcel Property 2012 Mill Area Number Number Type Levy 001 R001434_jl 273707338004 COMM/RES 1 32.325 Primary Owner Name and Address MILL STREET PLAZA ASSOC LLC 602 E COOPER#202 ASPEN, CO 81611 Additional Owner Detail Business Name MILL STREET PLAZA Legal Description Subdivision: CITY AND TOWNSITE OF ASPEN Block: 81 Lot: D AND:- Lot: Thru I Location Physical Address: 205 S MILL ST ASPEN Subdivision: CITY AND TOWNSITE OR 'E K ASPEN Ed Land Acres: 110.000 Land Sq Ft: 18,000 6 2013 AbPEN �OMMUNR DEVELOPMENT http://www.pitkinassessor.org/assessor/parcel.asp?AccountNumber=R001434 11/4/2013 Parcel Detail Page 2 of 3 eft 2013 Property Value Summary Actual Va F7Assessed Value Land: 11 15,004,00011 4,330,120 Improvements: 10,583,500 3,059,330 IF Total: 25,587,500 7,389,450 Sale Date: Sale Price: Additional Sales Detail Basic Building Characteristics Number of Residential 1 Buildings: Number of Comm/Ind 1 Buildings: Residential Building Occurrence 0 Characteristics 2ND FLOOR: 12,145 Total Heated Area:]2,145 Property Class: SINGLE FAM RES- IMPROVEMEN Actual Year Built: 1982 Effective Year Built: 11995 Bedrooms:]13 Baths: 13 Quality of Construction: GOOD T 12 Exterior Wall: 11FACE BRICK Interior Wall: 11DRYWALL Floor: ICARPET Heat Type: FORCED AIR Heating Fu IGAS Roof Cover: BUILT-UP Roof Structure: IFLAT Neighborhood: COMM. CORE ASPEN RESIDENTIAL Super Nbh 13011 http://www.pitkinassessor.org/assessor/parcel.asp?AccountNumber=R001434 11/4/2013 Parcel Detail Page 3 of 3 Commercial/Industrial Building Occurrence 0 Characteristics SPECIAL PURPOSE SECO FD 3,267 MERCH FIRST FLOOR: 1111,603 MERCH BASEMENT i 6 319 FINISHED: ' SPECIAL PURPOSE BSMT F2 --45 FIN: OFFICE SECOND FLOOR: 112,750 Total Area: 1126,084 Property Class: MULTI-USE(3 OR MORE)IMPS Actual Year Built: 11982 Effective Year Built: 111990 Quality of Construction: GOOD-BASE Exterior Wall: JIGOOD BASE Interior Wall: GOOD-BASE Neighborhood: COA COMMERCIAL "A" CORE Top of Page Assessor Database Search Ootions Pitkin County Hone Page The Pitkin County Assessor's Offices make every effort to collect and maintain accurate data. However, Good Turns Software and the Pitkin County Assessor's Offices are unable to warrant any of the information herein contained. Copyright©2003 - 2012 Good Turns Software. All Rights Reserved. Database &Web Design by Good-Turns Software. 1 013 C' Y OF ASPEN OEVELOPMENJ. http://www.pitkinassessor.org/assessor/parcel.asp?AccountNumber=R001434 11/4/2013 Land Title Guarantee Company CUSTOMER DISTRIBUTION "TWe GUARANTEE COMPANY W W W.LT GC.0 OM Date: 12-16-2013 Our Order Number: QPR62005727 Property Address: 205 S MILL ST ASPEN, CO 81611 If you have any inquiries or require further assistance, please contact one of the numbers below: For Closing Assistance: For Title Assistance: Aspen Title"QPR"Unit 533 E HOPKINS#102 Kurt Beereboom ASPEN,CO 81611 533 E HOPKINS#102 Phone: ASPEN, CO 81611 Fax: Phone:970-925-1678 Fax: 970-925-6243 EMail: kbeereboom @ltgc.com BLACK&VEATCH CORPORATION 304 INVERNESS WAY SOUTH#400 ENGLEWOOD,CO 80112 Attn: DONALEE ABRAMS Phone: 720-834-4200 Fax: 720-834-4285 Copies: 1 EMail:abramsd @bv.com Linked Commitment Delivery LAND TITLE GUARANTEE COMPANY PROPERTY REPORT Our Order No. QPR62005727 Cust. Ref: This Report is based on a limited search of the county real property records and provides the name(s) of the vested owner(s), the legal description, tax information (taken from information provided by the county treasurer on its website) and encumbrances, which, for the purposes of this report, means deed of trust and mortgages, and liens recorded against the property and the owner(s) in the records of the clerk and recorder for the county in which the subject property is located. This Report does not constitute any form of warranty or guarantee of title or title insurance. The liability of Land Title Guarantee Company is strictly limited to (1) the recipient of the Report, and no other person, and (2) the amount paid for the Report. Prepared For: This Report is dated: December 09, 2013 at 5:00 P.M. Address: 205 S MILL ST ASPEN, CO 81611 Legal Description: LOTS D-1, BLOCK 81, CITY AND TOWNSITE OF ASPEN. COUNTY OF PITKIN, STATE OF COLORADO. Record Owner: MILL STREET PLAZA ASSOCIATES, LLC, A COLORADO LIMITED LIABILITY COMPANY We find the following documents of record affecting subject property: 1. BARGAIN AND SALE DEED RECORDED FEBRUARY 06, 1998 UNDER RECEPTION NO. 413312. 