Loading...
HomeMy WebLinkAboutLand Use Case.Pfister Dr.A053-021 (,42,21 -4. <1 V. -7(Z) ur ¢06€ i 4053--01 /l 2735 -rr,-09-02 Lillillillililillip//1,1/,5/Ill'll'll t»-•14,Marc,n Creek Club Insub. PUD Amendment LOT 09 € 1 i <21(*14~ED )12-00_3 P 1 U i: ·*i eI. 273 9-216-0 101 4 CASE NUMBER A053-02 PARCEL ID # 2735-113-09024 CASE NAME Lot 24, MCC Building Envelope Adjustment PROJECT ADDRESS Lot 24, MCC PLANNER James Lindt CASE TYPE Insubstantial PUD Amendment OWNER/APPLICANT Wayne Ducote REPRESENTATIVE Francis Krizmanich DATE OF FINAL ACTION 9/26/02 CITY COUNCIL ACTION PZ ACTION ADMIN ACTION Approved w/ Condition BOA ACTION DATE CLOSED 10/1/02 BY J. Lindt .. ......... .~.:.j:*42::2.1::::? 4 16 .... .-/.5, 1 . 1, F PARCEL IDI|2735-113-09024 - [5*TE RdvE ~6/6/02 # COPIES:~ CASE NO|A053-02 CASE NAME:~Lot 24, MCC Building Envelope Adjustment PLNR:|--Ii)tu,i,£53~ l.-~i,ts~k PROJ ADDR:~Lot 24, MCC ~ CASETYP:|Insubstantial PUD Amendment STEPSr-- OWN/APP: Wayne Ducote ADR| C/S/Z:1 PHN:I REP:~Francis Krizmanich ADR:j 0079 Light Hill Road C/S/Z:]Snowmass/CO/8165 PHN1927-4263 FEES DUE:~500 D FEES RCVD~500 STAT: F REFERRALS~ **e»« REF:~ BYI DUE:~ r~ 4**6~#4.~*t:..,a'v MTG DATE REV BODY PH NOTICED 1.- DATE OF FINAL ACIEitlotto 2= CITY COUNCIL: REMARKS~ PZ: r L · BOA: CLOSED: | )0~l #1 BY:]-3, I,4 44 1 DRAC: F 1.11 PLAT SUBMITD: ~ ~ PLAT (BK,PG):~ , 9 ADMIN: kpArt*)€ d U.f COVO (TcokE Et*3 MEMORANDUM TO: - Julie Ann Woods, Community Development Director FROM: James Lindt, Planner 3-L RE: Lot 24, Maroon Creek Club Insubstantial PUD Amendment for a Building Envelope Adjustment DATE: September 16,2002 SUMMARY: Ducote Jax Holdings, LLC, represented by Francis Krizmanich Land Use Planning, has applied for an insubstantial amendment to the approved Maroon Creek Club PUD to amend an established building envelope. This request is to amend an established building envelope on Lot 24, of the Maroon Creek Club PUD in order to accommodate the construction of a fourteen (14) foot tall retaining wall (as low as 8 feet in some areas) and a drainage system on the northwest portion of the property. The Applicant believes that the retaining wall is needed to stabilize the soil and prevent the proposed residence from slope failure. Additionally, the Applicant wishes to utilize a 24 inch wide drainage pipeline to route storm drainage around the proposed residence to the northwest ofthe existing building envelope. Therefore, the Applicant has requested approval of an insubstantial PUD amendment to amend the building envelope to transfer 723 square feet from the northeast and southeast corners of the existing building envelope and add 723 square feet to the northwest portion of the building envelope (please see attached application for exact location of proposed transfer). Included in the Applicant's proposal is a drainage study that was prepared by Resource Engineering Inc. The drainage study indicates that fill material was placed on the northwestern portion of the lot during the construction of Pfister Drive. The Applicant contends that aforementioned fill material is not stable and thus, necessitates the proposed retaining wall. Additionally, the drainage report indicates that one of the two natural drainage swales located on the propeity is in the center of the building envelope. Therefore, the Applicant requests to utilize the twenty four (24") inch wide drainage pipe mentioned above to redirect the natural storm drainage to the south and west of the existing building envelope. The Applicant intends for the proposed drainage pipe to empty out into a natural drainage swale on the western portion of Lot 23 of the Maroon Creek Club. Staff has reviewed the proposed application and visited the site to verify that the proposed building envelope adjustment would not significantly effect the natural vegetation on the property in which the building envelope was established to protect. Staff has verified that the area that is proposed to be included in the building envelope is mainly fill material and that the important natural drainage area on the 1 western extent of the property will not be negatively impacted by the proposed retaining wall. Additionally, the Community Development Engineer has reviewed the proposed drainage arrangement and feels that it is appropriate . The Parks Department has also reviewed the proposal and believes that the proposal will not significantly impact valuable native vegetation. In addition, the Applicant has received letters of support for the proposal from the owner of the neighboring Lot 23 and the Maroon Creek Club Master Association. Staff has proposed conditions of approval that require the Applicant to fence off the new building envelope during construction so that existing trees and shrubs outside of the building envelope will not be disturbed during construction as well as to place silt fencing as is noted in the drainage study during construction. Additionally, Staff is requiring that the Applicant record a building envelope adjustment plat with the County Clerk and Recorder's Office within 180 days of approval, after having the plat reviewed and signed by the Community Development Director and the Community Development Engineer. Building permits will not be issued until the plat is recorded. Staff has reviewed this proposed PUD amendment and recommends administrative approval by the Director, with conditions. APPLICANT: Ducote Jax Holdings, LLC, Represented by Francis Krizmanich Land Use Planning. LOCATION: Lot 24, Maroon Creek Club PUD ZONING: R-15A PUD REVIEW PROCEDURE: Insubstantial amendments to an approved PUD may be approved by the Community Development Director, pursuant to Section 26.445.100. STAFF COMMENTS: Review criteria and Staff Findings have been included as Exhibit "A". The application has been included as Exhibit "B". The referral agency comments have been included as Exhibit "C". A letter of consent from the neighbor to the north is attached as Exhibit "D". Figure 1 of the Drainage Plan is attached as Exhibit "E". RECOMMENDATION: Staff recommends the Community Development Director approve this Insubstantial PUD Amendment for an amendment to the building envelope with the conditions as proposed below. 2 APPROVAL: I hereby approve this Insubstantial Amendment to the Maroon Creek Club PUD as proposed with the following conditions: 1. The Applicant shall prepare and record a building envelope adjustment plat within 180 days, and prior to submitting for a building permit application. 2. The Applicant shall place construction fencing around the amended building envelope so that the existing trees and shrubs outside of the building envelope will not be disturbed during construction. The Applicant shall have the City of Aspen Parks Department inspect the fencing prior to commencing construction activities. No grading shall be allowed outside of the amended building envelope, however additional landscaping as shown Plan Sheet L-1.0 shall be allowed to screen the retaining wall. 3. The Applicant shall apply the erosion and sediment control measures proposed in the March 7,2002 drainage plan prepared by Resource Engineering Inc. In addition, the Applicant shall submit a final drainage plan at the time of building permit submittal. The Applicant shall also have the Community Development Engineering inspect the silt fencing prior to construction of the retaining wall. 4. The Applicant shall submit the landscape plan (Plan Sheet L-1.0) at the time of building permit submittal to the City of Aspen Parks Department. 5. The Applicant shall face the entire retaining wall on the northwest portion of the property with stone or other similar materials to be approved by the Maroon Creek Club Master Association. 6. The Applicant shall bury the 24" Drainage Pipeline all the way to the Concrete Outfall Structure near the north property line as can be seen on Figure 1 of the dramage plan date June 12.2002. +IMPROVED SEP 16 A- 64 22:r dateQ,)/ 6 fDa- 2002 /JU/lu t-lilli „ oods, Community Develot#nentbirector COMMUNITY DEVELUPMEN 1 DIREG CITYOFASPEN ACCEPTANCE: Tg ~ I, as a person being or representing the applicant, do hereby agree to the condition of this approval and certify the information provided in this application is correct to the best of my knowledge. date Wayne C. Ducote, Ducote Jax Holdings LLC,,owner. 3 SEP-16-2002 MON 03:01 PM FAX £ P, 04 ArPROVAL: 1 hereby approve this Insubstantial Amendment le the Mroon Creek Club PU!) as proposed whh the folowing Gonditicns: 1. The Applicant shall pr•parc and record & building envelope adjuitment plat within 180 day& and priorte submitting for a building pormit applicaMon, 2. The Applicant shall plave construction fen©ing around the am¢nded building envelope Bo that the existing trees and shrubs Outside of the building envelope will not be di#urbed during censtruction. The Applicant shall have the City of Aspen Parks Deparcm©Mt inlpect the Ancing prior to commencln; conglruition activities. No gra•ing :hall bg allowed outside ofthe amended building en¥elope, however additional lands©aping as shown Plan Sheet L-1.0 shall be allowed to screen Ihe rataining wall, 1 The Applicant shall apply the erosion and sediment controt measures proposed in the Mlrch 7,2002 drainagc plan prepered by Re,ouroc Engineering Inc. In addition, the Appligarli shall submit n final drainage plan at the time of builditig permit submittal. ThcApplicant shall al•ohm the Community Development Engineering inspect the silt fencing prior le construction of the retaining wall. 4, Th¢ Applicant shall submit the land®mpc plan (Plan Shset L-1,0) at the time of building permit submmal to th@ City of Aspen Parks Department, 3. Thc Appligant Ghcli face the entirc rotaining wall on the northwest portion of th= property with Etone or other similu materials to be approved by the Maroon Creck Club Miator As®Giation. 6. The Applicant shalt bug th¢ 24" Dfainage Pipeline a!11},c way to the Col,creto Outful Structure near the north p:opaty line u can b* seen on Figure 1 ofthe dr•LM.1,0 plan dam June 12-2002. APPROVED -- SEP 1 6 2002 4 \ 2 *1-· (W ~25- an\.14/De- COMMU#17 DEa.Demell /"Ann Woods, Community D,ve[0~'enebtreQtor AccEAMY-*gRAspe **gi V L 85 a person being or representingthe applicant do hereby agree to the oondition of this approval and certify the Information provided in this application fs oorrect lo the best of my knowledf 8 1 flk(© f 02 WayM C. Du=ets, Ducete Jax Holdings LLC, *wner. r000 PITVO;6016 XYX ZZ:60 2000/LZ/60 ATTACHMENTS: Exhibit A -- Review Criteria and Staff Findings Exhibit B -- Application Exhibit C -- Referral Comments Exhibit D -- Letter of Consent from Neighbor Exhibit E -- Figure 1 of Drainage Plan 4 Exhibit A Review Criteria & Staff Findings Insubstantial PUD Amendment. An insubstantial amendment to an approved development order for a final development plan may be authorized by the Community Development Director if the following review standards are met. 1. A change in the use or character Of the development. Staff Finding: With this proposed amendment, the use and intensity remains the same as approved by the original PUD. Staff does not believe that the amendment changes the character of the development in a way which necessitates review by the Planning and Zoning Commission and Council. Staff finds this criterion to be met. 2. An increase by greater than three (3) percent in the overall coverage of structures on the land. Staff Finding: The proposed building envelope adjustment will not increase the coverage of structures within the PUD. Additionally, the amended building envelope will contain the same amount of square footage as the existing building envelope. Staff finds this criterion to be met. 3. Any amendment that substantially increases trip generation rates of the proposed development, or the demand for public facilities. Staff Finding: Trip generation and demand for public infrastructure are not affected by this change. Staff finds this criterion not to be applicable to the proposed amendment. 4. A reduction by greater than three (3) percent Of the approved open space. Staff Finding: The amount of open space within the PUD will not be reduced by the proposed building envelope adjustment. The amended building envelope will be the same size as the existing building envelope. Staff finds this criterion to be met. 5. A reduction by greater than one (1) percent of the off-street parking and loading space. Staff Finding: The applicant is not requesting an amendment to the existing or required number of parking spaces. Staff finds this criterion not to be applicable. 6. A reduction in required pavement widths or rights-Of-way for streets and easements. Staff Finding: The applicant is not proposing changes to right-of-way widths. Staff finds this criterion not to be applicable. 7. An increase of greater than two (2) percentin the approved gross leasable floor area ofcommercial buildings. Staff Finding: The applicant is not proposing changes to a commercial building. Staff finds this criterion not to be applicable. 8. An increase by greater than one (1) percent in the approved residential density Of the development. Staff Finding: The applicant is not proposing a change in the residential density. Staff finds this criterion not to be applicable. 9. Any change which is inconsistent with a condition or representation of the project's original approval or which requires granting a further variation from the project's approved use or dimensional requirements. Staff Finding: The proposed amendment is consistent with the project's original approval. Additionally, the Applicant is not requesting a variance from the approved use or dimensional requirements on the lot. Staff finds this criterion to be met. .J! An Insubstantial PUD Amendment Application for Lot 24, Maroon Creek Subdivision Prepared by: Francis X. Krizmanich Land Use Planning 0079 Light Hill Road Snowmass CO 81654 (970) 927-4263 June, 2002 1, 0 1 1 - Table of Contents 1. Introduction. 2. Insubstantial PUD Amendment, Section 26.445.100. 3. Attachments: 1. Pre-Application Summary. 2. Proof of Ownership. 3. Agreement to Pay. 4. Authorization for Representation. 5. Vicinity Map. 6. Site plans, Elevations and Landscaping plans. 7. Letters of support from Maroon Creek Club Master Association, Jeff Rich (owner lot 23) and David Chamberlain (owner lot 25) 8. Drainage report from Resource Engineering. 9. Soil report from HP Geotech. 10. 24x36-inch Amended Plat map. I. INTRODUCTION Ducote Jax Holdings, LLC, the owner ofLot 24, Maroon Creek Club Subdivision, requests approval of an insubstantial PUD Amendment to permit the construction of a new single family residence for Wayne and Diane Ducote. The proposed amendment will change the configuration of the building envelope to allow the construction of a retaining wall on the downhill side of the residence. A retaining wall is required at the proposed location because the platted building envelope is located on an area ofunconsolidated fill material. The new building envelope will ~ remain the same size as the original building envelope. The proposed reconfiguration will result in a shift of 723 square feet from the northeast and the southwest corners of the envelope to the northwest side ofthe envelope. The Ducotes have been involved in the planning and design of their new home for approximately the past year. The pre-application conference was conducted with James Lindt on June 29, 2001. Since that conference, the City reviewed and approved amendments to the existing building envelopes in the subdivision as insubstantial PUD Amendments (approved 10-19-01). Unfortunately, the Ducotes were not aware ofthat review process or the conditions that resulted from it. Condition number one, in particular, provides that " 1. No development (including any landscaping) shall be allowed beyond the rear perimeter ofthe existing approved building envelopes oflots 21 through 24 (see Attachment "D" for areas to remain undisturbed). The Ducotes believe that this condition should not apply to their lot because the development of the home and retaining wall as proposed will not affect the natural drainage system or any existing wildlife corridor. This condition appears to have been required to protect the natural drainage system and to preserve an "important wildlife corridor" as identified by the City Natural Resources and Construction Manager, Steve Ellsperman. The protection of the natural drainage system has also been an important concern ofthe Ducotes and the Maroon Creek Club Master 1 Association. In consideration of these concerns, the project has been designed to carry drainage around the home and to return it to the natural system immediately below the home and retaining wall. The building envelope is located on a previously disturbed site that contains an unknown amount of fill dirt of indeterminate origin. Because ofthese existing soil conditions, the proposed location of the retaining wall is necessary to stabilize the existing slope and protect the future residence from potential slope failure. A drainage report from Resource Engineering and a soil report from HP Geotech are attached for ' reference. The proposed development should not affect any important wildlife conidors because the area immediately adjacent to this lot is blocked by large retaining walls for Pfister Drive. This project has been reviewed and approved by the Maroon Creek Master Association a letter from them is included with this application. This application also includes letters of support from the two adjacent lot owners. The Applicant has attempted to provide all of the material requested by the Staff. If additional information is required, the Applicant will make every attempt to provide the requested information. 2 2. INSUBSTANTIAL PUD AMENDMENT, SECTION 26.445.100 The Ducotes request approval of an Insubstantial PUD Amendment to reconfigure the building envelope for Lot 24, Maroon Creek Club Subdivision pursuant to Section 26.445.100 of the City Land Use Code. This section ofthe application will outline the Insubstantial PUD Amendment criteria and the Applicant's response to those criteria: Code: 66 X. PUD Insubstantial Amendments. An insubstantial amendment to an approved development order for a final development plan may be authorized by the Community Development Director. The following shall not be considered an insubstantial amendment: 1. A change in the use or character of the development." APPLICANT'S RESPONSE: The proposed residence does not change the use or the character ofthe development. Code: "2. An increase by greater than three (3) percent in the overall coverage of structures on the land." APPLICANT'S RESPONSE: The new building envelope will remain the same size as the originally approved envelope. The construction of a residence on this site will require a retaining wall, the overall coverage of structures on the land will not increase Code: "3. Any amendment that substantially increases trip generation rates of the proposed development, or the demand for public facilities." APPLICANT'S RESPONSE: The proposed building envelope amendment will not affect trip generation rates or the demand for public facilities. 3 Code: "4. A reduction of greater than three (3) percent of the approved open space." APPLICANT' S RESPONSE: The proposed development will not reduce the amount of open space. Code: "5. A reduction by greater than one (1) percent of the off street parking and loading space." APPLICANT'S RESPONSE: Theproject will not reduce_parking or loading space. Code: "6. A reduction in required pavement widths or rights-of-way for streets and easements." APPLICANT'S RESPONSE: The project will not reduce pavement or rights-of-way widths. Code: "7. An increase of greater than two (2) percent in the approved gross leasable Aoor area of commercial buildings." APPLICANT'S RESPONSE: The condition is not applicable io the proposed residential b development. Code: "8. An increase by greater than one (1) percent in the approved residential density of the development." APPLICANT'S RESPONSE: The proposed project will not increase the residential density ofthe development Code: "9. Any change which is inconsistent with a condition or representation of the project's original approval or which requires granting a variation from the project's approved useor dimensional requirements. APPLICANT'S RESPONSE: The Ducotes believe that their proposed home design is consistent with the original project approval. There are no variances from the projects approved use or dimensional requirements. 4 V. ATTACHMENTS 5 ATTACHMENT 1 PRE-APPUCATION SUMMARy 6 21 w L. VL ,-V/4 1 1,%/1. 1.•lv 1.1 1 .1. 1/1 , 1 .-1 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY MANNER: James Lindt, 920.5441 DATE: 6.29.01 PROJECT: Lot 24 REPRESENTATIVE: Francis Krizmantch OWNER: TYP£ OF APPLICATION. PUD Amendment DESCRIPTION: PUD Amendment to amend the building envelope m include an existin3 ravine that was created by dralnage from a neighboring lot. The proposed appllcanI wishes to place a retaining wall around the ravinc. Land Use Code Section(s) 26.445.100 Amendment of PUD development order. Review by: Staff for complete application, referral agencies for technical considerations, Community Development Director for final approval. I (Community Development Director does not think that it mccts criteria for Insubstantial PUD Amendment then goes to Planning and Zoning Commission for a Public Hearing. Public Hearing: No, unless director feels that it needs to go to Planning and Zoning Commission. V Planning Fees: Planning Deposit $500 Total Deposit: $500 To apply, submit the following information: 1. Total Deposit for review of application. 