Loading...
HomeMy WebLinkAboutLand Use Case.300 AVSC Dr.0024.2015.ASLUASLU PD Amendment 300 AVSC Rd PID # 273514106032 1 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: Justin Barker, 970.429.2797 DATE: 7/29/2014 PROJECT: AVSC JSB UPDATED: 3/5/15 REPRESENTATIVE: Stephen Ellsperman REQUEST: Insubstantial PD Amendment DESCRIPTION: The applicant is proposing to construct a super trampoline and ramps with airbag pit on the property located at 300 AVSC Road. This property is located in Block B of the Moore Family PUD. According to Article VIII of the PUD Guide (reception #420467), “All development, including grading, shall be contained within the building envelopes…” The proposal includes development which encroaches into the platted setbacks. This requires an amendment to the PUD to allow for these improvements within the setbacks. Approval to apply for the amendment shall be provided by the Five Trees Homeowner’s Association. Below are links to the Land Use Application form and Land Use Code for your convenience: Land Use App: http://www.aspenpitkin.com/Portals/0/docs/City/Comdev/Apps%20and%20Fees/2013%20land%20use%20app%20form.pdf Land Use Code: http://www.aspenpitkin.com/Departments/Community-Development/Planning-and-Zoning/Title-26-Land-Use-Code/ Relevant Land Use Code Section(s): 26.304 Common Development Review Procedures 26.575.020 Calculations and Measurements 26.445.110.A Planned Development – Insubstantial Amendments Review by: Staff for completeness Review agencies for compliance Public Hearing: None. Planning Fees: $650 for 2 hours of staff time. Any unbilled portion of this deposit will be refunded at the conclusion of the case. Additional staff hours, if needed, will be billed at $325 per hour. Referrals: None. Total Deposit: $650. To apply, submit the following information:  Completed Land Use Application and signed fee agreement.  Pre-application Conference Summary (this document). 2  Total deposit for review of the application.  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  A site improvement survey (no older than a year from submittal) including topography and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado.  HOA Compliance form (Attached)  Evidence from the Five Trees HOA providing approval for the proposal and right to apply.  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the review standards relevant to the development application and relevant land use approvals associated with the property.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen.  2 Copies of the complete application packet and, if applicable, associated drawings.  A digital copy of the application provided in pdf file format. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. City C970 COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Owner (“I”): Name: Email: Phone No.: Address of Property: (subject of application) I certify as follows: (pick one) □ This property is not subject to a homeowners association or other form of private covenant. □ This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. □ This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners association or covenant beneficiary. Evidence of approval is attached. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: _________________________ date:___________ Owner printed name: _________________________ or, Attorney signature: _________________________ date:___________ Attorney printed name: _________________________ F I V E T REE S DESIGN REVIEW BOARD Am Starry., President Daviel Parker, Vice President Eve Whiston Tanja Wojcik Bruce Etkin Cary Beach, Manager August 30, 2014 Walt Evans Aspen Valley Ski and Snowboard Club 300 AVSC Road Aspen, Colorado 81611 Re: Side Yard Project Approval Walt: The FiveTrees Design Review Board has reviewed the most recent submission showing all new outdoor training facilities, referred to as the "Side Yard Project," will be installed to the north of the AVSC building. This includes the trampoline, the skateboard and inline skate ramp and airbag, all of which have been found to be acceptable to the FTDRB in the locations shown. We appreciate that AVSC contemplated and then considered the impact of these facilities on the Sievers Circle neighborhood, and we agree that moving these facilities from the originally proposed location to the "opposite" side of the building adequately addresses the concerns of those neighbors and the FiveTrees Community. Sincerely, By Gary L. Manager Email to FTMD @)b 0209drb-aysc side yard approval .wpd With Attachments M G) A, �2g3xg 18 8f-Xg �o- �o, A 8 R A RX88A X o-, x -o' gj5� 2 x wx g x 9PH S�M 95as° :,4 j 55 �-6 -2 -ol M g > 1— N, Asx43 , , m - 0,�.o 00 0— VUHI g� 5 M ox 12 "o 2g R� T� 0 -5p?.—H gm a fl5M E, -�g �- 6-� g �18 -1 5 11 -i2M Yg Rq'� 12 4�222 p o4 A-22 AM ogg2 8 m" Z ol .1 A, 25 �ffi�2 R —P AA % 9 m Mg-�, . �T '--,42-op R°QxQ.�': M. 2. n oH h, 2. —M.� A� > 'o 92 �t 8qg-,99 -9 9 ii Tgj�� Z�: 8�* 22� H;H� AM g .g. 92— > I > B;2� 8.- -8 8., lg�22 Pt�-­ ­�—:z .:2 — - ,, m 2 A 2,9*. qEt�-'2 . -1, 11 0 - - A -,m > > > Q �Rg pl� o� 2p2 -.q 2� '2"H' g g, A rl! '99 4$H�g g ij '2 R. >p mm= 94 -7 gj -,QAT ;`3 :d 3!