2. DEED OF TRUST DATED DECEMBER 01, 2006, FROM MILL STREET PLAZA ASSOCIATES, LLC, A COLORADO LIMITED LIABILITY COMPANY TO THE PUBLIC TRUSTEE OF PITKIN COUNTY FOR THE USE OF LASALLE BANK, NA TO SECURE THE SUM OF$12,000,000.00 RECORDED DECEMBER 01, 2006, UNDER RECEPTION NO. 531727. SAID DEED OF TRUST WAS FURTHER SECURED BY ASSIGNMENT OF RENTS RECORDED PROPERTY REPORT Our Order No. QPR62005727 Documents of Record: DECEMBER 01, 2006, UNDER RECEPTION NO. 531728. SUBORDINATION AGREEMENT IN CONNECTION WITH SAID DEED OF TRUST RECORDED DECEMBER 04, 2006 UNDER RECEPTION NO. 531766. 3. FINANCING STATEMENT WITH, LASALLE BANK THE SECURED PARTY, RECORDED DECEMBER 07, 2006 UNDER RECEPTION NO. 531944. SAID DEED OF TRUST WAS FURTHER SECURED BY ASSIGNMENT OF FINANCING STATEMENT RECORDED MARCH 30, 2007, UNDER RECEPTION NO. 536008. 4. DEED OF TRUST DATED DECEMBER 01, 2006, FROM MILL STREET PLAZA ASSOCIATES, LLC, A COLORADO LIMITED LIABILITY COMPANY TO THE PUBLIC TRUSTEE OF PITKIN COUNTY FOR THE USE OF LASALLE BANK, NA TO SECURE THE SUM OF $12,000,000.00 RECORDED DECEMBER 15, 2006, UNDER RECEPTION NO. 532310. SAID DEED OF TRUST WAS FURTHER SECURED BY ASSIGNMENT OF RENTS RECORDED DECEMBER 15, 2006, UNDER RECEPTION NO. 532311. SAID DEED OF TRUST WAS ASSIGNED TO WELLS FARGO BANK, NA IN ASSIGNMENT RECORDED MARCH 30, 2007, UNDER RECEPTION NO. 536007, 5. FINANCING STATEMENT WITH, ALPINE BANK THE SECURED PARTY, RECORDED JUNE 05, 2009 UNDER RECEPTION NO. 559692. BANKRUPTCIES,JUDGMENTS AND TAX LIENS NONE s " LAND TITLE GUARANTEE COMPANY INVOICE December 16, 2013 Record Owner: MILL STREET PLAZA ASSOCIATES, LLC, A COLORADO LIMITED LIABILITY COMPANY Property Address: 205 S MILL ST ASPEN, CO 81611 Your Reference No.: When referring to this order, please reference our Order No. QPR62005727 - CHARGES - Property Report $100.00 --Total-- $100.00 Please make checks payable to: Land Title Guarantee Company 5975 Greenwood Plaza Blvd. Suite 125 Greenwood Village, CO 80111-4701 ATTACHMENT 2—LAND USE APPLICATION PROJECT: Name: CO3 Aspen (AWS) - Verizon Wireless @ 205 S . Mill Street Location: 205 S . Mill Street, Aspen, CO 81611 (Indicate street address,lot&block number,legal description where appropriate) Parcel ID# REQUIRED 273707338004 APPLICANT: Name: Colorado RSA No. 3 Limited Partnership, d/b/a Verizon Wireless Address: 3131 S . Vaughn Way, Suite 550, Aurora, CO 80014 Phone#: REPRESENTATIVE: Name: Brad Johnson, consultant to Verizon Wireless Address: Black & Veatch Corp. , 304 Inverness Way South, Suite 400, Phone#: Englewood, CO 80112 303-229-4681 JohnsonBW2@BV.com TYPE OF APPLICATION: (please check all that apply): ❑ GMQS Exemption ❑ Conceptual PUD ❑ Temporary Use ❑ GMQS Allotment ❑ Final PUD(&PUD Amendment) ❑ Text/Map Amendment ❑ Special Review ❑ Subdivision ❑ Conceptual SPA ❑ ESA—8040 Greenline,Stream ❑ Subdivision Exemption(includes ❑ Final SPA(& SPA Margin,Hallam Lake Bluff, condominiumization) Amendment) Mountain View Plane ❑ Commercial Design Review ❑ Lot Split ❑ Small Lodge Conversion/ Expansion ❑ Residential Design Variance ❑ Lot Line Adjustment ❑X Other: Wireless Te 1 e c m ❑ Conditional Use EXISTING CONDITIONS: (description of existing buildings,uses,previous approvals,etc. Commercial, Residential, Mixed Use & Rooftop Wireless Telecom Facility PROPOSAL: (description of proposed buildings,uses,modifications,etc. Add 2 new omni/whip antennas, add new coax cables, add equipment at the antennas and inside the building. Have you attached the following? FEES DUE:$_9 7 5 . 0 0 ❑X Pre-Application Conference Summary ® Attachment#1,Signed Fee Agreement X❑ Response to Attachment#3,Dimensional Requirements Form ❑X Response to Attachment#4,Submittal Requirements-Including Written Responses to Wwrit s U4 3-D Model for large project All plans that are larger than 8S"X 11"must be folded. A disk with an electric copy o a (Mi crosoft Word Format)must be submitted as part of the application. Large scale pr" 'Os' Jude an electronic 3-D model. Your pre-application conference summary will indicate if you must submit model. O • �,O 2J• a S L �' COMMUNITY DEVEIOPMEN? G ate' a 9 S a C S (9"-( 7 IR e e � ATTACHMENT 3 DIMENSIONAL REQUIREMENTS FORM Project: CO3 Aspen (AWS) - Verizon Wireless C 205 S . Mill Street Applicant: Colorado RSA No. 3 Limited Partnership, d/b/a Verizon Wireless Location: 205 S . Mill Street, Aspen, CO 81611 Zone District: Commercial Core Historic District (CC) Lot Size: 18, 000 sq. ft . Lot Area: 18, 000 s q. ft . (for the purposes of calculating Floor Area,Lot Area may be reduced for areas within the high water mark, easements, and steep slopes.Please refer to the definition of Lot Area in the Municipal Code.) Commercial net leasable: Existing: N/A Proposed: No Change Number of residential units: Existing: N/A Proposed.