2. Applicant's name, address and telephone number, contained within a letter signed by the applicant stating the name. address. and letephono number of the representative authorized to act on behalf of the applicant. 3. Signed fee agreement, 4. Pre-application Conference Summary. 5. An 8 1/2" x 11" vicinity map locating the subject parcels within the City of Aspen. Site plan showing the proposed and existing building envelopes, 6. A written description of the proposal and a written explanation ofhow a proposed development complies with the review standards relevant to the development app!ication 8 2 Copies of the complete application packet Otems 1 -9) Process: Apply, Planner checks application for completeness. Staffreviews application against PUD Amendment - Standards. Tf staff feels that application meets criteria for Insubstantial Amendment, Community Development Director creates and approves decision notice and development order. Disclaimer; The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the fulure, and upon f=:ual representations that may or may not be accurate. The summary dous not create a legal or vested right ATTACHMENT 2 PROOF OF OWNERSHIP 4 7 DUCOTE JAX HOLD11468.1.I.,..9 • i..vv,•..a.- .-·---- -- of the Ge,•e· o f 0 *kIAgand State of 6.Alit••4 GRANTOR(5), and- ST. GEORGE INVESTMENTS, LLC., a Louisiana Limited Liability Company, rhose addresi i; 601 Poydraa, suite 2011. New Orleans. f.oulauna 70130 of the 6.* of OMMEAdbnd State ofABu,LAA*}RANTEECS) 1&1TNESS. that the grantor(s), for and in ccnBideration of the sum of TEN and NO/1 DO ··.$10.00 --- DOLLARS, and other good and vahiable conoideration. the receipt and suffici:ocy of which iK hereby aciolowledged, has remised, rel,#ed. sold ind QUTTCLAIMED. and by these presents does remise :i.ease. scll and QUITCLAIM unto the granteecs). their hein and assigns forever, all th• real properly. together with improvements, if any, sttuatt, lying and being in the County of Pitkin and State of Colorado, dcsaibed as foliowa; Lot 24. MAROON CREEK CLUB, according to thc Plat ther:of Sled November 15. 1993, in Plat Book 33 ot Page 4, - commonly known w , 22, TO HAVE AND TO HOLD the jame, topther with all and singular the appurtenances and privileges thereunto helonging or in anywise thereunto appertaining. and at tho estate, right, title and interest and claim whatsocvcr, of tbe granror(s). erther in law or in :quity. to the only proper use, benefit and bchoof of the lantecs, Lheir heirs and 0551*MS forever k Th, singular number shall include the plurd ttic plural the singular, atd the use of any gender shall be applicable to all genders. :d IN WITNESS WHEREOF. the grant«$) linve executed thia deed on the date set forth above. Deeote Jax Holdtnes, LLC.. o Louisiana Limited LI:bility Company 1/L By: Wade C. Dgente, Manager State of ~AM&/*6* r P,42#/ k G *448 441,1 1§ Ge-,- of } l The foregoin; instrument was acknowledged. sub,cribed and Eworn to befole melhil / 6 day of bicataek _, 2001 by . Wayre C. Ducote as Managerof Ducotc Jax Holdings, LLC a Louisiana Limited Liability Compnny Witness my Hamd and Omci* Seal M)· Cemr:ris,ioM E.iput *tk.JeL ¢ Nk56.ublic 6,1~...1 RUSULL J. NUNEZ, JR. Notaty Pubio Phh ol Od- Stiteol LA - M,Commillion Is 10- For*10 462207 Pal•: 1 of 1 i ll l mfil lul 'll uu' 1 gill Il l'W H lili ll 12/29/200% 11638: ;Il.Vta DIV"IN VIKTN cOL .TY CO R •.00 O ..00 929-4 Zoo/Zoo d 2. l'.1 290"28018 S]IMGON IMI :!0 AN¥,000 3011!1-12 Ulf!21: 10 1002-92-21 ATTACHMENT 3 AGREEMENT TO PAy 8 12/13/1396 18:56 9709230201 PARK ONE PAGE 91 'ROM : <RI ZMANICH P-ONE NO. : 970 927 4263 Jui. 02 2201 02:27FM 94 FROM : KRIZMANI CH PHONE NO. : 970 927 4263 Jul. 02 2201 02:26PM 13 .ASPEN/PITKIN COMMUNITY DEVELOPMENT DEPARTMENT Agreement for Payment of City of Aspen Development Application5 Fees (Please Print Clearly) CI7 OF ASPEN :'hereinafter CITY) and chereinafter APPLICANT) AGREE AS FOLLOWS: 1. APPLICANT has submirted to CITY an application for (hereinafter. THE PROJECD. 2, .APPLICANT undersrands and agre:3 thar Cit' of.Aspen Ordinance No. 43 I Series of 1996) esrablishes a ree structure for land use applications and :hepayment of ail processing fees is a condinon precedent to a derermination of application compiereness. 3. JPLICANT and CITY =grac chal because cithe +ize. nanize or scope of rhe proposed project. .r ts not possible ac this Ilme to ascertain the Atit extent of the costs involved in processing the applicaton. APPLICANT and CITY Airther agree rhar ir is in the imerest of the partle3 m allow APPLICANT IC make payment of an initial deposir and to theriatter permit acdiTional costs to be billed ro APPLIC.Ayr ona menthly basis. APPLICANT agrees he wii] be bencfired by retaining great cash liquidiry and will make additional paymeors Upon noification by :he CITY when th•y are necessary as cosrs are Lacurred. CIn agrees ir Will be benefited through rhe greater certiunty of recovering is full costs To process .APPLICANTS apolication. 4. CITY and APPLICANT t\=her 4:ee that i: is impracticable for CITY stalf to complete processing or present suEicient informgtion m the Planning Commission and/or City Council to enable the Flanm.ng Commission and/or City Council to make legally required findings for project approval. uniess current billings are paid in fuiI prior to decision. 5. Therefore. APPLICANT agrees thar in consideration of the Ciry's waiver of its right to collect ill fees prior to a determination of applicalion compicteness. APPLICANT shall pay an initial deposit in the amount of S which rs for hours cf Planning staff time, and if actual recorded cos[5 exceed the initial deposit APPLICANT shall pay additional monthly billings to CITY to reimburse the CITY for the processing of the applicarion mentioned above. including , post approval review. Such periodic payments shall be maic within 30 days ofie billing date. APPLICANT further agrees that faiture to pay sub accrued co313 shili be grounds for suspension of processing. CITY OF ASPEN APPLICANT ~1 1-9- --/ 6//-#.64'./.il.Ii' TLEOBOmjk 1 /l-i )4ic Ann Woods D.. U 6 1 j 6 '14 6 1 Printed Name: t..44 budjAL Community Developmont Mailing Address: ,4 0/. POYA»63 1-r Acting Director 9 RM.,6&14.64-6. UL City of Aspea 70/'ae, ATTACHMENT 4 AUTHORIZATION FOR REPRESENTATION 9 12/13/1996 10:56 9709230201 PARK ONE PAGE 02 FRCM : ARIZMPNICH PHONG NO. : 978 927 4Z63 3*.. 02 2201 02: 27PM H4 LETTER OF AUTHORIZATION Wayne C. Duete 501 Poydras Street, Suite 2011 Ne,v Or lear.s, LA 70130 July 2, 2001 Aspen Community Development Department 130 South Galena Stroot Aspen, Colorado 816 1 1 To whom it may concern' I rm the owner of the property described as Lot 24, Maroon Creek Subdivision. My local telephone number is 923-0208 and the FAX number is 923-0201. I authorize Francis X Krizmanich to act as my representative to obtain approvals and permits tom the City of' Aspen to improve my property. Mr. Krizmanich's address is 0079 Light Hill Road, Snowmass, Colorado 81654. His telephone and FAX number is 927-4263. Respectfully, (A- #Cayne C. Ducote ATTACHMENT 5 VICINITy MAP 10 Jun 23 01 01:20p Jack Miller Q JMR 970 927 8899 p.3 . .71.10,2-.:.../u (/D) \ *t,7 .//6\ 'lx'/7. 4 1. ..7 l.i 7.+ 1 . I .. \ 43 - . 16 ?titi~t<: Rr-,15. 1 ''/>4;hz..3 - rillj,'673 :99 f I \\ \ \ -w 't·V~~.'ABfA*WIhl~\2 4.-11. * j&~\.,*45, I *:41 \ '\ t \ --- 1 5," - r \\\ E---' < / \ ~4 19 <'1 \ 1 --\ , 14 1 - 11\\.% 2. 1 , Kv . . , 74 J, ¢ : L t, -\ 6 -9, .\ .- . . 9\,3.2 45 31<9 1 1 " i L L.21 1,~ . - 4 \ 94»460.- A £2kl# VhT ': r=E: 1~ 1 1\\ \ 4 : ; -i i: , :39 >f»- 1- \ \ C J...r I 4 4 21; 1 1 + 4, r*f'Nirk-4 1 / , i L.1,4 L . M \.14 i , 59 5,009 j i ; i 1 1 1% k<.i i i 1 ·r ·r , 7 1 i 0 ' '11 · .\ , AR-2 - \; ..1'-, f ~ t z / 43 /.li.f b .14 1 1 h\\\A.ag \\ ->0 1 4 \\\1 6.1 Vl,/ \ * » 4 1 11,8+0'l.,9,1 /4 1\:\ t\,1 /1 0 + C l. ~.,\% 4 3 .3 0.->..:~~'r~0 0 .4 CA/:4* + Fli..11 ' Trrt r r-r:-- v & /1 - . 2, rp.,6.-4.4 i 2 1 1 M ! c j L .5 1 6 1. b F, i ..IjJIV. . 1 1 1,1 1.1 1 1 MI i li :A j / 9041 34: \ '.1 Nrl f j '6'l /- ~I - f A / px\' 2/7 , P e.th 1 11\ 'Cf Ah , 1 i :1 f ' lt..,VN 4 4 11 \ 'd-\/ ~~~; -·~ -~i~~~~~~~,7fx 2% Fr~ 41<24 - 4\ h \ % 21<'91, 7 ~1\\\\~ClbiC.4 -$'1 (/ 1\\ rd /V; .3, 0, 1/-* 4 1 9I:Or ale ICD:/CO/T I. 1 .OTe e:re ALR XY,8 ATTACHMENT 6 SITE PLANS, ELEVATIONS AND LANDSCAPING PLANS 11 , - 4\ %. $ ----~\ * <-3 -0- 3 -priz X I -- c littl//*8· »~-- N , (8) P'ropoeed Dectduoue Trace d *El 1 Frupoead Rst:-he WAU - - -8.0.W. 72.06,1 --- -- 3(4) 409064•I Ever,·een Traoe d 211 T.O.W. 80.00 72- - -- -- % N \ , \.-54 -- . N j --.0/04$ Lot 23 -.- 9 11 7 24rt**10 W* J Nk - 0 52 ' m - -4- 2. N,%46 5 Q, i ' \\ 0 , ...,E~i>k...1.....1\11.--,4.:.../.- 1 ~ , 3- 2 / 11% » -- + 21£ (5) Fropoeed 7,8 / DeciA,ous Shrul,e~ 8~IP / 7 \ 0. j 2 11 / - oew,~ 000 j-· .014.76.00 - 2 iii DUL#Er..pow ~*~ ·'b ,«, -- ·· , \\. 723SF l i . 2 N ''-1 ... 1 Propoeed Kabctk,1 Of Le®nd e"'.7100 -* 340 allang Envelope \\\ Fli~ DECErtgfl*aneion 723 5F 1845F \ 42»14· - _~ 22- h ~_ /~ 11/61 47 -2 274\~9 g~ Fropoeed Area of \ - ---1 i.. -5'C - - 4 XY/% ~1~%1 Building Envelope Reduction 723 SF 142.42_ _-_-1= ? aft&*faf,i Lot 24 .< 0-- - 0\ 1 r. ../. **«\ 4<.-~ t \ 14,7.K. -N.47' 7 -- \- \ Residence I.-> " 12\ \ Lower Levai FFE: 81.50 Mah, L™IFFE: 9150 . # \\ de f \ 1%\<2«5/ 37 \ STE ELEVATION 90' = ARCH ELEMnON 10097 4 \ 4 <rv ) \ r . 44 Li/<,9 j c N NFI , ,-13 9 ~, 1 1 \ 70 /)1 / / IS \ \ /.\ 1 -IM i./19 L I 1 \ // / »<J •91.5 a...1 R.1 - 0 24 3/ \ /0 / \ ' - ",0 - / 1,4 -~ 336 4 11 1 ~ ,- f* Garage 1 Lot 25 Ducote / 1 9¥E 95.00 / IF\ /X / .234. Residence 47 0/ / r. ------ gr--- // X\\01/ Plan V. f J \ I. Landscape .\\ 2-- . *Idl / --- / 1 9 -1 4 0 0.-0-0-1 \ i H K W 4 -q - Prop,00201 Real• t~on of Dati: 082,0, \ \ 53595F SC,10: r.,7 Dr~wn By:-24 *V \. -- \ I \ \. 1 ' r. . 0 4 I ..0 / I L . -~ ' t 1 1,1 - 1 I - U \1 4 . . I. Priv47 Pi ...0 4 / /. .. 0 \ 1 \ 1 / I. ® - P\ \ 11 \ 1 1 ' \ ....~ fLAY*mi-p.Nul- Al \ \ 1 * CU 4(*7)-2..2.1-01@Jain* *Uka - --" - 1 \ k#Ak NAU, ELE\471-1- ALL-* 1 jie@gla#BJG~Z.~Ar- 0 \--/ . I \ Bartimat- 99.3 Nlp. ....SJTrop Of Prop.CarMa She=: L-1.0 10 3919!Al 9A M - - C.. - - ,i-4 - FC -' 1 3- it[240 3321 lator -i#44 t 093*1 ~ -37// ----r-li.-/7-*/29 .:. -iws...<. .._ ,~,~22~FsT- '6·2-_-231 ~ ··· '7- 1 1 147 90 - , 1 71 3-206 I --2%*4.-/Ain~%-r_j#-__-2 to=_ Ibill -6 11-ill. livik 8/20 --m--_tt DECL- ~' i- · ,• -- 711· ILITI}..LI-1--,4 1=-:-th-- ' -- -- - -- --;tzy.- -c -p: -z-~=6 p r. _j~ 34.64-.*6247= 4-5-F- N 'b - --=inl~1 i-- -1.7-147 ~ 12-'-1 1 +111 r -= - - Clb@flt. --'.,tf··u' 1,_21 .1 -1.- 1 1 4--,f -14. Ii- 9-;11+13 1 4 - 11 1 i.. 77---I/4&'<7 - ..,Fl u V.- . 11 =#K -~ij.~-/27.1, ,: LE -„i B-# 42-= d '' .~ ")>302-7.«ri~9 7- 42,;W; U C i' . 4.-- 1/5-,47. r + TED= 4,0- SECI{ON_@_-MBR &fAMILY RM WEST ELEVATION GARAGE - SOUTH-ELEVATION +I'/ --~~-*20/+~Jl/'0~ - .1 1 -7.- _ 1 Iti.tit I =gE#2151 : 1--11, alr- -- j - t--+f·- ac,&=h J - 2~_ 5"- 22..7 -_. -- =-22~1-.LEI . fik», ra:9111-raritc \D h----*--44 - 20%444- --I-71'.F=- )49 ---- -Qi - -=4-1 7- ti .r- r rf-, 1·Ur-1-414--t- itt-1 -21. - 41:=--J -i- --a! 1.NI' i 17 ' Lljol) i i ·· f -11 --, 1 '1- 71-=Z--1.1 . -~216-4 ; ' 4f- t-- - _ -: « 417ie- - -·-r-A L - __, .. .__ - ..1. -+1 .. -1 - . b -. - ,-=7., 54 , 2 1 - 7-7-26 1 -7.=.442=6 - _22=€-41 ~ 9-- 1 1 1 -1 - 6 1 7 - '-1--33-14-3-5-fEI»+ /y ».-Ne)/FT-ifo -_ 4 \ .,se-·~:=r----L-k--11.xJX- ,1 , ~ '.1.-----~ ..6 - J. -222-u- * 7-9,4,2--7---1, 3 MAI~ --~ 4_I- j .~- i · 1.~Li{- ~bl 2-1 f.-/.I- -- ' »L[ 1 uid - 1 .=91 r- -!,ii·,VIJ~LE~~233 ,=-fE--ri>4~ P.J_IiI.,-I.'L-~i *f-jif-~lrjoFF l EAST ELEVATION .~1 ·-,1 4 : .n- 11 'CJ It :1 - E--11 1 1,- i ! 71-7 i · [-4-1 Ldv i , · 9 I7-- PI<.2,L4--ulri,-J,~.-14 t-Tr-if- it-11-7- 1 - -1 - h =221 f ~~7 H-4 7,2.2=4= - /-0./ 1- 'L-- --R ~ 4 - -#' L„„w, . C; 1 L.-- r -<Ji---··N -fu.' 'i·-- 1 L- - -.2/20-.694·' LU- p HL-4.-1-4 1 '- - -07» 72 - -24. NORTH ELEVATION - I EITERIOE MATERIALS - Fz77- i N WAINSCOT Sti•• Or¥••c:-11.w,/1.1,0 1 --L.<-~71:=---2;In.1\~I=>- - StRiNg: Sul•,1,3-Medium Tial TRIN: m/01,1,-10,lom/,ar, Too, 4.-L..._4 --./ 'Air-t--1 741 4=.1--- 244==' 1 11*OF: Colar S"-les-lillint - - --r--' 2EZ=Im 31-__I--_1 1 WIHOOW: Poll, O#Id,1 LIM--8,0,ze LE.- -1»1 - i 1 4-_. MU~·:ji-3._,i«1! 1 1 1/ 1 - -/ I - 1 11 .1-1-- 1 J ... «12 - :--:-. 11 i 5 2-9 / Z . -- ··hk- Liti ** DATE: ·/ 7/02 LOWER FLOOR PLAN JACK MILLER AND ASSOCIATES DUCOTE RESIDE DRAWN PY //4 ARCHHECTURE/PLANNNG LOT *24 REVISCNS - WEST ELEVATION ~ DATE: fl-ALS POST OFFICE BOX 4285 MAROON CFIES< CUE 3.1 ASPEN, COLORADO inell ASPel COLORADO 8/8 1-1 \ 14 -7 ~ 1 FAX 970-927-6899 © 2001 .0£* 'ILLEN I ASSOC. TELEPHONE 970-927-9513 C« '2 02 -12-\ * ~\ X \ 4\ 4 \ 4\ C .- / Fropoeed Evergreen Tree 70-0 -*- --- 3 Fropoeed Tail Declduous Shrub 211.2 1100.3.~ \ \ / , Froposed Deciduoue Tree ~ ~ i 1/-- . e\ U \ \ .\.\ . - 3,4 - 8 F 74 -- /- ..9 z · 92 gal * \ < 2 21 . 4 1 -2.3 -4114 . . <4. / 1 i .. z ill - E :8 1 - . A· \ 4- 0 2 re -* \ 1 "mt ··.2./.W, .... Z 1.1" 00-ka. _ .,- 'Al //hawl/71 - . 3.36/12 V.A' . M 111 1-- fi f . ~7&27:4 U u .3 s. /9,0,7-. . ,-624% A * -f f -7/ I 4.07 .: d 4 4 -#41 ., >«, 1 21 7. /6.':Jrul 2 + SP. 6 1 1/1*Atib.Wil , ~ 4'·~·:: d.aA_!UN'-44.:9 9-7 A- I . /2 7,90. 1 Froposed Evergreen Tree 343 .4, ic 9% , Proposed Shrubs ana Groundcovers \.4 Q.J.'- /, / a - f B \ - ProposeaDed&™s-rree- .. 4-- Fropoeed Evergreen Tree Exietine Everereerl Tree · . 9 7 1 4 36.47 IR 1 : -*t£==chile 1 11 9 // / . t. 1 - & - Rt-' 4 .> -4 p . 12 .. N / 0, I.' 1. Ducote \4 A:\ F. - 1 X\\44~,11« 4 Residence 9~ \ 10 - 4-L , 6 94.1,4... -7:- ... . 4 / 1 / 1- ~~ ~~~ Plan . \ Planting N I 41 P % 0' 1 - - \ 1 Ben-le 0-ign » - ~64-NPL I cor=ruct~nooll/'na- AU'Co,Ccurt A 1 11, 4 1 . l. I Roy< - C-U- Ato: 08/21/01 1 , Scal.: r.le Symbol Qty./ Name Size _ (,22&==z 'L .:... \ \ 1 I. 1-41-- C 01 25 - Fropoeed Deciduous Tree 1.5"-4"Cal \ ' A 50 - Propoeed Ever,green Tree 12-20' ./1 \ / r. .../ / 12 - Froposed Tall Deciduoue Bhrub 3,-6, 4 . - - /Sh er 1,600 00ft. -Fropoeed Shrube and Groundcovers - 44 /.:-1 LIU Sh-t: L-2.0 ATTACHMENT 7 SUPPORT LETTERS 12 Sent By: William Lukes + Asso tes; 970 920 6986; Mar- 32 2:500M; Page 1/2 WILLIAM LUKES + ASSOCIATIS PRO]ILT MANAULML AT ARCH['1'[-71-7 Rk 25 March 2002 Francis Krizmanich Krizmanich Land Use Planning 0079 Light Hul Road Snowmass, Colorado - fax to 927-4263 re: Maroon Creek Club Lot 24 Site and Architecture Review Committee [SARC1 Approvals Francis: I am writing on oehalf of the Maroon Creek Club Master Association Site and Arcnitecture Review Committee [SARC] regarding the apolication by Mr. and Mrs, Wayne Ducote for architectural approval to construct a Rome on Lot 24 according to the plans prepared by Jack Miller. At the February 21, 2002 meeting of SARC, a request was made to SARC :0 grant Schematic [preliminary] Approval forlhe plans and to supporl the appl cant's proposed request to the Cityof Aspen for an insubstantial plat amendment to allow for re-configuratjon of the established building envelope. As it was presented to SARA Mr. and Mrs. Ducote propose to modify the building envelope to allow for 1) construction of a retaining wall and 2) removal / replacement of an area of deep fill outside of the envelopeinordertoaddressexisting drainageproblems and prevent furthererosion of theembankment. Since these itrprovements exceec 30' n height above existing grade, the plat amendment would apparently be required to accomplish them. SARC reviewed both the house design and the topographic and drainage issues involved with the request and asied you to provide the following additional information prior to any approvals: 1. -he consent of Mr. David Chamberlain as the owner of the adjacent Lot 25. The consentof the owner of the only other contiguous lot, Lot 23, had already been provided to the Committee with the application, 2. Ari engineered drainage plan for the prooosed modifications to existing drainage patterns to ensure ttat any new construction would not adversely affect either neighboring lots downhill of Lot 24 or the golf course below. Pe., 1 0 k i i C. c Box Ill 44 .\4,1,1. c.<l<•47.11.1 3 1 (, 1 7 9 70·420·09 19 1.X 42,3 09/6 Sent By: William Lukes + Asso tes; 970 920 6986; Mar- )2 2:51 PM; Page 2/2 25 March 2002 Page 2 Mr. Chamberlain has now confirmed to members of SARC that he has no objection to the plans with the provision of some additional landscaping, and a drainage diversion plan prepared by Resource Engineering, Inc. has been received and forwarded to our consulting engineers for more detailed review. We also received from you a copy of a letler from the geotechnical engineer establishing that there is a great amount of unconsolidated fill in the vicinity of the building envelope, and that a retaining wall and replacement of the fill will be required to stabilize this area. Based on the documented need to address drainage and slope instability cn the property, the Site and Architecture Review Committee of the Maroon Creek Club Master Association supports the Ducotes' request to the City of Aspen for an insubstantial amendment to the plat for Lot 24 in order to reconfigure A...,i-,< the building envelope in the manner you have proposed, es long as the square footage of the amended envelope is the same as the original. SARC requests that you pursue your application with the Cityand has continued any further design reviews until such time as the City approves the modified building envelope. If the City staff has any questions about the Association's position of support on the application, please have them contact me at any time, SiI'cerely, , William Lukes AIA Architectural Advisor, Maroon Creek Club Master Association copies: Gary Albert, President, MCC Master Association Brian Martin, SARC Brooke Peterson, Esq ATTACHMENT 8 DRAINAGE REPORT 13 ..rl. ..£,UU ..... RESOURCE ..... ~ENGINEERING INC. Mr. Jack Miller March 7,2002 Jack Miller and Associates PO Box 4285 Aspen CO 81612 RE: Drainage Study for Lot 24, Maroon Creek Club Subdivision Dear Jack: This letter report presents the drainage study for construction of a single family house on 1 Lot 24 of the Maroon Creek Club Subdivision near Aspen, Colorado. The drainage plan presented in this report provides for conveyance of off-site storm waterthrough the property and conveyance of on-site storm water consistent with the Master Drainage Plan for the Maroon Creek Club Subdivision. BACKGROUND Lot 24 is located on the hillside below Pfister Drive with slopes ranging from 10% within the building envelope area to 70% on the steep slopes to the west and north. The existing vegetation includes aspen and evergreen trees with gamble oak and service berry brush with various grasses. The soil is primarily Morval loam. However, fill material was placed on a portion the site during the construction of roads and infrastructure and rough grading of the site. There are two natural drainage swales across the property, both of which receive point source discharges of storm water from culverts under Pfister Driver. The western swale is away from the building envelope and is undisturbed by the proposed project. The central swale runs through building envelope and the storm water flow must be rerouted around the proposed house. The source of water for this swale is from a 24 inch culvert under Pfister Driver which conveys storm water collected from a relatively small offsite basin. It is proposed to route the drainage from the 24 inch culvert around the house and back into the swale at the north property line. RUNOFF Off-Site The off-site drainage basin tributary to the 24 inch CMP under Pfister Drive includes approximately 10.2 acres of forested and grassed hillsite, portions of two developed lots, and approximately 4,000 square feet of roadway. The rational method was used in calculating the peak flows for the two year and 100 year storm events. The two year flow is calculated at 0.84 cfs. The 100 year flow is calculated at 12.4 cfs. The assumptions and calculations are presented in the appendix. jm lot 24 drainage.890.wpd Consulting Engineers and Hydrologists 909 Colorado Avenue I Glenwood Springs, CO 81 601 1 [970]945-6777 I Fax (970]945-1137 Mr. Jack Miller March 7,2002 Page 2 Site The project site includes 0.604 acres. The two year peak runoff rate is calculated at 0.22 cfs. The peak 100 runoff rate is calculated at 1,6 cfs. The assumptions and analysis are presented in the appendix. Design Flow Since the 24 inch culvert under Pfister Drive has the capacity to convey the 100 year flow from the off-site basin, the pipeline through the property is likewise sized to convey the 100 year flow for the off-site basin plus the on-site basin. This is a conservative assumption since the peak flows do not coincide and approximately half of the site drainage will be conveyed thriugh the pipeline. The design flow is 14 cfs for the combined off-site and site drainage. DRAINAGE PLAN The overall drainage masterplan forthe Maroon Creek Subdivision provides forrouting the off-site and subdivision area drainage to Maroon Creek or through the golf course ponds consistent with the historic drainage patterns. The drainage from Lot 24 flows down the swales, into the large swale along the golf course (which includes the Willow Creek Ditch channel), into the golf course pond system, and eventually to the Roaring Fork River. The golf course ponds were designed to provide detention storage for up to the 100 year storm event. The drainage plan outlined below is consistent with the overall drainage master plan for the subdivision. The off-site drainage will be picked up in a 24 inch pipeline and routed around the house and discharged into the existing drainage swale consistent with the historic drainage pattern. The design of the pipeline will include water tight joints, manholes at the bends, and concrete inlet and outlet structures to anchor the pipe. The outlet structure will be designed to dissipate energy. The existing eroded gully will be stabilized by construction of a retaining wall and fill to reclaim the upper area, and rock riprap/vegetation to stabilize the gully below the outlet. A portion of the steep eroded portion of the gully is on the adjacent Lot 23 property. It is anticipated that the Lot 23 owner will cooperate in allowing stabilization of the eroded gully below the Lot 24 property line. The proposed location of the pipeline structure is shown on the attached Figure 1. The site drainage will generally follow the historic drainage pattern on the site. The general concept is to direct drainage away from the house structure. Area drains are proposed in the front of the house and in the rear of the house where continuous slopes or swales are interrupted by walk ways and retaining walls. These area drains will be connected into the proposed 24 inch drainage pipeline. The proposed site drainage concept is shown on the attached Figure 1. jm lot 24 drainage.890.wpd ..... ..... ..... RESOURCE ..... 