�W§ — a 1 R. j�A 200- 94 >pm�� 2' l8o'd q A P A .1 > 2H�A -- T g g m.z 2iFg ;A —.9 PF,�qg aPmgr amA Mo A 63 29--� og> :ig-o-�a �o 3!� o z Ag� 0 -Mdg- - 4� . s! (�n P �tl 22". > C) 2 8 31 '5T o z4 g 2PF2 55�26. �21q 1, g A 'gj�g ag A g �- I o � g!2 2 PM n i F M �;f,-5!25 9E q, >! -2 lg o' > a -m 3o� A Z - - . A - - z n— Ag. -V _.o �;glzo 22."-o 8.mmm A �F zg�.5! o > H2 'o FRU 'fiez ?; j ; E, -, Rsij n- -�>p �-z z -omg 9g9 -g i3�-qgg 6 P g.92 .0WA-. MW u d-.2. 11 21 > g -o'M A �ffi ;->'N9 H p §§0 lz gil --o o H., 3 2 ZR `° app 2 :1 ii ;- 54 ogg 1 H 4-2 2 5� z> 5 'M H 2.8 . q 2 5 g g z> �2 2 0 -H om Mpg M.- �9 M. 'o 2 �z H., -'M59ti ox H2P g 2, § 6 '> I � ��o �� p FRI. H - 2 ; 2 zo .2 g o 268"Mm i. -- ; 9 o o z- -z o zl P U o 8 A3 X /I o Asqo z A v E z g g 8>1 8, R i; o z z Z —H, Z. o mF hyo o -Z A ;3 EH z g z > 81 ogg� mRXm 2 A y8 -il �o -�-e MHP �-.gHn.1 � R- —EP9 --9Rao " ,- —�'2-5Z8. �2� 994A 1-z ­-.Vz5j " 2' <g 0 M H, W ;;T> o MPH Ha j.mg H Ug in o'rS� Zig h— > 5M i 2, 22 W- 415� z -,98H.-a-im> M, m oa oun M-1-8 u--§ n az 9z, qog -o, `imago o z �12 El 0 13 X$* , o yIliY . . . . . II�� (��� I �. X o 9 929 9 2 p 9 2 9 —Z 919 2229 9 9 9 9994 4 g g 4 n 9 o o �o �o g g g g �o g g g g g g o 0880 gg z I z z I I I z z I z I z z z z z z z z z z 2 z z z z z z z z 0� 0� 0� 0 0 0 1 1 0 0 0 0 0 o o o o o o o o o o > . . . . . . . . . . . . . . . . . . . . . . . � G) R g m m m m A A A A O:E S44 z� mg 2* 2 . . . . . . . . . . . . . �m G) F� . , -, @ @-, , 9 " ;E g 0 G) 'o z A 2 z 0 0- aga s➢ Z z. i 0, g z� 10 0 M I p 2 0 0BY GATEAVSC SIDEYARD AERIAL SITE S OPRis ENGINEERING, LM o u;mas CITY OF ASPEN, COLORADO I CIVIL CONSULTANTS DEMNED BY DATE T TRAINING FACILITIES OVERALL SITE LAYOUT 502 M?4 STREE—N BY CARHOWALEC081623 7D4-0311 CHECY.ED BY DESIGN SET FAX (9970)-7G4-Q3l3 Homeowner Association Compliance Policy All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. The following certification shall accompany the application for a permit. Subject Property: 300 441,1L 'OUME I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: Owner printed name: or, Attorney signature: Attorney printed name: date: 2- �6 /S date: November, 2014 City of Aspen 1 130 S. Galena St. 1 (970) 920-5090 IMPROVEMENT SURVEY PLAT/TOPOGRAPHICAL MAP OF: BLOCK B MOORE FAMILY P.U.D. I A PARCEL OF LAND SITUATED IN THE W 1/2 OF THE SE 1/4 OF SECTION 111 THE NW% OF THE NE% ANDTHES% OF THE NEY OFSECTION 14 TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M. COUNTY OF PITKIN, STATE OF COLORADO SHEET 1 OF 1 W H f T r R i V. -E R ' ! / I . 9v , , I , _INV 805.1T 18" CPP STORM 1 4.15 FNV 8)134`.60\ 18" CPPStpR,M I IMPROVEMENT SURVEY PLAT/TOPOGRAPHICAL MAP OF: BLOCK B MOORE FAMILY P.U.D. I A PARCEL OF LAND SITUATED IN THE W 1/2 OF THE SE 1/4 OF SECTION 111 THE NW% OF THE NE% ANDTHES% OF THE NEY OFSECTION 14 TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M. COUNTY OF PITKIN, STATE OF COLORADO SHEET 1 OF 1 \ �I INV 8034.7 110. 110 33 \ \ +ll I INV♦804403\ 18' CP\ST�RM - - \ '�•�\ \` \`` ``\ \ '/ / / / / / EXISTING CONDITIONS LEGEND CATV PEDESTAL TELEPHONE PEDESTAL ELECTRIC METER ELECTRIC TRANSFORMER SEWER MANHOLE WATER HYDRANT DRYWELL IRRIGATION VALVE GAS LINE COMMON UTILITY TRENCH 2" ASPEN TREE EDGE OF VEGETATION INV 9;59♦ \ i ASPHALT `\ `\(>\ -` Lo 32.34')-- ` --__ _ ',• / ' ,C f��`�`/ COM410N SKI LIASEM NT BOOK 45VAGE7 35.39: ± l \ \ \,` TRASH ENCLOSUR CONCRETE PAD MULTI-STORYD` \ / ' %� 14.40' F WOO RA 1 ' I ONCFESE \ /�/ � -/ ME BUILDING h ' � i �\ C �� STORY .12' 'fOUN REAR& WOOD FRAME BUILDING2 LAP Lb #20133 TWORY ; /' --- /',' J, I I I I I I ' 1I 1 1 / rl B i)CK B ASPEN SCHOOL DISTRICT 5//7,013SQIFT. d.309AC•RES City of Aspen Marcin control (GPS -15) Maroon Creek Road at Aspen Recreational Center\BENC ` \.•.. , , / ' ,' / , ' \ ' % ,' FOUND REBAR& r -\` .`- `\\ - / - // , , I/ / \I ' I I 02'42"W CAP LS #20133 / ' - \ _ _ / ' / / ,{ ,\ ' \ / / BENCHMARK — — — ' , + SCREENI \ ' / \ - _ — _ _ / / / / / +u 6S' (TIE) — — NG LO - \ , / o ELV=8050.77 — I— — i _ 1 RE TS21e_ ♦_\ L- \ \ �-- _ _ ��8334 2qe -� \ \\-----'' / / ' I/ m/ "�-- -- — -- --- 54-5'14'45" \ � \ � ��•__-�`-----� / j'' //' / ,{ u /\�//,' E99.00' 1850' City of Aspen Marcin control (GPS -14) Tiehack Road at Bridge NOTICE: ACCORDING TO COLORADO LAW%CMENICEDINIOaE UST COMMENCE A V LEGAL ACTION BASED UPON ANY DEFECT IN THIS WITHIN THREE YEA S AFTER YOU FIRST DISCOVER SUCH DEFECT.EVENTY ANY A N BASED UPON ANY DEFECT IN THIS SURVEY BE THAN EN YEARS FROM THE DATE OF CERTIFICATION HEREON. ND REBAR-& CAP LS #20133 N58.1T2TE 2161.93' ( LOT 22e ,803, ti�7. 10' SE RACK (TYP) . 3 \ „ ,' S I EASEMENY / �91D I ` REC #450569 OQ9, FOUND REBAR & LIFT `,',{(,ERATbR ' I I \ ' 2� AP LS #20133 CONTRmL SHACK LOT 23e LOT 21e I FI �NDED PLATBLOCK C OFT E MOOK FAIL ILY y.U.D. FOUND REBAR & CAP LS #20133 BENCHMARK V=8065.94 S15° 40"W LOT 20e 0.37' / T1 e CHAIR LIFT (SUPPORT GRAPHIC SCALE 10 20 40 ( IN FEET) 1 inch = 20 ft. W H f T r R i V. -E R I . 9v , , I , \ �I INV 8034.7 110. 