• No Change Number of bedrooms: Existing: N/A Proposed: No Change Proposed% of demolition(Historic properties only): N/A DIMENSIONS: Floor Area: Existing: Allowable: Proposed: No Change Principal bldg. height: Existing: 41 ' -6"Allowable: 411 -611 Proposed:No Change Access. bldg. height: Existing: Allowable: Proposed:No Change On-Site parking: Existing: Required: Proposed: No Change % Site coverage: Existing: Required: Proposed: No Change % Open Space: Existing: Required: Proposed: No Change Front Setback: Existing: Required: Proposed: No Change Rear Setback: Existing: Required: Proposed: No Change Combined F/R: Existing: Required: Proposed: No Change Side Setback: Existing: Required: Proposed:No Change Side Setback: Existing: Required: Proposed:No Change Combined Sides: Existing: Required: Proposed:No Change Distance Between Existing Required: Proposed.-No Change Buildings Existing non-conformities or encroachments: None Variations requested: None D DEC 0 6 2013 CITY OF ASPEN (:OMMUNITY DEVELOPMENT s COMMUNITY DEVELOPMENT DEPARTMENT Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community Development for applications which normally take a minimal and predictable amount of staff time to process. Review fees for other City departments reviewing the application (referral departments) will also be collected when necessary. Flat fees are cumulative — meaning an application with multiple flat fees must pay the sum of those flat fees. Flat fees are not refundable. A review fee deposit is collected by Community Development when more extensive staff review is required. Actual staff time spent will be charged against the deposit. Various City staff may also charge their time spent on the case in addition to the case planner. Deposit amounts may be reduced if, in the opinion of the Community Development Director, the project is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be made during the pre-application conference by the case planner. Hourly billing shall still apply. All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be accepted for processing without the required application fee. The Community Development Department shall keep an accurate record of the actual time required for the processing of a land use application requiring a deposit. The City can provide a summary report of fees due at the applicant's request. The applicant will be billed for the additional costs incurred by the City when the processing of an application by the Community Development Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than provided for by the deposit, the department shall refund the unused portion of the deposited fee to the applicant. Fees shall be due regardless of whether an applicant receives approval. Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final, and recordation of approval documents shall be handled as individual cases for the purposes of billing. Upon conceptual approval all billing shall be reconciled and all past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall require a new deposit at the rate in effect at the time of final application submission. Upon final approval all billing shall again be reconciled prior to the Director accepting an application for review of technical documents for recordation. The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more days past due. Unpaid invoices of 90 or more days past due may be assessed a late fee of 1.75% per month. An unpaid invoice of 120 days or more may be subject to additional actions as may be assigned by the Municipal Court Judge. All payment information is public domain. All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, an unpaid invoice of 90 or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all cos IVEland use application for the property. Any