11Ial ENG NEERING 1 nJ CJ Mr. Jack Miller March 7,2002 Page 3 Construction design documents including the pipeline profile, inlet, outlet, and manhole structure details will be developed for review and approval by the City of Aspen. EROSION AND SEDIMENT CONTROL Construction on the site will require implementation of erosion and sediment control measures. These include silt fence around the downstream perimeter of disturbed areas and installation of hay bales or erosion control logs in all drainage swales. The proposed location for erosion and sediment control measures are shown on the attached Figure 1. Details for construction of these items is also attached to the study. The erosion and sediment control measures must remain in place until all disturbed area are revegetated or stabilized. CERTIFICATION This report was prepared by Michael J. Erion, a Colorado Registered Professional Civil Engineer familiar with urban and rural drainage and flood control design and construction practices. The proposed drainage plan is consistent with the overall master drainage plan of the Maroon Creek Club Subaivision and will not cause damage to adjacent or downstream properties resulting from erosion, flood or environmental impact during construction and after completion. Please call if you have any questions or need additional information. Sincerely, RESOURCE ENGINEERING, INC. A l CA: tatf-tr 3:14« 1- \ i Michael J. Eton, P.E. Water Resources Engineer MJE/mmm 890-1.0 Attachment CC: Wayne and Diane Ducote, w/attachment jm lot 24 drainage.890.wpd ..... ..... ..... RESOURCE ..... 1111~ ENGINEERING INC m ATTACHMENT 9 SOIL REPORT 14 i Irtl L. - L 1-1 - 1 LILL, 1 L'_, 1 r. LI,-/ L.14 - G*Etech He, _ th-Pawlak Geotechnical, Inc. 5020 Counlv Road 154 GIenwood gprings, Colorado 81601 Phone: 970-945-7988 Fax: 970943-8454 hpgeo@hpgeotech.com March 6, 2002 Wayne Ducote 601 Poydras Street, Suite 2011 - New Orleans, Louisiana 70130 Job No. 100 920 Subject: Proposed Site Wall, North Side of Proposed Ducote Residence, Lot 24, Maroon Creek Club, Aspen, Colorado Dear Mr. Ducote: As requested by Jack Miller, we have reviewed our preliminary subsoil study report, Job No. 100 920 dated December 19, 2000 for a proposed residence at the subject site. The review was conducted to evaluate the feasibility of constructing a retamtig wall to elevate and level the site for the residence. The proposed concrete wall will be about 1() feet high and is needed roughly along the north building envelope line to build the residence. Borings 1 and 2, located just to the south of the proposed wall, encountered between 17 to 23 feet of fill material judged to be unsuitable for building support. We assume that the proposed building has been designed based on our preliminary recommendations for spread footings and that no more than 10 feet of compacted structural fill will underlie the footings. Based on our review, the proposed retaining wall appears feasible provided the existing fill is completely removed and the site elevalions are re-established as recommended in our previous report. Additional exploratory borings should be drilled to evaluate existing fill depths within the wall area and at other parts of the building for site specific foundation and grading design recommendations. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH - PAWLAK GEOSJKHNICAL, INC. N rr Steven L. Pawlak, P.g.*: 1 5222 . 211~~ Rev. By: DEH P##~31*5825&47 1LL . L OF COLO - SLP/ksw CC: Jack Miller & Associates - Attn: Jack Miller TOTAL P.02 ATTACAMENT 10 24x36-INCH AMENDED PLAT-ATTACHED SEPARATELy 15 .. . . 0 . . . FIRST AMENDED PLAT OF ~1 LOT 24 - FOUND REBAR MAROON CREEK SUBDIVISION COMMON AREA /- RPC LS# 25947 l 0 AA'/bY ~ \ 0 10 20 40 I SBA.-Vog~ ~ = 20' 1 \\ \ LOT 23 BASIS OF BEARING = A BEARING OF S60°00'00"E BETWEEN % ~7 RETAINING Nki. A FOUND NO 5 REBAR AND RPC CAP LS 25947 j~~ ( WALL \ 00. AT THE N.W. PROP. CORNER AND A FOUND NO 5 REBAR AND RPC LS 25947 FOUND AT 1 1 liv 40 0.111. 00.. \ i THE N.E. PROP. CORNER AND SHOWN HEREON. 1 1 »\VA + 09 '00\L HOMEOWNERS APPROVAL ~\ N ~t~~, 4 6 »42%20~ IN 4> e. O 1 BUILDIN- r J['ll '1%~TE:11:22 9111% ff~f.VIE, %- Tr_ --9--0-N_.C#-M. 1 1 34 <0 Jk <« 24-~ so s~/~~x +00 PRESIDENT: MARRON CREEK CLUB MASTER N X~~~~9' 6~ 4. 0&9 /,9 - ,»-4 -Loges« s 60%41/3 01'2&33~ ~ ~ 6~03's ~ 9 v 49 + N\\ ~ FOUND REBAR 4/ 7 f *21 \ ,#*- RPC LS# 25947 LEGAL DESCRIPTION COMMUNITY DEVELOPMENT DIRECTOR APPROVAL % * # PROPOSED REDUCBON OF Lj Lot 24, Maroon Creek Club, According to the plat thereof filed Nov. 15, 1993 41 1 , THIS AMENDED PLAT WAS APPROVED BY THE COMMUNITY DEVELOPMENT DEPARTMENT DIRECTOR Of- THE CITY 4 8U#LDING EN\iLOPE in Plat Book 33, at Page 4, County of Pitkin, State of Colorado. OF ASPEN, COLORADO SIGNED THIS -___-- DAY OF _____-___-. 2002 96 4*~~/ be' 0 264/6) 4 (184 SO FT COMMUNITY DEVELOPMENT DEPARTMENT DIRECTOR \ 40 1 \\\ 9,3401 - 4/ / U. 0\% ><\ 4 1\\ / 5 ls. 4 6 34%.EN iLl\ . U?4».9 4 /3 m i \9 \ Legend St:gr rb' CITY ENGINEER'S APPROVAL 10\ 1 1 THIS AMENDED PLAT WAS APPROVED BY THE CITY OF ASPEN DEPARTMENT OF ENGINEERING Ld THIS ___ DAY OF ____________, 2002. , - indicates found monument as described mdicates set monument, RPC LS# 24303 CITY ENGINEER 10 \\ 14\ 0 5 - ASPEN TREE 1 ~ 0 1<2~~ 7 z| EVERGREEN TREE 0. / 57- Ill ' . 143,<A , 02\ W. OWNERS CERTIFICATE .1 4 0- LOT 25 M WATER VALVE »\0 Fr KNOW ALL PERSONS BY THESE PRESENTS THAT DUCOTE JAX HOLDINGS, LLC, IS RECORD OWNER OF CERTAIN LANDS \ 4/ ® SEWER MANHOLE IN THE CITY OF ASPEN, PITKIN CO. KNOWN AS: , DO HEREBY CERTIFY <(& # 4 .«% 013 THAT THIS AMENDED PLAT HAS BEEN PREPARED PURSUANT TO THE PURPOSES STATED HEREON \40.03, 1,/Ao 25 ° LID FOR SAID PLAT AMENDMENT, DATED: THIS ___DAY OF ______ 2002 AND RECORDED AS RECEPTION NO. OF THE RECORDS OF THE CLERK AND RECORDER OF THE COUNTY OF PITKIN, STATE OF COLORADO. ~ ~~ 362*20. 4./ 9 0 .7-4 0 1 L z Notes 1 BY: ________________ :1 ....26 WV A1 1. BASIS OF ELEVATION: AN ASSUMED ELEVATION OF 99.3 AT -1-HE S.E. PROPERTY 1-0i PROPOSED REDUCTION OF CORNER AT TOP OF CAP AND SHOWN HERON. 2. THE CONTOUR LEVEL IS TWO (2) FEET. 8Ull,DtNG ENVELOPE ~ \\ 539 SO FT 3. VERIFY TOPOGRAI?HIC INFORMATION BEFORE CONSTRUCTION 1 1 \/too T I TLE CER T IFICATE 4. NOTE: THIS MAP IS INVALID AS A LEGAL DOCUMENT AND POSSESSION THE UNDERSIGNED, AGENT, OF PITKIN COUNTY TITLE , INC. DOES HEREBY CERTIFY f /0(7 + OR USE OF THIS MAP IS UNAUTHORIZED BY THE SURVEYOR UNLESS IT THE ENTITY LISTED AS OWNER ON THIS AMENDED PLAT DOES HOLD FEE SIMPLE TITLE TO THE WITHIN BEARS THE ORIGINAL SIGNATURE AND WET STAMP OF CARL R. CARMICHAEL- DESCRIBED REAL PROPERTY SUBJECT ONLY TO A DEED OF TRUST FOR THE USE AND BENEFIT oF PLS. DOCUMENTS PREPARED BY THE SURVEYOR AND WITHOUT A SIGNATURE AND FILED FOR RECORD AS RECEPTION NO. _________ OF THE RECORDS OF ~ PITKf-ki--COUNTY. COLORADO, WET STAMP ARE TO BE VIEWED AS PRELIMINARY AND ALL INFORMATION WV 1~ SHOWN THEREON IS SUBJECT TO CHANGE. ALTHOUGH WE BELIEVE THE FACTS STATED ON THIS AMENDED PLAT ARE TRUE, THIS \ BENCHMARK = 99.3 CERTIFICATE IS NOT TO BE CONSTRUED AS AN ABSTRACT OF TITLE, NOR AN 5. PURPOSE: THE PURPOSE OF THIS PLAT AMENDEDMENT IS TO OPINION OF TITLE NOR A GUARANTEE OF TITLE, AND IT IS UNDERSTOOD AND \ i ~ ~~~AT TOP OF PROP.CORNER REVISE THE BUILDING ENVELOPE AS SHOWN HEREON. AGREED THAT PITKIN COUNTY TITLE OF ASPEN, INC., NEITHER ASSUMES NOR WILL BE 1 \ CHARGED WITH ANY FINANCIAL OBLIGATION OR LIABILITY WHATSOEVER ON ANY STATEMENT CONTAINED HEREIN, 1 i 1 1 PITKIN COUNTY TITLE, INC. 601 EAST HOPKINS \ \ ASPEN, CO 81611 \ SIGNED BY: i STATE OF COLORADO ) SURVEYOR'S CERTIFICATE COUNTY OF PITKIN ) THE FOREGOING TITLE CERTIFICATE WAS ACKNOWLEDGED BEFORE ME THIS _--- DAY ~ OF ________, 2002 BY VINCENT J. HIGENS, AS PRESIDENT OF PITKIN COUNTY TITLE I HEREBY CERTIFY THAT THIS MAP ACCURATELY DEPICTS A TOPOGRAPHIC MAP AND AND IMPROVEMENT SURVEY PLAT WITNESS MY HAND AND OFFICIAL SEAL PERFORMED UNDER MY SUPERVISION ON MAY 09,2002 OF THE MY COMMISSION EXPIRES 1 ABOVE DESCRIBED PARCEL OF LAND. THE LOCATION AND DIMENSIONS OF ALL IMPROVEMENTS, EASEMENTS, NOTARY PUBLIC RIGHTS-OF-WAY IN EVIDENCE ARE KNOWN TO ME AND CLERK AND RECORDER'S ACCEPTANCE N ENCROACHMENTS BY OR ON THESE PREMISES ARE ACCURATELY SHOWN. ~ THIS IMPROVEMENT SURVEY PLAT WAS ACCEPTED FOR FILING ~l IN THE OFFICE OF THE CLERK AND RECORDER OF THE COUNTY OF \ PITKIN, STATE OF COLORADO, AT _ - O'CLOCK, _ M. THIS_ _ DAY OF ~~ 4 - IN PLAT BOOK _ AT PAGE__ _ AS RECEPTION NUMBER CARL R CARMICHAEL P.L.S. 24303 DATE: CLERK & RECORDER NOTICE: According to Colorado law you must commence any legal action based upon HIRED GUN SURVEYING LTD. DATE DRAFTED: 11/9/01 DATE SURVEYED: 11/8/01. any defect in this survey within three years after you first discover such defect. REVISED: 11/25/01 DATA FILE NAME: 0010206 In no event may any action based upon any defect in this survey be commenced more P.O. BOX 9 REVISED: 5/9/02 DRAWN BY: T. YOCUM than ten years from the date of the certification shown hereon. REVISED: 5/20/02 SNOWMASS, COLORADO 81654 (970)923-2794 ........ ZOof,-Z Ex h & la j 1 M 4 To: James Lindt From: John Niewoehner City of Aspen Community Development Engineer THE CITY OF ASPEN Date: June 19, 2002 RE: Drainage at Maroon Creek Club Lot 24 James: Proposed Storm Water Drain Pipe: I see no problem with the plan to route the drainage around the proposed house using a 24" pipe. The pipe is sized correctly and erosion control issues have been addressed. (1 think they could reduce the number of manholes but that's not our concern.) Retaining Wall: They could bring the west wing wall back towards the building by 10 to 20 feet. The elevation at the top of the retaining wall is 80 feet. On the east end of the retaining wall the wall rejoins the existing topography at elevation 78'. Similarly, the west end of the wall could be shortened to rejoin the existing topography at elevation 78'. (See attached drawing) A final note... With a little effort, I think the retaining wall might be eliminated. Only a small portion of the existing grade behind house is lower than the floor elevation of 81.5 feet. i \3 /JohnN/10124:MaroonCrkClub AREA i.. ./ -~-MOUND REBAR 540 €Te.€o RET+N'-4 ~\ RPC LS# 25947 j LOT 3 ~---fES£- W BALES OR SILT FENCE ~ , EROSION CONTROL. LOGS ~ ROCK RIP RAP 7« D. - 24" RETAINING --- ° CONCRETE 4 C WALL AREA DRAIN OUTFALL ON STRUCTURE O $%\- A \ 72&04~,I, ~~41;*b· . I ft $ W DRAINAGE 701 + e OD.4, PIPELINE --4 0 7 , - '00 li f v 76.00 - - 4 7 8,00.--* 4 0 41 10 P 8-L MANHOLE ~ Crm.) -SILT FENCE / th.: 0/ ' ?- i ..N 45 - PLE' \ \ GU 1 1 \ RAIL 00 LOT 25 H (' 1 1 ./.--I 3 1 2 1 4 6}lj 't '. W .8 AREA DRAINS \~~LI~ ----* RE-(767/ 5/1 3045 te<0 J€,-T} 64 ', 3 - Z (TYP.) i ,PA«94 ~Er·ve¢Cru.f' 'r¥ -96 li 06 · 00 .. ( pity j'\ fer #1 11 6. L i < 4p \ 1% Di \ j Z..tn-~I 4-' y. 59 19« #CONCRETE 4 .4 HEADWALL 47.- 9 ... AT TOP OF PROPERTY CORNER ~~~ma~ - 09.3 ZPO - 8120 1RUE DEVAXII Mar 27 02 01:26p k Miller Q JMA 970 927 8899 P.6 EX|/h bl F U _ February 6,2002 Aspen County Planring Dept. Cily of Aspen Zoning Dept. Maroon Creek Architectural Review Commillec RE: Plol Amendments Lots 23 and 24 Maroon Creek Club Subdivision I have recently piii:liased tile residence located on Lot # 23, Maroon Creek Subdivision and [ have reviewed Llic mullial approvals between thc fi ,rnicr owner of this property (Richard Wax) and the owner of the adjacent Lot # 24, Mr. & Mis. Wayite Ducote. Further, [ have reviewed the proposed floor plans and clevation: of the proposed residence to bc located on Lot 24 along with requcstcd niodifications of the building envelope. These modifications would accommodate a deck on tlic nordiwest side of the properly as well 1,5 establishing retaining walls to prevent further erosion oil tile rear of the properly [ support both o['llicsc requests by Ilic Ducoles and encourage your approval. Sincerely, WCARich 1 03/27/02 14:31 FAX 0002 3-27-2e02 11 :08AM FROM wAVID R CHAMBERLIN 970 544 5334 ~ P. 1 TCHOUPNOULAS PARTNERS 601 POYDRAS STRET. SUrrE 2011 NEW ORLEANS, LA 70l30 PHONE (504) 525-9017 L FAX (504) 525-78 17 March 19,2002 Mr. David Chamberlain 101 Date Avenue Aspen, CO 81611 RE: Lot 24 Maroon Creek Subdivision Dear David: Thanks for taking the time to meet with me relative to the above project. 1 appreciate your interest as well ns reviewing any potential impagts which it might have on your property. I have enclosed a preliminary site plan which delinestes the location of the residence, associated nat work, driveway and landscape screening, We have programmed large evergmens between our rwo properties whlch should provide adequate screening. Not only will the trees screen our driveways, they will also provide privacy for your property from our side terrace. We have also engaged a drainage engincer to propose a permanent solution to seasonal water runoff from the street Richard Wax and I have agreed to split this rernedial cost and the plan should eliminate existing drainage problems on your property. I believe we both want the same level of separation between our properties and if the landscaping shown on the plan proves to be inadequate. we will add more trees until wc achieve the desired effect I have also enclosed a copy of a letter prepared by my architect, Jack Miller, to the Maroon Creek Homeowners Association indicating your approval of our plan. If that is correct, I would appreciato your signing a oopy of this letter and I will have it picked up from you so that we can pres¢m that letter of no objection to the committee at the March 21't meeting. Thanks again for your cooperation. Stmly, - Uync Dwoote I Agree to the proposed landscaping and drainage preliminary designs set forth in the drainage 9601 and landwiing plan which I have reviewed. I have no objection to the proposed project on bivid Chamber/in Owner, Lot 25 SE't OUA Couv(AMT) ON I VISIT- 1 A*1 OAR.t C 0)4yt ~oth*14* nICAE \1 A LOT op LA·NME-,4-PiNG -19 (t(-H R,8 ~£ Du vew#ck 'M)6 b R,11 e460 bITCH 22( 1 5 6-0 u ¢RU) luj L 41*:406- nft,06 Brian Flynn, 08:59 AM 06/20/2002 -0500, Re: Lot 24, Maroon Creek Club Retaining Wall X-Sender: brianf@commons X-Mailer: QUALCOMM Windows Eudora Pro Version 4.2.0.58 Date: Thu, 20 Jun 2002 08:59:14 -0500 To: James Lindt <jamesl@ci.aspen.co.us> From: Brian Flynn <brianf@ci.aspen.co.us> Subject: Re: Lot 24, Maroon Creek Club Retaining Wall X-ECS-MaiIScanner: Found to be clean James, please refer to the comments below as requirements of the applicant for Lot 24 Maroon Creek. . proper erosion control at the base of the slope with silt fence and straw bales during construction . a final drainage plan is required showing how the applicant will protect the slope below the proposed wall . the trees and native vegetation located on the south side of the property (along the road) are required to be fenced off and protected from construction activity before any construction takes place. . a landscape plan will be required at the time of bldg permit submittal . a tree permit will be required for all trees outside of the bldg envelope call with questions. At 12:46 PM 6/19/02 , you wrote: Hi Brian, Do you want a referral on Lot 24 at the Maroon Creek Club that we looked at with Francis Krizmanich, or do you want to just e-mail me back any comments that you may have from the site visit? Thanks, James Printed for James Lindt <jamesl@ci.aspen.co.us> 1 ----r·t [ If 11-6% N.'. ... I --*.-0-' 0 I #)=r'--0--1. Y · L- -- · -t ; , ! fr~ 114 ¢ 12/ 1 41 ~o_i_V~-9{i.zrJEEGRf~to=Tf.»L- -':. -4.,1 11 ,-'.1--2 ~ 3':-·· ~~·:Fl~y.~Ai·~~-:=7::Iel..:. ~-i.~;0;~=:=:£&~---325;f-.0.- -7»3~u'l~~ t - 1 - . 4.. i I P IT~ -='-- --3;pi , uu-- - ---7 1.-1 '----~-- - r·-A _t='F t-ZE#F: f IY,- : 1-41; 2/54. " ~· 1 1522©-4.- ",1-V 1 s: -2.I I. 3 3 1' 1; t ? t. i - -Ef.....4. : ~. I 5' 1 -1/ 1 iII 1 0 J I k i 1 ·I U 1 -- Virm,1 - · ~' -i N N j * 0 3 1141 :VIr-T,4 -'7.jj¢-j j--'07-{fi._Tfrii]{ir-i~° j f.-. ,<* I: I Ii· ··~ i fr I i = = --6 6--- *PE#afv*,ir-&*L #42.1 .. £,244jQ2-62$~ 1 ./ & .:,il 11 '* lic 31 4 4, . . .. -I 1 T proposed Ketaining Wall - Angled Wall . 1/1 i ' 1 ,-':, a. A 1 ~-- Top Of Wafe BO.C)' It) I. lf'+ / 1 1 35 2 - 1 11*:1 y 1 4 I I I Angled Wall · Bottom Of Wall To Follow Existing Grade 74'-0" 2 R S * Ducote Reeidence Bite Wall Elevation GREG MOZIAN AND ASSOCIATES, INC. Landscape Architecture • Environmental Planning 08/8/02 117 South Spring Street, Suite 202 • Aspen, Colorado 81611 2 Ph: (970) 925-8963 • Fax: (970) 925-1217 • Email: gma@rof.net NTS VII'....4 / 11 tuM110 111 to COMMON AREA OUND REBAR PC LS# 25947 . 441; LOT 23 STRAW BALES OR EROSION CONTROL LOGS SILT FENCE, -~- ROCK RIP RAP D. = 24" ; I 1 « CONCRETE RETAINING OUTFALL -- 0 x~ WALL AREA DRAIN STRUCTURE \ 0 • /9 24' DRAINAGE 1 PIPELINE rzf: 7 76.00 «\\ 8.0~..1~-- 7 0 00 MANHOLE X +M (TYP.) . -SILT FENCE et 0160 - f GU - ~ RAIL 2 '1 --- --- rl . -- 1 ~ \ 4 LOT 25 "\. ; ... X 1 - 1 M. \ 1 .,1 j 1 'f / W - 01. . - RAP"zy S14 6(As lEi'O JoT) ~u ,4-. 41 f ./4 64*04 4-Nut-LU 10 38 71/Ji) '9€t,) i -67' AREA BRAINS z (TYP.) 1 96. \ 1' C 6 .00 (p),r ./1 re e N 0-1 'H. i t ,-AN 4 f 4444 \\ 42. 0 - 1.-7 ~ba.: ~* CONCRETE -9 ) C. HEADWALL PFISTER (0 8; \Y/ BENCHMARK - 99.3 TOPO - 8120 TRUE ElEVAMON 645 J/F ! .; 7 \\ 01 4991,8 AT - w PROPIRTY come 51,94- 1 240 CMP EXISTING JACK MILLER AND ASSOCIATES <~1 -17•¥m ARCHTECTURE/PLANNING - JI\11 JAMJ• =, DATE: JUNE 12, 2002 JOB NO. 890-1.0 DRAWN BY: DLS CHECKED BY: MJE REVISIONS: SCALE: 1" = 30 ~RESOURCE DRAINAGE PLAN DUCOTE RESIDENCE FIGURE 1 ENGINEERING. INC 10.0.m~.1.01 LOT 24, MAROON CREEK CLUB SUBDIVISION -ILE: C LIEN[\890©UCOTE-SITE.dwg I ./ MEMORANDUM TO: Julie Ann Woods, Community Development Director FROM: James Lindt, Planning Technician GL RE: Revised Maroon Creek Club Subdivision Insubstantia] PUD Amendment DATE: October 16,2001 SUMMARY: The Maroon Creek Club Master Association, represented by Brooke Peterson, has applied for an insubstantial amendment to an approved Maroon Creek Club PUD to allow for areas outside the building envelopes the ability to be developed in a similar fashion to what is allowed in the current City of Aspen setbacks. The applicant is requesting to have the proposed amendment apply to lots 4,6 through 11,inclusive, 13, 14, 15,17 though 40, and 46 through 48 inclusive. The applicant is proposing that the areas outside of the approved building envelopes on the aforementioned lots be governed by city land use code section 26.575.040(A), Projections Into Required Yards, with the exception of subsections (A)(1) through (A)(4). Please see Attachment "C" for the city land use code section 26.575.040(A). BACKGROUND: According to some of the people involved in the original approvals for the Maroon Creek Club PUD, the original intention was that on the smaller lots within the PUD there was to allegedly be a "development envelope" approved between the building envelope and the lot lines that would allow development as described in the Maroon Creek Club Design Guidelines. However, the final recorded Subdivision/PUD plat did not show or reference "development envelopes" on these small lots and the Maroon Creek Club Design Guidelines were never signed by the County or the City, and are not recognized as an approval document. Therefore, over the past several years the City Zoning Officer has only allowed development outside the building envelope that is consistent with what is allowed outside the building envelope in the Pitkin County Land Use Code (under which the PUD approval was originally granted). The Maroon Creek Club Design Guidelines require that property owners do certain tree plantings outside the prescribed building envelopes. These non-native plantings directly conflict with what is allowed outside the building envelope under the Pitkin County Land Use Code's definition of a "building envelope". The applicant is requesting that the PUD be amended to allow for Section 26.575.040(A.)