110 33 \ \ +ll I INV♦804403\ 18' CP\ST�RM - - \ '�•�\ \` \`` ``\ \ '/ / / / / / EXISTING CONDITIONS LEGEND CATV PEDESTAL TELEPHONE PEDESTAL ELECTRIC METER ELECTRIC TRANSFORMER SEWER MANHOLE WATER HYDRANT DRYWELL IRRIGATION VALVE GAS LINE COMMON UTILITY TRENCH 2" ASPEN TREE EDGE OF VEGETATION INV 9;59♦ \ i ASPHALT `\ `\(>\ -` Lo 32.34')-- ` --__ _ ',• / ' ,C f��`�`/ COM410N SKI LIASEM NT BOOK 45VAGE7 35.39: ± l \ \ \,` TRASH ENCLOSUR CONCRETE PAD MULTI-STORYD` \ / ' %� 14.40' F WOO RA 1 ' I ONCFESE \ /�/ � -/ ME BUILDING h ' � i �\ C �� STORY .12' 'fOUN REAR& WOOD FRAME BUILDING2 LAP Lb #20133 TWORY ; /' --- /',' J, I I I I I I ' 1I 1 1 / rl B i)CK B ASPEN SCHOOL DISTRICT 5//7,013SQIFT. d.309AC•RES City of Aspen Marcin control (GPS -15) Maroon Creek Road at Aspen Recreational Center\BENC ` \.•.. , , / ' ,' / , ' \ ' % ,' FOUND REBAR& r -\` .`- `\\ - / - // , , I/ / \I ' I I 02'42"W CAP LS #20133 / ' - \ _ _ / ' / / ,{ ,\ ' \ / / BENCHMARK — — — ' , + SCREENI \ ' / \ - _ — _ _ / / / / / +u 6S' (TIE) — — NG LO - \ , / o ELV=8050.77 — I— — i _ 1 RE TS21e_ ♦_\ L- \ \ �-- _ _ ��8334 2qe -� \ \\-----'' / / ' I/ m/ "�-- -- — -- --- 54-5'14'45" \ � \ � ��•__-�`-----� / j'' //' / ,{ u /\�//,' E99.00' 1850' City of Aspen Marcin control (GPS -14) Tiehack Road at Bridge NOTICE: ACCORDING TO COLORADO LAW%CMENICEDINIOaE UST COMMENCE A V LEGAL ACTION BASED UPON ANY DEFECT IN THIS WITHIN THREE YEA S AFTER YOU FIRST DISCOVER SUCH DEFECT.EVENTY ANY A N BASED UPON ANY DEFECT IN THIS SURVEY BE THAN EN YEARS FROM THE DATE OF CERTIFICATION HEREON. ND REBAR-& CAP LS #20133 N58.1T2TE 2161.93' ( LOT 22e ,803, ti�7. 10' SE RACK (TYP) . 3 \ „ ,' S I EASEMENY / �91D I ` REC #450569 OQ9, FOUND REBAR & LIFT `,',{(,ERATbR ' I I \ ' 2� AP LS #20133 CONTRmL SHACK LOT 23e LOT 21e I FI �NDED PLATBLOCK C OFT E MOOK FAIL ILY y.U.D. FOUND REBAR & CAP LS #20133 BENCHMARK V=8065.94 S15° 40"W LOT 20e 0.37' / T1 e CHAIR LIFT (SUPPORT GRAPHIC SCALE 10 20 40 ( IN FEET) 1 inch = 20 ft. SCALE: 1" = 2000' ..,-\Tre 1. Date of Survey: June - July 2012. Reviewed site for changes on June 27th, 2013 REVIEWED SITE FOR CHANGES ON JULY 17TH, 2014 2. Date of Preparation: July - August 2011. Reissued to current date July 17, 2013 REISSUED TO CURRENT DATE AUGUST 11, 2014 3. Basis of Bearing: A bearing of S45034'45"E from the Westerly corner of Block B, a found Rebar & Cap LS #20133 to the Westerly angle point a found Rebar & Cap LS #20133. 4. Basis of Survey: The Moore Family Lot Line Adjustment Plat recorded August 10, 1998 in Plat Book 45 at Page 73 as Reception Number 420462, the Moore Family Division Plat recorded August 10, 1998 in Plat Book 45 at Page 76 as Reception Number 420463, the Moore Family Parcel "A" Subdivision, Essential Community Facilities Exemption Plat recorded August 10, 1998 in Plat Book 45 at Page 78 as Reception Number 420464, the Moore Family Planned Unit Development, a Planned Community recorded August 10, 1998 in Plat Book 45 at Page 81 as Reception Number 420465, First Amended Plat of the Moore Family P.U.D. a Planned Community recorded July 6, 1999 in Plat Book 50 at Pate 40 as Reception Number 433030, Moore No. 1 Annexation recorded July 14, 1999 in Plat Book 50 at Page 44 as Reception Number 433342, Moore No. 2 Annexation recorded July 14, 1999 in Plat Book 50 at Page 45 as Reception Number 433343, Moore No. 3 Annexation recorded July 14, 1999 in Plat Book 50 at Page 46 as Reception Number 433344, Moore No. 4 Annexation recorded July 14, 1999 in Plat Book 50 at Page 47 as Reception Number 433345, various documents of record, and the found monuments, as shown. 5. This survey does not constitute a title search by Sopris Engineering, LLC (SE) to determine ownership or easements of record. For all information regarding easements, rights of way and/or title of record, SE relied upon the above said plats described in note 4 and the Title Commitment prepared by Land Title Guarantee Company, order #QT62004656, effective date of June 27, 2012. 6. Basis of elevation: City of Aspen, Marcin control datum, which is based on an elevation of 8021.91' (NAVD 1988) on the City of Aspen Control (GPS -15) Maroon Creek Road at the Aspen Recreational Center. This established two site benchmarks, shown on this page. 7. Contour Interval: One (1) foot. 8. The linear unit used in the preparation of this plat is the U.S. Survey Foot as defined by the United States Department of Commerce, National Institute of Standards and Technology. RD COLUMNS, \ SOPRIS ENGINEERING - LLC 60' WIDE \ CIVIL CONSULTANTS SKI TLIFT EASEMENT EASEMENT 502 MAIN STREET/ SUITE A3 BOOK 45 PAGE 78 \ CARBONDALE, COLORADO 81623 \\ (970) 704-0311 SOPRISENG@SOPRISENG.COM SURVEYOR'S CERTIFICATE I, Mark S. Beckler, hereby certify to Aspen Valley Ski Club (AVSC) and Land Title Guarantee Company, that this is an "IMPROVEMENT SURVEY PLAT" as defined by C.R.S. § 38-51-102(9), and that is is a monumented Land Survey showing the current location of all structures, water courses, water features and/or bodies of water, visible roads, utilities, fences, or walls situated on the described parcel and within five feet of all boundaries of such parcel, any conflicting boundary evidence or visible encroachments, all easements and rights of way of a public or private nature that are visible, or apparent, or of record and underground utilities described in Land Title Guarantee Company's title Order or other sources as specified on the IMPROV,,ENT,,,, - ror of closure is less than 1/15,000. I�NAL LPS� RAR sb 121.15 08/02/12 12115EX-COND.DWG W H f T r R i V. -E R . 