secondary agreement between a property owner and an ap licant representing the owner(e.g. a contract purchaser) regarding payment of fees is solely between tho . � 004*s. GI fY OF ASPEN COMMUNITY DEvELOPMEM7 � t DEVELOPMENT COMMUNITY DEPARTMENT Agreement to Pay Application Fees Anagreement between the City of Aspen ("City")and Lessee's Black &Veatch Corp. Phone No.: 303-229-4681 Consultant Attn: Brad Johnson Email: JohnsonBW2 @BV.com («I„): Address of 205 S. Mill Street Billing Black&Veatch Corp. -Telecom Property: Aspen, CO 81611 Address: Attn: Brad Jonson (subject of (send bills here) 304 Inverness Way South, Suite 400 application) Englewood, CO 80112 1 understand that the City has adopted, via Ordinance No. , Series of 2011, review fees for Land Use applications and the payment of these fees is a condition precedent to determining application completeness. I understand that as the Applicant's Consultant that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $ 975 flat fee for 3 hours of review time $ flat fee for $ flat fee for $ flat fee for For deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review, and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. have read, understood, and agree to the Land Use Review Fee Policy including consequences for non-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $ 975 deposit for 3 hours of Community Development Department staff time. Additional time above the deposit amount will be billed at$315 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at$265 per tCFIVED City of Aspen: Applicant's Representative: U6 2013 fi-�y-i3 Chris Bendon Name: rad ohnson for Black &Veatch Corp. Community Development Director;MWNITY OEVELOPMENTitle: Sr.Site Acquisition Specialist Consultant to Verizon Wireless City Use: Fees Due: $ Received:$ 1 1 920-5090 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Sara Nadolny, 970.429.2739 DATE: 10/10/13 PROJECT: Verizon Antenna Upgrade at 205 S. Mill St. REPRESENTATIVE: Brad Johnson, 303.229.4681 TYPE OF APPLICATION: Wireless Telecommunication Services Facilities and Equipment DESCRIPTION: The applicant is looking for approval to update the existing cellular antennas on the roof of the building at 205 S. Mill St, the Mill Street Plaza building. This building is located in the Commercial Core (CC) zone district, and is part of the City's historic district. The purpose of the update is to increase the LTE/4G coverage to the City of Aspen. The applicant has indicated that update will include the addition of 2 omni/whip style antennas, equipment inside their equipment roof located inside the mall, the addition of 2 small equipment boxes at the base of the new antennas, the addition of 1 small equipment box located between the two proposed antennas, and the addition of a cable run. The potential applicant has indicated that the new antennas will not be mounted any higher than the existing antenna. The potential applicant will be required to show in the submittal how these antennas meet the height requirement per the Land Use Code. Staff expects this will be an administrative review process. No public notice is required. Along with the Land Use application, you will need to answer the criterion found in Section 26.575.130.A.1-5 of the Land Use Code. Below is a link to the Land Use application Form for your convenience. http://www.aspenpitki n.com/Portals/0/docs/City/Comdev/Apps%20and%20Fees/2013%20land%20us e%20app%20form.pdf Below is a link to the Land Use Code for your convenience: http://www.aspenpitkin.com/Departments/Community-Development/PIanning-and-Zoninq Title-26- Land-Use-Code/ Land Use Code Section(s) 26.304 Common Development Review Procedures 26.575.130 Wireless telecommunications services facilities and equipment (Respond to how you will meet the criteria of statements 1-5) Review by: Community Development Staff Public Hearing: Not required Planning Fees: Administrative Review: $975 for Community Development Administrative review. This includes three (3) hours of staff time. Additional staff hours, if needed, will be billed at $325 per hour. RECEIVED Total Deposit (P&Z): $975 DEC 06 201 Total Number of Application Copies: 2 CITY OF ASPEN .OMMUNITY DEVELOpMEN C To apply, submit the following information ® Total Deposit for review of application. E� Pre-application