(5) through 26.575.040(A)(8) (Attachment "C") to govern the areas between the building envelope and the lot lines on the aforementioned lots. 1 STAFF FINDINGS: Staff finds that lots 4, and 6 through 11 should not be amended administratively because they already contain platted "development envelopes" that allow for non- native landscaping and retaining walls to be developed within the development envelopes. Staff feels that the proposed amendment may be inconsistent with the character of the original approvals in that it is clear that these lots already contained specific areas in which to plant non-native landscaping(Development Envelopes). The applicant may seek approval for this amendment through a review by the Planning and Zoning Commission. Lots 14 and 15 are the parking lot parcels that are already landscaped and don't contain building envelopes. Lots 17 and 18 are the Townhome Lots that are already governed by City Setbacks. With regards to lots 13,25 through 40, and 46 through 48, staff finds that these lots have already been graded and landscaped outside of the building envelopes, in conflict with the requirements for building envelopes in the Pitkin County Land Use Code. Staff finds that the City of Aspen Setback Regulations as proposed in this application would be more appropriate than building envelopes on these specific lots because many of the lots have been developed beyond the scope of what a building envelope is intended for. Building envelopes are typically set up to protect pristine, untouched areas or to preserve wildlife migration corridors which for the mostpart no longer exist on these lots. City Natural Resources and Construction Manager, Stephen Ellsperman, finds that some valuable native areas do exist within lots 19 through 24 and has recommended that a condition be placed on the amendment that would restrict the approval to only allow for Section 26.575.040(A)(5) through 26.575.040(A)(8) to only apply outside the building envelope as far back as the rear of the approved building envelopes on these specific lots. A drainage area that abuts the rear of lots 19 through 24 has been identified as an important wildlife conidor by Stephen Ellsperman. Ellsperman has also indicated that this drainage area remain undeveloped and untouched. Ellsperman has also indicated that some native tree plantings would be acceptable on vacant Lots 19 and 20 for the purpose o f screening the gol f course, but cautions that the planting should be limited and informal to maintain the "open feel" of the meadow. Though we will not regulate a specific landscape plan, we do recommend that the City Forester be consulted for tree placement at the time of landscaping. The City Engineering Department also has concerns about utility and emergency service personnel's access between the building envelopes. The Engineering Department recommends that a condition be placed on the amendment that puts the applicant on notice that any landscaping or retaining walls developed outside the approved building envelope will be allowed at the owner's risk and expense, and that if utility or emergency service personnel need to access the approved building envelopes that they will have the right to do so without preserving the non-native landscaping and improvements. 2 Staff has reviewed this proposed amendment and recommends that the Community Development Director administratively approve the proposed amendment with conditions on Lots 13, 14, 15, 17 through 40, and 46 through 48. APPLICANT: Maroon Creek Club Master Association, represented by Brooke Peterson, Kaufman & Peterson. LOCATION: Lots 13,14,15,17 through 40, and 46 through 48 included in this approval. ZONING: R-15 PUD REVIEW PROCEDURE: Insubstantial amendments to an approved PUD may be approved by the Community Development Director, pursuant to Section 26.445.100. STAFF COMMENTS: Review criteria and Staff Findings have been included as Attachment "A". The application has been included as Attachment "B". City of Aspen Land Use Code Section 26.575.040(A) has been included as Attachment "C". A map of the area to remain undisturbed is included as Attachment "D". RECOMMENDATION: Staff recommends the Community Development Director approve with conditions this Insubstantial PUD Amendment to allow for the area between the building envelopes and the lot lines to be governed by Section 26.575.040(A)(5) through 26.575.040(A)(8), "Projections Into Required Yards", of the City of Aspen Land Use Code on lots 13,14,15,17 through 40, and 46 through 48. APPROVAL: I hereby approve this Insubstantial Amendment on lots 13, 14, 15, 17 through 40, and 46 through 48 of the Maroon Creek Club PUD as proposed with the following conditions. 1. No development (including any landscaping) shall be allowed beyond the rear perimeter of the existing approved building envelopes of Lots 21 through 24 (see Attachment "D" for areas to remain undisturbed). 2. Ifremoval of landscaping or a retaining wall is required outside of the approved building envelopes for either utility personnel or emergency services to access through the subject lots, the utility and/or emergency services personnel will not be responsible for replacing the landscaping or retaining walls. The owner shall be responsible for bearing the cost of the replacement landscaping or retaining walls. 3 3. Trees that are located outside of the approved building envelopes on Lots 21 through 24 shall not be removed without a tree removal permit issued by the City of Aspen Parks Department. 4. Any landscaping to the rear of the building envelopes on lots 19 and 20 shall be approved by the Maroon Creek Club Master Association in consultation with the City Forester prior to planting to ensure that the landscaping will remain open and informal adjacent to the gol f course. APPROVED date t c/1 7 64 ~lie Ann Woods, Community Development Director oCT 17 2001 COMMUNITY DEVELOPMENT DIRECTOR (A OW CITY OFASPEN 4 UN_>4114 dale /0 < 1,u 1 0 r Garf**rt, Mardon Creek Club Master A~sociatibn ATTACHMENTS: Attachment "A" -- Review Criteria Checklist Attachment "B" -- City of Aspen Land Use Code Section 26.575.040(A) Attachment "C" -- Application Attachment "D" -- Map o f area to remain undisturbed. G:/PLANNING/ASPEN/CASES/INSUBSTANTIAUMCCBUILDINGENVELOPE 4 ATTACHMENT A Case No. A070-01 Parcel ID No. Multiple Parcels Zone District R-15 PUD Reviewed By James Lindt Date 9/24/01 Insubstantial PUD Amendment Checklist 26.445.100 Review Criteria All insubstantial PUD Amendments shall meet the following criteria, pursuant to Section 26.445.100, Amendment to PUD Development Order: 53'~ The proposed amendment does not change the use or character o f the development. 8< The proposed amendment does not increase by greater than three (3) percent the overall coverage o f structures on the land. Gt The proposed amendment does not substantially increases trip generation rates of the proposed development, or the demand for public facilities. 1 ~ The proposed amendment does not decrease the approved open space by greater than three (3) percent. 5<< The proposed amendment does not reduce the off street parking and loading space by greater than one (1) percent. [2'~- The proposed amendment does not reduce required pavement widths or rights-of- way for streets and easements. 8« The proposed amendment does not increase the approved gross leasable fioor area of commercial building by greater than two (2) percent. < The proposed amendment does not increase the approved residential density of the development by greater than one (1) percent. ~ The proposed amendment will not enact a change which is inconsistent with a condition or representation of the project' s original approval or which requires granting a variation from the project' s approved use or dimensional requirements. 5 26.575.040 Yards. A#ack 04 € M k 'cE e The following suppl ital regulations shall apply to all yards. A. Projections Into Required Yards. Yards shall be unobstructed from the ground to the sky except for the fol- lowing allowed projections: 1. Building eaves--Eighteen (18) inches; 1. Architectural projections-- Eighteen (18) inches; 3. Individual balconies not utilized as a passageway (provided they do not project more than one-third (1/3) the distance from the exterior wall to the property line)--Four (4) feet; 4. Fire escapes required by the Uniform Building Code--Four (4) feet; 5. Uncovered porches, slabs, patios, walks, retaining walls, steps and similar structures, which do not ex- ceed thirty (30) inches above or below natural grade, shall be permitted to project into the yard without restriction. Projections may exceed thirty (30) inches below grade if determined to be required by the chief building official for window egress. 6. Fences, hedges, berms and walls less than six (6) feet in height, as measured from natural grade, are per- mitted in all required yard setbacks. (See, Supplementary Regulations - Section 26.575.050, Fences.). 7. Driveways Driveway access shall not exceed a depth or height greater than twenty-four (24) inches above or below grade within the required front yard setback. Within all other required setbacks, driveway access shall not exceed a depth or height greater than thirty (30) inches above or below grade. Parking is only permitted within re- quired setbacks if it is in an approved driveway or other area approved for parking. 8. Exterior merchandizing. Exterior merchandizing in non-residential zone districts shall be prohibited in all required yard set backs. /1 Ha Cla Ful € M F *c f LAW OFFICES OF BROOKE A. PETERSON KAUFMAN & PETERSON, P.C. TELEPHONE GIDEON L KAUFMAN* (970) 925-8166 TERRI J. KAFRISSEN FACSIMILE 315 EAST HYMAN AVENUE, SUITE 305 (970) 925-1090 OF COUNSEL: ASPEN, COLORADO 81611 HAL S. DISHLER" ~ ALSO ADMITTED IN MARYLAND - ALSO ADMITTED IN TEXAS VIA HAND DELIVERY .Tune 25, 2001 Mr. Julie Ann Woods, Director Mr. James Lindt, Zoning Enforcement Officer Aspen/Pitkin Community Development Department 130 South Galena Street, Third Floor Aspen, Colorado 81611 Re: Maroon Creek Club Subdivision/Application for Insubstantial PUD Amendment Dear Julie Ann and James: Please allow this letter to serve as an application on the part of the Maroon Creek Club Master Association, as the duly authorized representative of the owners of the lots in the Maroon Creek Club Subdivision (the "Applicant"), for an Insubstantial PUD Amendment to the approvals for the Maroon Creek Club Subdivision for the following purposes: 1. To define the areas outside of the building envelopes of Lots 4, 6 through 11, inclusive, 13, 14, 15 and 17 through 40, inclusive. in the Maroon Creek Club Subdivision as "Yards", with the additional clarifications listed below: (a) The projections permitted by Sub-subsection A(1) through .A(4), inclusive. would not be permitted. (b) New landscaping, irrigation and trees would be defined as allowed uses in the "yard". Any of these uses would have to also be approved by the Maroon Creek Club Master Association. (c) Those improvements allowed by Sub-subsection A(7) would also require the approval of the City of Aspen Engineering Department and the Maroon Creek Club Master Association. With respect to the specific submission requirements, please be advised as follows: 1. Review Deposit. Enclosed please find a check from the Maroon Creek Club Master Association in the required amount of Five Hundred Dollars ($500.00). Ms. Julie Ann Woods, Director Mr. James Lindt, Zoning Enforcement Officer - June 25, 2001 Page 2 2. Pre-Application Conference Summary. Enclosed please find the Pre-Application Conference Summary prepared by James Lindt. 3. Fee Agreement. Enclosed please find the Fee Agreement with the City duly executed by Gary Albert, President of the Maroon Creek Club Master Association. 4. Property Owner's Consent. Enclosed please find a Consent Letter duly executed by Gary Albert as President ofthe Maroon Creek Club Master Association. By virtue ofthe provisions of the Protective Covenants for the Maroon Creek Club Master Association, copies ofthe relevant sections of which are enclosed. the Maroon Creek Club Master Association is granted all of the powers set forth in Colorado Revised Statute 3 8-33.3-302 (a copy of which is also enclosed), which includes the power to "institute, defend, or intervene in litigation or administrative proceedings in its own name on behalfof itself or two or more unit owners on matters affecting the common interest community". As I discussed with John Worcester. we submit that the authority set forth in the Protective Covenants and relevant statutes allow the Maroon Creek Club Master Association the ability to process this application. The Maroon Creek Club Master Association's address, for the purposes of this application, is c/o Brooke A. Peterson, Esq., Kaufman & Peterson, P.C., 315 East Hyman Avenue, Suite 305, Aspen, Colorado 81611; telephone: 970-925-8166. Furthermore, we, as attorneys for the Maroon Creek Club Master Association, certify that all of the information contained in the submission is correct. 5. Location ofProperly. The property affected by this request is the Maroon Creek Club Subdivision, located adjacent to Tiehack Road and The Buttermilk Ski Area in the City of Aspen. 6. Explanation of Proposal. The purpose of this application is to clarify what may be done in the land areas between the edge ofthe building envelopes and the lot lines of certain lots in the Maroon Creek Club Subdivision. The Applicant believes that it was never the intent of the Board of County Commissioners when this subdivision was approved to disallow all development outside the building envelopes on the affected lots. Indeed, many of these lots have already been developed with improvements which technically would be prohibited by an interpretation of PUD and City regulations which would disallow all development. This interpretation is also inconsistent with the recorded Protective Covenants for the Maroon Creek Club Subdivision, the design guidelines for this subdivision and the approvals for this subdivision. The requested clarifications do not alter the actual use of the lots in any manner and will indeed make them more aesthetically pleasing. With respect to the criteria set forth in Attachment #5, Review Standards. to the Pre-Application Conference Summary, we believe that the explanation above addresses Criteria #1. We do not believe, for obvious reasons, that Criteria #2 through #8 are applicable to our request since these will be fundamentally no change to the Maroon Creek Club Subdivision as approved and Ms. Julie Ann Woods, Director Mr. James Lindt, Zoning Enforcement Officer June 25, 2001 Page 3 contemplated by the granting of the proposed amendment, and none of the actual land areas of the existing parking, open space, streets, or easements will be affected. Clearly, this is not a commercial proj ect nor will the residential density be affected. With respect to Criteria # 9, we do not believe that the proposed amendment will have any effect other than confirming what all of the landowners and the Maroon Creek Club Master Association have thought since the inception ofthe Maroon Creek Club Subdivision, which is that the landowners would be allowed to do landscaping and permitted improvements in the area between the building envelopes and the lot line, subject to the prior approval of the Maroon Creek Club Master Association. 7. Prior Approvals. Enclosed herewith are copies of the final County Resolution granting approval for the Maroon Creek Club Subdivision, the Subdivision Improvements Agreement, and Ordinance No. 40 annexing this property into the City of Aspen. 8. Vicinity Map. Enclosed is a copy of the vicinity map o f the Maroon Creek Club Subdivision. 9. Planned Unit Development Map. Enclosed is a copy of the first page of the Plat for the Maroon Creek Club Subdivision. 10. Recorded Documents. Other than the enclosed documents, we do not believe any other recorded documents will be affected by this application. We respectfully request therefore that the Insubstantial PUD Amendment as set forth herein be approved administratively by you as soon as possible. Should you need any further information, please do not hesitate to contact me. Thank you for your time and attention to this matter. Yours very truly, K3118 --.1 PE RSON, C. 10% *Professionaf Corithration ~ Lud At L BAP/ljk C / ~Brotke A. Petersoh '§~ Enclosures CC: Maroon Creek Club Master Association (via facsimile w/0 encl.) John Worcester, Esq. (via facsimile w/0 encl.) William Lukes (via facsimile w/0 enct) letters\anspen pitkin comm dev lindt woods t! Sent By: William Lukes + Associates; 970 920 6986; Oc --01 12:48PM; Page 1/1 1 j f' 1 df WILLIAM LUKES + ASSOCIATES PROJECT MANAGEMkNT ARCHIrECTURE 1 2 Octodar 2001 James t'idt, City Planning Technician City c - f · pen Community Development Department 130 South Galena Aspen, Colorado 81611 re: Maroon Creek Club Master Association ,Request for approval of Insubstantial Amendment to the Plat h..6.1,/. I, James:, I Please *cept this letter as a modification to the application submitted by Brooke Peterson on behalf of the Master Association. Since both parties would like to get the language agreed upon before your vacation and Brooke is not available right now, I will confirm our conversation as you requested. e ' 1 Based on the conversation you and I had this morning about the appropriate lots to be included in the amendment, the proposed amendment should include all lots which do not clearly show distinct building and dev#lopment envelopes on the plat map. By my count, this would include the following lots: tots 13,14,15,19 - 40 inclusive, and 46 - 48 inclusive. Lots 15 *rough 24 inclusive would be subject to the two types of"rear yard' restrictions set forth in your amendment in order to preserve the wildlife corridor. We would also appreciate your including the other clarifications that you and I discussed so that MCC can hav* a final version of the amendment before the end of the day. Upon your return, we can get Julie Ann Wo¢ds and Gary Albert to execute the amendment. Thank ylu for your continuing assistance - please call if the above does not agree with your list. Cordially, PLO - William Cukes AIA Architectural Advisor to the Site and Architecture Review Committee of the Maroon Creek Club Master Association Pos r O i i Ic, Box 11289 copies: Brooke Peterson Brian Martin / MCC Ab!'1:A C:„1.(,n A),0 Gary Albert ' 8,6/2 970.910.6919 FAX 920.6488 Sent By: William Lukes + Associates; 970 920 6986; Apr -01 7:18PM; Page 3 ArK-13-ZUU] PR! UB~UZ AM FAX NO, P, 02 CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PLANNER: James Lindt, 920.5441 DATE: 4.13.01 PROJECT: 1 lighlands Planned Unit Development Amendment REPRESENTATIVE: Bill Lukes & Brook Peterson OWNER: TYPE OF APPLICATION: PUD Amendment DESCRTPTION: PUD Amendment IO approve and define what is pennitted outside the Building Envelopes on the small lots at the Maroon Creek Club. Staff feels that it may be possible to do this administratively if the applicant proposes thatthe new requirementsbe similarto whal is allowed in current City of Aspen Selbacks pursuant to section 26.575.040, Yards, with the exception of the first 3 allowances in this code section.. Also. an amendment to approve and provide a definition of Natural Area outside Ihe Development Envelopes on the larger lots at the Maroon Creek Club. Land Use Code Section(s) 26.445.100(B) Amendment of PUD development order. Review by: Staff for comploic application, referral agencies for lechnical considerations, Community Dcvclopment Director for final approval, If Community Development Director does not think that it niccts criteria for }nsubstantial PUD Amendment then goes to Planning and Zoning Commission for a Public 1 Iearing Public Hearing: No, unless Community Development Director does not think the proposed amendment ineets the criteria for an insubstantial amendment. Referral Agencies: Parks Departinent Blanning Fees: Planning Deposit $500 .teferral Fees: Total Deposit: 5500 To apply, submit the following information: 1. kai Deposit for review of application. 2. Applicant's name: address and telephone number, contained within a letter signed by the applicant stating the name, address, and telephone number ofthc representative authorized to act on behalf of the applicant. 3. Signed fcc agreement. 4, Pre-application Conference Summary. 5. An 8 1/2" x 11" vicinity map locating the subject parcels within the City of Aspen, 6. A written description of the proposal and a written explanation of how a proposed development co.mplies with the review standards relevant to the development application. 