9v SCALE: 1" = 2000' ..,-\Tre 1. Date of Survey: June - July 2012. Reviewed site for changes on June 27th, 2013 REVIEWED SITE FOR CHANGES ON JULY 17TH, 2014 2. Date of Preparation: July - August 2011. Reissued to current date July 17, 2013 REISSUED TO CURRENT DATE AUGUST 11, 2014 3. Basis of Bearing: A bearing of S45034'45"E from the Westerly corner of Block B, a found Rebar & Cap LS #20133 to the Westerly angle point a found Rebar & Cap LS #20133. 4. Basis of Survey: The Moore Family Lot Line Adjustment Plat recorded August 10, 1998 in Plat Book 45 at Page 73 as Reception Number 420462, the Moore Family Division Plat recorded August 10, 1998 in Plat Book 45 at Page 76 as Reception Number 420463, the Moore Family Parcel "A" Subdivision, Essential Community Facilities Exemption Plat recorded August 10, 1998 in Plat Book 45 at Page 78 as Reception Number 420464, the Moore Family Planned Unit Development, a Planned Community recorded August 10, 1998 in Plat Book 45 at Page 81 as Reception Number 420465, First Amended Plat of the Moore Family P.U.D. a Planned Community recorded July 6, 1999 in Plat Book 50 at Pate 40 as Reception Number 433030, Moore No. 1 Annexation recorded July 14, 1999 in Plat Book 50 at Page 44 as Reception Number 433342, Moore No. 2 Annexation recorded July 14, 1999 in Plat Book 50 at Page 45 as Reception Number 433343, Moore No. 3 Annexation recorded July 14, 1999 in Plat Book 50 at Page 46 as Reception Number 433344, Moore No. 4 Annexation recorded July 14, 1999 in Plat Book 50 at Page 47 as Reception Number 433345, various documents of record, and the found monuments, as shown. 5. This survey does not constitute a title search by Sopris Engineering, LLC (SE) to determine ownership or easements of record. For all information regarding easements, rights of way and/or title of record, SE relied upon the above said plats described in note 4 and the Title Commitment prepared by Land Title Guarantee Company, order #QT62004656, effective date of June 27, 2012. 6. Basis of elevation: City of Aspen, Marcin control datum, which is based on an elevation of 8021.91' (NAVD 1988) on the City of Aspen Control (GPS -15) Maroon Creek Road at the Aspen Recreational Center. This established two site benchmarks, shown on this page. 7. Contour Interval: One (1) foot. 8. The linear unit used in the preparation of this plat is the U.S. Survey Foot as defined by the United States Department of Commerce, National Institute of Standards and Technology. RD COLUMNS, \ SOPRIS ENGINEERING - LLC 60' WIDE \ CIVIL CONSULTANTS SKI TLIFT EASEMENT EASEMENT 502 MAIN STREET/ SUITE A3 BOOK 45 PAGE 78 \ CARBONDALE, COLORADO 81623 \\ (970) 704-0311 SOPRISENG@SOPRISENG.COM SURVEYOR'S CERTIFICATE I, Mark S. Beckler, hereby certify to Aspen Valley Ski Club (AVSC) and Land Title Guarantee Company, that this is an "IMPROVEMENT SURVEY PLAT" as defined by C.R.S. § 38-51-102(9), and that is is a monumented Land Survey showing the current location of all structures, water courses, water features and/or bodies of water, visible roads, utilities, fences, or walls situated on the described parcel and within five feet of all boundaries of such parcel, any conflicting boundary evidence or visible encroachments, all easements and rights of way of a public or private nature that are visible, or apparent, or of record and underground utilities described in Land Title Guarantee Company's title Order or other sources as specified on the IMPROV,,ENT,,,, - ror of closure is less than 1/15,000. I�NAL LPS� RAR sb 121.15 08/02/12 12115EX-COND.DWG Agreement to Pay Application Fees An agreement Detween the city of Aspen (--city-) ana Property Mark COTe Phone No.: mcole@teamavSc.org Owner ("I"): Email: Address of 300 AVSC Drive Billing 300 AVSC Drive Property: Address: (subject of (send bills here) application) I understand that the City has adopted, via Ordinance No. , Series of 2011, review fees for Land Use applications and the payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner that I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $0 flat fee for Select Dept $ 0 flat fee for Select Dept $ 0 flat fee for Select Dept $ 0 flat fee for Select Review For deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review, and presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are paid in full. The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy including consequences for non-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated. $ 650 deposit for 2 hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325 per hour. $ 0 deposit for 0 hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $265 per hour. City of Aspen: Property Owner: Chris Bendon Community Development Director Name: Mark Cole City Use: Title: Executive Director Fees Due: $ 650 Received: $ ATTACHMENT 2 —LAND USE APPLICATION PROJECT: Name: Aspen Valley Ski and Snowboard Club Location: 300 AVSC Drive (Indicate street address, lot & block number, legal description where appropriate) Parcel ID 4 (REQUIRED) APPLICANT: Name: Nick Ketpura Address: 66 Hunter Logan