Conference Summary. [�jl Applicant's name, address and telephone number, contained within a letter signed by the applicant stating the name, address, and telephone number of the representative authorized to act on behalf of the applicant. Street address and legal description of the parcel on which development is proposed to occur, consisting of a current certificate from a title insurance company, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner's right to apply for the Development Application. If the property is condominiumized a letter from the HOA is required. A site plan depicting the proposed layout and the project's physical relationship to the land and its surroundings. [2'Completed Land Use application and signed fee agreement. ® An 8 1/2" x 11" vicinity map locating the subject parcels within the City of Aspen. 5g A written description of the proposal and a written explanation of how a proposed development complies with the review standards relevant to the development application (§26.575.130 D-F). � Elevation drawings or"before and after' photographs/drawings simulating and specifying the location and height of antennas, support structures, transmission building(s) and/or other accessory uses, fences, and signs. 0 Structural integrity report or letter clarifying the installation and support program for the proposed wireless telecommunication equipment. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. RECEIVED OEC i16 2013 CITY OF ASPEN %OMMUNITY DEVELOPMEN! COMMUNITY DEVELOPMENT DEPARTMENT Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community Development for applications which normally take a minimal and predictable amount of staff time to process. Review fees for other City departments reviewing the application (referral departments) will also be collected when necessary. Flat fees are cumulative — meaning an application with multiple flat fees must pay the sum of those flat fees. Flat fees are not refundable. A review fee deposit is collected by Community Development when more extensive staff review is required. Actual staff time spent will be charged against the deposit. Various City staff may also charge their time spent on the case in addition to the case planner. Deposit amounts may be reduced if, in the opinion of the Community Development Director, the project is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be made during the pre-application conference by the case planner. Hourly billing shall still apply. All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be accepted for processing without the required application fee. The Community Development Department shall keep an accurate record of the actual time required for the processing of a land use application requiring a deposit. The City can provide a summary report of fees due at the applicant's request. The applicant will be billed for the additional costs incurred by the City when the processing of an application by the Community Development Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than provided for by the deposit, the department shall refund the unused portion of the deposited fee to the applicant. Fees shall be due regardless of whether an applicant receives approval. Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final, and recordation of approval documents shall be handled as individual cases for the purposes of billing. Upon conceptual approval all billing shall be reconciled and all past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall require a new deposit at the rate in effect at the time of final application submission. Upon final approval all billing shall again be reconciled prior to the Director accepting an application for review of technical documents for recordation. The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more days past due. Unpaid invoices of 90 or more days past due may be assessed a late fee of 1.75% per month. An unpaid invoice of 120 days or more may be subject to additional actions as may be assigned by the Municipal Court Judge. All payment information is public domain. All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, an unpaid invoice of 90 or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all costs associated with a land use application for the property. Any secondary agreement between a property owner and an applicant representing the owner(e.g. a contract purchaser) regarding payment of fees is solely between those private parties. 