7. Application materials set forth in minimum submission requirements of attached land use application, 8. Application materials set forth in specific submission contents of attached land use application, 8. 2 Copies of tlie complete application packet (items 1-8) Process: Apply. Planner checks application for completeness. Staff reviews application against PUD Amendment Standards. Application taken to DRC for City Departinent referral comments. The Community Development Director approves the decision notice for an insubstantial amendment if Staff feels that the application meets the criteria Ior an insubstantial amendment, Disclaimer: The foregoing summary is advisory in nature only and is nor binding on tlie City, The summary is based on current zoning, which is ibject to change in the future, and upon factual representations thar may or may not be accurate. The summary does not Create a icgal or vested right. Sent By: William Lukes + Associ ' s; 970 920 6986; API -01 7:20PM; Page 8/12 MrK-13-LUU! t'K! Utl:U4 AM FAX NO, P. 07 ASPEN/PlTKIN COMMUNITY DEVELOPMENT DEPARTMENT ACreement for Payment of City of Aspen Development Application Fees CITY OF ASPEN (hereinafter CITY) and Maroon Creek Club Master Association (hereinafter APPLICANT) AGREE AS FOLLOWS: APPI.TCANT has submitted to CITY an application for Insubstantial P.U.D. Amendment (hercinafter, THE PROJECO. 2. APPLICANT understands and agrees that City of Aspen Ordinance No. 57 (Series of 2000) establishes a fee structure for Land Use applications and Lhc paymcnI of all processing fees is a condition precedent to a determination of application completeness. 3. APPLICANT and CITY agree [hat because of the size, nature or scope of the proposed projec[, i[ is not possible at this lime to ascertain the ful exlent of Ihe costs involved in processing the application. APPLICANT and CITY further agree that i[ is in the interest of the parties that APPLICANT make payment of an initial deposit and le thereafter permit additional costs to be billed to APPLICANT on a monthly basis. APPLICANT agrees addilional costs may accruc fol}owing their hearings and/or approvals. APPLICAN'I' agrees llc will be benefited by retaining greater cash liquidity and wi]I make additional payments upon notification by the CITY when they are necessary as costs are incurred. CITY agrees it Will be benefit:cd through the greater certainty ofrecovering its full costS to process APPLICANT'S application, 4. CITY and APPLICANT furcher agree that it i.9 impracticable for CITY staff to complete processing ol' present sufficien[ information to the Planning Commission and/or City Council to enable tile Planning Commission and/or City Council to make legally required findings for project consideration, unless cuirent billings are paid in full prior to decision. 5. Therefore, APPLICANT agrees that in consideration of the CITY's waiver of its right to collect full t-ccs prior to a d¢tcrinination of applicalion completeness, APPLICANT shall pay an initial deposit in the amount of 5 500.00 which is for hours of Community Development staff time, and if actual recorded costs exceed Ihe initial deposiFAPPLICANT shall pay additional monthly billings to CITY to reiniburse the Cll'Y for the processing of ilic application inentioned above, including post approval review at a rate of $203.00 per planner hour over the initial deposit. Such periodic payinents shall bc made wit]1ill 30 days of the billing date. APPLICANT fulther agrees that failure-to·-pay-Duch-«clucd COSIS shall be grounds for suspension of processing~ and in no case will building parmits bc issued until all costs associated with case processing have bccn paid. CITY OF ASPEN APPLICANT Maroon Creek CluB'Baster Association / 4-0 - By: ~1% AX'~--~33" · , By: C X U-f_Q 1 J#¢ Ann Woods 4/ G*r)~Alber-t< President 90mtinity Development Director Date: . June 19, 2001 Mailing Address: c/o Kaufman & Peterson, Esq. 315 East Hyman Avenue, Suite 305 Aspen, Colorado 81611 Attn: Brooke A. Peterson, Esq. g:\support\forms\agrpayas.doc 1/10/01 AHodh,Me,1 1- \18 4 10% 35 , t' I -7 1 Ul-- 3 58 G-LE-fAM[LLBUiLD.[i*G--AND_DEMELC™ENLE.Nyfl.QEES. 1 -/1 t - 1- I , l- -. N -}-li r---- ''' 1, \ , 1 1 i ; U80 .al- -1 1 '1 1 \ 1 / '' : - , 1 / /«23 e ' / C C ' I avu (4- :1-\, - -7lf)] 1 1 . , I -, I [78-~47,«3·- j tEll -- fiSM \ & 1 =25'' - ~ 241 , ~*xy*-« 412)- ' «41 C I '' 913 -r-t) VI , / 1 1----_ . #, / i. .' 'Phi £ 011 1 92 ,« 191 -----1 - 2% i, U -2.,'Al!90)F -111 i.\3.1. \1 i Zi 4.11 / 1 1 r 7-------0 /60: ''Pi\ \ 1 1 1 F ikf# \ \-9 1 3 [--4~-.f) =2+ : 4/ , / /52\ \ 10 , 1 1 11 -1 I. ,- 1 i , U.Z.1-- - (28 1 \1\ 1 1 Ill i i • ) 11 ® ~ ,It 1 --1 1 1 ! it f l @f\,1 /11 \ 11, 1 J.--A lit 1 L %1- 1 L.0- - J 9, a <25/ 1 \ IL , }-----1 | 14 -. - 1 ¢ 35 7 1 i /// i i ill i / E \ h P ® Lf 1 0 \0 --- v<'04# 1 3.1, 1 L ' f « A Vifofi ''O / ,/ %1 1 J --1 --1 --- 1 1 1., 44,4~11 ---' If - \: \ tip \, 1 ./--1 1 r i \i' , 13 1 - I.J , I , 1 14.j \ @1 1 11 k , 1 1-YrIC.N. C:'b ~fy·1·IC-NT c,«rler. T-¥noN. Dull[,NG C+NELOrt \\ 1 i i f @DE:14 Trrot. 101 LINC , I, -3 m - A ~a ih> re,v®v© 1~Moli's'14~¢*4-1 / \ 2 1~.0 1 3-1 /C // . - PAA+144/' 5 V\Ct,/ 1 .4,4- / ,\,V I 6- , , 1 / I. I -- ,»d by M cd i 90,/WO>'014 = /0 r---n\~'I ~ 1 ,; 1 , \ 6 /VI CO¥, *''4/6-4,497 14 -, Al*M SUV¥,1, k , 1 1.-- .- - .- ,... % ., . 1 ~- . ...I- 01-16 k...1 C 19 33 0 V...4. d FU44 FLAT Of C»-4 W AD,-g.. /M'· FUL U-jilia1 V 5 f... E, MAROON GREEK- al.~t}~11{Mi-nit.u Up- f € y 0 Antvt.Ink. 4 0,i n ··· ·,·•/0,0'-1 N'frf.n,-*:16TTIO,flrl LETTER OF CONSENT I, Gary Albert, as President of the Maroon Creek Club Master Association (hereinafter the "Association"), on behalf of said Association, hereby consent to the filing of the Application for - Insubstantial P.U.D. Amendment as detailed in the Application from Kaufman & Peterson, P.C. and I hereby authorize Kaufman & Peterson, P.C., 315 East Hyman Avenue, Suite 305, Aspen, Colorado; telephone: (970) 925-8166, to act upon behalf of the Association. MAROON CREEK CLUB MASTER ASSOCIATION Dated: June SCO , 2001 By: 1 VJJU--4-4 ~,~~e.~-0- dtfy Alber¥,President 5 letters\consent letter MEMORANDUM TO: Plans were routed to those departments checked-off below: X ........... Community Development Engineer 0........... Zoning Officer 0........... Housing O........... Parks Department O ........... Aspen Fire Marshal 0........... City Water O........... Aspen Consolidated Sanitation District O ........... Building Department O ........... Environmental Health Electric Department Holy Cross Electric 0........... City Attorney v........... Streets Department O ........... Historic Preservation Officer 0........... Pitkin County Planning TO: John Newoehner FROM: James Lindt, Planner Community Development Department 130 S. Galena St.; Aspen, CO 81611 Phone-920.5095 Fax-920.5439 RE: Lot 24, MCC PUD Amendment for Building Envelope Adjustment DATE: June 18,2002 COMMENTS: Please find attached an application for PUD amendment for a building envelope adjustment on Lot 24 of the Maroon Creek Club PUD. Please review and return comments by June 25th. Please pay special attention to their drainage plan. Thanks, James .IDA L of 24 *f c <5 - Doc o ¥ e Resource Engineering, Inc. 909 Colorado Avenue SHEET NO OF GLENWOOD ~~~I~6~~RADO 81601 CALCUI ATFO BY #Al E D,5 3 1 6 go k. CHECKFn RY DATF Master Drainate Ylan SCALE goor,y' a Fork- 7--ev er - /Lake 3 C -hguitp\- C LA\<a 2 1 7-- JU--3 X • h>:"OV C.xeel- D-&~ St/e le>.. L f j t. v ibz /CK. . 11013 t. of 2 4 /4<3 - D U :f:In, .1 e Resource Engineering, Inc. 909 Colorado Avenue SHEET NO ~ OF GLENWOOD SPRINGS, COLORADO 81601 AA-1 e ".1 1 (970) 945-6777 CALCULATED BY DATF C ,/ 5 i 0 7. CHECKED BY DATF SCAI F 0 U E c \..r ,- 1 4 u /3 0 F F - 1-r , Lut' oy· y 40 24 " C Ny , -- I £3<75 /2 Area 10.4- ar.1 € s j 1 1 ..4 tt<.3 Forest l.],lIS,Cl¢£2 i_ ·3 # 1 5 ar- 3, 2 )0 is L -1 0.10 4«0 + 5 F iz-00.4 . = O.41 1 2 -TI M€; of- Co Ace.•ft-ratiovt Z. O.SC,Z W- = 33.9 mau\es r le </9 -rr,_er tro•4 Workilies€*t - / 4 -1 910*,·=wed /4811.·04 (:p -r CIA 41 n ,/O, 1% C o. 82. 4/lir) (ID,2 no 2 1 / l VV /- b - o. 84 Cts Lr 2 ' Cp z @p. 45) (2,7 "hr > (/62,21 £247 00~ \00 4) = 12.4- cf-5 100 JOB Lat 24 ./217 · L U Ce i (52 Resource Engineering, Inc. 909 Colorado Avenue SHEET NO ~ OF GLENWOOD SPRINGS, COLORADO 81601 (970) 945-6777 CALCULATED RY DATA 3 /S /0 23 CHECKED BY DATF SCALE SITE (21 U /90 r F ' I 7240 1 Ar -cox = 26. 2 26 < F .7 to.· f:.:,9 4?,.7 0<ir~;, -1/ t r , Flood 3>320 cr 0, eD C> 90 -> A i,-- 5 - r. *1 h .,n 237 - -T t L/7 ·> t , Lawn / 6 0,0.·fs ry>/. \2, loo S F U/,3 Ne..4 i v 6 rl SOO s F O,05 O.5 0) ellkle ; 5 0,7 5 7 01 <«f'> t.3.€.'1 , €% tief.~ T( z t 6 *,1 (Al_Arls 44# worksi--1 -3 626 -77259 R_Al lok>AL Al liTHot> Cp= CIA I ./ (P =. 101-651 ( L+S "'lkA f 0,604·4 or j Z kir ~V, O. Z 2 c.ij52 C.@> - 1*7,1 I :. f · / 4. ,<1 f."D,#2~ 4.- j I 4 42-0.1 3 «,45 '"/Ar/' i u, ' -· L. . 40.. b l.6 6 4 .InA 64 2 4 /*rer k Jr 1, --11.-0,5 ./.r &. Ir/ ' / Resource Engineering, Inc. 2 909 Colorado Avenue SHEET NO OF GLENWOOD SPRINGS, COLORADO 81601 A , (970) 945-6777 CALCULATED BY ~t.-L.,1 G DAT - /- £ CD 4 CHECKED AY DATF SCALE DYLA\IJAGE PLAI.j I , /2 0 01 € off -5.--le fle>up: %.J 4 * p € \ 46 - D,tr -c· i 9 K to I /490 4% 'tri 4 u; 11.02 t, C. 42 A 5 : S t'- 31'-1 4-'/ 6 /9 6/ / C pa /:t-vur 60 b 2 . 1 Q le_ 12) ni ; el Ai er .S,-\ r , L.LA, r .1 v i..0 -4 - Ado #0/~12.0, rt,/ re##er>€fri £ 3 1' 22 i 44 " l' 2 1 'r, 1 , Rog .04 ra, F'\12 <21.64 1 0 6.2 p ' 1 + . 4011043 fiolo\-~l )->214~ 4«1., 1/h'fle, ~Af</09...~, r.-r· » - 4 1 r 3 ©~ ' 6 ~,4 F .11 1 j -4 23 64-4, lia.-lf,d¥1 <6,fe-12,5,€*t OAH,rd -Al ·il« 51<*-p 4, .E »· d i 23 # ¥169 27 e -r ,--1 44 ~Orry-VA . D air.*1*or. prd)'114/AA t it: 6 cAT co· >r acs Cor; i C i 0 *st c te-*A w i 44 L.106\·/·7 -bi-916*le Pia.M. ie>¥ Med . , TOR 4,+ 24 /vic - Duce>-pe Resource Engineering, Inc. 909 Colorado Avenue SHEET No -4 OF GLENWOOD SPRINGS, COLORADO 81601 .4 Z.1 6 (970) 945-6777 CALCULATED BY DATE al slot. CHECKED BY DATF SCALE DES \ 6/4 E Lot-o S C 1 0 3<:- €- --7 P I fpe \:MEL ft,roudrbi 92*ep - 1,6 4.-ts lei- 44 4 .2 f f--. Ur- 4-(44 G = ' 4 41·- s N (00 Use 24'( Pre, collsiste.+ 40,46 roael culver 4 . Uge pit>- 2 60.421 coaler + i.d,cl Joivds L.1 USe BAA 601<rs 04 U AL,VW.4 ab US C Cd.>Au.£m * 0421 \«1 54[1/41+Doe irp clit (...Uor' p,pe . , 1 1- Sht' 1 V, 2 Ut .2 f, \\ cul<& re-A 6,6 0., A n- 8,01 I -4, r-eclo;-1 up·F~.r e. Ir- en 4 of- in roe=trU q w i le'i, 4 , 1 73.t j FLBrk. At• ,> 740> 6 5-404, 6 22 7 € 7 .l 1 €t. 1. I & -2 - 2 -2 -4.. 'I fi<V/1- 2,2't t<kis ,<c m. Apt ZIA . Allroe.UM P,De 1 le>f' 43 2 0. (30 36 -vk ! 9 4 k. ~ 05 e • J /1 ri . '42/ fyb A i *Av KA. U) t h/ 7 19 {,fl 1,70 0.0 (3 s -t «· e, 0 r 0 * 5 4 . Al f 4% DRAINAGE CRITERIA MANUAL RUNOFF TABLE 3-1 (42) RECOMMENDED.RUNOFF COEFFICIENTS AND PERCENT IMPERVIOUS LAND USE OR PERCENT FREQUENCY SURFACE CHARACTERISTICS IMPERVIOUS 2 5 10 25 100 Business: Commercial Areas 95 .87 .87 .88 .89 Neighborhood Areas 70 .60 .65 .70 .80 Residenti„1: * .40 .45 .50 .60 Single-Family Multi-Unit (detached) 50 .45 .50 .60 0.62.70 Multi-Unit (attached) 70 .60 .65 .70 .80 1/2 Acre Lot or Larger * .30 .35 .40 .60 Apartments 70 .65 .70 .70 .80 Industrial: Light Areas 80 .71 .72 .76 .82 Heavy Acres 90 ·80 .80 .85 .90 Parks, Lemetaries: 7 .10 .18 .25 .45 Playgrounds: 13 .15 .20 .30 .50 Schools: . 50 .45 .50 .60 .70 Railroad Yard Areas 20 .20 .25 .35 .45 Undeveloped Areas: Historic Flow Analysis- 2 (See "Lawns") Greenbelts, Agricultural Offsite Flow Analysis 45 .43 .47 .55 .65 (when land use not defined) Streets: Paved 100 .87 .88 .90 51 .93 Gravel (Packed) 40 .40 .45 .50 .60 Drive and Walks: 96 .87 .87 .88 .89 Roofs: 90 .80 .85 .90 .90 Lawns, Sandy Soil 0 .00 .01 .05 .20 Lawns, Clayey Soil 0 .05 .15 .25 .50 NOTE: These Rational Formula coefficients may not be valid for large basins. *See Figure 2-1 for percent impervious. 8 6 Z 4 - f. \~2 Y.cr \1 3 2 - I i 7.0 1 0 0 10 20 30 40 50 60 TIME IN MINUTES i *94&»,J TR~45 2%25 2%40 TlME-INTENSITY-FREQUENCY LURVES ASPEN, COLORADO T. 10 1, R. 85*. WRIGHT-MCLAUGHLIN ENGINEERS 2423 ALCOTT /!t DENVER, COLO. iC211 It 4 - (9 -%3 49 1 INTENSITY R I+Ol JR 7 391. . Worksheet 3: Time of concentration (Te) or iravel time (Tt) Project DOCC>te- Dr-4,11'91¢E 1-~1071 By A-1 E Dates 'S lot- -1 •·-4 Location 20 + 24 /4 c C Checked Date Circle one: Present Fbevelop@83 ioff· si 4-e. Gas *n \r\Watorv Circle one: ~~~ T through subarea 422 2 4t 1 C AA p t NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to T only) Segment ID C U.jewt>.5 1. Surface description (table 3-1) ............ 1 £.51,3 f 2. Manning's roughness coeff., n (table 3-1) .. 0 1 49 3. Flow length, L (total L < 300 ft) ......... ft 3043 4. Two-yr 24-hr rainfall, P2 ••..•.••••••. .... in LZ 5. Land slope, s .............................. ft/ft 0. 2 5- 0.007 (nL)0*8 6. T = t 0.5 0.4 Compute Tt '0•••• hr 0.513 + = 0.5 L.3 P S 2 Shallow concentrated flow Segment ID 7. Surface description (paved or unpaved) ..... Unpae! 8. Flow length, L ............................. fe 1400 9. Watercourse slope, s ....................... ft/ft 10. Average velocity, V (figure 3-1) ........... ft/s 8 L 11. Tt = 3600 V Compute Tt ...... hr O. 041 + = 0.047 Channel flow Segment ID 12. Cross sectional flow area, a .. ............. ft 13. Wetted perimeter , Pw ....................... ft 14. Hydraulic radius, r = ;8 Compute r .. ..... ft W 15. Channel slope, s ........................... ft/ft 16. Manning's roughness coeff., n .............. 1.49 r 2/3 sl/2 17. V = Compute V ....... ft/s n 18. Flow length, L ............................. ft L + - 19. T = Compute Tt ...... hr t 3600 V 20. Watershed or subarea Te or Tt (add Tt in steps 6, 11, and 19) ....... hr 0.562 33.7 Min,/625 O 0 Worksheet 3: Time of concentration (Tc) or wavel time (Tt) Project 1->ucc-1-1. 12>8--s,Maere />60 Hy /416 Date -7 1,«» U Location 10-1 2.4 06(€ c Checked Date Circle one: Present Dg.9-Qped SA-e- D re, i 0.49 e U Circle one: :-T~ 1 Tt through subarea - NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to Tc only) Segment ID 1. Surface description (table 3-1) ............ 6 rass 2. Manning's roughness coeff., n (table 3-1) .. 3. Flow length, L (total L < 300 ft) .......... ft /620 4. Iwe-yr 24-hr rainfall, P2 .................. in <, 2 5. Land slope, s .............................. ft/ft O.05 , 6. Tt = 0.007 (nL)0.8 Compute Tt ...... hr 6 24 + . 0,264 p 0.5 80.4 2 Shallow concentrated flow Segment ID 7. Surface description (paved or unpaved) ..... 8. Flow lengths L ............................. ft 9. Watercourse slope, s ....................... ft/ft 10. Average velocity, V (figure 3-1) ........... ft/s L 11. Tt - 3600 V Compute Tt ...... hr + = 0 Channel flow Segment ID 2 12. Cross sectional flow area, a ............... ft 13. Wetted perimeter, p ....................... ft W 14. Hydraulic radius, r x ~ Compute r ....... ft W 15. Channel slope, s ........................... ft/ft 16. Manning's roughness coeff., n .............. 2/3 1/2 1.49 r s 17. V = Compute V ....... ft/s n 18. Flow length, L ............................. L + 19. T - Compute Tt ...... hr *~ CD i t 3600 V l 20. Watershed or subarea Tc or TE (add Tt in steps 6, 11, and 19) ....... hr ~, 266 ~ \ 6 #,Aute Mountain Driveway Best Management Practices Manual April 1999 Staked and Entrenched Wood or Steel Fence Post Straw Bale (Rebar not allowed) Bindag Wire or Twlne Compacted Soil to lillill"ll Prevent Piping Sediment Laden Fmered Runoff 11 lili 111 1 1 . ;...:.:... Runoff ...... .. .. - 1 111 I litill - 4- Min. 1 11- =1: =111- -111-1 -2 == =111=111 - -1 =€ Illimili -- 4481* =T~ 11 1111*2 12' Min. 1. Excavate ne nnch. 2. Place and stake straw bates. Il,IliTIL.thiti'-4-*"al.8//Al Q.IRMI.W.¥1 '1411'.1#Ul/1,191'2-,-CI>-, , 'i -1---'117'~~~.011| I -370*6¥, 1 | f f I •,3 - i ,~ilt-M·/·, M-*.r . . B. 4.-4/55~ - ~.,-2=10 - 10*U .Te:22900"r:m.=J -1 .1- . r --4 /-/W=i_ .. 3. Wedge loose sir- between 4. Bact®l and compact the bale£ excavated soil. From: Virgkiia Soll Ind Water Conservabon Commission, 1985 As reprinted In Urban Drainage and Flood Control District 1992 Urban Storm Drainage Critoria Manual. Volume 3. Page 16 Mountain Drivewav Best M_. agement Practices Manual April 1999 Silt Fence Type: Temporary Description Silt fences are temporary barriers constructed of woven, synthetic material attached to posts. The goal of this BMP is to pool water from an croding area, allowing the sediment to settle. Sediment transported off-site can otherwise collect in drainages, waterways, wetlands or adjacent properties. Installation/Design Guidelines 1. Secure filter fabric to the ground by installing wooden posts to a depth of 12 inches and exeavating a trench approximately six inches deep along the line of the post and upslope from the barrier. Bury lower eight inches of filter fabric into this trench and compact the backfill soil. 2. Posts should be spaced a maximum of 10 feet apart. For shallow channel flow applications, the pests should be spaced a maximum of three feet apart and reinforced with wire mesh. The base of the fence should be secured. 3. Silt fences installed across a ditch or swale must have the bottom o f the ends of the fence at a higher elevation than the top center of the fence. 4. Silt fences should be installed along the contour at the base of gentle slopes in areas where upi&~adient disrurbance is occumng. f Silt fences should remain in place until vegetation has been established. Special Considerations in Mountainous Areas 1. Thin, rocky soils may preclude the use ofthis BMP in mountainous areas. 2. In areas prone to rockfall, install a wire mesh fence uphill 10 feet o capture rocks that may damage the fence. 3. When equipment is working near sensitive areas or when substantial movement of fill is taking place, it may be necessary to reinforce the silt fence with wire mesh. Maintenance 1. Remove excess sediment periodically, at a minimum when the sediment reaches one-fourth of the silt fence height. 2. Repair or replace damaged fence, and replace broken posts. 3. Check weekly and before and after storms. Silt fence may only perform for a period ofweeks or months. 4. Remove silt fence when area has been successfully revegetated. Page 18 Mountain Driveway Best Management Practices Manual April 1999 SiN Fence Applications . - . P. X~ 4. . - -.'*.r-...... - 5.- 0 - - 4 ZZ s '4 ... 4% - .. . --- - . r 0 '23 14 0- -- 0 - k - .~j~~tc=~LI; '~?%~-- .. . . - -.. - L.- i Fiters Runoff Before Emming o Stre a * 'r.:- - - 1211,1,''ll:=imizzi~/0;6, ~al.im./.'llia ." r Y 9 -'-i--- From: Colorado Depatnent of Highways. Eros,or Control Manual, 197B 1. Set POStB. 2. Exca.ate a 4' x 4- Trench upslope along Ine line of uprights. rm , -~ 11 ·s>e .. , 0-~9-4-4 ;L y 0,111 '5~ fiR .. 3. Attach Filler M-rid to post; or 4. Flnished se<*ion: Iwert Sewn Pockets over pous Ind extend it into the Dinch. Wooden or Steel Fence 'h__ Finer Fabric. Attach Posts 3- e·i igkr. · .. Runoff i-, 4..W.'*- , . i /1 1:. -- · - 1.1 2 ..,=cey-· 4 x C - ~ Trench -*0/7 12,1.4 jem/Addli As r.print,d In Urban Drainage and Flood Control District 1992 Urban Storm Drainage Criteria Manual, Volume 3. Page 19 Mountain Driveway Bes. „anagement Practices Manual April 1999 7 2 ==. A Residual Capadty br Larger Floods W 2-yeir Row Depth (0) < 3 Feet 4¥1220 , Sideslope: Z > 4(Z > 5 Prefered) B=orn VUdth OAD ,~ TRAPEZOIDAL GRASS-LINED SWALE SECTION NOT TO SCALE Slope =021 10 18% /(drop toe to drop crest) Etend Along Banke 2-, Flow /1 1 Plus a Mnimum of D.5 Feet U 4 p, 1 1 Gride Cormol Checks AY'<XX-><~XXX,X,PVVVYILfiLAAARAAITrrr-r-r-r,e-,- . 1«>092*~,1FRI:mill'kj~ P ./VY¥'*"br,A,-vbAr,AAAA'YW -"VXXXIX XXX X, GRASS-UNED SWALE PROFILE - 140><>0~~~ NOT TO SCALE Residuil opicity 2-ye,r Flow r, 7 .- A Dep• (D) 13 Feet ~§0*00 rl Sideslope: Z2 4 ¢ > 5 preferred) TRIANGULAR GRASS-LINED SWALE SECTION NOT TO SCALE As reprinted in Urban Drainage and Flood Control District 1992 Urban Storm Drainage Criteria Manual, Volume 3. Page 29 Mountain Driveway Be~ Wlanagement Practices Manual April 1999 Grass-lined Swales C Type: Permanent Description Grass-lined swales are densely vegetated small drainageways with low-pitched side slopes that collect and slowly convey runoff. Design of their longitudinal slope and cross-section size forces the flow to be slow and shallow, thereby facilitating sedimentation while limiting erosion. Installation/Design Guidelines 1. Roadside swales should be designed to convey concentrated surface nmoff to a receiving channel without damage from erosion. 2. Berms or check dams should be installed within the swale perpendicular to the flow as needed to slow it down and to encourage settling and infiltration. 3. Channel cross-section and lining should be considered based upon volume and velocity of expected flow. Possible cross-section shapes include "V'-shaped (low water), parabolic (high water, low velocity) or trapezoidal (high water, high velocity). 4. Establishing a dense, resistant vegetation is essential. 5. Stabilize the outlet. Special Considerations in Mountainous Areas 1. Grass may be difficult to establish and maintain in arid and cold areas. Riprap can be used to stabilize roadside ditches in place of vegetation, although the cost is much higher. Erosion matting can provide stability until vegetation is established. 2. Grass swales are not appropriate for steep slopes (>2 percent). 