Ln Snowmass CO Phone 4: 970-343-9205 REPRESENTATIVE: Name: Nick Ketpura Address: 66 Hunter Logan Ln Snowmass CO Phone 4: 970-343-9205 TYPE OF APPLICATION: (please check all that apply): ❑ GMQS Exemption ❑ GMQS Allotment ❑ Special Review ❑ ESA — 8040 Greenline, Stream Margin, Hallam Lake Bluff, Mountain View Plane ❑ Commercial Design Review ❑ Residential Design Variance ❑ Conditional Use ❑ Conceptual PUD ® Final PUD (& PUD Amendment) ❑ Subdivision ❑ Subdivision Exemption (includes condominiumization) ❑ Lot Split ❑ Lot Line Adjustment EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.) Current clubhouse house administrative offices, locker rooms, meetings spaces for ski + snowboard programs. "ROPOSAL: (description of proposed buildings, uses, modifications, etc.) Addition of outdoor training facilities including ramps/air bags and trampolines. ❑ Temporary Use ❑ Text/Map Amendment ❑ Conceptual SPA ❑ Final SPA (& SPA Amendment) ❑ Small Lodge Conversion/ Expansion ❑ Other: Have you attached the following? FEES DUE: $ 650 Pre -Application Conference Summary Attachment #1, Signed Fee Agreement %❑ Response to Attachment 43, Dimensional Requirements Form rL] Response to Attachment 44, Submittal Requirements- Including Written Responses to Review Standards 9:1 3-D Model for large project All plans that are larger than 8.5" X I I" must be folded. A disk with an electric copy of all written text (Microsoft Word Format) must be submitted as part of the application. Large scale projects should include an electronic 3-D model. Your pre -application conference summary will indicate if you must submit a 3-D model. A S P E N H I G H S C O O L M O O R E D R S I E V E R S C I R A V S C P R O P E R T Y P R O P O S E D R A M P S A N D A I R B A G P R O P O S E D S U P E R T R A M P A S P E N R E C R E A T I O N C E N T E R 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 0 2 0 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 1 2 1 1 5 TRAINING FACILITIES OVERALL SITE LAYOUT AVSC SIDEYARD AERIAL SITE J O B N O . S H E E T C 1 . 1 D A T E : 0 7 - 2 3 - 2 0 1 4 NO.REVISION BY DATE 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 DESIGNED BYCITY OF ASPEN, COLORADO DRAWN BY CHECKED BY DATEINITIALS DESIGN SET K n o w w h a t ' s R V I C I N I T Y M A P P R O P O S E D E L E C T R I C M A N H O L E P R O P O S E D D R A I N A G E D R Y - W E L L P R O P O S E D S E W E R M A N H O L E P R O P O S E D T E L E P H O N E M A N H O L E P R O P O S E D U T I L I T Y M A N H O L E P R O P O S E D G U Y W I R E P R O P O S E D P O W E R P O L E P R O P O S E D F I R E H Y D R A N T P R O P O S E D W A T E R V A L V E P R O P O S E D C U R B S T O P P R O P O S E D G A S M E T E R / V A L V E P R O P O S E D E L E C T R I C T R A N S F O R M E R P R O P O S E D E L E C T R I C M E T E R P R O P O S E D T E L E P H O N E P E D E S T A L P R O P O S E D C A T V P E D E S T A L P R O P O S E D S E W E R C L E A N O U T P R O P O S E D L I G H T P O L E P R O P O S E D S I G N P R O P O S E D L E G E N D P R O P O S E D S T O R M I N L E T P R O P O S E D C O N T O U R P R O P O S E D C O N T O U R I N T E R V A L P R O P O S E D 8 " W A T E R M A I N 8 ' ' W P R O P O S E D 1 2 " W A T E R M A I N 1 2 ' ' W P R O P O S E D 8 " S A N I T A R Y S E W E R M A I N 8 ' ' S S P R O P O S E D 1 2 " S A N I T A R Y S E W E R M A I N 1 2 ' ' S S P R O P O S E D E L E C , T E L E , C A B L E , G A S E T C G P R O P O S E D G A S E T C P R O P O S E D T E L E P H O N E G G P R O P O S E D E L E C T R I C P R O P O S E D C A B L E P R O P O S E D F I B E R O P T I C P R O P O S E D S T O R M S E W E R P R O P O S E D E L E C , T E L E , C A B L E T E C A T V F O E X I S T I N G E L E C T R I C M A N H O L E E X I S T I N G D R A I N A G E D R Y - W E L L E X I S T I N G S E W E R M A N H O L E E X I S T I N G T E L E P H O N E M A N H O L E E X I S T I N G U T I L I T Y M A N H O L E E X I S T I N G G U Y W I R E E X I S T I N G P O W E R P O L E E X I S T I N G F I R E H Y D R A N T E X I S T I N G W A T E R V A L V E E X I S T I N G C U R B S T O P E X I S T I N G G A S M E T E R E X I S T I N G E L E C T R I C T R A N S F O R M E R E X I S T I N G E L E C T R I C M E T E R E X I S T I N G T E L E P H O N E P E D E S T A L E X I S T I N G C A T V P E D E S T A L E X I S T I N G S E W E R C L E A N O U T E X I S T I N G L I G H T P O L E E X I S T I N G S I G N E X I S T I N G L E G E N D E X I S T I N G S T O R M I N L E T E X I S T I N G C O N T O U R E X I S T I N G C O N T O U R I N T E R V A L E X I S T I N G W A T E R M A I N w E X I S T I N G S A N I T A R Y S E W E R M A I N S S E X I S T I N G T E L E P H O N E u e t c E X I S T I N G E L E C T R I C u t E X I S T I N G O V E R H E A D E L E C T R I C u e E X I S T I N G G A S o e E X I S T I N G F I B E R O P T I C u c E X I S T I N G S T O R M S E W E R E X I S T I N G C A B L E u g f o E X I S T I N G E T C C O M M O N T R E N C H E X I S T I N G E A S E M E N T E X I S T I N G P R O P E R T Y L I N E E X I S T I N G S E T B A C K P R O P O S E D R E T A I N I N G W A L L E X I S T I N G W O O D F E N C E E X I S T I N G W I R E F E N C E E X I S T I N G C H A I N L I N K F E N C E x E X I S T I N G R O C K W A L L GENERAL CONSTRUCTION NOTES:1.ALL CONTRACTORS AND SUBCONTRACTORS SHALL HAVE A SET OF APPROVED CONSTRUCTIONDOCUMENTS ON SITE AT ALL TIMES.2.EXISTING CONTOURS ARE AT 1' FOOT INTERVALS.3.PROPOSED CONTOURS ARE AT 1' FOOT INTERVALS.4.