201 1 1)920-50 COMMUNITY DEVELOPMENT DEPARTMENT Agreement to Pay Application Fees Anagreement between the City of Aspen ("City")and Lessee's Black &Veatch Corp. Phone No.: 303-229-4681 Consultant Attn: Brad Johnson Email: JohnsonBW2 @BV.com ("I„): Address of 205 S. Mill Street Billing Black &Veatch Corp. -Telecom Property: Aspen, CO 81611 Address: Attn: Brad Jonson (subject of (send bills here) 304 Inverness Way South, Suite 400 application) Englewood, CO 80112 1 understand that the City has adopted, via Ordinance No. , Series of 2011, review fees for Land Use applications and the payment of these fees is a condition precedent to determining application completeness. I understand that as the Applicant's Consultant that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $ 975 flat fee for 3 hours of review time $ flat fee for $ flat fee for $ flat fee for For deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review, and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy including consequences for non-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $ 975 deposit for 3 hours of Community Development Department staff time. Additional time above the deposit amount will be billed at$315 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at$265 per hour. a , City of Aspen: Applicant's Representative: +1Fi: 062013 Chris Bendon 5 S , y w e: hnson for Black &Veatch Corp. Community Development Director �s a�t� . r. cquisition Specialist �i ' I! r Consultant to Verizon Wireless City Use: Fees Due: $ Received: $ 1 920-5090 THE CITY OF ASPEN Land Use Application Determination of Completeness Date: December 13, 2013 Dear City of Aspen Land Use Review Applicant, We have received your land use application and reviewed it for completeness. The case number and name assigned to this property is 0079.2013.ASLU—205 S. Mill St, Wireless. Your Land Use Application is incomplete: Proof of ownership. A title report or ownership and encumbrance report that is no older than 6 months from the date of submission is required or a letter from a licensed Colorado attorney disclosing ownership. Please submit the aforementioned missing submission items so that we may begin reviewing your application. No review hearings will be scheduled until all of the submission contents listed above have been submitted and are to the satisfaction of the City of Aspen Planner reviewing the land use application. ❑ Your Land Use Application is complete: If there are not missing items listed above, then your application has been deemed complete to begin the'land use review process. Other submission items may be requested throughout the review process as deemed necessary by the Community Development Department. Please contact me at 429-2759 if you have any questions. Th You 4fhen, Deputy Dir ector , Community Development Department For Office Use Only: Qualifying Applications: Mineral Rights Notice Required New SPA New PUD Yes No� Subdivision, SPA, or PUD(creating more than 1 additional lot) GMQS Allotments Residential Affordable Housing Yes No Commercial E.P.F. Lodging File Edit Record Navigate Form Reports Format Tab Help Q Jump 1 z E E Mains C ustom Fields Routing Status Fee Summary Actions Routing History v Permit type aslu !Aspen Land Use Permit#;0079.2013.ASLU W Address;205 MILL ST AptlSuite P City AASPEN State'CO! zip'816 1 ..........v ; x _.. a .__.__. _ . .�.., . _.... ..., ........� �_.�-.._.... W... `l Permit Information JD Master permit Routing queue aslu07 Applied 1�2N6t2013 o Project Status pending Approved 1 I Description LAND USE APPLICATION FOR-VERIZON WIRELESS.OTHER:WIRELESS TELECAM. Issued ADD NEW ANTENNAS AND NEW COAL(CABLES. Closed/Final l Submitted BRAD JOHNSON 303-229-4681 Clock Running g Days 0 Expires 12e`1314 I ` Submitted via I Owner Last name ;MILL STREET PLAZA ASSOr 1 First name 205 S MILL ST .301-A l Phone (970)925 8032 Address ASPEN CO 81611 Applicant Q Owner is applicant? Q Contractor is applicant? i Last name VERIZON WIRELESS i First name'COLORADO RSA#3 3131 S VAUGHN WAY { i SUITE 550 Phone ( ) Cust#i 2 69 77 Address AURORA CO 80014 Lender Last name First name I Phone O Address 3 AspenGolda(server) djamam View 1 of 1