3. Avoid sharp changes in direction or grade. Maintenance 1. Mow no closer than six inches, and preferably taller, to increase filtering ability. 2. Wider, fIatter, shallower ditches are easier to maintain. 3. Maintain center line ditch grade to be between one and two feet below the edge ofroadway. 4. Keep the grass in healthy condition at all times, since it is the primary erosion protection and filtration media for the swale. Page 28 Mountain Driveway Bes„v,anagement Practices Manual April 1999 Revegetation C Type: Pemanent 3 Description Revegetation is the establishment of vegetative cover on soil left bare by the construction process. This process includes seedbed preparation, temporary revegetation and pennanent revegetation. Revegetation limits erosion and sedimentation on areas adjacent to the driveway by preventing raindrop and sheet flow erosion and prevents weed infestation of exposed earth. Installation/Design Guidelines 1. Use native vegetation recommended in your area. A representative list of native seed mixes in Colorado is provided in Appendix 1. 2. Check weights, seed species and puiities prior to planting the seed. 3. Prior to permanent seeding, prepare soil (e.g., roughen soil surface) and, if required, incorporate topsoil, amendments and fertilizer. Use stock-piled topsoil, if possible. Use fenilizer sparingly. 4. Apply mulch after seeding to 11------**Ari~J---*~-*2-- retain moisture and protect from \4~4Cb<x~2-0 ; .=·:0~~ erosion. \2<»2<\\ 2 , 9'0- il'll 01- 1 Special Considerations in 0 Mountainous Areas 'TRACKNG' *77)4 MACHINERY UP \ AAO 000•/ 7~45- SIO€ ARowurs #t ~ 1. Timing, soil type, fertilization 6,426;0%5 nUT WILL CATCH STIO. 2\ \ RMNIALL AND REOUC£- evor'- requirements and availability of \ irrigation supply are all serious Adapted from McCullah 1994 considerations prior to selecting a method ofrevegetat,on. Consult local experts as needed. 2. Steeper slopes require more attention to revegetate. Mulch should be used on slopes steeper than 3:1 and matting or hydromulch should be used on slopes steeper than 2:1. 3. Native grasses can become established without irrigation in most circumstances. Maintenance 1. Check for growth and re-seed areas where the coverage is not complete. Vegetation is considered established when ground cover is achieved which is sumciently mature to control soil erosion (approximately 80 percent coverage) and can survive severe weather conditions. 2. Watering should be performed as needed during the first year of installation in the absence of rainfall. Page 30 11~i?;121;11:I:ill Mountain Driveway Best Management Practices Manual April 1999 Straw Bales ~ Type: Temporary ~ Description Straw bales can serve as a temporary sediment barrier when anchored and placed across or at the toe of a slope to intercept and detain sediment and decrease flow velocities from small drainage areas. Some local governments discourage use of straw bales because of common failures associated with their use and encourage use of silt fence instead. Installation/Design Guidelines 1. Use only in areas of low-velocity nmoff where sheet and rill erosion potential is low to moderate. 2. Proper installation includes a) excavating a trench the width of the bale and length of the proposed barrier to a minimum depth of six inches; b) placing the bales in the trench; c) staking the bales by driving at least two wood stakes a minimum of six inches into the ground and towards the previously laid bale to force the bails together; and d) backfilling soil against the upgradient side ofthe hay bale. 3. "Chink" between bales with loose straw. 4. Al! bales must be either wire-bound or string-tied. 5. Straw bales should remain in place until vegetation is reestablished. Special Considerations in Mountainous Areas 1. Thin, rocky soils may preclude the use ofwooden stakes during installation. 2. If depth to bedrock is shallow, do not use this method. 3. Improved performance can be achieved by installing a silt fence on the upslor: side and placing it over the balrs. Maintenance 1. Remove excess sediment periodically, at a minimum when sediment reaches half of the straw bale height. 2. Repair orreplace damaged bales andreplace broken posts. 3. "Chink" between bales with loose straw. 4. Check weekly and after storms. Bales may only perform for a period of weeks or months. Check for rills under or around bales. Page 15 fE-,* ~ 4*Tit . 11 . . 17 11. r .516 El. I *' , Abc -41 41: ..1 . 02*2,- 4 · lik 4.< ?*1 k P..... *P.4 - . . i ite . , , 942*k ..4:'1- . 4 1:4491 4%4£,9 144.01 j .4,16. I -Wh . ?4% , .r, 171.7 4.:J h N .* tifflM#.3 3$ 724.'~, *. ..- I - 'I .2 I. . . 't 0. 94 we . 2.. 47 d. K 2 ~,r ., 4 I C . ~~ ~14/ar*iji :e,, . 0 '111 4. F ·" r + il· ' .·~· ' •~0£*, 1 ' 14 'il,Mt'iff/twi;v~ / .718+Ins,&+MEE#KIP#/C , 31- I : 7 ....+ . 611..' 31 1]j¢ i 1 J p-' 'R· ... ., . I .. 1..74&114?fi K < .4, , . i J & A h i + 12/1 :;i€F 4 . 11 ·. 9 11, IN -1 .... *14,Iffly* %1:4~'.~t.cl . 1 '0 , :4 . , i ...1 + 14.10 A...1 1 y - 2!L. 11'-1.~\ 1 11 1...1, 11, . 1 1 .r /1 . ) i,- '." A i./ . 0 ..4, . '. - ..7 V- . .. -I -,$/. I. -4. , 4F Ae.4 ..I:I 1 '3.. 4, 1 '.·A - 4' 1/ 3/ I %11 I + . 04 „ 1 0 ./1/irlpilia,"". ird=,=.2 V , .....: 1 %- - - . . I I. 4 t.... / : 4.14·'f 4 s..1 ~ 14 7-,>d. 1 , 3.4. 1 ¢ a/6 t, I trk-7-,fl 0,14.' • Coil 4. . 1 .. 2 --4 4, *0~ '~P .114£1~ ' :Pdvq:t ;' %·112:.te' .ept O.;' .. ..1.. i,·49 2 / .t#*f A .f . I !:i#b{ ." , ". . ...9 ..':244*».2: I. ' 9 ~'4 10& ·I -· t#4.i, 4,>,1. :· t#Kt 'gh ' 7 01*9 . {11 ,?A li' *'WHAL&*-Yf.¢ A CA '.: . , flik . f£ 344 1*6 - ir,14'ZG, i 2 3 4%~A*t€ 1,0, „.3<4,·* r ,..3 -4 ¢4. . 1 -#VALEJ.£6(2~,·: ·. 960 · 7 Ji,W 'E'444*ul £ 12 4,4, 14~21 :31:.<L.li.$<>< fjklt ~ 7 .~* 4 1.04 i.*v : u.'·, · PJ:~ .,i,11 ~o,Po'-3,3 , f *~ 9*·-it:«*ft ]3>4.rr~ 5 +: *49 .' 1 .1,·. 1*;. ~- *1 4 U• I . 7. .- I iii . -2 - , 4 .. r f . , k *4 9:34**43.*6,4%14,1~-11*:fi . 1,49% 1.:41¢94 . 744<454%*SZ)A<AW#~71. 4.36.6 .3 4. 1. 54-f,· - - 2.43 1 ' -1 1 4 . .... I */: * '1~ . , 4«-,·1 r . vY'm•-t•r- eK' 1% *..,4,44 -·hi 't',4 . . ' 4*;- 91: 42#91,a„~1 - -...... - te. 4*... €.. *..3.i,9~. . '.0 , r .... ,-*. 1- /' ' e ' /5 .·1:ait<·· tr- 7 ·· . 14'&1$ . 1 . A 4 . 4 - 14 4 ' 4 * "2. IN (4.1~43 -1, . · 6 $ .4- lf· ~' ~.~t '.4.20*46. * I . , I , f . I , fly, ... ... , e, -* , I .2, .... . 1 . I , 1 4 . t .,.,,If *,6 4/ ...4 . . f'. r. , . I .*..4 1, 29 .·A ... , , 944.44,·*j·'i'e' , j¢*'. f*%f ..14~·'.; ;41647: ; '., t. I 2- "~604·,.i L f,tu - ' ....: . }.,1.- -,7 .. 11. 11 -h/ 4. 1 1 . ./ . 0 . .:a 4 - 4 * 4 . , ... ,3•r . #i- . 42/2 , cy~T./, 4%13:(S*G,frfi'7€k . i 'D-9, 43 1- i I I '4#1:11,1 1,- 3- . ... 0,1.4.1,11 it - 1 gil : , . /421.5/71. Ir 0 ·e ('.- ~·-u le le I ty, 1 1,1 4 r · 1: j'° ' ' 4'· 'j; 4~~ 1 ~ . .~ , 4·4 ,*E ,-'WRRE#84*visc<lif' . $ 7, . 1 ./ ' .,1. I , r ' .. · < ·k, 1., 9, 1 .6».t 2 .m -I . , 1 - /3 ..' ; . 4 12.-,4 , . v ./ 1 . • , · I i ' % 1 VP. . , ". 71, , , ,,f, ji ' . ; . . .....:03 1 4. •F 4 .., . I ' I : ./' j.'11 & . 4 'L ' 6, 4 ~41:*6& , ,· ' rd*,8.a . 7 4, 0 ¢ 4 ' , +9. I ' . . 9 .: . ,&UP' I ..1£~Pitild#(44&,~~:'.ikE . . 4 . k $ f . 411 , %24 049 5 ~ k .1 , - 2.2 .7 - 6 : . 4.54, 6.9 # -22G* Wa. '.rip,4. . - irs/#PIAR:/1ic,61/ ·54- . .15Sby/*A'Of/WA %44 ' ¥ L 'tp , 4., ·*.,44 i'VE£*%4* 4,~19.«%8v·.·j-**Br- 21 145.,FF ·94¢ c, :.· ' ·.9%790,·99:. ..r' ..7. JOB D ucet e Resource Engineering, Inc. 909 Colorado Avenue SHEET NO OF GLENWOOD SPRINGS, COLORADO 81601 p (970) 945-6777 CALCULATED BY #Al E DA-F -1 14 lok_ CHFCKFn AY DATF Master Dr-ainale Plan SCALE i Baor ; 0 6 F rtiver l 4- 402 23 L N 4 // /2.dice 2 1 0-- Lake / . .Lod 104) Creel- bAAA < -Cole t ' Lf j +312 C 1-+I-T , h / -4 r j L. 0- 4- -2 \\ 24.'.~ 1013 LOt 24 /Ack-c r- O 4.450 -t C Resource Engineering, Inc. 909 Colorado Avenue SHEET NO ~ OF GLENWOOD ~~~I~~(~~ADO 81601 CALCUI ATFn RY 614 e DA-F 4 ~ g )57. CHECKED BY DATF SCALE , 0 Frf- S \74 6 1-291"·0 A}o f~' F i n Dul'ai *y t= 24<t <= t+P £3 6,6 ; 1/1 Area 10.-4- ar-r € S Lona 134 .1.- 1 C i Forest 1-\'11 side 2 /0 +5 EL O.lo 4400 + s r r€c,0-4 3+9 01 r O. 4- S i Tige of- do,\Ca.,ft-ratioe, 2 0.56-6 Vr = 13.7 NOW\,?S frOM Wer-Us\,#66\ 1, SCS TAL -15 . l-2.0.6 >pwa/ /tfcs /bed' (p -7 C .1 A , 47 = /O.1 ) l O.8 z 'gAT ) ( jo. 1 00 2 92 = 00 84 46 z fe. +S) ( 2,7 '6/Ar > (/O,2 42£ ) 100 1 = 12.4- cf-5 90,0 1 wa 64 L . tb o c -4,» Resource Engineering, Inc. 909 Colorado Avenue SHEET NO (~· OF GLENWOOD SPRINGS, COLORADO 81601 (970) 945-6777 CALCULATED BY Ala DATF 3/sioe CHECKED BY DATF SCAIF S I TE (21 U /JO fr F 76 fat A rea 7 26 , 324 5 Ff .7 0. 40 44 31- r - 21 - 10 0 14-0.1 3320 20 - /3 -p. O.90 e) ·i w-f„, 1 l,):~re i.71·.-2 34/0 9 f O. 6'7 O U /9: .. * CPI ..3 Lawn ,/ L a.e.,is c. ··g->c \2 , too s i 005 O,5 Ne., + i v e r) SO O " 0.-- ¢ r ./ WewA ~F~-TJ (1 5 0 #25 , i IOT <1-£->r«:41% o lint. TE ** t(p A.Al v.U4O-S 11»- le,prk:,64 3, 566 -777 5; U._Al IoUAL A.At-rllop 9 5 CIA /0,25) f /, 45 ;'/Ar) f~O, 6 044 00 432 Mr L O. z 2 =tk 4>-2 .-1 r -2,7 e •.1 1 -r 4/ /,6 afl »27,„O Fi - ·'08 Z«/ 7 4. /23: f - ···=-6 L- • I y ' f ' 7 Resource Engineering, Inc. 909 Colorado Avenue SHEET NO - OF GLENWOOD SPRINGS, COLORADO 81601 (970) 945-6777 CALCULATED BY /0lit 6- DA-F -1~/~S /~ 2 CHECKED 8Y DATF SCALE DI-LAWAGE FLA·tj 1, /20 04 d off -st--1 c f le> 41) 5 4 f-cul-ti~ ZE & f r i 1 I & g>•ff- \,IA€, - 13*t- St 914, 70,1 /(90 91 I ./.*. Il / 64„ks,%1,7,7*' ft..P q C...,dA·'/ 42<:·4;5.57·-·77' 4.-3/ kils f.,1,07 ·r. p=+A,·M 2 . 5 , 4£ D ra, tle,lee t'.' · ~- .~~ ~ ~W' ~ 0 #*, i·~ e'~ - We f. -1 .0. re * - <-Ar 1.NA€.14 #674 - T3514' 1 ;.9 1.-1 '.2 . €4 ~22 I t\£ ·:571,~ 1 /. ~2 72> ·1 i * , Ati -0 i i f.~ 4.0 f f 1 1 r.?'.' 0-,1 9.1 . 2 27/1.445'>·t.., C.ki :a ' A . 4146, A.'1 4- 21 17 2 r.444479 + 1 0 8,7,¢ C ...4 M , = 7 0% f, quittfu , '4 -4 4, Sift# Ar.1,0142 2/4.-r.=>Fl, 9.rf'. 1 1<:**" rf. 49 yn1//rg, 4/..0 47-4 r U 1 3 t r· p«Uern . f/! '22<52/1 4.06,7-23 47 (323*7 15 117* 6,6:2 0.5 / i te'0 i 011)4 kloil·=1 Dral#wle Pi<RA. -bi m ,44- 2+ /464 - Ducot-f Resource Engineering, Inc. 909 Colorado Avenue SHEET NO '4- OF GLENWOOD SPRINGS, COLORADO 81601 (970) 945-6777 CALCUI ATFn RY hu E DAT 3 l Slat CHFCKFD AY DATF SCALE 0 i fli .1 I. I ~L-li ... I. C. F> it>~~114€22. 1 &,F~OU<~.~A 543 £ - *. - 6,>1 1 2, 1 C 1 .3 i U S 5 1-16- QcoMer:rva-4 *u e ) 4>r- 4·c*-4 9,00 = 14 4 -ES Use Z#t< 7/re Cd>,15#STS<it 40)146 readl C-L>tv€-r* 1 Uge yip··1 60,44 (oaler-i-iqU-1- joiets L.i 1 1 USE, Ba 14. MO WS O I 6.,cuds L..75 € 6, 601 ver·~ 64:,jauter le 020.1,0¥ p. pe lt,-'lte:tl . 56£.1,.re: rge u...2 -1 1.- 4 -h-'3 Qgt,¢61 f '10 .tr I. 1 V , fl R ct,12 re,-~1-e:,lit, r.,4 val ; 41 recto,» upper ' encl ot- e.roed=st 37 1\,6'-1. --1 ; 1.0 · 2.12. icet· k. Yty 23--la6% (, 1 2 te·-1 {enG : y. /. ey< 4 6, S , 3 ¢=M 4,9 2.5 j 9,.7 4 . 14, f Ak rue.unA 1 le>re = D. 003 5 14 l f A e>* O, 5 37 X 1 Use fy\1~81 LAU, RAPot O.ops /4/.A Or U.5 4 5 DRAINAGE CRITERIA MANUAL RUNOFF TABLE 3-1 (42) RECOMMENDED.RUNOFF COEFFICIENTS AND PERCENT IMPERVIOUS LAND USE OR PERCENT FREQUENCY SURFACE CHARACTERISTICS IMPERVIOUS 2 5 10 25 100 Business: Commercial Areas 95 .87 .87 .88 .89 Neighborhood Areas 70 .60 .65 .70 .80 Resident#„1: Single-Family * .40 .45 .50 .60 Multi-Unit (detached) 50 .45 .50 .60 42..70 Multi-Unit (attached) 70 .60 .65 .70 .80 1/2 Acre Lot or Larger * .30 .35 .40 .60 Apartments 70 .65 .70 .70 .80 Industrial: Light Areas 80 .71 .72 .76 .82 Heavy Acres 90 .80 .80 .85 .90 Parks, Lemetaries: 7 .10 .18 .25 .45 Playgrounds: 13 .15 .20 .30 .50 Schools: 50 .45 .50 .60 .70 Railroad Yard Areas 20 .20 .25 .35 .45 Undeveloped Areas: Historic Flow Analysis- 2 (See "Lawns") Greenbelts, Agricultural Offsite Flow Analysis 45 .43 .47 .55 .65 (when land use not defined) Streets: Paved 100 .87 .88 .90 51 .93 Gravel (Packed) 40 .40 .45 .50 .60 Drive and Walks: 96 .87 .87 .88 .89 Roofs: 90 .80 .85 .90 .90 Lawns, Sandy Soil 0 .00 .01 .05 .20 Lawns, Clayey Soil 0 .05 .15 .25 .50 NOTE: These Rational Formula coefficients may not be valid for large basins. *See Figure 2-1 for percent impervious. 8 7 -- 4 . 1 6 \ i » i \'DC Yecr : i 3 2 015 7. 0 0 10 20 20 40 50 60 1 06.roukU~.-1.u...4 TIME IN MINUTES C · 1 -U:U TR~q'= *25. ?440 TME-INTENSITY-FREQUENCY -CURVES ASPEN, COLORADO T. 10 S., R. 85W. 1 WRIGHT- MCLAUGHLIN ENGINEERS 2420 ALCOTT STL DENVER, COLO- IC]211 19 -PS 49 i INTENSITY INCIOES 1+OUR Worksheet 3: Time of concentration (Te) or travel time (Tt) } project D o ec>+ e. Draitale Plon By /43 E Dated·/Stot . Location 20 + 24 /Mc C Checked Date 7.1 1 Circle one: Present r Developed> Ott· bi 4-2. B as,n 1 r k b ·'ut.bi V Circle one: /Th T through subarea +D 2 41' C Al p NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to Tc only) Segment ID 1. Surface description (table 3-1) ............ Law s 2. Manning's roughness coeff., n (table 3-1) .. O,43 3. Flow length, L (total L < 300 ft) ......~... ft 300 4. Two-yr 24-hr rainfall, P2 ................. in Z 2 5. Land slope, s .............................. ft/ft 0.2 y 0.8 6. T = 0.007 (nL) t 0.5 0.4 Compute Tt hr 8.513 + = 0. 5 13 P S 2 Shallow concentrated flow Segment ID Uopet€W 7. Surface description (paved or unpaved) ..... 8. Flow length, L ............................. 9. Watercourse slope, s ....... ft/ft O.15• 10. Average velocity, V (figure 3-1) ........... ft/s 8 11. T = L t 3600 V Compute Tt ...... br D.OAfl + Channel flow Segment ID 2 12. Cross sectional flow area, a ............... ft 13. Wetted perimeter, Pw ....................... ft 14. Hydraulic radius, r = ;;8· Compute r ft W 15. Channel slope, s ........................... ft/ft 16. Manning's roughness coeff., n . 2/3 1/2 1.49 r s 17. V = Compute V ....... ft/s n 18. Flow length, L ............................. ft L + - 19. T = Compute Tt ...... hr t 3600 V 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) hr O.5412 33, 7 M in 4/115 . 6 ri Worksheet 3: Time of concentration (T@ or travel time (Tt) , project F) t.-7 <001 13>,-r:z~. Morye f->6. B, *Al & Date «/42/Ce Location 20-1 214 &Ue:c Checked Date Circle one: Present Develcoed S ACE 13 ran,4 4 9 e g Circle one: -T T through subarea LS- t NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet flow (Applicable to T only) Segment ID C 1. Surface description (table 3-1) ............ 2. Manning's roughness coeff., n (table 3-1) .. . 6.2 4 3. Flow length, L (total L < 300 ft) .......... ft /220 ~ 4. Twc-yr 24-hr rainfall, Pz ·················· in (,1 5. Land slope, s .............................. ft/ft O.05 08 . 6. T s 0.007 (nL) Compute Tt ...... hr 1 Or .24 + L> : C.,bL t 0.5 0.4 P2 s Shallow concentrated flow Segment ID 7. Surface description (paved or unpaved) ....4 1 8. Flow length, L ............................. ft 9. Watercourse slope, S ....................... ft/ft 10. Average velocity, V (figure 3-1) ........... ft/s L 11. T s Compute Tt ...... hr + - t 3600 V 0 Channel flow Segment ID 2 12. Cross sectional flow area, a ............... ft 13. Wetted perimeter, p ....................... ft W 14. Hydraulic radius, r = *£· Compute r ....... ft W 15. Channel slope, s ........................... ft/ft 16. Manning's roughness coeff., n .............. 1 1.49 r 2/3 81/2 17. V = Compute V ....... ft/s n 18. Flow length, L ............................. ft L + 19. T - Compute T ...... hr ' 1=11 0 1 t 3600 V t 20. Watershed or subarea T( or Tt (add Tt in steps 6, 11, and 19) ....... hr 142266| 2 6 'M"ft/47 Mountain Driveway Best Management Practices Manual April 1999 , Staked and Entrenched Wood or Steel Fence Post (Rebar not allowed) Bindk Wire or Twine , Compacted Soil to ~ Prevent Piping , Sediment L=len Filtered Runoff - n,ER 9111Id·U=L ,.3*4LJ.: C .0 0 L . : . .. 4- Min. i fill 1 1 1 -111- -111-1 -2 - =111=111 111=11 ./-- " 421]jilM =T, 1 1 111'w= 12' Min. 1. Excavate me trench. 2. Place and stake str- bales. . . 1 / 1 4, 12 1<52% 7-22•: -404,1 -- 3- ·· t. ·.....=trLET*J)&,cri, 'WA -he"ki' UT;8¥hil"I --*.j r.ji'Lit:r: .~/9<QJUI/Jfril~V 3. Wedge bose sir- between 4. BackAH and comact the bales. excavated soil. From: Virglia SOO and Water Conservabon Commission, 1985 As reprinted In Urban Drainage and Flood Control District 1992 Urban Storm Drainage Criteria Manual. Volume 3. Page 16 Mountain Driveway Best Management Practices Manual April 1999 Type: Temporary Silt Fence Description Silt fences are temporary barriers constructed of woven, synthetic material attached to posts. The goal of this BMP is to pool water from an eroding area, allowing the sediment to settle. Sediment transported off-site can otherwise collect in drainages, waterways, wetlands or adjacent properties. Installation/Design Guidelines 1. Secure filter fabric to the ground by installing wooden posts to a depth of 12 inches and excavating a trench approximately six inches deep along the line of the post and upslope from the barrier. Bury lower eight inches of filter fabric into this trench and compact the backfill soil. 2. Posts should be spaced a maximum of 10 feet apart. For shallow channel flow applications, the pests should be spaced a maximum of three feet apart and reinforced with wire mesh. The base of the fence should be secured. 3. Silt fences installed across a ditch or swale must have the bottom ofthe ends of the fence at a higher elevation than the top center of the fence. 4. Silt fences should be installed along the contour at the base of gentle slopes in areas where upgradient disturbance is occurring. f Silt fences should remain in place until vegetation has been established. Special Considerations in Mountainous Areas 1. Thin, rocky soils may preclude the use ofthis BMP in mountainous areas. 2. In areas prone to rockfall, install a wire mesh fence uphill 10 feet ,0 capture rocks that may damage the fence. 3. When equipment is working near sensitive areas or when substantial movement of fill is taking place, it may be necessary to reinforce the silt fence with wire mesh. Maintenance 1. Remove excess sediment periodically, at a minimum when the sediment reaches one-fourth of the silt fence height 2. Repair or replace damaged fence, and replace broken posts. 3. Check weekly and before and after storms. Silt fence may only perform for a period of weeks or months. 4. Remove silt fence when area has been successfully revegetated. Page 18 Mountain Drivewav Best Management Practices Manual ApMI 1999 SIN Fence Applications * --L .. - -0- ... .. . - - .--#.- ---# 0 . ... -. .. .. il: 34<.1 45 - --€¢=V 8 V... . - - lallure Ukely ¥ . . CEA + . :. 42, A · Occur.t!9 - SiR Fence . . I . 9. F*ters Runoff - . 6 -,f<79,- · *t-Z%4?K- 1 Befo. Entedng . 6,1 - - .pr->«:-< Strea 7140· - - - *-+411.1 - From: Colorado Deparment of Highways, Eros,or Control Manual, 197B 1. Set Post;. 2. Exce..ate a 4' x 4- Trench upilope aiong me line of uprights. lili lili + -.11.-0,-1 - I ... .. , -=7~'Les e - 4 19*.1, 40<57.0/Wal&-3,/ I h 4. 3. Attach FRter Matwial to posts or 4. Flnbhed section: Iwert Sewn Pockets ovw po- and extend it into the Dinch. Wooden or 41_-Finer Fabric Steel Fence , Amach Posts Runoll UirEEr-1,w#,/1 4' x T -I -1 -<Z/-7 Ar-W' -1/12/ PE,Vig/*MEW# Tlench -:a»34Affil#'~- As reprinted In Urban Drainage and Flood Control District 1992 Urban Storm Drainage Criteria Manual, Volume 3. Page 19 Mountain Driveway Best Management Practices Manual April 1999 .alf A W Residual Capacity br Larger Floods 21 2-yeir Flow Depth (D) 13 Feet 4-¥190 . Sidesloge * Z > 4(Z > 5 Prefered) Botorn Width OAC) TRAPEZOIDAL GRASS-LINED SWALE SECTION NOT TO SCALE Slope = 021 10 1 0 1 / (SImp toe to drop cnst) 13¢end Along Bankto 2-y Flow r I , , Depth Plus a Mnimum of 0.5 Feet 1 , rt AXAXAMJ" 4 1 1 Grlde Cormol Checks R*RRARRRR~RRERRA61'%11(rzxx,JELf.... :i 9 'AAA(h/;CALVIVZVLYY63/925/y# GRASS-UNED SVALE PROFILE ./ NOT TO S CALE Residual Clp,City 2-ye,r Flow r7 r7 Hap A Deph (D) 13 Feet *6 ~:#§2*02<rl Sideslope: Z2 4 g > 5 preferred) TRIANGULAR GRASS-LINED SWALE SECTION NOT TO SCALE As reprinted in Urban Drainage and Flood Control District 1992 Urban Storm Drainage Criteria Manual, Volume 3. Page 29 14 Mountain Driveway Best Management Practices Manual April 1999 Grass-lined Swales I Type: Permanent Description Grass-lined swales are densely vegetated small drainageways with low-pitched side slopes that collect and slowly convey runoff. Design of their longitudinal slope and cross-section size forces the flow to be slow and shallow, thereby facilitating sedimentation while limiting erosion. Installation/Design Guidelines 1. Roadside swales should be designed to convey concentrated surface runoff to a receiving channel without damage from erosion. 2. Berms or check dams should be installed within the swale perpendicular to the flow as needed to slow it down and to encourage settling and infiltration. 3. Channel cross-section and lining should be considered based upon volume and velocity of expected flow. Possible cross-section shapes include 'V'-shaped (low water), parabolic (high water, low velocity) or trapezoidal (high water, high velocity). 4. Establishing a dense, resistant vegetation is essential. 5. Stabilize the outlet. Special Considerations in Mountainous Areas 1. Grass may be difficult to establish and maintain in arid and cold areas. Riprap can be used to stabilize roadside ditches in place of vegetation, although the cost is much higher. Erosion matting can provide stability until vegetation is established. 2. Grass swales are not appropriate for steep slopes (>2 percent). 