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATIONS AND PROTECTION OFALL EXISTING UTILITIES SHOWN, ALL EXISTING UTILITIES NOT SHOWN, AND ALL PROPOSEDUTILITIES ON THESE PLANS. THESE UTILITIES EITHER UNDERGROUND OR OVERHEAD, SHALL BE MAINTAINED INCONTINUOUS SERVICE THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL BE RESPONSIBLEAND LIABLE FOR ANY DAMAGE TO, OR INTERRUPTION OF SERVICES CAUSED BY THE CONSTRUCTION.5.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING CONDITIONSOUTSIDE THE DESIGNATED IMPROVEMENT AREA FROM DAMAGE. ANY DAMAGE TO EXISTINGAREAS OUTSIDE THE DESIGNATED IMPROVEMENT AREA DURING CONSTRUCTION SHALL, AT AMINIMUM, BE RESTORED TO A STATE EQUAL TO ITS PRE CONSTRUCTION STATE.6.THE GENERAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS TO COMPLETE WORK, ANDSHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS. IDENTIFYING THE NEEDFOR A PERMIT, PREPARING THE APPLICATION, AND PAYING THE SUBMITTAL AND REVIEW FEESNECESSARY TO SECURE PERMITS WILL BE THE TOTAL RESPONSIBILITY OF THE GENERALCONTRACTOR. A COPY OF ALL PERMITS MUST BE ON SITE AT ALL TIMES.7.THE GENERAL CONTRACTOR SHALL PERFORM THE WORK ACCORDING TO ALL LOCALGOVERNMENT, COUNTY, STATE, AND FEDERAL SAFETY AND HEALTH REGULATIONS. INPARTICULAR, THE "TRENCHING" AND "OPEN EXCAVATION" OPERATIONS SHALL COMPLY WITH ALLCURRENT O.S.H.A. REGULATORY REQUIREMENTS.8.ALL WORK INCLUDING WARRANTY WORK, SHALL BE INSPECTED BY THE PROJECT ENGINEER WHOSHALL HAVE AUTHORITY TO HALT CONSTRUCTION WHEN PROPER CONSTRUCTION PRACTICES ARENOT BEING ADHERED TO.9.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THEIR OWN DISPOSAL SITEFOR ALL DISPOSED MATERIALS.10.COMPACTION IN EXCAVATED AREAS SHALL BE 95% STANDARD PROCTOR DENSITY.11.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING INSPECTIONS PERFORMED BYOTHER GOVERNMENTAL AGENCIES, AS PRESCRIBED IN THEIR PERMITS AND APPROVALS.12.THE CONTRACTOR SHALL HIRE A TESTING LABORATORY, APPROVED BY THE LOCAL GOVERNMENT,TO PERFORM COMPACTION TESTS OF AGGREGATE BASE, AGGREGATE SUB-BASE AND SUB-GRADETO THE SATISFACTION OF THE LOCAL GOVERNMENT. THE TEST RESULTS SHALL BE SUBMITTED TOTHE LOCAL GOVERNMENT PRIOR TO ANY AC OR PCC PAVING. AC PAVING SHALL BE TESTED WITH ANUCLEAR GAGE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ALL TESTING.13.THE CONTRACTOR SHALL INSTALL AND MAINTAIN FENCES, BARRIERS, LIGHTS AND SIGNS THATARE NECESSARY TO GIVE ADEQUATE WARNING TO THE PUBLIC AT ALL TIMES.14.NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY AFTER "NORMALWORKING HOURS". AT THE END OF EACH DAY'S WORK AND AT OTHER TIMES WHEN CONSTRUCTIONOPERATIONS ARE SUSPENDED FOR ANY REASON, THE CONTRACTOR SHALL REMOVE ALLEQUIPMENT AND OTHER OBSTRUCTIONS FROM THE PUBIC RIGHT-OF-WAY.15.WHERE TWO OR MORE CONTRACTORS ARE WORKING IN THE SAME AREA, EACH SHALL CONDUCTTHEIR OPERATIONS IN SUCH A MANNER AS NOT TO CAUSE ANY UNNECESSARY DELAY ORHINDRANCE TO THE OTHER. WHERE CONFLICTS CANNOT BE AVOIDED, THE LOCAL GOVERNMENTWILL DETERMINE WHICH CONTRACTORS HAVE CONSTRUCTION PRIORITY OVER THE OTHERCONTRACTORS AND THE TERMS OF SUCH CONSTRUCTION PRIORITY.16.CONTRACTOR SHALL NOTIFY ALL PUBLIC OR PRIVATE UTILITY OWNERS FORTY-EIGHT HOURSPRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY.17.CONTRACTOR SHALL NOTIFY THE ADJACENT RESIDENCES AND BUSINESS IN WRITING DESCRIBINGTHE NATURE OF THE WORK, SCHEDULE OF THE WORK, WHEN PARKING WILL BE PROHIBITED (IFANY), AND WHO TO CALL AT THE CONTRACTOR'S OFFICE IF THEY HAVE QUESTIONS ABOUT THEWORK. THE LOCAL GOVERNMENT PRIOR TO ITS DISTRIBUTION MUST APPROVE THE NOTICE. THECONTRACTOR MUST DISTRIBUTE THE NOTICE TO THE ADJACENT RESIDENCES AND BUSINESS ATLEAST 7 DAYS PRIOR TO THE START OF THE CONSTRUCTION WORK.18.AT THE END OF EACH WORK DAY, ALL EXCAVATIONS WITHIN THE STREET AND TRAVEL WAY SHALLBE: (1) BACKFILLED AND PAVED WITH TEMPORARY PAVING SUCH THAT THE FINISHED SURFACE ISFLUSH WITH THE EXISTING PAVEMENT, (2) ADEQUATELY COVERED WITH STEEL PLATE BRIDGING,OR (3) BACKFILLED AND PAVED WITH PERMANENT PAVING. IF STEEL PLATE BRIDGING IS USED, THESTEEL PLATE BRIDGING MUST BE REMOVED WITHIN 48 HOURS AFTER ITS INSTALLATION.CONTROLLED DENSITY FILL SHALL NOT BE USED AS TEMPORARY AC PAVING.19.ALL EXCESS MATERIALS GENERATED FROM THE SITE ARE THE RESPONSIBILITY OF THECONTRACTOR AND SHALL BE DISPOSED PROPERLY.20.ALL ITEMS REMOVED ON THE PROJECT SHALL BECOME THE PROPERTY OF THE CONTRACTORUNLESS OTHERWISE NOTED.21.WHERE IT IS REQUIRED TO SAW CUT EXISTING PAVEMENT THE CUTTING SHALL BE DONE TO ANEAT WORK LINE.22.ALL GEOTECHNICAL RECOMMENDATIONS TO BE ADHERED TO.EARTHWORK, EROSION AND SEDIMENT CONTROL NOTES:1.ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE CITY OF ASPEN.2.PROPOSED CONTOURS ARE AT 1' INTERVALS.3.THE STORM SYSTEM SHALL BE INSPECTED AS SOON AS POSSIBLE AFTER CONSTRUCTION.4.ALL LANDSCAPED AREAS OUTSIDE OF THE CONSTRUCTION DISTURBANCE ZONE SHALL BEREVEGETATED PER LANDSCAPE SPECIFICATIONS AS SOON AS POSSIBLE AFTER GRADING ISCOMPLETE. ALL SEEDED AREAS SHALL BE MULCHED AND MATTED.5.CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION CONTROL FACILITIES IN GOODWORKING ORDER UNTIL PERMANENT FACILITIES ARE IN PLACE.6.SILT FENCE ON THE DOWNHILL SIDE OF ANY DISTURBED AREA SHALL BE CONSTRUCTED PRIOR TOCOMMENCEMENT OF SITE GRADING.7.ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE REGULARLY INSPECTED AT LEASTEVERY 14 DAYS AND IMMEDIATELY FOLLOWING ANY PRECIPITATION EVENT. AN INSPECTIONREPORT SHALL BE MADE AND A COPY MAINTAINED AT THE SITE. ALL REQUIRED REPAIRS SHALL BECOMPLETED AND MADE IN A TIMELY MANNER. ACCUMULATED SEDIMENT AND DEBRIS SHALL BEREMOVED FROM ANY SEDIMENT TRAPPING DEVICE OR AT ANY TIME THAT THE SEDIMENT ORDEBRIS ADVERSELY IMPACTS THE FUNCTIONING OF THE SEDIMENT-TRAPPING DEVICE.8.TOPSOIL SHALL BE STOCKPILED TO THE EXTENT PRACTICAL ON SITE FOR USE ON AREAS TO BEREVEGETATED. ANY AND ALL STOCKPILES SHALL BE LOCATED AND PROTECTED FROM EROSIVEELEMENTS.9.THE CONTRACTOR IS RESPONSIBLE FOR ANY TRACKING OF SEDIMENT ONTO THE ROADWAYS.ROADWAYS ARE TO BE KEPT CLEAN THROUGHOUT THE CONSTRUCTION PHASE.10.THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS TO THE SITE BOUNDARIESAND SPECIFIED RIGHT OF WAY. THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREAWITHOUT THE PRIOR EXPRESSED CONSENT OF THE OWNER. DUST CAUSED BY EXCAVATION,TOPSOIL REMOVAL OPERATIONS, OR ROAD BASE PLACEMENT SHALL BE CONTROLLED BY THECONTRACTOR AT HIS EXPENSE. THE ENGINEER MAY REQUIRE THE CONTRACTOR AT ANY TIME TODISCONTINUE CONSTRUCTION ACTIVITIES UNTIL DUST CONDITIONS ARE REDUCED TO THEOWNER'S SATISFACTION.11.THE CONTRACTOR WILL BE REQUIRED TO FURNISH AND APPLY A DUST PALLIATIVE ON THE SITE ASDIRECTED BY THE TOWN. DUST PALLIATIVE MAY CONSIST OF WATER OR A NON-POLLUTINGSOLUTION. SPREADING OF WATER OR WATER MIXTURE SHALL BE DONE WITH ACCEPTABLESPRINKLING EQUIPMENT. ALL DUST CONTROL SHALL EXTEND BEYOND THE CONSTRUCTION AREAPROPER TO THE SIDE STREETS ENTERING AND EXISTING THE PROJECT, WHERE MUD AND DIRTFROM CONSTRUCTION EQUIPMENT, AS WELL AS LOCAL TRAFFIC, MAY GET ONTO THE SIDESTREETS. CLEANUP OF THESE AREAS WILL BE REQUIRED AS NECESSARY OR AS DIRECTED BY THEOWNER.12.VEHICLE TRACKING CONTROL DEVICES (MUD RACKS) SHALL BE PROVIDED AT CONSTRUCTIONENTRANCES. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTENANCE OF THESE DEVICES.13.MAINTENANCE OF PROPER DRAINAGE AND CLEANING TEMPORARY SEDIMENT PIT DURING THEPROGRESS OF THE CONTRACT IS REQUIRED. ANY DAMAGE DUE TO IMPROPER MAINTENANCE OFSAID DRAINAGE PRIOR TO FINAL ACCEPTANCE OF THE PROJECT WILL BE THE CONTRACTOR'SRESPONSIBILITY.14.ALL DISTURBED AREAS MUST BE RE-VEGETATED.15.CONTRACTOR MUST UTILIZE "BEST MANAGEMENT PRACTICES", AS EXPLAINED IN THE DRAINAGEREPORT, TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION. NO SEDIMENTSHALL LEAVE SITE OR DAMAGE THE PROPERTY BEYOND ALLOWED LIMITS OF DISTURBANCEDURING CONSTRUCTION. 1 . A C O P Y O F T H E S E P L A N S M U S T B E K E P T O N S I T E , F O R R E A D Y A V A I L A B I L I T Y T O T H E O P E R A T O R , A N D S O T H A T D I V I S I O N O R E P A P E R S O N N E L C A N R E V I E W I T D U R I N G A N I N S P E C T I O N . I F A N O F F I C E L O C A T I O N I S N O T A V A I L A B L E A T T H E S I T E , T H E S W M P M U S T B E M A N A G E D S O T H A T I T I S A V A I L A B L E A T T H E S I T E W H E N C O N S T R U C T I O N A C T I V I T I E S A R E O C C U R R I N G ( e . g . , B Y K E E P I N G T H E S W M P I N A S U P E R I N T E N D E N T ' S V E H I C L E . ) 2 . A L L C O N S T R U C T I O N P R O J E C T S O V E R 1 A C R E R E Q U I R E S A C O N S T R U C T I O N S T O R M W A T E R D I S C H A R G E P E R M I T F R O M T H E C O L O R A D O D E P A R T M E N T O F P U B L I C H E A L T H & E N V I R O N M E N T ( C D P H E ) , W A T E R Q U A L I T Y C O N T R O L D I V I S I O N ( W Q C D ) . 3 . T H E P E R M I T A P P L I C A T I O N S H A L L B E S U B M I T T E D A T L E A S T 1 0 D A Y S P R I O R T O T H E S T A R T O F C O N S T R U C T I O N A C T I V I T I E S . 4 . T H E P E R M I T A P P L I C A N T ( S ) S H A L L B E T H E O W N E R A N D / O R T H E S I T E C O N T R A C T O R . T H E A P P L I C A T I O N S H A L L B E S I G N E D B Y T H E O W N E R A N D / O R T H E S I T E C O N T R A C T O R . 5 . S T O R M W A T E R M A N A G E M E N T P L A N S ( S W M P s ) A R E R E Q U I R E D F O R A L L P R O J E C T S R E Q U I R I N G A C O N S T R U C T I O N S T O R M W A T E R D I S C H A R G E P E R M I T A N D S H A L L B E M A I N T A I N E D A N D U P D A T E D O N S I T E . T H E P E R M I T H O L D E R M U S T I M P L E M E N T , M A I N T A I N A N D I N S P E C T S T O R M W A T E R A N D E R O S I O N C O N T R O L S D E L I N E A T E D O N T H E S W M P s U N T I L T H E S I T E I S P E R M A N E N T L Y S T A B I L I Z E D A N D T H E P E R M I T I S I N A C T I V A T E D . T H E P E R M I T C O V E R S A L L W O R K O N T H E P R O J E C T I N C L U D I N G W O R K P E R F O R M E D B Y S U B - C O N T R A C T O R S A N D O T H E R E N T I T I E S . I T I S R E C O M M E N D E D B Y T H E W Q C D T H A T A S W M P A D M I N I S T R A T O R B E D E S I G N A T E D F O R T H E P R O J E C T . T H E S W M P M U S T B E K E P T O N S I T E F O R U S E B Y T H E A D M I N I S T R A T O R A N D R E V I E W B Y W Q C D P E R S O N N E L . 6 . T H E S W M P S H A L L B E P R E P A R E D I N A C C O R D A N C E W I T H G O O D E N G I N E E R I N G , H Y D R O L O G I C A N D P O L L U T I O N C O N T R O L P R A C T I C E S . T H E S W M P N E E D N O T B E P R E P A R E D B Y A R E G I S T E R E D E N G I N E E R . T H E O B J E C T I V E O F T H E P L A N S H A L L B E T O I D E N T I F Y B E S T M A N A G E M E N T P R A C T I C E ' S ( B M P S ) W H I C H W H E N I M P L E M E N T E D W I L L M E E T T H E T E R M S A N D C O N D I T I O N S O F T H E G E N E R A L P E R M I T . T H E S W M P S H O U L D B E A M E N D E D A S N E E D E D T O R E F L E C T T H E C H A N G E S / I M P R O V E M E N T S M A D E . 7 . T H E P E R M I T R E Q U I R E S T H A T I N S P E C T I O N O F T H E S T O R M W A T E R M A N A G E M E N T S Y S T E M B E P E R F O R M E D A T L E A S T E V E R Y 1 4 D A Y S A N D A F T E R A N Y P R E C I P I T A T I O N O R S N O W M E L T E V E N T O C C U R S . I N S P E C T I O N R E P O R T S M U S T B E M A I N T A I N E D O N S I T E A N D M A D E A V A I L A B L E F O R R E V I E W B Y W Q C D P E R S O N N E L . 8 . T H E O B J E C T I V E O F T H E S T O R M W A T E R M A N A G E M E N T P L A N I N C L U D E S B U T I S N O T L I M I T E D T O M I N I M I Z I N G T H E A M O U N T O F D I S T U R B E D S O I L , P R E V E N T I N G R U N O F F F R O M O F F - S I T E A R E A S F R O M F L O W I N G A C R O S S D I S T U R B E D A R E A S , S L O W I N G D O W N T H E R U N O F F F L O W I N G A C R O S S T H E S I T E A N D R E M O V I N G S E D I M E N T F R O M O N - S I T E R U N O F F B E F O R E I T L E A V E S T H E S I T E . 9 . T H E I N S T A L L A T I O N O F B M P S A N D S P E C I F I C A T I O N S F O R E R O S I O N C O N T R O L S S H A L L B E I N C O M P L I A N C E W I T H T H E C D O T E R O S I O N A N D C O N T R O L S T O R M W A T E R Q U A L I T Y G U I D E . S T O R M W A T E R M A N A G E M E N T N O T E S : A V S C S E T F O R R E V I E W 0 7 / 2 4 / 2 0 1 4 0 + 0 0 B P : 0 + 0 0 . 0 0 17.8 3 ' 1 7 . 8 3 ' 5.52' 6 . 0 0 ' 34.01' 3 4 . 4 8 ' R5.00'R10.00'R10.00'EXISTING TRASHENCLOSURE TO BEREMOVED ANDRELOCATED P R O P O S E D R E L O C A T E D T R A S H E N C L O S U R E S -4. 0 : 1 -4.1:1 - 4 . 0 : 1 3 . 6 % 6.2%3.3%0+00 0+ 5 0 0+ 7 5 BP: 0+00.00 E P : 0 + 7 5 . 0 0 0+00 0 + 5 0 0 + 7 5 BP: 0+00.00 EP: 0 + 7 5 . 0 0 x x x x x x x x x x x x x A V S C T R A M P N - S P R O F I L E 8 0 3 0 8 0 4 0 8 0 5 0 8 0 3 0 8 0 4 0 8 0 5 0 0 + 0 0 8041.7 8041.72 8040.5 8040.28 0 + 5 0 8038.5 8036.05 0 + 7 5 8037.2 S U P E R T R A M P P I T 6 . 0 0 ' E X I S T I N G D R I V E W A Y P R O P O S E D D R I V E W A Y 3 4 . 0 0 ' 6 . 0 0 ' 4 : 1 D A Y L I G H T 1 7 . 8 3 ' A V S C T R A M P E - W P R O F I L E 8 0 3 0 8 0 4 0 8 0 5 0 8 0 3 0 8 0 4 0 8 0 5 0 0 + 0 0 8041.3 8039.0 8040.32 0 + 5 0 8039.3 8040.44 0 + 7 5 8038.7 6 . 0 0 ' S U P E R T R A M P P I T 3 4 . 0 0 ' 6 . 0 0 ' E X I S T I N G D R A I N A G E D I T C H P R O P O S E D S U R F A C E 1 7 . 8 3 ' OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 1 2 1 1 5 AVSC SUPER TRAMP FACILITY AVSC SIDEYARD AERIAL SITE J O B N O . S H E E T C 1 . 2 D A T E : 0 7 - 2 3 - 2 0 1 4 NO.REVISION BY DATE 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 DESIGNED BYCITY OF ASPEN, COLORADO DRAWN BY CHECKED BY DATEINITIALS DESIGN SET K n o w w h a t ' s R A V S C S E T F O R R E V I E W 0 7 / 2 4 / 2 0 1 4 AVSC WAX ANDSTORAGE ROOM WS WS WS WS WS WS 2 9 . 5 2 ' A P P R O X E X I S T I N G N O R D I C T R A I L 0+000+501+001+501+52 BP: 0+00.00EP: 1+52.42 0+000+500+67 BP: 0+00.00EP: 0+66.95 22.83'22.83'16.00'PROPOSED RELOCATEDTRASH ENCLOSURES - 3 . 0 : 1 -4.2:1 5.8:13.3%2.0%2.0%1.0%2.0%2.0%14.89'10.00'3.09'4.53'4.53'PROPOSED REALIGNMENTOF WATEREXISTING WATER SERVICEALIGNMENT x x xxxxxxxxxxx A V S C S T E P S P R O F I L E 8 0 4 0 8 0 5 0 8 0 6 0 8 0 4 0 8 0 5 0 8 0 6 0 0 + 0 0 8044.9 8044.86 8048.3 8048.32 0 + 5 0 8051.1 8051.08 0 + 6 7 8052.2 8052.23 5 . 5 0 ' A I R B A G P R O P O S E D S T A I R S P R O P O S E D S T A I R S P R O P O S E D R A I L I N G / F E N C E 6 . 0 0 ' 0 . 5 0 ' 5 . 0 3 ' A V S C A I R B A G P R O F I L E 8 0 4 0 8 0 5 0 8 0 6 0 8 0 4 0 8 0 5 0 8 0 6 0 0 + 0 0 8042.0 8043.6 8042.91 0 + 5 0 8045.4 8041.49 8048.1 8047.20 1 + 0 0 8050.5 8051.34 8052.3 8052.55 1 + 5 0 8055.5 8054.28 1 + 5 2 8056.0 8055.08 2 2 . 8 3 ' 4 . 0 0 ' 8 . 0 0 ' OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 1 2 1 1 5 AVSC TRAINING RAMPS AND AIR BAG FACILITY AVSC SIDEYARD AERIAL SITE J O B N O . S H E E T C 1 . 3 D A T E : 0 7 - 2 3 - 2 0 1 4 NO.REVISION BY DATE 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 DESIGNED BYCITY OF ASPEN, COLORADO DRAWN BY CHECKED BY DATEINITIALS DESIGN SET K n o w w h a t ' s R A V S C S E T F O R R E V I E W 0 7 / 2 4 / 2 0 1 4 300 AVSC DRIVE ASPEN, CO 81611 PHONE 970.205.5100 Issue: 07.24.2014 CONCEPT DRAWINGS AVSC CLUBHOUSE SIDEYARD PROJECT NO: DWG FILE: A1-1—Conceptual Site Plan.dwg SHEET TITLE 1§0114:10 1 DIN: A 06A 1 Lim SCALE: NOT TO SCALE M11