3. Avoid sharp changes in direction or grade. Maintenance 1. Mow no closer than six inches, and preferably taller, to increase filtering ability. 2. Wider, flatter, shallower ditches are easier to maintain. 3. Maintain center line ditch grade to be between one and two feet below the edge ofroadway. 4. Keep the grass in healthy condition at all times, since it is the pdmary erosion protection and filtration media for the swale. Page 28 Mountain Driveway Best Management Practices Manual April 1999 Revegetation Type: Permanent Description Revegetation is the establishment of vegetative cover on soil left bare by the construction process. This process includes seedbed preparation, temporary revegetation and pennanent revegetation. Revegetation limits erosion and sedimentation on areas adjacent to the driveway by preventing raindrop and sheet flow erosion and prevents weed infestation of exposed earth. Installation/Design Guidelines 1. Use native vegetation recommended in your area. A representative list of native seed mixes in Colorado is provided in Appendix 1. 2. Check weights, seed species and purities prior to planting the seed. 3. Prior to permanent seeding, prepare soil (e.g., roughen soil surface) and, if required, incorporate topsoil, amendments and fertilizer. Use stock-piled topsoil, if possible. Use fertilizer sparingly. <*84983$~ 4. Apply mulch after seeding to 1 - - ...- CbM--*~.- retain moisture and protect from 1 #f FA llE.I-9- _321- .=-=11 *9111£=ir- - erosion. \\>0»»\h 1 --rew /1// u/r- 1 1 Special Considerations in Mountainous Areas 'TRACKNG' WTTH MACHWERY UP AAO 02*4 »2- SIOPE FROWDES ~~\\~4 -- -- -- 1. Timing, soil type, fertilization GROOVES TWAT WILL CATCH SEED. RAINFALL AND REDUCE RUNOFF requirements and availability of 4*99~2- --2 irrigation supply are all serious Adapted from McCullah 1994 considerations prior to selecting a method ofrevegetat.on. Consult local experts as needed. 2. Steeper slopes require more attention to revegetate. Mulch should be used on slopes steeper than 3:1 and matting or hydromulch should be used on slopes steeper than 2: 1. 3. Native grasses can become established without irrigation in most circumstances. Maintenance 1. Check for growth and re-seed areas where the coverage is not complete. Vegetation is considered established when ground cover is achieved which is sufficiently mature to control soil erosion (approximately 80 percent coverage) and can survive severe weather conditions. 2. Watering should be performed as needed during the first year of installation in the absence of rainfall. Page 30 %Pt¢,141'11'11 1 Mountain Driveway Best Management Practices Manual April 1999 Straw Bales Type: Temporary Description Straw bales can serve as a temporary sediment barrier when anchored and placed across or at the toe of a slope to intercept and detain sediment and decrease flow velocities from small drainage areas. Some local governments discourage use of straw bales because of common failures associated with their use and encourage use of silt fence instead. Installation/Design Guidelines 1. Use only in areas of low-velocity nmoff where sheet and rill erosion potential is low to moderate. 2. Proper installation includes a) excavating a trench the width of the bale and length of the proposed barrier to a minimum depth of six inches; b) placing the bales in the trench; c) staking the bales by driving at least two wood stakes a minimum of six inches into the ground and towards the previously laid bale to force the bails together; and d) backfilling soil against the upgradient side ofthe hay bale. 3. "Chink" between bales with loose straw. 4. All bales must be either wire-bound or string-tied. 5. Straw bales-should remain in place until vegetation is reestablished. Special Considerations in Mountainous Areas 1. Thin, rocky soils may preclude the use ofwooden stakes during installation. 2. If depth to bedrock is shallow, do not use this method. 3. Improved performance can be achieved by installing a silt fence on the upslop: side and placing it over the balrs. Maintenance 1. Remove excess sediment periodically, at a minimum when sediment reaches half of the straw bale height. 2. Repair or replace damaged bales and replace broken posts. 3. "Chink" between bales with loose straw. 4. Check weekly and after storms. Bales may only perform for a period of weeks or months. Check for rills under or around bales. Page 15 . 0 0 . COMMON AREA ~ OUND REBAR RPC LS# 25947 . 664 LOT 23 STRAW BALES OR ,EROSION CONTROL LOGS SILT FENCE, 0 -~~ ROCK RIP RAP D. = 24" RETAINING 0 CONCRETE ~ WALL AREA DRAIN - 4 STRUCTURE OUTFALL . 0 . 15. ~> T~ e f I 24' DRAINAGE PIPELINE 7 76.00 140% 8.00 .0 - =.--Z. \ J .OP 4 h MANHOLE - (TYP.) . 1 4- -SILT FENCE a." . GU t RAIL e 4 LOT 25 K \\\ 7 21 . B AREA DRAINS Z (TYP.) -96 00 4 44* 12 »98'pa» ® eak\ HEADWALL CONCRETE 8 I. BENONARK - 99.3 TOPO - 8120 TRUE aEVAT,ON AT TOP OF PROPERTY CORNER EXISnNG 24" CMP JACK MILLER AND ASSOCIATES i . 9- ARCHTECTURE/PLANNING \\ ==52=:5:.1==r DATE JUNE 12,2002 JOB NO. 890-1.0 DRAWN BY: DLS CHECKED BY MUE REVISIONS: SCALE 1"= 30 IRESOURCE DRAINAGE PLAN DUCOTE RESIDENCE FIGURE 1 ~ENGINEERING. INC LOT 24, MAROON CREEK CLUB SUBDIVISION i iLL a .LLIL .,Ul' L.uuu;L-LI/L (Jv.:g 11 An Insubstantial PUD Amendment Application for Lot 24, Maroon Creek Subdivision Prepared by: Francis X. Krizmanich Land Use Planning 0079 Light Hill Road Snowmass CO 81654 (970) 927-4263 June, 2002 1 1 ' 2. 1 Table of Contents 1. Introduction. 2. Insubstantial PUD Amendment, Section 26.445.100. 3. Attachments: 1. Pre-Application Summary. 2. Proof of Ownership. 3. Agreement to Pay. 4. Authorization for Representation. 5. Vicinity Map. 6. Site plans, Elevations and Landscaping plans. 7. Letters of support from Maroon Creek Club Master Association, Jeff Rich (owner lot 23) and David Chamberlain (owner lot 25). 8. Drainage report from Resource Engineering. 9. Soil report from HP Geotech. 10. 24x36-inch Amended Plat map. t I. INTRODUCTION Ducote Jax Holdings, LLC, the owner of Lot 24, Maroon Creek Club Subdivision, requests , approval of an insubstantial PUD Amendment to permit the construction of a new single family residence for Wayne and Diane Ducote. The proposed amendment will change the configuration ofthe building envelope to allow the construction of a retaining wall on the downhill side ofthe residence. A retaining wail is required at the proposed location because the platted building ,4 envelope is located on an area ofunconsolidated fill material. The new building envelope will remain the same size as the original building envelope. The proposed reconfiguration will result in a shift of 723 square feet from the northeast and the southwest corners of the envelope to the northwest side of the envelope. The Ducotes have been involved in the planning and design of their new home for approximately the past year. The pre-application conference was conducted with James Lindt on June 29, 2001. Since that conference, the City reviewed and approved amendments to the existing building envelopes in the subdivision as insubstantial PUD Amendments (approved 10-19-01). Unfortunately, the Ducotes were not aware of that review process or the conditions that resulted from it. Condition number one, in particular, provides that " 1. No development (including any landscaping) shall be allowed beyond the rear perimeter ofthe existing approved building envelopes oflots 21 through 24 (see Attachment "D" for areas to remain undisturbed). The Ducotes believe that this condition should not apply to their lot because the development of the home and retaining wall as proposed will not affect the natural drainage system or any existing wildlife corridor. This condition appears to have been required to protect the natural drainage system and to preserve an "important wildlife corridor" as identified by the City Natural Resources and Construction Manager, Steve Ellsperman. The protection of the natural drainage system has also been an important concern of the Ducotes and the Maroon Creek Club Master 1 Association. In consideration ofthese concerns, the project has been designed to carry drainage around the home and to return it to the natural system immediately below the home and retaining wall. The building envelope is located on a previously disturbed site , that contains an unknown amount of fill dirt of indeterminate origin. Because ofthese existing soil conditions, the proposed location ofthe retaining wall is necessary to stabilize the existing slope and protect the future residence from potential slope failure. A drainage report from Resource Engineering and a soil report from HP Geotech are attached for reference. The proposed development should not affect any important wildlife corridors because the area immediately adjacent to this lot is blocked by large retaining walls for Pfister Drive. This project has been reviewed and approved by the Maroon Creek Master Association a letter from them is included with this application. This application also includes letters of support from the two adjacent lot owners. The Applicant has attempted to provide all of the material requested by the Staff. If additional information is required, the Applicant will make every attempt to provide the requested information. 2 2. INSUBSTANTIAL PUD AMENDMENT, SECTION 26.445.100 The Ducotes request approval of an Insubstantial PUD Amendment to reconfigure the building envelope for Lot 24, Maroon Creek Club Subdivision pursuant to Section 26.445.100 ofthe City Land Use Code. This section of the application will outline the Insubstantial PUD Amendment criteria and the Applicant's response to those criteria: Code: 66 A. PUD Insubstantial Amendments. An insubstantial amendment to an approved development order for a final development plan may be authorized by the Community Development Director. The following shall not be considered an insubstantial amendment: 1 1. A change in the use or character of the development." APPLICANT'S RESPONSE: The proposed residence does not change the use or the character ofthe development. Code: "2. An increase by greater than three (3) percent in the overall coverage of structures on the land." APPLICANT'S RESPONSE: The new building envelope will remain the same size as the originally approved envelope. The construction of a residence on this site will require a retaining wall, the overall coverage of structures on the land will not increase Code: "3. Any amendment that substantially increases trip generation rates of the proposed development, or the demand for public facilities." APPLICANT'S RESPONSE: The proposed building envelope amendment will not affect trip generation rates or the demand for public facilities. 3 Code: "4. A reduction of greater than three (3) percent of the approved open space." APPLICANT'S RESPONSE: The proposed development will not reduce the amount of open space. Code: "5. A reduction by greater than one (1) percent of the off street parking and loading space." APPLICANT' S RESPONSE: The project will not reduce parking or loading space. Code: "6. A reduction in required pavement widths or rights-of-way for streets and easements." APPLICANT' S RESPONSE: The project will not reduce pavement or rights-of-way widths. Code: "7. An increase of greater than two (2) percent in the approved gross leasable floor area of commercial buildings." APPLICANT'S RESPONSE: The condition is not applicable to tile proposed residential development. Code: "8. An increase by greater than one (1) percent in the approved residential density of the development." APPLICANT'S RESPONSE: The proposed project will not increase the residential density of the development Code: "9. Any change which is inconsistent with a condition or representation of the project's original approval or which requires granting a variation from the project's approved use=or dimensional requirements. APPLICANT'S RESPONSE: The Ducotes believe that their proposed home design is consistent with the original project approval. There are no variances from the projects approved use or dimensional requirements. 4 V. ATTACHMENTS 5 ATTACHMENT 1 PRE-APPUCATION SUMMARy 6 2 U L V L. LV/1 1 l.41 1.. -TV , /1 , ./. . 1'21 1, V' CITY OF ASPEN PRE-APPLICATION CONFERENCE SUMMARY PIANNER: James Lindt, 920.5441 DATE: 6.29.01 PROJECT: Lot 24 REPRESENTATIVE: Francis Krizmanich OWNER: TYPE OF APPLICATION; PUD Amendment DESCRIPnON: PUD Amendment to amend the building envelope m include an existin3 ravine Illat was created by dralnagc from a neighboring lot. The proposed applicant wishes 0 place a retaining wall around the ravinc. Land Use Code Section(s) 26.445.100 Amendment of PUD development order. Review by: Staff for complete application, referral agencies for technical considerations, Community Development Director for final approval. I f Community Development Director does nor think that it mccts criteria for Insubstantial POD Amendment then goes to Planning and Zoning Commission for a Public Hearing. Public Hearing: No, unless director feels that it needs to go to Planning and Zoning Commission. Planning Fees: Planning Deposit $500 Total Deposit: S500 To apply, submit th• following information: Total Deposit for review of application. Applicant' s name, address and telephone number, contained within a letter signed by the applicant stating the name, address. and telephonc number of the representative authorized to act on behalf offhe applicant. 3. Signed fee agreement, 4. Pre-application Conference Summary. 5. An 8 1 /2" x l l" vicinity map locating the subject parcels within the City of Aspen 6. Site plan showing the proposed and existing building envelopes. 6. A wrillen description of the proposal and a written explanation ofhow a proposed development complies with the review standards relevant to the development app!ication 2 Copies ofthc complete application packet (items 1 -9) Process: Apply, Planner checks applicalion for completeness. Staff reviews application against PUD Amendment Standards. If staff feels that application meets criteria for Insubstantial Amendment, Community Development Director creates and approves decision notice and development order. Disclaimer; The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to changcin the fULUfC, and upon factual representations that may ormay not beaccurate. Thesummary docs notercale a legal orve:ted right t.7 - ATTACHMENT 2 PROOF OF OWNERSHIP 7 DUCOTE JAX HOLDINGS. LLC.. a Loul,tan• urnatea 6.am.9 #v........, of th¢ G-e·of- 0*44.~ State of 6AW<P-4 GRANTOR(5), and_ ST. GEORGE INVESTMENTS, LLC., a Louisiana Limited Liability Company, whose address is 601 Poydras, suite 2011. New Orleans. Louiniana 70130 of the G.•- of 0512_MEand State of.At)£04bAUGRANTEECS): WITNESS. thar the grantor(51, for and in conBideration of the sum of TEN and NO/100 ··-$10.00 --DOLLARS. and other goodand valuable consideratjon. the receipt and sufficioncy of which is hereby acknowledged,has remised, rel,#ed. sold and QUITCLAIMED. and by these presents doc,remise release. sell and QUITCLAIM unto the gromeds). their hein and assigns forever, all th, real propeny. together with improvements, if an situate, lying and being in th, County of Pitkin and State of Colorado, described as follow,; t4' - Lot 24. MAROON CREEK CLUB, according to thc Plat thereof filed November 15. 1993, in Plat Book 33 at Page 4, commonly known a,:, 9 TO HAVE AND TO HOLD the same, together with all and Mtigular the appurtenances and privilegen thereunto helonsing or in anywise thereunto appertaining. and at the estate, right, title and interest and claim whatsocvcr, of rbe gramorls). erther in law or in equity. to the only proper use, benefit and bchoof of the grantees, Lhelf hein and agiens forever. The singular number $hall include the plural, th¢ plural the singular, and the use of any gender ghall be applicable to all genders. IN WITNESS WHEREOF. the grantor(© have executed thia deed on the date set fotth above. Dueste Jax Holdings, LLC.. n Louisiana Limited Liability Company 1 A- By W.Ne C. D.cote, Manager State of 44. 1, AA• 1 P.g k d. Wt 44"& G.m,- of ) I The fortioing instrument was acknowledged. sub,cribed and sworn to befole mOhiz / 2~ day of bA-C Q, •182/k. , 2001 by , Wayne C. Ducote as Managerof Ducotc Jax Holding•, LLC a Louisiana Limited Liability Comonny witness my Hand ind Omci* Sent My Commin,ion 2.2.,t igj,g.*L <+El\Ans 1£&4 1,- 6 rks, public un,~~~~~; 9 RUSIELL J. NUNEZ, JR. Notaty Rubio Pwish of OA- State 01 LA My Commlon • 19:u,d Forklle Illiti '11[1 im'~1111' 11 462207 0•,•: 1 of 1 12/29/2001 11 : 399 $1:L-VTa DIVID mt™!N SOL .TY eD R 6.00 0..0. 929-0 ZOO/ZOO d I IP-1 29"026010 Sll)!30@ 341 £ AN¥~IOO 31.L I 1-mO ·Id Uid! l: 10 1002-92-2 1 4Cle, ¥ ·,CK ATTAC HMENT 3 AGREEMENT TO PAy 8 12/13/1996 12:55 9709230201 PARK ONE PAGE 91 'ROM : KRIZMANICH PWONG NO. : 970 927 4263 Jul. 02 2221 02 27;:M 94 ROM : KRIZMANICH PHONE NO. : 970 927 4263 Jul . 02 2201 02: 26PM P3 ASPEN/PITKIN COMMUNITY DEVELOPMENT DEPARTMENT Agreement for Payment of City of Aspen Developmeut Applications Fees (Please Print aearty) CITY OF ASPEN (hereinafter CITY) and (hereinafter APPLICANT) AGREE AS FOLLOWS: 1. APPLICANT has submirted to CITY an application for (heremater. THE PROJECD. APPLICANT,mderstands and agrees that City et' Aspen Ordinance No. 43 I Series of 1996) establishes a iee structure for land use appiic=lons and the payment of ali processing fces is a condinon precedent to a determination or' application compieteness. 3. .tPPLICANT and CITY Tree rh= becallie ofthe cize. nazure or scope QI The prooosed prOjeCt. :I is not possible :lt this time to ascertain the lit extent ofthe costs involved in procesSing the application. APPLICANT and CITY &rther agree that ir is in ihe interest ot' the parties to allow APPLICANT to make paymmt of an initial dcposir and to ther,ater permit acdirional COStS to be billed m APPLIC.ANT on a manthly basis. APPLICANT agrees he will be benctized by retaining Feat cash liquidicy and will make additional payments upon notication by :he CITY when th•y AN necessary as costs gre iocured. CITY *res it will be benefited through *le greater certainty of recovering irs full co,13 ro process APPLIC.ANTS application. 4. CITY and APPLICANT further agree thar k is impraccicable for CITY sraff to complete processing or presern suficient information to the Planning Commission and/or City Council to enable the Planning Commission andior City Council to make legally requ~red findings for project approval. unless current billings are paid G fuil prior to decision. 5. Therefore, APPLICANT avees rhar in consideration of the Ciry'S waiver of its right to collect &11 fees prior to a determination of application Compieteness. APPLICANT shall pay an ijatial deposit in the amoimt of S which Es for hours of Planning stafftime, and if actual recorded cosm exceed the initial deposit .APPLICANT shall pay additional monthly billings to CITY to reimburse the CITY for the processing of the applicarion mentioned above. ir.cluding post approval review. Such periodic payments shall be inadc within 30 days ofthe billing date. APPLICANT further agree thai Ikiture to pay such accrued co313 shall be grounds for suspension of pece#Sing. CITY OF ASPEN APPLICANT 1/1~ G./_*'4* Simate: j.]ie Ann Woods D.. U 8 16&16 1 Printed Name: v t. 04 bued JL - Community Development Mailing Address: 6 0 / PaYA**S Ir Acting Director 12 {lu ,-e-Ad-,2.6+16 0,_ City of Aspen -70216 ATTACHMENT 4 AUTHORIZATION FOR REPRESENTATION 9 12/13/1396 10:56 9709230201 PARK ONE PAGE 02 FRCM : KRIZMANICH PHONE NO. : 978 927 4263 Jul. 02 2201 0Z:27PM H4 l LETTER Of AUTHORIZATION Wayne C. Ducote 601 Poydras Street, Suite 2011 New Oeleans, LA 70130 July 2, 2001 Aspen Community Development Department 130 South Galena Street Asp:n, Colorado 8161 I To whom it may goncem I am the owner of the property described as Lot 24, Memon Creek Subdivision. My local telephone number is 923-0208 and the FAX number is 923-0201 I authorize Francis X Krizmanich to act as my representative to obtain approvals and permits tom the City of Aspen to improve my propeity. Mr. Krizmanich's address i3 0079 Light Hill Road Snowmass, Colorado 81654. His telephone and FAX number is 927-4263. Respectfully, \ A _tic I Myne C. Ducote ATTACHMENT 5 VICINITy MAP 10 Jun 23 01 01:2Op Jack Miller Q JMA 970 927 8899 P.3 r .\31. ..i;}1\ j li-t11' '1-1 , 1 + :, 44 .r 1 ,. '1139 m ,\ \9, \V \\14\ \ ~ \ - 1 »:>1. i . 4 g A.. \ 1,1 1 \ \I Ic \ \\ 1 1 + 1 1 0110 \ \. \ .i \\\ : - .._c' ~·«lit, ~6,~· C *2 21*66/«41,· ~ r-.-- --\ 6449,Ay~k#:f:.~\\ 8-24 * P/+24. s . ... '< f -/ , ''.,7: , \ \,\ ;t' 't .. \ ' , -'. i '&: v ,«414 W'.. l ,~ ~ >-t <h 1 /.... 1 4 ' a.~44311~0,~iT<6*41*,»Pi. < t_.i., J - 4 :':>91 / \\ ·i ': 6 1,\ - I - & J 1 \ . 644041-- f---1 t'~fit 4-~' . 4--- 21 \·2ht-xi''ill. 1 LU+,2 h ' ~ ' ~-- ~111 2 & ' /5.,6 b. P r /3 . 5 . I -7177 , f 0 , 141. lf , 2& S (c 37 2*< F f ' 701 '' f (r,5 L.1,466<, i d L_,1 i & 64424 4 1, , AR-2 · ,; .rs' f Z , T \L ,/ i ,i, 1 7 :, Sti/!It 1 \ :#*11\ *9 h 1 J. 1,1.x / i.· 1 1 .1 f / PAL f 'i r. \ 1 , 2. . 1 .,1 , .. 6/ 46 ' ~ f s f 1 1.0~4 */// 4.4 -6.47, 1 1\ . \ ¢ ''-I \ \ \ 8 \1\ 7 0 ' f-ft tk-1 ) *14 4% 4. /54 f Eff-1 \Ali€..r,4. \\ d r' 1131111 111,\1 + 1 \ % i ,, i ' .44£ i \ 90&%• C. VI 1 ' <47/-t<\3 j 11 \: . Ber/0 \ \ 4Nk.~4 \/1 \ 494. L 1 1 1 ..1. a \ ..1 -aTQ e/R 01.6 Tri BI;Or Gle Icor/£0/T ATTACHMENT 6 SITE PLANS, ELEVATIONS AND LANDSCAPING PLANS 11 + I \4122- -0 -- - \« 70-- - -1--2 -- -- -- X ~ I 4./.-- - h- -x * \I.\ 7\\ Propo-1 Ratiblk,0 WAII - ~~ \ 0 - =%:.=8. --·y tat * * B--1 (8) F» ad Dec iduoue Tr- 4 -, l\ T.O.W. 80.DC) --2 ---t.£.-:3-Grl<,fpre~Evgr,·-Treae 72----- /- E- - D=: - 2 -- l#NWn.Rl , , k *- 1*. Lot 23 4 /1 TI \ I.6.1 -4[ • VE#"Wl"~204 'V-~L _IN- 58 f , #t~*10 W011 U/22 <%218#b 8 -- -00 - 2:Jammb/gflk N \ 0 322:9 -i:·."r··~·\»ebejai,Ii,Ef,ki,11 -- 4 E 38 z · mi » 83, - 1 . /·,5.0.w.6000 •u-/7- <%3;?4•:,. 95~~IR~ 1£2CT (511,09068. ?18 ~~j. · / _ O. 1 0,15.-\'2-/9-) NY**G--9,621 1 ~ E /11 of.... .0>N.7600 ad-10 - tkvt.. 723 SF L n: _ 2***da- .. O 3 22 1. 1 e.0/.72.003 -0 adath? Tre// Tu ETE=3 proposed Area of DA 1,410 Envelite Legend 184 SF 4 \0 / 0.* P 2.-3-~2* 1 / 8&*001 h' ~ ~'31 BulidneEnvelope59=20n7235F 211 4 I M- ~ ~ A,4 ... :'14 \ /3 I 7~1 Proposed Area of ' 1 - - -729 - - -- - Ffaim f'*,/....r- )- 11 'F~ Building Envelope Reduction 723 SF /4. ,/0 0/ -- - - . 9- ae zi=a Lot 24 .-th/<el 14 Residence 1 /' Lower L evel FFE: 81.50 M,b, L™IFFE: 91.50 . /1 \ IS 0 I 4 \ St\\\\ \ .gao //\: :m<J STEELEVATI0N015'=AC}la.EVATO)41007<7 I) \ 1 \ c \ k < 1 1 \ 4 & - 61/1 'l 67., \ \ //1 \ \ 1 \ \\ I. / \ 0 r. b / /1 g j U / / \ 4. ' 1 / :., 1 / i i ./ \ 3> I \ al,•1 Ki - / / / 1 ... . \ 2 i kM-9--- 1 1 1 - 1. 0.- I . / 1% Garage / ~ Lot 25 Ducote \ PUTO , / ~ Residence ~*<*% 1 9.- \ - .d -. 00\\ --- -- - --0\ ~« - f> 3 \ 1 Landscape - i Plan -- / \1/ N -- i - 2514 J. 4 0 0•-0-•~m~N --4- - Bulo™ Enveme 4441 - \ 0 0--- 000-- - Phmeaci Redlitlan of D-: 0842•m \ U -:-,-AN N 1- Drim, By:.22~ 539 SF scal.: r=¥7 \ 1 \ Wt . 0 i # 40 Of'UNM I \ \ i \ \ EffenU'k ,\Nr~ .6~.b~rt-<4131£21//im, @ If 24 \ @ f 1/4 8 1 \/ /kirreere A \ 1. 7 f - k:Ak w.u, ELE*:1108 Aut>-- 173*Al/25#INIG 21-3444-.. ~ ~ -- '' ~ , &4#ME+99.3 ¥\307 AG Top Of Prop. Comer Sheet: 1 L-1.0 14 1 ., - 31-6.. 2-4..t-- -391=2 ,£24 p. f i---, 1- 1 -1- 1 Ill M 467~6 7~ --- - _~ - il CE-1-11 I Il 14 i:-IL- F-----~ 1 /79.- 1 1 -----4 L--A I'ji 61 ..J -,r-=-- =EL C ~f»-~1-1-4 -1.11 JJ i =71 11 - 3. ..1-, 01+> ~»----9f€FJ*¥.%11 i _. rr-ra~ 241 --' * 4 C-kr-=L=b- -- 2: 3-1.-1---- -7...r 1 : ~ DEct .. F , -·*ar-Elf_1111:Z '1' -R 1-4-' _--- 4- . 1,1 11== - 4, '1.- *< 31-891 F191/. ' irp,1 - ~- 1 int-1 12.47 1 - .. -4. E fl 1 -1 1] ...1 -it-i- r - 1 -EY 1 1, L- . 11 1 l. T- q .- Fuz t_, 1=- ~<~-~*r--~~U FF '~ -~--~~.~-Ly-- [-I ~f.,3~~~-~~ 11.-[9_~c-u i 11:4 \ ,ZA:*92'/7- | 9, L.-.[ 1 ~ F - t.ta , ,< den, 331:- - - = -- 442 - .._. e.- ./ -£90 -.-481* -r.#Lazi~u ,.- 1 ..-- SECTION_@_MBR-&_FAMILY RM WEST ELEVATION GARAGE - SOUTH=ECEVATON .r,DI. 7·~prF.riZ, 47,27·1 -66 -€1,1 + Jimt k 1/ I -9. 1 - -- _=2232«--- »84>.- i a-:/.j ,, - - -==;i= .L_ I --==9*i=2.-\ d-3 1 --6 1 12 . 79 1 : 7-1--1 r 'rj, -4--2493622LT$3i -- -, [ /5>-1 1 '12 --3-4143 . .--7.-- ...0-:Er,4.1111--2 ... --r.--„„! 3 -2.-21-1-=2212 F.-3.«~_ .x j'*tks +2 . L - I. .~ 1- fih»-=-1- EAST ELEVATION 44/1 34[LE- 'C i --1 4']r(-4--, ::12-it~' .4-G·:11.i-#11* ff--El~f .%.;-1.-f ..- -4--'p-iL fIJ[--=1 - 71 -, 7 -p~--4--1[-4 ~P-Iff---i-- - - -1. 1, 1 + -111(.1 11.- =e==L 3/313:=- -»=4425-- r·p =4e®=L,uL...L_1 zz-J -·--- -ot-» ~-- ~fli _- 1-=Ill--I-- 2712__ 1 2-=21 1 IR=,ec . --z , - ~-L-11 ,lu.---- -21, ,= l- 1 , --idf' -4 ' ~ ,-2-7-17~-7 1-1- =71 -.11 122 1 14 ~ LE 2©1-1 4. - f F:CUP 1( +1' -, 4 1 . 4.- -·-L-1 _11 NORTH ELEVATION 1 -- ~77- EXTERIOR MATERIUS - - tt-=.i-=..r./9 35-#~t f f j - 1 WAINSCOT : St... Or¥"15&.IBUW'/1,1,0 Slolle: Shl•"les-Mellum Tele b=4==64==cm.11'.1-3 -4----494=-2----i ~7-7- 1 9 TBIN: Fl,/•,•,E-lilli./9,1 T... ROOF: **Wils-01'M 3 ----=-·~ .--i____ 14-9 1. - - --7-- 222:24 1 1 f-7- Ff--1 4 WINON: NIla livld•~ ilm-0,1,ZI _ l.' Il; i Il P - ·+All ji-·'--i!.·TR -y -- -- L -Ill E.7 f -- - A J L Or :-7 -,d 7 2-71'-H -4 - - -1 d i 11 -·_t• l-:'~ - --- . tr~Ta_-• -- -42 DATE. ' /1 7/02 LOWER FLOOR PLAN -- - - JACK MILLER AND ASSOCIATES DUCOTE RESDENCE DRAWN BY: ARCHFTECTURE/PLANFING LOT *24 REVISIONS WEST ELEVATION ASPEN. COLORADO 81611 ASPel COLORADO 4.*29 ,01- \ 3.1 DATE: , N ITALS POST OFFICE BOX 4285 MAROON CFEEK CLUB TELEPHONE 970-927-950 EAU 970-927,3899 ©2001 ./ .ILLER I ASSOC. ~ « Q -.:%-2.>Lk -\ / Fropoeed Everereen Tree . . V /1..1.\1 1 0> 9 70- --- - L l-- .... --- --- ~-~- - 2- ~ 1~, ~ \ \ 1 \ , Froposed Dedduoue Tree , 1\\ \\\\ Fropoeed Tall Deciduous Shrub '~ ~~~ 1*- - -I. 9 1/1 0. .: K 90.-- C U, 8 0 9-----1 : . mal 8 *. - Z • Ry . . <221 z ill %:Ej. e N.%41 A \ 4- r. ~%.. -- .1 er h - O 0 0'' I Z Ji ..f-,3 : --- --C --- --- 2*MVN#Mi - IN\\ /// ar/11//7 I SLL_.W.,4- - ~ 5 lit -·~91%£-334 1 U UE: 1 t. 9 7.# 7 .3. . . 1 -euth 9 .. i....(: ,"W,4 1 •A¥C'-i . : 'V 1 90 b. r 1 .O .\- 4 1 'CEL·-9 1 ...1 it .t 1% sp. -P./£,ru, t } 1 ... . I i. £ . 4 8 i>7 ; *- - ---. _. ' 4 - \ \ ¥441 , 7r 4.-- . i. .. , 7 1 0 1 --/ 4 f 4 / ~ ~~ ~. Proposed Ever@reen Tree -/ffs Fropoeed Shrube and Grounkovers 5 2 i ~·i e J - 3 i h C «\ \. I . . . -44 --- 0. Fropoead Deciduoue Tree - Fropoeed Everdreen Tree ' Eidetin, Everdreen Tree ,< .,0 $ i/ . 0 / - Ir -- -- 2--- -: --- --- - 2%' 30 34 / /0 " * n OF ./ 4. Ducote ..9.0.I F ., - Residence 93 - 1 0 1 14-\ . I -741- 1 1 -* Planting :.H.< N -h $ $ 1 1. \ /1\1[jix \ Plan 11\ 0 i. - 2 cor...1-n locum/- - Aute,Court. . I 0 - · 1 · ·. 0 8©.i.: r.e , Symbol Qty. / Name Size . -I-- ===iII N q Int .. \ I. 25 - Proposed Deciduous Tree 1.5"-4" Cal. \ . I A . \ i 50 - Proposed Evergreen Tree 12'-20' 1.4 P . \ . / 12 - Proposed Tall Deciduoue Shrub 5.6' 4 f ' \ 9• \ 4- ~Ul '81% . h 1,600 50ft. -Proposed Shrube and Groundcovers - 4 . .A 1 0 ~ .0 ~ . 1/ 1 0 Sh-t: L-2.0 ATTACHMENT 7 SUPPORT LETTERS 12 Sent By: William Lukes + Associates; 970 920 6986; Mar-25-02 2:50PM; Page 1/2 WILLIAM LUKES 0 ASSOCIATIS p A O j EC T MANAGEAL.NT ARCH [T[ C T:JR b 25 March 2002 Francis Krizmanich Krizmanich Land Use Panning 0079 Light Hill Road Snowmass, Colorado - fax to 927-4263 re: Maroon Creek Club Lot 24 Site and Architecture Review Committee [SARC} Approvals Francis: I am writing on oehalf of the Maroon Creek Club Master Association Site and Arcnitecture Review Comrrittee [SARC] regarding the application by Mr. and Mrs, Wayne Ducote for architectural approval to construct a home on Lot 24 according to the plans prepared by Jack Miller. At the February 21, 2002 meeting of SARC, a request was made to SARC to grant Schematic [preliminary] Approval for lhe plans and to support the appl:cant s proposed request to the Cityof Aspen f for an insubstantial plat amendment lo allow for re-configuration of the established building envelope. As it was presented to SARA Mr. and Mrs. Ducote propose to modify the building envelope to allow for 1) construction of a retaining wall and 2) removal / replacement of an area of deep fill outside of the envelopeinordertoaddress existing drainageproblemsand prevent furthererosion of theembankment. Since thege improvements exceec] 30" n height above existing grade, the plat amendment would apparently be required to accomplish them. SARC reviewed both the house design and the topographic and drainage issues involved with the request and asked you to provide the following additional information prior to any approvals: 1. The consent of Mr. David Chamberlain as the owner of the adjacent Lot 25. The consent of the ownerof theonly other contiguouslot, Lot 23, had alreadybeen provided to the Committee with the application. 2. Ari engineered drainage plan for the proposed modifications to existing drainage patterns to ensure that any new construction would not adversely affect either neighboring lots downhill of Lot 24 or the golf course below. Posi OF,i<: Box 1(244 A , 1, £ A l. 0 1 4~ R 2. i) 0 MI (,1 , y70·92,g.0,19 1.. 920 ht,He Sent By: William Likes + Associates; 970 920 6986; Mar-25-02 2:51PM; Page 2/2 25 March 2002 Page 2 Mr. Chamberlain has now confirmed to members of SARC that he has no objection to the plans with the provision of some additional landscaping, and a drainage diversion plan prepared by Resource Engineering, Inc has been received and forwarded to our consulting engineers for more detailed review. We also received from you a copy of e letler from the geotechnical engineer establishing that there is a great amount of unconsolidated fill in the vicinity of the building envelope, and that a retaining wall and replacement of the fil will be required to stabilize this area. Based on the documented need to address drainage and slope instability cn the property, the Site and Architecture Review Committee of the Maroon Creek Club Master Association supports the Ducotes' request to the City of Aspen for an insubstantial amendment to the plat for Lot 24 in order to reconfigure - the building envelope in the manner you have proposed, as long as the square footage of the amended envelope is the same as the original. SARC requests that you pursue your application with the Cityand has continued any further design reviews until such time as the City approves the modified building envelope. If the City staff has any questions about the Association's position of support on the application, please have them contact me at any time. Spcerely, , Wi][iam Lukes AIA Architectural Advisor, Maroon Creek Club Master Association copies: Gary Albert, President, MCC Master Association Brian Martin, SARC Brooke Peterson, Esq. Mar 27 02 01:26p Jack Miller Q JMA 970 927 8899 P.6 February 6,2002 Aspen Coutily- 1%.nuing Dept. Cily of Aspen Zoning Dept. Maroon Creek Architectural Review Commillee RE: Plol Anicticiniclits 1.ols 23 and 24 Maroon Creek Club Sul,division I have recently purehased Ule residence located on Lot # 23, Maroon Creek Subdivision and I have reviewed the mutual approvals between the former owner of this properly (Rieliard Wax) and Uic owner ofthe adjacent Lot # 24, Mr. & Mrs. Wayne Ducole. Flirther, L ha,c reviewed tlic proposed floor plans and elevations of the proposed residence to bc located on Lol 24 along with requested tilodificalions of tlic building envelope. Thesc modificalions woold accommodate a dick on the nuriliwert. :side ofthe properly as well 1,5 establishing retaining walls lo prevent j'urlher erosion on tile rear of the properly [ support both of these requests by the Ducotes and encourage your approval. Sincerely, »1-Ar·4~3 03/27/02 14:31 FAX 0002 3-27-2002 11:08AM FROM DAVID R CHAMBERLIN 972 544 5334 - P.1 TCHOUPTTOULAS PARINERS 601 POYDRAS S,REET. SUrrE 201 I NEW ORLEANS. LA 70l30 PHONE (504) 525-9017 FAX (504) 525-7517 March 19,2002 Mr. David Chamberlain 101 Dale Avenue Aspen, CO 81611 RE: Lot 24 Maroon Creek Subdivision Dear David: Thanks for taking the time to meet with me relative to the above project. ] appreciate your interest as well as reviewing any potential impacts which it mighz have on your property. I have enclosed a preliminary site plan which delineates the location of the residence, associated flat work, driveway and landscape screening, We have prograrnmed large evergmens between our two properties whlch should provide adequate sgrecning. Not only will the trees screen our driveways, they will also provide privacy for your property from our side terrace. We have also engaged a drainage engineer to propose a permanent solution to seasonal water nmoff from the street Richard Wax and I have agreed to split this remedial cost and the plan should eliminate existing drainage problems on your property. I believe we both want the same level of separation between our properties and ifthe landscaping shown on the plan proves to be inadequate, we will add more trees until wc achieve the desired effect 1 have also enclosed a copy of a letter prepared by my architect, Jaok Miller,to the M=on Creek Homeowners Association indicating your approval of our pIan. If that is correct. I would apprecisto your signing a oopy of this letter and I will have it picked up from you so that we can present that letter of no objection tothe committee at the March 21* meeting. Thanks again for your cooperation. NIGiync Duoot© I & ce to the proposed landscaping and drainage preliminary designs set forth in the drsinage pi46 and land,0*ing plan which I have reviewed. I have no objection to the proposed project on David Chambert#in Owner, Lot 25 Mt. DIA# Cow v(6171 0,9 i VISIT- 1 4*A OK)(,1 4 W *f ?01}044 nICAE 11 A Ld[ 6p LA·NO€C-,4pi N6 -R) (4(-it Fl,8 unlt btivt.w}4* ANA bRA,0462 NTCH QC !5 Coue,RCD -00) #A)8 L. 49 SE#CS- nfl«% Wi ATTACHMENT 8 DRAINAGE REPORT 13 •Iri. ..aug RESOURCE ..... ..... ImINI ENGINEERING INC. Mr. Jack Miller March 7,2002 Jack Miller and Associates PO Box 4285 Aspen CO 81612 RE: Drainage Study for Lot 24, Maroon Creek Club Subdivision Dear Jack: This letter report presents the drainage study for construction of a single family house on Lot 24 of the Maroon Creek Club Subdivision near Aspen, Colorado. Tile drainage plan presented in this report provides for conveyance of off-site storm waterthrough the property and conveyance of on-site storm water consistent with the Master Drainage Plan for the Maroon Creek Club Subdivision. BACKGROUND Lot 24 is located on the hillside below Pfister Drive with slopes ranging from 10% within the building envelope area to 70% on the steep slopes to the west and north. The existing vegetation includes aspen and evergreen trees with gamble oak and service berry brush with various grasses. The soil is primarily Morval loam. However, fill material was placed on a portion the site during the construction of roads and infrastructure and rough grading of the site. There are two natural drainage swales across the property, both of which receive point source discharges of storm water from culverts under Pfister Driver. The western swale is away from the building envelope and is undisturbed by the proposed project. The central swale runs through building envelope and the storm water flow must be rerouted around the proposed house. The source of water for this swale is from a 24 inch culvert under Pfister Driver which conveys storm water collected from a relatively small offsite basin. It is proposed to route the drainage from the 24 inch culvert around the house and back into the swale at the north property line. RUNOFF O ff-S ite The off-site drainage basin tributary to the 24 inch CMP under Pfister Drive includes approximately 10.2 acres of forested and grassed hillsite, portions of two developed lots, and approximately 4,000 square feet of roadway. The rational method was used in calculating the peak flows for the two year and 100 year storm events. The two year flow is calculated at 0.84 cfs. The 100 year flow is calculated at 12.4 cfs. The assumptions and calculations are presented in the appendix. im lot 24 drainage.890.wpd Consulting Engineers and Hydrologists 909 Colorado Avenue I Glenwood Springs, CO 81601 • [970]945-6777 1 Fax [970]945-11 37 Mr. Jack Miller March 7,2002 Page 2 Site The project site includes 0.604 acres. The two year peak runoff rate is calculated at 0.22 cfs. The peak 100 runoff rate is calculated at 1.6 cfs. The assumptions and analysis are presented in the appendix. Design Flow Since the 24 inch culvert under Pfister Drive has the capacity to convey the 100 year flow from the off-site basin, the pipeline through the property is likewise sized to convey the 100 year flow for the off-site basin plus the on-site basin. This is a conservative assumption since the peak flows do not coincide and approximately half of the site drainage will be conveyed through the pipeline. The design flow is 14 cfs for the combine J off-site and site drainage. DRAINAGE PLAN The overall drainage master plan forthe Maroon Creek Subdivision provides for routing the off-site and subdivision area drainage to Maroon Creek or through the golf course ponds consistent with the historic drainage patterns. The drainage from Lot 24 flows down the swales, into the large swale along the golf course (which includes the Willow Creek Ditch channel), into the golf course pond system, and eventually to the Roaring Fork River. The golf course ponds were designed to provide detention storage for up to the 100 year storm event. The drainage plan outlined below is consistent with the overall drainage master plan for the subdivision. The off-site drainage will be picked up in a 24 inch pipeline and routed around the house and discharged into the existing drainage swale consistent with the historic drainage pattern. The design of the pipeline will include water tight joints, manholes at the bends, and concrete inlet and outlet structures to anchor the pipe. The outlet structure will be designed to dissipate energy. The existing eroded gully will be stabilized by construction of a retaining wall and fill to reclaim the upper area, and rock riprap/vegetation to stabilize the gully below the outlet. A portion of the steep eroded portion of the gully is on the adjacent Lot 23 property. It is anticipated that the Lot 23 owner will cooperate in allowing stabilization of the eroded gully below the Lot 24 property line. The proposed location of the pipeline structure is shown on the attached Figure 1. The site drainage will generally follow the historic drainage pattern on the site. The general concept is to direct drainage away from the house structure. Area drains are proposed in the front of the house and in the rear of the house where continuous slopes or swales are interrupted by walk ways and retaining walls. These area drains will be connected into the proposed 24 inch drainage pipeline. The proposed site drainage concept is shown on the attached Figure 1. jm lot 24 drainage.890.wpd ..... ..... RESOURCE ..... ~1~•• ENG NEEAING I I C Mr. Jack Miller March 7,2002 Page 3 Construction design documents including the pipeline profile, inlet, outlet, and manhole structure details will be developed for review and approval by the City of Aspen. EROSION AND SEDIMENT CONTROL Construction on the site will require implementation of erosion and sediment control measures. These include silt fence around the downstream perimeter of disturbed areas and installation of hay bales or erosion control logs in all drainage swales. The proposed location for erosion and sediment control measures are shown on the attached Figure 1. Details for construction of these items is also attached to the study. The erosion and sediment control measures must remain in place until all disturbed area are revegetated or stabilized. CERTIFICATION This report was prepared by Michael J. Erion, a Colorado Registered Professional Civil Engineer familiar with urban and rural drainage and flood control design and construction practices. The proposed drainage plan is consistent with the overall master drainage plan of the Maroon Creek Club Subaivision and will not cause damage to adjacent or downstream properties resulting from erosion, flood or environmental impact during construction and after completion. Please call if you have any questions or need additional information. Sincerely, RESOURCE ENGINEERING, INC. A ' #Ailmft :3,u. Michael J. Epion, P.E. Water Resources Engineer MJE/mmm 890-1.0 Attachment CC: Wayne and Diane Ducote, w/attachment jm lot 24 drainage.890.wpd ..... :m: FRES OURC ..... all11 ENG INEERING 1 A ATTACHMENT 9 SOIL REPORT 14 i irti E - LI i '-,1.LIL·- 1 L • _4:1 17"i -4 L L' 1 L'-1 1 F. UL/U= Hepworth-Pawlak Geotechnical, Inc. 5020 Countv Road 154 Glenivood ipringg, Colorado 81601 C cortech Phone: 970-945-7988 Fax: 970-943-8454 hpgeo@hpgeotech.cotn March 6,2002 Wayne Ducote 601 Poydras Street, Suite 2011 New Orleans, Louisiana 70130 Job No. 100 920 Subject: Proposed Site Wall, North Side of Proposed Ducote Residence, Lot 24, Maroon Creek Club, Aspen, Colorado Dear Mr. Ducote: As requested by Jack Miller, we have reviewed our preliminary subsoil study report, Job No. 100 920 dated December 19, 2000 for a proposed residence at the subject site. The review was conducted to evaluate the feasibility of constructing a retakling wall to elevate and level the site for the residence. The proposed concrete wall will be about 1() feet high and is needed roughly along the north building envelope line to build the residence. Borings 1 and 2, located just to the south of the proposed wall, encountered between 17 to 23 feet of fill material judged to be unsuitable for building support. We assume that the proposed building has been designed based on our preliminary recommendations for spread footings and that no more than 10 feet of compacted structural fill will underlie the footings. Based on our review, the proposed retaining wall appears feasible provided title existing fill is completely removed and the site elevations are re-established as recommended in our previous report. Additional exploratory borings should be drilled to evaluate existing fill depths within the wall area and at other parts of the building for site specific foundation and grading design recommendations. If you have any questions or need further assistance, please call our office. Sincerely, HEPWORTH - PAWLAK GLQ~CHNICAL, INC. Steven L. Pawlak, P.11*8 1 5222 :34,~ %.9/7/.21 1 Rev. By: DEH 9%1,<E>:>019'teR:*50, SLP/ksw CC: Jack Miller & Associates - Attn: Jack Miller TOTAL P.02 ATTACHUENT 10 24x36-INCH AMENDED PLAT-ATTACHED SEPARATELy 15